JP2004030333A - Rotational integrated business management system - Google Patents

Rotational integrated business management system Download PDF

Info

Publication number
JP2004030333A
JP2004030333A JP2002186909A JP2002186909A JP2004030333A JP 2004030333 A JP2004030333 A JP 2004030333A JP 2002186909 A JP2002186909 A JP 2002186909A JP 2002186909 A JP2002186909 A JP 2002186909A JP 2004030333 A JP2004030333 A JP 2004030333A
Authority
JP
Japan
Prior art keywords
information
management
business
value
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2002186909A
Other languages
Japanese (ja)
Inventor
Asako Oikawa
及川 麻子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Universal Entertainment Corp
Original Assignee
Aruze Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aruze Corp filed Critical Aruze Corp
Priority to JP2002186909A priority Critical patent/JP2004030333A/en
Publication of JP2004030333A publication Critical patent/JP2004030333A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To allow a user to utilize useful information among a large amount of input information and to effectively utilize experience information and information about business. <P>SOLUTION: A rotational integrated business management system is provided with an information processing means 4 for analyzing basic management information and obtaining value added information, a business managing means 5 for performing business management on the basis of the value added information obtained from the information processing means, and a monitoring means 6 for monitoring the business managing means 5. The monitoring means 6 feedbacks the quality decision of management criteria of business management as monitoring results to the business managing means 5. The business managing means 5 changes management criteria on the basis of the feedbacked decision results, and the information processing means 4 feedbacks management results caused by the business management as value added information to be circulated. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、経営管理システムに関し、経営管理における経営情報の管理に関する。
【0002】
【従来の技術】
経営管理には、日々の業務管理、目標計画の設定、設定した計画の実行、さらには人事管理や教育等、種々にわたって管理業務が行われている。
【0003】
通常、これらの管理業務は個々の部門毎に行われ、従来これら各部門間の情報の伝達は主に書類により行われている。書類による場合には、迅速な情報伝達が望めないため、最近では構内配線を用いて電子メール等を利用することも行われている。
【0004】
また、共通情報についてはデータベースに格納しておき、担当者が各自の判断で自由に参照できるように構成することで、経営管理に役立てることも考えられる。
【0005】
【発明が解決しようとする課題】
一般に、経営管理は売り上げ向上や原価低減等を行うことにより、利益改善を行うことを目的の一つとしている。このためには、情報が単に迅速に伝達されるだけでなく、伝達される情報が有効なものであることが求められる。
【0006】
電子メール等を利用した情報伝達は迅速さの点では改善されるものの、伝達される情報は、情報提供者や情報入力者に依存しているため、有効さの点では種々の段階のものが含まれ、必ずしも有効な情報であるとは言い難い。種々の情報源から提供されるに情報は、必要性や重要さの点で種々のレベルのものが含まれており、また、この必要性や重要さは利用者にとって異なるため、種々のレベルにある多量の情報の中から、利用者にとって有益な情報を抽出するには多くの時間と労力が必要となる。
【0007】
従来のように、必要性や重要さの点で雑多の情報が伝達されるため、必ずしも情報が有効に利用されているとは言えず、また、情報の利用に当たって情報の選別に無駄な時間を要するという問題がある。
【0008】
また、一般に情報の流れは一方向であり、情報活用などの経験で得られた情報は蓄積されることなく廃棄される。経験情報は、業務を改善し経営管理に有益である可能性があるが、従来においては、この貴重な経験情報が無駄に廃棄され、有効利用されていないという問題がある。
【0009】
本発明は、前記した課題を解決して、経営に係わる情報を有効利用することを目的とし、特に、多量の入力情報に対して利用者にとって有益な情報の利用を可能とし、また、経験情報についても有効利用することを目的とする。
【0010】
【課題を解決するための手段】
本発明は、経営に係わる情報を利用者に有用な付加価値情報とすることにより、多量の入力情報に対して各利用者にとって有益な情報の利用を可能とする。また、付加価値情報を用いた経営管理により得た経験情報を再びフィードバックして付加価値情報として蓄積することにより、情報の付加価値を高めながら循環させる。
【0011】
図1は、本発明の循環型統合経営管理システムにおける情報の流れ、及び経営循環を説明するための概略図である。
【0012】
この循環型統合経営管理システムは、情報を入力し、情報価値のある情報(付加価値情報)を蓄積する部分、付加価値情報を用いて経営に係わる判断・決定を行い、この判断・決定に基づいて経営管理を行う部分、経営管理部分を監視する部分を備える。
【0013】
付加価値情報は、多種多様の入力情報の中から選別して経営に有用な情報としたものであり、種々の観点で付与した付加情報を用いて分析を行うことで取得することができる。
【0014】
経営管理手段は、付加価値情報を用いて例えば機種開発や販売戦略等に関して判断、方針決定、意思決定を行い、この判断・決定に基づいて業務管理を行う。業務管理では、方針に基づいて管理基準(基準数値)を設定する。
【0015】
監視部分は、管理基準と実績とを比較することにより経営管理手段を監視して業務プロセスを改善し、管理基準を変更することにより経営管理部分における管理機能を向上させる。経営管理部分の管理機能の向上は、売り上げや原価低減という実績情報として現れる。
【0016】
なお、業務プロセスの見直しは、監視結果のよる警告に基づいて業務プロセス改善を指令し、改善企画及びその効果を算定して業務改善を行うことでシステム開発を行い、開発したシステムを導入して改善を実施し、その効果を確認し、管理基準を変更することで行う。この改善に伴う効果は、経験情報としてフィードバックされ付加価値情報に蓄積される。
【0017】
また、経営管理手段の経営により得られる情報についても、実績情報や外部評価としてフィードバックされ付加価値情報に蓄積される。外部評価は、例えば、情報公開等で公開される情報や、経営活動で形成される企業の信頼度としてフィードバックされる。
【0018】
このように、本発明の循環型統合経営管理システムでは、入力した情報を付加価値情報とした後、この付加価値情報に基づいて経営管理を行い、この経営管理で得られる経験情報や実績情報や経営活動で形成される外部評価の形態で付加価値情報としてフィードバックされて情報循環が行われる。また、この循環の間に経営管理における管理基準が変更され、業務管理の管理能力の向上がはかられる。
【0019】
上記した本発明の循環型統合経営管理システムは、以下の構成により具体化することができる。
【0020】
本発明の循環型統合経営管理システムは、基礎経営情報を分析して付加価値情報を得る情報処理手段と、情報処理手段から得られる付加価値情報に基づいて管理基準を形成し、経営管理を行う経営管理手段と、経営管理手段による経営管理を監視する監視手段とを備えた構成とする。監視手段は、実績情報に基づいて経営管理の管理基準の良否判定を監視結果として経営管理手段にフィードバックし、経営管理手段は、フィードバックされた良否判定結果に基づいて前記管理基準を変更し、情報処理手段は、経営管理手段による管理結果を付加価値情報としてフィードバックする。これらの構成間において、経営に係わる情報は循環し、この循環の間において付加価値が高められる。
【0021】
経営管理手段による経営管理は、計画管理及び業務管理を含む。計画管理は、付加価値情報に基づく計画の作成、及び監視手段の監視結果に基づく計画の変更を含み、また、業務管理は、計画に基づく経営の管理を含む。
【0022】
また、基礎経営情報は、市場情報、及び、販売情報を含む実績情報を含む。 また、管理基準は、各業務毎の基準値、業務実績や営業実績に対する目標値を備える。基準値は、従来からの業務や業務計画書で定められた新たな業務において、従来の類似する業務実績に基づいて、各業務に要する時間数や工程数が定められる。また、目標値は、業務計画書に基づいて、その業務における目標時間数や目標工程数が定められる他、営業における目標値(例えば、生産台数、販売台数、売り上げ数等)が定められる。
【0023】
したがって、この実績情報は、情報処理手段に対して付加価値情報としてフィードバックされ、情報循環が行われることになる。
【0024】
本発明の循環型統合経営管理システムが備える経営管理手段において、経営管理手段が行う計画管理は、製品機器の機種開発に関する開発計画、製品機器の販売計画、製品機器の生産計画を行う。また、経営管理手段が行う業務管理は、各計画管理の少なくとも一つを目標計画として管理を行う。
【0025】
本発明の循環型統合経営管理システムにおいて、監視手段は各計画管理の少なくとも一つを含む目標計画を実績情報と比較し、この比較に基づいて経営管理手段の管理基準の良否判定を行う。
【0026】
また、監視手段は、経営管理手段による種々の業務の業務実績を基準値と比較して業務プロセスにおける基準値の良否を判定する他、業務実績や営業実績を目標値と比較して経営上の目標値の良否判定を行う。
【0027】
この良否判定は、計画変更に対して指針の方向性を示し、例えば、計画の拡張、計画の改善、又は新規の計画を開発するといった方向性を示す。
【0028】
監視手段は、1回の良否判定結果、又は複数回の良否判定結果に基づいて経営管理手段に監視結果をフィードバックする。
【0029】
本発明の循環型統合経営管理システムの情報処理手段は、基礎経営情報に対して複数の観点で付加情報を付与することで特徴付けを行い、この付与した付加情報に基づいて情報分析を行う分析手段と、分析結果及び実績情報を付加価値情報として一次記録する情報蓄積手段と、付加価値情報を配信する配信手段とを備える。
【0030】
付加価値情報は、基礎経営情報及びフィードバック情報に対して少なくとも一つの観点で付加情報を付与することで特徴付けされる。観点は、情報が属するカテゴリー、情報の種類、情報の重要度の少なくとも一つを含み、これらはさらに細分化された観点を含む。
【0031】
情報蓄積手段が記録するデータ構造は、付加価値情報を格納するデータ領域、各観点毎又は各観点の組合せに対応する少なくとも一つのフラグ領域を備え、分析手段は、情報蓄積手段のフラグ領域にフラグデータを付することにより付加価値情報を形成する。
【0032】
情報蓄積手段が記録する付加価値情報は、観点に付与された付加情報を用いて所定の付加価値情報を検索することができる。また、付加情報として時間情報を付与することにより、自動消去、あるいは、自動抽出を行うことができる。
【0033】
配信手段は、付加価値情報に付された付加情報の組合せにより情報を仕分けし、この仕分けに応じて設定した配信先及び配信手順に従って配信する。配信手順は、複数の配信先を階層化し、選択された階層より上位配信先に対して一斉配信、又は下位の階層から上位の階層もしくは上位の階層から下位の階層に向かって順次配信する。
【0034】
本発明の循環型統合経営管理システムは、さらに、選択された情報を履歴情報として記録する履歴記録手段を備える。この履歴記録手段に記録される選択情報は、経営管理手段が形成する経営管理に係わる情報や、配信データの内で選択された付加価値情報とすることができる。配信データの選択は、配信先において、配信データに設けたフラグ領域にフラグデータを付すか否かで行うことができる。
【0035】
本発明の循環型統合経営管理システムは人事評価手段を備え、この人事評価手段は、経営管理手段の業務管理の計画と、この計画の実績情報とを個人又はグループで設定し、計画と実績情報とを個人又はグループ毎に比較し、計画に対する個人別及び/又はグループ別に貢献度を評価することで行う。この人事評価手段で得た評価結果は、情報処理手段にフィードバックして付加価値情報として蓄積することもできる。
【0036】
【発明の実施の形態】
以下、本発明の実施の形態について、図を用いて詳細に説明する。
【0037】
以下、図2,3を用いて本発明の循環型統合経営管理システムの概略構成を説明し、図4〜図6を用いて本発明の付加情報付与による付加価値情報について説明し、図7〜図10を用いて本発明の付加情報付与による自動配信について説明し、図11〜図15を用いて本発明による監視処理について説明し、図16,17を用いて本発明による人事評価について説明し、図18を用いて本発明による検索及び自動消去を説明する。
【0038】
はじめに、図2のブロック図を用いて本発明の循環型統合経営管理システムの概略構成を説明する。図2において、循環型統合経営管理システム1は、入力手段2と、情報処理手段4と、経営管理手段5と、監視手段6と、人事評価手段7と、基幹システム8と、教育活用手段9と、効果確認手段10を備える。なお、入力手段2と情報処理手段4との間に、処理手段3を設ける場合もある。
【0039】
循環型統合経営管理システム1は、基礎経営情報及び実績情報に基づいて、経営に有効な付加価値情報を形成し、この付加価値情報を自動配信すると共に、付加価値情報を用いて経営管理及び監視を行い、さらに、得られた経験情報をフィードバックして付加価値情報とする。なお、実績情報としては、主に内部業務に係わる業務実績と、営業活動の結果として得られる営業実績がある。
【0040】
入力手段2は、図2の構成では、基礎経営情報を入力する入力手段(2a,2b,2c)の他、外部評価を入力する入力手段2d,業務実績を入力する入力手段を含み、各入力手段は端末装置やスキャナ装置とすることができる。端末装置は、独立して設置された形態の他、ネットワークと接続した形態とすることができ、キー操作や種々の記録媒体から情報を入力する他、ネットワークを介して情報を入力することができる。
【0041】
基礎経営情報としては、例えば、報告書や連絡書の形態により一般外部から得られる情報、稟議書や申請書の形態により経営内部から得られる情報、経費/精算情報等がある。報告書や連絡書の形態で入力される情報としては、例えば、経営情報、トラブル情報、クレーム情報、市場情報、人事情報、外部に対する申請情報等がある。また、稟議書や申請書の形態で入力される情報としては、例えば、稟議申請の係わる情報、各種内部申請に係わる情報がある。
【0042】
これらの各情報は、入力手段2a,2b,2cにより入力される。情報の形態は、テキストデータとすることも画像データとすることもできる。書面上の情報を入力する手段としては、例えば、キー入力あるいはスキャナ装置による読み取りがある。スキャナ装置により読み取んだ場合には、キャラクタデータに変換する他、PDFの形式とすることもできる。
【0043】
なお、稟議書や申請書は、入力手段2bで入力した後に、稟議書処理手段3aによって承認者や決裁者による書類の認証操作が行われ、その後情報処理手段4に入力される。また、経費/精算は、入力手段2cで入力した後に、経費/精算処理手段3bによって承認者や決裁者による認証操作が行われる場合がある。さらに、認証手段3bで認証された後、後述する受注情報や会計情報と共に販売/会計サーバ3cに入力された後に、情報処理手段4に入力される。
【0044】
実績情報の内、営業実績情報としては、例えば、受注情報、仕入支払情報や決算情報等の会計情報、売上情報や販売見込情報等の経営実績情報がある他、、外部評価情報を含めることができる。業務実績情報としては、各担当者やプロジェクトの各種業務における実績を表す実働時間や工程などの進行情報がある。
【0045】
これらの各情報は、キー操作や種々の記録媒体から情報を入力する他、ネットワークを介して各担当者やプロジェクトからオンラインで入力することもできる。
【0046】
ここで、生産情報、在庫情報。見積情報、受注情報、販売情報、会計情報や、仕入支払情報、販売見込情報等の経営管理上で必須となる基本的な情報は、基幹システム8で管理される。
【0047】
図3は基幹システムの概略を説明するためのブロック図である。図3において、基幹システム8は、例えば、生産システム8a,営業システム8b,会計システム8c等の各システム群で構成される。なお、この基幹システムを構成するシステム群は上記した各システムに限らず、営業形態に応じて任意のシステム形態で構成することができる。
【0048】
生産システム8aは、生産管理や在庫管理を行うシステムであり、生産データや在庫データは生産在庫入力手段8dから入力される。また、営業システム8bは、見積や受注、販売、売り上げ等の管理を行うシステムであり、各データは例えば見積受注入力手段8eや販売入力手段8fから入力される。この営業システム8b内には、営業実績8b1g蓄積されている。また、会計システム8cは、会計管理を行うシステムであり、会計データは会計入力手段8gから入力される。なお、会計データとして、内部の経費や精算のデータは、前記した入力手段2cから入力され、経費精算手段3bを経た後、情報処理手段4の自動配信手段4hから入力するようにしてもよい。
【0049】
また、外部評価情報は、外部評価入力手段2dに入力され後に、情報処理手段4に入力される。なお、外部評価情報は、企業がIRやPRで外部に提供する情報の他、企業による情報開示や種々の活動により形成される企業イメージの評価を含み、企業イメージはアンケート等により取得するようにしてもよい。なお、上記した基礎経営情報や実績情報は一例であり、情報の種類や分類は例示したものに限らず任意なものとすることができる。
【0050】
また、稟議書処理手段3a,経費/精算処理手段3b等の処理手段3は、必要に応じて設けることができる他、各入力手段2b〜2eは処理手段3を経由することなく情報処理手段4に直接入力するようにしてもよい。
【0051】
情報処理手段4は、付加情報付与手段4a,4b,4cと、分析手段4dと、情報蓄積手段4eとを備え、さらに、検索手段4fと自動消去手段4gを備えることができる。以下、図2と共に、図4の情報処理手段における情報の流れを説明するためのブロック図を用いて説明する。
【0052】
付加情報付与手段4a,4b,4cは、入力する情報を特徴付けるための種々の観点で付加情報を付与する手段である。この観点は、情報が有する特徴を表すものであれば任意とすることができる。例えば、情報が属する分野に係わる情報カテゴリーの観点TA、情報の種類に関する観点TB、緊急度の観点TC、決裁権限の所属に関する観点TD、承認のために情報が移動する経路の観点TE、情報を要する職務を表す職務権限の観点TF等がある。
【0053】
情報カテゴリーの観点TAで付与される付加情報としては、例えば、他社の販売情報TA1、クレーム情報TA2、市場情報TA3、人事情報TA4等があり、情報の種類に関する観点TBで付与される付加情報としては、例えば、報告TB1、連絡TB2、相談TB3、掲示TB4、要望等TB5があり、緊急度TCの観点で付与される付加情報としては、例えば、大TC1、中TC2、小TC3の緊急性の程度があり、決裁権限の所属に関する観点TDで付与される付加情報としては、例えば、決裁権限を有する職種や権限者名(TD1〜TD4)があり、経路の観点TEで付与される付加情報としては、例えば、決裁権限者間の移動順(TE1,TE2)がある。また、職務権限の観点TFで付与される付加情報として、権限のある部署TF1,TF2等がある。なお、この観点及び付加情報を表す符号は一例であり、取り扱う情報に応じて任意に設定することができる。
【0054】
図2において、付加情報付与手段4a、4cは各入力手段から入力する基礎経営情報や外部評価や基幹システム8から入力する情報に対して付加情報を付与し、付加情報付与手段4bは後述する人事評価手段7や効果確認手段10から得られる経験情報や経営情報に対して付加情報を付与する。
【0055】
なお、付加情報の付与は、例えば、情報を格納するデータ構造中に各観点を表すフラグ領域を設け、情報が有する観点に対応するフラグ領域にフラグを立てることで設定することができるが、これに限らず他の方法により設定することもできる。例えば、情報を格納するデータ構造に各観点を表すデータ、あるいは各観点の組合せを表すデータを付与するようにしてもよい。
【0056】
この付加情報付与手段4aは、付加情報を付与者が付与する形態とするとも、あるいは、入力する情報を解析することで自動付与する構成とすることもできる。自動付与する場合には、例えば、情報の入力手段の種別や、入力した情報に含まれる文字等の解析を利用することができる。
【0057】
分析手段4dは、付加情報付与手段4aで付与された付加情報を用いて、入力された情報の取捨選択したり、入力された情報を加工して新たな派生情報を形成することにより、元情報に付加価値を加えて付加価値情報を形成する手段である。入力された情報には種々の情報が含まれており、利用者の経営管理にとって有用活用の可能性がない情報も含まれている。分析手段4dでは、付与した付加情報を利用することで、有効活用の可能性がある情報と可能性がない情報とを分別し、不要な情報については消去する等の処理を行う。
【0058】
また、入力した情報に対して、例えば、統計処理を施したり、複数の情報間の相関関係を求める等のデータ処理を行うことにより、より有益な派生情報を形成する。また、上記のデータ処理の他、所定の分析手法により、所望の情報を求めるデータ処理を行うこともできる。したがって、分析手段4dを通すことにより、入力した情報を付加価値情報とする。
【0059】
分析手段4dで得られた付加価値情報、及び付加情報付与手段4b、4cで付加情報付与された情報は、情報蓄積手段4eに記録される。この記録は、後述する自動消去手段4gにより所定の条件の元で消去されるため、一時的な記録となる。
【0060】
付加情報付与手段4b及び4cで付加情報付与された情報は、分析手段4dを経ていないが、後述するように、効果確認手段10から得られる経験情報や、業務実績や外部評価は、付加価値情報を用いて行われる経営活動を経て得られるものであり、元の情報に経験や経営活動状態等の付加価値が加わっており、付加価値情報として扱うことができる。また、基幹システムから得られる経営上の基本的な情報に、見積受注や生産在庫等のその情報を特徴付ける付加情報を付与することにより後述する経営管理手段における経営管理に有用となる。したがって、ここで付加価値とは、新たな情報の形成や、不要な情報の削除の他、経験や経営活動を含むものである。
【0061】
図4において、分析手段4dは、派生情報を形成する派生情報形成処理機能4d1と、この派生情報に付加情報を付与する機能4d2を備える他、また、所定の付加価値情報を選択し、不要な付加価値情報を除去する選択処理の機能4d3を備える。
【0062】
情報処理手段4では、情報蓄積手段4eに蓄積される付加価値情報を用いて、検索処理や自動消去処理を行うことができる。
【0063】
検索処理は検索手段4fにより行うことができる。検索手段4fは、付加価値情報についてテキスト検索による他、付加情報付与手段で付与した付加情報を用いることもできる。
【0064】
また、自動消去処理は自動消去手段4gにより行うことができる。自動消去手段4gは、入力時等の所定時刻から所定時間が経過した不可価値情報を抽出して消去する他、予め設定しておいた付加情報やキーワードと所定時間の経過とを組合せて抽出し、この組合せに対応する付加価値情報を抽出して消去することもできる。これによれば、特定の付加情報の付加価値情報毎に自動消去する時期を設定することができる。
【0065】
自動配信手段4hは、情報蓄積手段4eに蓄積される付加価値情報を所定の配信先に自動配信する手段である。自動配信は、予め設定しておいた配信先情報4h2に向けて各付加価値情報を配信する。どの付加価値情報をどの配信先に配信するかは、観点あるいは複数の観点の組み合わせと配線先との関係を予め定めておくことで設定することができる。
【0066】
配信処理機能4h1は、付加価値情報に付与された付加情報あるいは複数の付加情報の組み合わせに対して設定された配信先を配信先情報4h2から読み出し、読み出した配信先情報4h2に配信する。配信先は、個別の配信先12a〜12c,経営管理手段5、基幹システム8,意志決定部11等がある。個別の配信先12としては、例えば、経営管理者や責任者等がある。
【0067】
また、意思決定部11は、経営管理において経営方針を決定する部門であり、例えば、機器開発や販売戦略を決定し、方針指示書(あるいは見直し指示書)5Fで基本方針を定め、この方針に従って各部門における業務計画立案5Gを作成する。さらに、この業務計画立案5Gに従って、各担当部においてより詳細な業務計画書5Aを作成する。この業務計画書5Aは、機器開発や販売戦略に伴うスケジュールを定めた業務計画、この業務計画を実行させるための複数の行程からなる業務プロセスを含んでいる。さらに、業務計画書5Aに従って、業務プロセスの基準となる基準値5B、売り上げや売り上げ台数等の営業実績に対する目標の他、業務上の目標(例えば、目標時間数や目標工程数)等の種々の目標値5Cを定める。基準値5Bは、業務計画書5Aで定められる業務計画に対して、従来の業務実績を参照して定められる。また、目標値5Cは、営業上及び業務上で目標とする指標を表すものとして定められる。
【0068】
これら業務計画書5A、業務プロセスの基準となる基準値5B、目標値5Cは経営管理手段5内に設定される。
【0069】
経営管理手段5は、意思決定部11で決定した業務計画、業務プロセス、あるいは業務目標を監視する手段であり、業務計画書5A、基準値5B、目標値5Cを、業務実績入力手段2eから入力した業務実績5Dや基幹システムから入力した営業実績と比較することにより、業務の進捗状況や業務プロセスの適正や目標の達成具合を監視し、基準値5B及び目標値5Cの適正を判定し、さらに修正,変更を行って経営管理を改善する。なお、ここでは、業務実績5Dは、個人、グループ、あるいはプロジェクト等の各種単位で設定された各業務の進行の程度を表し、営業実績は、例えば受注や販売台数や売り上げ等の他、見積受注、生産、在庫、会計の営業活動により得られる実績を表している。業務実績5Dは、図1に示す構成では、業務実績入力手段2eから入力する構成としているが、別に設ける業務管理システム(図示していない)が備えるサーバから入力するようにしてもよい。
【0070】
監視手段6は、経営管理手段5における業務計画、業務プロセス等を監視する手段であり、業務監視手段6a,業務プロセス監視手段6b,目標監視手段6c等を備える。業務監視手段6aは、業務計画進捗状況監視手段6a1及び業務量監視手段6a2を備える。
【0071】
業務計画進捗状況監視手段6a1は、業務計画の業務スケジュールを監視し、所定日時毎に所定の業務計画事項を経営管理手段5に対して指示する。業務計画進捗状況監視手段6a1による監視は、所定日時に業務計画書5Aをチェックして業務指示を出す他、所定日時に業務計画書5Aと業務実績5Dとを比較して業務指示を出すようにすることもできる。なお、指示する業務計画の事項は任意に定めることができ、また、所定日時の設定もタイマ手段6dにより任意に設定することができる。これにより、業務計画について注意を喚起することができる。また、業務指示の指示先は、各業務の担当者、プロジェクト先等任意に定めることができる。
【0072】
また、業務量監視手段6a2は、各業務を達成するに要する時間量や工程数を監視する手段であり、各業務の所定段階に定めた基準業務量(時間量や工程数)に対して実際に要した実業務量を比較することにより監視を行う。例えば、実業務量が基準業務量を超えたか否かを判定したり、基準業務量により定まる所定範囲内に実業務量が収まるか否かを判定することで監視することができる。
【0073】
業務プロセス監視手段6bは、所定の業務を実行するために設定された業務プロセスが効率良く円滑に進められているかを監視し、監視結果を業務改善部13に業務改善指示を通知する他、所定の配信先に通知する。配信先は、例えば、経営層12とすることができる。業務プロセス監視手段6bによる監視は、常時あるいは所定間隔で、業務プロセスの効率の程度を表す基準値5Bと業務実績5Dとを比較し、業務実績5Dが基準値5Bを超えた場合に指示を出すことで行う。業務プロセスの基準値5Bは、例えば、業務計画書5Aに従って定めらる、各業務プロセスを実行するに要する時間数や工程数により設定することができる。
【0074】
業務改善部13は、業務プロセス監視手段6bから業務改善指示を受けると、業務プロセスの改善処理を行う。この改善処理は、業務改善指示書13Aを作成し、この業務改善指示書13Aに従って業務改善書13Bを作成することで行われる。さらに、業務改善書13Bに従って、改善企画のシステムを作成すると共にその効果(直接的効果、波及効果)を算定し、業務改善のシステム開発を行い、このシステムを実施することで改善導入を行う。効果確認手段10は、この業務改善による効果を確認する。これにより業務プロセスの改善が行われる。改善された業務プロセスに対し新たに基準値5Bを設定し、経営管理手段5に反映して基準値5Bを変更する。業務プロセス監視手段6bは、設定された基準値に5Bに基づいて行う経営管理において、再び業務プロセスの監視を行う。この工程を繰り返すことで、業務プロセスの改善が繰り返して行われる。
【0075】
また、業務改善部13に対する業務改善指示は、業務プロセス監視手段6bから通知を受けた個別配信先が出すようにしてもよい。
【0076】
この業務プロセスの改善で得られた経験情報は、効果確認手段10から情報処理手段4にフィードバックされ、付加情報付与手段4bで所定の付加情報が付された後、情報蓄積手段4eに蓄積される。
【0077】
また、目標監視手段6cは、業務計画書5Aに従って設定された目標値5Cと業務実績及び営業実績とを比較する。目標値5は業務に係わる目標値、及び営業に係わる目標値を含み、目標監視手段6cはこの両目標値が適正であるか否かを監視する。なお、営業実績は基幹システム8中の営業システム8b内の営業実績8b1を用いることができる。
【0078】
目標値の監視は、業務実績の目標値及び営業実績の目標値に対する達成度をそれぞれ算出し、各目標値からのずれが所定の値を超えた場合には、業務指令を経営管理手段5に通知する他、所定の配信先(例えば、経営層12)に通知する。目標監視手段6cによる監視は、常時あるいは所定間隔で、目標値5Cと営業実績とを比較して行う。目標値5Cは、目標監視手段6cの判定に従って変更するようにしてもよい。
【0079】
