JP2004240663A - Shipping planning method - Google Patents

Shipping planning method Download PDF

Info

Publication number
JP2004240663A
JP2004240663A JP2003028575A JP2003028575A JP2004240663A JP 2004240663 A JP2004240663 A JP 2004240663A JP 2003028575 A JP2003028575 A JP 2003028575A JP 2003028575 A JP2003028575 A JP 2003028575A JP 2004240663 A JP2004240663 A JP 2004240663A
Authority
JP
Japan
Prior art keywords
shipping
information
planning
product
products
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2003028575A
Other languages
Japanese (ja)
Inventor
Takahisa Tateyama
貴久 立山
Toyokazu Shudo
豊和 首藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2003028575A priority Critical patent/JP2004240663A/en
Publication of JP2004240663A publication Critical patent/JP2004240663A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a shipping planning method capable of preparing the shipping plan of products according to a request from a client by on-line, and preventing the delay of a term of delivery or any unnecessary inventory. <P>SOLUTION: This shipping planning method comprises: a first process for preparing shipping schedule planning information including data associated with shippable ordered products, shipping scheduled date based on the load assortment condition and available transporting means in a shipping planning system 10; a second process for receiving the shipping schedule planning information by using a client operating terminal 14 from the shipping planning system 10, designating either products whose shipping is necessary or products whose shipping is adjusted with respect to each or the ordered products and preparing shipping schedule information by deciding the shipping requested date, available transporting means and the shipping requested volume for each of the ordered products; and a third process for receiving the shipping schedule information by the shipping planning system 10 and preparing shipping instruction information by designating the ordered products to be shipped from among the products whose shipping is adjusted and the shipping volume based on the instruction of the shipping of the whole volume of products whose shipping is necessary and redundant loading tolerance. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、オンラインで需要家の要望に応じて製品の出荷計画を立てる出荷計画方法に関する。
【0002】
【従来の技術】
鉄鋼製品の注文納期を守る方法として、例えば、生産工程の下流工程から上流工程へ遡って作業日を計画し、その計画された作業日を基に、生産工程の上流工程から下流工程に向かって作業日を再計画することで、将来の各生産工程における作業負荷状況、及び各注文製品の出荷可能日を正確に予測する生産管理装置を使用した生産管理方法が適用されている(例えば、特許文献1参照)。
【0003】
【特許文献1】
特開平8−16662号公報
【0004】
【発明が解決しようとする課題】
しかしながら、注文納期は、通常その製品の発注時に取り決められた希望納期であるため一般的に精度が低く、需要家が発注した製品を緊急に必要とする事態が生じたり、希望納期に製品の納入が不要になったりする事態が生じる場合がある。
例えば、需要家が緊急に必要とする製品がまだ仕掛材の状態である場合には、製造者側の出荷部門と工場部門との間で緊急連絡を行なって製造を優先させ、指定した納期に間に合うように製品を製造し出荷していた。このため、緊急出荷が生じた場合は、出荷部門と工場部門の間で緊急連絡等の新たな業務が発生し、双方の負担となっていた。
そして、工場部門では、緊急出荷製品の製造を優先させたため、現実の生産状況と生産計画との間には大幅なくるいが生じその回復のための業務が更に発生していた。
また、工場部門の操業変動で荷揃いが遅れた場合や船舶等の輸送手段の運行計画が変更となって積載量や出荷日に変更が生じた場合には、出荷部門では需要家に出荷予定が変更になることを知らせると共に、空荷を防ぐため、出荷可能な製品を確保して輸送手段に積載する製品の荷揃えを緊急に行なう必要が生じていた。
【0005】
一方、需要家側で希望納期に製品の納入が不要になった場合には、製造者側の出荷部門にその製品の出荷を延期するように申し入れを行っていた。そのため、製造者側では滞留在庫が発生することになると共に、その製品が出荷されるまで保管場所を確保する必要が生じていた。
本発明はかかる事情に鑑みてなされたもので、オンラインで需要家の要望に応じて製品の出荷計画を立てることで納期遅れや需要家の滞留在庫の発生を防止することが可能な出荷計画方法を提供することを目的とする。
【0006】
【課題を解決するための手段】
前記目的に沿う本発明に係る出荷計画方法は、製造者側に設けた製造者操作端末を有する出荷計画システムと需要家側に設けた需要家操作端末を情報通信回線を介して結び、前記出荷計画システムと前記需要家操作端末を用いて前記需要家が注文した注文製品の出荷計画を立てる方法において、
前記需要家より発注された製品の中で出荷可能な注文製品、該出荷可能な注文製品の荷揃え状況に基づく出荷予定日、及び該出荷予定日に使用可能な運送手段に関する各データを含む出荷予約立案情報を前記出荷計画システムで作成する第1工程と、
前記出荷計画システムより前記需要家操作端末を用いて前記出荷予約立案情報を受け取り、該出荷予約立案情報に含まれる各注文製品に対して出荷必須製品及び出荷調整製品のいずれか1の指定を行うと共に、該各注文製品に対して出荷希望日、該出荷希望日に使用する運送手段、及び出荷希望量を決めて出荷予約情報を作成する第2工程と、
前記出荷計画システムで前記出荷予約情報を受け取り、前記出荷必須製品の全量の出荷の指示、及び前記出荷予定日に使用する運送手段の積載許容量に応じて発生する余剰積載許容量に基づいて前記出荷調整製品の中から出荷する注文製品並びにその出荷量の指定を行って出荷指示情報を作成する第3工程とを有する。
【0007】
注文製品は需要家より指定された出荷希望日に基づいて製造されている。このため、注文製品の製造実績データを用いて、各需要家毎に発注された製品の荷揃え状況を把握することができる。
一方、製品の出荷に使用しようとする運送手段の状況は、例えば、その運送手段を管理する運送業者において作成された運送手段の運行管理データから把握することができる。
従って、出荷計画システムに設けられた製造者操作端末を用いて製品の荷揃え状況データ及び運送手段の運行管理データが入手できるようにすると、これらのデータに基づいて、例えば、出荷可能な注文製品、出荷可能な注文製品の荷揃え状況に基づく出荷予定日、出荷予定日に使用可能な運送手段に関する各データを備えた出荷予約立案情報を出荷計画システムで作成することができる。
ここで、製造者操作端末を有する出荷計画システムと需要家操作端末を情報通信回線を介して接続しておくと、製造者は製造者操作端末を用いて作成した出荷予約立案情報を容易に需要家に対して提供することができる。
【0008】
需要家は、需要家操作端末を用いて、出荷計画システムから出荷予約立案情報を入手することで、製造者側で出荷可能となる各注文製品を知ることができる。
従って、需要家は各注文製品の使用計画に沿って希望する出荷日に使用できる運送手段の指定を行ない、出荷可能な各注文製品毎に出荷必須製品及び出荷調整製品のいずれか1の区分指定とその出荷希望量の指定を行って出荷予約情報を作成することができる。
ここで、出荷必須製品とは、需要家で必ず使用する予定の注文製品、すなわち緊急性の高い製品を指す。また、出荷調整製品とは、需要家に納入されれば使用する製品、すなわち非緊急性の製品を指す。
なお、作成された出荷予約情報は需要家操作端末から情報通信回線を介して出荷計画システムに送ることができ、出荷予約情報を製造者に容易に提供することができる。
また、需要家は、出荷予約立案情報を提供されることで、注文製品の製造進捗状況を知ることができる。そのため、需要家は注文製品が納入される前に、注文製品の使用計画を立案することが可能となる。
【0009】
製造者は、製造者操作端末を用いて出荷計画システムで出荷予約情報を入手して、出荷に使用する運送手段と、出荷必須製品を特定することができる。
そこで、製造者は、出荷必須製品の全量の出荷の指示を行うと共に、余剰積載許容量(指定された運送手段の積載許容量と出荷必須製品総量との差)に相当する重量の製品を出荷調整製品の中から指定を行って出荷指示情報を作成する。
ここで、出荷調整製品の中からの指定は、例えば、出荷する各出荷調整製品のロットが分割されないで、その総量が余剰積載許容量に近接することを条件として行われる。
このように、製造者は、需要家が作成した出荷予約情報に基づいて出荷指示情報を作成するので、常に需要家の要求に応じた形で製品を出荷することができる。更に、計画した運搬能力を有する運搬手段を準備できない場合が発生する。この場合においても、運送手段に発生する余剰積載許容量に基づいて、需要家より指定された出荷調整製品の中から適宜出荷する製品を選定することができるため、運送手段の運搬能力に応じた出荷を可能とすることができる。
【0010】
本発明に係る出荷計画方法において、前記運送手段を船舶とすることができる。船舶を使用することで、一度に多量の製品を安価に出荷することができる。
また、複数の需要家に対して積載持ち分を指定すると、一隻の船舶で複数の需要家に対して各注文製品を同時に出荷することができる。
【0011】
本発明に係る出荷計画方法において、前記運搬手段に積載する前記出荷調整製品の出荷指示情報は前記需要家操作端末で入手可能であることが好ましい。
出荷指示情報は出荷計画システムを用いて作成されるので、情報通信回線を介して出荷指示情報を需要家操作端末で入手することができる。
その結果、需要家は、製造者が出荷する出荷必須製品と出荷調整製品の内訳を事前に確認することができる。
【0012】
本発明に係る出荷計画方法において、前記出荷予約立案情報には、製造途中の製品も含まれることが好ましい。
製造途中の製品についても出荷計画の対象とすることにより、必要な製品が出荷可能な状態となるよりも前に製造者側に対して出荷指示を行なうことができる。このため、製造者側では緊急に荷揃いしなければならない製品を認識することができ、負担をより少なくして緊急出荷措置に対応することができる。
【0013】
【発明の実施の形態】
続いて、添付した図面を参照しつつ、本発明を具体化した実施の形態につき説明し、本発明の理解に供する。
ここに、図1は本発明の一実施の形態に係る出荷計画方法に適用する出荷計画システムの構成図、図2は同出荷計画方法のフロー図、図3はデータベース内に格納されている全注文製品データの説明図、図4はデータベース内に入力されている配船管理データの説明図、図5は本発明の一実施の形態に係る出荷計画方法の第2工程で出荷予約情報を作成する際の需要家操作端末の表示画面の説明図、図6は同出荷計画方法の第2工程で需要家操作端末の表示画面に表示される作成済の出荷予約情報を示す説明図、図7はデータベース内で作成された製品積載情報の説明図、図8は出荷指示のフロー図である。
【0014】
本発明の一実施の形態に係る出荷計画方法は、需要家が注文した注文製品の一例である鉄鋼製品(以下、単に製品ともいう)を製造者の一例である製鉄所から需要家に、運送手段の一例である船舶を使用して出荷する場合の出荷計画を立てる方法である。
【0015】
図1に示すように、本実施の形態に係る出荷計画方法に適用される出荷計画システム10は、製鉄所側に設けた製造者操作端末11と、需要家より発注された鉄鋼製品の中でその荷揃え状況に基づいて、出荷可能な鉄鋼製品、その出荷予定日、及び出荷に使用可能な船舶に関するデータを含む出荷予約立案情報を作成する出荷予約立案情報作成手段12と、製造者操作端末11に情報通信回線13を介して接続した需要家操作端末14からの指示に基づいて出荷予約立案情報を需要家操作端14に表示する出荷予約立案情報表示手段15を有している。
また、出荷計画システム10は、需要家操作端末14を用いて出荷予約立案情報を受け取り、出荷希望日に使用する船舶を指定し、各注文製品に対して出荷必須製品及び出荷調整製品のいずれか1の指定及び出荷希望量の指定を行って出荷予約情報を作成する出荷予約情報作成手段16と、作成された出荷予約情報を製造者操作端末11に表示させる出荷予約情報表示手段17を有している。
【0016】
更に、出荷計画システム10は、指定された船舶の手配情報、出荷必須製品の全量の出荷の指示を行う必須製品出荷情報、及び手配した船舶の積載許容量と出荷必須製品総量との差である余剰積載許容量に相当する鉄鋼製品とその出荷量を出荷調整製品の中から指定する調整製品出荷情報を備えた出荷指示情報を作成する出荷指示情報作成手段18と、作成した出荷指示情報を需要家操作端末14に表示させる出荷指示情報表示手段19を有している。
また、出荷計画システム10は、製鉄所で鉄鋼製品の製造管理を行っている生産管理システム20から製造計画データ及び製造実績データが、船会社の配船管理システム21から配船管理データが入力されるデータベース22を有している。以下、これらについて詳細に説明する。
【0017】
出荷予約立案情報作成手段12は、製造者操作端末11の指示により起動し、データベース22の製造計画データ及び製造実績データに基づいて、需要家より発注された製品の中でその荷揃え状況に基づく出荷可能な鉄鋼製品、出荷予定日、及び出荷に使用可能な船舶のデータを含む出荷予約立案情報を作成し、データベース22に格納する機能を有している。
なお、出荷予約立案情報には、製造実績データから製造が終了し出荷可能と判定される製品と、製造計画データ及び各製造工程毎の製造実績データに基づき製造に着手している製造途中の注文製品が含まれてもよい。
【0018】
出荷予約立案情報表示手段15は、情報通信回線13を介した需要家操作端末14からの指示により起動し、データベース22内に格納されている出荷予約立案情報を読込み需要家操作端末14の表示画面に表示する機能を有している。
ここで、製造者操作端末11、需要家操作端末14には、例えばコンピュータを使用することができ、情報通信回線13には、例えばインターネットを使用することができる。また、出荷予約立案情報作成手段12、出荷予約立案情報表示手段15は、上記の各機能を発現するプログラムをコンピュータに搭載させることにより構成することができる。
更に、データベース22は、出荷予約立案情報作成手段12及び出荷予約立案情報表示手段15を構成するコンピュータの記憶装置内に構築することができる。
【0019】
出荷予約情報作成手段16は、情報通信回線13を介した需要家操作端末14からの指示により起動し、データベース22内に格納されている出荷予約立案情報に基づいて、各鉄鋼製品毎の出荷希望日、出荷希望日に使用する船舶を指定させ、出荷予約立案情報に含まれる各鉄鋼製品毎に出荷必須製品及び出荷調整製品のいずれか1の指定を行わせると共に、出荷希望量の指定を行わせて出荷予約情報を作成させる機能と、作成した出荷予約情報をデータベース22格納する機能を有している。
出荷予約情報表示手段17は、製造者操作端末11からの指示で起動し、データベース22内に格納されている出荷予約情報を読込み製造者操作端末11の表示画面に表示する機能を有している。
ここで、出荷予約情報作成手段16、出荷予約情報表示手段17は、上記の各機能を発現するプログラムをコンピュータに搭載させることにより構成することができる。
【0020】
出荷指示情報作成手段18は、製造者操作端末11からの指示で起動し、データベース22内に格納されている出荷予約情報に基づいて、出荷希望日に使用する船舶の指定を行う船舶情報と、出荷必須製品の全量の出荷指示を行う出荷必須製品情報と、指定された船舶の積載許容量と出荷必須製品総量との差である余剰積載許容量に基づいて出荷調整製品の中から出荷する鉄鋼製品とその出荷量を指定する調整製品出荷情報を備えた出荷指示情報を作成する機能と、作成した出荷指示情報をデータベース22に格納する機能を有している。
ここで、調整製品出荷情報の作成は、例えば、出荷する各出荷調整製品のロットが分割されないで、その総量が余剰積載許容量に近接することを条件として行う。
また、出荷指示情報表示手段19は、需要家操作端末14からの指示で起動し、データベース22内に格納されている出荷予約情報を読込み需要家操作端末14の表示画面に表示する機能を有している。
【0021】
ここで、出荷指示情報作成手段18、出荷指示情報表示手段19は、上記の各機能を発現するプログラムをコンピュータに搭載させることにより構成することができる。
