JP2004278269A - Snow-sliding board for snow-melting panel, and construction method for accelerating melting of snow by using the same - Google Patents
Snow-sliding board for snow-melting panel, and construction method for accelerating melting of snow by using the same Download PDFInfo
- Publication number
- JP2004278269A JP2004278269A JP2003117621A JP2003117621A JP2004278269A JP 2004278269 A JP2004278269 A JP 2004278269A JP 2003117621 A JP2003117621 A JP 2003117621A JP 2003117621 A JP2003117621 A JP 2003117621A JP 2004278269 A JP2004278269 A JP 2004278269A
- Authority
- JP
- Japan
- Prior art keywords
- snow
- melting
- roof
- panel
- eaves
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
【0001】
【発明が属する技術分野】
本発明は、屋根軒端に融雪パネルを取付けた融雪屋根に堆積する積雪を滑雪させることを目的とした滑雪板及びこれを用いた融雪促進工法に関する。
【0002】
【従来の技術】
雪国での屋根の雪は、雪が降れば積り、雪が止み晴天になって気温が上昇したときには溶け出し、また夜は気温が下がって氷結し、これの繰返しである。また屋内の暖房がきいて暖気が上昇するため屋根上の積雪は棟方向から軒先方向に降下してくる傾向にある。
【0003】
このため軒先には氷塊やツララが生じて落雪や屋根構造への損壊が生じるという種々の危険が生じる。従って屋根の融雪・消雪は主に軒先を対象としている。
【0004】
この軒先の融雪・消雪には数多くの発明・考案がなされている。出願人は先に特開2002−213107号や実登第3065733号を開発していて、雪国の融雪屋根として十分地域に利用されている。
【0005】
【発明が解決しようとする課題】
しかし、前記先発明の融雪装置を含めて、軒先に融雪装置を取付けた屋根の雪は、棟上から滑下して来て、この軒端の融雪装置で止り、氷結するという問題が生じる。即ち軒端の積雪は融雪装置によって溶けるが、その装置の手前の取付け部に停止するという厄介な点が問題となっている。
【0006】
【課題を解決するための手段】
発明者はこの点に鑑み鋭意研究を続けた結果本発明に到達したものであって、本発明はこの邪魔板的な役割をしている軒先融雪装置の端部に滑雪板を掛けることによって、停滞している積雪を徐々に軒端方向に移動させることになり、軒先方向に進んだ雪は融雪装置によって融雪されて前記の問題点を解消することに成功したものである。
【0007】
【発明の実施の形態】
添付図面により本発明の滑雪板及びこの滑雪板を用いた融雪促進工法を説明すると、図1は滑雪板(1)を用いた詳細図であって、(10)は軒先部に設けてある融雪パネルを示している。図2及び図3は軒先融雪装置の取付け金具(5),(5−1)にこの取付け金具用の滑雪板カバー(2),(2−1)を取付けた実施例図であり、図2は瓦棒葺及び立平葺屋根の融雪装置(10)の接続金具(5)に対しての滑雪用カバー(2)の取付けを示す実施例図であり、図3は横葺屋根の融雪装置(10)の接続金具(5−1)に対しての滑雪用カバー(2−1)の取付けを示す実施例図である。
【0008】
Sは屋根上の積雪を示し、この積雪Sは滑雪カバー(2),(2−1)を伝ってS−2として軒先方向に移動して融雪が促進される。
【0009】
図4は一般に使用されている電熱体及び温水を使用した融雪パネルPの実施例図であって、このような電熱体及び温水を使用した融雪パネルPの場合には、パネルPの段差が顕著なため積雪Sの停滞が激しく、雪は張出しの形S−1はツララや氷塊となって一向に軒先の融雪は進まない。
【0010】
このような場合には本発明の滑雪板を融雪パネルPの端面に設ければ、図示していないが積雪の張出し部S−1は滑雪板を介して軒先方向に崩れて屋根上の融雪が促進される。
【0011】
この滑雪板(1)は、屋根の軒勾配に対して逆勾配に設けるか、又は水平の角度で形成するもので、逆勾配に形成したとしても屋根上の積雪は重力の作用によって軒先方向に移動し、軒先に設けられた融雪装置によって消雪される。
【0012】
【発明の効果】
上述のように本発明は、軒先の融雪装置又はこの融雪装置を取付ける金具によって、積雪の移動を止められている積雪Sも滑雪 板(1)或は取付け金具カバー(2),(2−1)によって移動が進み、融雪が促されているという屋根の融雪に対して画期的な作用効果を奏する。
【図面の簡単な説明】
【図1】滑雪板の詳細図
【図2】融雪装置取付け金具の実施例図
【図3】別な取付け金具の実施例図
【図4】一般的な融雪パネルの実施例図
【符号の説明】
(1)…滑雪板
(2)…取付け金具用のカバー
(2−1)…取付け金具用のカバー
(5)…取付け金具
(5−1)…取付け金具
(10)…軒先融雪装置
P…融雪パネル
S…屋根上の積雪[0001]
TECHNICAL FIELD OF THE INVENTION
TECHNICAL FIELD The present invention relates to a snow-slide board for snow-slipping snow accumulated on a snow-melting roof having a snow-melting panel attached to a roof eave end, and a snow-melting promotion method using the same.
