JP2004199324A - Coal ash effective use support system - Google Patents

Coal ash effective use support system Download PDF

Info

Publication number
JP2004199324A
JP2004199324A JP2002366306A JP2002366306A JP2004199324A JP 2004199324 A JP2004199324 A JP 2004199324A JP 2002366306 A JP2002366306 A JP 2002366306A JP 2002366306 A JP2002366306 A JP 2002366306A JP 2004199324 A JP2004199324 A JP 2004199324A
Authority
JP
Japan
Prior art keywords
ash
coal
silo
boiler
operation plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002366306A
Other languages
Japanese (ja)
Inventor
Shinji Tanaka
信二 田中
Toshiro Ito
俊郎 伊藤
Naoki Matsuo
直樹 松尾
Mitsutoshi Hatori
光俊 羽鳥
Yuichi Miyamoto
裕一 宮本
Shoji Murakami
昭二 村上
Kenichiro Matsui
健一郎 松井
Sumiaki Matsumoto
純明 松本
Masaru Manabe
賢 真鍋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Heavy Industries Ltd
Original Assignee
Kawasaki Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Heavy Industries Ltd filed Critical Kawasaki Heavy Industries Ltd
Priority to JP2002366306A priority Critical patent/JP2004199324A/en
Publication of JP2004199324A publication Critical patent/JP2004199324A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a coal ash effective use support system organically managing a process from ash production to an ash discharge so as to manage stock of coal ash generated from various kinds of raw coal in a coal-fired boiler to supply fly ash fit for required specifications of an ash customer. <P>SOLUTION: In the coal-fired boiler, the coal ash of the boiler is distributed to silos according to ash quality, is applied with quality adjustment, and is shipped. In the coal-fired boiler, a data collection device 111 collects operation results value through a controller or the like of the boiler, and accumulates the operation results value in a database. An arithmetic unit 112 estimates a temporal change of the ash quality and a discharge ash amount of each portion of the boiler by a simulator and a scheduler, supposes a transfer system to the silo to predict the temporal change of the ash quality and a silo level, finds silo selection and blending operation allowing shipment satisfying ash delivery specifications to draw up an operation plan for the boiler, and appropriately displays the operation results value or the operation plan drawn up from a browsing device 113. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、石炭火力発電所の石炭焚ボイラで生ずる石炭灰の有効利用を支援するコンピュータ支援システムに関し、特に火力発電所の石炭焚ボイラに付属する灰処理プラントの支援システムに関する。
【0002】
【従来の技術】
火力発電所ボイラの燃料は、重油、LNG、オイルサンドなど、新燃料を含めて種々の選択肢があるが、資源量、経済性、運用容易性などの観点から依然として石炭を選択する場合も多い。
特に石炭火力発電所では、ベース発電所としての機能を持ちながら負荷変動にも対応できる運用性能の向上が求められる。また、燃料としての石炭も多種多様な海外炭を使用することが求められ、石炭の使用計画をいかに的確に実施するかが重要な課題となっている。このため、貯炭場の運用管理立案の自動化が必要となる。
【0003】
川崎重工技報136号には、石炭火力発電所の貯炭場における運用支援用の計算機システムが開示されている。このシステムの中心は貯炭場在庫予測機能で、従来計画立案者が自ら計算しながら合理的な計画を立案していたのを、受入計画や払出計画などのケーススタディを含んだシミュレーション機能を備えて、石炭消費計画が発電計画を満たしているかまた指定した銘柄が混炭燃焼可能であるかなどを確認しながら、将来の石炭の在庫量および貯炭場の積山状況を予測することにより、貯炭場の運用計画立案の支援を行う。
開示されたシステムは、発電計画に対応して、石炭船から石炭を揚炭し、貯炭場に貯炭し、またボイラバンカに払い出す工程を効率よく行う運用計画を自動的に立案し、あるいは立案を支援することができる。
【0004】
一方、ボイラ運用に伴い発生する石炭灰は、産業廃棄物として埋め立て処分するが、近年環境問題が顕在化したため、従来のように石炭灰を単に廃棄するのではなく、石炭灰を有効利用することができるセメント会社等の灰需要家に売却する動きが活発である。灰需要家に売却するためには、利用目的に適うような品質要求を満たすようにする必要がある。しかし、様々な特性の原料炭から得られる石炭灰は品質もいろいろであるので、適当な品質の灰を適当な割合で混合して需要家の要求品質に適応するようにしてから出荷するようにしなければならない。
【0005】
石炭灰の分別は粒度に基づいて行われるが、要求仕様は、さらに強熱減量、密度、比表面積、メチレンブルー吸着量などを規定する場合がある。したがって、分別した石炭灰がそのままでは需要家の要求を満たさないときには、複数のサイロからそれぞれ適当量の石炭灰を集めてブレンドして出荷する。原料炭の特性が異なれば粒度が同じでも他の特性が異なるため、在庫中の石炭灰のみを用いてブレンドする銘柄と量を適切に決定して、要求仕様を満たすフライアッシュを調合することは大変な経験と熟練を要する。
【0006】
また、発電所は生産した電気により収入を得るが、これに伴って発生する石炭灰の埋立場の不足や廃棄費用も無視できない状況になってきている。このため、場合によっては、石炭灰の売却先となる需要家の要請に合うように、炭種の調整やボイラプラントの運用を調整する必要もでてくる。しかし、電力供給と石炭灰売却の間の整合を取りながら的確な計画を策定することは難しい。
【0007】
従来は、過去に多数の有効な運用実績があったにもかかわらず、これらの資料が利用可能な状態で蓄積しておくことが難しかったため、これら計画について運用方法の詳細な検証ができなかった。また、灰生産から売却や廃棄までの長い工程の間で相互連絡が適切に行われず、無駄なランニングコストが発生していた。
また、発電、運炭、ボイラの運用計画に灰売却、廃棄の計画を組み込むことは難しく、1ヶ月程度の長期計画において考慮することがせいぜいであった。
さらに、従来は灰売却時の品質調整を行うことを目的とした自動制御をすることはなく、個別の需要家の灰納入仕様を満たすようにプラント運用をするためには、オペレータの経験則に頼らざるを得なかった。
【0008】
なお、特開平9−296924には、ボイラで発生し電気集塵機で回収するフライアッシュを貯蔵するサイロのレベル変化を予測して表示する灰処理設備運用支援用計算機が開示されている。
ここでは、炭種ごとに知られている燃料中の灰分、灰がフライアッシュとなる比率、電気集塵機の集塵効率を用い、ボイラの負荷予定曲線と燃料供給予定曲線を与えてフライアッシュの灰輸送量を算出し、現時点におけるサイロのレベルをオンラインで測定して今後のレベル変化の予測値を表示して、運用員がサイロからのフライアッシュの排出計画を立案することを支援する。
【0009】
ボイラから発生する灰量はボイラ負荷によって大きく変化するので、フライアッシュサイロの現状レベルを知っても実際にボイラから供給されてくる灰を確かに受け入れられるか、予め排出しておく必要があるかは分からないので、計算機システムによって今後のレベル変化を予測してその結果を提示してサイロから灰を排出する必要を正しく判断させるようにしたものである。
したがって、上記特許公開公報に開示された技術はサイロのレベル管理に使用するものに過ぎず、灰需要家の要求仕様に適合するように成分調整をすることや予想される灰販売需要に合わせてプラントの運用計画を立てるような事項に関わるものではない。
【0010】
【発明が解決しようとする課題】
そこで、本発明が解決しようとする課題は、石炭火力発電プラントにおいて多種多様の原料炭から発生する石炭灰のストックを管理して灰の有効利用をする需要家の要求仕様に合うフライアッシュを供給できるようにするため、また必要に応じて発電プラントの運用計画や石炭受け入れ計画にフィードバックしてより効率的な石炭灰処分を行うことができるようにするため、灰生産から灰排出までの工程を有機的に管理する石炭灰有効利用支援システムを提供することである。
【0011】
【課題を解決するための手段】
上記課題を解決するため、石炭焚ボイラで発生する石炭灰を灰品質にしたがってサイロに分配し必要により灰品質の調整をして出荷するようにした石炭火力発電プラントにおける本発明の石炭灰有効利用支援システムは、運用計画演算装置と運用計画実績閲覧装置とデータ収集装置を備える。
データ収集装置は、ボイラプラントの制御装置または灰分析装置を介して運用の実績値を収集してデータベースに蓄積する。
運用計画演算装置は、データ入力装置とシミュレータとスケジューラを備えて、シミュレータとスケジューラによってボイラの石炭灰排出部位における排出灰量と灰品質の時間変化を推定し、サイロへの移送系統を仮定してサイロにおけるレベルと灰品質の時間変化を予測し、データ入力装置から入力した灰納入仕様を満たす出荷が可能になるサイロ選択とブレンディング操作を見いだして石炭火力発電プラントの運用計画を策定する。
運用計画実績閲覧装置は、運用計画演算装置が策定した運用計画やデータベースに蓄積された運用実績値を適宜に表示することを特徴とする。
【0012】
本発明の石炭灰有効利用支援システムを用いると、シミュレータやスケジューラの助けを得て、石炭焚ボイラプラントにおける石炭灰の発生やその灰品質、あるいはボイラ各部位からサイロまで、またサイロ間の灰移送時間、ブレンディング時間、ブレンディングのためのサイロ選択、工程中の灰品質変化状況、出荷操作など、プラント運用計画に必要な諸パラメータを算定して、運用計画を策定することができる。
また、データベースには、灰量や灰品質など必要なデータが、通常のプラント運用業務を通じて長期間にわたる運用実績としてデータベース化して蓄積するので、過去の運用方法の検証を行うことにより、また近似した条件における実績を参照することにより、個々の灰需要についてプラント運用計画を作成するに際し、必要な諸パラメータを算定する上で必要な情報を実績値として的確に取得することができ、運用計画の信頼性を向上させることができる。
さらに、従来はプラントの構成が複雑なため1ヶ月単位程度の長期的な灰処理計画しか立案できなかったが、本発明のシステムでは、灰処理装置のシミュレーションや、灰処理装置、出荷設備、ボイラ設備のスケジューリングなどを組み合わせて用いるので、個別設備における比較的短期間の詳細な運用計画を立案することもできる。
【0013】
なお、データ収集装置は、運用実績データベースに加えて運用計画データベースを備えて、利用可能と認められた運用計画を格納して、必要に応じて運用計画実績閲覧装置により表示するようにしてもよい。
運用計画の詳細は、一旦検査して承認した後は、実際にプラント運用を調整しなければならない時期になるまでは必要がないので、灰納入仕様にしたがって出荷の準備をするときになって初めて表示させるようにすればよい。
【0014】
また、スケジューラは石炭火力発電プラントの機器に関して設定する制約条件を要素とする人工知能型スケジューラであることが好ましい。
装置の制約条件が複雑なため運用計画は順序だって一義的に策定することができないが、このような人工知能型プログラムを利用することにより、試行錯誤法により可能性のある運用計画を策定することができる。
【0015】
【発明の実施の形態】
以下、実施例を用いて本発明の石炭灰有効利用支援システムを詳細に説明する。
図1は本実施例の構成を説明するブロック図、図2は本システムの作用を説明するブロック図、図3は本システムの動作論理を説明するフロー図、図4は対象とする石炭火力発電プラントを示すブロック図である。
本実施例の石炭灰有効利用支援システムは、灰需要家の品質要求に適合するフライアッシュを調合して供給するシステム、もしくは操作員がそうすることを効果的に支援するシステムである。
【0016】
本システムの適用対象となる灰処理プラントは、図4に示すように、石炭焚ボイラ設備1から出る石炭灰を灰処理装置2で貯留して、需要家の要請に合わせて成分調整した上で出荷設備3から船積出荷もしくは車載出荷するものである。灰処理装置2は原則として石炭焚ボイラ設備1に付属させるので、石炭焚ボイラ設備と灰処理装置はそれぞれ複数存在することもある。一方、出荷設備3は複数の灰処理装置に対して共通に1式設けられるのが普通である。
【0017】
石炭火力発電プラントをさらに詳しく説明すると、石炭焚ボイラ設備1は、石炭焚ボイラ11、エコノマイザECOとエアヒータAH12、電気集塵機EP13、および煙突14を備える。石炭焚ボイラ11で発生する熱気流は石炭灰を含みながら石炭焚ボイラ11内の伝熱面やエコノマイザECOとエアヒータAH12で熱回収され、電気集塵機EP13を通って煙突14で大気に放出される。
熱気流に搬送される石炭灰のうち粗粉灰の大部分はエコノマイザECOとエアヒータAH12の底から回収される。電気集塵機EP13はガスの流れに沿って集塵ユニットが直列に並んでいて、上流から下流にかけて粒度の大きい石炭灰から順に回収される。上流側のユニットで回収される石炭灰にはエコノマイザECOとエアヒータAH12で取り残された粗粉灰が混じるが、下流側ユニットでは細粉灰だけが回収される。
なお、石炭焚ボイラ11の底に落ちたクリンカは下に設けたクリンカホッパで一旦捕集し、クリンカ中継タンク21に移して払い出すまで貯蔵する。クリンカは路盤材として有効利用することができる。
【0018】
石炭焚ボイラ設備1から排出される石炭灰は、灰処理装置2で灰の粒度にしたがって分別して貯蔵した後、適宜払い出す。灰処理装置2はクリンカ中継タンク21の他に、灰捕集機22、サイクロン23、分級器24、細粉サイロ25、回収サイロ26、粗粉サイロ27を備える。
灰捕集機22は、エコノマイザECOとエアヒータAH12、電気集塵機EP13の底に設けられたホッパに溜まった灰をそれぞれ真空吸引して捕集する装置である。灰捕集機22には切替弁を備え、エコノマイザECOとエアヒータAH12から吸引した粗粉灰は粗粉サイロ27に送り、電気集塵機EP13の下流側ユニットから回収される細粉灰は細粉サイロ25に送る。また、電気集塵機EP13の上流側ユニットから回収した石炭灰には粗粉灰と細粉灰が混在するため一旦回収サイロ26に貯留する。
【0019】
灰捕集機22の入口配管に灰分析器28を備えて、捕集機のボイラ設備1から排出される石炭灰をサンプリングしてその特性を測定する。測定項目は、未燃炭素分または強熱減量、粒度分布、メチレンブルー吸着量、ブレーン比表面積、酸化シリコンや酸化カルシウムや3酸化2鉄の成分比、45μmふるい残分、塩基度などフライアッシュとしての性能に係わる事項である。
【0020】
回収サイロ26の石炭灰は、分級器24に搬送されて粒度にしたがって分離され、細粉灰がサイクロン23で回収され、粗粉灰は粗粉サイロ27に落とされる。分級器24の回転ベーンの回転数を上げればより細かい灰が分離できる。サイクロン23で回収した細粉灰は細粉サイロ25に送って貯蔵する。
粗粉サイロ27に貯蔵された粗粉灰と回収サイロ26に貯蔵された石炭灰は、粘土代替として有効利用するか、需要のあるフライアッシュの成分調整代として混入して利用することができる。
これらサイロから直接に石炭灰を取り出して出荷することもでき、このような直接出荷では、出荷量が小さい場合、あるいは需要先が近い場合や水運に適さない場所にある場合などは、タンクローリ29で出荷することもできる。
【0021】
灰の出荷設備3は、ブレンディングサイロ31、船積サイロ32、灰積込装置33を備える。海岸や河岸、あるいは湖岸に立地した火力発電所では、船を使ってフライアッシュを搬送することが合理的であるため、灰積込装置33は船積施設となるが、トラック輸送など他の手段が好ましい場合には、それぞれの手段に合わせた施設が用意される。ここでは、海運を利用することとして説明する。
ブレンディングサイロ31は、サイロ25,26,27から選択した石炭灰をそれぞれ適当量受容し、混合して需要家の要求仕様を満たすようにした上で灰積込装置33に送る。ブレンディングサイロ31には、高圧のコンプレッサを使用したミキシング装置が備えられていて、灰を空気攪拌して灰中の成分を均質化する。
【0022】
また、船積サイロ32は船で大量の灰を払い出すために石炭灰を貯蔵しておくサイロである。混合する必要がないときにも使用するが、主に回収サイロ26や粗粉サイロ27に貯留した有効利用しにくい灰を廃棄する場合に使用する。
灰積込装置33は調整された石炭灰や廃棄する石炭灰を受容して、フライアッシュ運搬船34に積み込み需要地や廃棄場に運搬させる。
なお、図に示していないが、灰処理装置2から出荷設備3の各装置に、また出荷設備3の各装置間で石炭灰を輸送するために、空気圧力を用いた灰圧力輸送装置が設けられている。
ブレンディングサイロ31や船積サイロ32の内容物はタンクローリ35に払い出して処理することもできる。
【0023】
石炭灰を利用する需要家は、目的によって異なる品質を要求する。
コンクリートに混合して利用するフライアッシュについては、JIS A 6201に規定があって、酸化珪素成分比、湿分、強熱減量、密度、45μmふるい残分、比表面積(ブレーン値)、フロー比値、活性度指数について評価することにより、シリカフライアッシュをI種からIV種までの4種類に分類している。
ブレーン値5000cm/g以上、強熱減量3.0%以下、フロー比値105%以上などの条件を満たすものは、もっとも高品質のフライアッシュI種とされ、コンクリートに混入したときの流動性改善効果が高い。
【0024】
ブレーン値2500cm/g以上、強熱減量5.0%以下、フロー比値95%以上などの条件を満たすものは、フライアッシュII種とされ、コンクリートに混入して問題なく使用できる。実際に販売できるフライアッシュは殆どがII種である。
フライアッシュIII種は、ブレーン値2500cm/g以上、強熱減量8.0%以下、フロー比値85%以上などの条件を満たすもので、フライアッシュII種と比較して強熱減量が大きいので、需要家の目的によっては有価で売却することができる。
【0025】
フライアッシュIV種は、ブレーン値1500cm/g以上、強熱減量5.0%以下、フロー比値75%以上などの条件を満たすものであるが、粒度が粗いフライアッシュを位置づけたもので、粗粉を対象とする。IV種のフライアッシュは、コンクリートに混入したときのフレッシュ性状に配慮が必要で、また十分な強度を発現することは期待できない。このため、需要家側に費用を払って引き取らせたり、廃棄することが普通である。
JIS規格外のフライアッシュは発電所側が費用を払って引き取らせたり廃棄処分する。
なお、需要家によっては、メチレンブルー吸着量を品質の基準として使用することがある。メチレンブルー吸着量は、コンクリートに添加する一種の表面活性剤の効果を殺すため適正に管理する必要がある未燃炭素分の良好な指標となる。
【0026】
コンクリート混和材やセメント混合材としてはフライアッシュI種またはII種しか利用できないが、固化盤など道路材料や土壌改良材、建設汚泥再生利用にはJIS規格外のフライアッシュまで利用することができる。ただし、普通に有価で売却できるのはフライアッシュII種までで、III種は場合によっては売却が可能であるが、IV種以下は廃棄費用を出して処分してもらう状況である。
なお、農業や建築の分野では特別な炭種を指定して納入が認められる場合もある。
【0027】
このように、需要家は、JISや自己の基準に基づいた品質等級、納入量、納入期日を指定して、取引要求をする。発電所は、これに応えることができるか否かを検討して、応じられるときには実際に指定された期日に指定された品質のフライアッシュを指定された量だけ出荷する。
各サイロ25,26,27のいずれかに貯蔵されている石炭灰の性質と量が需要家の要求を満たすならば、そのサイロから船積サイロ32に排出させて灰積込装置33で船積みすればよい。また、いずれのサイロも条件を満たす石炭灰を貯蔵していない場合は、複数のサイロの内容物を適当量ずつ取り出してブレンディングサイロ31で混合し成分調整を行ってから出荷する。
【0028】
このためには、サイロ中の石炭灰の特性を正確に把握しておかなければならない。サイロ中の成分分析は、配管中の灰分析器28で自動分析した結果を用いることができる。しかし、灰分析器28の結果はかなり時間がたってから入手することになるため、その分析結果を呈する石炭灰がどのサイロに貯蔵されたものであるか正確に特定することが困難である。
ただし、一つのサイロも下から上まで同じ性質の石炭灰が貯蔵されているわけではなく、石炭焚ボイラ設備1の異なる部分から捕集した石炭灰を層状に重ねて収納することも普通に行われるし、同じ部位から捕集したものでも、原料炭が異なったり、ボイラ運用条件が異なれば、石炭灰の性状は変化する。
【0029】
したがって、サイロからサンプルを採取して分析する場合でも、正確な結果を得るためには深さ方向に何個ものサンプル点を設定して多数の分析を行う必要がある。
このため、サイロからサンプルを採取し、分析室の自動分析器で分析して結果を得ることもできる。この方法では分析員の手数が掛かり結果も遅れるが、サンプルの採取位置に比較的制約が少なく色々な場所について正しい結果を得ることができる。
【0030】
またさらに、いくつかの石炭灰を複合して要求仕様に合わせる方法では、考慮すべき特性値が複数あり、原料とすることができる石炭灰が限られるので、調合方法を選択するためには、高度な計算能力と経験に裏付けられた直感的な解決能力が必要となり、熟練作業員が担当する作業となっている。
しかし、この場合でも納入期日が将来のいつかであれば、その時のサイロ内状態はその日までの発電計画や運炭計画から各サイロに溜まる石炭灰の性状と量を推定しなければならない。このような推定を人が行うことは困難で、納入時に条件を満たす石炭灰を貯蔵しているかどうかも簡単には分からない。まして、どのような調合方法をとればよいかを知ることは熟練者にとっても極めて難しい。
【0031】
また、発電ボイラの運用や燃料炭の選択は、灰処理装置の運用とは独立に行われることが普通であるが、サイロに貯蔵されることになる石炭灰の特性が適合しないため需要家の要求する品質仕様を満たすような組み合わせがどうしても得られなくなる場合には、総合的な経済性を考慮すれば石炭灰有効利用処理に適合するような原料炭使用計画を策定することが好ましい。
こうした原料炭使用計画は短期的なものであるとはいえ、長期の発電計画や運炭計画、あるいは各ボイラの運用計画と矛盾しないようにする必要がある。十分に裏付けされた前提に基づいて計画を立てることが大切である。
【0032】
本実施例の石炭灰有効利用支援システムは、図1のシステム構成図に説明するように、電子計算機ネットワークシステムを用いて、各サイロの貯蔵される石炭灰の性状と量を推定し、需要家の要求に合うように石炭灰を調合して供給するための石炭火力発電プラントの運用計画を立案したり、必要な資料を適切に提供して人が立案するのを支援するものである。
電子計算機システムは、発電事務所とプラント運転室と関連事務所に、それぞれ必要なユニットを設置して利便を図っている。
【0033】
図1に示すように、発電事務所110にはデータベース装置111と運用計画を立てる演算装置112と運用の計画と実績を表示する運用計画実績閲覧用装置113を備えたLANが組まれていて、ルータ114を介して他の事務所のLANと接続されている。
データベース装置111には、石炭焚ボイラ設備1、灰処理装置2、出荷設備3における石炭灰処理に関する運用条件とその結果を格納して蓄積するプラント運用実績データベース115と、顧客情報と石炭灰の出荷や廃棄の実績を登録する出荷実績データベース116と、石炭焚ボイラ設備1、灰処理装置2、出荷設備3に関する確定した運用計画を格納する運用計画データベース117が設けられる。
