JP2003288497A - Schedule operation method - Google Patents

Schedule operation method

Info

Publication number
JP2003288497A
JP2003288497A JP2002090085A JP2002090085A JP2003288497A JP 2003288497 A JP2003288497 A JP 2003288497A JP 2002090085 A JP2002090085 A JP 2002090085A JP 2002090085 A JP2002090085 A JP 2002090085A JP 2003288497 A JP2003288497 A JP 2003288497A
Authority
JP
Japan
Prior art keywords
company
schedule
user
provider
heavy equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002090085A
Other languages
Japanese (ja)
Inventor
Tomohisa Mekata
智久 目堅
Naoki Kawanishi
直規 川西
Yasuo Ogawa
安雄 小川
Yusuke Fujita
裕介 藤田
Ichiro Muranaka
一郎 村中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2002090085A priority Critical patent/JP2003288497A/en
Publication of JP2003288497A publication Critical patent/JP2003288497A/en
Pending legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide a schedule operation method enabling an owner and a user by rental to efficiently utilize object resources. <P>SOLUTION: The keeping places of a B company 3, a C company 4, and a D company 5 capable of providing heavy construction machines and the using places of an A company 2, an E company 6, and an F company 7 desiring the use of the heavy construction machine are dropped on a map. Heavy construction machine using time is inputted and moving time is calculated corresponding to a distance from a provider to a user. The using time, the moving time, and a price are taken into consideration and an optimum heavy construction machine using schedule is set. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、土木工事用の重機
などの資源を対象として、効率的に運用するためのスケ
ジュール運用方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a schedule operation method for efficiently operating resources such as heavy equipment for civil engineering work.

【0002】[0002]

【従来の技術】従来から、土木や建築工事などは、各種
重機を使用して行われている。たとえば都市ガスの導管
を敷設するための土木工事では、開削工法や非開削工法
などにそれぞれ複数種類の工法が選択可能であり、各工
法毎に複数種類の重機を使用する。複数種類の重機は、
一般に工期の異なる段階で必要となる。
2. Description of the Related Art Conventionally, various heavy machinery is used for civil engineering and construction work. For example, in civil engineering work for laying city gas conduits, a plurality of types of construction methods can be selected for each of the open-cutting method and the non-open-cutting method, and multiple types of heavy equipment are used for each construction method. Multiple types of heavy equipment,
Generally required at different stages of construction.

【0003】他の土木工事や建築工事でも、工法や工期
に応じて複数種類の重機を使用する。したがって、工事
を受け持つ事業者は、使用可能性がある複数の重機を用
意しなければならない。そのような重機は、自社で所有
するか、レンタル業者から借り入れる。自社で所有する
場合は、重機を使用しない日には倉庫などに置いたまま
にしている。レンタル業者から借り入れる場合は、日を
単位として借り入れる必要がある。
In other civil works and construction works, a plurality of types of heavy equipment are used according to the construction method and the construction period. Therefore, the business operator responsible for the construction must prepare a plurality of heavy equipment that may be used. Own such heavy equipment or rent it from a rental agency. If you own it, you leave it in a warehouse when you don't use heavy equipment. When borrowing from a rental company, it is necessary to borrow on a daily basis.

【0004】[0004]

【発明が解決しようとする課題】前述のように、工事な
どに必要となる重機は、必ずしも常時使用することはな
く、高額で購入しても、使用しない日が生じる。また、
レンタルを利用する場合は、数時間しか使用しないの
に、1日分のレンタル料金を支払う必要がある。このよ
うな問題は、重機に限らず、多くの対象資源で共通に生
じている。
As described above, the heavy equipment necessary for construction work is not always used at all times, and even if it is purchased at a high price, there are days when it is not used. Also,
When using a rental, it is necessary to pay a rental fee for one day even though the rental is used for only a few hours. Such problems occur not only in heavy machinery but also in many target resources.

【0005】本発明の目的は、対象資源を、所有者とレ
ンタルによる利用者とが効率的に利用することができる
スケジュール運用方法を提供することである。
An object of the present invention is to provide a schedule operation method which allows an owner and a user who rents the target resource to use it efficiently.

