JP2004139230A - Construction project information management server and construction project information management system - Google Patents

Construction project information management server and construction project information management system Download PDF

Info

Publication number
JP2004139230A
JP2004139230A JP2002301645A JP2002301645A JP2004139230A JP 2004139230 A JP2004139230 A JP 2004139230A JP 2002301645 A JP2002301645 A JP 2002301645A JP 2002301645 A JP2002301645 A JP 2002301645A JP 2004139230 A JP2004139230 A JP 2004139230A
Authority
JP
Japan
Prior art keywords
information
construction project
static
dynamic
management server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002301645A
Other languages
Japanese (ja)
Inventor
Shigeo Murai
村井 重雄
Toshiyuki Ichijo
一條 俊之
Hiroshi Nishimaki
西牧 普志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP2002301645A priority Critical patent/JP2004139230A/en
Publication of JP2004139230A publication Critical patent/JP2004139230A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To easily and surely store the information of a construction project. <P>SOLUTION: A construction project management system 100 in which a user terminal 2 and a construction project management server 1 for managing construction project information are connected through a communication line is provided with an input means 26 and a transmitting means 25. This construction project management server 1 is provided with a dynamic information storage means 16 for storing dynamic information with identification numbers transmitted from the transmitting means 25, a static information storage means 17 for storing static information with identification numbers transmitted by the transmitting means 25 and information management means 11, 12, and 13 for preparing static information based on the dynamic information when deciding that predetermined conditions are fulfilled by the dynamic information, and for storing the prepared static information in the static information storage means 17. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、建設プロジェクト情報管理サーバ及び建設プロジェクト情報管理システムに関する。
【0002】
【従来の技術】
建設プロジェクトにおいては、施工管理や安全衛生管理等、多数の管理項目が存在し、現場の担当者を始め、管轄する支店や本社の担当者は、これらの管理項目を常に監視し把握することにより、短期間、低コストで建設プロジェクトを遂行できるよう、日々努力している。
建設プロジェクトにおいて発生する各種情報は、実行中の建設プロジェクトだけに限らず、将来、類似する建設プロジェクトを遂行する際に重要なデータとして活用することができる。そのため、建設プロジェクトにおける各情報は、建設プロジェクト終了間際に整理し、ファイルに綴じて保管している。
また、各種情報をファイルで綴じる以外に、ネットワークに接続されたコンピュータによって管理するものがある(例えば、特許文献1参照。)。
【0003】
【特許文献1】
特開2002−189803号公報 (第1頁、図2)
【0004】
【発明が解決しようとする課題】
しかしながら、建設プロジェクトにおいて発生する情報は、内容が変化する動的情報や内容が確定した静的情報のように、種類の異なる情報が存在し、その量も膨大であるため、整理が困難であった。さらに、担当者の異動が行われる場合もあるため、必要な情報の選別が困難であった。にもかかわらず、これらの情報を簡単に、且つ、確実に管理する手段が講じられていなかった。
【0005】
そこで、本発明の課題は、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる建設プロジェクト情報管理サーバ及び建設プロジェクト情報管理システムを提供することである。
【0006】
【課題を解決するための手段】
上記課題を解決するため、請求項1に記載の発明は、例えば、図1に示すように、ユーザ端末に通信回線を介して接続され、建設プロジェクト情報を管理する建設プロジェクト管理サーバ(例えば、ホストサーバ1)であって、前記建設プロジェクト情報のうち、建設プロジェクトを遂行するにあたり時間の経過に伴って内容が変化し、識別番号が付された動的情報を格納する動的情報記憶手段(例えば、動的情報データベース16)と、前記建設プロジェクト情報のうち、内容が確定され、識別番号が付された静的情報を格納する静的情報記憶手段(例えば、静的情報データベース17)と、前記動的情報が所定の条件を満たしたと判断した場合に、当該動的情報に基づいて静的情報を作成し、作成された静的情報を前記静的情報記憶手段(例えば、静的情報データベース17)に格納する情報管理手段(例えば、CPU11,RAM12,ROM13)と、を備えることを特徴とする。
【0007】
請求項1に記載の発明によれば、所定の条件を満たしたと判断した場合には、動的情報記憶手段に格納された動的情報に基づいて静的情報が作成され、作成された静的情報は静的情報記憶手段に格納される。よって、動的情報と静的情報とを明確に区別して取り扱うことができ、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0008】
請求項2に記載の発明は、例えば、図1に示すように、請求項1に記載の建設プロジェクト情報管理サーバ(例えば、ホストサーバ1)において、前記情報管理手段(例えば、CPU11,RAM12,ROM13)は、所定の条件を満たしたと判断された動的情報の中から、予め設定された項目の情報を抽出して静的情報を作成する作成手段(例えば、CPU11,RAM12,ROM13)を備えることを特徴とする。
【0009】
請求項2に記載の発明によれば、情報管理手段は、所定の条件を満たしたと判断された動的情報の中から、予め設定された項目の情報を抽出して静的情報を作成する作成手段を備えるので、動的情報の内容が確定する度に、ユーザが静的情報に書き換える必要がなくなることとなって、作業の煩雑さを減らし、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0010】
請求項3に記載の発明は、例えば、図1に示すように、請求項2に記載の建設プロジェクト情報管理サーバ(例えば、ホストサーバ1)において、前記作成手段(例えば、CPU11,RAM12,ROM13)が動的情報から静的情報を作成した場合に、作成された静的情報の識別番号を変換する識別番号変換手段(例えば、CPU11,RAM12,ROM13)を備えることを特徴とする。
【0011】
請求項3に記載の発明によれば、作成手段が動的情報から静的情報を作成した場合に、作成された静的情報の識別番号を変換する識別番号変換手段を備えるので、動的情報の内容が確定して静的情報が作成される度に、ユーザが作成された静的情報の識別番号を変換する必要がなくなることとなって、作業の煩雑さを減らし、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0012】
請求項4に記載の発明は、例えば、図1に示すように、請求項1〜3のいずれか一項に記載の建設プロジェクト情報管理サーバ(例えば、ホストサーバ1)において、所定の対価の支払情報の入力を確認する支払情報確認手段(例えば、CPU11,RAM12,ROM13)を備え、前記情報管理手段(例えば、CPU11,RAM12,ROM13)を、前記支払情報確認手段(例えば、CPU11,RAM12,ROM13)により前記支払情報の入力が確認されたことに基づいて、動作するように構成したことを特徴とする。
【0013】
請求項4に記載の発明によれば、所定の対価の支払情報の入力を確認する支払情報確認手段を備え、情報管理手段を、支払情報確認手段により支払情報の入力が確認されたことに基づいて、動作するように構成したので、ASP(Application Service Provider)等のサーバとして利用することができる。
【0014】
請求項5に記載の発明は、例えば、図1に示すように、請求項1〜4のいずれか一項に記載の建設プロジェクト情報管理サーバ(例えば、ホストサーバ1)において、日時を計測する計時手段(例えば、時計部14)を備え、前記情報管理手段(例えば、CPU11,RAM12,ROM13)を、前記計時手段(例えば、時計部14)により所定の時間が経過したことに基づいて、動作するように構成したことを特徴とする。
【0015】
請求項5に記載の発明によれば、日時を計測する計時手段を備え、情報管理手段を、計時手段により所定の時間が経過したことに基づいて、動作するように構成したので、動的情報及び静的情報を時系列で管理することができることとなって、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0016】
請求項6に記載の発明は、例えば、図1に示すように、ユーザ端末2と、建設プロジェクト情報を管理する建設プロジェクト管理サーバ(例えば、ホストサーバ1)とが、通信回線を介して接続される建設プロジェクト管理システム100であって、前記ユーザ端末2は、前記建設プロジェクト情報のうち、建設プロジェクトを遂行するにあたり時間の経過に伴って内容が変化する動的情報と、内容が確定された静的情報とを識別番号を付して入力する入力手段(例えば、入力部26)と、前記入力手段(例えば、入力部26)により入力された前記動的情報及び前記静的情報を前記建設プロジェクト管理サーバ(例えば、ホストサーバ1)に送信する送信手段(例えば、送信部25)と、を備え、前記建設プロジェクト管理サーバ(例えば、ホストサーバ1)は、前記送信手段(例えば、送信部25)により送信された識別番号付きの動的情報を格納する動的情報記憶手段(例えば、動的情報データベース16)と、前記送信手段(例えば、送信部25)により送信された識別番号付きの静的情報を格納する静的情報記憶手段(例えば、静的情報データベース17)と、前記動的情報が所定の条件を満たしたと判断した場合に、当該動的情報に基づいて静的情報を作成し、作成された静的情報を前記静的情報記憶手段(例えば、静的情報データベース17)に格納する情報管理手段(例えば、CPU11,RAM12,ROM13)と、を備えることを特徴とする。
【0017】
請求項6に記載の発明によれば、ユーザ端末は、入力手段と、送信手段と、を備え、建設プロジェクト管理サーバは、動的情報記憶手段と、静的情報記憶手段と、情報管理手段と、を備えるので、ユーザが入力手段から動的情報及び静的情報を入力し、送信手段によって動的情報及び静的情報を建設プロジェクト管理サーバに送信すると、動的情報は動的情報記憶手段に格納される。この動的情報は、情報管理手段によって、所定の条件を満たしたと判断した場合に、動的情報に基づいて静的情報を作成し、作成された静的情報を静的情報記憶手段に格納するので、動的情報と静的情報とを明確に区別して取り扱うことができ、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0018】
【発明の実施の形態】
以下、図面を参照して本発明に係る実施の形態である建設プロジェクト情報管理サーバ及び建設プロジェクト情報管理システムについて詳細に説明する。
図1に示すように、建設プロジェクト情報管理システム100は、例えば、空港建設や都市開発等の建設プロジェクトを遂行するにあたって、日々発生する情報を蓄積し、この情報を実行中の建設プロジェクトや将来の建設プロジェクトを遂行する際のデータベースとして利用できるように、ASP(Application Service Provider)を利用して構築したものである。ASPとは、ソフトウェアやハードウェアを使用する企業が個別に所有するのではなく、インターネット環境にて利用することのできるサービスのことである。
【0019】
建設プロジェクト情報管理システム100は、建設プロジェクトの情報を格納する建設プロジェクト情報管理サーバ(以下、ホストサーバという。)1、このホストサーバ1に情報の入力操作を行うユーザ端末2、利用者が選択したホストサーバ1内の静的情報を取り出して社内のデータベースに保存する社内サーバ3、ホストサーバ1への各情報の格納作業を代理する代行業者端末4等を備えている。
【0020】
ホストサーバ1は、CPU(Central Processing Unit)11、RAM(Random Access Memory)12、ROM(Read Only Memory)13、日時を計時する計時手段としての時計部14、ユーザ端末2等との間で情報通信を行う通信部15、時間の経過に伴って内容が変化する動的情報を格納する動的情報データベース16、内容が確定された静的情報を格納する静的情報データベース17等を備えている。
ここで、動的情報とは、建設プロジェクト情報のうち、建設プロジェクトを遂行するにあたり時間の経過に伴って内容が変化する情報のことであり、例えば、日々作成される工事日誌や、安全パトロールの記録等の情報である。静的情報とは、建設プロジェクト情報のうち、内容が確定された情報のことであり、例えば、建設プロジェクトのパンフレットや、発注者に提出する契約書、設計書等の情報である。
【0021】
CPU11、RAM12、ROM13は、それぞれ公知のものであり、ROM13内に記憶された実行プログラムを、RAM12を作業領域としてCPU11で実行するように構成されている。
CPU11は、RAM12、ROM13とともに、例えば、動的情報が所定の条件を満たしたと判断した場合に、動的情報に基づいて静的情報を作成し、作成された静的情報を静的情報データベース17に格納する情報管理手段として機能する。また、CPU11は、RAM12、ROM13とともに、所定の条件を満たしたと判断された動的情報の中から、予め設定された項目の情報を抽出して静的情報を作成する作成手段として機能したり、作成された静的情報の識別番号を変換する識別番号変換手段として機能したり、ホストサーバ1の管理者に使用料が支払われているかを確認する支払情報確認手段として機能する。