なお、出荷予約立案情報作成手段12、出荷予約立案情報表示手段15、出荷予約情報作成手段16、出荷予約情報表示手段17、出荷指示情報作成手段18、出荷指示情報表示手段19は、1つのコンピュータを用いて一括して構成することも、複数のコンピュータを用いて分割して構成することもできる。
また、データベース22は、1つのコンピュータの記憶装置内に構築することも、複数のコンピュータの記憶装置内に分割して構成することもできる。
【0022】
次に、本発明の一実施の形態に係る出荷計画方法について詳細に説明する。
図2に示すように、出荷計画を行なう製鉄所では、製造者操作端末11を起動させて出荷計画業務を開始する(ステップSA1)。
先ず、出荷計画システム10に接続して、出荷予約立案情報作成手段12を起動させる(ステップSA2)。
次いで、製品の出荷先を特定するために、例えば、需要家コードを入力する(ステップSA3)。
その結果、出荷予約立案情報作成手段12は、製造実績データ及び製造計画データを基に作成されデータベース22内に格納されている、例えば図3に示すような全鉄鋼製品データを検索し、特定した需要家から発注された製品の中でその荷揃え状況に基づいて、例えば、製造を開始している全ての鉄鋼製品、その出荷量を出荷可能な日(出荷予定日)毎に求める。
更に、船会社の配船管理システム21からデータベース22内に入力されている、例えば図4に示すような配船管理データに基づいて、各出荷予定日に対して使用可能な船舶の候補を選定して出荷予約立案情報を作成する(ステップSA4)。
そして、出荷予約立案情報をデータベース22内に格納する(ステップSA5)。
また、製鉄所は、この需要家に対して、出荷予約立案情報を作成したことを、製造者操作端末11から、情報通信回線13を介して連絡する(ステップSA6)(以上、第1工程)。
【0023】
出荷予約立案情報が作成された連絡を受け取った需要家は、需要家操作端末14を起動させ、情報通信回線13を介して出荷予約システム10に接続して、出荷予約立案情報表示手段15を起動させ、例えば、図5に示すような表形式の出荷予約立案情報を、需要家操作端末14の表示画面に表示させることができる(ステップSA7)。
図5に示すように、出荷予約立案情報には、出荷予約No.(図5では、向け先「関東」と通し番号「6−2」を用いて表記されている)、船舶の出航日を示す出荷予定日、船舶の積載許容量を示す出荷の予定量が表記され、注文No.毎に製品の仕様が記載されている。なお、使用する船舶は出荷予定日及び出荷の予定量から特定できる。
また、出荷予約立案情報には、製造を開始している全ての注文製品が含まれているので、出荷予定日は複数設定されることになり、しかも、各出荷予定日で出荷される製品の構成は異なっている(図5は、6月6日を出荷予定日とした場合の、出荷可能な全製品の構成を示している)。
【0024】
続いて、需要家は、出荷予約情報作成手段16を起動させ、表示された出荷予約立案情報の中から、出荷希望日となる出荷予定日が記載されている出荷予約立案情報を選択して、記載されている各注文製品に対して出荷必須製品及び出荷調整製品のいずれか1の指定を行うと共に、各注文製品に対して出荷希望量を順次決定して出荷予約情報を作成する。
ここで、出荷予約情報の作成について、図5を用いて詳しく説明する。
【0025】
先ず、出荷希望日となる出荷予定日が記載されている出荷予約情報を選択する(図5では、6月6日の出荷予定情報が選択されている)。次に、必ず出荷してほしい鉄鋼製品(出荷必須製品)を注文No.から特定し、指示入力欄23の入力部24に、出荷希望量を示す出荷指示重量を入力する(ステップSA8)。
また、出荷調整製品の指定は、詳細指示部25の調整材26をクリックすることにより行う(ステップSA9)。出荷調整製品の指定が行なわれると、入力部24に指示量と共に「調整材」の表示が行なわれる。
詳細指示部25の上積指定27をクリックすると、この注文番号の製品は、船舶に積載される際に上積みされることになる。表示された注文番号の製品を今回の出荷計画の対象としない場合は、消去28をクリックする。なお、出荷時に特に指示を必要とする製品に対しては、予約ステータス欄29に指示内容を記載する。
【0026】
各注文番号の製品に対して、出荷必須製品又は出荷調整製品の指定、出荷指示重量、及び出荷除外製品の指定の各入力が完了すると、図6に示すように、指示量部30には各注文番号の製品毎に指示量(出荷希望量)が表示され、指示量欄31には各注文番号の製品毎に入力された指示量の合計量が表示される(ステップSA10)。
需要家操作端末14から出荷予約情報作成手段16に対して出荷予約情報の作成完了が入力されると(ステップSA11)、作成された出荷予約情報はデータベース22内に格納され、製造者操作端末11に対しては出荷予約情報の作成完了が通知されて、需要家操作端末14と出荷予約情報作成手段16との接続が切断されて出荷予約情報の作成が終了する(ステップSA12)(以上、第2工程)。
【0027】
出荷予約情報が作成された連絡を受け取った製鉄所は、製造者操作端末11を用いて出荷指示情報作成手段18を起動させ、データベース22内に格納されている出荷予約情報に基づいて、出荷に使用する船舶の指定を行う船舶情報と、出荷必須製品の全量の出荷指示を行う出荷必須製品情報と、指定された船舶の積載許容量と出荷必須製品総量との差である余剰積載許容量に基づいて出荷調整製品の中から出荷する鉄鋼製品とその出荷量を指定する調整製品出荷情報を備えた出荷指示情報を作成し、データベース22内に格納する(ステップSA13)。
そして、製造者操作端末11から出荷指示情報の作成完了が、出荷指示情報作成手段18に対して入力されると(ステップSA14)、需要家操作端末14に対しては出荷指示情報の作成完了が通知されて、製造者操作端末11と出荷指示情報作成手段18との接続が切断されて出荷計画業務が終了する(ステップSA15)(以上第3工程)。
なお、出荷指示情報が作成された連絡を受け取った需要家は、需要家操作端末14を起動させ、情報通信回線13を介して出荷予約システム10に接続して、出荷指示情報表示手段19を起動させて、データベース22内の出荷指示情報を需要家操作端末14の表示画面に表示させる。これによって、需要家は、実際に出荷される出荷必須製品と出荷調整製品の内訳を事前に知ることができる。
【0028】
続いて、出荷指示情報が作成されて注文製品が出荷されるときの出荷方法について説明する。
データベース22内に出荷指示情報が格納されると、データベース22内では出荷指示情報に基づいて、例えば、図7に示すように、配船番号、注文番号、指示量、及び調整材マーク欄(出荷調整製品の指定欄)の各情報から構成される製品積載情報が作成される(例えば、図7では、配船番号B0001の船舶には、先ず注文番号C000−01の製品(出荷必須製品)を1000t積載し、更に予定量(ここでは1000t)に達するまで注文番号C000−02の製品(出荷調整製品)を積載する出荷指示が出される)。
次いで、製品積載情報は出荷オンラインシステム32に転送される。製品積載情報が転送されると、出荷オンラインシステム32では、図8に示すように、先ず、出荷予約に使用する船舶を予約する(ステップSB1)。
【0029】
次いで、出荷オンラインシステム32は、出荷必須製品(製品積載情報では、出荷調整製品の指定が行われていない注文番号の製品)を全量出荷するように出荷命令を指示する(ステップSB2)。
この出荷命令に基づいて、出荷必須製品の全量が製品倉庫内に存在するか否かの調査が行われ(ステップSB3)、出荷必須製品の全量が製品倉庫に存在する場合、引き続いて出荷調整製品が製品倉庫に存在するか否かの調査が行われる(ステップSB4)。そして、出荷調整製品の全量が製品倉庫に存在する場合、出荷オンラインシステム32から製品倉庫搬出装置33に対して、製品積載情報に基づいて出荷必須製品及び出荷調整製品製品の船舶への積載が指示される(ステップSB5)。
なお、出荷指示されている製品が製品倉庫内に存在しない場合、製造者操作端末11に荷揃え遅れ警報を表示すると共に、情報通信回線13を介して需要家操作端末14にも荷揃え遅れ警報を表示する(ステップSB6)。
【0030】
以上、本発明の実施の形態を説明したが、本発明は、この実施の形態に限定されるものではなく、発明の要旨を変更しない範囲での変更は可能であり、前記した実施の形態や変形例の一部又は全部を組み合わせて本発明の出荷計画方法を構成する場合も本発明の権利範囲に含まれる。
例えば、1つの需要家が1つの船舶(運送手段)を占有する場合に関して説明したが、1つの船舶を複数の需要家が予め設定された積載持ち分に応じて共同で使用する場合にも適用できる。この場合は、各需要家の持ち分を積載可能な最大重量として、これから決まる予定量に対して必須材、調整材を積載すればよい。
【0031】
【発明の効果】
請求項1〜4記載の出荷計画方法においては、需要家より発注された製品の中で出荷可能な注文製品、出荷可能な注文製品の荷揃え状況に基づく出荷予定日、及び出荷予定日に使用可能な運送手段に関する各データを含む出荷予約立案情報を出荷計画システムで作成する第1工程と、出荷計画システムより需要家操作端末を用いて出荷予約立案情報を受け取り、出荷予約立案情報に含まれる各注文製品に対して出荷必須製品及び出荷調整製品のいずれか1の指定を行うと共に、各注文製品に対して出荷希望日、出荷希望日に使用する運送手段、及び出荷希望量を決めて出荷予約情報を作成する第2工程と、出荷計画システムで出荷予約情報を受け取り、出荷必須製品の全量の出荷の指示、及び出荷予定日に使用する運送手段の積載許容量に応じて発生する余剰積載許容量に基づいて出荷調整製品の中から出荷する注文製品並びにその出荷量の指定を行って出荷指示情報を作成する第3工程とを有するので、需要家側の指定に応じて注文製品の出荷を行うことができ、納期遅れの発生や需要家の滞留在庫の発生を防止することが可能となる。
また、運送手段に余剰積載許容量が生じる場合は、需要家が指定した出荷調整製品を積載することにより、常に運送手段に無駄が生じないようにすることができ、効率的な製品出荷を行なうことが可能となる。
【0032】
特に、請求項2記載の出荷計画方法においては、運送手段が船舶であるので、多量の製品を一度に安価に運搬することができ、製品の出荷コストを低減することが可能となる。
【0033】
請求項3記載の出荷計画方法においては、運搬手段に積載する出荷調整製品の出荷指示情報は需要家操作端末で入手可能であるので、需要家側では納入される出荷調整製品の使用計画を事前に作成することが可能となる。
その結果、製造者側では滞留在庫量を低減させることができ、需要家側では不要在庫の発生を防止することが可能となる。
【0034】
請求項4記載の出荷計画方法においては、出荷予約立案情報には、製造途中の製品も含まれるので、緊急に荷揃えする必要がある製品を事前に認識して緊急措置の対応を取ることで、荷揃え率を向上させることが可能となる。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係る出荷計画方法に適用する出荷計画システムの構成図である。
【図2】同出荷計画方法のフロー図である。
【図3】データベース内に格納されている全注文製品データの説明図である。
【図4】データベース内に入力されている配船管理データの説明図である。
【図5】本発明の一実施の形態に係る出荷計画方法の第2工程で出荷予約情報を作成する際の需要家操作端末の表示画面の説明図である。
【図6】同出荷計画方法の第2工程で需要家操作端末の表示画面に表示される作成済の出荷予約情報を示す説明図である。
【図7】データベース内で作成された製品積載情報の説明図である。
【図8】出荷指示のフロー図である。
【符号の説明】
10:出荷計画システム、11:製造者操作端末、12:出荷予約立案情報作成手段、13:情報通信回線、14:需要家操作端末、15:出荷予約立案情報表示手段、16:出荷予約情報作成手段、17:出荷予約情報表示手段、18:出荷指示情報作成手段、19:出荷指示情報表示手段、20:生産管理システム、21:配船管理システム、22:データベース、23:指示入力欄、24:入力部、25:詳細指示部、26:調整材、27:上積指定、28:消去、29:予約ステータス欄、30:指示量部、31:指示量欄、32:出荷オンラインシステム、33:製品倉庫搬出装置
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a shipping planning method for making a shipping plan of a product according to a demand of a customer online.
[0002]
[Prior art]
As a method of observing the order delivery date of steel products, for example, work days are planned retroactively from the downstream process of the production process to the upstream process, and based on the planned work date, from the upstream process of the production process to the downstream process, A production management method using a production management device that accurately predicts a work load situation in each future production process and a shippable date of each ordered product by re-planning the work date is applied (for example, Patent Reference 1).
[0003]
[Patent Document 1]
Japanese Patent Application Laid-Open No. 8-16662
[Problems to be solved by the invention]
However, the order delivery date is generally the desired delivery date agreed upon when ordering the product, and is generally inaccurate, which may result in an urgent need for the product ordered by the customer or the delivery of the product at the desired delivery date. May become unnecessary.
For example, if the product urgently needed by the customer is still in work-in-process, an urgent communication is made between the shipping department and the factory department on the manufacturer side to give priority to production and to meet the specified delivery date. The products were manufactured and shipped in time. For this reason, when an emergency shipment occurs, new work such as an emergency communication occurs between the shipping department and the factory department, which is a burden on both sides.
In the factory department, the priority was given to the production of emergency shipment products, so there was a considerable gap between the actual production situation and the production plan, and more work was required to recover the situation.
Also, in the event that shipments are delayed due to fluctuations in the operation of the factory department, or when the operation plan of transport means such as ships is changed and the load capacity or shipping date changes, the shipping department will ship to customers. In order to notify that the product will be changed and to prevent empty shipment, it is necessary to secure urgently available products and to urgently arrange the products to be loaded on the transportation means.
[0005]
On the other hand, if the customer no longer needs to deliver the product at the desired delivery date, the manufacturer has made an offer to the shipping department of the manufacturer to postpone shipping the product. For this reason, the stocker is generated on the manufacturer side, and it is necessary to secure a storage place until the product is shipped.
The present invention has been made in view of the above circumstances, and a shipping planning method capable of preventing a delay in delivery time and occurrence of a stagnant inventory of a customer by making a shipping plan of a product according to a customer's request online. The purpose is to provide.