【0006】[0006]

【課題を解決するための手段】本発明は、利用可能な対
象資源を、提供者と利用者との間を仲介する仲介者が設
定するスケジュールに従って効率的に運用するためのス
ケジュール方法であって、仲介者は、情報通信ネットワ
ークを介して、提供者からは、提供可能な対象資源につ
いて、提供可能な時間と場所と希望対価とを含む情報を
収集し、利用者からは、使用を希望する対象資源につい
て、使用希望の時間と場所とを含む情報を収集し、仲介
者は、提供者と利用者との間の移動時間と、利用者を複
数にする場合の利用者間の移動時間とを考慮して、対象
資源の利用について効率的なスケジュールを作成し、該
スケジュールに従う場合に提供者に希望対価を支払うた
めに必要な費用に基づいて設定する価格を利用者に通知
し、利用者が承諾すれば、契約を締結し、該スケジュー
ルに従って対象資源を移動して利用者が使用することを
特徴とするスケジュール運用方法である。
The present invention provides a schedule method for efficiently operating available target resources according to a schedule set by an intermediary who mediates between a provider and a user. , The intermediary collects the information about the target resources that can be provided, including the available time, place, and the desired price from the provider through the information communication network, and the user wants to use the resource. For the target resource, the information including the desired time and place of use is collected, and the intermediary determines the travel time between the provider and the user and the travel time between the users when there are multiple users. In consideration of the above, create an efficient schedule for using the target resource, notify the user of the price to be set based on the cost necessary to pay the desired consideration to the provider when following the schedule, and Consent Lever, entered into an agreement, a schedule operation method which is characterized in that the user moves the target resources in accordance with the schedule to be used.

【0007】本発明に従えば、利用可能な対象資源の所
有者などの提供者は、提供可能な時間と場所と希望対価
とを含む情報を、仲介者からの情報通信ネットワークを
介する収集に応じて提供する。仲介者は、情報通信ネッ
トワークを介して、利用者から使用を希望する対象資源
について、使用希望の時間と場所とを含む情報を収集す
る。仲介者は、提供者と利用者との間や、複数の利用者
の間の移動時間を考慮して、対象資源の利用について効
率的なスケジュールを作成するので、対象資源の利用に
ついて、可能な場合は複数の利用者が有効に利用するよ
うなスケジュールを作成することができる。仲介者は、
スケジュールを作成すると、スケジュールに従う場合に
提供者に希望対価を支払うために必要な費用に基づいて
設定する価格を利用者に通知する。この価格には、仲介
者の利益を含めることができる。利用者が承諾すれば、
契約を締結し、そのスケジュールに従って対象資源を移
動して利用者が使用するので、1日に数時間しか利用し
ないような対象資源を1日単位で借りる必要はなく、複
数の利用者で利用することができる。提供者も、使用し
ない対象資源を有効に活用して、対価を得ることができ
る。
According to the present invention, the provider such as the owner of the available target resource responds to the collection of the information including the available time, place, and desired price from the intermediary through the information communication network. To provide. The intermediary collects, from the user via the information communication network, information about the target resource that the user desires to use, including the time and place of the desired use. Since the intermediary creates an efficient schedule for the use of the target resource in consideration of the travel time between the provider and the user and between the plurality of users, the use of the target resource is possible. In this case, it is possible to create a schedule that can be effectively used by multiple users. The intermediary is
When the schedule is created, the user is notified of the price to be set based on the cost required to pay the desired consideration to the provider when the schedule is followed. This price may include the interests of intermediaries. If the user consents,
Since the user concludes a contract and moves the target resource according to the schedule to use it, it is not necessary to rent the target resource which is used only for several hours a day on a daily basis, and it is used by multiple users. be able to. Providers can also make effective use of unused target resources to obtain compensation.

【0008】また本発明で、前記利用者は、前記仲介者
から通知される価格について、情報通信ネットワークを
介して交渉を行い、仲介者は、交渉の途中で前記提供者
に対し、前記希望対価についての交渉を情報通信ネット
ワークを介して行うことを特徴とする。
Further, in the present invention, the user negotiates a price notified from the intermediary via an information communication network, and the intermediary mediates the desired price to the provider in the middle of the negotiation. Is carried out via an information communication network.