【0022】
時計部14は、動的情報や静的情報が入力された日時、ASPの使用料が支払われた日時を計時して管理するものである。
通信部15は、モデム、ターミナルアダプタ、ルータ等によって構成され、電話回線、ADSL回線等の通信回線を介して、ユーザ端末2、社内サーバ3、代行業者端末4との間で指示信号や各情報の送受信を行うものである。
動的情報データベース16は、動的情報を格納するものであり、ハードディスク等から構成されている。
静的情報データベース17は、静的情報を格納するものであり、ハードディスク等から構成されている。
【0023】
ユーザ端末2は、CPU21、RAM22、ROM23、日時を計時する時計部24、ホストサーバ1又は代行業者端末4に動的情報及び静的情報を送信する送信手段としての送信部25、各情報を入力する入力手段としての入力部26等を備えている。
入力部26は、例えば、キーボードやタッチパネル等であり、この入力部26を操作して各情報を入力する。
なお、他の構成要素の機能は、上述のホストサーバ1に備えているものと同様のものであるため、説明を省略する。
【0024】
社内サーバ3は、建設プロジェクトに参画している企業ごとに所有するものであり、CPU31、RAM32、ROM33、日時を計時する時計部34、ホストサーバ1との間で情報通信を行う通信部35、ホストサーバ1から取り出した静的情報を保存する保存情報データベース36等を備えている。
保存情報データベース36は、発注者等に提示する静的情報を保存するものであり、ハードディスク等から構成されている。なお、他の構成要素の機能は、上述のホストサーバ1に備えているものと同様のものであるため、説明を省略する。
【0025】
代行業者端末4は、代行業者が建設プロジェクトに参画している企業の担当者に代わって、動的情報や静的情報をホストサーバ1に入力操作する際に用いられ、CPU41、RAM42、ROM43、日時を計時する時計部44、ホストサーバ1等との間で情報通信を行う通信部45等を備えている。なお、これらの構成要素の機能は、上述のホストサーバ1に備えているものと同様のものであるため、説明を省略する。
【0026】
次に、以上のように構成された建設プロジェクト情報管理システム100における各動作機能についてフローチャートを用いて説明する。
図2に示すように、例えば、ユーザである現場の担当者は、階層ごとに分類した建設プロジェクトの動的情報及び静的情報に識別番号を付ける(S1)。次いで、担当者は、識別番号を付与した各情報をユーザ端末2の入力部26から入力する(S2)。各情報が入力され、担当者が送信の指示を与えると、送信部25は、入力された各情報をホストサーバ1に送信する(S3)。
【0027】
なお、動的情報及び静的情報は、担当者が必ずしもホストサーバ1に入力する必要はなく、代行業者に依頼し、代行業者端末4からホストサーバ1に入力することも可能である。この場合、担当者が送信部25を介して代行業者端末4に識別番号を付して電子化した各情報を送信し、通信部45を介して各情報を受信した代行業者がこれらの各情報を通信部45からホストサーバ1に送信する。代行業者は、識別番号で各情報を操作することとなるので、建設業界に精通している者でなくても容易に行えるようになっている。
なお、担当者が電子化せずに各情報を代行業者に渡し、代行業者が識別番号を付与して電子化した各情報をホストサーバ1に送信するようにしてもよい。
【0028】
図5は、ホストサーバ1に送信される識別番号を付けた動的情報及び静的情報の一覧表である。ここで、第4階層に項目が記載されているものが動的情報であり、動的情報データベース16に格納される。また、第4階層に項目が記載されていないもの、すなわち、第4階層の識別番号が「00」のものは静的情報であり、静的情報データベース17に格納される。
【0029】
具体例を挙げて説明すると、図5に示すように、発注者との契約書に関する情報は、識別番号が「01010100」であり、第4階層に相当する下2桁の番号が「00」であるため、静的情報である。また、発注者に提出する施工計画書に関する情報は、原図の段階であれば識別番号が「03020101」、作成中であれば「03020102」、提出したものであれば「03020103」となる。これらは、施工計画書の作成状況によって変化する情報であるため、動的情報である。
【0030】
送信部25から送信された静的情報及び動的情報は、ホストサーバ1の通信部15で受信し(S4)、CPU11が各情報をRAM12に格納する。
次いで、CPU11が銀行等のサーバにアクセスして、ホストサーバ1の管理者にASPの使用料が支払われているかを確認する(S5)。ここで、使用料が未払いであれば、ホストサーバ1を使用することは許されないので、ホストサーバ1への進入を遮断される。
使用料が支払われていれば、CPU11が送信元のコンピュータアドレス等に基づいて、各情報の送信者がASPの契約者であるかどうかを確認する(S6)。代行業者が各情報を代理で送信した場合には、担当者の認証がなければ、各情報を消去する(S7)。
担当者が送信するか、あるいは、代行業者が送信した各情報を担当者が認証すると、CPU11は、ROM13に格納されたプログラムを起動させ、動的情報を動的情報データベース16に格納し、静的情報を静的情報データベース17に格納する。なお、格納する際には、時計部14によって格納された日時が書き込まれる(S8)。
【0031】
続いて、動的情報データベース16に格納された動的情報に基づいて、静的情報を作成する各動作機能について説明する。
図3に示すように、担当者が事前に設定した日時から時計部14が計時し(S9)、所定の時間が経過すると(S10)、CPU11がROM13に格納されたプログラムを起動させ、予め設定された項目の動的情報を抽出して静的情報を作成する(S11)。次いで、静的情報の作成に伴い、CPU11はROM13に格納されたプログラムを起動させ、識別番号を変換する(S12)。次いで、作成された静的情報を静的情報データベース17に格納する(S13)。
なお、CPU11は、静的情報が静的情報データベース17に格納されてから所定の時間経過後に、ROM13からプログラムを読み込んで、静的情報を静的情報データベース17から消去する。これは、静的情報データベース17のオーバーフローを防ぐためである。消去する情報量は、担当者が事前に設定しておく。また、上述の所定の時間は、各データベース16,17の容量に合わせて決定される。また、全ての動的情報を静的情報として作成してもよい。
【0032】
続いて、静的情報データベース17に格納された静的情報のうち、保存しておきたい情報を社内サーバ3に保存する場合の各動作機能について説明する。
図4に示すように、社内サーバ3の入力部37から静的情報データベース17に格納された静的情報を取り出す指示操作を行い、この指示信号をCPU31が通信部35を介してホストサーバ1に送信する(S14)。ホストサーバ1の通信部15は、指示信号を受信し(S15)、指示信号に基づいて社内サーバ3に送信する静的情報を、通信部15を介して社内サーバ3に送信する(S16)。次いで、送信された静的情報を社内サーバ3の通信部35が受信し(S17)、CPU31がROM33に格納されたプログラムを読み込んで静的情報を保存情報データベース36に格納する(S18)。
【0033】
本実施の形態の建設プロジェクト情報管理サーバ1及び建設プロジェクト情報管理システム100によれば、現場の担当者がユーザ端末2から動的情報及び静的情報を入力し、ホストサーバ1に送信すると、動的情報と静的情報はそれぞれ別個の場所に格納される。また、所定の条件を満たしたと判断した場合に、動的情報に基づいて静的情報が作成され、作成された静的情報が静的情報データベース17に記憶されるので、動的情報と静的情報とを明確に区別して取り扱うことができ、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0034】
また、所定の条件を満たしたと判断された動的情報の中から、予め設定された項目の動的情報を抽出して静的情報が作成されるので、動的情報の内容が確定する度に、担当者が静的情報に書き換える必要がなくなることとなって、作業の煩雑さを減らし、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0035】
また、動的情報から静的情報を作成した場合に、作成された静的情報の識別番号を変換するので、動的情報の内容が確定して静的情報が作成される度に、担当者が作成された静的情報の識別番号を変換する必要がなくなることとなって、作業の煩雑さを減らし、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0036】
また、ホストサーバ1への使用料の支払情報の入力が確認されたことに基づいて、動的情報から静的情報を作成するように構成されているので、ASPのサーバとして利用することができる。
【0037】
また、時計部14により所定の時間が経過したことに基づいて、動的情報から静的情報を作成するように構成されているので、動的情報及び静的情報を時系列で管理することができることとなって、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0038】
なお、本発明は、上記実施の形態に限定されるものではない。例えば、動的情報から静的情報を作成する場合の条件は、経過時間に限らず、各工程が終了する度に行うようにしてもよい。また、本システムに工事予算の項目を加え、コスト管理をすることも可能である。その他、発明の要旨を変更しない範囲内であれば、自由に設計変更が可能である。
【0039】
【発明の効果】
請求項1に記載の発明によれば、所定の条件を満たしたと判断した場合には、動的情報記憶手段に格納された動的情報に基づいて静的情報が作成され、作成された静的情報は静的情報記憶手段に格納される。よって、動的情報と静的情報とを明確に区別して取り扱うことができ、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0040】
請求項2に記載の発明によれば、情報管理手段は、所定の条件を満たしたと判断された動的情報の中から、予め設定された項目の情報を抽出して静的情報を作成する作成手段を備えるので、ユーザの作業の煩雑さを減らし、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0041】
請求項3に記載の発明によれば、作成手段が動的情報から静的情報を作成した場合に、作成された静的情報の識別番号を変換する識別番号変換手段を備えるので、ユーザの作業の煩雑さを減らし、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0042】
請求項4に記載の発明によれば、所定の対価の支払情報の入力を確認する支払情報確認手段を備え、情報管理手段は、支払情報確認手段により支払情報の入力が確認されたことに基づいて、動作するように構成されているので、ASP(Application Service Provider)等のサーバとして利用することができる。
【0043】
請求項5に記載の発明によれば、日時を計測する計時手段を備え、前記情報管理手段は、計時手段により所定の時間が経過したことに基づいて、動作するように構成されているので、動的情報及び静的情報を時系列で管理することができることとなって、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【0044】
請求項6に記載の発明によれば、ユーザ端末は、入力手段と、送信手段と、を備え、建設プロジェクト管理サーバは、動的情報記憶手段と、静的情報記憶手段と、情報管理手段と、を備えるので、動的情報と静的情報とを明確に区別して取り扱うことができ、建設プロジェクトの情報を簡単に、且つ、確実に管理することができる。
【図面の簡単な説明】
【図1】本発明の実施の形態における建設プロジェクト情報管理システムの全体構成を示すブロック図である。
【図2】上記実施の形態におけるユーザ端末に入力された動的情報及び静的情報を建設プロジェクト情報管理サーバに送信する各動作機能を示すフロー図である。
【図3】上記実施の形態における動的情報データベースに格納された動的情報に基づいて、静的情報を作成する各動作機能を示すフロー図である。
【図4】上記実施の形態における保存しておきたい静的情報を社内サーバに保存する場合の各動作機能機能を示すフロー図である。
【図5】上記実施の形態における建設プロジェクト情報管理サーバに入力される動的情報及び静的情報の一例を示す図である。
【符号の説明】
1    建設プロジェクト情報管理サーバ
11   CPU(情報管理手段、作成手段、識別番号変換手段、支払情報確認手段)
12   RAM(情報管理手段、作成手段、識別番号変換手段、支払情報確認手段)
13   ROM(情報管理手段、作成手段、識別番号変換手段、支払情報確認手段)
14   時計部
16   動的情報データベース
17   静的情報データベース
2    ユーザ端末
25   送信部
26   入力部
100  建設プロジェクト情報管理システム
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a construction project information management server and a construction project information management system.
[0002]
[Prior art]
In a construction project, there are many management items such as construction management and health and safety management.The person in charge of the site, as well as the person in charge of the branch or headquarters in charge, constantly monitors and grasps these management items. We work hard every day to carry out construction projects in a short period of time and at low cost.
Various types of information generated in a construction project can be used as important data not only for a running construction project but also for performing a similar construction project in the future. Therefore, each piece of information on the construction project is arranged just before the end of the construction project, and stored in a file.
In addition, other than binding various kinds of information with a file, there is a type of information managed by a computer connected to a network (for example, see Patent Document 1).
[0003]
[Patent Document 1]
JP-A-2002-189803 (page 1, FIG. 2)
[0004]
[Problems to be solved by the invention]
However, information generated in a construction project is difficult to organize because there are different types of information, such as dynamic information whose contents change and static information whose contents are fixed, and the amount is enormous. Was. Furthermore, since the transfer of the person in charge may be performed, it is difficult to select necessary information. Nevertheless, no means has been taken to easily and reliably manage such information.