したがって、上記目標監視手段6cは、経営管理手段5による開発計画や販売計画、あるいは生産計画に基づいて定められた目標値5Cと業務実績及び営業実績と比較し、これらの比較に基づいて、業務上の目標値の適正(良否)判定、及び、売り上げや販売台数等の営業上の目標値の適正(良否)判定を行う。
【0080】
この目標値の適正判定において、計画変更に対する指針の方向性を示すようにしてもよい。例えば、計画の拡張、計画の改善、又は新規の計画の方向性を予め用意し、判定結果に基づいて選択するようにしてもよい。
【0081】
なお、監視手段6は、適正判定結果に基づいて行う経営管理手段5への監視結果のフィードバックは、1回の適正判定結果、あるいは複数回の適正判定結果に基づいて行うことができる。
【0082】
人事評価手段7は、業務計画の進捗状況に基づいて、人、グループ、あるいはプロジェクトの評価を行う。評価は、例えば、各業務計画を実行するに要する時間数や工程数を基準値として人、グループ、あるいはプロジェクト毎に設定しておき、各業務実績をこの基準値と比較することにより行う。
【0083】
人事評価手段7で得られた評価は、人、グループ、あるいはプロジェクトの評価算定に利用する他、経験情報として情報処理手段4にフィードバックし、付加情報付与手段4bで所定の付加情報を付与して情報蓄積手段4eに蓄積する。また、情報蓄積手段4eに蓄積された人事評価の経験情報は、教育活用手段9において参照することができる。
【0084】
以下、本発明の循環型統合経営管理システムで行う、分析、自動配信、業務プロセス監視、業務計画進捗状況監視や業務量監視、目標監視、人事評価の各処理について図を用いて説明する。
【0085】
はじめに、分析及び自動配信処理について図5〜図10を用いて説明する。図5は分析及び自動配信におけるデータの流れを説明するための図である。図5では、一例として情報A〜情報Dについて示している。付加情報付与手段4aは、各情報A〜情報Dにそれぞれに関連する付加情報を付与する。例えば、情報Aには、経営情報TA1,報告TB1,相談TB3,緊急度大TC3,経路TE1等の付加情報が付与され、情報Bには、人事情報TA4,連絡TB2,緊急度中TC2,経路TE2等の付加情報が付与され、情報Cには、市場情報TA3,連絡TB2,緊急度小TC1等の付加情報が付与され、情報Dには、市場情報TA3,連絡TB2,緊急度中TC2等の付加情報が付与される。なお、この例は説明の便宜から設定したものであり、必ずしも実際例ではない。
【0086】
分析手段4dは、各情報について付与された付加情報に基づいて、情報の取捨選択、及び派生情報の形成を行う。ここでは、例えば、緊急度が中以上の情報を採用し、緊急度が小以下の情報は自動消去することにより情報の選択を行う。従って、上記情報例では、緊急度が小の情報Cは消去される。
【0087】
また、例えば経営情報を用いて派生情報Pを形成する機能を有する場合には、上記情報例によれば、情報Aから派生情報Pとして情報Eを形成する。なお、この情報Eには派生情報Pであることを示す付加情報TP1を付与する。これにより、分析手段4dからは、情報A,情報B,情報D,情報Eが付加価値情報として選択される。自動配信手段4hは、各情報に付与された付加情報に基づいて配信先の配信する。例えば、情報Aは、配信先である経路TE1に従って配信される。
【0088】
図6は、付加情報が付与された付加価値情報のデータの一例である。この例では、各観点に対応して定められた情報の他、情報の入力日や保存期間等の情報も付加情報として備える。例えば、情報Aは、TA1,TB1,…,TE1等の各観点に対して付加された付加情報、入力日、及び保存期間1年等の付加情報が記録される。なお、情報コードD−0001は情報Aを特定するコード名である。また、図示するデータ例は、本発明の付加情報を説明するためであり、その他のデータについては省略している。
【0089】
図7は配信処理を説明するためのブロック図である。各情報に付された付加情報に基づいて配信を行うために、自動配信手段は、付加情報の組合せに対する配信先を表すテーブル(対応表)を備える。図7は、このテーブルの一例を示している。図7に示す例では、情報のカテゴリーの観点と情報の種類の観点、及び緊急度の観点の組合せにより、配信先を特定している。例えば、テーブルの左上の欄は、情報のカテゴリーの観点中の経営情報、情報の種類の観点中の報告、緊急度の観点中の大がそれぞれ付与されている場合に対応し、この配信先として「a・b・c・d」が設定されている。また、その下の欄は、同じく情報のカテゴリーの観点中の経営情報、情報の種類の観点中の報告が付与され、緊急度の観点において大が付与されている場合に対応し、この配信先として「a→b→c→d」が設定されている。
【0090】
なお、ここで、a,b,c,dは配信先を表し、「a・b・c・d」は各配信先に同時に配信する一斉配信を意味し、「a→b→c→d」は各配信先に順に配信する順次配信を意味している。また、配信先は対象者a,対象者b,…のように各個別の配信先とすることも、複数の配信先(例えば、対象者e,f,g)からなる配信グループを設定することもできる。
【0091】
一斉配信を行う場合には、図7に示すように、例えば、「a・b・c・d」の配信先が設定されている場合には、対象者a,対象者b,対象者c,対象者dに同時に配信され、「a・b」の配信先が設定されている場合には、対象者a及び対象者bに同時に配信される。
【0092】
図8は一斉配信におけるデータを説明するための図である。図8において、「a・b」の配信先が設定された配信情報は、配信先のアドレスa、アドレスbを備え、各対象者a,bの端末に配信される。配信の確認は、例えば、各端末から配信サーバに受信確認を送信することで行うことができる。受信確認は、端末が備える機能により自動で行うことも、対象者の操作により行うこともできる。配信サーバは、配信データ中に各対象者の受信日時のデータを記録するようにしてもよい。
【0093】
また、順次配信を行う場合には、例えば、「d→c→b→a」の配信先が設定されている場合には、対象者dから対象者c,対象者b,対象者aの順で配信され、また、「c→b→a」の配信先が設定されている場合には、対象者dを外して、対象者cから対象者b,対象者aの順で配信される。
【0094】
なお、複数のの配信先を階層化しておき、選択した階層より上位の配信先に対して一斉配信したり、下位の階層から上位の階層に向かって、あるいは逆に上位の階層から下位の階層に向かって順次配信するようにしてもよい。
【0095】
なお、配信先の組合せは任意に設定することができ、また、一斉配信と順次配信とを組み合わせることもできる。また、図示するテーブルは、情報のカテゴリー,情報の種類,及び緊急度の各観点の組合せに基づいて配信先を定めているが、組み合せる観点の種類や個数は、配信する情報や配信先に応じて任意に設定することができる。なお、テーブルの4段目以降の配信先は記載を省略している。
【0096】
図9は順次配信におけるデータを説明するための図である。図9において、「d→c→b→a」の配信先が設定された配信情報は、配信先のアドレスd〜アドレスaを備えると共に、配信順の情報を備える。配信順の情報は、図示するように記述された配信先のアドレスの順序により定めることも、あるいは配信順のデータを記述することで定めることもできる。
【0097】
対象者dから対象者cへの送信は、対象者d側の端末において、送信操作に時の次の対象者のアドレスを読み込むことで行う。このとき、配信サーバに対して送信したことを通知することで、配信サーバは配信データの現在位置を確認することができる。また、配信データ中に各対象者の受信日時及び送信日時のデータを記録するようにしてもよい。図10は、配信サーバが管理する配信データの一例であり、図6に示したデータに加えて、配信情報及び通過情報を記録することができる。
【0098】
次に、業務プロセス監視処理について図11,12を用いて説明する。図9は業務プロセス監視による表示例であり、図12は業務プロセス監視におけるデータ例である。
【0099】
図11に示す表示例において、ユニットA,Bは各業務を表している。各ユニットは、その業務を実施するために単独あるいは複数の工程により構成される。前記経営管理手段は、これらの工程を管理することにより所定の業務を実施する。各工程には、予め予定した時間(基準時間)あるいは工程(基準工程)が設定される。
【0100】
業務プロセス監視では、この基準時間あるいは基準工程と、実際の業務で費やされた時間(実績時間)あるは工程(実績工程)とを比較することにより、業務が効率的に行われているか否かを監視し、設定した基準値(基準時間あるいは基準工程)の良否を判定し、さらに、この基準値の変更を行う。基準時間(基準工程)と実績時間(実績工程)との比較は、基準時間(基準工程)に対して設定した許容範囲内に実績時間(実績工程)があるか否かで判定することができる。
【0101】
例えば、ユニットAにおいて、工程A−1では実績時間は設定した許容範囲内にあるのに対して、工程A−2,工程A−3では実績時間は設定した許容範囲を超えている。この許容範囲を超えた場合には通知を行う。
【0102】
また、通知は、許容範囲を超えた場合に限らず、ユニットBの工程B−2に示すように、実績時間が設定した許容範囲以下の場合においても行うようにしてもよい。
【0103】
図12に示すデータ例において、各工程毎に基準値として基準時間には予定される時間数が設定され、基準工程には予定される工程数が設定される。また、許容範囲は、パーセント表示で設定する他、許容される時間数や工程数で設定することもできる。
【0104】
次に、業務監視処理の業務計画進捗状況監視処理について図13,14を用いて説明する。図13は業務計画進捗状況監視による表示例であり、図14は業務計画進捗状況監視におけるデータ例である。
【0105】
業務計画進捗状況監視の一例では、日時、あるいは日時と重要度を検索条件として業務計画に設定される業務を検索し、検索で得られた業務内容により業務計画の進捗を管理する。なお、検索条件は日時及び重要度を用いているが、これに限らず業務計画に設定される任意の事項を検索条件とすることができる。
【0106】
図13に示す表示例では、例えば、当日の業務を検索条件としたとき、業務内容aが検索結果として得られ、1週間先の週間業務を検索条件としたとき、業務内容c−1、c−2,…,c−7が検索結果として得られる。また、月日と業務の重要度を組合せる例として、一月先の月間業務において重要度がAの業務を検索条件としたとき、業務内容e−1,e−11,e−12が検索結果として得られ、一月先の月間業務において重要度がBの業務を検索条件としたとき、業務内容e−1,e−3,e−11,e−12,e−15が検索結果として得られる。
【0107】
図14に示すデータ例において、業務計画中の各業務は、業務内容,月日,重要度等のデータの他に、その業務と関連する関連業務を記述するようにしてもよい。これにより、検索で得られた業務に加えて関連業務についても、注意を喚起することができる。
【0108】
次に、目標監視処理について説明する。目標値は、業務計画や売り上げ目標や受注目標等の販売戦略などの方針決定や意思決定により決定される。目標値としては、例えば、各業務における時間数や工程数の目標値、販売数や売り上げ数等の営業上の目標値がある。
【0109】
目標監視処理は、業務実績や営業実績がこの目標値に基づいて設定される許容範囲を超えるか否かを判定することで監視が行われる。
【0110】
次に、人事評価処理について図15,16を用いて説明する。図15は人事評価による表示例であり、図16は人事評価におけるデータ例である。
【0111】
図15に示す表示例において、個人AあるいはグループBに係わる各タスクについて、予め予定される所要時間を基準時間として設定する。人事評価では、各タスクについて、この基準時間と実際に費やされた時間(実績時間)とを比較することにより、業務の達成状況を評価する。達成度の評価は、例えば、基準時間に対する実績時間の比率で行うことができる。図15の表示例では、評価の程度を「*」の個数で表している。
【0112】
また、各タスクやタスク全体の達成率をパーセント表示することもできる。 図16に示すデータ例において、各タスク毎に基準値として基準時間には予定される時間数が設定され、実際に要した時間数が実績時間として記録される。また、達成率や評価についても記録される。
【0113】
次に、情報処理手段4における検索手段4f及び自動消去手段4gの構成例について図17を用いて説明する。
【0114】
図17において、検索手段4fは、検索条件を入力する検索条件入力手段4f1,検索結果を出力する検索結果出力手段4f2、及び情報蓄積手段4eのデータ入出力を管理するデータベース管理手段4f3を備える。
【0115】
データベース管理手段4f3は、検索条件入力手段4f1から入力された付加情報等を検索条件として、情報蓄積手段4eのデータベースを検索して所定の付加価値情報を抽出し、抽出した付加価値情報を検索結果出力手段4f2から出力する。
【0116】
図17において、自動消去手段4gは、タイマ4g1及び情報蓄積手段4eのデータ入出力を管理するデータベース管理手段4f3を備える。
【0117】
データベース管理手段4f3は、タイマ4g1から得られる日付データに基づいて、情報蓄積手段4eのデータベースから所定の付加価値情報を抽出し消去処理を行う。この抽出処理は、例えば、付加価値情報に設定された入力日から保存期間を過ぎたものを抽出することにより行うことができる。
【0118】
なお、この自動消去処理は、単に保存期間を過ぎたか否かの判定で行う他、所定の観点や付加情報と保存期間との組合せの判定で行うようによい。これによれば、例えば、基礎経営情報と実績情報の自動消去の時期や、報告書と連絡書の自動消去の時期を異ならせるなど、情報毎の自動消去の時期を設定することができる。
【0119】
次に、処理手段3における稟議書処理手段3a、及び経費/精算手段3bの構成例について図18,図19を用いて説明する。
【0120】
図18において、稟議書処理手段3aは、稟議サーバ3a1、認証手段3b2〜3b4を備える。稟議サーバ3a1は、稟議書や申請書の記録と認証処理を管理するサーバであり、入力手段2bから入力された稟議書や申請書のデータを記録する。稟議書や申請書を認証する職務権限データは、各認証手段3a2〜3a4により認証を得ることで稟議書や申請書の承認が行われる。認証手段3a2〜3a4による認証データは稟議サーバ3a1に記録される。認証データは、基礎経営情報として情報処理手段4に入力される。また、情報処理手段4には、稟議書や申請書のデータも入力するようにしてもよい。
【0121】
各認証手段3a2〜3a4は、例えば指紋認証機能や暗証データを認証する機能により、予め登録された個人のみの認証を許容する。なお、認証手段の個数は任意とすることができる。また、入力手段2bから入力される稟議書や申請書のデータは、キャラクタデータとすることもスキャナ装置で読み込んだイメージデータとすることもできる。
【0122】
図19において、経費/精算処理手段3bは、経費/精算サーバ3b1、認証手段3b2〜3b4を備える。経費/精算サーバ3b1は、経費/精算の記録と認証処理を管理するサーバであり、入力手段2cから入力された経費/精算のデータを記録する。経費/精算を認証する職務権限データは、各認証手段3b2〜3b4により認証を得ることで稟議書や申請書の承認が行われる。認証手段3b2〜3b4による認証データは経費/精算サーバ3b1に記録される。認証データは、基礎経営情報として販売/会計サーバ3cに入力される。また、販売/会計サーバ3cには、経費/精算のデータも入力するようにしてもよい。
【0123】
各認証手段3b2〜3b4は、例えば指紋認証機能や暗証データを認証する機能により、予め登録された個人のみの認証を許容する。
【0124】
本発明によれば、情報を用いて経営管理を行い、この経営管理で得た経験情報を付加価値情報として再び蓄積することで情報を循環させることにより、経験情報の蓄積と共に、情報の付加価値を高めることができる。
【0125】
本発明によれば、種々の観点で付加情報を付与することで情報の付加価値を高めることができる。
【0126】
これにより、各情報に付与された付加情報を用い、利用者毎に設定された付加情報で識別して情報を自動選別することにより、利用者にとって有効な情報を迅速に伝達することができる。
【0127】
本発明によれば、情報を用いて経営管理を行い、この経営管理で得た経験情報を付加価値情報として再び蓄積することで情報を循環させることにより、経験情報の蓄積と共に、情報の付加価値を高めることができる。
【0128】
また、本発明によれば、経営管理手段が行う経営情報の管理を監視手段において監視することにより、業務プロセスの効率化を改善する他、業務計画の進捗状況を把握することができる。
【0129】
また、本発明によれば、経営管理手段が行う経営情報を人事の評価に適用することができ、さらに、人事評価で得た経験情報を付加価値情報として蓄積することもできる。
【0130】
【発明の効果】本発明の循環型統合経営管理システムによれば、多量の入力情報に対して利用者にとって有益な情報の利用を可能とし、また、経験情報についても有効利用することができ、経営に係わる情報を有効利用することができる。
【図面の簡単な説明】
【図1】本発明の循環型統合経営管理システムにおける情報の流れ、及び経営循環を説明するための概略図である。
【図2】本発明の循環型統合経営管理システムの概略構成を説明するためのブロック図である。
【図3】本発明の基幹システムの概略を説明するためのブロック図である。
【図4】本発明の情報処理手段における情報の流れを説明するためのブロック図である。
【図5】本発明の自動配信におけるデータの流れを説明するための図である。
【図6】本発明の付加情報が付与された付加価値情報のデータの一例である。
【図7】本発明の配信処理を説明するためのブロック図である。
【図8】本発明の配信データのデータ例である。
【図9】本発明の順次配信におけるデータを説明するための図である。
【図10】配信サーバが管理する配信データの一例である。
【図11】本発明の業務プロセス監視による表示例である。
【図12】本発明の業務プロセス監視におけるデータ例である。
【図13】本発明の業務計画進捗状況監視による表示例である。
【図14】本発明の業務計画進捗状況監視におけるデータ例である。
【図15】本発明の人事評価による表示例である。
【図16】本発明の人事評価におけるデータ例である。
【図17】本発明の検索手段及び自動消去手段の構成例を説明するためのブロック図である。
【図18】本発明の稟議書処理手段の構成例を説明するためのブロック図である。
【図19】本発明の経費/精算手段の構成例を説明するためのブロック図である。
【符号の説明】
1 循環型総合経営管理システム
2 入力手段
2a〜2c 入力手段
2d 外部評価入力手段
2e 業務実績入力手段
3 処理手段
3a 稟議処理手段
3a1 稟議サーバ
3a2〜3a4 認証手段
3b 経費/精算手段
3b1 経費/精算サーバ
3b2〜3b4 認証手段
3c 販売/会計サーバ
4 情報処理手段
4a,4b,4c 付加情報付与手段
4d 分析手段
4d1 派生データ形成処理
4d2 付加情報付与
4d3 選択処理
4e 情報蓄積手段
4f 検索手段
4f1 検索条件入力手段
4f2 検索結果出力手段
4f3 データベース管理手段
4g 自動消去手段
4g1 タイマ
4h 自動配信手段
4h1 配信処理
4h2 配信先情報
5 経営管理手段
5A 業務計画書
5B 基準値
5C 目標値
5D 業務実績
5F 方針指示書(見直し指示書)
5G 業務計画立案
6 監視手段
6a 業務監視手段
6a1 業務計画進捗状況監視手段
6a2 業務量監視手段
6b 業務プロセス監視手段
6c 目標監視手段
6d タイマ
7 人事評価手段
8 基幹システム
8a 生産システム
8b 営業システム
8b1 営業実績
8c 会計システム
8d 生産在庫入力手段
8e 見積受注入力手段
8f 販売入力手段
8g 会計入力手段
9 教育活用手段
10 効果確認手段
11 意思決定部
12,12a〜12c 個別配信先
13 業務改善
13A 業務改善指示書
13B 業務改善書
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a business management system, and to management of business information in business management.
[0002]
[Prior art]
In the business management, various management operations are performed such as daily business management, setting of a target plan, execution of the set plan, and personnel management and education.
[0003]
Normally, these management tasks are performed for each department, and conventionally, information transmission between these departments is mainly performed by documents. In the case of documents, rapid information transmission cannot be expected, so recently, e-mails and the like have been used using on-premises wiring.
[0004]
In addition, common information may be stored in a database and configured so that a person in charge can freely refer to it at his / her own discretion, which may be useful for business management.
[0005]
[Problems to be solved by the invention]
Generally, the purpose of business management is to improve profits by improving sales and reducing costs. This requires not only that information be transmitted quickly, but also that the transmitted information be valid.
[0006]
Although the transmission of information using e-mail etc. can be improved in terms of speed, the information to be transmitted depends on the information provider and the information input person, so there are various stages of effectiveness. It is not necessarily valid information. Information provided by various sources includes information of various levels in terms of necessity and importance, and since the necessity and importance are different for users, various levels of information are provided. Extracting useful information from a large amount of information requires a lot of time and effort.
[0007]
As in the past, miscellaneous information is transmitted in terms of necessity and importance, so it can not be said that the information is always used effectively, and in the use of information, wasted time sorting information. There is a problem that it costs.
[0008]
Generally, the flow of information is one-way, and information obtained through experiences such as information utilization is discarded without being accumulated. Experience information may be useful for business improvement and business management, but there is a problem in the past that this valuable experience information is wasted and is not effectively used.
[0009]
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems and aims to effectively use information related to management. In particular, it is possible to use useful information for a large amount of input information for a user, The purpose is also to make effective use of.
[0010]
[Means for Solving the Problems]
The present invention makes it possible to use information useful to each user for a large amount of input information by making information relating to management into value-added information useful to the user. Further, the experience information obtained by the business management using the added value information is fed back and accumulated as the added value information, thereby circulating the information while increasing the added value of the information.
[0011]
FIG. 1 is a schematic diagram for explaining the flow of information and the business cycle in the cycle-type integrated business management system of the present invention.
[0012]
This recycling-type integrated business management system inputs information, accumulates information with added value (value-added information), and makes judgments and decisions related to management using the added-value information. It has a part to perform business management and a part to monitor the business management part.
[0013]
The value-added information is selected from a wide variety of input information to be useful information for management, and can be obtained by performing analysis using the additional information given from various viewpoints.
[0014]
The management means uses the value-added information to determine, for example, model development, sales strategy, and the like, make a policy decision, and make a decision, and perform business management based on the decision / decision. In business management, management standards (standard numerical values) are set based on policies.
[0015]
The monitoring part monitors the business management means by comparing the management standard with the performance to improve the business process, and improves the management function in the business management part by changing the management standard. The improvement in the management function of the business management part appears as performance information such as sales and cost reduction.
[0016]
In reviewing the business process, system development is conducted by instructing business process improvement based on warnings from monitoring results, planning improvement plans and calculating the effects, and performing business improvement. Implement improvements, confirm their effects, and change management standards. The effect of this improvement is fed back as experience information and accumulated in value-added information.
[0017]
Information obtained by the management of the management means is also fed back as performance information or external evaluation and accumulated in value-added information. The external evaluation is fed back, for example, as information disclosed in information disclosure or the like, or as the reliability of a company formed in business activities.
[0018]