【0034】
石炭火力発電プラントの灰処理装置2と出荷設備3の各サイトにあるプラント運転室120には、プラント制御装置121とプラントのデータを収集するデータ収集装置122と運用計画実績閲覧用装置123を備えて、ルータ124を介して他の事務所のLANと接続されている。
灰処理装置2と出荷設備3におけるサイロや分級器などの各要素装置にはそれぞれ制御系が付属していて、各プラント運転室120に設けられたプラント制御装置121によりシーケンス制御を中心とした制御が施される。また、制御系の要素が発生する各種の情報、オンライン分析器からの信号入力、および石炭灰成分の分析結果などの入力データは、データ収集装置122に格納され、さらにルータ124,114を介してデータベース装置111に集約される。
【0035】
また、運炭場や出荷所など発電所内外の関連する部門の事務所130にも、ルータ132を介して発電事務所110に接続される運用計画実績閲覧用装置131を備えて、石炭灰処理作業の状況を把握し、適切な作業計画の提示を受けて、必要な作業を適切なタイミングで実行することができるようになっている。
なお、複数のボイラ設備が存在する場合は、発電事務所110はそれらを統合する主事務所であってもよく、また各設備ごとに設けた現場事務所であってもよい。各設備ごとに設けるときは、さらに、上位の管理事務所に管理用電子計算機を設けて、各設備から必要な情報を集めて処理するようにすることが便利である。
【0036】
図2には、システムの全体像を作用に基づいて説明するブロック図が示されている。太い矢印線でシステム要素間の信号の動きを示し、細い矢印線で人の指示の方向を示している。
図2中の右上に示された、石炭焚ボイラ設備1、灰処理装置2、出荷設備3を含む石炭火力発電プラント200に対して、鎖線で囲った本実施例の石炭灰有効利用支援システム100が付属して、オペレータや計画員に灰の販売に伴う灰処理設備の運用に関する適切な情報を提供して判断の支援を行う。
【0037】
別途、電力需要予測201や石炭価格202に基づいて、長期の発電計画211が立てられ、さらにそれに見合った石炭購入、貯蔵、使用について長期運炭計画212が立てられる。さらに、灰需要予測203を加味して各ボイラごとに長期運用計画213が立案される。
支援システム100は、各ボイラの長期運用計画213を演算装置112に付属するデータ入力装置118を介して入力し、さらに、灰需要家から引き合いを受けたあるいは受注した個々の石炭灰の納入条件、すなわち灰納入仕様204をデータ入力装置118から入力する。
一方、石炭火力発電プラント200のボイラの各機器、サイロ、分級機、サイクロン、灰積込装置などの実際の状況と石炭灰自動分析装置で得られる分析データが、石炭焚ボイラ設備1、灰処理装置2、出荷設備3それぞれの装置に設置された制御装置121とデータ収集装置122により収集され、データベース装置111に集約される。
【0038】
データ収集装置122により収集されるプラントに関するデータとして、石炭灰を受け入れたときの各サイロのレベル変化、各ボイラから各灰処理サイロまでの系統選択操作、各灰処理サイロから各移送先サイロへの系統選択操作、各ボイラの負荷変化、各ボイラで使用した石炭種、ブレンディング操作、灰積込装置操作などがある。
また、石炭灰自動分析装置から取得するデータには、酸化シリコン、酸化カルシウム、酸化鉄などの組成、メチレンブルー吸着量、ブレーン比表面積、粒度分布、45μmふるい残分、塩基度、強熱減量分、JIS規格判定結果、サンプル採取位置、ボイラ投入石炭種、ボイラ負荷などがある。
【0039】
この他に、石炭名称コード、石炭中の灰分量、ボイラとエコノマイザや集塵機など部位における灰捕集効率などのデータは、データ収集装置122や演算装置112の入力装置から人が入力する。
これらのデータは、プラント運用実績データベース115に格納し蓄積して、所定の条件の下で運用したときの実績データとして、検索して利用することができる。
また、石炭火力発電プラント200で実際に行われた灰売却や灰廃棄の状況を顧客の情報とともに入力して出荷実績データベース116に格納する。格納するデータには、出荷日、出荷量、出荷灰品質、出荷したサイロ名、顧客名、顧客の希望品質、希望出荷量、希望納期などがある。
【0040】
演算装置112は、灰需要家からの灰納入引き合いに対して、図3に示すよう手順に従って、灰納入仕様204を満たすプラント運用が可能かを検証し、実行可能な場合は運用計画を策定して、運用計画実績閲覧用装置113を介して計画担当者に提示する。
運用計画に規定する内容は時系列的に表現されたものであって、サイロレベル変化量、サイロ内灰品質、各ボイラ部位から灰処理装置の各サイロまでの系統選択操作、灰処理装置のサイロから出荷設備のサイロまでの系統選択操作、分級器操作、各ボイラの負荷変化、各ボイラの使用石炭種、ブレンディング操作、灰積込装置操作などの事項がある。
【0041】
計画担当者は提示された運用計画の内容を検討221して、合理的であることを確認したときには承認222して、運用計画データベース117に格納させる。提示された計画が利用できない場合は、さらに発電や運炭の運用計画を見直し223、必要があれば長期発電計画211や長期運炭計画212を変更する。
計画の変更があったときは、演算装置112は新しい運用計画に基づいて再度運用計画の策定を行って、計画担当者に提示する。
【0042】
プラントの運用は、石炭灰有効利用支援システム100が直接に行うのではなく、運用計画データベース117に格納された実行可能な承認済みの運用計画を運用計画実績閲覧用装置113を介して読み出し、これを参照231して各設備ごとに設けられる制御装置121に必要な指示をして制御を実行する。
承認済み運用計画データに基づく石炭焚ボイラ設備1の制御装置に対する指示は、炭種の選択や、ボイラ負荷の変化がある。
また、灰処理装置2に対する指示には、ボイラの灰供給部位と灰処理装置2の各サイロまでの系統選択、分級器操作、配車指示などがある。
出荷設備3については、灰処理装置2の各サイロとブレンディングサイロ31および船積サイロ32の系統選択、ブレンディングサイロ31に対するブレンディング操作、灰積込装置33の操作、配船指示、などの指示を行う。
なお、各事務所では、必要に応じて適宜に運用実績データやプラント内の石炭灰の状況を運用計画実績閲覧用装置113を介して閲覧241することができる。
【0043】
灰納入仕様が与えられたときに、演算装置112が行う運用計画策定の手順を図3によって説明する。
出荷は必ず未来のある時期になるが、石炭灰有効利用支援システム100は既に決められた計画に沿って運用がされている。また、新しく要請された出荷以外にいくつかの既定の出荷予定もあることが普通である。そこで、まずは、現状における運用計画に新しい出荷作業を挿入した場合に顧客の要求仕様を満たし得るかを検証する。
このため、現状の運用計画の下で最も遅い出荷予定時刻と今回要請があった出荷の時期のいずれか遅い時刻までの将来にわたり、各ボイラ部位から発生する灰量、灰品質の変化を推定する(S11)。灰量や灰品質は原料炭の種類やボイラの負荷により変化するので、運炭計画や発電計画に依存する。ある条件下で得られる灰量や灰品質は過去の長い期間実績を積んできているので、これらの推定は運用実績データを活用したシミュレーションによって比較的精度よく行うことができる。
【0044】
ボイラで発生する石炭灰は、運用計画に従って灰処理装置2の各サイロに分配される。このときの各サイロに堆積する灰量とその石炭灰の品質性状の時系列的な変化を予測する(S12)。
出荷時期を考慮した上で、サイロごとに予測した灰量と灰品質の石炭灰を使って、サイロを選択し内部の石炭灰を適当量ずつ取り出しブレンディングサイロに搬送してブレンドする出荷設備運用計画を策定する(S13)。出荷設備運用計画には、ボイラへの給炭計画や石炭灰の移送計画、ブレンド操作の計画などが有機的に影響しあうため、エキスパートシステムなどの人工知能型プログラムを用いたスケジューラを活用して解を求めることが好ましい。
【0045】
策定された出荷設備運用計画によって得られる石炭灰の灰量と灰品質、およびブレンド後に灰排出が可能になる時刻を算定して、これらが需要家の灰納入仕様を満たすか否かを検証する(S14)。灰供給時刻の算出には、搬送時間、ブレンディング時間、ブレンド後の静置時間などの情報が必要となるが、これらは蓄積された実績値を利用することができる。なお、出荷設備運用計画には配船計画も含まれ、配船間隔中にブレンド作業が完了するように立案されなければならない。
【0046】
策定した運用計画によっては灰納入仕様を満たす石炭灰を提供することができない場合は、灰処理装置2から出荷設備3への灰搬送系統を変更して検討し尽くしたか調べる(S15)。サイロ選択変更や系統変更の余地が残っている場合は、これらを変更して(S16)、再度、サイロごとに取り出す灰量を想定して運用計画を立て、計画に従って取り出した石炭灰をブレンドしたときの灰品質を推定して(S13)灰納入仕様を満たすかを検証する(S14)。
このように、サイロ選択の余地がなくなるまで検討しても(S15)、灰納入仕様を満たしきれない場合は、石炭焚ボイラ設備1で使用する石炭の種類を変更する余地があるか否かを調べて(S17)、変更できる場合は炭種を変更するような運用計画を立てるものとし(S18)、新しく策定した炭種変更をする運用計画においてボイラ各部位から回収される石炭灰の量と品質を推定し(S11)、灰処理装置2の各サイロに回収した灰を分配するときの各サイロにおける灰の量と灰の品質を予測する(S12)。
【0047】
その後、ステップ13からステップ16のループを繰り返しては、需要家の要求を満たすような運用計画を探る(S14)。灰納入仕様を満たす運用計画が見つかったら、そうして策定した運用計画を運用計画実績閲覧用装置113を介して計画担当者に提示する(S19)。
計画担当者は、提示された運用計画を総合的に判断して、承認できると判断したときにはこの運用計画を運用計画データベース117に格納する(S20)。
なお、ステップ17において石炭種類を変更することができない場合、あるいは炭種変更を望まない場合は(S17)、その時点で得られている運用計画を計画担当者に提示する。
運用計画データベース117に格納された承認済みの実行可能な石炭焚ボイラ設備1、灰処理装置2、出荷設備3の運用計画は、操作員が運用計画実績閲覧用装置113を介して読み出しこれを参照して制御装置121に必要な指示を与えて各設備ごとの運用を行う。
【0048】
運用計画策定のためにシミュレーションを行うシミュレータは、演算装置112に組み込まれたソフトウエアであって、各プラント機器を物理モデル化して、プラント運用計画に基づいてどこにどのような品質の灰がどの程度発生し、各サイロの入出灰量がどうなるかを動態として予測する。
シミュレータで用いられる物理モデルは、ボイラBRと、その付属機器であるエアヒータAH、エコノマイザECO、電気集塵機EPのホッパ、および粗粉サイロL、回収サイロM、細粉サイロS、ブレンディングサイロB、船積サイロF、さらに分級器BKを対象として作成されている。
【0049】
灰の成分組成は、酸化シリコンSiO(S)、酸化カルシウムCaO(C)、酸化鉄Fe(F)、その他(O)の4種として、各サイロについて時間軸に沿った変動外乱としてあらかじめ格納しておく。
{S,C,F,O}={S(t),C(t),F(t),O(t)}
ただし、S(t)+C(t)+F(t)+O(t)=100%
【0050】
灰移送操作による灰流量は、指定した配管に最大流量が流れるものとする。
G=K×Gmax
ただし、Kは移送選択操作信号で1または0、Gはホッパからサイロあるいは灰処理装置のサイロから出荷設備のサイロまでの配管の流量、Gmaxはその容量である。
たとえば、粗粉サイロからブレンディングサイロもしくは船積サイロに移送される灰流量は、
GL=(KLB+KLF)×GLmax
と表される。GLは粗粉サイロに接続された配管の流量、KLBとKLFはそれぞれ粗粉サイロからブレンディングサイロへの経路と粗粉サイロから船積サイロへの経路における移送の有無を1または0で表すもので、KLBとKLFが同時に1になることはない。
【0051】
また、ブレンディングサイロ内の灰は完全混合するとする。
d/dt(W)=Gi−Go
Wは灰重量、Giは流入量、Goは流出量である。Wを強熱減量、ブレーン比表面積、メチレンブルー吸着量などの特性値とするときは、Gi、Goは流入流出の特性値に流量を掛けた値となる。
【0052】
エアヒータAH、エコノマイザECO、電気集塵機EPの各ホッパについては、ボイラに投入した石炭量に、その灰分率、灰中のフライアッシュ率、さらにその機器における捕集効率を掛け合わせて、各ホッパにおける灰発生量を算定する。また、灰組成、強熱源量、ブレーン比表面積、メチレンブルー吸着量は、ボイラ負荷や石炭種などにより変化するので、これらの実例をプラント運用実績データベース115から検索して用いる。
【0053】
各サイロには、灰を最下層から排出し、最下層の灰がなくなったときにその上の層の成分に切り替わる、バッチモデルを採用する。最上層は、ボイラや上流のサイロから投入された灰の灰成分を有する。
分級器では、回転数によって細粉サイロと粗粉サイロへの分級率が異なるのでこれを考慮して、組成、強熱減量、ブレーン比表面積、メチレンブルー吸着量を分配する。
【0054】
シミュレータは、こうした物理モデルを用いて、ボイラにおける負荷と原料炭供給の時間変化、ボイラ機器のホッパから灰処理装置の各サイロへの配管系統、さらにブレンディングサイロと船積サイロへの配管系統に基づいてシミュレーションして、ボイラ機器のホッパから排出される灰量や灰品質、各サイロにおいて積層する灰量と灰品質、ブレンディングサイロにおける灰量と灰品質および排出可能な時刻、船積装置への配船などを算出する。
なお、このシミュレータは、出荷する灰の品質を評価するときにも使用されている。
【0055】
演算装置112に組み込まれる人工知能型スケジューラは、PROLOGなどの論理型言語を用いて、それぞれの要素について満たすべき制約条件を設定し、出荷条件を満たす運用スケジュールを作成してはすべての制約条件を満足するか検証することを繰り返して、最終的にプラント全体の運用スケジュールにつき適切な解を求めるものである。
したがって、制約条件そのものがスケジューラを構築する要素となる。制約条件には優先順位を設定して求解手順を簡単化し、灰出荷スケジュールの適解が得られるまで試行を繰り返させる。
【0056】
本実施例の石炭灰有効利用支援システム100により、電力需要予測201と石炭価格202に基づいて決定される長期発電計画211と長期運炭計画212に灰需要予測203を加味して策定されたボイラ長期運用計画213に沿いながら、個々の灰需要家が灰量、灰品質、納期などを定めた灰納入仕様204に適合するような石炭火力発電プラント200の運用計画が提示されるので、計画担当者は容易に的確な運用計画を策定することができる。
また、必要であれば、運炭計画を短期的に修正して灰納入仕様に適合させることにより、有効活用できる灰量を増大させるようにすることもできる。
なお、炭種や負荷により変化するボイラ各部位における灰発生量や生成する灰の品質、灰のサイロ選択系統や移送時間、サイロのレベル変化、ブレンディング条件やブレンディングによる品質調整結果、顧客の希望条件、等々の実績情報はデータベース装置111で収集して蓄積するので、シミュレーションやスケジューリングに活用して計画の精度を向上させることができる。また運用計画実績閲覧用装置113を通じて、計画担当者らに提示して経験則のみに頼ることなく実績に基づいて判断できるようにすることができる。
【0057】
本実施例の石炭灰有効利用支援システムを用いると、灰品質データ、出荷管理データ、在庫管理データ、灰需要家データ、その他必要なデータが、通常のプラント運用業務を通じて、運用実績としてデータベース化して蓄積するので、過去の運用方法の検証を行うことにより、また近似した条件における実績を参照して、個々の灰需要に際し新しい運用計画を適切に作成することができる。
従来はプラントの構成が複雑なため1ヶ月単位程度の長期的な灰処理計画しか立案できなかったが、本実施例のシステムでは、灰処理装置のシミュレーションと、灰処理装置、出荷設備、さらにボイラ設備のスケジューリングを組み合わせて用いるので、個別設備における比較的短期間の詳細な運用計画を立案することもできる。
このようにして、オペレータの経験則に頼ることなく、最適な運用計画をほぼ機械的に立案することができる。特に、個別の灰需要家による灰納入仕様に適合するようにプラントの運用方法を変更することができるようになった。
【0058】
また、本実施例の石炭灰有効利用支援システムを用いると、急激な灰需要変動があっても、シミュレーションやスケジューリングの再試行によって柔軟に対応することができる。また、灰需要に適応して需給のバランスが取れるようにボイラ側の運用を調整することができる。
さらに、シミュレーションを行うことにより、サイロ内の石炭灰の品質管理を行うことができる。
また本実施例のシステムを用いると、ネットワークを通じて、得られた情報を各所に配信して共有することができるので、複数部門間でタイムリーに情報を利用することにより無駄なランニングコストが発生しない。
なお、発電所によって発電設備数やサイロの構成などが変化するが、灰処理プラントとしての構成や本実施例の石炭灰有効利用支援システムの構成は基本的に変らない。
【0059】
【発明の効果】
以上説明した通り、本発明の石炭灰有効利用支援システムにより、多種多様の原料炭から発生する石炭灰のストックを適切に管理して灰需要家の要求仕様に合うフライアッシュを供給できるようにすることができる。また必要に応じて発電プラントの運用計画や石炭受け入れ計画にフィードバックして、より効率的な石炭灰処分を行うことができる。
【図面の簡単な説明】
【図1】本発明の石炭灰有効利用支援システムについて、その1実施例の構成を説明するブロック図である。
【図2】本実施例の石炭灰有効利用支援システムの作用を説明するブロック図である。
【図3】本実施例の石炭灰有効利用支援システムの動作論理を説明するフロー図である。
【図4】本発明の対象とする石炭火力発電プラントを示すブロック図である。
【符号の説明】
1 石炭焚ボイラ設備
2 灰処理装置
3 出荷設備
11 石炭焚ボイラ
12 エコノマイザとエアヒータ
13 電気集塵機
14 煙突
21 クリンカ中継タンク
22 灰捕集機
23 サイクロン
24 分級器
25 細粉サイロ
26 回収サイロ
27 粗粉サイロ
28 灰分析器
29 タンクローリ
31 ブレンディングサイロ
32 船積サイロ
33 灰積込装置
34 フライアッシュ運搬船
35 タンクローリ
100 石炭灰有効利用支援システム
110 発電事務所
111 データベース装置
112 演算装置
113 運用計画実績閲覧用装置
114 ルータ
115 プラント運用実績データベース
116 出荷実績データベース
117 運用計画データベース
118 データ入力装置
120 プラント運転室
121 プラント制御装置
122 データ収集装置
123 運用計画実績閲覧用装置
124 ルータ
130 関連部門事務所
131 運用計画実績閲覧用装置
132 ルータ
200 石炭火力発電プラント
201 電力需要予測
202 石炭価格
203 灰需要予測
204 灰納入仕様
211 長期発電計画
212 長期運炭計画
213 各ボイラ長期運用計画
221 運用計画内容検討
222 計画承認
223 発電運炭運用計画見直し
231 承認済運用計画参照
241 閲覧
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a computer-assisted system for supporting the effective use of coal ash generated in a coal-fired boiler of a coal-fired power plant, and more particularly to a support system for an ash treatment plant attached to a coal-fired boiler of a thermal power plant.
[0002]
[Prior art]
There are various options for the fuel for the thermal power plant boiler, including new fuels such as heavy oil, LNG, and oil sands. However, coal is still often selected from the viewpoint of resource quantity, economy, operability, and the like.
In particular, in coal-fired power plants, there is a demand for improved operation performance that can cope with load fluctuations while functioning as a base power plant. In addition, it is required to use a wide variety of overseas coal as fuel, and how to properly implement a coal use plan has become an important issue. For this reason, it is necessary to automate the operation management planning of the coal yard.
[0003]
Kawasaki Heavy Industries Technical Report 136 discloses a computer system for supporting operations in a coal storage plant of a coal-fired power plant. At the center of this system is a stockpile inventory forecasting function, which has been provided with a simulation function that includes case studies such as acceptance planning and withdrawal planning, compared to the former planner who made rational plans while calculating by himself. The operation of the coal storage yard by predicting future coal stocks and the stockpiling status of the coal yard while confirming whether the coal consumption plan satisfies the power generation plan and whether the specified brand is capable of mixed coal combustion. Provide planning support.
The disclosed system automatically prepares or plans an operation plan to efficiently process coal unloading from a coal carrier, coal storage at a coal yard, and discharge to a boiler bunker in response to a power generation plan. I can help.
[0004]
On the other hand, coal ash generated during boiler operation is disposed of as landfill as industrial waste.However, due to environmental problems in recent years, coal ash must be effectively used instead of simply discarding it as in the past. There is an active movement to sell to ash consumers such as cement companies that can do this. In order to sell to ash consumers, it is necessary to satisfy the quality requirements suitable for the purpose of use. However, coal ash obtained from coking coals of various characteristics has various qualities, so ash of appropriate quality should be mixed in an appropriate ratio to meet the quality required by customers before shipping. There must be.
[0005]