[0005]
Therefore, an object of the present invention is to provide a construction project information management server and a construction project information management system that can easily and reliably manage information on construction projects.
[0006]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, the invention according to claim 1 is, for example, as shown in FIG. 1, connected to a user terminal via a communication line and manages construction project information by a construction project management server (for example, a host). A server 1) for storing, in the construction project information, dynamic information storage means (for example, dynamic information storage means for storing dynamic information with an identification number, the content of which changes with the passage of time when performing a construction project; A dynamic information database 16), a static information storage means (for example, a static information database 17) for storing static information whose contents are determined and assigned an identification number among the construction project information, When it is determined that the dynamic information satisfies a predetermined condition, static information is created based on the dynamic information, and the created static information is stored in the static information storage unit. For example, the information management unit (e.g. for storing the static information database 17), characterized in that it comprises CPU 11, RAM 12, ROM 13 and), the.
[0007]
According to the first aspect of the present invention, when it is determined that the predetermined condition is satisfied, static information is created based on the dynamic information stored in the dynamic information storage unit, and the created static information is created. The information is stored in the static information storage means. Therefore, the dynamic information and the static information can be clearly distinguished and handled, and the information on the construction project can be easily and reliably managed.
[0008]
According to a second aspect of the present invention, for example, as shown in FIG. 1, in the construction project information management server (for example, the host server 1) according to the first aspect, the information management means (for example, the CPU 11, the RAM 12, the ROM 13) ) Includes creation means (for example, CPU11, RAM12, ROM13) for extracting information of a preset item from dynamic information determined to satisfy a predetermined condition and creating static information. It is characterized by.
[0009]
According to the second aspect of the present invention, the information management unit extracts static information by extracting information of a preset item from the dynamic information determined to satisfy the predetermined condition. Means, the user does not need to rewrite the static information every time the content of the dynamic information is determined. This reduces the complexity of the work and makes it easy and reliable to provide information on the construction project. Can be managed.
[0010]
According to a third aspect of the present invention, as shown in FIG. 1, for example, in the construction project information management server (eg, the host server 1) according to the second aspect, the creation means (eg, CPU11, RAM12, ROM13) Is characterized by comprising identification number conversion means (for example, CPU11, RAM12, ROM13) for converting the identification number of the created static information when the static information is created from the dynamic information.
[0011]
According to the third aspect of the present invention, when the creating means creates the static information from the dynamic information, the identification information converting means for converting the identification number of the created static information is provided. Each time the static information is created with the content of the fixed information, the user does not need to convert the identification number of the created static information, thereby reducing the complexity of the work and reducing the information of the construction project. It can be managed easily and reliably.
[0012]
According to a fourth aspect of the present invention, for example, as shown in FIG. 1, the construction project information management server (for example, the host server 1) according to any one of the first to third aspects pays a predetermined price. A payment information confirmation unit (for example, CPU11, RAM12, ROM13) for confirming input of information is provided, and the information management unit (for example, CPU11, RAM12, ROM13) is replaced with the payment information confirmation unit (for example, CPU11, RAM12, ROM13). ), The operation is performed based on the confirmation of the input of the payment information.
[0013]
According to the fourth aspect of the present invention, there is provided a payment information confirming means for confirming the input of payment information of a predetermined value, and the information management means is operated based on the confirmation of the payment information input by the payment information confirming means. Since it is configured to operate, it can be used as a server such as an ASP (Application Service Provider).
[0014]
According to a fifth aspect of the present invention, for example, as shown in FIG. 1, a construction project information management server (for example, a host server 1) according to any one of the first to fourth aspects is configured to measure time and date. Means (for example, a clock unit 14), and operates the information management means (for example, the CPU 11, the RAM 12, the ROM 13) based on the elapse of a predetermined time by the clock means (for example, the clock unit 14). It is characterized by having such a configuration.
[0015]
According to the fifth aspect of the present invention, there is provided a timekeeping means for measuring the date and time, and the information management means is configured to operate based on a lapse of a predetermined time by the timekeeping means. And static information can be managed in chronological order, and information on construction projects can be easily and reliably managed.
[0016]