As described above, in the cyclical integrated business management system of the present invention, after the input information is added value information, the business management is performed based on the added value information, and the experience information, the result information, and the like obtained by the business management are obtained. Information is circulated by being fed back as value-added information in the form of external evaluation formed by business activities. In addition, management standards in business management are changed during this cycle, and the management ability of business management is improved.
[0019]
The above-mentioned circulating integrated business management system of the present invention can be embodied by the following configuration.
[0020]
The circulating integrated business management system of the present invention performs business management by analyzing information on basic business information and obtaining value-added information, and forming a management standard based on the value-added information obtained from the information processing means. The system includes a business management means and a monitoring means for monitoring business management by the business management means. The monitoring means feeds back the quality judgment of the management standard of the business management to the business management means as a monitoring result based on the performance information, and the business management means changes the management standard based on the fed back quality judgment result, and The processing means feeds back the management result by the business management means as value-added information. Information related to management circulates between these components, and added value is increased during this circulation.
[0021]
Business management by business management means includes plan management and business management. The plan management includes creation of a plan based on value-added information and a change of the plan based on the monitoring result of the monitoring means, and the business management includes management of management based on the plan.
[0022]
Further, the basic management information includes market information and performance information including sales information. Further, the management standard includes a reference value for each business, and a target value for business performance and business performance. As the reference value, the number of hours and the number of steps required for each task in a conventional task or a new task defined in a task plan are determined based on similar task results in the past. As the target value, a target number of hours and a target number of processes in the business are determined based on the business plan, and a target value in sales (for example, the number of units produced, the number of units sold, the number of units sold, etc.) is determined.
[0023]
Therefore, the result information is fed back to the information processing means as value-added information, and information circulation is performed.
[0024]
In the business management means provided in the cyclical integrated business management system of the present invention, the plan management performed by the business management means performs a development plan related to the development of a product device model, a sales plan of the product device, and a production plan of the product device. The business management performed by the business management means manages at least one of the plan managements as a target plan.
[0025]
In the cyclical integrated business management system of the present invention, the monitoring means compares a target plan including at least one of the respective plan managements with the actual information, and judges the quality of the management standard of the business management means based on the comparison.
[0026]
In addition, the monitoring means compares the business results of various operations performed by the business management means with the reference values to determine whether the reference values in the business process are good or bad, and compares the business results and operating results with the target values to improve management. The quality of the target value is determined.
[0027]
This pass / fail judgment indicates the direction of the guideline with respect to the plan change, for example, the direction of expanding the plan, improving the plan, or developing a new plan.
[0028]
The monitoring means feeds back the monitoring result to the management means based on one pass / fail judgment result or a plurality of pass / fail judgment results.
[0029]
The information processing means of the cyclical integrated management system of the present invention is characterized by performing additional information on basic management information from a plurality of viewpoints to characterize the information, and performing information analysis based on the added additional information. Means, an information storage means for temporarily recording analysis results and performance information as value-added information, and a delivery means for delivering value-added information.
[0030]
The value-added information is characterized by adding additional information from at least one viewpoint to the basic management information and the feedback information. The viewpoint includes at least one of the category to which the information belongs, the type of information, and the importance of the information, and these include further subdivided viewpoints.
[0031]
The data structure recorded by the information storage means includes a data area for storing value-added information, and at least one flag area corresponding to each viewpoint or a combination of each viewpoint. The analysis means includes a flag area in the flag area of the information storage means. By adding data, value-added information is formed.
[0032]
The value-added information recorded by the information storage means can search for predetermined value-added information using the additional information given to the viewpoint. Also, by adding time information as additional information, automatic deletion or automatic extraction can be performed.
[0033]
The distribution means sorts the information according to a combination of the additional information added to the value-added information, and distributes the information according to a distribution destination and a distribution procedure set according to the classification. In the distribution procedure, a plurality of distribution destinations are hierarchized, and simultaneous distribution is performed to distribution destinations higher than the selected hierarchy, or distribution is sequentially performed from a lower hierarchy to an upper hierarchy or from an upper hierarchy to a lower hierarchy.
[0034]
The recycling-type integrated business management system of the present invention further includes a history recording unit that records the selected information as history information. The selection information recorded in the history recording means can be information relating to business management formed by the business management means or value-added information selected from the distribution data. The selection of the distribution data can be made based on whether or not the distribution destination attaches the flag data to the flag area provided in the distribution data.
[0035]
The cyclical integrated business management system of the present invention includes personnel evaluation means. The personnel evaluation means sets the business management plan of the business management means and the result information of this plan as an individual or a group. Is compared for each individual or group, and the degree of contribution to the plan for each individual and / or group is evaluated. The evaluation result obtained by the personnel evaluation means can be fed back to the information processing means and accumulated as added value information.
[0036]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0037]
Hereinafter, a schematic configuration of the cyclical integrated business management system of the present invention will be described with reference to FIGS. 2 and 3, and additional value information by adding additional information of the present invention will be described with reference to FIGS. The automatic distribution using the additional information of the present invention will be described with reference to FIG. 10, the monitoring process according to the present invention will be described with reference to FIGS. 11 to 15, and the personnel evaluation according to the present invention will be described with reference to FIGS. The search and automatic deletion according to the present invention will be described with reference to FIG.
[0038]
First, the schematic configuration of the cyclical integrated management system of the present invention will be described with reference to the block diagram of FIG. In FIG. 2, the recycling-type integrated business management system 1 includes an input unit 2, an information processing unit 4, a business management unit 5, a monitoring unit 6, a personnel evaluation unit 7, a core system 8, and an educational utilization unit 9. And an effect checking unit 10. The processing means 3 may be provided between the input means 2 and the information processing means 4 in some cases.
[0039]
The circulating integrated management system 1 forms value-added information effective for management based on basic management information and performance information, automatically distributes this value-added information, and manages and monitors the business using the added-value information. Is performed, and the obtained experience information is fed back to add value information. The performance information mainly includes business performance related to internal business and business performance obtained as a result of business activities.
[0040]
In the configuration of FIG. 2, the input means 2 includes an input means (2a, 2b, 2c) for inputting basic management information, an input means 2d for inputting external evaluation, and an input means for inputting business performance. The means may be a terminal device or a scanner device. The terminal device can be configured to be connected to a network in addition to a mode in which the terminal device is independently installed, and can input information from a key operation or various recording media, or can input information via a network. .
[0041]
The basic management information includes, for example, information obtained from outside the general public in the form of a report or a communication form, information obtained from inside the management in the form of a draft decision or application form, and expense / payment information. Information input in the form of a report or a communication includes, for example, management information, trouble information, complaint information, market information, personnel information, application information to the outside, and the like. Information input in the form of a request for approval or an application includes, for example, information relating to a request for approval and information relating to various internal applications.
[0042]
These pieces of information are input by the input means 2a, 2b, 2c. The form of the information may be text data or image data. Means for inputting written information include, for example, key input or reading by a scanner device. When the data is read by the scanner device, the data may be converted into character data or may be in a PDF format.
[0043]
Note that, after inputting the approval request or the application form by the input means 2b, the approval request processing means 3a performs an authentication operation of the document by the approver or the approver, and then inputs the information processing means 4. After the expense / payment is input by the input unit 2c, the expense / payment processing unit 3b may perform an authentication operation by an approver or an approver. Further, after being authenticated by the authentication means 3b, the information is input to the sales / accounting server 3c together with order information and accounting information described later, and then is input to the information processing means 4.
[0044]
Among the performance information, the business performance information includes, for example, order information, purchase payment information, accounting information such as settlement information, business performance information such as sales information and expected sales information, and external evaluation information. Can be. As the work result information, there is progress information such as actual working hours and processes representing the results of each person in charge and the various works of the project.
[0045]
These pieces of information can be input online from a person in charge or a project via a network, in addition to key operations or inputting information from various recording media.
[0046]
Here, production information and inventory information. Basic information essential for business management, such as quote information, order information, sales information, accounting information, purchase payment information, and expected sales information, is managed by the core system 8.
[0047]
FIG. 3 is a block diagram for explaining the outline of the core system. In FIG. 3, the core system 8 includes, for example, a system group such as a production system 8a, a sales system 8b, and an accounting system 8c. It should be noted that the system group constituting the core system is not limited to each of the above-described systems, but can be configured in any system form according to the business form.
[0048]
The production system 8a is a system that performs production management and inventory management, and production data and inventory data are input from the production inventory input means 8d. The sales system 8b is a system that manages estimates, orders, sales, sales, and the like, and each data is input from, for example, the estimated orders input means 8e or the sales input means 8f. In this sales system 8b, sales results 8b1g are accumulated. The accounting system 8c is a system for performing accounting management, and accounting data is input from the accounting input means 8g. As accounting data, internal expense and settlement data may be input from the input unit 2c, and may be input from the automatic distribution unit 4h of the information processing unit 4 after passing through the expense settlement unit 3b.
[0049]