Although the classification of coal ash is performed based on the particle size, the required specification may further define the ignition loss, density, specific surface area, methylene blue adsorption amount, and the like. Therefore, when the separated coal ash does not satisfy the customer's requirements as it is, an appropriate amount of coal ash is collected from a plurality of silos, blended and shipped. If the properties of the coking coal are different, the other properties are different even if the grain size is the same.Therefore, it is not possible to appropriately determine the brand and amount to be blended using only coal ash in stock, and to mix fly ash that meets the required specifications. Requires great experience and skill.
[0006]
In addition, although power plants generate income from the electricity they produce, the resulting shortage of landfills and the disposal costs of coal ash are becoming insignificant. For this reason, in some cases, it may be necessary to adjust the coal type and adjust the operation of the boiler plant to meet the demands of the customers to which coal ash is sold. However, it is difficult to formulate an accurate plan while matching power supply and coal ash sales.
[0007]
In the past, it was difficult to keep these materials available in spite of the fact that there were many effective operation results in the past, so it was not possible to perform detailed verification of the operation method for these plans . In addition, communication between the long steps from ash production to sale and disposal was not properly performed, resulting in unnecessary running costs.
In addition, it is difficult to incorporate ash sales and disposal plans into power generation, coal transportation, and boiler operation plans, and at most it could be considered in long-term plans of about one month.
In addition, conventionally, there is no automatic control for the purpose of adjusting the quality at the time of selling ash.In order to operate the plant to meet the ash delivery specifications of individual customers, it is necessary to use the operator's empirical rules. I had to rely on it.
[0008]
Japanese Patent Application Laid-Open No. 9-296924 discloses a computer for supporting the operation of ash processing equipment for predicting and displaying a level change of a silo for storing fly ash generated in a boiler and collected by an electric dust collector.
Here, the ash content of the fuel, the ratio of the ash to fly ash, and the dust collection efficiency of the electric dust collector, which are known for each coal type, are used to give the boiler load curve and the fuel supply curve, giving the fly ash ash. Calculate the traffic volume, measure the current silo level online, and display the expected level change in the future, to assist operators in developing a plan for the emission of fly ash from the silo.
[0009]
Since the amount of ash generated from the boiler varies greatly depending on the boiler load, whether the ash actually supplied from the boiler can be actually accepted even if the current level of the fly ash silo is known, or whether it is necessary to discharge it in advance Because it is not known, the computer system predicts future level changes and presents the results so that the user can correctly determine the necessity of discharging ash from the silo.
Therefore, the technology disclosed in the above-mentioned patent publication is only used for silo level control, and it is possible to adjust the components to meet the required specifications of ash consumers or to meet expected ash sales demand. It does not relate to matters such as planning a plant operation.
[0010]
[Problems to be solved by the invention]
The problem to be solved by the present invention is to supply fly ash that meets the required specifications of customers who manage the stock of coal ash generated from various types of coking coal in a coal-fired power plant and make effective use of the ash. The process from ash production to ash emission is to be carried out in order to be able to conduct more efficient coal ash disposal by feeding back to the power plant operation plan and coal acceptance plan as necessary. The purpose is to provide an effective utilization support system for coal ash that is managed organically.
[0011]
[Means for Solving the Problems]
In order to solve the above problems, the coal ash of the present invention is effectively used in a coal-fired power plant in which coal ash generated in a coal-fired boiler is distributed to silos in accordance with ash quality, and ash quality is adjusted and shipped as necessary. The support system includes an operation plan calculation device, an operation plan result browsing device, and a data collection device.
The data collection device collects the actual operation values through the control device or the ash analysis device of the boiler plant and accumulates them in a database.
The operation plan calculation device is equipped with a data input device, a simulator and a scheduler, estimates the amount of ash discharged and the ash quality at the coal ash discharge site of the boiler with the simulator and the scheduler, and assumes a transfer system to a silo. Predict the time variation of silo level and ash quality, find silo selection and blending operation that will enable the shipment to meet the ash delivery specifications input from the data input device, and formulate an operation plan for the coal-fired power plant.
The operation plan result browsing device is characterized by appropriately displaying the operation plan formulated by the operation plan calculation device and the operation result value accumulated in the database.
[0012]
With the use of the coal ash effective utilization support system of the present invention, with the help of a simulator and a scheduler, the generation of coal ash and its ash quality in a coal-fired boiler plant, or the transfer of ash from each part of a boiler to a silo, and between silos The operation plan can be formulated by calculating various parameters necessary for the plant operation plan, such as time, blending time, silo selection for blending, ash quality change status during the process, and shipping operation.
In the database, necessary data such as ash quantity and ash quality are stored in a database as long-term operation results through normal plant operation work, and the results are approximated by verifying past operation methods. By referring to the actual results under the conditions, when creating a plant operation plan for each ash demand, it is possible to accurately obtain the information necessary to calculate the necessary parameters as actual values, and Performance can be improved.
Further, conventionally, only a long-term ash treatment plan of about one month unit could be made due to the complicated structure of the plant. However, the system of the present invention simulates the ash treatment device, and performs the ash treatment device, shipping equipment, boiler Since a combination of equipment scheduling and the like is used, a relatively short-term detailed operation plan for individual equipment can be formulated.
[0013]
In addition, the data collection device may include an operation plan database in addition to the operation result database, store the operation plan recognized as being usable, and display the operation plan with the operation plan result browsing device as necessary. .
Once the details of the operation plan have been inspected and approved, it is not necessary until it is time to actually adjust the plant operation, so it is only when preparing for shipment according to the ash delivery specifications. What is necessary is just to make it display.
[0014]
Further, it is preferable that the scheduler is an artificial intelligence type scheduler that includes, as elements, constraints set for the equipment of the coal-fired power plant.
The operation plan cannot be formulated uniquely in order due to the complicated constraints of the equipment.However, by using such an artificial intelligence program, a possible operation plan must be formulated by trial and error. Can be.
[0015]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, the coal ash effective utilization support system of the present invention will be described in detail using embodiments.
1 is a block diagram illustrating the configuration of the present embodiment, FIG. 2 is a block diagram illustrating the operation of the present system, FIG. 3 is a flowchart illustrating the operation logic of the present system, and FIG. It is a block diagram showing a plant.
The coal ash effective utilization support system of the present embodiment is a system that mixes and supplies fly ash that meets the quality requirements of ash consumers, or a system that effectively assists operators in doing so.
[0016]
An ash processing plant to which the present system is applied stores coal ash emitted from a coal-fired boiler facility 1 in an ash processing device 2 as shown in FIG. The shipment is carried out from the shipping facility 3 or shipped on the vehicle. Since the ash treatment device 2 is attached to the coal-fired boiler equipment 1 in principle, there may be a plurality of coal-fired boiler equipment and a plurality of ash treatment devices. On the other hand, one set of shipping equipment 3 is commonly provided for a plurality of ash processing apparatuses.
[0017]
Describing the coal-fired power plant in more detail, the coal-fired boiler facility 1 includes a coal-fired boiler 11, an economizer ECO and an air heater AH12, an electric dust collector EP13, and a chimney 14. The hot air flow generated by the coal-fired boiler 11 is recovered by the heat transfer surface in the coal-fired boiler 11, the economizer ECO and the air heater AH12 while containing coal ash, and is discharged to the atmosphere through the chimney 14 through the electric dust collector EP13.
Most of the coarse powder ash among the coal ash conveyed to the hot air stream is recovered from the bottom of the economizer ECO and the air heater AH12. In the electric dust collector EP13, dust collection units are arranged in series along the flow of gas, and coal ash having a large particle size is collected in order from upstream to downstream. The coal ash collected in the upstream unit contains the economizer ECO and the coarse powder ash left by the air heater AH12, but the downstream unit collects only the fine powder ash.
The clinker dropped to the bottom of the coal-fired boiler 11 is once collected by a clinker hopper provided below, transferred to the clinker relay tank 21, and stored until dispensed. Clinker can be effectively used as a roadbed material.
[0018]
The coal ash discharged from the coal-fired boiler facility 1 is sorted and stored according to the ash particle size in the ash treatment device 2, and then appropriately discharged. The ash treatment device 2 includes an ash collector 22, a cyclone 23, a classifier 24, a fine powder silo 25, a recovery silo 26, and a coarse powder silo 27 in addition to the clinker relay tank 21.
The ash collector 22 is a device that vacuum-suctions and collects ash accumulated in a hopper provided at the bottom of the economizer ECO, the air heater AH12, and the electric dust collector EP13. The ash collector 22 is provided with a switching valve. The coarse ash sucked from the economizer ECO and the air heater AH12 is sent to the coarse silo 27, and the fine ash collected from the downstream unit of the electric dust collector EP13 is fine fine silo 25 Send to Further, coarse ash and fine ash are mixed in the coal ash recovered from the upstream unit of the electrostatic precipitator EP13, so that the coal ash is temporarily stored in the recovery silo 26.
[0019]