In the invention according to claim 6, for example, as shown in FIG. 1, a user terminal 2 and a construction project management server (for example, a host server 1) for managing construction project information are connected via a communication line. In the construction project management system 100, the user terminal 2 includes, among the construction project information, dynamic information whose contents change over time in performing a construction project, and static information whose contents are determined. Means (for example, an input unit 26) for inputting target information with an identification number, and the dynamic information and the static information input by the input means (for example, the input unit 26) are input to the construction project. A transmission unit (for example, a transmission unit 25) for transmitting to the management server (for example, the host server 1), and the construction project management server (for example, The host server 1) includes a dynamic information storage unit (for example, a dynamic information database 16) for storing dynamic information with an identification number transmitted by the transmission unit (for example, the transmission unit 25), and the transmission unit (for example, the dynamic information database 16). For example, when it is determined that the static information storage means (for example, the static information database 17) for storing the static information with the identification number transmitted by the transmitting unit 25) and the dynamic information satisfies a predetermined condition. Information management means (for example, CPU 11 and RAM 12) for creating static information based on the dynamic information and storing the created static information in the static information storage means (for example, static information database 17). , ROM 13).
[0017]
According to the invention described in claim 6, the user terminal includes an input unit and a transmission unit, and the construction project management server includes a dynamic information storage unit, a static information storage unit, and an information management unit. When the user inputs the dynamic information and the static information from the input means and transmits the dynamic information and the static information to the construction project management server by the transmission means, the dynamic information is stored in the dynamic information storage means. Is stored. When the information management unit determines that the predetermined condition is satisfied, the dynamic information creates static information based on the dynamic information, and stores the created static information in the static information storage unit. Therefore, the dynamic information and the static information can be clearly distinguished and handled, and the information on the construction project can be easily and reliably managed.
[0018]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, a construction project information management server and a construction project information management system according to embodiments of the present invention will be described in detail with reference to the drawings.
As shown in FIG. 1, the construction project information management system 100 accumulates information that occurs daily when performing a construction project such as airport construction or urban development, and uses this information to execute a construction project or a future project. It is constructed using ASP (Application Service Provider) so that it can be used as a database when performing a construction project. ASP is a service that can be used in an Internet environment rather than individually owned by a company that uses software and hardware.
[0019]
The construction project information management system 100 includes a construction project information management server (hereinafter, referred to as a host server) 1 for storing information on a construction project, a user terminal 2 for inputting information to the host server 1, and a user's selection. The system includes an in-house server 3 for taking out static information in the host server 1 and storing it in an in-house database, an agent terminal 4 acting as a proxy for storing each information in the host server 1, and the like.
[0020]
The host server 1 includes a CPU (Central Processing Unit) 11, a RAM (Random Access Memory) 12, a ROM (Read Only Memory) 13, a clock unit 14 as a timekeeping unit for measuring the date and time, a user terminal 2, and the like. A communication unit 15 for performing communication, a dynamic information database 16 for storing dynamic information whose contents change over time, a static information database 17 for storing static information whose contents have been determined, and the like are provided. .
Here, the dynamic information is information that changes with the passage of time during the execution of the construction project in the construction project information, and includes, for example, a construction diary created daily and a safety patrol. Information such as records. The static information is information of which the content is determined among the construction project information, and is, for example, information such as a pamphlet of the construction project, a contract document to be submitted to the orderer, and a design document.
[0021]
The CPU 11, the RAM 12, and the ROM 13 are each publicly known, and are configured to execute an execution program stored in the ROM 13 by using the RAM 12 as a work area.
For example, when the CPU 11 determines that the dynamic information satisfies a predetermined condition together with the RAM 12 and the ROM 13, the CPU 11 creates static information based on the dynamic information, and stores the created static information in the static information database 17. Function as information management means to be stored in the. Further, the CPU 11 functions together with the RAM 12 and the ROM 13 as creation means for extracting information of a preset item from dynamic information determined to satisfy a predetermined condition and creating static information, It functions as an identification number conversion means for converting the identification number of the created static information, or functions as a payment information confirmation means for confirming whether the usage fee has been paid to the administrator of the host server 1.
[0022]
The clock unit 14 manages the date and time when the dynamic information or the static information is input and the date and time when the ASP usage fee is paid.
The communication unit 15 is composed of a modem, a terminal adapter, a router, and the like. Instruction signals and various information are exchanged with the user terminal 2, the in-house server 3, and the agency terminal 4 via communication lines such as a telephone line and an ADSL line. Is transmitted and received.
The dynamic information database 16 stores dynamic information, and is composed of a hard disk or the like.
The static information database 17 stores static information, and is configured from a hard disk or the like.
[0023]
The user terminal 2 includes a CPU 21, a RAM 22, a ROM 23, a clock unit 24 for measuring date and time, a transmission unit 25 as a transmission unit for transmitting dynamic information and static information to the host server 1 or the agency terminal 4, and inputs each information. An input unit 26 and the like are provided as input means.
The input unit 26 is, for example, a keyboard or a touch panel, and operates the input unit 26 to input various information.
Note that the functions of the other components are the same as those provided in the host server 1 described above, and thus description thereof will be omitted.
[0024]
The in-house server 3 is owned by each company participating in the construction project, and includes a CPU 31, a RAM 32, a ROM 33, a clock unit 34 for measuring date and time, a communication unit 35 for performing information communication with the host server 1, A storage information database 36 for storing static information extracted from the host server 1 is provided.
