JP2003308450A - Construction estimate drawing-up device and storage medium used for device - Google Patents

Construction estimate drawing-up device and storage medium used for device

Info

Publication number
JP2003308450A
JP2003308450A JP2002112025A JP2002112025A JP2003308450A JP 2003308450 A JP2003308450 A JP 2003308450A JP 2002112025 A JP2002112025 A JP 2002112025A JP 2002112025 A JP2002112025 A JP 2002112025A JP 2003308450 A JP2003308450 A JP 2003308450A
Authority
JP
Japan
Prior art keywords
construction
miscellaneous
amount
work
budget
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002112025A
Other languages
Japanese (ja)
Other versions
JP4104367B2 (en
Inventor
Sei Takeuchi
竹内聖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IN X KK
Original Assignee
IN X KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IN X KK filed Critical IN X KK
Priority to JP2002112025A priority Critical patent/JP4104367B2/en
Publication of JP2003308450A publication Critical patent/JP2003308450A/en
Application granted granted Critical
Publication of JP4104367B2 publication Critical patent/JP4104367B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To draw up a highly accurate estimate. <P>SOLUTION: This construction estimate drawing-up device has a first step for retrieving each construction name constituting the main construction for drawing up an execution budget of the main construction, a second step for inputting the numerical quantity or unit cost data relative to basic cost items on resources for the construction and miscellaneous expanse items accompanying the construction into item columns of an itemized statement for the estimation object construction selected in the first step and displayed on a display screen, and a third step for displaying automatically a profit rate of the main construction on a profit rate display column of the itemized statement by a calculation means for dividing a contract sum of the main construction by a budget profit, while the working budget amount of the main construction and the budget profit are fluctuated in accompany with fluctuation of the total sum of the construction including the total amount of the miscellaneous expenses, based on the data on at least the miscellaneous expenses inputted in the second step. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、工事見積り書作成
装置及び該装置に用いられる記憶媒体に関し、たとえば
(1)土木、(2)法面工、(3)コンクリート工など
の本工事の利益率を把握ながら本工事に含まれる各工事
に関する自社の歩掛りデータを入力する場合に適合する
工事見積り書作成装置及び該装置に用いられる記憶媒体
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction quotation preparation apparatus and a storage medium used for the construction quotation preparation apparatus. For example, (1) civil engineering, (2) slope work, (3) concrete construction, etc. The present invention relates to a construction quotation preparation device suitable for inputting company's progress data regarding each construction included in this construction while grasping the rate, and a storage medium used for the construction quotation preparation equipment.

【0002】[0002]

【従来の技術】従来、貴庁に提案した原価管理システム
は、特開平11−232329号に記載された一例があ
る。この公報に記載の実施例は、「会社特有の自社歩掛
りを作業日報の蓄積データにより自動的に作成し、次の
見積り、実行予算などでその蓄積データの参照可能とす
る複数の段階を備えている。
2. Description of the Related Art Conventionally, there is an example of a cost management system proposed to your office, which is described in Japanese Patent Laid-Open No. 11-232323. The embodiment described in this publication is "provided with a plurality of stages in which a company-specific company's own progress is automatically created from accumulated data of daily work reports, and the accumulated data can be referred to in the next estimation, execution budget, etc. There is.

【0003】しかしながら、上記構成に於いては、次の
ような問題点があった。工事に要する材料、労務及び機
材という基本的原価項目以外に諸雑費に関するデータが
含まれていない。
However, the above structure has the following problems. Other than basic cost items such as materials, labor and equipment required for construction, data on miscellaneous expenses are not included.

【0004】したがって、精度の高い見積書を作成する
ことができない。当然のことながら表示画面に表れる内
訳書に諸雑費参考欄などが設けられていないので、仮に
基本的原価項目に諸雑費の合計を加味しても、当該工事
の諸雑費が標準よりも多いものか、それともすくないも
のか知ることができない。さらに、諸雑費に関するデー
タの変動に関連して当該工事の施工量の数量を求める算
出手段及び当該工事の施工量の単価を求める算出手段な
どが設けられていないので、特に諸雑費に関するデータ
を工事の合計金額に参入する場合には素人は容易に見積
書を作成することができなかった。
Therefore, it is not possible to create a highly accurate quote. As a matter of course, since there is no miscellaneous cost reference column in the detailed statement that appears on the display screen, even if the total miscellaneous cost is added to the basic cost items, the miscellaneous cost of the construction is higher than the standard. I can't know if it's the one or not. Furthermore, since there is no calculation means for calculating the quantity of the construction amount of the relevant work or calculation unit for calculating the unit price of the construction amount of the relevant construction in relation to the fluctuation of the data on the miscellaneous expenses, the data regarding the miscellaneous expenses is When entering the total amount of, the layman could not easily make an estimate.

【0005】[0005]

【発明が解決しようとする課題】本発明は、本工事の利
益率の変化を人為的に算出しなければならない現況に鑑
み、第1の目的は、素人でも容易に見積書を作成するこ
とができることである。第2の目的は、精度の高い見積
書を作成することである。第3の目的は、公の標準の単
価ないし歩掛りデータと比較対照しながら、見積り依頼
を受けた本工事に関連する工事の見積りを作成すること
ができることである。第4の目的は、特に諸雑費が標準
よりも多いものか、それともすくないものか一目で知る
ことができることである。
In view of the present situation in which the change in the profit rate of this construction must be artificially calculated, the first object of the present invention is that even an amateur can easily create an estimate. It is possible. The second purpose is to create a highly accurate quote. The third purpose is to be able to prepare an estimate of the construction related to the construction for which the quotation request has been received, while comparing and contrasting with public standard unit price or accrual data. The fourth purpose is to be able to know at a glance whether the miscellaneous expenses are higher than the standard or low.

【0006】[0006]

【課題を解決するための手段】本発明の工事見積り書作
成装置は、本工事の実行予算を作成するために、本工事
を構成する各工事名称を検索する第1段階と、この第1
段階により選択され、かつ、表示画面に表示された見積
り対象工事の内訳書の項目欄に、当該工事の資源に関す
る基礎原価項目及び当該工事に付随する諸雑費項目につ
いて数量や単価データを入力する第2段階と、この第2
段階で入力された少なくとも諸雑費に関するデータに基
づき、当該諸雑費の合計額を含む当該工事の合計金額の
変動に伴い、本工事の実行予算額並びに予算利益が変動
し、この予算利益で当該本工事の請負金額を割る算出手
段により、内訳書の利益率表示欄に当該本工事の利益率
が自動的に表示される第3段階とを備えることを特徴と
する。
The construction quotation preparation apparatus of the present invention comprises a first step of searching for each construction name constituting the construction in order to prepare an execution budget for the construction, and the first step.
Enter the quantity and unit price data for the basic cost items related to the resources of the construction and miscellaneous expenses items associated with the construction in the item column of the breakdown of the construction to be estimated that is selected in each stage and displayed on the display screen. Two stages and this second
Based on at least the miscellaneous expenses data entered at the stage, along with the fluctuation of the total amount of the construction work including the total amount of the miscellaneous expenses, the execution budget amount and budget profit of this construction will change, and the budget profit A third step is provided in which the profit rate of the main work is automatically displayed in the profit rate display field of the detailed statement by the calculation means that divides the contracted amount of work.