【0009】本発明に従えば、仲介者は、利用者と提供
者とに対して、価格についての交渉を情報通信ネットワ
ークを介して行うので、迅速に交渉をまとめて、対象資
源を有効に利用する契約をまとめることができる。
According to the present invention, the intermediary negotiates the price with the user and the provider via the information communication network, so that the negotiation can be put together quickly and the target resource can be effectively used. You can put together a contract to do.

【0010】また本発明で、前記対象資源は、主として
土木工事用の重機であることを特徴とする。
Further, in the present invention, the target resource is a heavy machine mainly for civil engineering work.

【0011】本発明に従えば、工事計画に従って計画的
な使用が可能な土木工事用の重機を、提供者と利用者と
の間で効率的に利用するように運用することができる。
According to the present invention, it is possible to operate the heavy equipment for civil engineering work that can be systematically used according to the construction plan so as to be efficiently used between the provider and the user.

【0012】[0012]

【発明の実施の形態】図1は、本発明の実施の一形態で
あるスケジュール運用方法を利用する重機レンタルシス
テムの概略的な構成を示す。レンタル事業を行うX業者
1は、顧客となる複数の会社など、たとえばA会社2、
B会社3、C会社4、D会社5、E会社6、F会社7な
どの情報端末と、インターネット10のような情報通信
ネットワークを介して接続されるサーバによって、重機
11のレンタルを仲介するサイトを開設する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows a schematic configuration of a heavy equipment rental system using a schedule operating method according to an embodiment of the present invention. An X agent 1 who conducts a rental business is a plurality of customers, such as company A 2,
A site that mediates rental of heavy equipment 11 by a server connected to an information terminal such as B company 3, C company 4, D company 5, E company 6, F company 7, etc. via an information communication network such as the Internet 10. To open.

【0013】図2は、図1のX業者1が重機のレンタル
について顧客間の仲介を行う形態の例を示す。X業者1
は、特定の日、たとえば○月△日について、重機を所有
しているA会社2、B会社3、C会社4、およびD会社
5から、各社が所有している重機で、その日には使用し
ないものもしくは使用していても終日は使用していない
ものについての情報を収集する。図2では、X業者1に
対して、各社が使用日時・場所等を含む重機使用計画に
従って、不使用となっている重機を希望対価○○円で貸
すという入札を行っているけれども、X業者1からのメ
ールなどによる問い合わせに回答するような形式で情報
を収集することもできる。
FIG. 2 shows an example of a mode in which the X trader 1 in FIG. 1 acts as an intermediary between customers for rental of heavy equipment. X supplier 1
Is a heavy machine owned by each company from a company A 2, a company B 3, a company C 4, and a company D 5, which owns the heavy equipment, on a specific day, for example, ◯ △ day, and is used on that day. Gather information about what you don't or that you use but don't use throughout the day. In FIG. 2, although each company is bidding to X trader 1 according to the heavy equipment usage plan including the date and time of use and location, etc., the unused heavy equipment is lent for a desired consideration of XX yen. It is also possible to collect information in the format of answering an inquiry by e-mail from 1.

【0014】重機の利用希望者も、E会社6やF会社7
のように入札を行う。また、重機を所有しているA会社
2やD会社5も、さらに重機を借りるように入札するこ
とができる。X業者1は、入札によって重機の利用希望
についての情報を収集するばかりではなく、メールなど
による問い合わせで情報を収集することもできる。
Those who wish to use heavy equipment can also use E company 6 and F company 7.
Bid as in. In addition, Company A 2 and Company D 5 who own the heavy equipment can also bid to rent the heavy equipment. The X trader 1 can collect not only the information about the desire to use the heavy equipment by bidding, but also the information by inquiry by e-mail or the like.