Further, the external evaluation information is input to the information processing unit 4 after being input to the external evaluation input unit 2d. The external evaluation information includes the information provided by the company to the outside through IR and PR, as well as the evaluation of the corporate image formed by the disclosure of information and various activities by the company. You may. Note that the above-described basic management information and performance information are merely examples, and the types and classifications of the information are not limited to those illustrated, and may be arbitrary.
[0050]
Further, processing means 3 such as a request for approval processing means 3a and an expense / payment processing means 3b can be provided as needed, and each of the input means 2b to 2e can be processed by the information processing means 4 without passing through the processing means 3. May be directly input.
[0051]
The information processing means 4 includes additional information providing means 4a, 4b, 4c, an analyzing means 4d, and an information storing means 4e, and can further include a searching means 4f and an automatic erasing means 4g. Hereinafter, a description will be given using a block diagram for explaining the flow of information in the information processing means in FIG. 4 together with FIG.
[0052]
The additional information adding units 4a, 4b, and 4c are units that add additional information from various viewpoints for characterizing input information. This viewpoint can be arbitrarily set as long as it represents a feature of the information. For example, the viewpoint TA of the information category relating to the field to which the information belongs, the viewpoint TB of the type of information, the viewpoint TC of the urgency, the viewpoint TD of the affiliation of the decision authority, the viewpoint TE of the route on which the information travels for approval, and the information There is a viewpoint of job authority TF indicating the required job.
[0053]
Examples of the additional information given from the viewpoint TA of the information category include sales information TA1, complaint information TA2, market information TA3, and personnel information TA4 of other companies. Include, for example, a report TB1, a contact TB2, a consultation TB3, a bulletin TB4, a request TB5, and the like. The additional information given in the viewpoint TD relating to the affiliation of the decision authority includes, for example, the job type having the decision authority and the name of the authorized person (TD1 to TD4), and the additional information given in the route viewpoint TE Is, for example, the transfer order (TE1, TE2) between decision-making authorities. Further, as additional information given from the viewpoint of job authority TF, there are authorized departments TF1, TF2, and the like. In addition, the code | symbol showing this viewpoint and additional information is an example, and can be set arbitrarily according to the information handled.
[0054]
In FIG. 2, additional information adding means 4a and 4c add additional information to basic management information input from each input means, external evaluation and information input from the core system 8, and additional information adding means 4b is used for personnel information to be described later. Additional information is added to the experience information and management information obtained from the evaluation means 7 and the effect confirmation means 10.
[0055]
The addition of the additional information can be set by, for example, providing a flag area representing each viewpoint in a data structure storing the information and setting a flag in a flag area corresponding to the viewpoint included in the information. The setting is not limited to this, and can be set by other methods. For example, data representing each viewpoint or data representing a combination of each viewpoint may be added to a data structure for storing information.
[0056]
The additional information providing means 4a may be configured to provide the additional information by the user, or may be configured to automatically provide the additional information by analyzing the input information. In the case of automatic assignment, it is possible to use, for example, the type of information input means or the analysis of characters included in the input information.
[0057]
The analyzing means 4d uses the additional information provided by the additional information providing means 4a to select the input information or to process the input information to form new derived information, thereby obtaining the original information. This is a means for forming value-added information by adding value-added information. The input information includes various types of information, and also includes information that is unlikely to be usefully utilized for the business management of the user. The analysis unit 4d uses the added additional information to separate information that has a possibility of being effectively used from information that is not possible, and deletes unnecessary information.
[0058]
In addition, for example, more useful derivative information is formed by performing data processing on the input information, such as performing statistical processing or determining a correlation between a plurality of pieces of information. In addition to the data processing described above, data processing for obtaining desired information can be performed by a predetermined analysis method. Therefore, the input information is set as value-added information by passing through the analyzing means 4d.
[0059]
The added value information obtained by the analyzing unit 4d and the information added by the additional information adding units 4b and 4c are recorded in the information storage unit 4e. This recording is a temporary recording because it is erased under predetermined conditions by an automatic erasing means 4g described later.
[0060]
The information added with the additional information by the additional information adding units 4b and 4c has not passed through the analyzing unit 4d, but as will be described later, the experience information obtained from the effect checking unit 10, the business performance and the external evaluation are added value information. The information is obtained through business activities performed using the information, and added value such as experience and business activity state is added to the original information, and can be treated as added value information. Also, by adding additional information characterizing the information, such as estimated orders and production inventory, to basic management information obtained from the core system, it is useful for business management in the business management means described later. Therefore, the added value here includes not only the formation of new information, the deletion of unnecessary information, but also experience and business activities.
[0061]
In FIG. 4, the analyzing means 4d includes a derivative information formation processing function 4d1 for forming derivative information and a function 4d2 for adding additional information to the derivative information. A selection processing function 4d3 for removing value-added information is provided.
[0062]
The information processing unit 4 can perform a search process and an automatic erasure process using the added value information stored in the information storage unit 4e.
[0063]
The search processing can be performed by the search means 4f. The search means 4f can use the additional information provided by the additional information providing means in addition to the text search for the added value information.
[0064]
Further, the automatic erasing process can be performed by the automatic erasing means 4g. The automatic erasing means 4g extracts and deletes the invaluable information for which a predetermined time has passed from a predetermined time such as the time of inputting, and also extracts a combination of predetermined additional information and a keyword with the lapse of a predetermined time. The value-added information corresponding to this combination can be extracted and deleted. According to this, it is possible to set the time of automatic deletion for each value-added information of specific additional information.
[0065]
The automatic distribution unit 4h is a unit for automatically distributing the value-added information stored in the information storage unit 4e to a predetermined destination. In the automatic distribution, each value-added information is distributed to distribution destination information 4h2 set in advance. Which value-added information is to be distributed to which distribution destination can be set by previously determining the relationship between a viewpoint or a combination of a plurality of viewpoints and a wiring destination.
[0066]
The distribution processing function 4h1 reads from the distribution destination information 4h2 the distribution destination set for the additional information added to the value-added information or a combination of a plurality of pieces of additional information, and distributes the distribution destination to the read distribution destination information 4h2. The distribution destinations include the individual distribution destinations 12a to 12c, the business management unit 5, the core system 8, the decision making unit 11, and the like. The individual distribution destinations 12 include, for example, a business manager and a responsible person.
[0067]
The decision making unit 11 is a department that determines a management policy in business management. For example, it determines equipment development and sales strategy, determines a basic policy in a policy instruction (or review instruction) 5F, and follows this policy. Create a business plan 5G for each department. Further, in accordance with the business plan drafting 5G, each department in charge creates a more detailed business plan 5A. The business plan 5A includes a business plan that defines a schedule associated with equipment development and a sales strategy, and a business process including a plurality of steps for executing the business plan. Further, according to the business plan 5A, various values such as a reference value 5B serving as a standard of the business process, a target for sales performance such as sales and the number of units sold, and a business target (for example, a target number of hours and a target number of processes). Set the target value 5C. The reference value 5B is determined with reference to the conventional business results for the business plan defined in the business plan 5A. In addition, the target value 5C is determined as representing a target index for business and business purposes.
[0068]
The business plan 5A, the standard value 5B and the target value 5C which are the standards of the business process are set in the management means 5.
[0069]
The business management means 5 is a means for monitoring a business plan, a business process, or a business target determined by the decision making unit 11, and inputs a business plan 5A, a reference value 5B, and a target value 5C from the business result input means 2e. By monitoring the business performance 5D and the business performance input from the core system, the progress of the business, the appropriateness of the business process and the degree of achievement of the target are monitored, and the appropriateness of the reference value 5B and the target value 5C is determined. Modify and change to improve business management. Here, the business performance 5D indicates the degree of progress of each business set in various units such as an individual, a group, and a project, and the business performance includes, for example, estimated orders in addition to orders, sales volume, and sales. , Production, inventory and accounting activities. In the configuration shown in FIG. 1, the work result 5D is input from the work result input means 2e, but may be input from a server provided in a separately provided work management system (not shown).
[0070]
The monitoring means 6 is a means for monitoring a business plan, a business process, and the like in the business management means 5, and includes a business monitoring means 6a, a business process monitoring means 6b, a target monitoring means 6c, and the like. The work monitoring means 6a includes a work plan progress monitoring means 6a1 and a work amount monitoring means 6a2.
[0071]
The business plan progress monitoring unit 6a1 monitors the business schedule of the business plan, and instructs the business management unit 5 on a predetermined business plan item every predetermined date and time. The work plan progress monitoring unit 6a1 monitors the work plan 5A at a predetermined date and time and issues a work instruction, and also compares the work plan 5A with the work result 5D and issues a work instruction at a predetermined date and time. You can also. The task plan items to be instructed can be arbitrarily determined, and the setting of the predetermined date and time can be arbitrarily set by the timer means 6d. Thereby, it is possible to call attention to the business plan. The destination of the work instruction can be arbitrarily determined, such as a person in charge of each work, a project destination, and the like.
[0072]
The work volume monitoring means 6a2 is a means for monitoring the amount of time and the number of steps required to accomplish each task. Monitoring is performed by comparing the actual amount of work required for. For example, monitoring can be performed by determining whether the actual work volume exceeds the reference work volume, or by determining whether the actual work volume falls within a predetermined range determined by the reference work volume.
[0073]
The business process monitoring means 6b monitors whether the business process set for executing the predetermined business is being efficiently and smoothly progressed, notifies the business improvement unit 13 of the monitoring result, and notifies the business improvement unit 13 of the business improvement instruction. Notify the distribution destination. The distribution destination can be, for example, the management layer 12. The monitoring by the business process monitoring means 6b always or at predetermined intervals compares the reference value 5B representing the degree of efficiency of the business process with the business result 5D, and issues an instruction when the business result 5D exceeds the reference value 5B. Do it by doing. The reference value 5B of the business process can be set based on, for example, the number of hours or the number of steps required to execute each business process, which is determined according to the business plan 5A.