[0006]
[Means for Solving the Problems]
A shipping planning method according to the present invention, which meets the above object, connects the shipping planning system having a manufacturer operation terminal provided on the manufacturer side to a customer operation terminal provided on the consumer side via an information communication line, and In a method of making a shipping plan of ordered products ordered by the customer using the planning system and the customer operation terminal,
Shipment including ordered products that can be shipped among the products ordered by the customer, a scheduled shipping date based on the assortment status of the shippable ordered products, and data on transportation means available on the scheduled shipping date. A first step of creating reservation planning information in the shipment planning system;
The shipping reservation system receives the shipping reservation planning information from the shipping planning system using the customer operation terminal, and designates any one of a shipment essential product and a shipping adjustment product for each ordered product included in the shipping reservation planning information. A second step of determining a desired shipping date, a transportation means to be used on the desired shipping date, and a desired shipping amount for each of the ordered products and creating shipping reservation information;
The shipment planning system receives the shipment reservation information, and instructs the shipment of all the required products to be shipped, and the surplus loading capacity generated according to the loading capacity of the transportation means used on the scheduled shipping date. A third step of designating an ordered product to be shipped from among the shipment-adjusted products and a shipping amount thereof to create shipping instruction information.
[0007]
Custom products are manufactured based on the desired shipping date specified by the customer. For this reason, it is possible to grasp the packing status of the products ordered for each customer using the production result data of the ordered products.
On the other hand, the status of the transportation means to be used for shipping the product can be grasped from, for example, the operation management data of the transportation means created by the transportation company that manages the transportation means.
Therefore, if the product packing status data and the operation management data of the transportation means can be obtained using the manufacturer operation terminal provided in the shipping planning system, based on these data, for example, the orderable products that can be shipped In addition, shipping schedule planning information can be created by the shipping planning system, which includes scheduled shipping dates based on the assortment status of orderable products that can be shipped and data on transportation means available on the scheduled shipping dates.
Here, if the shipment planning system having the manufacturer's operation terminal and the customer's operation terminal are connected via an information communication line, the manufacturer can easily request the shipping reservation planning information created using the manufacturer's operation terminal. Can be offered to the house.
[0008]
The customer can use the customer operation terminal to obtain the shipping reservation planning information from the shipping planning system, thereby knowing each ordered product that can be shipped on the manufacturer side.
Therefore, the customer specifies the transportation means that can be used on the desired shipping date in accordance with the usage plan of each ordered product, and designates any one of the mandatory shipping product and the shipping adjusted product for each shipping orderable product. And the shipping desired quantity can be designated to create shipping reservation information.
Here, the shipment essential product refers to an ordered product that is always used by a customer, that is, a product with high urgency. In addition, the shipment adjustment product refers to a product used when delivered to a customer, that is, a non-emergency product.
The created shipping reservation information can be sent from the customer operation terminal to the shipping planning system via the information communication line, and the shipping reservation information can be easily provided to the manufacturer.
In addition, the customer can know the production progress of the ordered product by being provided with the shipping reservation planning information. Therefore, the customer can make a use plan of the ordered product before the ordered product is delivered.
[0009]
The manufacturer obtains the shipping reservation information by the shipping planning system using the manufacturer operation terminal, and can specify the transportation means used for shipping and the products required to be shipped.
Therefore, the manufacturer issues an instruction to ship the entire amount of the products required to be shipped, and ships a product having a weight corresponding to the surplus load capacity (the difference between the load capacity of the designated transportation means and the total quantity of the products required to be shipped). The shipping instruction information is created by specifying from the adjusted products.
Here, designation from among the shipment adjustment products is performed, for example, on the condition that the lot of each shipment adjustment product to be shipped is not divided, and the total amount thereof is close to the surplus loading allowable amount.
As described above, since the manufacturer creates the shipping instruction information based on the shipping reservation information created by the customer, the manufacturer can always ship the product according to the request of the customer. Furthermore, a case may occur in which a transportation means having the planned transportation capacity cannot be prepared. Also in this case, the product to be shipped can be appropriately selected from the shipping adjustment products specified by the customer based on the surplus load allowable amount generated in the transportation means. Shipping can be possible.
[0010]
In the shipping planning method according to the present invention, the transportation means may be a ship. By using a ship, a large number of products can be shipped at once at a low cost.
In addition, if the loading share is specified for a plurality of customers, each product can be simultaneously shipped to a plurality of customers by one ship.
[0011]
In the shipping planning method according to the present invention, it is preferable that shipping instruction information of the shipping adjusted product loaded on the transporting means is available at the customer operation terminal.
Since the shipping instruction information is created using the shipping planning system, the shipping instruction information can be obtained at the customer operation terminal via the information communication line.
As a result, the customer can check in advance the breakdown of the products required for shipment and the products adjusted for shipment shipped by the manufacturer.
[0012]
In the shipping planning method according to the present invention, it is preferable that the shipping reservation planning information includes a product being manufactured.
By making the products in the course of manufacture also subject to the shipping plan, shipping instructions can be given to the manufacturer before the necessary products can be shipped. For this reason, the manufacturer can recognize the products that need to be urgently packed, and can cope with emergency shipping measures with less burden.
[0013]
BEST MODE FOR CARRYING OUT THE INVENTION
Next, embodiments of the present invention will be described with reference to the accompanying drawings to provide an understanding of the present invention.