【0015】X業者1は、収集した情報に基づいてい
て、各重機、たとえばア重機、イ重機、ウ重機などのス
ケジュールを設定して運用のシミュレーションを行い、
最適運用結果に基づく入札結果を各顧客に回答する。す
なわち、本実施形態のイメージは、X業者1が重機を調
達し、他の会社にレンタルする形になる。A会社2は、
不使用のイ重機を貸し出し、D会社5は、不使用のア重
機およびイ重機を貸し出すことができる。
Based on the collected information, the X trader 1 sets a schedule for each heavy machine, for example, A heavy machine, A heavy machine, C heavy machine, etc., and performs an operation simulation,
Answer the bid result based on the optimal operation result to each customer. That is, the image of this embodiment is such that the X trader 1 procures heavy equipment and rents it to another company. Company A 2
The unused A heavy equipment can be lent out, and the company D 5 can rent out unused A heavy equipment and A heavy equipment.

【0016】図3は、図1の重機レンタルシステムをX
業者1が運用する概略的な手順を示す。ステップs0で
インターネット10上に重機レンタルシステムのサイト
を開設して運用を開始し、ステップs1では、各社所有
の重機11で使用していないものの情報をインターネッ
ト10を通じて収集する。情報の収集は、前述のよう
に、入札やメールで行うことができる。収集する情報
は、次のようなものを含める。 重機の機種 不使用の日時、または使用する日時・場所 保管場所 希望価格
FIG. 3 shows the heavy equipment rental system of FIG.
A schematic procedure used by the trader 1 is shown. In step s0, a site for a heavy equipment rental system is opened on the Internet 10 to start operation, and in step s1, information of the heavy equipment 11 owned by each company that is not used is collected through the internet 10. Information can be collected by bidding or e-mail as described above. The information collected will include the following: Date and time when heavy equipment model is not used, or date and time and location where it is used

【0017】ステップs2では、各社で使用したい重機
11についての情報をインターネット10を通じて収集
する。収集する情報は、次のようなものを含める。 重機の機種 使用する日時 使用場所
In step s2, information about the heavy equipment 11 that each company wants to use is collected through the Internet 10. The information collected will include the following: Type of heavy equipment Date and time of use Place of use

【0018】ステップs3では、収集した情報を、情報
処理端末装置で表示する地図上に落とし込み、シミュレ
ーションによって最適な運用スケジュールを自動的に設
定する。設定方法としては、以下に示すように行われ
る。 ステップs4で、場所情報から移動時間を算出する。 ステップs5で、移動時間と希望価格とから、何処の
会社から重機を借り、何処の会社へレンタルすれば効率
的かを考慮して、スケジュールを設定する。一般に、な
るべく少ない会社(低価格)から重機を借り、なるべく
多くの会社へレンタルするように設定すると、有効な結
果が得られやすい。
In step s3, the collected information is dropped on a map displayed on the information processing terminal device, and an optimal operation schedule is automatically set by simulation. The setting method is as follows. In step s4, the travel time is calculated from the location information. In step s5, a schedule is set based on the travel time and the desired price, in consideration of which company should rent the heavy equipment and to which company it should be rented. Generally, it is easy to obtain an effective result by renting heavy equipment from as few companies as possible (low price) and renting it to as many companies as possible.

【0019】次に、次のような手順で、価格設定につい
ての交渉をインターネット10を介して行う。 ステップs6で、重機を借りる価格、貸す価格を各社
に返信して通知する。 ステップs7で、各社が同意して契約するか否かを判
断する。契約が成立しないときは、契約に同意していな
い会社を除いて、ステップs4からの手順を繰り返す。
価格などの条件が一致しないときは、交渉して、一致す
る条件でのシミュレーションをやり直す。ステップs7
で契約が成立すれば、ステップs8で契約を締結し、契
約内容に沿って重機のレンタル利用を実行する。
Next, the price setting is negotiated via the Internet 10 in the following procedure. In step s6, the price for renting the heavy equipment and the price for renting the heavy equipment are returned to each company and notified. In step s7, it is determined whether each company agrees and contracts. When the contract is not established, the procedure from step s4 is repeated except for the companies that do not agree with the contract.
If the price and other conditions do not match, negotiate and try the simulation again under the matching conditions. Step s7
If the contract is established in step S8, the contract is signed in step s8, and rental of heavy equipment is executed according to the contents of the contract.