The storage information database 36 stores static information to be presented to the orderer and the like, and is configured from a hard disk or the like. Note that the functions of the other components are the same as those provided in the host server 1 described above, and thus description thereof will be omitted.
[0025]
The agent terminal 4 is used when the agent inputs and operates dynamic information and static information to the host server 1 on behalf of the person in charge of the company participating in the construction project, and the CPU 41, the RAM 42, the ROM 43, A clock section 44 for measuring the date and time, a communication section 45 for performing information communication with the host server 1 and the like are provided. Note that the functions of these components are the same as those provided in the host server 1 described above, and thus description thereof will be omitted.
[0026]
Next, each operation function in the construction project information management system 100 configured as described above will be described using a flowchart.
As shown in FIG. 2, for example, a person in charge of a site, which is a user, assigns an identification number to the dynamic information and the static information of the construction project classified by hierarchy (S1). Next, the person in charge inputs the information to which the identification number has been assigned from the input unit 26 of the user terminal 2 (S2). When each information is input and the person in charge gives a transmission instruction, the transmission unit 25 transmits each input information to the host server 1 (S3).
[0027]
The dynamic information and the static information do not necessarily need to be input by the person in charge into the host server 1, but can be requested from an agent and input from the agent terminal 4 to the host server 1. In this case, the person in charge sends the computerized information with the identification number to the agent terminal 4 via the transmission unit 25, and the agent receiving the information via the communication unit 45 allows the agent to receive the information. Is transmitted from the communication unit 45 to the host server 1. Since the agency operates each information by the identification number, it can be easily performed even by a person who is not familiar with the construction industry.
Alternatively, the person in charge may pass each information to the agent without digitizing the information, and the agent may assign the identification number and transmit the information digitized to the host server 1.
[0028]
FIG. 5 is a list of dynamic information and static information with identification numbers transmitted to the host server 1. Here, the items whose items are described in the fourth hierarchy are the dynamic information, and are stored in the dynamic information database 16. Items for which no item is described in the fourth hierarchy, that is, those whose identification number is “00” in the fourth hierarchy are static information, and are stored in the static information database 17.
[0029]
Explaining with a specific example, as shown in FIG. 5, the information on the contract with the orderer has an identification number of “01010100” and a lower two-digit number corresponding to the fourth hierarchy of “00”. Because it is, it is static information. The information on the construction plan to be submitted to the orderer has the identification number “03020101” at the stage of the original drawing, “030201002” during the preparation, and “03020103” when the file has been submitted. These are dynamic information because they are information that changes depending on the creation status of the construction plan.
[0030]
The static information and the dynamic information transmitted from the transmission unit 25 are received by the communication unit 15 of the host server 1 (S4), and the CPU 11 stores each information in the RAM 12.
Next, the CPU 11 accesses a server, such as a bank, to confirm whether the administrator of the host server 1 has been paid the ASP usage fee (S5). Here, if the usage fee has not been paid, the use of the host server 1 is not allowed, so that entry into the host server 1 is blocked.
If the usage fee has been paid, the CPU 11 checks whether or not the sender of each information is an ASP contractor based on the computer address of the transmission source (S6). When the agent transmits each information on a proxy basis, each information is deleted unless the person in charge is authenticated (S7).
When the person in charge transmits or the person in charge authenticates the information transmitted by the agent, the CPU 11 activates the program stored in the ROM 13, stores the dynamic information in the dynamic information database 16, and The target information is stored in the static information database 17. When storing, the date and time stored by the clock unit 14 are written (S8).
[0031]
Next, each operation function for creating static information based on the dynamic information stored in the dynamic information database 16 will be described.
As shown in FIG. 3, the clock section 14 measures the time from the date and time set in advance by the person in charge (S9), and after a predetermined time has elapsed (S10), the CPU 11 activates the program stored in the ROM 13 and The dynamic information of the selected item is extracted to create static information (S11). Next, with the creation of the static information, the CPU 11 starts the program stored in the ROM 13 and converts the identification number (S12). Next, the created static information is stored in the static information database 17 (S13).
Note that the CPU 11 reads a program from the ROM 13 and deletes the static information from the static information database 17 after a predetermined time has elapsed since the static information was stored in the static information database 17. This is to prevent the static information database 17 from overflowing. The amount of information to be deleted is set in advance by a person in charge. The above-mentioned predetermined time is determined according to the capacity of each of the databases 16 and 17. Further, all dynamic information may be created as static information.
[0032]
Next, a description will be given of each operation function in the case where information to be stored, of the static information stored in the static information database 17, is stored in the in-house server 3.
As shown in FIG. 4, an instruction operation for extracting the static information stored in the static information database 17 is performed from the input unit 37 of the in-house server 3, and the instruction signal is transmitted from the CPU 31 to the host server 1 via the communication unit 35. It is transmitted (S14). The communication unit 15 of the host server 1 receives the instruction signal (S15), and transmits the static information to be transmitted to the internal server 3 based on the instruction signal to the internal server 3 via the communication unit 15 (S16). Next, the communication unit 35 of the in-house server 3 receives the transmitted static information (S17), and the CPU 31 reads the program stored in the ROM 33 and stores the static information in the storage information database 36 (S18).