An ash analyzer 28 is provided at the inlet pipe of the ash collector 22 to sample coal ash discharged from the boiler facility 1 of the collector and measure its characteristics. Measurement items include unburned carbon content or ignition loss, particle size distribution, methylene blue adsorption amount, specific surface area of brane, component ratio of silicon oxide, calcium oxide, and iron trioxide, 45 μm sieve residue, basicity, etc. as fly ash This is a matter related to performance.
[0020]
The coal ash in the recovery silo 26 is conveyed to the classifier 24 and separated according to the particle size, the fine powder ash is recovered in the cyclone 23, and the coarse powder ash is dropped into the coarse powder silo 27. If the number of rotations of the rotary vanes of the classifier 24 is increased, finer ash can be separated. The fine ash collected in the cyclone 23 is sent to the fine silo 25 for storage.
The coarse ash stored in the coarse silo 27 and the coal ash stored in the recovery silo 26 can be effectively used as a substitute for clay, or mixed and used as a component adjustment allowance for fly ash, which is in demand.
Coal ash can also be directly taken out of these silos and shipped. In such direct shipping, when the amount of shipment is small, or when the demand is near or in a place that is not suitable for water transportation, the tank lorry 29 is used. Can also be shipped.
[0021]
The ash shipping facility 3 includes a blending silo 31, a loading silo 32, and an ash loading device 33. At thermal power stations located on the coast, riverside, or lakeshore, it is reasonable to transport fly ash using a ship, so the ash loading device 33 is a loading facility, but other means such as truck transport In a preferred case, facilities suitable for each means are provided. Here, description will be made assuming that shipping is used.
The blending silo 31 receives an appropriate amount of the coal ash selected from the silos 25, 26, and 27, mixes the coal ash to meet the specifications required by the customer, and sends it to the ash loading device 33. The blending silo 31 is provided with a mixing device using a high-pressure compressor, and agitates the ash with air to homogenize the components in the ash.
[0022]
The loading silo 32 is a silo for storing coal ash in order to discharge a large amount of ash by ship. It is also used when it is not necessary to mix, but is mainly used when discarding ash which is stored in the recovery silo 26 or the coarse powder silo 27 and is difficult to use effectively.
The ash loading device 33 receives the adjusted coal ash and the coal ash to be discarded, and loads the fly ash carrier 34 to transport it to a demand place or a disposal site.
Although not shown in the figure, an ash pressure transport device using air pressure is provided to transport coal ash from the ash processing device 2 to each device of the shipping facility 3 and between each device of the shipping facility 3. Have been.
The contents of the blending silo 31 and the loading silo 32 can be paid out to the tank lorry 35 for processing.
[0023]
Consumers who use coal ash require different qualities for different purposes.
Fly ash to be mixed with concrete and used is specified in JIS A 6201. The ratio of silicon oxide component, moisture, loss on ignition, density, 45 μm sieve residue, specific surface area (Brain value), flow ratio value The silica fly ash is classified into four types from type I to type IV by evaluating the activity index.
Those satisfying conditions such as a Blaine value of 5000 cm 2 / g or more, a loss on ignition of 3.0% or less, and a flow ratio value of 105% or more are considered to be the highest quality fly ash class I and have fluidity when mixed into concrete. High improvement effect.
[0024]
Those satisfying conditions such as a Blaine value of 2500 cm 2 / g or more, a loss on ignition of 5.0% or less, and a flow ratio value of 95% or more are classified as Fly Ash II and can be used without any problem by mixing with concrete. Most fly ash that can actually be sold is Type II.
The fly ash III class satisfies conditions such as a Blaine value of 2500 cm 2 / g or more, a loss on ignition of 8.0% or less, and a flow ratio value of 85% or more. The ignition loss is larger than that of the fly ash type II. Therefore, it can be sold as valuable depending on the purpose of the consumer.
[0025]
The fly ash type IV satisfies conditions such as a Blaine value of 1500 cm 2 / g or more, a loss on ignition of 5.0% or less, and a flow ratio value of 75% or more. For coarse powder. The type IV fly ash requires consideration of the fresh properties when mixed with concrete, and it cannot be expected to exhibit sufficient strength. For this reason, it is common for consumers to pay for and dispose of them.
Non-JIS fly ash is paid for by the power station and collected or disposed of.
It should be noted that the amount of methylene blue adsorbed may be used as a quality standard by some customers. The amount of methylene blue adsorbed is a good indicator of the unburned carbon content that needs to be properly managed to counteract the effect of a type of surfactant added to concrete.
[0026]
Although only fly ash class I or class II can be used as a concrete admixture or cement admixture, it is possible to use road materials such as a solidifying machine, soil improvement materials, and fly ash that does not comply with JIS standards for construction sludge recycling. However, only fly ash class II can be sold normally as valuables, class III can be sold in some cases, but class IV and below are subject to disposal costs and disposal.
In the fields of agriculture and construction, special coal types may be specified for delivery.
[0027]
As described above, the customer makes a transaction request by designating a quality grade, a delivery amount, and a delivery date based on JIS and own standards. The power plant considers whether it can meet this and, when available, actually ships the specified quantity of fly ash of the specified quality on the specified date.
If the properties and quantity of the coal ash stored in any of the silos 25, 26, 27 meet the demands of the customer, the silo is discharged to the loading silo 32 and loaded by the ash loading device 33. Good. If none of the silos store coal ash that satisfies the conditions, the contents of the plurality of silos are taken out in appropriate amounts and mixed in the blending silo 31 to adjust the components before shipping.
[0028]
For this purpose, the characteristics of coal ash in the silo must be accurately understood. For the component analysis in the silo, the result of automatic analysis by the ash analyzer 28 in the pipe can be used. However, since the result of the ash analyzer 28 is obtained after a long time, it is difficult to accurately determine in which silo the coal ash representing the analysis result is stored.
However, one silo does not store coal ash of the same properties from bottom to top, and it is common practice to store coal ash collected from different parts of the coal-fired boiler facility 1 in layers. In addition, even if collected from the same site, the properties of the coal ash will change if the coking coal is different or if the boiler operating conditions are different.
[0029]
Therefore, even when collecting and analyzing a sample from a silo, it is necessary to set a number of sample points in the depth direction and perform a large number of analyzes in order to obtain accurate results.
For this reason, a sample can be obtained from a silo and analyzed by an automatic analyzer in an analysis room to obtain a result. In this method, the analysis is troublesome, and the result is delayed. However, there are relatively few restrictions on the sampling position, and correct results can be obtained in various places.
[0030]
Furthermore, in the method of combining several coal ashes to meet the required specifications, since there are a plurality of characteristic values to be considered and the amount of coal ash that can be used as a raw material is limited, in order to select a blending method, It requires advanced computational skills and intuitive solution skills backed by experience, and is a task for skilled workers.
However, even in this case, if the delivery date is sometime in the future, the condition in the silo at that time must estimate the properties and amount of coal ash accumulated in each silo from the power generation plan and coal transportation plan up to that date. It is difficult for humans to make such an estimation, and it is not easy to know whether or not coal ash that meets the conditions at the time of delivery is stored. Moreover, it is extremely difficult even for a skilled person to know what preparation method should be used.
[0031]
In addition, the operation of the power boiler and the selection of fuel coal are usually performed independently of the operation of the ash treatment equipment, but the characteristics of the coal ash that is to be stored in the silo do not conform to the needs of consumers. If it is impossible to obtain a combination that satisfies the required quality specifications, it is preferable to formulate a coking coal use plan that is compatible with the effective use of coal ash in consideration of overall economics.
Although such a coking coal use plan is short-term, it must be consistent with long-term power generation plans, coal transportation plans, and operation plans for each boiler. It is important to plan based on well-documented assumptions.
[0032]
The coal ash effective utilization support system of this embodiment estimates the properties and quantity of coal ash stored in each silo by using a computer network system as described in the system configuration diagram of FIG. The purpose of the plan is to formulate an operation plan for a coal-fired power plant to mix and supply coal ash to meet the requirements of the above, and to provide human resources by providing necessary materials appropriately.
The electronic computer system is installed in a power generation office, a plant operation room, and a related office, respectively, to provide necessary units for convenience.
[0033]
As shown in FIG. 1, the power generation office 110 is provided with a LAN including a database device 111, an arithmetic device 112 for making an operation plan, and an operation plan / results viewing device 113 for displaying the operation plan and results. It is connected to the LAN of another office via the router 114.
The database device 111 stores a plant operation result database 115 for storing and accumulating operation conditions and results of the coal ash processing in the coal-fired boiler facility 1, the ash processing apparatus 2, and the shipping facility 3, customer information, and shipping of coal ash. And an operation plan database 117 for storing a confirmed operation plan relating to the coal-fired boiler equipment 1, the ash processing apparatus 2, and the shipping equipment 3.
[0034]
The plant operation room 120 at each site of the ash processing device 2 and the shipping facility 3 of the coal-fired power plant includes a plant control device 121, a data collection device 122 for collecting plant data, and an operation plan result viewing device 123. Thus, it is connected to the LAN of another office via the router 124.