【0020】また重機を借りる側は、希望レンタル価格
を提示しておき、その条件にある最適な運用スケジュー
ルを設定することもできる。
The renter of heavy equipment can also present a desired rental price and set an optimal operation schedule under the conditions.

【0021】ステップs9では、重機利用の当日に、予
定と異なる事情が発生しているか否かを判断する。当日
事情が発生しなければ、ステップs1に戻る。当日事情
としては、たとえば当日の事故等によるキャンセルの可
能性がある。X業者1は、リアルタイムで重機位置を把
握し、指示を出すことができるシステムを構築し、キャ
ンセルがあった場合は、即座に連絡する。
In step s9, it is determined whether or not a situation different from the schedule has occurred on the day of using the heavy equipment. If the situation does not occur on the day, the process returns to step s1. The situation on the day may be cancellation due to an accident or the like on the day. The X trader 1 builds a system capable of grasping the position of the heavy equipment and giving an instruction in real time, and immediately informs the operator if there is a cancellation.

【0022】また、当日になって、急に重機が必要とな
る場合もある。ステップs10で、X業者1は、リアル
タイムで重機位置を把握し、現状で借りている重機で対
応可能か否かを判断する。対応可能と判断するときに
は、ステップs11で指示を出し、重機に、新規に発生
した現場に向かわせる。現状で借りている重機として
は、キャンセルの対象となった重機も含めることができ
る。ステップs11で対応策を実行した後は、ステップ
s1に戻る。ステップs10で、現状で借りている重機
では対応可能でないと判断するときは、ステップs4以
下の手順を繰り返し、可能なら新たな契約を結ぶ。
In some cases, heavy equipment may be needed suddenly on the day. In step s10, the X trader 1 grasps the position of the heavy equipment in real time, and determines whether or not the heavy equipment currently rented can handle the situation. When it is determined that it is possible to respond, an instruction is issued in step s11 to direct the heavy equipment to the newly generated site. The heavy equipment that is currently rented can include the heavy equipment that has been canceled. After executing the countermeasure in step s11, the process returns to step s1. When it is determined in step s10 that the heavy equipment currently rented cannot be used, the procedure from step s4 is repeated, and if possible, a new contract is signed.

【0023】図4は、図3のステップs3からステップ
s5で、地図上で最適な重機の運用スケジュールを設定
する状態を示す。地図上には、たとえばア重機につい
て、貸す会社であるB会社3、C会社4およびD会社5
の重機保管場所の位置と、借りる会社であるA会社2、
E会社6およびF会社7の重機使用場所の位置とが入力
される。重機使用時間も入力される。距離に基づいて重
機の移動時間が算出される。重機使用時間と価格とを考
慮に入れ、最適な重機使用のスケジュールを自動的に選
択する。この結果、C会社4とD会社5とからア重機を
借り、B会社3からは借りないことが決定される。ま
た、C会社3のア重機を、F会社7とE会社6との順に
貸し出し、D会社5のア重機をA会社2に貸し出すこと
も決定される。A会社2には、B会社3の方が近いけれ
ども価格がD会社5よりも高いからである。
FIG. 4 shows a state in which the optimum operation schedule of heavy equipment is set on the map in steps s3 to s5 of FIG. On the map, for example, for heavy machinery, B company 3, C company 4 and D company 5 that are companies to rent
Location of the heavy equipment storage area of A and company A, which is the company to rent,
The positions of the heavy machinery use locations of the E company 6 and the F company 7 are input. Heavy equipment usage time is also entered. The travel time of the heavy equipment is calculated based on the distance. An optimal schedule for heavy equipment use is automatically selected, taking into consideration heavy equipment usage time and price. As a result, it is determined that the heavy machinery is borrowed from the C company 4 and the D company 5, and not from the B company 3. It is also decided to rent out heavy machinery of C company 3 in order of F company 7 and E company 6, and rent heavy machinery of D company 5 to A company 2. This is because the B company 3 is closer to the A company 2, but the price is higher than the D company 5.