[0033]
According to the construction project information management server 1 and the construction project information management system 100 of the present embodiment, when a person in charge at the site inputs dynamic information and static information from the user terminal 2 and sends them to the host server 1, Target information and static information are stored in separate locations. When it is determined that the predetermined condition is satisfied, static information is created based on the dynamic information, and the created static information is stored in the static information database 17. Information can be clearly distinguished and handled, and information on construction projects can be easily and reliably managed.
[0034]
Also, static information is created by extracting dynamic information of a preset item from the dynamic information determined to satisfy a predetermined condition, so that each time the content of the dynamic information is determined, This eliminates the need for the person in charge to rewrite the static information, thereby reducing the complexity of the work and easily and reliably managing information on the construction project.
[0035]
In addition, when static information is created from dynamic information, the identification number of the created static information is converted. Therefore, each time the contents of the dynamic information are determined and the static information is created, the person in charge is assigned. Therefore, it is not necessary to convert the identification number of the generated static information, so that the complexity of the work can be reduced, and the information on the construction project can be easily and reliably managed.
[0036]
In addition, since it is configured to generate static information from dynamic information based on confirmation of input of usage fee payment information to the host server 1, it can be used as an ASP server. .
[0037]
In addition, since the static information is created from the dynamic information based on the elapse of a predetermined time by the clock unit 14, the dynamic information and the static information can be managed in time series. As a result, it is possible to easily and reliably manage information on construction projects.
[0038]
Note that the present invention is not limited to the above embodiment. For example, the condition for creating static information from dynamic information is not limited to the elapsed time, and may be performed each time each process ends. In addition, it is also possible to add cost budget items to this system to manage costs. In addition, the design can be freely changed as long as the gist of the invention is not changed.
[0039]
【The invention's effect】
According to the first aspect of the present invention, when it is determined that the predetermined condition is satisfied, static information is created based on the dynamic information stored in the dynamic information storage unit, and the created static information is created. The information is stored in the static information storage means. Therefore, the dynamic information and the static information can be clearly distinguished and handled, and the information on the construction project can be easily and reliably managed.
[0040]
According to the second aspect of the present invention, the information management unit extracts static information by extracting information of a preset item from the dynamic information determined to satisfy the predetermined condition. Since the means is provided, the complexity of the work of the user can be reduced, and the information on the construction project can be easily and reliably managed.
[0041]
According to the third aspect of the present invention, when the creating unit creates the static information from the dynamic information, the identification unit includes the identification number converting unit that converts the identification number of the created static information. , And information on construction projects can be easily and reliably managed.
[0042]
According to the fourth aspect of the present invention, there is provided a payment information confirming means for confirming the input of payment information of a predetermined consideration, and the information management means is configured to execute the processing based on the confirmation of the payment information input by the payment information confirming means. Since it is configured to operate, it can be used as a server such as an ASP (Application Service Provider).
[0043]
According to the fifth aspect of the present invention, the information processing apparatus further includes a clock unit for measuring a date and time, and the information management unit is configured to operate based on a predetermined time elapsed by the clock unit. Since the dynamic information and the static information can be managed in time series, the information on the construction project can be easily and reliably managed.
[0044]
According to the invention described in claim 6, the user terminal includes an input unit and a transmission unit, and the construction project management server includes a dynamic information storage unit, a static information storage unit, and an information management unit. , Dynamic information and static information can be clearly distinguished and handled, and information on construction projects can be easily and reliably managed.
[Brief description of the drawings]
FIG. 1 is a block diagram showing an overall configuration of a construction project information management system according to an embodiment of the present invention.
FIG. 2 is a flowchart showing each operation function of transmitting dynamic information and static information input to a user terminal to a construction project information management server in the embodiment.
FIG. 3 is a flowchart showing each operation function for creating static information based on dynamic information stored in a dynamic information database in the embodiment.
FIG. 4 is a flowchart showing each operation function when the static information to be stored in the above embodiment is stored in an in-house server.
FIG. 5 is a diagram showing an example of dynamic information and static information input to the construction project information management server in the embodiment.
[Explanation of symbols]
1 Construction project information management server 11 CPU (information management means, creation means, identification number conversion means, payment information confirmation means)
12 RAM (information management means, creation means, identification number conversion means, payment information confirmation means)
13 ROM (information management means, creation means, identification number conversion means, payment information confirmation means)
14 Clock section 16 Dynamic information database 17 Static information database 2 User terminal 25 Transmission section 26 Input section 100 Construction project information management system