Here, FIG. 1 is a configuration diagram of a shipment planning system applied to a shipment planning method according to an embodiment of the present invention, FIG. 2 is a flowchart of the shipment planning method, and FIG. FIG. 4 is an explanatory diagram of order product data, FIG. 4 is an explanatory diagram of ship assignment management data inputted in a database, and FIG. 5 is a diagram showing shipping reservation information created in a second step of a shipping planning method according to an embodiment of the present invention. FIG. 6 is an explanatory view of a display screen of the customer operation terminal when the customer performs the operation, and FIG. 6 is an explanatory view showing created shipping reservation information displayed on the display screen of the customer operation terminal in the second step of the shipment planning method. Is an explanatory diagram of the product loading information created in the database, and FIG. 8 is a flowchart of a shipping instruction.
[0014]
The shipping planning method according to one embodiment of the present invention is a method of transporting a steel product (hereinafter, also simply referred to as a product), which is an example of an ordered product, from a steel mill, which is an example of a manufacturer, to a customer. This is a method of making a shipping plan when shipping using a ship, which is an example of the means.
[0015]
As shown in FIG. 1, a shipping planning system 10 applied to the shipping planning method according to the present embodiment includes a manufacturer operation terminal 11 provided on a steel mill side and a steel product ordered by a customer. Shipping reservation planning information creating means 12 for creating shipping reservation planning information including data on a shippable steel product, its scheduled shipping date, and ships available for shipping, based on the packing status, and a manufacturer operation terminal A shipping reservation planning information display means 15 for displaying shipping reservation planning information on the customer operation terminal 14 based on an instruction from a customer operation terminal 14 connected to the information terminal 11 via an information communication line 13 is provided.
In addition, the shipping planning system 10 receives the shipping reservation planning information using the customer operation terminal 14, specifies a ship to be used on the desired shipping date, and specifies, for each ordered product, one of a shipping essential product and a shipping adjustment product. 1 and a shipping reservation information creating means 16 for creating shipping reservation information by designating a desired shipping quantity and a shipping reservation information display means 17 for displaying the created shipping reservation information on the manufacturer operation terminal 11. ing.
[0016]
Further, the shipment planning system 10 is the arrangement information of the designated ship, the essential product shipment information for instructing the shipment of the entire quantity of the essential shipment product, and the difference between the allowable load of the arranged ship and the total quantity of the essential shipment product. Shipping instruction information creating means 18 for creating shipping instruction information including adjusted product shipping information for designating a steel product corresponding to the surplus loading allowable amount and the shipping amount from the shipping adjusted products; It has a shipping instruction information display means 19 to be displayed on the house operation terminal 14.
The shipping planning system 10 receives production plan data and production result data from a production management system 20 that manages the production of steel products at an ironworks, and ship allocation management data from a ship management system 21 of a shipping company. It has a database 22. Hereinafter, these will be described in detail.
[0017]
The shipping reservation planning information creating means 12 is activated by an instruction from the manufacturer operation terminal 11 and, based on the manufacturing plan data and the manufacturing result data in the database 22, based on the packing status of the products ordered by the customer. It has a function of creating shipping reservation planning information including data on steel products that can be shipped, scheduled shipping dates, and ships that can be used for shipping, and storing the information in the database 22.
In addition, the shipping reservation planning information includes, for the products whose production is determined to be finished and can be shipped from the production performance data, and for the orders during the production that are underway based on the production plan data and the production performance data for each production process. Products may be included.
[0018]
The shipping reservation planning information display means 15 is activated by an instruction from the customer operation terminal 14 via the information communication line 13, reads the shipping reservation planning information stored in the database 22, and reads the display screen of the customer operation terminal 14. Has the function of displaying the information.
Here, for example, a computer can be used for the manufacturer operation terminal 11 and the customer operation terminal 14, and for example, the Internet can be used for the information communication line 13. Further, the shipping reservation planning information creating means 12 and the shipping reservation planning information displaying means 15 can be configured by installing a program that expresses each of the above functions in a computer.
Further, the database 22 can be constructed in a storage device of a computer constituting the shipping reservation planning information creating means 12 and the shipping reservation planning information display means 15.
[0019]
The shipping reservation information creating means 16 is activated by an instruction from the customer operation terminal 14 via the information communication line 13, and based on the shipping reservation planning information stored in the database 22, requests shipping for each steel product. The ship to be used on the date and the desired shipping date, and for each steel product included in the shipping reservation planning information, specify either the mandatory shipping product or the shipping adjustment product, and specify the desired shipping amount. It also has a function of creating shipping reservation information and a function of storing the created shipping reservation information in the database 22.
The shipping reservation information display means 17 is activated by an instruction from the manufacturer operation terminal 11 and has a function of reading the shipping reservation information stored in the database 22 and displaying the information on the display screen of the manufacturer operation terminal 11. .
Here, the shipping reservation information creating means 16 and the shipping reservation information displaying means 17 can be configured by installing a program that expresses each of the above functions in a computer.
[0020]
The shipping instruction information creating means 18 is activated by an instruction from the manufacturer's operation terminal 11, and based on shipping reservation information stored in the database 22, ships information for specifying a ship to be used on a desired shipping date, Iron and steel to be shipped from among shipment-adjusted products based on the shipping essential product information that instructs the shipping of all the products that must be shipped and the surplus loading capacity that is the difference between the allowable capacity of the designated vessel and the total quantity of the shipping essential products. It has a function of creating shipping instruction information including adjusted product shipping information that specifies a product and its shipping amount, and a function of storing the created shipping instruction information in the database 22.
Here, the adjusted product shipping information is created, for example, on the condition that the lot of each shipping adjusted product to be shipped is not divided, and that the total amount is close to the surplus loading allowable amount.
The shipping instruction information display means 19 has a function of being activated by an instruction from the customer operation terminal 14, reading shipping reservation information stored in the database 22, and displaying the information on the display screen of the customer operation terminal 14. ing.
[0021]
Here, the shipping instruction information creating unit 18 and the shipping instruction information displaying unit 19 can be configured by installing a program that expresses each of the above functions in a computer.