【0007】また本発明の工事見積り書作成装置用の記
憶媒体は、工事見積り書作成装置がドライブを介してそ
のファイル装置に読み取り可能なプログラムが記録され
ている記憶媒体であって、該記憶媒体からインストール
されたプログラムは、本工事の実行予算を作成するため
に、本工事を構成する各工事名称を検索する第1段階
と、この第1段階により選択され、かつ、表示画面に表
示された見積り対象工事の内訳書の項目欄に、当該工事
の資源に関する基礎原価項目及び当該工事に付随する諸
雑費項目について数量や単価データを入力する第2段階
と、この第2段階で入力された少なくとも諸雑費に関す
るデータに基づき、当該諸雑費の合計額を含む当該工事
の合計金額の変動に伴い、本工事の実行予算額並びに予
算利益が変動し、この予算利益で当該本工事の請負金額
を割る算出手段により、内訳書の利益率表示欄に当該本
工事の利益率が自動的に表示される第3段階とを備える
ことを特徴とする。
Further, the storage medium for the construction quotation preparation device of the present invention is a storage medium in which a program readable by the construction quotation preparation device via a drive is recorded in the file device, and the storage medium is the storage medium. The program installed from was selected in the first step of searching each construction name that constitutes this construction and the display screen, in order to create the execution budget of this construction. In the item column of the breakdown of the construction work to be estimated, the second stage of inputting the quantity and unit price data for the basic cost items related to the resources of the construction work and the miscellaneous expenses items associated with the construction work, and at least the data entered in this second stage Based on the data on miscellaneous expenses, the total amount of the miscellaneous expenses, including the total amount of miscellaneous expenses, will cause changes in the amount of budget for execution of this construction and the profit of The calculation means budget income dividing the contracted in the present construction, characterized in that it comprises a third step of margins of the present construction the margin display field breakdown statement is automatically displayed.

【0008】上記構成に於いて、当該工事の内訳書には
諸雑費参考欄31が設けられ、該諸雑費参考欄31に
は、標準の諸雑費額から入力した諸雑費の合計額を差し
引いた額が表示されることを特徴とする。また、諸雑費
に関するデータの変動に関連して当該工事の施工量の数
量を求める算出手段及び当該工事の施工量の単価を求め
る算出手段を備え、これらの算出手段によって算出され
た数値は、内訳書に設けた自社用の実施欄に表示される
ことを特徴とする。さらに、内訳書には、自社用実施欄
と対比することができるように標準用実施欄が設けられ
ていることを特徴とする。
In the above structure, a miscellaneous expense reference column 31 is provided in the breakdown of the construction work, and the miscellaneous expense reference column 31 is obtained by subtracting the total amount of miscellaneous expenses entered from the standard miscellaneous expense amount. The feature is that the amount is displayed. In addition, there is a calculating means for calculating the quantity of the construction amount of the relevant construction and a calculating means for calculating the unit price of the construction amount of the relevant construction in relation to the fluctuation of data on miscellaneous expenses, and the numerical values calculated by these calculating means are It is characterized in that it is displayed in the implementation column for the company provided in the manual. Further, the detailed statement is characterized in that a standard implementation column is provided so that it can be compared with the in-house implementation column.

【0009】ここで「本工事」とは、請負った当該工事
のことを言う。またここで「実施」とは、一日当りの施
工量を意味する。さらに、ここで「歩掛り」とは、狭義
では当該工事をする場合の活動単位(作業)当りの材
料、労務、機械及び諸雑費の消費量を言う。また広義で
は当該工事を含めた本工事をするために各工事の歩掛り
を合算した場合の全体の材料、労務、機械及び諸雑費の
消費量を言う。
Here, "main work" means the work under contract. The term “implementation” as used herein means the amount of construction per day. Further, in the narrow sense, the “step” means the consumption of materials, labor, machines and miscellaneous expenses per activity unit (work) in the case of performing the construction. In a broad sense, it means the total consumption of materials, labor, machinery, and miscellaneous expenses when the steps of each work are added to perform this work including the work.

【0010】[0010]

【発明の実施の形態】図1は工事見積り書作成装置の構
成例を示すブロツク図である。また図2は該装置により
実行される処理フローである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a block diagram showing an example of the construction of a construction quotation preparation device. Further, FIG. 2 is a processing flow executed by the apparatus.

【0011】まず1は中央演算処理装置(これを以下
「CPU」と称する)で、このCPU1には、制御プロ
グラム2を有するメインメモリ3、ドライブ4、ファィ
ル装置(記憶手段)5、キーボード、マウスなどの入力
装置6、プリンターなどの出力装置7がそれぞれ接続し
ている。前記ドライブ4はプログラムをインストールす
る機能を有し、CPU1とファイル装置5との電気的な
架渡し(インストール)をする。本実施例のファィル装
置5は、例えば汎用コンピュータ(ハードウエア)の記
憶手段に予め固定されている場合のみならず、パッケー
ジソフトと称されるも記憶媒体も含まれる。
First, reference numeral 1 is a central processing unit (hereinafter referred to as "CPU"), which has a main memory 3 having a control program 2, a drive 4, a file device (storage means) 5, a keyboard and a mouse. An input device 6 such as a printer and an output device 7 such as a printer are connected to each other. The drive 4 has a function of installing a program and electrically bridges (installs) the CPU 1 and the file device 5. The file device 5 of the present embodiment includes not only a case where it is fixed in advance in a storage means of a general-purpose computer (hardware) but also a storage medium called package software.