【0024】また、X業者1は、仲介業務のみを行い、
提供者からの重機の機種、使用状況、保管場所、希望価
格等、利用者から重機の機種、使用状況、使用場所等の
情報を集め、最適運用案を両者に提示することもでき
る。
Further, the X trader 1 performs only intermediary work,
It is also possible to collect information such as the type of heavy equipment, usage status, storage location, desired price, etc. from the provider, and the type of heavy equipment, usage status, usage location, etc. from the user, and present the optimal operation plan to both parties.

【0025】またX業者1の重機使用の最適運用計画も
作成できる。すなわち、まず提供者からの重機の機種、
使用状況、保管場所、希望価格等の情報を入手した後、
自社の現場に利用状況を入力し最適運用計画を作成する
ことができる他、自社重機の使用状況等のデータと自社
の現場の利用状況を入力し、最適運用計画を作成するこ
とができる。
Also, an optimum operation plan for heavy machinery of X trader 1 can be created. That is, first, the type of heavy equipment from the provider,
After obtaining information such as usage status, storage location, desired price, etc.,
In addition to being able to enter the usage status at the company's own site and create an optimal operation plan, it is also possible to create an optimal operation plan by entering data such as the usage status of the company's heavy equipment and the usage status at the company's site.

【0026】以上で説明した重機としては、たとえばア
スファルト再生装置が考えられる。アスファルト再生装
置は、道路を掘削する工事に対し、工期の一定の時期に
必要となる。また、土木工事や建築工事用の重機ばかり
ではなく、農業機械、パートタイムの人材派遣などを対
象資源として、本発明を適用することもできる。また、
時間単位ではなく、日を単位とするような場合でも、本
発明を適用すれば、移動に要する日数を考慮して適切な
スケジュールを設定することができる。たとえば、基礎
工事用の重機、プレハブ小屋、イベント施設など、効率
的に使用するスケジュールを設定することができる。
As the heavy equipment explained above, for example, an asphalt regenerating apparatus can be considered. An asphalt reclaiming device is required at certain times of the construction period for road excavation work. Further, the present invention can be applied not only to heavy machinery for civil engineering work and construction work, but also to agricultural machinery, part-time personnel dispatch, and the like. Also,
Even in the case where the unit is days instead of hours, by applying the present invention, it is possible to set an appropriate schedule in consideration of the number of days required for movement. For example, it is possible to set a schedule for efficiently using heavy equipment for foundation work, prefabricated huts, event facilities, and the like.

【0027】[0027]

【発明の効果】以上のように本発明によれば、仲介者
は、提供者と利用者との間や、複数の利用者の間の移動
時間を考慮して、対象資源の利用について効率的なスケ
ジュールを作成するので、可能な場合は複数の利用者が
有効に利用するようなスケジュールを作成することがで
き、そのスケジュールに従って対象資源を移動して利用
者が使用することができる。1日に数時間しか利用しな
いような対象資源を1日単位で借りる必要はなく、複数
の利用者で有効に利用することができる。提供者も、使
用しない対象資源を有効に活用して、対価を得ることが
できる。
As described above, according to the present invention, the intermediary can efficiently use the target resource in consideration of the travel time between the provider and the user or between the plurality of users. Since such a schedule is created, a schedule that can be effectively used by a plurality of users can be created if possible, and the target resource can be moved and used by the user according to the schedule. It is not necessary to rent a target resource that is used for only a few hours a day on a daily basis, and it can be effectively used by a plurality of users. Providers can also make effective use of unused target resources to obtain compensation.

【0028】また本発明によれば、価格についての交渉
を情報通信ネットワークを介して行うので、迅速に交渉
をまとめて、対象資源を有効に利用する契約をまとめる
ことができる。
Further, according to the present invention, since the price negotiation is carried out via the information communication network, the negotiation can be put together quickly and the contract for effectively using the target resource can be put together.

【0029】また本発明によれば、今まで重機は使用し
ない日には倉庫などに置いたままにしておかなければな
らなかった提供者でも、仲介者に情報を提供して、利用
者を捜してもらい、使用していない重機を必要とする利
用者に安価で貸すことができ、貸す側としても、本来な
ら倉庫に置いてあるだけだったのに、貸すことによって
収入を得ることができる。
Further, according to the present invention, even a provider who had to leave a heavy machine in a warehouse or the like on a day when he / she does not use it, provides information to an intermediary to search for the user. It can be rented to users who need heavy equipment that they do not use at a low price, and even the lender, who was originally only in the warehouse, can earn income by lending.