Claims (6)

ユーザ端末に通信回線を介して接続され、建設プロジェクト情報を管理する建設プロジェクト管理サーバであって、
前記建設プロジェクト情報のうち、建設プロジェクトを遂行するにあたり、時間の経過に伴って内容が変化し、識別番号が付された動的情報を格納する動的情報記憶手段と、
前記建設プロジェクト情報のうち、内容が確定され、識別番号が付された静的情報を格納する静的情報記憶手段と、
前記動的情報が所定の条件を満たしたと判断した場合に、当該動的情報に基づいて静的情報を作成し、作成された静的情報を前記静的情報記憶手段に格納する情報管理手段と、
を備えることを特徴とする建設プロジェクト情報管理サーバ。
A construction project management server connected to the user terminal via a communication line and managing construction project information,
Among the construction project information, in performing the construction project, the contents change over time, and dynamic information storage means for storing dynamic information with an identification number,
Among the construction project information, the content is determined, static information storage means for storing static information with an identification number,
Information management means for creating static information based on the dynamic information when it is determined that the dynamic information satisfies a predetermined condition, and storing the created static information in the static information storage means; ,
A construction project information management server, comprising:
請求項1に記載の建設プロジェクト情報管理サーバにおいて、
前記情報管理手段は、
所定の条件を満たしたと判断された動的情報の中から、予め設定された項目の情報を抽出して静的情報を作成する作成手段を備えることを特徴とする建設プロジェクト情報管理サーバ。
The construction project information management server according to claim 1,
The information management means,
A construction project information management server, comprising: a creation unit that extracts information of a preset item from dynamic information determined to satisfy a predetermined condition and creates static information.
請求項2に記載の建設プロジェクト情報管理サーバにおいて、
前記作成手段が動的情報から静的情報を作成した場合に、
作成された静的情報の識別番号を変換する識別番号変換手段を備えることを特徴とする建設プロジェクト情報管理サーバ。
The construction project information management server according to claim 2,
When the creating means creates static information from dynamic information,
A construction project information management server, comprising: an identification number conversion unit that converts an identification number of created static information.
請求項1〜3のいずれか一項に記載の建設プロジェクト情報管理サーバにおいて、
所定の対価の支払情報の入力を確認する支払情報確認手段を備え、
前記情報管理手段を、
前記支払情報確認手段により前記支払情報の入力が確認されたことに基づいて、動作するように構成したことを特徴とする建設プロジェクト情報管理サーバ。
The construction project information management server according to any one of claims 1 to 3,
A payment information confirming means for confirming the input of payment information of a predetermined consideration;
The information management means,
A construction project information management server configured to operate based on confirmation of input of the payment information by the payment information confirmation means.
請求項1〜4のいずれか一項に記載の建設プロジェクト情報管理サーバにおいて、
計時手段を備え、
前記情報管理手段を、前記計時手段により所定の時間が経過したことに基づいて、動作するように構成したことを特徴とする建設プロジェクト情報管理サーバ。
In the construction project information management server according to any one of claims 1 to 4,
Equipped with timekeeping means,
A construction project information management server, characterized in that the information management means is configured to operate based on a lapse of a predetermined time by the clock means.
ユーザ端末と、建設プロジェクト情報を管理する建設プロジェクト管理サーバとが、通信回線を介して接続される建設プロジェクト管理システムであって、
前記ユーザ端末は、
前記建設プロジェクト情報のうち、建設プロジェクトを遂行するにあたり時間の経過に伴って内容が変化する動的情報と、内容が確定された静的情報とを識別番号を付して入力する入力手段と、
前記入力手段により入力された前記動的情報及び前記静的情報を前記建設プロジェクト管理サーバに送信する送信手段と、を備え、
前記建設プロジェクト管理サーバは、
前記送信手段により送信された識別番号付きの動的情報を格納する動的情報記憶手段と、
前記送信手段により送信された識別番号付きの静的情報を格納する静的情報記憶手段と、
前記動的情報が所定の条件を満たしたと判断した場合に、当該動的情報に基づいて静的情報を作成し、作成された静的情報を前記静的情報記憶手段に格納する情報管理手段と、
を備えることを特徴とする建設プロジェクト情報管理システム。
A construction project management system in which a user terminal and a construction project management server that manages construction project information are connected via a communication line,
The user terminal,
Of the construction project information, input means for inputting, with an identification number, dynamic information whose contents change with the passage of time when performing a construction project, and static information whose contents are determined,
Transmitting means for transmitting the dynamic information and the static information input by the input means to the construction project management server,
The construction project management server,
Dynamic information storage means for storing dynamic information with an identification number transmitted by the transmission means,
Static information storage means for storing the static information with the identification number transmitted by the transmission means,
Information management means for creating static information based on the dynamic information when it is determined that the dynamic information satisfies a predetermined condition, and storing the created static information in the static information storage means; ,
A construction project information management system comprising:
JP2002301645A 2002-10-16 2002-10-16 Construction project information management server and construction project information management system Pending JP2004139230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002301645A JP2004139230A (en) 2002-10-16 2002-10-16 Construction project information management server and construction project information management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002301645A JP2004139230A (en) 2002-10-16 2002-10-16 Construction project information management server and construction project information management system