【0012】記憶媒体には工事の自社歩掛り作成システ
ム(一連の処理をするソフトウエア)が格納されてるい
が、記憶媒体を、例えばノートパソコンの記憶媒体収納
部に装着した場合にも、本発明のファイル装置5を構成
する。このような場合にはドライブ4を介して各種の記
憶媒体5a〜5dからそれぞれソフトウエアがインスト
ールされる。記憶媒体としては、フロッピディスクを含
む磁気ディスク5a、CD−ROM、DVDなどの光デ
ィスク5b、MDを含む光磁気ディスク5c、小矩形板
状或いは棒状の半導体メモリ5dを列挙することができ
る。
Although the storage medium stores the company's own work progress preparation system (software for performing a series of processes), the present invention is also applicable when the storage medium is mounted in, for example, the storage medium storage unit of a notebook computer. The file device 5 of FIG. In such a case, software is installed from the various storage media 5a to 5d via the drive 4, respectively. As the storage medium, a magnetic disk 5a including a floppy disk, an optical disk 5b such as a CD-ROM, a DVD, a magneto-optical disk 5c including an MD, a small rectangular plate-shaped or rod-shaped semiconductor memory 5d can be enumerated.

【0013】さて、本実施例では、各種の記憶媒体5a
〜5dからそれぞれソフトウエアがファイル装置5にイ
ンストールされていることを前提とし、CPU1は、メ
インメモリ3中の制御プログラム2の指令を受け、ファ
イル装置5から本工事の実行予算(見積り)や予算利益
を含む利益率を作成しようとする内訳書データファィル
10を読み出し、かつ、読み出した内訳書データファィ
ル10のフォーマット(ここでは「内訳書」という)1
1を、図3に示すように表示画面12に表示する。
Now, in this embodiment, various storage media 5a are used.
Assuming that the software is installed in the file device 5 from each of 5d to 5d, the CPU 1 receives the instruction of the control program 2 in the main memory 3, and the file device 5 executes the execution budget (estimate) and budget of the construction work. The detailed statement data file 10 for which a profit rate including profit is to be created is read, and the format of the read detailed statement data file 10 (herein referred to as "detailed statement") 1
1 is displayed on the display screen 12 as shown in FIG.

【0014】内訳書11は、例えばフレーム分けされた
本工事欄の階層的かつ列状的に描かれたフォルダにポイ
ンターを当てて入力装置(ポインティングデバイス)6
を操作(クリック)することにより表示画面12に表れ
る。
For the detailed statement 11, for example, by pointing the pointer to a folder drawn in a hierarchical and columnar manner in the main work column divided into frames, an input device (pointing device) 6
It appears on the display screen 12 by operating (clicking).

【0015】したがって、本実施例では実行予算(見積
り)を作成しようとする本工事の工事名称を検索する第
1段階が必要である。図3の表示画面12には、本工事
の下層にある土木工事の「C0010のフォルダの内
容」が表れている。そこで、内訳書11の各表示欄につ
いて説明する。
Therefore, this embodiment requires the first step of searching for the construction name of the construction for which an execution budget (estimate) is to be created. On the display screen 12 of FIG. 3, “contents of the folder of C0010” of the civil engineering work which is the lower layer of this work is displayed. Therefore, each display column of the detailed statement 11 will be described.

【0016】13は本工事の種類に対応してそれ付され
たコードを示すコード表示ボックスである。本実施例で
は、例えば本工事は、上層として(1)土木、(2)法
面工、(3)コンクリート工に区分けされ、これらの工
事中に必要な工事名称が下層して位置付けられている。
Reference numeral 13 is a code display box showing a code attached to each type of work. In this embodiment, for example, the main work is divided into (1) civil engineering, (2) slope work, and (3) concrete work as the upper layers, and the construction names required during these works are positioned as the lower layers. .

【0017】図4は本実施形態において用いる工事テー
ブルの内容である。ここでは官庁が定めた標準の本工事
に基づき、工事名称として工事A〜工事Kを設定する。
また各工事名称には「C0001〜C0011」という
コードを割り当てると共に、各工事名称コードを、工事
テーブル14の所定の記憶領域に各工事の名称と対応付
けて格納しておく。そして、これを実行予算額、利益率
等を算出するための本工事マスタとして使用する。後述
する「請負金額」に対する「実行予算額」は、本工事マ
スタのトータル金額(複数の工事の合計)である。
FIG. 4 shows the contents of the construction table used in this embodiment. Here, constructions A to K are set as construction names based on the standard main construction established by the government agencies.
Codes “C0001 to C0011” are assigned to each construction name, and each construction name code is stored in a predetermined storage area of the construction table 14 in association with each construction name. Then, this is used as a main work master for calculating the execution budget amount, the profit rate, and the like. The “execution budget amount” for the “contract amount” described later is the total amount (total of a plurality of works) of this construction master.

【0018】したがって、今仮にC0010のフォルダ
を呼び出して工事Gの歩掛りに関する基礎原価及び当該
土木工事に付随する諸雑費に関して自社の数量や単価デ
ータを入力すると、当該工事Gの右下欄に表れる合計金
額が変わると共に、これに連動して本工事マスタのトー
タル金額(実行予算額)も変わる。また、C0011の
フォルダを呼び出して工事Kの基礎原価及び当該土木工
事に付随する諸雑費に関して見積りに応じて自社の数量
や単価データを入力すると、当該工事Kの右下欄に表れ
る合計金額が変わると共に、これに連動して本工事マス
タのトータル金額(実行予算額)も変わる。それ故に、
本実施例では、当然に本工事マスタ中の各工事の合計数
を加算する第1の算出手段がある。
Therefore, if the folder of C0010 is called and the company's quantity and unit price data regarding the basic cost related to the work G's progress and miscellaneous expenses associated with the civil engineering work are entered, the total appearing in the lower right column of the work G appears. As the amount of money changes, the total amount of money (execution budget) of this construction master changes in conjunction with this. If you call the folder of C0011 and enter the company's quantity and unit price data according to the estimate regarding the basic cost of construction K and miscellaneous expenses associated with the civil engineering work, the total amount shown in the lower right column of the construction K will change. At the same time, the total amount of the construction master (execution budget) also changes in conjunction with this. Therefore,
In the present embodiment, naturally, there is a first calculating means for adding the total number of each construction in the construction master.

【0019】次に15は工事名称表示ボックスで、この
工事名称表示ボックス15には本工事の(1)土木、
(2)法面工、(3)コンクリート工のいずれか一つの
工事名称A〜Kが表れる。例えば見積りを受けた工事が
「コンクリート工」の中の「コンクリートクレーン車打
設」である場合には、前述したように本工事の工事名称
を検索する第1段階に於いて、C0010のフォルダを
クリックする。そうすると、前記工事テーブル14によ
り「工事G」の名称が工事名称表示ボックス15に表れ
る。
Next, 15 is a construction name display box. In this construction name display box 15, (1) civil engineering of this construction,
One of the construction names AK of (2) slope work and (3) concrete work appears. For example, if the construction for which the quotation was received is “concrete crane vehicle placement” in “concrete construction”, in the first step of searching for the construction name of this construction, as described above, select the C0010 folder. click. Then, the name of “Construction G” appears in the construction name display box 15 according to the construction table 14.