Each element device such as a silo and a classifier in the ash treatment device 2 and the shipping equipment 3 has a control system attached thereto, and the plant control device 121 provided in each plant operation room 120 controls mainly the sequence control. Is applied. In addition, various information generated by the elements of the control system, signal input from the online analyzer, and input data such as the analysis result of the coal ash component are stored in the data collection device 122 and further through the routers 124 and 114. It is collected in the database device 111.
[0035]
In addition, offices 130 of related departments inside and outside the power plant such as a coal yard and a shipping station are also provided with an operation plan result viewing device 131 connected to the power generation office 110 via the router 132 to perform coal ash processing. It is possible to grasp the status of the work, receive an appropriate work plan, and execute necessary work at a proper timing.
When a plurality of boiler facilities are present, the power generation office 110 may be a main office integrating them, or a site office provided for each facility. When providing for each facility, it is more convenient to provide a management computer in a higher-ranking management office so that necessary information is collected from each facility and processed.
[0036]
FIG. 2 is a block diagram illustrating an overall image of the system based on the operation. Thick arrow lines indicate the movement of signals between the system elements, and thin arrow lines indicate the direction of human instructions.
For the coal-fired power plant 200 including the coal-fired boiler facility 1, the ash processing apparatus 2, and the shipping facility 3 shown in the upper right in FIG. And provides appropriate information to the operators and planners regarding the operation of the ash processing equipment associated with the sale of ash to assist in making decisions.
[0037]
Separately, a long-term power generation plan 211 is set based on the power demand forecast 201 and the coal price 202, and a long-term coal transportation plan 212 is set for purchase, storage, and use of coal corresponding to the plan. Further, a long-term operation plan 213 is prepared for each boiler in consideration of the ash demand forecast 203.
The support system 100 inputs the long-term operation plan 213 of each boiler via the data input device 118 attached to the arithmetic unit 112, and furthermore, the delivery conditions of the individual coal ash received or ordered from the ash consumer, That is, the ash delivery specification 204 is input from the data input device 118.
On the other hand, the actual situation of each device, silo, classifier, cyclone, ash loading device, etc. of the boiler of the coal-fired power plant 200 and the analysis data obtained by the automatic coal ash analyzer are used for the coal-fired boiler facility 1, ash treatment. The data is collected by the control device 121 and the data collection device 122 installed in each of the device 2 and the shipping facility 3, and is collected in the database device 111.
[0038]
As the data on the plant collected by the data collection device 122, a level change of each silo when coal ash is received, a system selection operation from each boiler to each ash processing silo, and a transfer from each ash processing silo to each transfer silo. There are system selection operation, load change of each boiler, type of coal used in each boiler, blending operation, ash loading device operation, and the like.
The data obtained from the coal ash automatic analyzer include the composition of silicon oxide, calcium oxide, iron oxide, etc., the amount of methylene blue adsorbed, the specific surface area of the brane, the particle size distribution, the 45 μm sieve residue, the basicity, the loss on ignition, There are JIS standard judgment results, sample collection position, boiler input coal type, boiler load, and the like.
[0039]
In addition, data such as the coal name code, the amount of ash in the coal, and the ash collection efficiency of the boiler, the economizer, the dust collector, and other parts are input by a person from the input device of the data collection device 122 or the arithmetic device 112.
These data can be stored and accumulated in the plant operation result database 115, and can be searched for and used as result data when operated under predetermined conditions.
Further, the status of ash sale or ash disposal actually performed in the coal-fired power plant 200 is input together with customer information and stored in the shipping result database 116. The stored data includes a shipping date, a shipping amount, a shipping ash quality, a shipped silo name, a customer name, a customer's desired quality, a desired shipping amount, a desired delivery date, and the like.
[0040]
The arithmetic unit 112 verifies whether it is possible to operate a plant that satisfies the ash delivery specification 204 according to the procedure shown in FIG. 3 in response to an ash delivery inquiry from an ash consumer, and formulates an operation plan if feasible. Then, the information is presented to the person in charge of planning via the operation plan result browsing device 113.
The contents stipulated in the operation plan are expressed in chronological order, the amount of change in silo level, ash quality in the silo, system selection operation from each boiler part to each silo of the ash treatment device, silo of the ash treatment device There are items such as system selection operation from the silo to the shipping equipment silo, classifier operation, load change of each boiler, type of coal used in each boiler, blending operation, ash loading device operation, etc.
[0041]
The planner examines the contents of the presented operation plan 221, and if it is reasonable, approves 222 and stores it in the operation plan database 117. If the presented plan cannot be used, the operation plan of power generation and coal transportation is further reviewed 223, and the long-term power generation plan 211 and long-term coal transportation plan 212 are changed if necessary.
When there is a change in the plan, the arithmetic unit 112 formulates the operation plan again based on the new operation plan and presents it to the person in charge of the plan.
[0042]
The operation of the plant is not performed directly by the coal ash effective utilization support system 100, but rather, an executable and approved operation plan stored in the operation plan database 117 is read out via the operation plan result browsing device 113, and 231 and instructs the control device 121 provided for each facility to execute necessary control.
The instruction to the control device of the coal-fired boiler facility 1 based on the approved operation plan data includes selection of a coal type and a change in boiler load.
The instructions to the ash processing device 2 include a system selection from the ash supply site of the boiler and each silo of the ash processing device 2, a classifier operation, a vehicle allocation instruction, and the like.
With respect to the shipping facility 3, instructions are given such as system selection of each silo of the ash processing device 2, the blending silo 31 and the loading silo 32, blending operation for the blending silo 31, operation of the ash loading device 33, ship assignment instruction, and the like.
In each office, the operation result data and the status of coal ash in the plant can be browsed 241 via the operation plan result browsing device 113 as needed.
[0043]
The procedure of operation plan formulation performed by the arithmetic unit 112 when the ash delivery specification is given will be described with reference to FIG.
Although the shipment always comes at a certain time in the future, the coal ash effective utilization support system 100 is operated according to the already determined plan. Also, there are usually some default shipping schedules in addition to the newly requested shipments. Therefore, first, it is verified whether the specifications required by the customer can be satisfied when a new shipping operation is inserted into the current operation plan.
For this reason, the change in the amount of ash generated from each boiler part and the change in ash quality are estimated in the future until the later of the latest scheduled shipping time under the current operation plan and the shipping time requested this time, whichever is later. (S11). Ash content and ash quality vary depending on the type of coking coal and the load on the boiler, and therefore depend on the coal transportation plan and the power generation plan. Since the ash amount and ash quality obtained under certain conditions have been accumulated for a long time in the past, these estimations can be made with relatively high accuracy by simulation using operation result data.
[0044]
The coal ash generated in the boiler is distributed to each silo of the ash processing device 2 according to an operation plan. At this time, a time-series change in the amount of ash deposited in each silo and the quality properties of the coal ash is predicted (S12).
A shipping facility operation plan that uses coal ash of the ash quantity and ash quality predicted for each silo, taking into account the shipping time, selecting silos, extracting an appropriate amount of internal coal ash, transporting it to a blending silo, and blending. Is formulated (S13). Since the coal supply plan to the boiler, the coal ash transfer plan, and the blending operation plan, etc., organically affect the shipping equipment operation plan, a scheduler using an artificial intelligence type program such as an expert system is used. It is preferable to find a solution.
[0045]
Calculate the ash amount and ash quality of coal ash obtained from the formulated shipping facility operation plan, and the time at which ash can be discharged after blending, and verify whether these meet the ash delivery specifications of customers (S14). The calculation of the ash supply time requires information such as the transport time, the blending time, and the standing time after blending, and these can use the accumulated actual values. The shipping equipment operation plan also includes a ship allocation plan, and it must be drafted so that the blending operation is completed during the ship allocation interval.
[0046]
If coal ash satisfying the ash delivery specifications cannot be provided according to the formulated operation plan, it is checked whether the ash transport system from the ash processing device 2 to the shipping facility 3 has been changed and the study has been completed (S15). If there is still room for silo selection change or system change, these are changed (S16), and an operation plan is made again assuming the amount of ash to be taken out for each silo, and the coal ash taken out according to the plan is blended. The ash quality at that time is estimated (S13), and it is verified whether the ash delivery specifications are satisfied (S14).
As described above, even if there is no room for silo selection (S15), if the ash delivery specification cannot be satisfied, it is determined whether there is room for changing the type of coal used in the coal-fired boiler facility 1. Investigation (S17), and if it can be changed, an operation plan to change the coal type shall be made (S18), and the amount of coal ash recovered from each part of the boiler in the newly formulated operation plan to change the coal type shall be determined. The quality is estimated (S11), and the amount and quality of the ash in each silo when distributing the collected ash to each silo of the ash treatment device 2 are predicted (S12).
[0047]