[0074]
Upon receiving a business improvement instruction from the business process monitoring means 6b, the business improvement unit 13 performs business process improvement processing. This improvement process is performed by creating a business improvement instruction 13A and creating a business improvement 13B in accordance with the business improvement instruction 13A. Further, in accordance with the business improvement document 13B, an improvement planning system is created, its effects (direct effects, ripple effects) are calculated, a business improvement system is developed, and improvement is introduced by implementing this system. The effect checking means 10 checks the effect of the business improvement. Thereby, the business process is improved. A reference value 5B is newly set for the improved business process, and the reference value 5B is changed by reflecting the reference value 5B on the management means 5. The business process monitoring means 6b monitors the business process again in the business management performed based on the set reference value based on 5B. By repeating this process, the business process is repeatedly improved.
[0075]
The business improvement instruction to the business improvement unit 13 may be issued from the individual distribution destination notified by the business process monitoring unit 6b.
[0076]
The experience information obtained by the improvement of the business process is fed back from the effect confirming means 10 to the information processing means 4, and is given predetermined additional information by the additional information adding means 4b, and then stored in the information storing means 4e. .
[0077]
The target monitoring means 6c compares the target value 5C set according to the business plan 5A with the business performance and the business performance. The target value 5 includes a target value related to business and a target value related to business, and the target monitoring means 6c monitors whether these two target values are appropriate. In addition, the sales record 8b1 in the sales system 8b in the core system 8 can be used as the sales record.
[0078]
The target value is monitored by calculating the achievement level of the business performance target value and the business performance target value, and when the deviation from each target value exceeds a predetermined value, a business command is sent to the management means 5. In addition to the notification, a predetermined distribution destination (for example, the management 12) is notified. The monitoring by the target monitoring means 6c is performed at all times or at predetermined intervals by comparing the target value 5C with the business results. The target value 5C may be changed according to the judgment of the target monitoring means 6c.
[0079]
Therefore, the target monitoring means 6c compares the target value 5C determined based on the development plan, the sales plan, or the production plan with the business management means 5 with the business performance and the business performance, and based on these comparisons, performs the business operation. The appropriate (good / bad) judgment of the above target value and the appropriate (good / bad) judgment of the business target value such as sales and number of units sold are performed.
[0080]
In the determination of the appropriateness of the target value, the direction of the pointer with respect to the plan change may be indicated. For example, a plan extension, a plan improvement, or a new plan direction may be prepared in advance and selected based on the determination result.
[0081]
The monitoring means 6 can feed back the monitoring result to the management means 5 based on the appropriateness determination result based on one appropriateness determination result or a plurality of appropriateness determination results.
[0082]
The personnel evaluation means 7 evaluates a person, a group, or a project based on the progress of the work plan. The evaluation is performed by, for example, setting the number of hours and the number of steps required to execute each work plan as a reference value for each person, group, or project, and comparing each work result with the reference value.
[0083]
The evaluation obtained by the personnel evaluation means 7 is used for evaluation calculation of a person, a group, or a project, and is fed back to the information processing means 4 as experience information, and predetermined additional information is added by the additional information adding means 4b. The information is stored in the information storage unit 4e. Further, the experience information of the personnel evaluation stored in the information storage unit 4e can be referred to in the educational utilization unit 9.
[0084]
Hereinafter, the processes of analysis, automatic distribution, business process monitoring, business plan progress monitoring, business volume monitoring, target monitoring, and personnel evaluation, which are performed by the cyclical integrated management system of the present invention, will be described with reference to the drawings.
[0085]
First, the analysis and automatic distribution processing will be described with reference to FIGS. FIG. 5 is a diagram for explaining the flow of data in analysis and automatic distribution. FIG. 5 shows information A to information D as an example. The additional information adding unit 4a adds additional information related to each of the information A to information D. For example, information A is provided with additional information such as management information TA1, report TB1, consultation TB3, large emergency TC3, route TE1, etc., and information B is personnel information TA4, contact TB2, medium emergency TC2, route Additional information such as TE2 is added, information C is added with market information TA3, contact TB2, additional information such as small urgency TC1 and the like, and information D is market information TA3, contact TB2, medium TC2 etc. Is added. This example is set for convenience of explanation, and is not necessarily an actual example.
[0086]
The analysis unit 4d selects information and forms derived information based on the additional information given to each piece of information. Here, for example, information with an urgency of medium or higher is adopted, and information with an urgency of less than or equal to low is automatically deleted to select information. Therefore, in the above information example, the information C having a small urgency is deleted.
[0087]
Further, for example, in the case of having a function of forming derivative information P using management information, information E is formed as derivative information P from information A according to the above information example. Note that additional information TP1 indicating the derivative information P is added to the information E. As a result, the information A, the information B, the information D, and the information E are selected as added value information from the analysis unit 4d. The automatic distribution means 4h distributes the distribution destination based on the additional information given to each information. For example, the information A is distributed according to the route TE1 that is the distribution destination.
[0088]
FIG. 6 is an example of data of added value information to which additional information has been added. In this example, in addition to the information defined corresponding to each viewpoint, information such as an information input date and a storage period is also provided as additional information. For example, the information A records additional information added to each viewpoint such as TA1, TB1,..., TE1, an input date, and additional information such as a storage period of one year. The information code D-0001 is a code name for specifying the information A. The illustrated data example is for explaining additional information of the present invention, and other data is omitted.
[0089]
FIG. 7 is a block diagram for explaining the distribution processing. In order to perform distribution based on the additional information attached to each piece of information, the automatic distribution unit includes a table (correspondence table) indicating a distribution destination for a combination of the additional information. FIG. 7 shows an example of this table. In the example illustrated in FIG. 7, the distribution destination is specified based on a combination of the viewpoint of the information category, the viewpoint of the type of information, and the viewpoint of the urgency. For example, the upper left column of the table corresponds to the case where management information in the viewpoint of the category of information, report in the viewpoint of the type of information, and large in the viewpoint of the degree of urgency are respectively assigned. “Abcd” is set. Also, the columns below it correspond to the case where management information in the category of information and reports in the category of information are given, and large is given in terms of urgency. Is set as "a → b → c → d".
[0090]
Here, a, b, c, and d represent distribution destinations, and “abcd” means simultaneous distribution for simultaneous distribution to each distribution destination, and “a → b → c → d” Means sequential delivery to deliver to each delivery destination in order. Further, the distribution destinations may be individual distribution destinations such as the target person a, the target person b,..., Or a distribution group including a plurality of distribution destinations (for example, the target persons e, f, and g) may be set. You can also.
[0091]
When performing simultaneous distribution, as shown in FIG. 7, for example, when the distribution destination of “abcd” is set, the target person a, the target person b, the target person c, When the distribution destination is set to “a · b” at the same time as the distribution to the target person d, the distribution is simultaneously performed to the target person a and the target person b.
[0092]
FIG. 8 is a diagram for explaining data in the simultaneous distribution. In FIG. 8, the distribution information in which the distribution destination of “ab” is set includes the distribution destination address “a” and the address “b”, and is distributed to the terminals of the target persons “a” and “b”. Confirmation of distribution can be performed, for example, by transmitting reception confirmation from each terminal to the distribution server. The reception confirmation can be performed automatically by a function of the terminal, or can be performed by an operation of the subject. The distribution server may record data on the reception date and time of each target person in the distribution data.
[0093]
In the case of performing sequential distribution, for example, when the distribution destination of “d → c → b → a” is set, the order of the target person d, the target person c, the target person b, and the target person a is set in order. When the delivery destination of “c → b → a” is set, the delivery is performed in the order of the subject b and the subject a, excluding the subject d.
[0094]
It should be noted that a plurality of distribution destinations are hierarchized and are simultaneously distributed to distribution destinations higher than the selected hierarchy, or from a lower hierarchy to a higher hierarchy, or conversely, from a higher hierarchy to a lower hierarchy. , May be sequentially distributed.
[0095]
The combination of distribution destinations can be set arbitrarily, and simultaneous distribution and sequential distribution can be combined. In the illustrated table, distribution destinations are determined based on combinations of information categories, information types, and urgency levels. However, the types and number of viewpoints to be combined depend on the information to be distributed and the distribution destinations. It can be set arbitrarily depending on the situation. Note that the distribution destinations in the fourth and subsequent rows of the table are omitted.
[0096]
FIG. 9 is a diagram for explaining data in the sequential distribution. In FIG. 9, the distribution information in which the distribution destination of “d → c → b → a” is set includes the distribution destination addresses d to a and the distribution order information. The information of the distribution order can be determined by the order of the address of the distribution destination described as shown in the figure, or can be determined by describing the data of the distribution order.
[0097]
The transmission from the subject d to the subject c is performed by reading the address of the next subject at the time of the transmission operation at the terminal on the subject d side. At this time, by notifying the transmission to the distribution server, the distribution server can confirm the current position of the distribution data. Further, data of the reception date and time and the transmission date and time of each subject may be recorded in the distribution data. FIG. 10 shows an example of distribution data managed by the distribution server. In addition to the data shown in FIG. 6, distribution information and passage information can be recorded.
[0098]
Next, the business process monitoring process will be described with reference to FIGS. FIG. 9 shows an example of display by business process monitoring, and FIG. 12 shows an example of data in business process monitoring.
[0099]
In the display example shown in FIG. 11, units A and B represent each task. Each unit is composed of a single process or a plurality of processes for carrying out its business. The business management means performs a predetermined task by managing these steps. A predetermined time (reference time) or a step (reference step) is set for each step.
[0100]
In business process monitoring, by comparing this reference time or reference process with the time (actual time) or process (actual process) spent in actual work, whether or not the work is performed efficiently Is monitored to determine whether the set reference value (reference time or reference process) is good or not, and further, the reference value is changed. The comparison between the reference time (reference process) and the actual time (actual process) can be determined based on whether or not the actual time (actual process) is within an allowable range set for the reference time (reference process). .