【0020】次に16は当該工事の規格を示す規格表示
欄である。以下、本実施例では工事Gに関する内訳書1
1が表示画面12に表れていることを前提にして説明す
る。ここで「工事G(コンクリートクレーン車打設)」
の規格内容が、無筋構造物であり、また一日当り30m
3を意味する場合には、規格表示欄16には「無筋構造
物、30m3未満/日」という文字・数字・記号が表れ
る。
Next, 16 is a standard display column showing the standard of the construction. Hereinafter, in this embodiment, the detailed statement 1 regarding the construction G
1 will be described on the assumption that 1 appears on the display screen 12. Here, "Construction G (concrete crane truck placement)"
The standard content of is a non-reinforced structure and is 30m per day.
In the case where it means 3, the standard display field 16 displays the letters, numbers and symbols of "unreinforced structure, less than 30 m3 / day".

【0021】次に17,18は規格表示欄16の下方に
設けられた一日当たりの施工量を表示する複数個の実施
欄である。本実施例では、自社用実施欄17と標準用実
施欄18が左右並列的に設けられている。各実施欄1
7,18の表示ボックスは複数個で構成されている。す
なわち、17a,18aは数量を示す数量表示ボック
ス、17b,18bは単価を示す単価表示ボックス、1
7c,18cは単位を示す単位表示ボックスである。
Next, reference numerals 17 and 18 are a plurality of implementation columns provided below the standard display column 16 for displaying the construction amount per day. In this embodiment, the in-house implementation column 17 and the standard implementation column 18 are provided in parallel on the left and right. Each implementation column 1
The display boxes 7 and 18 are composed of a plurality of boxes. That is, 17a and 18a are quantity display boxes showing the quantity, 17b and 18b are unit price display boxes showing the unit price, 1
7c and 18c are unit display boxes showing units.

【0022】ここで「実施」の用語について説明する。
「実施」とは、一日当りの施工量を意味する。本実施例
では工事Gの内訳書11の右上隅角部分に、全数量表示
欄19並びに施工日数表示欄20が列状態で設けられて
いるが、自社用実施欄17の前記数量表示ボックス17
aに表れるデータ(数量)は、前記全数量表示欄19並
びに施工日数表示欄20にそれぞれ表れるデータに関連
付けられている。例えば全数量表示欄19の数字が「5
0.00」、施工日数表示欄20の数字が「2.50
(ここでは二日と半日かかる意味合い)」とすると、全
数量表示欄19の数字を施工日数表示欄20の数字で割
る第2の算出手段により数量表示ボックス17aの数字
「20,00」が算出される(当該工事の施工量の数量
を求める手段)。
Here, the term "implementation" will be described.
"Execution" means the amount of construction per day. In the present embodiment, the total quantity display column 19 and the construction days display column 20 are provided in a row at the upper right corner of the detailed statement 11 of the construction G, but the quantity display box 17 of the in-house implementation column 17 is provided.
The data (quantity) appearing in a is associated with the data appearing in the total quantity display column 19 and the construction days display column 20, respectively. For example, the number in the total quantity display column 19 is “5
0.00 ", the number in the construction days display column 20 is" 2.50
(Here, it takes two days and a half day) ", the number" 20,00 "in the quantity display box 17a is calculated by the second calculating means that divides the number in the total quantity display field 19 by the number in the construction day display field 20. It is done (means for obtaining the quantity of the construction amount of the construction).

【0023】また自社用実施欄17の前記単価表示ボッ
クス17bに表れるデータ(単価)は、当該工事Gの合
計金額表示欄21に表れるデータに関連付けられてい
る。合計金額表示欄21は工事Gの内訳書11の右下隅
部分に設けられているが、例えば合計金額表示欄21の
数字が「299,199(ここでは30万弱である意味
合い)」とすると、この合計金額表示欄21の数字を前
記数量表示ボックス17aに表れる数字(数量)で割る
第3の算出手段により単価表示ボックス17bの数字
「14,959」が算出される(当該工事の施工量の単
価を求める手段)。
Further, the data (unit price) appearing in the unit price display box 17b of the in-house implementation field 17 is associated with the data appearing in the total price display field 21 of the construction G. The total amount display column 21 is provided in the lower right corner portion of the detailed statement 11 of the construction G. For example, if the number in the total amount display column 21 is "299,199 (here, it means a little less than 300,000)", The number "14,959" in the unit price display box 17b is calculated by the third calculating means for dividing the number in the total amount display field 21 by the number (quantity) appearing in the quantity display box 17a (of the construction amount of the construction. A means to determine the unit price).

【0024】次に23は各実施欄17,18の各表示ボ
ックスと前記合計金額表示欄21との間に大きく表状態
に設けられ、かつ、歩掛りに関する当該工事Gの資源に
ついての基礎原価項目及び当該工事に付随する諸雑費項
目を表示する資源表示欄である。
Next, 23 is largely provided in a table state between each display box of each of the execution columns 17 and 18 and the total amount display column 21, and the basic cost item and the basic cost item for the resource of the construction G related to the step rate. It is a resource display column that displays miscellaneous expenses items associated with the construction.

【0025】ここで「歩掛り」の用語について説明す
る。ここで「歩掛り」とは、狭義では当該工事をする場
合の活動単位(作業)当りの材料、労務、機械及び諸雑
費の消費量を言う。また広義では当該工事を含めた本工
事をするために各工事の歩掛りを合算した場合の全体の
材料、労務、機械及び諸雑費の消費量を言う。本実施例
では、工事Gの歩掛りに関する資源表示欄23には、当
該工事についての基礎原価項目、当該工事に付随する諸
雑費項目などが表示されている。図5は資源ファイル2
4の内容説明図である。左側から順番に説明すると、2
5は資源項目コードエリア、26は資源項目コードエリ
アに関連付けられた資源項目エリア、27は資源項目エ
リアに関連付けられた数量エリア、28は資源項目エリ
アに関連付けられた単位エリア、29は数量エリアに関
連付けられた単価エリア、30は数量エリアと単価エリ
アにそれぞれ関連付けられた金額エリアである。
Here, the term "progress" will be described. In the narrow sense, the term “step” refers to the consumption of materials, labor, machines and miscellaneous expenses per activity unit (work) when performing the construction. In a broad sense, it means the total consumption of materials, labor, machinery, and miscellaneous expenses when the steps of each work are added to perform this work including the work. In the present embodiment, the resource display column 23 relating to the progress of the construction G displays basic cost items for the construction, miscellaneous expenses items associated with the construction, and the like. Figure 5 shows resource file 2
It is a content explanatory view of 4. From left to right, 2
5 is a resource item code area, 26 is a resource item area associated with the resource item code area, 27 is a quantity area associated with the resource item area, 28 is a unit area associated with the resource item area, and 29 is a quantity area. The associated unit price area, 30 is the amount area and the amount area associated with the unit price area, respectively.