[0002]
[Prior art]
In a snowy country, the snow on the roof piles up when the snow falls, melts when the snow stops and the temperature rises due to clear weather, and the temperature drops and freezes at night, and so on. In addition, the snow on the roof tends to fall from the ridge to the eaves because the indoor heating is good and the warm air rises.
[0003]
For this reason, there is a variety of dangers that ice blocks and icicles are generated at the eaves, causing snowfall and damage to the roof structure. Therefore, snow melting and snow removal on the roof mainly target the eaves.
[0004]
Numerous inventions and inventions have been made in the melting and snow melting at the eaves. The applicant has previously developed Japanese Patent Application Laid-Open No. 2002-213107 and Japanese Utility Model No. 3065733, and has been sufficiently used as a snow-melting roof in a snowy country.
[0005]
[Problems to be solved by the invention]
However, there is a problem that the snow on the roof including the snow melting device of the above-mentioned invention, which has the snow melting device attached to the eaves, slides down from the ridge, stops at the eaves end snow melting device, and freezes. That is, the snow at the eaves end is melted by the snow melting device, but there is a problem in that the snow stops at a mounting portion in front of the device.
[0006]
[Means for Solving the Problems]
The inventor of the present invention has arrived at the present invention as a result of intensive research in view of this point, and the present invention stagnates by placing a snow slide on the end of the eaves snow melting apparatus which plays a role of a baffle. The snow that has been moved gradually toward the eaves end, and the snow that has advanced toward the eaves is successfully melted by a snow melting device to solve the above-mentioned problem.
[0007]
BEST MODE FOR CARRYING OUT THE INVENTION
The snowboard of the present invention and the method of promoting snowmelt using the snowboard will be described with reference to the accompanying drawings. FIG. 1 is a detailed view using a snowboard (1), and (10) shows a snowmelt panel provided at the eaves tip. ing. FIGS. 2 and 3 are diagrams showing an embodiment in which the snow sliding plate covers (2) and (2-1) for the mounting metal fittings are attached to the mounting metal fittings (5) and (5-1) of the eaves snow melting apparatus. FIG. 3 is an embodiment view showing attachment of a snow sliding cover (2) to a connection fitting (5) of a snow melting device (10) of a tiled roof and a vertical roof, and FIG. It is an Example figure which shows attachment of the snow cover (2-1) with respect to the connection fitting (5-1) of 10).
[0008]
S indicates the snow cover on the roof, and the snow cover S moves along the snow slide covers (2) and (2-1) as S-2 toward the eaves to promote snow melting.
[0009]
FIG. 4 is an embodiment diagram of a snow melting panel P using a generally used electric heating element and hot water. In the case of the snow melting panel P using such an electric heating element and hot water, the step of the panel P is remarkable. Therefore, the stagnation of the snow S is so severe that the overhanging form S-1 becomes a icicle or ice block, and the snow melting at the eaves does not progress at all.
[0010]
In such a case, if the snow-slide board of the present invention is provided on the end face of the snow-melting panel P, the snow-covered overhanging portion S-1 collapses in the direction of the eaves through the snow-slide board to promote snow melting on the roof, though not shown. You.