Note that the shipping reservation planning information creating means 12, the shipping reservation planning information displaying means 15, the shipping reservation information creating means 16, the shipping reservation information displaying means 17, the shipping instruction information creating means 18, and the shipping instruction information displaying means 19 are one computer. , Or may be divided using a plurality of computers.
Further, the database 22 can be constructed in a storage device of one computer, or can be divided into storage devices of a plurality of computers.
[0022]
Next, a shipment planning method according to an embodiment of the present invention will be described in detail.
As shown in FIG. 2, in a steelworks that performs shipping planning, the manufacturer operation terminal 11 is activated to start shipping planning work (step SA1).
First, it connects to the shipping planning system 10 and activates the shipping reservation planning information creating means 12 (step SA2).
Next, in order to specify the shipping destination of the product, for example, a customer code is input (step SA3).
As a result, the shipping reservation planning information creating means 12 searches and specifies all steel product data, for example, as shown in FIG. 3, which is created based on the production result data and the production plan data and stored in the database 22. For example, all the steel products whose production has been started and the shipping amount thereof are obtained for each possible shipping date (scheduled shipping date) based on the assortment status of the products ordered by the customer.
Further, based on, for example, ship management data as shown in FIG. 4, which is input into the database 22 from the ship management system 21 of the shipping company, a candidate ship that can be used for each scheduled shipping date is selected. To create shipping reservation planning information (step SA4).
Then, the shipping reservation planning information is stored in the database 22 (step SA5).
In addition, the steel mill notifies the customer that the shipping reservation planning information has been created from the manufacturer operation terminal 11 via the information communication line 13 (step SA6) (the above is the first step). .
[0023]
The customer who has received the notification that the shipping reservation planning information has been created activates the customer operation terminal 14, connects to the shipping reservation system 10 via the information communication line 13, and activates the shipping reservation planning information display means 15. Then, for example, shipping reservation planning information in a table format as shown in FIG. 5 can be displayed on the display screen of the customer operation terminal 14 (step SA7).
As shown in FIG. 5, the shipping reservation planning information includes the shipping reservation number. (In FIG. 5, the destination "Kanto" and the serial number "6-2" are used.) The planned shipping date indicating the ship's departure date and the planned shipping amount indicating the allowable load of the ship are described. , Order No. The specification of the product is described for each. The ship to be used can be specified from the scheduled shipping date and the scheduled shipping volume.
In addition, since the shipping reservation planning information includes all ordered products that have started production, a plurality of scheduled shipping dates will be set, and moreover, the number of products to be shipped at each scheduled shipping date will be set. The configuration is different (FIG. 5 shows the configuration of all the products that can be shipped when June 6 is the scheduled shipping date).
[0024]
Subsequently, the customer activates the shipping reservation information creating means 16, selects shipping reservation planning information in which the scheduled shipping date to be the desired shipping date is described from the displayed shipping reservation planning information, For each of the listed ordered products, one of the required shipping product and the adjusted shipping product is designated, and the desired shipping quantity is sequentially determined for each ordered product to prepare the shipping reservation information.
Here, the creation of the shipping reservation information will be described in detail with reference to FIG.
[0025]
First, the user selects the shipping reservation information in which the expected shipping date, which is the desired shipping date, is described (in FIG. 5, the shipping schedule information on June 6 is selected). Next, order the steel products (required products to be shipped) that you want to be shipped. , And input a shipping instruction weight indicating a desired shipping amount to the input section 24 of the instruction input field 23 (step SA8).
The designation of the shipping adjustment product is performed by clicking the adjustment material 26 of the detailed instruction section 25 (step SA9). When the shipment adjustment product is designated, an "adjustment material" is displayed on the input unit 24 together with the indicated amount.
When the user clicks on the stack designation 27 of the detailed instruction section 25, the product of this order number is stacked when the product is loaded on the ship. If the product of the displayed order number is not included in the current shipment plan, the erasure 28 is clicked. Note that, for a product requiring an instruction at the time of shipment, the instruction content is described in the reservation status column 29.
[0026]
For each product of each order number, when the input of the designation of the product required for shipment or the shipment adjustment product, the designation of the designated shipping weight, and the designation of the product to be excluded from the shipment is completed, as shown in FIG. The designated amount (desired shipping amount) is displayed for each product of the order number, and the total amount of designated amounts input for each product of each order number is displayed in the designated amount column 31 (step SA10).
When the completion of the creation of the shipment reservation information is input from the customer operation terminal 14 to the shipment reservation information creation means 16 (step SA11), the created shipment reservation information is stored in the database 22 and the manufacturer operation terminal 11 , The completion of the creation of the shipping reservation information is notified, the connection between the customer operation terminal 14 and the shipping reservation information creating means 16 is disconnected, and the creation of the shipping reservation information ends (step SA12) (step SA12). 2 steps).
[0027]
The steelworks receiving the notification that the shipping reservation information has been created activates the shipping instruction information creating means 18 using the manufacturer operation terminal 11 and starts shipping based on the shipping reservation information stored in the database 22. Ship information to specify the vessel to be used, shipping essential product information to instruct shipping of all shipping essential products, and surplus loading allowance, which is the difference between the allowable capacity of the designated vessel and the total shipping essential product quantity. Based on the adjusted products, shipping instruction information including adjusted product shipping information that specifies a steel product to be shipped and the shipping amount is created and stored in the database 22 (step SA13).
When the completion of the creation of the shipping instruction information is input from the manufacturer operation terminal 11 to the shipping instruction information creating means 18 (step SA14), the completion of the creation of the shipping instruction information is completed for the customer operation terminal 14. Then, the connection between the manufacturer's operation terminal 11 and the shipping instruction information creating means 18 is disconnected, and the shipping planning operation is completed (step SA15) (the third step).