【0026】図3の表示画面には、この資源ファイル2
4の内容が具体的に表れている。図3を参照にして各記
憶エリアの間連性について説明する。表示画面12の内
訳書11の左側を見ると、アイコンが描かれている。こ
のアイコンは資源項目コードエリア25に関連付けられ
ている。同じ絵柄のアイコンは識別コードが同一又は類
似している。したがって、異なる絵柄のアイコンは識別
コードが非類似であると共に、資源項目の意味合いも異
なっている。
The resource file 2 is displayed on the display screen of FIG.
The contents of 4 are specifically shown. Connectivity between the storage areas will be described with reference to FIG. Looking at the left side of the detailed statement 11 on the display screen 12, an icon is drawn. This icon is associated with the resource item code area 25. The icons having the same pattern have the same or similar identification codes. Therefore, the icons of different designs have different identification codes and different meanings of resource items.

【0027】資源項目エリア26には、本実施例では、
基礎原価項目26aと、この基礎原価項目26aに付随
する諸雑費項目26bとが設けられている。基礎原価項
目26aの内容は、材料、労務、機材の三要素である。
「工事G(コンクリートクレーン車打設)」の基礎原価
項目26aは、ソートされた数字の中の「1」と「6」
と「7」と「8」と「9」である。すなわち、工事Gで
は「材料」に該当するものは、生コンクリートであり、
また「労務」に相当するものは、土木一般世話人、特殊
作業員、普通作業員であり、また「機材」に相当するも
のはトラッククレーン賃料である。
In the resource item area 26, in this embodiment,
A basic cost item 26a and a miscellaneous expense item 26b associated with the basic cost item 26a are provided. The contents of the basic cost item 26a are three elements of materials, labor, and equipment.
The basic cost item 26a of “Construction G (concrete crane vehicle placement)” is “1” and “6” in the sorted numbers.
And "7", "8" and "9". That is, in construction G, the material that corresponds to "material" is ready-mixed concrete,
In addition, “labor” corresponds to civil engineer, special worker, ordinary worker, and “equipment” corresponds to truck crane rent.

【0028】これに対して諸雑費項目26bの内容は、
ソートされた数字の中の「2」と「3」と「4」であ
る。これらの内容は損料、電気代など目に見えない部分
が多い。工事Gではバイブレータ損料、コンクリートバ
ケット損料、電力の三つである。
On the other hand, the contents of the miscellaneous expense item 26b are as follows.
It is "2", "3" and "4" in the sorted numbers. Many of these contents are invisible, such as damages and electricity bills. In construction G, there are three costs: vibrator loss, concrete bucket loss, and electric power.

【0029】金額エリア30は、前述したように数量エ
リア27と単価エリア20にそれぞれ関連付けられてい
る。しかして、本実施例では少なくとも諸雑費項目26
bの数量エリア27並び単価エリアの各ボックスはポイ
ンター領域であり、これらのポインター領域に自社の数
値を入力することができる。
The amount area 30 is associated with the quantity area 27 and the unit price area 20, respectively, as described above. Therefore, in this embodiment, at least the miscellaneous expense item 26
The boxes in the quantity area 27 and the unit price area of b are pointer areas, and the user's own numerical values can be entered in these pointer areas.

【0030】図7は入力装置6を介して諸雑費項目26
bに自社の諸雑費を入力した画面の一例である。図3と
対比すると明らかなように、バイブレータ損料の数量を
「1台」から「2台」にした。また単価を「500円」
にした。したがって、バイブレータ損料=2(台)×5
00(円)=1,000(円)となる。またコンクリー
トバケット損料=1(台)×500(円)=500
(円)とした。さらに、電力=1kw/h×500
(円)=500(円)とした。したがって、本実施例で
は「工事G(コンクリートクレーン車打設)」の基礎原
価項目26aに対する諸雑費項目26bの合計は、2,
000円となる。
FIG. 7 shows the miscellaneous expense items 26 via the input device 6.
It is an example of the screen which input the miscellaneous expenses of the company in b. As is clear from comparison with FIG. 3, the number of vibrator loss charges was changed from “1” to “2”. Also, the unit price is "500 yen"
I chose Therefore, vibrator loss = 2 (units) x 5
00 (yen) = 1,000 (yen). In addition, concrete bucket loss = 1 (unit) x 500 (yen) = 500
(Yen) Furthermore, power = 1 kw / h × 500
(Yen) = 500 (yen). Therefore, in this embodiment, the total of the miscellaneous expense items 26b with respect to the basic cost item 26a of "construction G (concrete crane vehicle placement)" is 2,
It will be 000 yen.

【0031】ところで、本実施例では内訳書11の施工
数字表示欄20に下方に諸雑費の合計が標準のそれより
も多いか少ないの目安になる諸雑費参考欄31が設けら
れている。この諸雑費参考欄31には、標準の諸雑費額
から本件諸雑費の「2,000円」を差し引いた額が表
示される。
By the way, in this embodiment, a miscellaneous expense reference column 31 is provided below the construction number display column 20 of the breakdown statement 11 to indicate whether the total miscellaneous expense is higher or lower than the standard. In the miscellaneous expense reference field 31, an amount obtained by subtracting "2,000 yen" of the miscellaneous expense from the standard miscellaneous expense is displayed.

【0032】すなわち、図3で示すように標準の諸雑費
額が「2,736」であるから、第4の算出手段(2,
736−2,000=736)により、「736」とい
う数字が表れる。したがって、見積りを作成する者は、
この諸雑費参考欄31を見ながら自己の諸雑費項目26
bをサービスするか否か、どのくらいの額にするかを検
討することができる。
That is, as shown in FIG. 3, since the standard miscellaneous expenses are "2,736", the fourth calculation means (2,2)
736−2,000 = 736), the number “736” appears. Therefore, the person making the quote is
Looking at this miscellaneous expenses reference column 31, own miscellaneous expenses item 26
It is possible to consider whether or not to service b, and how much it should be.