【0030】このように貸す側にも、借りる側にもメリ
ットがあるので、このような形態のレンタルを前提とす
れば、高価な重機でも使用の頻度が高ければ購入してお
いて、空き時間に貸し出すことが多くなると考えられ、
新たに開発された工法に使用する重機なども、購入する
確率が高くなると考えられる。
Since there is an advantage to both the renting side and the renting side in this way, assuming such a form of rental, even if an expensive heavy machine is used frequently, it can be purchased and vacated. It is thought that it will be loaned to
Heavy machinery used for the newly developed construction method is also likely to be purchased.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の一形態であるスケジュール運用
方法を利用する重機レンタルシステムの概略的な構成を
示すブロック図である。
FIG. 1 is a block diagram showing a schematic configuration of a heavy equipment rental system using a schedule operating method according to an embodiment of the present invention.

【図2】頭1の重機レンタルシステムの運用形態の一例
を示すブロック図である。
FIG. 2 is a block diagram showing an example of an operating mode of the heavy equipment rental system of the head 1.

【図3】図1の重機レンタルシステムの概略的な運用手
順を示すフローチャートである。
FIG. 3 is a flowchart showing a schematic operation procedure of the heavy equipment rental system of FIG.

【図4】図3のステップs3からステップs5で、地図
上で最適な重機の運用スケジュールを設定する状態を示
す図である。
FIG. 4 is a diagram showing a state in which an optimal operation schedule of heavy equipment is set on a map in steps s3 to s5 of FIG.

【符号の説明】[Explanation of symbols]

1 X業者 2 A会社 3 B会社 4 C会社 5 D会社 6 E会社 7 F会社 10 インターネット 11 重機 1 X supplier 2 A company 3 B company 4 C company 5D company 6 E company 7 F company 10 Internet 11 heavy machinery

フロントページの続き (72)発明者 小川 安雄 大阪府大阪市中央区平野町四丁目1番2号 大阪瓦斯株式会社内 (72)発明者 藤田 裕介 大阪府大阪市中央区平野町四丁目1番2号 大阪瓦斯株式会社内 (72)発明者 村中 一郎 大阪府大阪市中央区平野町四丁目1番2号 大阪瓦斯株式会社内Continued front page    (72) Inventor Yasuo Ogawa             4-1-2 Hirano-cho, Chuo-ku, Osaka-shi, Osaka Prefecture               Within Osaka Gas Co., Ltd. (72) Inventor Yusuke Fujita             4-1-2 Hirano-cho, Chuo-ku, Osaka-shi, Osaka Prefecture               Within Osaka Gas Co., Ltd. (72) Inventor Ichiro Muranaka             4-1-2 Hirano-cho, Chuo-ku, Osaka-shi, Osaka Prefecture               Within Osaka Gas Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 利用可能な対象資源を、提供者と利用者
との間を仲介する仲介者が設定するスケジュールに従っ
て効率的に運用するためのスケジュール方法であって、 仲介者は、情報通信ネットワークを介して、 提供者からは、提供可能な対象資源について、提供可能
な時間と場所と希望対価とを含む情報を収集し、 利用者からは、使用を希望する対象資源について、使用
希望の時間と場所とを含む情報を収集し、 仲介者は、提供者と利用者との間の移動時間と、利用者
を複数にする場合の利用者間の移動時間とを考慮して、
対象資源の利用について効率的なスケジュールを作成
し、該スケジュールに従う場合に提供者に希望対価を支
払うために必要な費用に基づいて設定する価格を利用者
に通知し、 利用者が承諾すれば、契約を締結し、該スケジュールに
従って対象資源を移動して利用者が使用することを特徴
とするスケジュール運用方法。
1. A scheduling method for efficiently operating available target resources according to a schedule set by an intermediary that mediates between a provider and a user, wherein the intermediary is an information communication network. Through the provider, the information on the target resources that can be provided including the available time and place and the desired price is collected from the provider, and from the user, the desired time for the target resources that the user wants to use is collected. And the information including the location, the intermediary considers the travel time between the provider and the user, and the travel time between the users when there are multiple users,
Create an efficient schedule for the use of the target resource, notify the user of the price to be set based on the cost required to pay the desired consideration to the provider when following the schedule, and if the user consents, A schedule operation method, which is characterized by concluding a contract, moving a target resource according to the schedule, and using it by a user.
【請求項2】 前記利用者は、前記仲介者から通知され
る価格について、情報通信ネットワークを介して交渉を
行い、 仲介者は、交渉の途中で前記提供者に対し、前記希望対
価についての交渉を情報通信ネットワークを介して行う
ことを特徴とするスケジュール運用方法。
2. The user negotiates the price notified by the intermediary via an information communication network, and the intermediary negotiates with the provider about the desired consideration in the middle of the negotiation. A schedule operation method characterized in that the operation is performed via an information communication network.
【請求項3】 前記対象資源は、土木工事用の重機であ
ることを特徴とする請求項1または2記載のスケジュー
ル運用方法。
3. The schedule operating method according to claim 1, wherein the target resource is a heavy machine for civil engineering work.
JP2002090085A 2002-03-28 2002-03-28 Schedule operation method Pending JP2003288497A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002090085A JP2003288497A (en) 2002-03-28 2002-03-28 Schedule operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002090085A JP2003288497A (en) 2002-03-28 2002-03-28 Schedule operation method