The customer who has received the notification that the shipping instruction information has been created activates the customer operation terminal 14, connects to the shipping reservation system 10 via the information communication line 13, and activates the shipping instruction information display means 19. Then, the shipping instruction information in the database 22 is displayed on the display screen of the customer operation terminal 14. As a result, the customer can know in advance the breakdown of the shipment essential products and the shipment adjustment products that are actually shipped.
[0028]
Next, a shipping method when the shipping instruction information is created and the ordered product is shipped will be described.
When the shipping instruction information is stored in the database 22, based on the shipping instruction information in the database 22, for example, as shown in FIG. The product loading information composed of the information of the adjustment product designation column) is created (for example, in FIG. 7, first, for the ship with the dispatch number B0001, the product with the order number C000-01 (product required for shipment) is first assigned. A shipping instruction to load the product (ordering adjusted product) of the order number C000-02 is issued until the product is loaded to 1000 t and further reaches the scheduled amount (here, 1000 t)).
Next, the product loading information is transferred to the shipping online system 32. When the product loading information is transferred, the shipping online system 32 first reserves a ship to be used for shipping reservation as shown in FIG. 8 (step SB1).
[0029]
Next, the shipping online system 32 instructs a shipping command to ship all products that are required to be shipped (in the product loading information, products whose order numbers have not been designated as shipping adjusted products) (step SB2).
Based on this shipping instruction, it is checked whether or not all the products required for shipment are present in the product warehouse (step SB3). A check is made as to whether or not is present in the product warehouse (step SB4). Then, when the entire quantity of the shipment adjustment product is present in the product warehouse, the shipping online system 32 instructs the product warehouse unloading device 33 to load the shipment essential product and the shipment adjustment product product on the ship based on the product loading information. Is performed (step SB5).
If the product for which the shipment is instructed does not exist in the product warehouse, a packing delay alarm is displayed on the manufacturer's operation terminal 11 and a packing delay alarm is also displayed on the customer operation terminal 14 via the information communication line 13. Is displayed (step SB6).
[0030]
As described above, the embodiments of the present invention have been described. However, the present invention is not limited to these embodiments, and can be changed without changing the gist of the invention. A case where the shipping planning method of the present invention is configured by combining some or all of the modifications is also included in the scope of the present invention.
For example, the case where one customer occupies one ship (transportation means) has been described. However, the present invention is also applied to a case where a plurality of customers jointly use one ship according to a preset loading share. it can. In this case, the essential material and the adjusting material may be loaded with respect to the planned amount determined from this, assuming that each customer's share is the maximum loadable weight.
[0031]
【The invention's effect】
In the shipping planning method according to any one of claims 1 to 4, among the products ordered by the customer, the ordered products that can be shipped, the scheduled shipping date based on the packing status of the ordered products that can be shipped, and the scheduled shipping date are used. A first step of creating shipping reservation planning information including data on possible transportation means by the shipping planning system, and receiving shipping reservation planning information from the shipping planning system using the customer operation terminal, and including the shipping reservation planning information; For each ordered product, specify one of the mandatory shipment product and the shipment adjustment product, and determine the desired shipping date, the transportation method to be used on the desired shipping date, and the desired shipping quantity for each ordered product before shipping. The second step of creating the reservation information, and receiving the shipment reservation information by the shipment planning system, instructing the shipment of all the products required for shipment, and responding to the load capacity of the transportation means used on the scheduled shipment date. A third step of designating the ordered product to be shipped from the shipment-adjusted products based on the surplus loading capacity generated and the shipping amount to create the shipping instruction information, according to the specification by the consumer side. In this way, the ordered product can be shipped, and it is possible to prevent a delay in the delivery date and the occurrence of a stock of the customer.
In addition, when the surplus loading capacity is generated in the transportation means, by loading the shipment-adjusted product specified by the customer, it is possible to always prevent the transportation means from being wasted, and to efficiently ship the products. It becomes possible.
[0032]
In particular, in the shipping planning method according to the second aspect, since the transportation means is a ship, a large amount of products can be transported at once at low cost, and the shipping cost of the products can be reduced.
[0033]
In the shipping planning method according to the third aspect, since the shipping instruction information of the shipping adjustment product to be loaded on the transportation means is available at the customer operation terminal, the customer side preliminarily plans the use of the shipping adjustment product to be delivered. Can be created.
As a result, the amount of accumulated stock can be reduced on the manufacturer side, and the occurrence of unnecessary stock can be prevented on the customer side.
[0034]
In the shipping planning method according to the fourth aspect, since the shipping reservation planning information also includes products that are being manufactured, it is possible to recognize in advance the products that need to be urgently packed and take emergency measures. Thus, it is possible to improve the packing ratio.
[Brief description of the drawings]
FIG. 1 is a configuration diagram of a shipment planning system applied to a shipment planning method according to an embodiment of the present invention.
FIG. 2 is a flowchart of the shipment planning method.
FIG. 3 is an explanatory diagram of all ordered product data stored in a database.
FIG. 4 is an explanatory diagram of ship allocation management data input in a database.
FIG. 5 is an explanatory diagram of a display screen of a customer operation terminal when creating shipping reservation information in a second step of the shipping planning method according to one embodiment of the present invention.
FIG. 6 is an explanatory diagram showing created shipping reservation information displayed on a display screen of a customer operation terminal in a second step of the shipping planning method.
FIG. 7 is an explanatory diagram of product loading information created in a database.
FIG. 8 is a flowchart of a shipping instruction.
[Explanation of symbols]
10: Shipment planning system, 11: Manufacturer operation terminal, 12: Shipment reservation planning information creation means, 13: Information communication line, 14: Consumer operation terminal, 15: Shipment reservation planning information display means, 16: Shipment reservation information creation Means, 17: shipping reservation information displaying means, 18: shipping instruction information creating means, 19: shipping instruction information displaying means, 20: production management system, 21: ship allocation management system, 22: database, 23: instruction input column, 24 : Input unit, 25: detailed instruction unit, 26: adjustment material, 27: upper product designation, 28: delete, 29: reservation status column, 30: indicated amount unit, 31: indicated amount column, 32: shipping online system, 33 : Product warehouse unloading device