【0033】工事Gでは標準の諸雑費額が「2,73
6」であるから、今仮に、工事Gの諸雑費額の合計が
「2,736」になると、標準2,736−自己の諸雑
費額2,736=0となるから、自己の諸雑費額は標準
の諸雑費額と同額であるということになる反面、諸雑費
参考欄31がマイナスであれば、自己の諸雑費額は標準
よりも食み出ていることになる。
In construction G, the standard miscellaneous expenses are "2,73".
Therefore, if the total of the miscellaneous expenses of construction G becomes "2,736", the standard 2,736-the miscellaneous expenses of the self becomes 2,736 = 0. Therefore, the miscellaneous expenses of the self. Is the same as the standard miscellaneous expense amount, but if the miscellaneous expense reference column 31 is negative, it means that the miscellaneous expense amount of the user is more than the standard amount.

【0034】また本実施例では工事の自社歩掛りの精度
を高めるために、工事Gの本件諸雑費の「2,000
円」が合計金額に加算されると共にも実施(日当り施工
量)の単価も変わる。すなわち、工事Gに関して基礎原
価項目26aだけの合計金額は「299,190」であ
ったが、本件諸雑費の「2,000円」が基礎原価項目
26aの合計金額「299,190」に加算されると
(299,190+2,000=301,190)と、
その合計金額301,190円が合計金額表示欄31に
表示される(第5の算出手段)と共に、その単価も30
1,190(合計)÷20(数量)=15,059とな
る。このように本実施例では図3と図6の単価表示ボッ
クスを比較すると明らかなように、単価も本件諸雑費な
いし合計金額に連動して変動する。
Further, in this embodiment, in order to improve the accuracy of the company's own work rate of the construction, the miscellaneous expenses of the construction G of "2,000" are added.
While the "yen" is added to the total amount, the unit price of implementation (daily construction amount) also changes. That is, the total amount of only the basic cost item 26a for the construction G was "299,190", but the miscellaneous expenses of "2,000 yen" were added to the total amount "299,190" of the basic cost item 26a. Then (299,190 + 2,000 = 301,190),
The total amount of money of 301,190 yen is displayed in the total amount of money display field 31 (fifth calculation means), and the unit price is also 30.
1,190 (total) / 20 (quantity) = 15,059. As described above, in the present embodiment, as is clear by comparing the unit price display boxes of FIG. 3 and FIG. 6, the unit price also changes in association with the miscellaneous expenses or the total amount of the case.

【0035】さらに、本実施例では本工事の利益率が一
目瞭然となるように内訳書11の諸雑費参考表示欄31
に下方に利益率表示欄21が設けられている。この利益
率表示欄32の数字も工事Gの本件諸雑費の「2,00
0円」が合計金額に加算されることにより変更表示され
る。本実施例では「16.06%→15.85%」とな
っている。
Further, in the present embodiment, the miscellaneous expense reference display field 31 of the detailed statement 11 is provided so that the profit rate of this construction can be seen at a glance.
A profit margin display field 21 is provided below. The numbers in the profit margin display column 32 are also “2,000
It is changed and displayed by adding "0 yen" to the total amount. In this embodiment, “16.06% → 15.85%”.

【0036】このように、本実施例では基礎原価のみな
らず、当該土木工事に付随する諸雑費に関して自社の数
量や単価データを入力すると、当該工事Gの右下欄に表
れる合計金額が変わると共に、これに連動して本工事マ
スタのトータル金額(実行予算額)も変わり、その結
果、本工事を実施した場合の利益率も変動する。図7は
特定の工事の諸雑費が変更することにより、全体の本工
事の利益率が変更した場合の一例を示す。図7に於い
て、35は本工事の請負金額を示す請負金額表示欄、3
6は諸雑費を含む自己の実行予算額を示す実行予算額表
示欄、37は自己の予算利益額を示す予算利益額表示欄
である。これらの各欄35,36,37に対応して右側
には参考までに標準の各欄35a,36a,37aが設
けられている。
As described above, in the present embodiment, when not only the basic cost but also the miscellaneous expenses associated with the civil engineering work are input by the company's quantity and unit price data, the total amount shown in the lower right column of the relevant work G changes. In conjunction with this, the total amount of the construction master (execution budget) also changes, and as a result, the profit rate when the construction is carried out also fluctuates. FIG. 7 shows an example in which the profit rate of the entire main work is changed by changing the miscellaneous expenses of the specific work. In FIG. 7, 35 is a contract amount display column showing the contract amount of this construction, 3
Reference numeral 6 is an execution budget amount display column showing the self execution budget amount including miscellaneous expenses, and 37 is a budget profit amount display column showing the self budget profit amount. Corresponding to these columns 35, 36, 37, standard columns 35a, 36a, 37a are provided on the right side for reference.

【0037】したがって、見積りを作成する者は、標準
の各欄35a,36a,37aと比較して、自己の実行
予算額や予算利益額が標準よりも多いか少ないかを比較
することができる。
Therefore, the person who prepares the estimate can compare whether or not his / her own execution budget amount or budget profit amount is larger or smaller than the standard by comparing with the standard columns 35a, 36a, 37a.

【0038】しかして、本実施例では工事Gの本件諸雑
費の「2,000円」が当該工事Gの合計金額に加わる
ことにより、利益率が「16.06%→15.85%」
に変更した。前述したように本件諸雑費の2,000円
は、一日20m3当りの額である。施工量は、50m3
で2.5に相当するので、2,000円×50/20=
5,000円となる。この5,000円が実行予算額に
加わることにより、図8の実行予算額表示欄の数字が
「2,014,497」から「2,019,497」に
変わる。つまり、5,000円が原価に加算されると共
に、利益が5,000円減った。この時利益率は、第5
の算出手段により、予算利益380,503÷請負金額
2,400,000×100=15.85%となる。な
お、諸雑費も含む本工事の利益率は、利益率表示欄32
Aに表示される。
In the present embodiment, however, the profit rate of "16.06% → 15.85%" is obtained by adding "2,000 yen" of the miscellaneous expenses of the construction G to the total amount of the construction G.
Changed to. As described above, the miscellaneous expenses of 2,000 yen are per 20 m3 per day. Construction volume is 50m3
Is equivalent to 2.5, so 2,000 yen x 50/20 =
It will be 5,000 yen. By adding this 5,000 yen to the execution budget amount, the number in the execution budget amount display column of FIG. 8 changes from “2,014,497” to “2,019,497”. In other words, 5,000 yen was added to the cost and profit decreased by 5,000 yen. The profit rate at this time is 5th
By the calculation means, the budget profit 380,503 / contract amount 2,400,000 × 100 = 15.85%. The profit margin of this construction including miscellaneous expenses is shown in the profit margin display column 32.
Displayed in A.