[0101]
For example, in the unit A, the actual time is within the set allowable range in the step A-1, whereas the actual time exceeds the set allowable range in the steps A-2 and A-3. If the allowable range is exceeded, a notification is made.
[0102]
Further, the notification may be performed not only when the actual time is less than the allowable range but also when the actual time is equal to or less than the set allowable range as shown in step B-2 of the unit B.
[0103]
In the data example shown in FIG. 12, the expected number of hours is set as the reference value for each process, and the expected number of processes is set for the reference process. Further, the allowable range can be set by the number of permitted hours or the number of steps in addition to the setting of the percentage.
[0104]
Next, a business plan progress monitoring process of the business monitoring process will be described with reference to FIGS. FIG. 13 shows a display example based on the business plan progress monitoring, and FIG. 14 shows a data example in the business plan progress monitoring.
[0105]
In an example of business plan progress monitoring, a business set in a business plan is searched using date and time or date and time and importance as search conditions, and the progress of the business plan is managed based on the business content obtained by the search. Although the search condition uses the date and time and the degree of importance, the present invention is not limited to this, and any item set in the business plan can be used as the search condition.
[0106]
In the display example shown in FIG. 13, for example, when the search condition is the job of the day, the job content a is obtained as a search result, and when the weekly job one week ahead is set as the search condition, the job contents c-1 and c ,..., C-7 are obtained as search results. Further, as an example of combining the date and the importance of the business, when the business having the importance A is set as the search condition in the monthly business one month earlier, the business contents e-1, e-11, and e-12 are searched. As a result, when the business having the importance B is set as the search condition in the monthly business one month earlier, the business contents e-1, e-3, e-11, e-12, and e-15 are obtained as the search results. can get.
[0107]
In the data example shown in FIG. 14, for each task in the task plan, in addition to data such as task content, date, importance, etc., a related task related to the task may be described. Thereby, it is possible to call attention to related tasks in addition to the tasks obtained by the search.
[0108]
Next, the target monitoring process will be described. The target value is determined by a policy decision or a decision such as a business plan, a sales target, a sales strategy such as an order target, or the like. As the target value, for example, there are a target value of the number of hours and the number of processes in each business, and a target value of business such as a sales number and a sales number.
[0109]
In the target monitoring process, the monitoring is performed by determining whether the business performance or the business performance exceeds an allowable range set based on the target value.
[0110]
Next, the personnel evaluation process will be described with reference to FIGS. FIG. 15 shows a display example based on personnel evaluation, and FIG. 16 shows an example of data in personnel evaluation.
[0111]
In the display example shown in FIG. 15, for each task related to the individual A or the group B, a required time scheduled in advance is set as a reference time. In the personnel evaluation, the task achievement status is evaluated for each task by comparing the reference time with the actually spent time (actual time). The evaluation of the degree of achievement can be performed, for example, by the ratio of the actual time to the reference time. In the display example of FIG. 15, the degree of evaluation is represented by the number of “*”.
[0112]
In addition, the achievement rate of each task or the entire task can be displayed as a percentage. In the data example shown in FIG. 16, the scheduled time is set as the reference time for each task as the reference time, and the actually required time is recorded as the actual time. The achievement rate and evaluation are also recorded.
[0113]
Next, a configuration example of the search unit 4f and the automatic deletion unit 4g in the information processing unit 4 will be described with reference to FIG.
[0114]
In FIG. 17, the search unit 4f includes a search condition input unit 4f1 for inputting search conditions, a search result output unit 4f2 for outputting search results, and a database management unit 4f3 for managing data input / output of the information storage unit 4e.
[0115]
The database management unit 4f3 searches the database of the information storage unit 4e to extract predetermined value-added information, using the additional information or the like input from the search condition input unit 4f1 as a search condition, and extracts the extracted value-added information as a search result. Output from the output means 4f2.
[0116]
In FIG. 17, the automatic erasing unit 4g includes a timer 4g1 and a database management unit 4f3 for managing data input / output of the information storage unit 4e.
[0117]
The database management unit 4f3 extracts predetermined value-added information from the database of the information storage unit 4e based on the date data obtained from the timer 4g1, and performs an erasing process. This extraction process can be performed, for example, by extracting the data that has passed the storage period from the input date set in the value-added information.
[0118]
The automatic erasing process may be performed simply by determining whether or not the storage period has passed, or by determining a combination of a predetermined viewpoint or additional information and the storage period. According to this, for example, it is possible to set the time for automatic erasure for each piece of information, such as making the time for automatic erasure of basic management information and performance information and the time for automatic erasure of a report and a contact note different.
[0119]
Next, an example of the configuration of the request for approval processing unit 3a and the cost / payment unit 3b in the processing unit 3 will be described with reference to FIGS.
[0120]
In FIG. 18, the draft decision processing means 3a includes a draft decision server 3a1 and authentication means 3b2 to 3b4. The approval server 3a1 is a server that manages the recording of the approval request and the application form and the authentication process, and records the data of the approval request and the application input from the input unit 2b. The job authority data that authenticates the request for approval and the application form is approved by each of the authentication means 3a2 to 3a4, thereby approving the request for approval and the application form. The authentication data by the authentication means 3a2 to 3a4 is recorded in the approval server 3a1. The authentication data is input to the information processing means 4 as basic management information. The information processing means 4 may also input data of a request for approval or an application.
[0121]
Each of the authentication means 3a2 to 3a4 permits authentication of only registered individuals in advance, for example, by a fingerprint authentication function or a function of authenticating personal identification data. Note that the number of authentication means can be arbitrary. Further, the data of the request for approval or the application form input from the input means 2b may be character data or image data read by a scanner device.
[0122]
In FIG. 19, the expense / payment processing means 3b includes an expense / payment server 3b1, and authentication means 3b2 to 3b4. The expense / payment server 3b1 is a server that manages the recording of the expense / payment and the authentication process, and records the data of the expense / payment input from the input unit 2c. The job authority data for authenticating the expense / payment is approved by the respective authentication means 3b2 to 3b4, and the approval form and the application form are approved. Authentication data by the authentication means 3b2 to 3b4 is recorded in the expense / payment server 3b1. The authentication data is input to the sales / accounting server 3c as basic management information. Further, the sales / accounting server 3c may also input data of expenses / payments.
[0123]
Each of the authentication means 3b2 to 3b4 permits authentication of only a registered individual, for example, by a fingerprint authentication function or a function of authenticating personal identification data.
[0124]
According to the present invention, business management is performed using information, and the experience information obtained in this business management is stored again as value-added information, thereby circulating the information. Can be increased.
[0125]
According to the present invention, the additional value of information can be increased by adding additional information from various viewpoints.
[0126]
As a result, information that is effective for the user can be quickly transmitted by using the additional information assigned to each piece of information and automatically selecting the information by identifying the additional information set for each user.
[0127]
According to the present invention, business management is performed using information, and the experience information obtained in this business management is stored again as value-added information, thereby circulating the information. Can be increased.
[0128]
Further, according to the present invention, by monitoring the management of the business information performed by the business management means with the monitoring means, it is possible to improve the efficiency of the business process and to grasp the progress of the business plan.
[0129]
Further, according to the present invention, the management information performed by the management means can be applied to the evaluation of personnel, and the experience information obtained by the personnel evaluation can be stored as value-added information.
[0130]
According to the cyclical integrated management system of the present invention, it is possible to use useful information for a large amount of input information for the user, and also to effectively use experience information. Information related to management can be used effectively.
[Brief description of the drawings]
FIG. 1 is a schematic diagram for explaining a flow of information and a business cycle in a cycle-type integrated business management system of the present invention.
FIG. 2 is a block diagram for explaining a schematic configuration of a recycling-type integrated business management system of the present invention.
FIG. 3 is a block diagram for explaining an outline of a core system of the present invention.
FIG. 4 is a block diagram for explaining a flow of information in the information processing means of the present invention.
FIG. 5 is a diagram for explaining a data flow in automatic distribution according to the present invention.
FIG. 6 is an example of data of value-added information to which additional information of the present invention has been added.
FIG. 7 is a block diagram illustrating a distribution process according to the present invention.
FIG. 8 is a data example of distribution data of the present invention.
FIG. 9 is a diagram for explaining data in sequential distribution according to the present invention.
FIG. 10 is an example of distribution data managed by a distribution server.
FIG. 11 is a display example by the business process monitoring of the present invention.
FIG. 12 is an example of data in business process monitoring according to the present invention.
FIG. 13 is a display example of the work plan progress monitoring according to the present invention.
FIG. 14 is an example of data in the work plan progress monitoring of the present invention.
FIG. 15 is a display example based on personnel evaluation according to the present invention.
FIG. 16 is an example of data in personnel evaluation according to the present invention.
FIG. 17 is a block diagram illustrating a configuration example of a search unit and an automatic deletion unit according to the present invention.
FIG. 18 is a block diagram illustrating a configuration example of a request for approval document processing unit of the present invention.
FIG. 19 is a block diagram illustrating a configuration example of an expense / payment means according to the present invention.
[Explanation of symbols]
1 Recycling-type comprehensive business management system
2 Input means
2a to 2c input means
2d External evaluation input means
2e Work record input means
3 Processing means
3a Decision processing means
3a1 Decision server
3a2-3a4 Authentication means
3b Expense / payment means
3b1 Expense / payment server
3b2-3b4 Authentication means
3c Sales / Accounting Server
4 Information processing means
4a, 4b, 4c Additional information adding means
4d analysis means
4d1 Derived data formation processing
4d2 Additional information addition
4d3 selection processing
4e Information storage means
4f Search means
4f1 Search condition input means
4f2 search result output means
4f3 database management means
4g Automatic deletion means
4g1 timer
4h Automatic distribution means
4h1 distribution process
4h2 Delivery destination information
5 Business management means
5A Business plan
5B reference value
5C target value
5D business performance
5F policy instructions (review instructions)
5G business planning
6 monitoring means
6a Business monitoring means
6a1 Business plan progress monitoring means
6a2 Business volume monitoring means
6b Business process monitoring means
6c Target monitoring means
6d timer
7 Personnel evaluation means
8 Core system
8a Production system
8b Sales system
8b1 Business results
8c Accounting system
8d Production stock input means
8e Estimated order input means
8f Sales input means
8g Accounting input method
9 Education utilization means
10 Effect confirmation means
11 Decision Making Department
12, 12a-12c Individual distribution destination
13 Business Improvement
13A Business Improvement Instruction
13B Business Improvement Document