Thereafter, the loop from step 13 to step 16 is repeated to search for an operation plan that satisfies the demand of the customer (S14). When an operation plan that satisfies the ash delivery specification is found, the operation plan thus formulated is presented to the person in charge of the plan via the operation plan result browsing device 113 (S19).
The planner comprehensively judges the presented operation plan and, when judging that it can be approved, stores the operation plan in the operation plan database 117 (S20).
If the type of coal cannot be changed in step 17 or if it is not desired to change the type of coal (S17), the operation plan obtained at that time is presented to the person in charge of planning.
The operation plan of the approved executable coal-fired boiler facility 1, ash processing apparatus 2, and shipping facility 3 stored in the operation plan database 117 is read out by the operator via the operation plan result browsing apparatus 113 and is referred to. Then, a necessary instruction is given to the control device 121 to operate each facility.
[0048]
A simulator for performing a simulation for formulating an operation plan is software incorporated in the arithmetic unit 112. Each of the plant devices is physically modeled, and based on the plant operation plan, where and how much ash is of what quality. It predicts what happens and what happens to the amount of ash in each silo as dynamics.
The physical model used in the simulator is a boiler BR and its attached devices such as an air heater AH, an economizer ECO, a hopper of an electric dust collector EP, a coarse silo L, a recovery silo M, a fine silo S, a blending silo B, and a loading silo. F and the classifier BK.
[0049]
The component composition of the ash is four kinds of silicon oxide SiO 2 (S), calcium oxide CaO (C), iron oxide Fe 2 O 3 (F), and other (O), and the fluctuation disturbance along the time axis for each silo. Is stored in advance.
{S, C, F, O} = {S (t), C (t), F (t), O (t)}
However, S (t) + C (t) + F (t) + O (t) = 100%
[0050]
The maximum ash flow rate due to the ash transfer operation shall flow through the designated piping.
G = K × Gmax
Here, K is a transfer selection operation signal, 1 or 0, G is the flow rate of the pipe from the hopper to the silo or the silo of the ash processing unit to the silo of the shipping facility, and Gmax is the capacity thereof.
For example, the ash flow transferred from a coarse silo to a blending silo or a loading silo is:
GL = (KLB + KLF) x GLmax
It is expressed as GL represents the flow rate of the pipe connected to the coarse silo, and KLB and KLF represent the presence or absence of transfer on the route from the coarse silo to the blending silo and the route from the coarse silo to the loading silo, respectively, by 1 or 0. KLB and KLF never become 1 at the same time.
[0051]
Assume that the ash in the blending silo is completely mixed.
d / dt (W) = Gi−Go
W is the ash weight, Gi is the inflow, and Go is the outflow. When W is a characteristic value such as ignition loss, Blaine specific surface area, and methylene blue adsorption amount, Gi and Go are values obtained by multiplying the characteristic value of inflow and outflow by the flow rate.
[0052]
For each hopper of the air heater AH, economizer ECO, and electric dust collector EP, the amount of coal charged into the boiler is multiplied by the ash content, the fly ash ratio in the ash, and the collection efficiency of the equipment, and the ash in each hopper is obtained. Calculate the amount generated. Further, since the ash composition, the amount of ignition source, the specific surface area of the brane, and the amount of adsorbed methylene blue vary depending on the boiler load, the type of coal, and the like, these examples are retrieved from the plant operation result database 115 and used.
[0053]
Each silo employs a batch model that discharges ash from the bottom layer and switches to the components in the layer above when the bottom ash is exhausted. The top layer has the ash component of the ash fed from the boiler or upstream silo.
The classifier classifies the composition, loss on ignition, specific surface area of Blaine, and the amount of adsorbed methylene blue in consideration of the difference in the classification rate between the fine silo and the coarse silo depending on the number of rotations.
[0054]
Using such a physical model, the simulator uses the boiler load and coking coal supply over time, the piping system from the hopper of the boiler equipment to each silo of the ash treatment unit, and the piping system from the blending silo and the loading silo. Simulation, ash quantity and ash quality discharged from hopper of boiler equipment, ash quantity and ash quality stacked in each silo, ash quantity and ash quality in blending silo and dischargeable time, dispatch to shipping equipment, etc. Is calculated.
This simulator is also used when evaluating the quality of ash to be shipped.
[0055]
The artificial intelligence type scheduler incorporated in the arithmetic unit 112 sets a constraint condition to be satisfied for each element using a logical language such as PROLOG, creates an operation schedule that satisfies the shipping condition, and sets all the constraint conditions. By repeatedly verifying whether or not the system is satisfied, an appropriate solution is finally determined for the operation schedule of the entire plant.
Therefore, the constraint condition itself is an element for constructing the scheduler. Priorities are set for the constraint conditions to simplify the solution procedure, and the trial is repeated until an appropriate solution for the ash shipping schedule is obtained.
[0056]
The boiler formulated by adding the ash demand forecast 203 to the long-term power generation plan 211 and the long-term coal transport plan 212 determined based on the power demand forecast 201 and the coal price 202 by the coal ash effective utilization support system 100 of the present embodiment. While following the long-term operation plan 213, each ash consumer is presented with an operation plan of the coal-fired power plant 200 that conforms to the ash delivery specification 204 that defines the amount of ash, ash quality, delivery date, etc. Can easily formulate an accurate operation plan.
Also, if necessary, it is possible to increase the amount of ash that can be effectively used by modifying the coal transportation plan in the short term to meet the ash delivery specifications.
In addition, the amount of ash generated in each part of the boiler and the quality of the generated ash, which vary depending on the coal type and load, ash silo selection system and transfer time, silo level changes, blending conditions and quality adjustment results by blending, customer's desired conditions , Etc. are collected and accumulated by the database device 111, and can be used for simulation and scheduling to improve the accuracy of the plan. In addition, through the operation plan result browsing device 113, it can be presented to planners so that a decision can be made based on results without relying only on empirical rules.
[0057]
Using the coal ash effective utilization support system of the present embodiment, ash quality data, shipping management data, inventory management data, ash customer data, and other necessary data are converted into a database as operation results through normal plant operation work. Since accumulation is performed, a new operation plan can be appropriately created for each ash demand by verifying the past operation method and referring to the results under similar conditions.
Conventionally, only a long-term ash treatment plan of about one month unit could be made due to the complicated structure of the plant. However, in the system of this embodiment, simulation of the ash treatment device, ash treatment device, shipping equipment, and boiler Since the facility scheduling is used in combination, it is possible to formulate a relatively short-term detailed operation plan for individual facilities.
In this way, an optimal operation plan can be almost mechanically drafted without relying on the rules of thumb of the operator. In particular, it has become possible to change the operation of the plant to meet the ash delivery specifications of individual ash consumers.
[0058]
Further, when the coal ash effective utilization support system of the present embodiment is used, even if there is a sudden change in ash demand, it is possible to flexibly cope with simulation and retry of scheduling. In addition, the operation of the boiler can be adjusted so that the supply and demand can be balanced according to the ash demand.
Further, by performing the simulation, the quality control of the coal ash in the silo can be performed.
Further, by using the system of the present embodiment, the obtained information can be distributed and shared to various places through the network, so that unnecessary running costs do not occur by using the information in a timely manner among a plurality of departments. .
Although the number of power generation facilities and the configuration of silos vary depending on the power plant, the configuration of the ash processing plant and the configuration of the coal ash effective utilization support system of the present embodiment basically do not change.
[0059]
【The invention's effect】
As described above, the coal ash effective utilization support system of the present invention can appropriately manage the stock of coal ash generated from various kinds of coking coal and supply fly ash that meets the requirements of ash consumers. be able to. In addition, it is possible to feed back to the operation plan of the power plant and the coal receiving plan as needed, thereby performing more efficient coal ash disposal.
[Brief description of the drawings]
FIG. 1 is a block diagram illustrating a configuration of an embodiment of a coal ash effective utilization support system of the present invention.
FIG. 2 is a block diagram illustrating an operation of the coal ash effective utilization support system of the present embodiment.
FIG. 3 is a flowchart illustrating the operation logic of the coal ash effective use support system of the present embodiment.
FIG. 4 is a block diagram showing a coal-fired power plant to which the present invention is applied.
[Explanation of symbols]
REFERENCE SIGNS LIST 1 coal-fired boiler equipment 2 ash processing device 3 shipping equipment 11 coal-fired boiler 12 economizer and air heater 13 electric dust collector 14 chimney 21 clinker relay tank 22 ash collector 23 cyclone 24 classifier 25 fine powder silo 26 recovery silo 27 coarse powder silo 28 Ash analyzer 29 Tank lorry 31 Blending silo 32 Loading silo 33 Ash loading device 34 Fly ash carrier 35 Tank lorry 100 Coal ash effective utilization support system 110 Power generation office 111 Database unit 112 Operation unit 113 Operation plan result browsing unit 114 Router 115 Plant operation result database 116 Shipping result database 117 Operation plan database 118 Data input device 120 Plant operation room 121 Plant control device 122 Data collection device 123 For operation plan result browsing Installation 124 Router 130 Related department office 131 Operation plan actual viewing device 132 Router 200 Coal-fired power plant 201 Power demand forecast 202 Coal price 203 Ash demand forecast 204 Ash delivery specification 211 Long-term power plan 212 Long-term coal operation plan 213 Long-term coal boiler plan Operation plan 221 Review of operation plan contents 222 Plan approval 223 Review of power generation and coal operation plan 231 Reference to approved operation plan 241