【0039】[0039]

【実施例】本工事の工事名称を検索する第1段階に於い
て、例えばC0010のフォルダをクリックすると、工
事テーブル14により「工事G」の名称が工事名称表示
ボックス15に表れる。この場合工事Gの名称を工事名
称表示ボックス15に入力しても「工事G」の内訳書が
表れるように構成してもよい。
[Example] In the first stage of searching for the construction name of this construction, when the folder C0010 is clicked, the construction table 14 displays the name "Construction G" in the construction name display box 15. In this case, the construction G may be input in the construction name display box 15 or the breakdown of "construction G" may be displayed.

【0040】[0040]

【発明の効果】以上の説明から明らかなように、本発明
にあっては、次に列挙するような効果がある。 (1)本発明では、基礎原価のみならず、当該土木工事
に付随する諸雑費に関して自社の数量や単価データを入
力すると、当該工事Gの合計金額が変わると共に、これ
に連動して本工事マスタのトータル金額(実行予算額)
も変わり、その結果、本工事を実施した場合の利益率も
自動的に変動する。したがって、素人でも容易に見積書
を作成することができる。 (2)また本発明は、図5で示すように資源ファイルの
中に、諸雑費項目についてのデータも含まれているか
ら、精度の高い見積書を作成することができる。 (3)さらに、本発明は、標準の単価ないし歩掛りデー
タと比較対照しながら、見積り依頼を受けた本工事に関
連する工事の見積りを作成することができるので、赤字
の予算かどうか直に判る。 (4)特に諸雑費が標準よりも多いものか、それともす
くないものか一目で知ることができる。
As is clear from the above description, the present invention has the following effects. (1) In the present invention, when not only the basic cost but also the miscellaneous expenses associated with the civil engineering work are input by the company's quantity and unit price data, the total amount of the relevant work G changes, and in conjunction with this, the main work master Total amount (execution budget amount)
As a result, the profit rate when this work is carried out also fluctuates automatically. Therefore, even an amateur can easily create an estimate. (2) Further, according to the present invention, as shown in FIG. 5, since the resource file also includes data on miscellaneous expenses items, it is possible to create a highly accurate estimate. (3) Further, according to the present invention, since it is possible to create an estimate of the construction related to the construction for which the estimation request has been made while comparing and comparing with the standard unit price or accrual data, it is possible to directly determine whether the budget is in the red. . (4) In particular, you can see at a glance whether miscellaneous expenses are higher than standard or low.

【図面の簡単な説明】[Brief description of drawings]

図1乃至図7は本発明の一実施例を示す各概略説明図。 1 to 7 are schematic explanatory views showing an embodiment of the present invention.

【図1】工事見積り書作成装置の構成例を示すブロツク
図。
FIG. 1 is a block diagram showing a configuration example of a construction quotation preparation device.

【図2】工事見積り書作成装置により実行される処理フ
ローチャート。
FIG. 2 is a processing flowchart executed by a construction quotation preparation device.

【図3】選択した工事の内訳書に諸雑費の単価データが
入力されていない場合の説明図。
FIG. 3 is an explanatory view when the unit price data of miscellaneous expenses is not entered in the breakdown of the selected construction.

【図4】工事テーブルの内容説明図。FIG. 4 is an explanatory diagram of the contents of a construction table.

【図5】資源ファイルの内容説明図。FIG. 5 is an explanatory diagram of the contents of a resource file.

【図6】選択した工事の内訳書に諸雑費に関する数量や
単価データを入力した場合の説明図。
FIG. 6 is an explanatory diagram in the case where the quantity and unit price data regarding miscellaneous expenses are input in the breakdown of the selected construction work.

【図7】利益率が変動した一例を示す説明図。FIG. 7 is an explanatory diagram showing an example in which the profit rate has changed.

【符号の説明】[Explanation of symbols]