Claims (20)

基礎経営情報を分析して付加価値情報を得る情報処理手段と、前記情報処理手段から得られる付加価値情報に基づいて管理基準を形成し、経営管理を行う経営管理手段と、
前記経営管理手段を監視する監視手段とを備え、
前記監視手段は、経営管理の管理基準の良否判定を監視結果として経営管理手段にフィードバックし、
前記経営管理手段は、フィードバックされた判定結果に基づいて前記管理基準を変更し、
前記情報処理手段は、前記経営管理による管理結果を付加価値情報としてフィードバックして循環させることを特徴とする、循環型統合経営管理システム。
Information processing means for analyzing the basic management information to obtain value-added information, and management management means for forming a management standard based on the value-added information obtained from the information processing means and performing business management,
Monitoring means for monitoring the business management means,
The monitoring means feeds back the business management means as a monitoring result of the quality judgment of the management standard of the business management,
The business management means changes the management standard based on the feedback determination result,
The information processing means feeds back and circulates a management result by the business management as value-added information, and circulates the information.
前記経営管理手段による経営管理は、計画管理及び業務管理を含み、
当該計画管理は、前記付加価値情報に基づく計画の作成、及び前記監視手段の監視結果に基づく計画の変更を含み、
当該業務管理は、前記計画に基づく経営管理を含むことを特徴とする、請求項1に記載の循環型統合経営管理システム。
Business management by the business management means includes plan management and business management,
The plan management includes creating a plan based on the value-added information, and changing the plan based on the monitoring result of the monitoring unit,
The system according to claim 1, wherein the business management includes business management based on the plan.
前記基礎経営情報は、
市場情報、及び、販売情報を含む実績情報を含むことを特徴とする、請求項1に記載の循環型統合経営管理システム。
The basic management information is
The recycling integrated business management system according to claim 1, further comprising performance information including market information and sales information.
前記管理基準は、業務プロセスの基準値、実績に対する目標値を備えることを特徴とする、請求項1に記載の循環型統合経営管理システム。The system according to claim 1, wherein the management standard includes a standard value of a business process and a target value for an actual result. 前記経営管理手段が行う計画管理は、
製品機器の機種開発に関する開発計画、製品機器の販売計画、製品機器の生産計画を含み、
前記経営管理手段が行う業務管理は、前記各計画管理の少なくとも一つを目標計画として管理を行うことを特徴とする、請求項1乃至4の何れか一つに記載の循環型統合経営管理システム。
The plan management performed by the business management means includes:
Includes development plans for product equipment model development, product equipment sales plans, product equipment production plans,
The system according to any one of claims 1 to 4, wherein the business management performed by the business management means manages at least one of the plan managements as a target plan. .
前記業務管理の管理結果を人事評価情報として、前記情報処理手段にフィードバックすることを特徴とする、請求項5に記載の循環型統合経営管理システム。The system according to claim 5, wherein the management result of the business management is fed back to the information processing means as personnel evaluation information. 前記監視手段は、前記各計画管理の少なくとも一つを含む目標計画を実績情報と比較し、当該比較に基づいて経営管理手段の管理基準の良否判定を行うことを特徴とする、請求項1に記載の循環型統合経営管理システム。2. The method according to claim 1, wherein the monitoring unit compares a target plan including at least one of the plan managements with actual information, and determines whether or not a management criterion of a business management unit is acceptable based on the comparison. 3. Cycle-type integrated business management system described. 前記監視手段は、経営管理手段による業務の業務実績を基準値と比較して業務プロセスにおける基準値の良否判定を行い、業務実績及び営業実績を目標値と比較して経営上の目標値の良否判定を行うことを特徴とする、請求項5に記載の経営情報循環システム。The monitoring means compares the business performance of the business by the business management means with a reference value to determine whether the reference value in the business process is good, and compares the business performance and the business performance with the target value to determine whether the management target value is good. The management information circulation system according to claim 5, wherein the determination is performed. 前記良否判定は、計画変更に対して、拡張、改善、又は新規開発の方向性の判定結果を含むことを特徴とする、請求項8に記載の循環型統合経営管理システム。9. The system according to claim 8, wherein the pass / fail judgment includes a result of judging the direction of expansion, improvement, or new development with respect to a plan change. 前記監視手段は、1回の良否判定結果、又は複数回の良否判定結果に基づいて経営管理手段に監視結果をフィードバックすることを特徴とする、請求項7乃至9の何れか一つに記載の循環型統合経営管理システム。The method according to any one of claims 7 to 9, wherein the monitoring unit feeds back the monitoring result to the management unit based on one pass / fail judgment result or a plurality of pass / fail judgment results. Recycling-type integrated business management system. 前記情報処理手段は、
前記基礎経営情報に対して複数の観点で付加情報を付与して特徴付けを行う付加情報付与手段と、
前記付加情報に基づいて情報分析を行う分析手段と、
前記分析結果及び実績情報を付加価値情報として一次記録する情報蓄積手段と、前記付加価値情報を配信する配信手段とを備えることを特徴とする、請求項1に記載の循環型統合経営管理システム。
The information processing means includes:
Additional information providing means for providing additional information to the basic management information from a plurality of viewpoints and performing characterization,
Analysis means for performing information analysis based on the additional information,
2. The system according to claim 1, further comprising an information storage unit that temporarily records the analysis result and the result information as value-added information, and a distribution unit that distributes the value-added information. 3.
前記付加価値情報は、基礎経営情報及びフィードバック情報に対して少なくとも一つの観点で付加情報を付与して特徴付けを行うことにより形成することを特徴とする、請求項11に記載の循環型統合経営管理システム。The recycling integrated management according to claim 11, wherein the value-added information is formed by adding additional information to the basic management information and the feedback information from at least one viewpoint and performing characterization. Management system. 前記観点は、情報が属するカテゴリー、情報の種類、情報の重要度の少なくとも一つを含むことを特徴とする、請求項12に記載の循環型統合経営管理システム。13. The system according to claim 12, wherein the viewpoint includes at least one of a category to which the information belongs, a type of the information, and a degree of importance of the information. 前記情報蓄積手段が記録するデータ構造は、前記付加価値情報を格納するデータ領域、前記各観点毎又は各観点の組合せの付加情報に対応する少なくとも一つのフラグ領域を備え、
前記分析手段は、前記情報蓄積手段のフラグ領域にフラグデータを付することにより付加価値情報を形成することを特徴とする、請求項12又は13に記載の循環型統合経営管理システム。
The data structure recorded by the information storage means includes a data area for storing the value-added information, and at least one flag area corresponding to additional information of each viewpoint or a combination of each viewpoint,
14. The recycling integrated management system according to claim 12, wherein the analysis unit forms value-added information by attaching flag data to a flag area of the information storage unit.
前記配信手段は、付加価値情報に付された付加情報の組合せにより情報を仕分けし、当該仕分けに応じて設定した配信先及び配信手順に従って配信することを特徴とする請求項11に記載の循環型統合経営管理システム。The circulation type apparatus according to claim 11, wherein the distribution unit sorts information according to a combination of the additional information added to the value-added information, and distributes the information according to a distribution destination and a distribution procedure set according to the classification. Integrated business management system. 前記配信手順は、複数の配信先を階層化し、選択された階層より上位配信先に対して一斉配信、又は下位の階層から上位の階層もしくは上位の階層から下位の階層に向かって順次配信することを特徴とする請求項15に記載の循環型統合経営管理システム。In the distribution procedure, a plurality of distribution destinations are hierarchized, and simultaneous distribution is performed to distribution destinations higher than the selected hierarchy, or distribution is sequentially performed from a lower hierarchy to an upper hierarchy or from an upper hierarchy to a lower hierarchy. The recycling integrated business management system according to claim 15, wherein: 前記情報蓄積手段は、少なくとも一つの付加情報を検索タームとして所望の付加価値情報を検索自在であることを特徴とする、請求項12乃至14の何れか一つに記載の循環型統合経営管理システム。The system according to any one of claims 12 to 14, wherein the information storage means is capable of searching for desired value-added information by using at least one additional information as a search term. . 前記情報蓄積手段は、付加情報を時間情報として所定の付加価値情報を抽出し自動消去することを特徴とする、請求項12乃至14の何れか一つに記載の循環型統合経営管理システム。15. The system according to claim 12, wherein the information storage unit extracts predetermined value-added information by using the additional information as time information and automatically deletes the value-added information. 16. 選択された情報を履歴情報として記録する履歴記録手段を備え、
当該履歴記録手段に記録される選択情報は、経営管理手段が形成する経営管理に係わる情報、及び前記配信データの内で選択された付加価値情報であり、
当該配信データの選択は、配信先において、配信データに設けたフラグ領域に付されたフラグデータの有無により行うことを特徴とする請求項15、又は16に記載の循環型統合経営管理システム。
A history recording unit that records the selected information as history information,
The selection information recorded in the history recording means is information relating to business management formed by the business management means, and value-added information selected from the distribution data,
17. The recycling integrated business management system according to claim 15, wherein the selection of the distribution data is performed based on the presence / absence of flag data attached to a flag area provided in the distribution data at the distribution destination.
前記経営管理手段の業務管理の計画を個人又はグループで設定すると共に、前記実績情報を同様に個人又はグループで分配し、
当該計画と実績情報とを個人又はグループ毎に比較し、計画に対する貢献度を個人別及び/又はグループ別に評価することを特徴とする請求項1に記載の循環型統合経営管理システム。
Along with setting the business management plan of the business management means as an individual or a group, the performance information is similarly distributed to an individual or a group,
The system according to claim 1, wherein the plan and the result information are compared for each individual or group, and the degree of contribution to the plan is evaluated for each individual and / or group.
JP2002186909A 2002-06-26 2002-06-26 Rotational integrated business management system Withdrawn JP2004030333A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002186909A JP2004030333A (en) 2002-06-26 2002-06-26 Rotational integrated business management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002186909A JP2004030333A (en) 2002-06-26 2002-06-26 Rotational integrated business management system