Claims (4)

石炭焚ボイラ設備で発生する石炭灰を灰品質にしたがってサイロに分配し必要により灰品質の調整をして出荷するようにした石炭火力発電プラントにおける石炭灰有効利用支援システムであって、運用計画演算装置と運用計画実績閲覧装置とデータ収集装置を備え、前記データ収集装置が該石炭火力発電プラントの制御装置または灰分析装置を介して運用の実績値を収集してデータベースに蓄積し、前記運用計画演算装置がデータ入力装置とシミュレータとスケジューラを備えて、該シミュレータと該スケジューラにより前記石炭火力発電プラントの石炭灰排出部位における排出灰量と灰品質の時間変化を推定し、前記サイロへの移送系統を仮定して該サイロにおけるレベルと灰品質の時間変化を予測し、該データ入力装置から入力した灰納入仕様を満たす出荷が可能になるサイロ選択とブレンディング操作を見いだして該石炭火力発電プラントの運用計画を策定し、前記運用計画実績閲覧装置を通じて表示することを特徴とする石炭灰有効利用支援システム。A coal ash effective utilization support system in a coal-fired power plant that distributes coal ash generated in a coal-fired boiler facility to silos in accordance with ash quality and adjusts ash quality as necessary before shipping An apparatus, an operation plan result browsing device, and a data collection device, wherein the data collection device collects operation results through a control device or an ash analyzer of the coal-fired power plant, accumulates the results in a database, and stores the operation plan. The arithmetic unit includes a data input device, a simulator, and a scheduler. The simulator and the scheduler estimate the amount of ash discharged and the ash quality at a coal ash discharge site of the coal-fired power plant over time, and transfer the system to the silo. , The temporal change of the level and the ash quality in the silo is predicted, and the Coal ash effective use support system, characterized in that the ship to meet the specification is to develop a management plan of 該石-fired power plant found a silo selection and blending operation to be possible, to display through the operation Plan Actual browsing device. 前記データベースには策定した運用計画が利用可能と認められたときに該運用計画を格納して、必要に応じて運用計画実績閲覧装置により該運用計画を表示できるようにすることを特徴とする請求項1記載の石炭灰有効利用支援システム。The database is configured to store the established operation plan when it is recognized that the operation plan can be used, and to display the operation plan by an operation plan result browsing device as necessary. Item 2. A coal ash effective utilization support system according to item 1. 前記スケジューラは前記石炭火力発電プラントの機器に関して設定する制約条件を要素とする人工知能型スケジューラであることを特徴とする請求項1または2に記載の石炭灰有効利用支援システム。The coal ash effective utilization support system according to claim 1, wherein the scheduler is an artificial intelligence type scheduler that includes a constraint condition set for a device of the coal-fired power plant as an element. 請求項1から3のいずれかに記載の石炭灰有効利用支援システムを備えたことを特徴とする石炭火力発電プラント。A coal-fired power plant comprising the coal ash effective utilization support system according to claim 1.
JP2002366306A 2002-12-18 2002-12-18 Coal ash effective use support system Pending JP2004199324A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002366306A JP2004199324A (en) 2002-12-18 2002-12-18 Coal ash effective use support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002366306A JP2004199324A (en) 2002-12-18 2002-12-18 Coal ash effective use support system

Publications (1)

Publication Number Publication Date
JP2004199324A true JP2004199324A (en) 2004-07-15

Family

ID=32763551

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002366306A Pending JP2004199324A (en) 2002-12-18 2002-12-18 Coal ash effective use support system

Country Status (1)

Country Link
JP (1) JP2004199324A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007209076A (en) * 2006-01-31 2007-08-16 Chugoku Electric Power Co Inc:The Method and program for selecting species of coal for power generation
JP2007315686A (en) * 2006-05-26 2007-12-06 Chugoku Electric Power Co Inc:The Fly ash amount management method following coal type changing in fluidized bed boiler
JP2009294831A (en) * 2008-06-04 2009-12-17 Chugoku Electric Power Co Inc:The Coal ash discharge plan support device, method and program
CN102542865A (en) * 2011-11-22 2012-07-04 大连海联自动控制有限公司 Auxiliary boiler virtual control simulation system of ship
CN104793580A (en) * 2014-12-31 2015-07-22 远光共创智能科技股份有限公司 System and method for data management of coaling plan information
CN104808632A (en) * 2015-04-23 2015-07-29 华电国际山东信息管理有限公司 Automatic acquisition and processing system for fire coal heterogeneous data sources of thermal power plants
JP2016060673A (en) * 2014-09-19 2016-04-25 株式会社Ihi Processing method of fly ash
JP2016080203A (en) * 2014-10-10 2016-05-16 株式会社神戸製鋼所 Process of manufacture of low adhesion coal ash
CN105900030A (en) * 2013-11-22 2016-08-24 三菱日立电力系统欧洲有限公司 Method, system, and computer program product for analyzing production and/or process-engineering processes and/or process steps in a plant
JP2020001867A (en) * 2018-06-27 2020-01-09 一般財団法人電力中央研究所 Coal ash delivery system and coal ash delivery method, and concrete kneading method
CN110991069A (en) * 2019-12-12 2020-04-10 神华北电胜利能源有限公司 Wet-based oxygen-based boiler efficiency calculation method, storage medium and electronic equipment
JP2020201549A (en) * 2019-06-06 2020-12-17 株式会社 ディー・エヌ・エー Material operation planning device and material operation planning program

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007209076A (en) * 2006-01-31 2007-08-16 Chugoku Electric Power Co Inc:The Method and program for selecting species of coal for power generation
JP2007315686A (en) * 2006-05-26 2007-12-06 Chugoku Electric Power Co Inc:The Fly ash amount management method following coal type changing in fluidized bed boiler
JP2009294831A (en) * 2008-06-04 2009-12-17 Chugoku Electric Power Co Inc:The Coal ash discharge plan support device, method and program
CN102542865A (en) * 2011-11-22 2012-07-04 大连海联自动控制有限公司 Auxiliary boiler virtual control simulation system of ship
CN105900030A (en) * 2013-11-22 2016-08-24 三菱日立电力系统欧洲有限公司 Method, system, and computer program product for analyzing production and/or process-engineering processes and/or process steps in a plant
JP2016060673A (en) * 2014-09-19 2016-04-25 株式会社Ihi Processing method of fly ash
JP2016080203A (en) * 2014-10-10 2016-05-16 株式会社神戸製鋼所 Process of manufacture of low adhesion coal ash
CN104793580A (en) * 2014-12-31 2015-07-22 远光共创智能科技股份有限公司 System and method for data management of coaling plan information
CN104808632A (en) * 2015-04-23 2015-07-29 华电国际山东信息管理有限公司 Automatic acquisition and processing system for fire coal heterogeneous data sources of thermal power plants
JP2020001867A (en) * 2018-06-27 2020-01-09 一般財団法人電力中央研究所 Coal ash delivery system and coal ash delivery method, and concrete kneading method
JP7146342B2 (en) 2018-06-27 2022-10-04 一般財団法人電力中央研究所 COAL ASH DELIVERY SYSTEM, COAL ASH DELIVERY METHOD, AND CONCRETE MIXING METHOD
JP2020201549A (en) * 2019-06-06 2020-12-17 株式会社 ディー・エヌ・エー Material operation planning device and material operation planning program
JP7402389B2 (en) 2019-06-06 2023-12-21 株式会社Algo Artis Material operation planning device and material operation planning program
CN110991069A (en) * 2019-12-12 2020-04-10 神华北电胜利能源有限公司 Wet-based oxygen-based boiler efficiency calculation method, storage medium and electronic equipment
CN110991069B (en) * 2019-12-12 2023-09-12 神华北电胜利能源有限公司 Boiler efficiency calculating method based on wet oxygen, storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
Gomes et al. Modelling a recovery network for WEEE: A case study in Portugal
JP4056686B2 (en) Environmental management information system and environmental management information provision method
Sbihi et al. Combinatorial optimization and green logistics
AU2007283075B2 (en) Method for transporting physical objects, transportation system and transportation means
Slater Specification for a dynamic vehicle routing and scheduling system
Beullens Reverse logistics in effective recovery of products from waste materials
JP2004199324A (en) Coal ash effective use support system
US8042736B2 (en) Tracking and properties control system for bulk materials
Veelenturf et al. A quasi-robust optimization approach for crew rescheduling
Bloemhof-Ruwaard et al. Reviewing distribution issues in reverse logistics
US20060041390A1 (en) System and method for providing environmental impact information, recording medium recording the information, and computer data signal
US20020099587A1 (en) Method of support of environmentally concerned design of manufactured goods, and method and system for providing recycling support information
Sun Green and reliable freight routing problem in the road-rail intermodal transportation network with uncertain parameters: a fuzzy goal programming approach
CN103606021B (en) A kind of LNG receiving station dynamically stock forecast dispatching method
CN102708476A (en) IoT (Internet of Things)-technology-based refuse collection management system
JP2011170496A (en) Device and method for supporting plant construction plan
CN103632234A (en) Network type LNG (liquefied natural gas) industrial chain integrated prediction and scheduling method
JP4046603B2 (en) Silo coal ash quality simulator
Anghinolfi et al. Optimal planning of door-to-door multiple materials separated waste collection
Hajjar et al. Modeling and analysis of aggregate production operations
JP2004198018A (en) Coal ash shipment scheduling system
WO2001072611A1 (en) Resources/wastes collection system and resources/wastes collection method
Combs Life Cycle Analysis of Recycling Facilities in a Carbon Constrained World.
Khaminich et al. Managing the Product’s Creation of an Innovation-Oriented Engineering Business
US8452637B2 (en) Systems and methods of adjusting the order of product manufacturing and rescheduling release dates

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050823

A521 Written amendment