[0011]
This snow plate (1) is provided at an angle that is opposite to that of the eaves of the roof, or is formed at a horizontal angle. Even if it is formed at an angle of reverse, the snow on the roof moves toward the eaves by the action of gravity. Then, snow is removed by a snow melting device provided at the eaves.
[0012]
【The invention's effect】
As described above, according to the present invention, the snow cover S whose movement of the snow is stopped by the snow melting device at the eaves or the metal fitting for mounting the snow melting device is also used for the snow sliding plate (1) or the mounting metal cover (2), (2-1). ) Has a revolutionary effect on the roof snowmelt, which promotes the movement and promotes the snowmelt.
[Brief description of the drawings]
FIG. 1 is a detailed view of a snow sliding plate. FIG. 2 is an embodiment of a snow melting device mounting bracket. FIG. 3 is an embodiment of another mounting bracket. FIG. 4 is an embodiment of a general snow melting panel.
(1) Snow plate (2) Cover for mounting bracket (2-1) Cover for mounting bracket (5) Mounting bracket (5-1) Mounting bracket (10) Eaves snow melting device P Snow melting panel S: snow on the roof
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003117621A JP2004278269A (en) | 2003-03-17 | 2003-03-17 | Snow-sliding board for snow-melting panel, and construction method for accelerating melting of snow by using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003117621A JP2004278269A (en) | 2003-03-17 | 2003-03-17 | Snow-sliding board for snow-melting panel, and construction method for accelerating melting of snow by using the same |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004278269A true JP2004278269A (en) | 2004-10-07 |
Family
ID=33296317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003117621A Pending JP2004278269A (en) | 2003-03-17 | 2003-03-17 | Snow-sliding board for snow-melting panel, and construction method for accelerating melting of snow by using the same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2004278269A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015025342A (en) * | 2013-07-29 | 2015-02-05 | 株式会社長谷川工業所 | Snowslide prevention board and snowslide prevention system |
-
2003
- 2003-03-17 JP JP2003117621A patent/JP2004278269A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015025342A (en) * | 2013-07-29 | 2015-02-05 | 株式会社長谷川工業所 | Snowslide prevention board and snowslide prevention system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2525613A1 (en) | Roof deicing apparatus | |
JP2004278269A (en) | Snow-sliding board for snow-melting panel, and construction method for accelerating melting of snow by using the same | |
JP3939412B2 (en) | roof | |
JP3093672U (en) | Freezing-mitigation eaves snow removal equipment | |
JP2966998B2 (en) | Method and apparatus for preventing icing of roof for cold regions and drainage channel or rain gutter used in the method and apparatus | |
JP6106302B1 (en) | Roof snow melting equipment | |
JPH0354512Y2 (en) | ||
JP3043652U (en) | Aluminum roof tile eaves heat insulation device for snow melting | |
JP2001342721A (en) | Gutter cover | |
JP3107635U (en) | Snow melting structure on roof and eaves | |
JP3072279B2 (en) | Snow melting roof | |
JPS5856269Y2 (en) | Snow fall prevention and stagnation prevention device | |
JPH0411057Y2 (en) | ||
JP3030416U (en) | Eaves defroster | |
JP3111422U (en) | Drain structure of snow-free roof | |
JP3006533U (en) | Eaves snow melting structure | |
RU8014U1 (en) | DRAINAGE DEVICE FROM BUILDING ROOF | |
RU59664U1 (en) | DEVICE FOR EVACUATION OF MELT WATER WITH ROOF | |
JPH11323822A (en) | Snow removal method for top chord member (arch portion) and beam of bridge by snowplow | |
JP3617643B2 (en) | Rain gutter icicle generator | |
JP3025878U (en) | Roof eaves snow melting heater mounting structure | |
JPH09291665A (en) | Snow guard structure of eaves edge | |
JPH0642122A (en) | Roof snow melting device | |
JP2553344Y2 (en) | Snow melting roof | |
JP3939413B2 (en) | roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Effective date: 20060316 Free format text: JAPANESE INTERMEDIATE CODE: A621 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080310 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080318 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20080805 |