Claims (4)

製造者側に設けた製造者操作端末を有する出荷計画システムと需要家側に設けた需要家操作端末を情報通信回線を介して結び、前記出荷計画システムと前記需要家操作端末を用いて前記需要家が注文した注文製品の出荷計画を立てる方法において、
前記需要家より発注された製品の中で出荷可能な注文製品、該出荷可能な注文製品の荷揃え状況に基づく出荷予定日、及び該出荷予定日に使用可能な運送手段に関する各データを含む出荷予約立案情報を前記出荷計画システムで作成する第1工程と、
前記出荷計画システムより前記需要家操作端末を用いて前記出荷予約立案情報を受け取り、該出荷予約立案情報に含まれる各注文製品に対して出荷必須製品及び出荷調整製品のいずれか1の指定を行うと共に、該各注文製品に対して出荷希望日、該出荷希望日に使用する運送手段、及び出荷希望量を決めて出荷予約情報を作成する第2工程と、
前記出荷計画システムで前記出荷予約情報を受け取り、前記出荷必須製品の全量の出荷の指示、及び前記出荷予定日に使用する運送手段の積載許容量に応じて発生する余剰積載許容量に基づいて前記出荷調整製品の中から出荷する注文製品並びにその出荷量の指定を行って出荷指示情報を作成する第3工程とを有することを特徴とする出荷計画方法。
A shipment planning system having a manufacturer operation terminal provided on the manufacturer side is connected to a customer operation terminal provided on the customer side via an information communication line, and the demand is established using the shipment planning system and the customer operation terminal. In the method of planning the shipping of ordered products ordered by the house,
Shipment including ordered products that can be shipped among the products ordered by the customer, a scheduled shipping date based on the assortment status of the shippable ordered products, and data on transportation means available on the scheduled shipping date. A first step of creating reservation planning information in the shipment planning system;
The shipping reservation system receives the shipping reservation planning information from the shipping planning system using the customer operation terminal, and designates any one of a shipment essential product and a shipping adjustment product for each ordered product included in the shipping reservation planning information. A second step of determining a desired shipping date, a transportation means to be used on the desired shipping date, and a desired shipping amount for each of the ordered products and creating shipping reservation information;
The shipment planning system receives the shipment reservation information, and instructs the shipment of all the required products to be shipped, and the surplus loading capacity generated according to the loading capacity of the transportation means used on the scheduled shipping date. And a third step of designating an ordered product to be shipped from among the shipment-adjusted products and a shipping amount thereof to create shipping instruction information.
請求項1記載の出荷計画方法において、前記運送手段が船舶であることを特徴とする出荷計画方法。2. The shipping planning method according to claim 1, wherein said transportation means is a ship. 請求項1及び2のいずれか1項に記載の出荷計画方法において、前記運搬手段に積載する前記出荷調整製品の出荷指示情報は前記需要家操作端末で入手可能であることを特徴とする出荷計画方法。3. The shipping planning method according to claim 1, wherein the shipping instruction information of the shipping adjusted product to be loaded on the transporting means is available at the customer operation terminal. 4. Method. 請求項1〜3のいずれか1項に記載の出荷計画方法において、前記出荷予約立案情報には、製造途中の製品も含まれることを特徴とする出荷計画方法。4. The shipping planning method according to claim 1, wherein the shipping reservation planning information includes a product being manufactured.
JP2003028575A 2003-02-05 2003-02-05 Shipping planning method Withdrawn JP2004240663A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003028575A JP2004240663A (en) 2003-02-05 2003-02-05 Shipping planning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003028575A JP2004240663A (en) 2003-02-05 2003-02-05 Shipping planning method

Publications (1)

Publication Number Publication Date
JP2004240663A true JP2004240663A (en) 2004-08-26

Family

ID=32956007

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003028575A Withdrawn JP2004240663A (en) 2003-02-05 2003-02-05 Shipping planning method

Country Status (1)

Country Link
JP (1) JP2004240663A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009227354A (en) * 2008-03-19 2009-10-08 Jfe Steel Corp Method and device for making shipping lot
JP2010254474A (en) * 2009-04-03 2010-11-11 Nippon Steel Corp Device for forming shipping plan, method for forming the same, and computer program

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009227354A (en) * 2008-03-19 2009-10-08 Jfe Steel Corp Method and device for making shipping lot
JP2010254474A (en) * 2009-04-03 2010-11-11 Nippon Steel Corp Device for forming shipping plan, method for forming the same, and computer program

Similar Documents

Publication Publication Date Title
TW541483B (en) System and method for ensuring order fulfillment
US20030004595A1 (en) Order assembly production system and method
JP5163203B2 (en) Manufacturing plan creation system and manufacturing plan creation method
JP2002140110A (en) System and method for production control
JP5028991B2 (en) Manufacturing plan creation system and manufacturing plan creation method
JP6739744B2 (en) Physical distribution management device, physical distribution management method, and physical distribution management program
JP4847030B2 (en) Ordering system and ordering method
WO2015162715A1 (en) Server device, control method, recording medium, and program
KR20220004603A (en) Electronic apparatus and operation method thereof
JP3654812B2 (en) Display method and management method in component supply management system
JP2004227320A (en) Shipping planning method
JP2009217573A (en) System and method for optimizing supply chain
JP2004240663A (en) Shipping planning method
JP2009220927A (en) Storage place determination system and determination method
Brodskiy Improving transport and technological process to supply material resources for house construction
JP5204584B2 (en) Procurement and delivery system using trucking
JP7143989B2 (en) Ready-mixed concrete ordering system, ordering program, and ordering method
JP2010055258A (en) Method for supporting improvement in supply chain efficiency
JP2011170737A (en) Method for supporting promotion of efficiency of supply chain
JP2009140140A (en) Supply chain optimization system and supply chain optimization method
JP2003337614A (en) Production reservation system
JP2002240949A (en) Method and device for supporting storage/deivery and inventory control, storage medium and program
JP2014197320A (en) System and method for preparing production plan
JP5068845B2 (en) A method and system for integrated production management with full development of core management process using management process matrix table
JP2003108211A (en) System for managing consumable items, device and method for same

Legal Events

Date Code Title Description
A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20060509