Publications (1)

Publication Number Publication Date
JP2003288497A true JP2003288497A (en) 2003-10-10

Family

ID=29235466

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002090085A Pending JP2003288497A (en) 2002-03-28 2002-03-28 Schedule operation method

Country Status (1)

Country Link
JP (1) JP2003288497A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7756736B2 (en) 2003-10-31 2010-07-13 Komatsu Ltd Working machine management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7756736B2 (en) 2003-10-31 2010-07-13 Komatsu Ltd Working machine management system

Similar Documents

Publication Publication Date Title
US7761591B2 (en) Central work-product management system for coordinated collaboration with remote users
Collins et al. MAGNET: A multi-agent contracting system for plan execution
WO2006073406A1 (en) System and method for automated management of custom home design and build projects
US20020013712A1 (en) Method and system for renting a construction machine
Hill Total quality management and business process re-engineering: A study of incremental and radical approaches to change management at BTNI
US20020102525A1 (en) System and method for coordinating the selection and delivery of educational services
US20210350481A1 (en) Property enhancement services
JP2002007672A (en) Method and system for operating cyber type club
Chen et al. Webfill before landfill: an e‐commerce model for waste exchange in Hong Kong
JP2003288497A (en) Schedule operation method
WO2008134717A2 (en) Communication management tools for a secure information sharing architecture to facilitate post merger integration
Phillips Texas 9-1-1: Emergency telecommunications and the genesis of surveillance infrastructure
JP2006155008A (en) Debt lease and credit system for civil engineering and construction machine, and insurance system for civil engineering and construction machine
Kavakli et al. Focus issue on legacy information systems and business process change: modelling of organisational change using the EKD framework
JP2005157522A (en) Real estate relevant service proxy management device, system, and method
KR20000058621A (en) Architecture consulting potal website operating system and operating method therefor
JP2004280235A (en) Cad drawing creation system
US20090083080A1 (en) Method, apparatus and program product for facilitating transfer of group meeting contracts
WO2001046854A1 (en) A system and method for inter-enterprise workflow and document management
JPH11117528A (en) Construction management method and recording medium in which construction management program is recorded
US20230394543A1 (en) Multi-vendor api marketplace with targeted content and customized rate plan monetizaion capabilities
KR20040069728A (en) Method for starting a new enterprise of a shop using of network and its system
Lin Development of web-based teams management system in construction
PERRIN et al. From moving earth to moving data: A study of digital information flows in the earthmoving business ecosystem
JP2002032136A (en) Application service management system of software to be applied to business through communication line