Publications (1)

Publication Number Publication Date
JP2004139230A true JP2004139230A (en) 2004-05-13

Family

ID=32449937

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002301645A Pending JP2004139230A (en) 2002-10-16 2002-10-16 Construction project information management server and construction project information management system

Country Status (1)

Country Link
JP (1) JP2004139230A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456178A (en) * 2010-10-27 2012-05-16 镇江华扬信息科技有限公司 Construction project payment management system
CN103854116A (en) * 2012-12-03 2014-06-11 四川电力超高压建设管理公司 Distributed remote drawing method implementation
CN105303304A (en) * 2015-10-15 2016-02-03 贵州省邮电规划设计院有限公司 Method for engineering field management based on handheld terminal

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456178A (en) * 2010-10-27 2012-05-16 镇江华扬信息科技有限公司 Construction project payment management system
CN103854116A (en) * 2012-12-03 2014-06-11 四川电力超高压建设管理公司 Distributed remote drawing method implementation
CN105303304A (en) * 2015-10-15 2016-02-03 贵州省邮电规划设计院有限公司 Method for engineering field management based on handheld terminal

Similar Documents

Publication Publication Date Title
US20020198743A1 (en) Network architecture and management system for conducting insurance activities on a network
JP2004240891A (en) Contract management system
CN100591056C (en) Method and system for processing message
JP2002032611A (en) Procedure management system
JP3920522B2 (en) Trademark service processing method, system, and recording medium
JP2002117215A (en) Patent management system
JP2008140411A (en) Contract management system
JP2004139230A (en) Construction project information management server and construction project information management system
JP2020077078A (en) Ticket system
JP2004038494A (en) User information management method, application delivery method, user information management server, application delivery server and program, user information management program
JP2010039620A (en) Work management system
US20040088181A1 (en) Method and system for processing real estate transactions
JP5048211B2 (en) Total storage management system, total storage management method, and total storage management program
JP2004326250A (en) Price information management server, method, and program
JP2007172018A (en) Data storage method and data storage system
JP2005032158A (en) Computer asset information management device, method, and program
JP3672066B2 (en) Transaction reservation system and recording medium
Habib et al. Paperless office: First step to digital Bangladesh
JP2003132189A (en) Work control device and program
WO2022270431A1 (en) Information processing device, information processing method, and program
KR100975213B1 (en) The system which operates a construction data package online network in base
JP2002032527A (en) Patent business electronic transaction system and patent business electronic transaction method
JP2004110363A (en) System, method and program for approving and managing copyright, and recording medium
JP2006338073A (en) Personal information protection system
JP2010072961A (en) Content management apparatus

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060725

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20061121