Publications (1)

Publication Number Publication Date
JP2004030333A true JP2004030333A (en) 2004-01-29

Family

ID=31182098

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002186909A Withdrawn JP2004030333A (en) 2002-06-26 2002-06-26 Rotational integrated business management system

Country Status (1)

Country Link
JP (1) JP2004030333A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007122216A (en) * 2005-10-26 2007-05-17 Chugoku Electric Power Co Inc:The Performance target analysis system and performance target analysis method
JP2014157605A (en) * 2013-02-14 2014-08-28 Aktana Inc System and method for managing system-level workflow strategy and individual workflow activity
KR101793619B1 (en) * 2014-08-21 2017-11-20 이승태 Business plan management method for monthly based short-term supporting enterprise business plan management

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007122216A (en) * 2005-10-26 2007-05-17 Chugoku Electric Power Co Inc:The Performance target analysis system and performance target analysis method
JP2014157605A (en) * 2013-02-14 2014-08-28 Aktana Inc System and method for managing system-level workflow strategy and individual workflow activity
KR101793619B1 (en) * 2014-08-21 2017-11-20 이승태 Business plan management method for monthly based short-term supporting enterprise business plan management

Similar Documents

Publication Publication Date Title
Kumar et al. Dynamic work distribution in workflow management systems: How to balance quality and performance
US7437341B2 (en) System and method for selecting a suitable technical architecture to implement a proposed solution
US8271321B1 (en) Apparatus and method for providing building management information
US20020116210A1 (en) Computerized method for online quoting and pricing of tasks
US20030120584A1 (en) System and method for managing market activities
US20100268705A1 (en) Database and data access layer
US20090064101A1 (en) Dynamic data restructuring method and system
CN110162548B (en) Big data analysis system for electric power bidding items
Pacheco et al. A proposed model for reuse of software requirements in requirements catalog
CA2545446A1 (en) Systems and methods for retrieving data
CN1322460C (en) Informational object authoring and distribution system
CN105404999A (en) Purchase and asset management platform suitable for aviation field
Tavakolan et al. Risk management workshop application: a case study of Ahwaz Urban Railway project
JP2003196476A (en) Security policy creation support system and security measure determination support system
Vriens et al. Planning local e-government
US20030023597A1 (en) Methods and systems for automated project management
KR100441660B1 (en) Knowledge service system through ordered workflow, service method thereof, service method for developing products through network and system thereof
CN115600997B (en) Digital research and development project management system and method for normative content management
JP2008527500A (en) Automated project office and system and method for automated risk assessment and reporting
JP2004030333A (en) Rotational integrated business management system
JP2023118969A (en) man hour system
Albaum Information flow and decentralized decision making in marketing
Simonova Identification of IT-service metrics for a business process when planning a transition to outsourcing
Barcelo-Valenzuela et al. An IT service management methodology for an electoral public institution
Vraalsen et al. Assessing enterprise risk level: The CORAS approach

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050413

A761 Written withdrawal of application

Free format text: JAPANESE INTERMEDIATE CODE: A761

Effective date: 20080606