1…中央演算処理装置、2…制御プログラム、3…メイ
ンメモリ、4…ドライブ、5…ファィル装置(記憶手
段)、6…入力装置、7…出力装置、10…内訳書デー
タファィル、11…内訳書、12…表示画面、13…コ
ード表示ボックス、14…工事テーブル、15…工事名
称表示ボックス、16…規格表示欄、17…自社用実施
欄、18…標準用実施欄、19…全数量表示欄、20…
施工日数表示欄、21…合計金額表示欄、23…資源表
示欄、24…資源ファイル、25…資源項目コードエリ
ア、26…資源項目エリア、26a…基礎原価項目、2
6b…諸雑費項目、27…数量エリア、28…単位エリ
ア、29…単価エリア、30…金額エリア、31…諸雑
費参考欄、32,32A…利益率表示欄、33…、34
…、35…請負金額表示欄、36…実行予算額表示欄、
37…予算利益額表示欄。
1 ... Central processing unit, 2 ... Control program, 3 ... Main memory, 4 ... Drive, 5 ... File device (storage means), 6 ... Input device, 7 ... Output device, 10 ... Breakdown data file, 11 ... Breakdown Document, 12 ... Display screen, 13 ... Code display box, 14 ... Construction table, 15 ... Construction name display box, 16 ... Standard display column, 17 ... Company implementation column, 18 ... Standard implementation column, 19 ... Total quantity display Column, 20 ...
Construction day display column, 21 ... total amount display column, 23 ... resource display column, 24 ... resource file, 25 ... resource item code area, 26 ... resource item area, 26a ... basic cost item, 2
6b ... Miscellaneous expense items, 27 ... Quantity area, 28 ... Unit area, 29 ... Unit price area, 30 ... Price area, 31 ... Miscellaneous expense reference column, 32, 32A ... Profit margin display column, 33 ..., 34
..., 35 ... Contract amount display column, 36 ... Execution budget amount display column,
37 ... Budget profit amount display column.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 本工事の実行予算を作成するために、本
工事を構成する各工事名称を検索する第1段階と、この
第1段階により選択され、かつ、表示画面に表示された
見積り対象工事の内訳書の項目欄に、当該工事の資源に
関する基礎原価項目及び当該工事に付随する諸雑費項目
について数量や単価データを入力する第2段階と、この
第2段階で入力された少なくとも諸雑費に関するデータ
に基づき、当該諸雑費の合計額を含む当該工事の合計金
額の変動に伴い、本工事の実行予算額並びに予算利益が
変動し、この予算利益で当該本工事の請負金額を割る算
出手段により、内訳書の利益率表示欄に当該本工事の利
益率が自動的に表示される第3段階とを備える工事見積
り書作成装置。
1. A first step of searching for each construction name that constitutes this construction in order to create an execution budget for this construction, and an estimation target selected in this first step and displayed on the display screen. In the item column of the construction breakdown, the second stage of inputting the quantity and unit price data of the basic cost items related to the resources of the construction and miscellaneous expenses items associated with the construction, and at least the miscellaneous expenses input in this second stage. Based on the data on the above, the execution budget amount and budget profit of this work will change with the change of the total amount of the work including the total amount of the miscellaneous expenses, and the calculation amount to divide the contracted amount of the work by this budget profit According to the third stage, the profit rate of the main work is automatically displayed in the profit rate display column of the breakdown statement.
【請求項2】 請求項1に於いて、当該工事の内訳書に
は諸雑費参考欄31が設けられ、該諸雑費参考欄31に
は、標準の諸雑費額から入力した諸雑費の合計額を差し
引いた額が表示されることを特徴とする工事見積り書作
成装置。
2. In claim 1, a miscellaneous expense reference column 31 is provided in the breakdown of the construction work, and the miscellaneous expense reference column 31 is the total amount of miscellaneous expenses entered from the standard miscellaneous expense amount. A construction quotation preparation device, characterized in that the amount obtained by subtracting is displayed.
【請求項3】 請求項1に於いて、諸雑費に関するデー
タの変動に関連して当該工事の施工量の数量を求める算
出手段及び当該工事の施工量の単価を求める算出手段を
備え、これらの算出手段によって算出された数値は、内
訳書に設けた自社用の実施欄17に表示されることを特
徴とする工事見積り書作成装置。
3. The method according to claim 1, further comprising a calculating means for obtaining the quantity of the construction amount of the relevant construction and a calculating means for obtaining a unit price of the construction amount of the construction in association with the fluctuation of the data regarding miscellaneous expenses. The construction quotation preparation device, wherein the numerical value calculated by the calculation means is displayed in the in-house implementation column 17 provided in the detailed statement.
【請求項4】 請求項1に於いて、内訳書には、自社用
実施欄と対比することができるように標準用実施欄が設
けられていることを特徴とする工事見積り書作成装置。
4. The construction quotation preparation device according to claim 1, wherein the breakdown statement is provided with a standard implementation field so that it can be compared with the in-house implementation field.
【請求項5】 工事見積り書作成装置がドライブを介し
てそのファイル装置に読み取り可能なプログラムが記録
されている記憶媒体であって、該記憶媒体からインスト
ールされたプログラムは、本工事の実行予算を作成する
ために、本工事を構成する各工事名称を検索する第1段
階と、この第1段階により選択され、かつ、表示画面に
表示された見積り対象工事の内訳書の項目欄に、当該工
事の資源に関する基礎原価項目及び当該工事に付随する
諸雑費項目について数量や単価データを入力する第2段
階と、この第2段階で入力された少なくとも諸雑費に関
するデータに基づき、当該諸雑費の合計額を含む当該工
事の合計金額の変動に伴い、本工事の実行予算額並びに
予算利益が変動し、この予算利益で当該本工事の請負金
額を割る算出手段により、内訳書の利益率表示欄に当該
本工事の利益率が自動的に表示される第3段階とを備え
る工事見積り書作成装置用の記憶媒体。
5. A construction medium in which a construction quotation preparation device stores a readable program in its file device via a drive, and a program installed from the storage medium is a storage medium for executing an execution budget for this construction. In order to create, the first stage of searching for each construction name that constitutes this work, and the item column of the detailed statement of the construction work to be estimated that was selected in this first stage and displayed on the display screen, The total amount of miscellaneous expenses based on the second stage of inputting the quantity and unit price data for the basic cost items related to the resources and miscellaneous expense items associated with the construction work, and at least the miscellaneous expense data entered in this second stage In addition to the change in the total amount of the construction work including, the execution budget amount and the budget profit of the construction work fluctuate, and this budget profit is used as a calculation method to divide the contracted amount of the construction work. And a third stage in which the profit margin of the main work is automatically displayed in the profit margin display section of the breakdown statement.
JP2002112025A 2002-04-15 2002-04-15 Construction estimate making device and storage medium used for the device Expired - Fee Related JP4104367B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002112025A JP4104367B2 (en) 2002-04-15 2002-04-15 Construction estimate making device and storage medium used for the device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002112025A JP4104367B2 (en) 2002-04-15 2002-04-15 Construction estimate making device and storage medium used for the device

Publications (2)

Publication Number Publication Date
JP2003308450A true JP2003308450A (en) 2003-10-31
JP4104367B2 JP4104367B2 (en) 2008-06-18

Family

ID=29394648

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002112025A Expired - Fee Related JP4104367B2 (en) 2002-04-15 2002-04-15 Construction estimate making device and storage medium used for the device

Country Status (1)

Country Link
JP (1) JP4104367B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016106514A (en) * 2016-02-15 2016-06-16 パナソニックIpマネジメント株式会社 Energy management device, and program
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016106514A (en) * 2016-02-15 2016-06-16 パナソニックIpマネジメント株式会社 Energy management device, and program
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111428965B (en) * 2020-02-27 2023-11-03 中铁城建集团有限公司 Method for rapidly analyzing project cost

Also Published As

Publication number Publication date
JP4104367B2 (en) 2008-06-18

Similar Documents

Publication Publication Date Title
US6360188B1 (en) Time-based modeling
US7302444B1 (en) System for designating grid-based database reports
CN110532534A (en) The method and apparatus for generating engineering value document
US20030171970A1 (en) Project scheduler interface
CN109637592A (en) The calculating task management and analysis and its operation method that molecular force field parameter generates
US20120192053A1 (en) Method, Software and Computer System for Manipulating Aggregated Data
US20130013474A1 (en) System and method for modifying an index-based hierarchal cost model of a complex system
JP2019175032A (en) Production planning device, production planning system, production planning method, and program
JP2006268717A (en) Civil engineering cost integration system
Ioannidou et al. Where does the money go? Economic flow analysis of construction projects
US20110060626A1 (en) Storm water pollution prevention system and method
JP2009276904A (en) Project management device, project management method, project management program and recording medium
JP4104367B2 (en) Construction estimate making device and storage medium used for the device
JP2007102376A (en) Integration device
JP4351230B2 (en) Design document data generation system and design document data generation method
JP2002123572A (en) Device and system for construction cost management
CN114037304A (en) Data collection method, equipment and medium for cost data
Kim et al. Cost information model for managing multiple projects
JP7462500B2 (en) Project management device, project management method, and project management program
KR101396548B1 (en) The estimation device and method for generation of construction waste during construction and demolition phase
JP2001188873A (en) Financial accounting management system including cash flow management and computer program recording medium for financial accounting management
JP3927106B2 (en) Integration processing system, integration processing device, and program
JP2000285162A (en) Budget management system and recording medium
JP2024090878A (en) Accounting processing device, accounting processing method, and accounting processing program
JP2005235164A (en) Institution evaluation data processor, institution evaluation data processing method and computer readable program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050404

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071023

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071210

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080311

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080325

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees