JP2003228648A - Business process management method, business process management system, its program and recording medium - Google Patents

Business process management method, business process management system, its program and recording medium

Info

Publication number
JP2003228648A
JP2003228648A JP2002028178A JP2002028178A JP2003228648A JP 2003228648 A JP2003228648 A JP 2003228648A JP 2002028178 A JP2002028178 A JP 2002028178A JP 2002028178 A JP2002028178 A JP 2002028178A JP 2003228648 A JP2003228648 A JP 2003228648A
Authority
JP
Japan
Prior art keywords
work
business process
identifier
information
displayed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002028178A
Other languages
Japanese (ja)
Inventor
Yasuhiro Yamauchi
康弘 山内
Kazuhiro Kondo
和博 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Auto Body Co Ltd
Original Assignee
Toyota Auto Body Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Auto Body Co Ltd filed Critical Toyota Auto Body Co Ltd
Priority to JP2002028178A priority Critical patent/JP2003228648A/en
Publication of JP2003228648A publication Critical patent/JP2003228648A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a business process management means for efficiently storing and utilizing business information associated with a business process. <P>SOLUTION: A development process sheet 81 time-sequentially displaying the developing process for the internal panel of an automobile of a project P300 is presented from a management computer through a communication network to the terminal of a user so as to be displayed. Work items ((1) preceding check) indicating works necessary for the development process, arrows indicating the work periods, and the indirect display of instructions as information accessory to works are recorded so as to be associated with each other. When the (1) preceding check is clicked, an execution result display picture is displayed. When the instructions are clicked, an instruction display picture is displayed. Also, each work item is displayed in different colors according to the presence or absence of its completion. <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、特定プロジェクト
についての業務プロセスを管理コンピュータによって管
理するとともに、通信ネットワークを利用して、業務プ
ロセスに関連する情報をプロジェクトに携わるユーザ
(技術者)に提供する業務プロセス管理方法、業務プロ
セス管理システム、プログラム及び記録媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention manages a business process for a specific project by a management computer and provides a user (engineer) involved in the project with information related to the business process by using a communication network. The present invention relates to a business process management method, a business process management system, a program and a recording medium.

【0002】[0002]

【従来の技術】従来、自動車等の製品の開発は、例えば
以下のように行われている。まず、完成品である自動車
の開発プロジェクトが組まれ、その自動車のラインオフ
までのスケジュールに合わせて、所定の部品単位で全体
日程及びその部品を細分化した構成部品毎の日程等の開
発プロセスを設定して開発が進められる。例えば、自動
車のインストルメントパネル(以下「インパネ」とい
う。)の開発プロセスを設定する場合は、大日程と呼ば
れる自動車のラインオフまでのスケジュールに沿って、
全体日程及び構成部品である本体、リインフォースメン
ト、クラスター類、物入れ類、ダクト類等に分類された
各日程がそれぞれ設定される。これらの日程は、開発プ
ロセス表と呼ばれる一覧表に表示される。そして、この
開発プロセス表に従って、担当部署に所属する複数の技
術者が作業を行っていく。
2. Description of the Related Art Conventionally, products such as automobiles have been developed as follows, for example. First, a development project for an automobile, which is a finished product, is set up, and according to the schedule until the line-off of the automobile, the development process such as the entire schedule for each predetermined component and the schedule for each component subdivided Set and proceed with development. For example, when setting up a development process for an automobile instrument panel (hereinafter referred to as "instrument panel"), according to the schedule until the line-off of the automobile called the big schedule,
The dates are classified into the overall schedule and the constituent parts of the main body, reinforcement, clusters, storage cases, ducts, etc., respectively. These dates are displayed in a list called a development process table. Then, according to this development process table, a plurality of engineers belonging to the department in charge work.

【0003】[0003]

【発明が解決しようとする課題】しかし、開発に携わる
部署や技術者の数が多いと、個々の技術者が開発中に得
た情報や実験の成果、次への開発の課題などが、当該部
署レベル又は個人レベルでとどまってしまうことが多
い。このため、他の部署や技術者がこれらの情報を有効
に活用することができなかった。
[Problems to be solved by the invention] However, when there are a large number of departments and engineers involved in the development, the information obtained by each engineer during the development, the results of experiments, the problems of the next development, etc. Often stays at department level or individual level. Therefore, other departments and engineers could not effectively use this information.

【0004】また、部品単位で多数の部署に担当が振り
分けられ、それぞれの部署において開発プロセス表が使
用されるため、例えば全体を統括する管理者が各部署で
の開発状況の把握をするのが困難であった。
Further, since the person in charge is assigned to a number of departments on a part-by-part basis and the development process table is used in each department, for example, an administrator who supervises the entire department can grasp the development status in each department. It was difficult.

【0005】また、開発プロセスが終了しても、既に使
用した開発プロセス表が、当該部署に保管されたままと
なったり、開発の情報やノウハウが他の技術者に確実に
伝承されなかったりするという問題があった。
Further, even after the development process is completed, the development process table that has already been used may remain stored in the department concerned, or the development information and know-how may not be handed down to other engineers. There was a problem.

【0006】本発明は上記問題点を解決するためになさ
れたものであって、その目的は、製品開発等の業務プロ
セスに関連付けられた業務情報の効率的な蓄積及び活用
が可能な業務プロセス管理の手段を提供することにあ
る。
The present invention has been made to solve the above-mentioned problems, and its purpose is to manage business processes capable of efficiently storing and utilizing business information associated with business processes such as product development. To provide the means.

【0007】また、本発明の他の目的は、作業状況の把
握及び的確なフォローが可能な業務プロセス管理の手段
を提供することにある。また、本発明の他の目的は、業
務ノウハウのより確実な伝承が可能な業務プロセス管理
の手段を提供することにある。
Another object of the present invention is to provide a means for business process management capable of grasping the work status and performing accurate follow-up. Another object of the present invention is to provide a business process management means capable of more reliably transmitting business know-how.

【0008】[0008]

【課題を解決するための手段】上記問題点を解決するた
めに、請求項1に記載の発明は、特定プロジェクトにつ
いての業務プロセスを管理コンピュータによって管理す
る方法であって、前記管理コンピュータが、前記業務プ
ロセスに必要な作業を示す作業識別子及びその作業期間
を関連付けて記録する段階と、前記作業に関連する作業
付帯情報がある場合に、該作業付帯情報を前記作業識別
子に関連付けて記録する段階と、複数の前記作業識別
子、作業期間及び作業付帯情報を時系列に従って直接的
又は間接的に表示する業務プロセス表のデータを記録す
る段階と、前記業務プロセス表のデータを、通信ネット
ワークを介して、一以上の端末に対し提供する段階と、
前記作業識別子、作業期間及び作業付帯情報のいずれか
が間接的に表示されるように前記端末に提供された状態
で、該端末からの要求を受信した場合に、該作業識別
子、作業期間又は作業付帯情報を直接的に表示可能に該
端末に提供する段階とを備えたことを要旨とする。
In order to solve the above problems, the invention according to claim 1 is a method for managing a business process for a specific project by a management computer, wherein the management computer is Correlating and recording a work identifier indicating the work required for the business process and its work period; and, if there is work supplementary information related to the work, recording the work supplementary information in association with the work identifier. , A step of recording data of a business process table that directly or indirectly displays a plurality of the work identifiers, work periods, and work incidental information in time series, and the data of the business process table via a communication network, Providing for one or more terminals,
When a request from the terminal is received in a state where any one of the work identifier, the work period, and the work incidental information is provided to be indirectly displayed, the work identifier, the work period, or the work And providing the supplementary information to the terminal so that the supplementary information can be directly displayed.

【0009】請求項2に記載の発明は、請求項1に記載
の業務プロセス管理方法において、前記管理コンピュー
タが、前記作業識別子が属する分類を示す分類識別子を
記録する段階と、前記業務プロセス表のデータを、前記
分類識別子毎に分類して前記端末に表示されるようなデ
ータとして記録する段階とをさらに備えたことを要旨と
する。
According to a second aspect of the present invention, in the business process management method according to the first aspect, the management computer records a classification identifier indicating a classification to which the work identifier belongs, and the business process table The method further comprises a step of classifying data according to the classification identifier and recording the data as data to be displayed on the terminal.

【0010】請求項3に記載の発明は、請求項2に記載
の業務プロセス管理方法において、前記分類識別子に
は、業務の全体に関するプロセスの分類及び該業務の各
構成要素に関するプロセスの分類が含まれることを要旨
とする。
The invention according to claim 3 is the business process management method according to claim 2, wherein the classification identifier includes a classification of processes related to the entire business and a classification of processes related to each component of the business. The summary is that

【0011】請求項4に記載の発明は、請求項1〜3の
いずれかに記載の業務プロセス管理方法において、前記
管理コンピュータが、業務プロセスを示す業務プロセス
識別子を記録する段階と、前記業務プロセスが属するプ
ロジェクトを示すプロジェクト識別子を記録する段階
と、前記端末からの要求により、前記業務プロセス識別
子又はプロジェクト識別子の一覧表のデータを、通信ネ
ットワークを介して提供する段階と、前記一覧表に基づ
いて選択された前記業務プロセス識別子についての業務
プロセス表のデータを、通信ネットワークを介して該端
末に提供する段階とをさらに備えたことを要旨とする。
According to a fourth aspect of the present invention, in the business process management method according to any of the first to third aspects, the management computer records a business process identifier indicating a business process, and the business process. Record a project identifier indicating a project to which the user belongs, a step of providing data of a list of the business process identifier or the project identifier via a communication network in response to a request from the terminal, and based on the list. And providing the data of the business process table for the selected business process identifier to the terminal via a communication network.

【0012】請求項5に記載の発明は、請求項1〜4の
いずれかに記載の業務プロセス管理方法において、前記
作業付帯情報は、前記作業に対する実施結果を示す実施
結果情報、前記作業についての解説である解説情報、チ
ェック項目を示すチェック情報、作業に必要な数値につ
いての数値情報及び他システムへのリンク情報の少なく
ともいずれか一つであることを要旨とする。
According to a fifth aspect of the present invention, in the business process management method according to any one of the first to fourth aspects, the work incidental information is execution result information indicating an execution result for the work, and the work related information. The gist is that it is at least one of commentary information that is a commentary, check information that indicates a check item, numerical information about a numerical value necessary for work, and link information to another system.

【0013】請求項6に記載の発明は、請求項1〜5の
いずれかに記載の業務プロセス管理方法において、前記
管理コンピュータが、該管理コンピュータ又は前記端末
からの要求により、プロジェクト、業務プロセス及び作
業識別子の少なくともいずれか一つについて、作成、追
加、変更及び削除の少なくともいずれか一つを実行する
段階をさらに備えたことを要旨とする。
According to a sixth aspect of the present invention, in the business process management method according to any one of the first to fifth aspects, the management computer, in response to a request from the management computer or the terminal, projects, business processes, and It is a gist to further include the step of performing at least one of creation, addition, modification, and deletion for at least one of the work identifiers.

【0014】請求項7に記載の発明は、請求項1〜6の
いずれかに記載の業務プロセス管理方法において、前記
管理コンピュータが、ユーザの個人識別子を記録する段
階と、各ユーザについて前記端末を利用して、プロジェ
クト、業務プロセス又は作業識別子について、表示、作
成、追加、変更若しくは削除の権限を与えるかどうかの
アクセス権限情報を前記個人識別子と関連付けて記録す
る段階とをさらに備えたことを要旨とする。
According to a seventh aspect of the present invention, in the business process management method according to any one of the first to sixth aspects, the management computer records the personal identifier of the user, and the terminal for each user. The method further comprises the step of recording access authority information as to whether or not to give authority to display, create, add, change or delete the project, business process or work identifier in association with the individual identifier. And

【0015】請求項8に記載の発明は、請求項1〜7の
いずれかに記載の業務プロセス管理方法において、各作
業期間の前記端末への表示は、その作業期間に応じた長
さの線又は矢印により表示するものであることを要旨と
する。
The invention according to claim 8 is the business process management method according to any one of claims 1 to 7, wherein the display of each work period on the terminal is a line having a length corresponding to the work period. Alternatively, the gist is to display with an arrow.

【0016】請求項9に記載の発明は、請求項1〜8の
いずれかに記載の業務プロセス管理方法において、前記
管理コンピュータが、作業の実施及び未実施の別を表示
する段階をさらに備えたことを要旨とする。
The invention according to claim 9 is the business process management method according to any one of claims 1 to 8, further comprising a step in which the management computer displays whether the work is performed or not. That is the summary.

【0017】請求項10に記載の発明は、請求項9に記
載の業務プロセス管理方法において、前記作業の実施及
び未実施の別を表示する段階は、表示される前記作業識
別子を実施及び未実施によって異なる色で表示すること
を要旨とする。
The invention according to a tenth aspect of the invention is the business process management method according to the ninth aspect, wherein the step of displaying whether the work is executed or not is executed and the work identifier displayed is not executed. The point is to display in different colors depending on the type.

【0018】請求項11に記載の発明は、請求項1〜1
0のいずれかに記載の業務プロセス管理方法において、
前記管理コンピュータが、業務プロセスにおける現時点
を、年、月、週、日又は時間によって他と識別可能に表
示する段階をさらに備えたことを要旨とする。
The invention described in claim 11 is defined by claims 1 to 1.
In the business process management method according to any of 0,
It is a gist that the management computer further comprises a step of displaying the present time in the business process so as to be distinguishable from others by year, month, week, day or time.

【0019】請求項12に記載の発明は、請求項1〜1
1のいずれかに記載の業務プロセス管理方法において、
前記管理コンピュータが、プロジェクトのうち、ユーザ
又は部署が担当する業務プロセス又は作業識別子につい
て表示する段階をさらに備えたことを要旨とする。
The invention described in claim 12 is defined by claims 1 to 1.
In the business process management method according to any one of 1,
It is a gist that the management computer further includes a step of displaying a business process or a work identifier of a project, which is handled by a user or a department.

【0020】請求項13に記載の発明は、請求項1〜1
2のいずれかに記載の業務プロセス管理方法において、
複数の作業について、一の作業の進行が他の作業の進行
に影響を与える関連性がある場合において、前記管理コ
ンピュータが、これらの作業を関連付けて記録する段階
と、前記一の作業の予定の変更を記録した場合に、前記
他の作業の予定を変更して記録する段階とをさらに備え
たことを要旨とする。
The invention as set forth in claim 13 is any of claims 1 to 1.
In the business process management method according to any one of 2,
For a plurality of tasks, when the progress of one task is related to the progress of another task, the management computer records the tasks in association with each other, and The method further includes a step of changing and recording the schedule of the other work when the change is recorded.

【0021】請求項14に記載の発明は、請求項1〜1
2のいずれかに記載の業務プロセス管理方法において、
複数の作業について、一の作業の進行が他の作業の進行
に影響を与える関連性がある場合において、前記管理コ
ンピュータが、これらの作業を関連付けて記録する段階
と、前記一の作業の予定の変更を記録した場合に、前記
他の作業の予定が変更されることを前記端末に通知する
段階と、前記端末からの要求があった場合に、前記他の
作業の予定の変更を記録する段階とをさらに備えたこと
を要旨とする。
The invention described in claim 14 relates to claims 1 to 1.
In the business process management method according to any one of 2,
For a plurality of tasks, when the progress of one task is related to the progress of another task, the management computer records the tasks in association with each other, and Notifying the terminal that the schedule of the other work will be changed when the change is recorded, and recording the change of the schedule of the other work when requested by the terminal The point is that it is further equipped with and.

【0022】請求項15に記載の発明は、特定プロジェ
クトについての業務プロセスを管理コンピュータによっ
て管理する業務プロセス管理システムであって、前記管
理コンピュータが、前記業務プロセスに必要な作業を示
す作業識別子及びその作業期間を関連付けて記録する第
1の記録手段と、前記作業に関連する作業付帯情報があ
る場合に、該作業付帯情報を前記作業識別子に関連付け
て記録する第2の記録手段と、前記作業識別子、作業期
間及び作業付帯情報を時系列に従って直接的又は間接的
に表示する業務プロセス表のデータを記録する第3の記
録手段と、前記業務プロセス表のデータを、通信ネット
ワークを介して、一以上の端末に対し提供する業務プロ
セス表データ提供手段とを備え、前記作業識別子、作業
期間及び作業付帯情報のいずれかが間接的に表示される
ように前記端末に提供された状態で、該端末からの要求
を受信した場合に、前記業務プロセス表データ提供手段
が、該作業識別子、作業期間及び作業付帯情報を直接的
に表示可能に該端末に提供することを要旨とする。
According to a fifteenth aspect of the present invention, there is provided a business process management system for managing a business process for a specific project by a management computer, wherein the management computer indicates a work identifier indicating a work necessary for the business process, and the work identifier. A first recording means for recording the work period in association with each other; a second recording means for recording the work supplementary information in association with the work identifier when there is work supplementary information related to the work; and the work identifier Third recording means for recording the data of the business process table for directly or indirectly displaying the work period and the work incidental information in time series, and one or more of the data of the business process table via the communication network. And a work process table data providing means for providing the work identifier, the work period, and the work attendant. When a request from the terminal is received in a state where any of the information is provided to the terminal so as to be indirectly displayed, the business process table data providing unit determines the work identifier, the work period, and the work. The gist is to provide the supplementary information to the terminal in a directly displayable manner.

【0023】請求項16に記載の発明は、請求項1〜1
4のいずれかに記載の業務プロセス管理方法を実行させ
るためのプログラムである。請求項17に記載の発明
は、請求項1〜14のいずれかに記載の業務プロセス管
理方法を実行させるためのプログラムを記録した記録媒
体である。
The invention described in claim 16 is defined by claims 1 to 1.
A program for executing the business process management method according to any one of Nos. The invention described in claim 17 is a recording medium in which a program for executing the business process management method according to any one of claims 1 to 14 is recorded.

【0024】(作用)請求項1又は15に記載の発明に
よれば、管理コンピュータにより、作業識別子、作業期
間及び必要な作業付帯情報が関連付けて記録される。そ
して、業務プロセス表により、複数の作業識別子、作業
期間及び作業付帯情報は時系列に従って直接的又は間接
的に表示される。また、作業識別子、作業期間及び作業
付帯情報のいずれかが間接的に表示された状態で、該端
末からの要求を受信した場合に、該作業識別子、作業期
間又は作業付帯情報は直接的に表示可能に該端末に提供
される。従って、業務プロセスに関連付けられた業務情
報を効率的に蓄積及び活用することができる。また、業
務プロセスが時系列で表示されるように提供されるた
め、ユーザによる作業状況の把握が容易となる。特に、
作業付帯情報が表示されるため、業務情報の活用や的確
なフォローが可能となる。
(Operation) According to the invention described in claim 1 or 15, the management computer records the work identifier, the work period, and necessary work incidental information in association with each other. Then, according to the business process table, a plurality of work identifiers, work periods, and work incidental information are displayed directly or indirectly in time series. When any of the work identifier, work period, and work incidental information is indirectly displayed, when the request from the terminal is received, the work identifier, work period, or work incidental information is directly displayed. It is provided to the terminal as possible. Therefore, the business information associated with the business process can be efficiently accumulated and utilized. Further, since the business processes are provided so as to be displayed in chronological order, the user can easily understand the work status. In particular,
Since the work incidental information is displayed, it is possible to utilize the work information and follow up accurately.

【0025】請求項2に記載の発明によれば、業務プロ
セス表のデータが分類識別子毎に分類して端末に表示さ
れる。従って、ユーザは分類された状態で業務プロセス
表のデータを利用することができる。
According to the second aspect of the invention, the data of the business process table is displayed on the terminal after being classified by the classification identifier. Therefore, the user can use the data in the business process table in the classified state.

【0026】請求項3に記載の発明によれば、分類識別
子には、業務の全体に関するプロセスの分類及び該業務
の各構成要素に関するプロセスの分類が含まれる。従っ
て、少なくとも2段階において階層的な業務プロセスの
管理を行うことができる。
According to the third aspect of the invention, the classification identifier includes the classification of the process related to the entire business and the classification of the process related to each component of the business. Therefore, hierarchical business process management can be performed in at least two stages.

【0027】請求項4に記載の発明によれば、管理コン
ピュータが、端末からの要求により、業務プロセス識別
子又はプロジェクト識別子の一覧表のデータが端末に提
供される。また、一覧表に基づいて選択された業務プロ
セス識別子についての業務プロセス表のデータが、通信
ネットワークを介して該端末に提供される。従って、ユ
ーザは一覧表のデータを参照して必要な業務プロセス表
のデータを入手することができる。
According to the invention described in claim 4, the management computer provides the terminal with the data of the list of the business process identifiers or the project identifiers in response to the request from the terminal. Further, the data of the business process table for the business process identifier selected based on the list is provided to the terminal via the communication network. Therefore, the user can refer to the list data to obtain the necessary business process table data.

【0028】請求項5に記載の発明によれば、作業付帯
情報は、実施結果情報、解説情報、チェック情報、数値
情報及び他システムへのリンク情報の少なくともいずれ
か一つである。従って、これらの作業付帯情報について
も作業識別子とともに表示させることができ、ユーザは
作業付帯情報を容易に入手、利用することができる。
According to the invention described in claim 5, the work incidental information is at least one of execution result information, commentary information, check information, numerical information, and link information to another system. Therefore, these work incidental information can be displayed together with the work identifier, and the user can easily obtain and use the work incidental information.

【0029】請求項6に記載の発明によれば、管理コン
ピュータが、該管理コンピュータ又は端末からの要求に
より、プロジェクト、業務プロセス及び作業識別子の少
なくともいずれか一つについて、作成、追加、変更及び
削除の少なくともいずれか一つを実行する。従って、プ
ロジェクト、業務プロセス又は作業識別子について、複
数の者が作成、追加、変更又は削除を行うことができ
る。
According to the invention described in claim 6, the management computer creates, adds, changes and deletes at least one of the project, the business process and the work identifier in response to a request from the management computer or the terminal. Do at least one of Therefore, a plurality of persons can create, add, change, or delete a project, business process, or work identifier.

【0030】請求項7に記載の発明によれば、管理コン
ピュータが、ユーザの個人識別子を記録し、各ユーザに
ついて端末を利用して、プロジェクト、業務プロセス又
は作業識別子について、表示、作成、追加、変更若しく
は削除の権限を与えるかどうかのアクセス権限情報を個
人識別子と関連付けて記録する。従って、アクセス権限
を与えられたユーザについてのみ、プロジェクト、業務
プロセス又は作業識別子についての表示、作成、追加、
変更若しくは削除を認めることができる。このため、権
限のない者がこのような行為をすることを防ぐことがで
きる。
According to the invention described in claim 7, the management computer records the individual identifiers of the users, and displays, creates, adds, about the project, the business process or the work identifier by using the terminal for each user. The access authority information as to whether the authority to change or delete is granted is recorded in association with the personal identifier. Therefore, only users who have been given access rights can display, create, add, and
Changes or deletions can be permitted. Therefore, it is possible to prevent unauthorized persons from performing such an action.

【0031】請求項8に記載の発明によれば、各作業期
間の端末への表示は、その作業期間に応じた長さの線又
は矢印により表示される。従って、ユーザは各作業の作
業期間を視覚的に容易に把握することができる。
According to the eighth aspect of the present invention, the display of each work period on the terminal is displayed by a line or an arrow having a length corresponding to the work period. Therefore, the user can easily visually grasp the work period of each work.

【0032】請求項9に記載の発明によれば、管理コン
ピュータが、作業の実施及び未実施の別を表示する。従
って、ユーザは、作業の実施及び未実施の別を容易に把
握することができる。
According to the invention described in claim 9, the management computer displays whether the work is performed or not. Therefore, the user can easily grasp whether the work is performed or not.

【0033】請求項10に記載の発明によれば、作業の
実施及び未実施の別の表示は、表示される作業識別子を
実施及び未実施によって異なる色で表示する。従って、
ユーザは、作業の実施及び未実施の別を色によって容易
に把握することができる。
According to the tenth aspect of the present invention, as another display of whether or not the work is performed, the displayed work identifier is displayed in a different color depending on whether the work is performed or not. Therefore,
The user can easily understand whether the work is performed or not by the color.

【0034】請求項11に記載の発明によれば、管理コ
ンピュータが、業務プロセスにおける現時点を、年、
月、週、日又は時間によって他と識別可能に表示する。
従って、ユーザは、業務プロセスに従って作業をする場
合に、容易に現時点を把握することができる。
According to the eleventh aspect of the present invention, the management computer sets the present time in the business process to the year,
It is displayed so that it can be distinguished from the others by the month, week, day or time.
Therefore, the user can easily grasp the present time when working according to the business process.

【0035】請求項12に記載の発明によれば、管理コ
ンピュータは、プロジェクトのうち、ユーザ又は部署が
担当する業務プロセス又は作業識別子について表示す
る。従って、ユーザ又は部署にとっては、自己に必要な
情報のみが表示されるため、自己が行うべき作業をより
明確に把握できる。
According to the twelfth aspect of the invention, the management computer displays the business process or work identifier of the project, which is handled by the user or department. Therefore, for the user or the department, only the information necessary for the user or the department is displayed, so that the work to be performed by the user or department can be understood more clearly.

【0036】請求項13に記載の発明によれば、複数の
作業について、一の作業の進行が他の作業の進行に影響
を与える関連性がある場合において、管理コンピュータ
が、前記一の作業の予定の変更を記録した場合に、前記
他の作業の予定を変更して記録する。従って、一の作業
が遅れる場合又は早まる場合に、関連する他の作業がと
もに変更されるため、ユーザが個別に変更する必要がな
い。
According to the thirteenth aspect of the invention, regarding a plurality of works, when there is a relation in which the progress of one work influences the progress of another work, the management computer causes the work of the one work to proceed. When the schedule change is recorded, the schedule of the other work is changed and recorded. Therefore, when one work is delayed or hastened, other related works are changed together, so that the user does not need to individually change the work.

【0037】請求項14に記載の発明によれば、複数の
作業について、一の作業の進行が他の作業の進行に影響
を与える関連性がある場合において、管理コンピュータ
が、前記一の作業の予定の変更を記録した場合に、前記
他の作業の予定が変更されることを前記端末に通知する
とともに、前記端末からの要求があった場合に、前記他
の作業の予定の変更を記録する。従って、一の作業が遅
れる場合又は早まる場合には、ユーザに対して通知をし
た上で、他の作業の変更がされる。このため、ユーザが
意図しない変更等がある場合にこれを未然に防止するこ
とができる。
According to the fourteenth aspect of the invention, regarding a plurality of works, when there is a relation in which the progress of one work influences the progress of another work, the management computer causes the work of the one work to proceed. When the schedule change is recorded, the terminal is notified that the schedule of the other work is changed, and the schedule change of the other work is recorded when there is a request from the terminal. . Therefore, when one work is delayed or hastened, the other work is changed after notifying the user. Therefore, when there is a change or the like that the user does not intend, this can be prevented in advance.

【0038】請求項16に記載の発明によれば、業務プ
ロセス管理方法を実行させるための当該プログラムの実
行により、請求項1〜14のいずれかに記載の発明の作
用効果が得られる。
According to the sixteenth aspect of the invention, the operation and effect of the invention according to any one of the first to fourteenth aspects can be obtained by executing the program for executing the business process management method.

【0039】請求項17に記載の発明によれば、当該記
録媒体に記録された業務プロセス管理方法を実行させる
ためのプログラムの実行により、請求項1〜14のいず
れかに記載の発明の作用効果が得られる。
According to the seventeenth aspect of the invention, the effect of the invention according to any one of the first to fourteenth aspects is obtained by executing the program for executing the business process management method recorded in the recording medium. Is obtained.

【0040】[0040]

【発明の実施の形態】以下、本発明の業務プロセス管理
方法を具体化した自動車の開発における開発プロセス管
理システムの一実施形態を図1〜図19に従って説明す
る。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a development process management system in the development of an automobile embodying the business process management method of the present invention will be described below with reference to FIGS.

【0041】図1に示すように、管理コンピュータ21
は、開発プロセス管理を行うコンピュータであり、本社
工場内に設置されている。管理コンピュータ21は、図
示しないCPU、RAM、ROM、モニタ等を有すると
ともに、各種データの送受信を行う送受信部22及び各
種データの読み出し・書き込み等を行う記録部23〜3
0を有する。
As shown in FIG. 1, the management computer 21
Is a computer that manages the development process and is installed in the head office factory. The management computer 21 has a CPU, a RAM, a ROM, a monitor, etc. (not shown), and also has a transmitting / receiving unit 22 for transmitting / receiving various data and recording units 23-3 for reading / writing various data.
Has 0.

【0042】管理コンピュータ21には、個人識別子記
録手段としての個人情報記録部23、アクセス権限情報
記録手段としてのアクセス権限情報記録部24、リンク
情報記録手段としてのリンク情報記録部25、業務プロ
セス表記録手段及び業務プロセス表データ提供手段とし
ての開発プロセスシート記録部26、解説情報記録手段
としての解説書記録部27、実施結果情報記録手段とし
ての実施結果情報記録部28、数値情報記録部としての
車両寸法値記録部29及びチェック情報記録手段として
のチェックシート情報記録部30がそれぞれ接続されて
いる。また、管理コンピュータ21は、ネットワークN
1を介して、ユーザa,b,c等の端末31に接続され
ている。ネットワークN1は、本社工場内のLAN(ロ
ーカルエリアネットワーク)である。また、管理コンピ
ュータ21は、インターネットI及びネットワークN2
を介して、ユーザd,e,f等の端末31に接続されて
いる。ネットワークN2は、支社工場内のLANであ
る。ネットワークN1,N2及びインターネットIは、
通信ネットワークを構成する。各端末31は、一台の若
しくは複数台の表示ディスプレイを有するパソコンであ
る。
In the management computer 21, a personal information recording unit 23 as a personal identifier recording unit, an access authority information recording unit 24 as an access authority information recording unit, a link information recording unit 25 as a link information recording unit, and a business process table. A development process sheet recording unit 26 as a recording unit and a business process table data providing unit, a commentary recording unit 27 as a commentary information recording unit, an execution result information recording unit 28 as an execution result information recording unit, and a numerical information recording unit. A vehicle dimension value recording unit 29 and a check sheet information recording unit 30 as check information recording means are connected to each other. Further, the management computer 21 is the network N
1 is connected to terminals 31 of users a, b, c, etc. The network N1 is a LAN (local area network) in the head office factory. Also, the management computer 21 is the Internet I and the network N2.
Is connected to the terminals 31 of users d, e, f, etc. The network N2 is a LAN in a branch factory. The networks N1 and N2 and the Internet I are
Configure a communication network. Each terminal 31 is a personal computer having one or a plurality of display displays.

【0043】次に、管理コンピュータ21の各記録部2
3〜30のデータ構成及び端末31に表示される表示画
面等の構成を図2〜図15により説明する。個人情報記
録部23には、図2に示すように、個人情報ファイル3
5が記録されている。個人情報ファイル35には、ユー
ザID、パスワード、ユーザ名、部署コード及び職位コ
ードがそれぞれ関連付けられて記録されている。ユーザ
ID、パスワード、ユーザ名、部署コード及び職位コー
ドは、個人識別子を構成する。部署コードは、ユーザが
所属する部署毎に付与されるものである。職位コード
は、ユーザの属する職位を識別するものであり、個人情
報記録部23には、図3に示すように、職位コード対照
テーブル36が記録されている。職位コード対照テーブ
ル36には、職制毎に対応する職位コードが付与されて
おり、専任職(課)にはA、理事にはB、部長級には
1、次長級には2、課長級には3、係長級には4及び職
位なしには0がそれぞれ付与されている。従って、図2
に示すように、例えば中山隆一は、部署番号「132」
(本実施形態では内装シート設計部の第1内装設計室)
に所属する、職位コード「3」即ち課長級であり、ユー
ザID「AB10003」及びパスワード「8765
4」が設定されている。
Next, each recording unit 2 of the management computer 21
The data configuration of 3 to 30 and the configuration of the display screen displayed on the terminal 31 will be described with reference to FIGS. In the personal information recording section 23, as shown in FIG.
5 is recorded. In the personal information file 35, a user ID, a password, a user name, a department code, and a position code are recorded in association with each other. The user ID, password, user name, department code, and position code constitute a personal identifier. The department code is given to each department to which the user belongs. The position code identifies the position to which the user belongs, and in the personal information recording unit 23, a position code comparison table 36 is recorded as shown in FIG. The position code comparison table 36 is assigned a position code corresponding to each position. A is for a full-time job (section), B is for a director, 1 is for a general manager, 2 is for a deputy general manager, and 2 is for a section manager. 3 is assigned, 4 is assigned to the chief of staff, and 0 is assigned to those without a position. Therefore, FIG.
As shown in, for example, Ryuichi Nakayama has the department number “132”.
(In this embodiment, the first interior design room of the interior seat design department)
Belonging to a position code “3”, that is, a section manager, a user ID “AB10003” and a password “8765”.
4 ”is set.

【0044】アクセス権限情報記録部24には、図5に
示すように、アクセス権限設定テーブル38が記録され
ている。このアクセス権限設定テーブル38は、開発プ
ロセスシート又は解説書を端末31の画面に表示させる
権限(閲覧の権限)を、設定された職位コードに属する
ユーザにのみ与えるものである。各開発プロセスシート
は、そのシートを作成した作成部署(例えば、技術管理
部)、その作成部署コード(例えば、11)、及びプロ
ジェクト識別子としてのプロジェクト番号(例えば、P
300)に関連付けられて記録されている。ここでは、
内装シート設計部の部付、第1内装設計室及び第2内装
設計室に所属するユーザについての閲覧の権限が設定さ
れている。即ち、各解説書やプロジェクトP300の法
規適合確認の開発プロセスシート等、「A,B,1,
2,3,4,0」と表示されているものについては、す
べての職位のユーザが閲覧することができる。ただし、
プロジェクトP300及びP400の樹脂部品評価及び
シート評価の開発プロセスシートについては、「A,
B,1,2,3」と表示されており、係長級と職位なし
のユーザは閲覧することができない。なお、アクセス権
限設定テーブルは、他の部署及び他の開発プロセスシー
トについても設定されている。また、アクセス権限設定
テーブルは、閲覧の権限のみならず、開発プロセスシー
トの作成、追加、変更又は削除の権限についてもそれぞ
れ設定されている。
In the access authority information recording section 24, as shown in FIG. 5, an access authority setting table 38 is recorded. The access authority setting table 38 gives the authority (browsing authority) to display the development process sheet or the manual on the screen of the terminal 31 only to the users who belong to the set position code. Each development process sheet has a creation department (for example, a technical management department) that created the sheet, a creation department code (for example, 11), and a project number (for example, P as a project identifier).
300) and is recorded. here,
Browsing authority is set for users belonging to the interior seat design department, the first interior design room, and the second interior design room. In other words, "A, B, 1,
Those displayed as "2, 3, 4, 0" can be viewed by users of all positions. However,
For development process sheets for resin component evaluation and sheet evaluation for projects P300 and P400, see "A,
“B, 1, 2, 3” is displayed, and users without a section chief and no position cannot browse. The access authority setting table is also set for other departments and other development process sheets. Further, in the access authority setting table, not only the authority for browsing but also authority for creating, adding, changing or deleting the development process sheet is set.

【0045】リンク情報記録部25には、リンク情報が
記録されており、図4に示すリンクページ37が端末3
1のディスプレイ上に表示される。リンクページ37
は、社内システム及び社外システムについてのリンク情
報が表示され、各項目をクリックすると、端末31のデ
ィスプレイ上に当該ページが表示されるようになってい
る。
Link information is recorded in the link information recording section 25, and the link page 37 shown in FIG.
1 is displayed on the display. Link page 37
Displays the link information about the in-house system and the outside system, and when each item is clicked, the page is displayed on the display of the terminal 31.

【0046】開発プロセスシート記録部26には、図6
に示すように、開発プロセスシート用登録データ39が
記録されている。開発プロセスシート用登録データ39
は、作業識別子として開発プロセスシートに表示される
開発プロセスシート資料分類(作業項目)、作業期間及
び作業付帯情報としての関連情報が格納されるフォルダ
階層及びファイル名の情報が記録されている。例えば、
プロジェクト番号P300のインパネの開発プロセスシ
ートにおいて、先行調査におけるA社の車種●●につい
ての先行調査については、フォルダの階層「P300−
インパネ−先行調査…A社●●」のフォルダに、本体
1.jpg、本体2.jpg、評価1.jpg及び評価2.jpgの画像
ファイルが記録されている。また、作業期間について
は、開始時期及び終了時期と完了の有無が記録されてい
る。
The development process sheet recording section 26 is shown in FIG.
As shown in, the development process sheet registration data 39 is recorded. Registration data for development process sheet 39
The information of the development process sheet material classification (work item) displayed on the development process sheet as a work identifier, the folder hierarchy and the file name in which the related information as work period and work incidental information is stored are recorded. For example,
In the development process sheet for the instrument panel of project number P300, for the previous survey on vehicle type ●● of Company A in the previous survey, refer to the folder hierarchy “P300-
Instrument panel-preceding survey ... Company A ●● ”contains image files of main body 1.jpg, main body 2.jpg, evaluation 1.jpg, and evaluation 2.jpg. As for the work period, the start time, the end time, and the presence / absence of completion are recorded.

【0047】解説書記録部27には、図7に示すよう
に、各作業についての考え方、実施手順又は基準等の解
説が記載された解説書情報40が記録されている。解説
書情報40には、解説書であることを示す解説書識別
子、解説書に関連する開発プロセス、解説書が格納され
ている資料フォルダ名及び資料ファイル名が相互に関連
付けられて記録されている。図8は、解説書表示画面4
1を示している。解説書表示画面41は、端末31から
解説書の表示要求があった場合に、ディスプレイ上に表
示されるものである。解説書表示画面41には、解説書
が格納された資料フォルダ名を示す表示部42が設けら
れ、解説書情報40と同等の内容が示される。表示部4
2に設けられた資料一覧表ボタンを押すと、後述する解
説書・実施結果一覧表表示画面50がディスプレイ上に
て表示されるようになっている。また、資料ファイル表
示部43には、指定された資料フォルダに格納された資
料ファイル名(ここでは、1−1.jpg,1−2.jpg,1
−3.jpg)が表示される。そして、資料ファイル表示部
43で選択されたファイルが解説書表示部44に表示さ
れる。ここでは、過去のプロジェクトにおいて実施され
た、競合車調査におけるドライバー席の視野についての
調査データが掲載されている。
As shown in FIG. 7, the manual recording unit 27 records manual information 40 in which a description of the concept of each work, an implementation procedure, a standard, etc. is described. In the manual information 40, a manual identifier indicating a manual, a development process related to the manual, a material folder name in which the manual is stored, and a material file name are recorded in association with each other. . Figure 8 shows the manual display screen 4
1 is shown. The manual display screen 41 is displayed on the display when a display request for a manual is issued from the terminal 31. The manual display screen 41 is provided with a display unit 42 showing the name of the material folder in which the manual is stored, and shows the same contents as the manual information 40. Display unit 4
When the material list button provided in 2 is pressed, a manual / execution result list display screen 50, which will be described later, is displayed on the display. Further, the material file display section 43 displays the material file name (1-1.jpg, 1-2.jpg, 1 here) stored in the specified material folder.
-3.jpg) is displayed. Then, the file selected in the material file display section 43 is displayed in the manual display section 44. Here, the survey data on the driver's seat view in the competing vehicle survey conducted in the past project is posted.

【0048】実施結果情報記録部28には、図9に示す
ように、解説書に従って実施した各作業についての結果
が記載された実施結果情報45が記録されている。実施
結果情報45には、実施結果に関連するプロジェクト、
開発プロセス、実施結果が格納されている資料フォルダ
名及び資料ファイル名が相互に関連付けられて記録され
ている。図10は、実施結果表示画面46を示してい
る。実施結果表示画面46は、端末31から実施結果の
表示要求があった場合に、ディスプレイ上に表示される
ものである。実施結果表示画面46には、実施結果が格
納された資料フォルダ名を示す表示部47が設けられ、
実施結果情報45と同等の内容が示される。表示部47
に設けられた資料一覧表ボタンを押すと、図11に示す
解説書・実施結果一覧表表示画面50がディスプレイ上
にて表示されるようになっている。また、資料ファイル
表示部48には、指定された資料フォルダに格納された
資料ファイル名(ここでは、A社●●1.jpg,A社●●
2.jpg,B社▲▲1.jpg,B社▲▲2.jpg)が表示され
る。そして、資料ファイル表示部48で選択されたファ
イルが実施結果表示画面46に表示される。ここでは、
プロジェクトP300において実施された先行調査にお
いて、A社●●のインパネ関係構成部品についてのデジ
タル画像が掲載されている。
In the execution result information recording section 28, as shown in FIG. 9, the execution result information 45 in which the result of each work performed according to the manual is described is recorded. The implementation result information 45 includes projects related to implementation results,
The material folder name and the material file name in which the development process and the implementation result are stored are recorded in association with each other. FIG. 10 shows the implementation result display screen 46. The implementation result display screen 46 is displayed on the display when there is a request to display the implementation result from the terminal 31. The implementation result display screen 46 is provided with a display unit 47 showing the name of the material folder in which the implementation result is stored.
The same content as the implementation result information 45 is shown. Display 47
When the material list button provided on the display is pressed, the manual / implementation result list display screen 50 shown in FIG. 11 is displayed on the display. Further, in the material file display section 48, the material file name stored in the designated material folder (here, company A ●● 1.jpg, company A ●●
2.jpg, Company B ▲▲ 1.jpg, Company B ▲▲ 2.jpg) are displayed. Then, the file selected in the material file display section 48 is displayed on the implementation result display screen 46. here,
In a preliminary survey conducted in Project P300, digital images of instrument panel related components of Company A ●● were posted.

【0049】解説書・実施結果一覧表表示画面50は、
図11に示すように、登録されている解説書又は実施結
果の項目の一覧を表示するものである。解説書・実施結
果一覧表表示画面50には、プロジェクト選択ボックス
51が表示され、プロジェクトP300〜P700及び
解説書のいずれかについての一覧表の表示を選択するこ
とができる。プロジェクト選択ボックス51で選択され
ると(ここでは、プロジェクトP300)、プロセス選
択ボックス52が表示され、選択されたプロジェクトに
ついての開発プロセスの一覧が表示される(ここでは、
P300、インパネ開発)。プロセス選択ボックス52
で選択されると、一覧表表示部53にその結果が表示さ
れる。ここでは、プロジェクトP300のインパネ開発
についての先行調査等複数の実施結果が選択可能に表示
される。ここで、選択したものについては、解説書表示
画面41又は実施結果表示画面46と同様な形式でディ
スプレイ上に表示される。なお、プロセス選択ボックス
52及び一覧表表示部53は、それぞれ10個まで同時
に選択できるようになっている。
The manual / execution result list display screen 50 is
As shown in FIG. 11, a list of registered manuals or items of implementation results is displayed. A project selection box 51 is displayed on the commentary / implementation result list display screen 50, and it is possible to select display of a list of any of the projects P300 to P700 and the commentary. When selected in the project selection box 51 (here, project P300), the process selection box 52 is displayed and a list of development processes for the selected project is displayed (here,
P300, instrument panel development). Process selection box 52
When selected with, the result is displayed on the list display portion 53. Here, a plurality of implementation results such as a preceding survey on the instrument panel development of the project P300 are displayed in a selectable manner. Here, the selected one is displayed on the display in the same format as the manual display screen 41 or the implementation result display screen 46. The process selection box 52 and the list display section 53 can be selected up to 10 at the same time.

【0050】車両寸法値記録部29には、図12に示す
ように、開発プロセスに必要な各種車両寸法値を記録す
る車両寸法値情報54が記録されている。車両寸法値情
報54には、車両グループ、プロジェクト名、データ記
入日、時期、及び具体的な寸法値として、TSP_L
(右ハンドル)、TSP_H(右ハンドル)、TSP_
W(右ハンドル)、ブレーキペダル〜リインフォース、
ストップランプSW〜リインフォース、ステアリングN
〜メータCTR等の情報が記録される。ここで、時期と
は車両寸法値のデータ記入日が、計画図段階のものか正
式図段階のものかを示すものであり、「計」又は「正」
により記録される。車両寸法値情報54に記録されたデ
ータは、図13に示すように、車両寸法値一覧表画面5
5として、端末31のディスプレイ上に表示される。車
両寸法値一覧表画面55には、表示条件設定ボックス5
6が設けられており、開発プロセス、データ名称、プロ
ジェクトグループ及びプロジェクトの条件を設定した上
で、編集、追加、消去又は諸元一覧表表示の操作ボタン
によりそれぞれの操作又は表示が可能とされる。ここで
は、インパネ開発における1.D席断面についてのデー
タ編集及び諸元一覧表表示ボタンが押されている。その
結果、寸法値編集ボックス57及び諸元一覧表58が表
示される。従って、ユーザは諸元一覧表58により他の
車両の寸法値を確認しながら、寸法値編集ボックス57
で、数値の変更等を行うことができる。なお、編集、追
加、消去及び諸元一覧表表示の権限については、アクセ
ス権限情報記録部24に設けられたアクセス権限設定テ
ーブル38により管理されている。また、諸元一覧表5
8の上方に設けられた測定データポイント図表示ボタン
をクリックすると、各寸法値測定の目安となる図のデー
タ(図示しない)が別ウインドウに表示されるようにな
っている。
In the vehicle dimension value recording section 29, as shown in FIG. 12, vehicle dimension value information 54 for recording various vehicle dimension values necessary for the development process is recorded. The vehicle dimension information 54 includes TSP_L as a vehicle group, a project name, data entry date, time, and a specific dimension value.
(Right handle), TSP_H (Right handle), TSP_
W (right handle), brake pedal-reinforce,
Stop lamp SW ~ Reinforce, Steering N
~ Information such as the meter CTR is recorded. Here, the term indicates whether the date of entry of the vehicle dimension data is in the plan drawing stage or the official drawing stage, and is “total” or “correct”.
Recorded by. The data recorded in the vehicle dimension value information 54 is displayed on the vehicle dimension value list screen 5 as shown in FIG.
5 is displayed on the display of the terminal 31. On the vehicle dimension value list screen 55, the display condition setting box 5
6 is provided, and after setting the development process, data name, project group and project conditions, each operation or display is possible with the operation button of edit, add, delete or specification list display. . Here are the 1. The data edit and specification list display button for the D seat section is pressed. As a result, the dimension value edit box 57 and the specification list 58 are displayed. Therefore, the user can check the dimension value of another vehicle by using the specification list 58 while checking the dimension value edit box 57.
You can change the value. The authority to edit, add, delete, and display the specifications list is managed by the access authority setting table 38 provided in the access authority information recording unit 24. In addition, specifications list 5
When the measurement data point diagram display button provided above 8 is clicked, the data (not shown) of the diagram serving as a guide for each dimension value measurement is displayed in a separate window.

【0051】チェックシート情報記録部30には、図1
4に示すように、チェックシート表示画面61を端末3
1のディスプレイ上に表示するための情報が記録されて
いる。チェックシート表示画面61は、チェックシート
識別情報表示部62、チェックシート表示部63、及び
チェック項目記入部64が設けられている。チェックシ
ート識別情報表示部62には、プロジェクト名(例え
ば、プロジェクトP400)、モジュール名(例えば、
インパネ)、部品名(例えば、コンソール廻り)、分類
(例えば、計画)及びページ(例えば、1/3)が表示
される。チェックシート表示部63には、画像データ形
式のチェックシートが表示される。チェックシートには
チェック項目が記載されており、これに対応する項目が
チェック項目記入部64に表示される。チェック項目記
入部64には、項目番号、判定、コメント、改定要否、
改定理由、試作、手配、正式、登録者及び登録日の項目
が設けられている。判定はその時点におけるチェック項
目についての判定結果を、「○、×、−」の3段階で選
択できるようになっている。コメントは、評価について
のコメントを入力する欄である。改定要否は、チェック
項目の改定の必要がある項目に「レ」を入力できるよう
になっている。改定理由は、改定の必要のあるチェック
項目についての改定理由を入力する欄である。試作、手
配及び正式は、試作、手配、正式の各段階での判定結果
を表示する欄である。
The check sheet information recording section 30 has a structure shown in FIG.
As shown in FIG. 4, the check sheet display screen 61 is displayed on the terminal 3
The information to be displayed on the first display is recorded. The check sheet display screen 61 is provided with a check sheet identification information display section 62, a check sheet display section 63, and a check item entry section 64. The check sheet identification information display portion 62 includes a project name (for example, project P400) and a module name (for example, project P400).
Instrument panel), part name (for example, around console), classification (for example, plan), and page (for example, 1/3) are displayed. A check sheet in the image data format is displayed on the check sheet display portion 63. Check items are described on the check sheet, and items corresponding to the check items are displayed in the check item writing unit 64. The check item entry section 64 includes item numbers, judgments, comments, necessity of revision,
Items for reasons for revision, trial manufacture, arrangement, official, registrant and registration date are provided. As for the judgment, the judgment result of the check item at that time can be selected in three stages of "○, ×,-". The comment is a field for inputting a comment about the evaluation. As for the necessity of revision, it is possible to input "re" in the item that needs to be revised. The reason for revision is a field for inputting the reason for revision for a check item that needs to be revised. Prototype, Arrangement, and Formal are fields for displaying the determination results at each stage of trial, arrangement, and formal.

【0052】また、チェックシート情報記録部30に
は、図15に示すように、見栄えチェックシート表示画
面65を端末31のディスプレイ上に表示するための情
報が記録されている。図15に示すチェックシート情報
記録部30では、コンソール廻りの設計をデジタルアセ
ンブリ(Digital Assembly。三次元のCADデータを用
いて、静的・動的な表示を通して、仮想で各種検討を行
うこと。以下「DA」という。)による評価に基づいて
チェックを行うものである。見栄えチェックシート表示
画面65には、DAデータ表示部66及びチェック項目
記入部67が設けられている。DAデータ表示部66で
は、コンソール廻りのデザインを3次元的に確認できる
ように設定されている。チェック項目記入部67には、
確認項目、判定、及びコメントの項目が設けられてい
る。
Further, in the check sheet information recording section 30, as shown in FIG. 15, information for displaying the appearance check sheet display screen 65 on the display of the terminal 31 is recorded. In the check sheet information recording unit 30 shown in Fig. 15, the design around the console is digitally assembled (Digital Assembly. Various three-dimensional CAD data is used, and various examinations are performed virtually through static / dynamic display. The check is performed based on the evaluation by “DA”). The appearance check sheet display screen 65 is provided with a DA data display section 66 and a check item entry section 67. The DA data display unit 66 is set so that the design around the console can be confirmed three-dimensionally. In the check item entry section 67,
Items for confirmation, judgment, and comments are provided.

【0053】次に、ユーザが端末31から管理コンピュ
ータ21にアクセスして、開発プロセスシートを閲覧す
る手順について、図16〜図19により説明する。ま
ず、ユーザが端末31から管理コンピュータ21にアク
セスして、本実施形態の開発プロセス管理システムにロ
グインする際には、図16に示す個人認証画面71が端
末31のディスプレイ上に表示される。ユーザはユーザ
ID入力欄72及びパスワード入力欄73に、ユーザI
D及びパスワードをそれぞれ入力して、ログインボタン
を押す。次に、管理コンピュータ21は、端末31より
ユーザID及びパスワードを受信して、当該ユーザID
及びパスワードが図2に示す個人情報ファイル35に登
録されたものか否かを確認する。ユーザID及びパスワ
ードが正しいものであれば、管理コンピュータ21は、
図17に示す開発プロセス一覧表表示画面74を端末3
1に送信する。開発プロセス一覧表表示画面74は、ユ
ーザに開発プロセス一覧表を提供し、ユーザが選択した
開発プロセスシートを表示させるものである。開発プロ
セス一覧表表示画面74には、作成部署選択部75及び
開発プロセスシート一覧表76が設けられている。作成
部署選択部75は、全部署(*印のもの)又は各部署を
ユーザに選択させるもので、選択された条件に従って、
開発プロセスシート一覧表76の項目が表示される。開
発プロセスシート一覧表76には、開発プロセスシート
の作成部署、プロセスシート名及び閲覧可能なプロセス
シートがプロジェクト毎に表示されるようになってい
る。ここでは、図5に示すアクセス権限設定テーブル3
8によって閲覧権限がある者について、閲覧可能なプロ
セスシートのみ表示されるようになっている。そして、
○印をクリックすることにより該当する開発プロセスシ
ートが別画面上に表示される。なお、○印はプロセスシ
ートがデータとして登録されていることを示している。
Next, the procedure for the user to access the management computer 21 from the terminal 31 and browse the development process sheet will be described with reference to FIGS. First, when the user accesses the management computer 21 from the terminal 31 and logs in to the development process management system of this embodiment, the personal authentication screen 71 shown in FIG. 16 is displayed on the display of the terminal 31. The user enters the user ID in the user ID input field 72 and the password input field 73.
Enter D and password respectively and press the login button. Next, the management computer 21 receives the user ID and password from the terminal 31, and then the user ID
Also, it is confirmed whether or not the password is registered in the personal information file 35 shown in FIG. If the user ID and password are correct, the management computer 21
The development process list display screen 74 shown in FIG.
Send to 1. The development process list display screen 74 provides the user with a development process list and displays the development process sheet selected by the user. The development process list display screen 74 is provided with a created department selection unit 75 and a development process sheet list 76. The created department selection unit 75 allows the user to select all departments (marked with *) or each department, and according to the selected conditions,
The items of the development process sheet list table 76 are displayed. In the development process sheet list 76, the development process sheet creation department, the process sheet name, and the viewable process sheet are displayed for each project. Here, the access authority setting table 3 shown in FIG.
According to 8, only those process sheets that can be viewed are displayed for those who have viewing authority. And
By clicking the ○ mark, the corresponding development process sheet is displayed on another screen. In addition, the mark ◯ indicates that the process sheet is registered as data.

【0054】図18に、作業項目が入力されていない状
態の開発プロセスシート81のフォーマットを示す。開
発プロセスシート81は、時間を表す横軸と、実施事項
を分類毎に区分けする縦軸とで構成される。図18の開
発プロセスシート81は、プロジェクトP300の自動
車のインパネ開発に関するものであり、項目としては、
大日程、設計ステップ及び実施事項に大別される。大日
程は、完成品である自動車のラインオフまでの開発日程
である。設計ステップは、大日程に沿った設計ステップ
についての大まかな日程である。また、実施事項は、イ
ンパネ開発の場合には、全体、本体、R/F(リインフ
ォースメント)、クラスター類、物入れ類及びダクト類
に細分類される。これらの分類は図6に示す開発プロセ
スシート用登録データ39に登録された作業部署コード
及び分類等により特定されるものである。
FIG. 18 shows the format of the development process sheet 81 when no work item is input. The development process sheet 81 is composed of a horizontal axis representing time and a vertical axis that divides implementation items into categories. The development process sheet 81 of FIG. 18 relates to the development of the instrument panel of the automobile of the project P300, and the items are as follows.
It is roughly divided into large schedules, design steps, and implementation items. The large schedule is the development schedule until the line-off of the finished car. The design step is a rough schedule of design steps along the large schedule. In the case of instrument panel development, the items to be implemented are subdivided into whole, main body, R / F (reinforcement), clusters, storage cases and ducts. These classifications are specified by the work department codes and classifications registered in the development process sheet registration data 39 shown in FIG.

【0055】また、時間表示については、シート上方
に、カレンダー月(6,7,8,9…とあるもの。)及
び自動車のラインオフまでの残余月数(35,34,…
2,1,L/Oとあるもの。なお、L/Oとは、ライン
オフ即ち車両の完成を示す。)が表示されている。
Regarding the time display, a calendar month (6, 7, 8, 9 ...) Above the seat and a remaining number of months (35, 34, ...) until the line of the automobile is turned off.
2, 1, L / O. The L / O means line off, that is, completion of the vehicle. ) Is displayed.

【0056】なお、開発プロセスシート81の、チェッ
ク、コスト・質量及びサインの項目は、それぞれチェッ
クシート作成の日程、コスト・質量についての検討の日
程、各部門での承認のサインを記入する欄に利用される
ものである。
The items of check, cost / mass, and signature on the development process sheet 81 are entered in the fields for entering the check sheet preparation schedule, the cost / mass examination schedule, and the approval signature of each department. It is used.

【0057】次に、図19に、各作業が登録された状態
の開発プロセスシート81を部分的に示す。同図に示さ
れるように、開発プロセスシート81には、間接的な表
示としての各作業項目として、(1)先行調査、(3)
インパネ部品構成立案、(5)ディメンジョンチェック
等が表示されるとともに、その作業期間を示す矢印が掲
載されている。この矢印の長さ及び位置は、図6に示す
開発プロセスシート用登録データ39に登録された作業
期間の開始時期及び終了時期によって決定される。ま
た、例えば(5)ディメンジョンチェックにおける、窓
写り、メータ入射、視認性等の記載のように、所定の作
業に対しては注意事項又は確認事項が掲載されている。
また、所定の作業項目には、間接的表示としての解説書
の表示が掲載されている。なお、各作業項目は、実施さ
れる前は緑色に表示されており、作業が完了すると開発
プロセスシート用登録データ39に登録された完了項目
が反映されて、赤色に表示が変えられる。図19では、
(1)先行調査、(3)インパネ部品構成立案、(5)
ディメンジョンチェック、(11)建付ストーリー、及
び内装商品力ポイント評価は、作業が完了しており、赤
色の表示となっている。また、各作業項目は、関連情報
としての実施結果情報がある場合は、クリック可能とな
っており、クリックすることにより図10に示されるよ
うな、実施結果表示画面46が表示(直接的表示)され
るようになっている。
Next, FIG. 19 partially shows the development process sheet 81 in a state where each work is registered. As shown in the figure, the development process sheet 81 includes (1) advance survey, (3) as each work item as an indirect display.
Instrument panel component configuration planning, (5) dimensional check, etc. are displayed, and an arrow indicating the work period is posted. The length and position of this arrow are determined by the start time and end time of the work period registered in the development process sheet registration data 39 shown in FIG. Further, for example, as described in (5) Dimension check, window reflection, meter incidence, visibility, etc., cautions or confirmations are posted for predetermined work.
Further, the display of the manual as an indirect display is posted in the predetermined work item. Each work item is displayed in green before the work is performed, and when the work is completed, the completed item registered in the development process sheet registration data 39 is reflected and the display is changed to red. In FIG.
(1) Preliminary survey, (3) Instrument panel component composition planning, (5)
The work of the dimension check, (11) Building story, and interior product strength point evaluation has been completed and is displayed in red. Further, each work item can be clicked when there is execution result information as related information, and by clicking, an execution result display screen 46 as shown in FIG. 10 is displayed (direct display). It is supposed to be done.

【0058】また、解説書は青色の表示となっており、
これをクリックすると、図8に示すような解説書表示画
面41が表示(直接的表示)されるようになっている。
また、図19においてハッチングが付された月(N+1
月)は、現在の月を示しており、実際にはハッチングで
はなく黄色に着色されて他の月と識別できるようになっ
ている。さらに、このハッチング内の縦の太線は、現在
日を示しており、実際には赤色の表示で現在日が容易に
識別できるようになっている。
The manual is displayed in blue,
When this is clicked, a manual display screen 41 as shown in FIG. 8 is displayed (direct display).
In addition, the hatched month (N + 1) in FIG.
Month) indicates the current month, and is actually colored yellow instead of hatching so that it can be distinguished from other months. Further, the vertical thick line in this hatching indicates the current date, and in fact, the red color is displayed so that the current date can be easily identified.

【0059】また、開発プロセスシート用登録データ3
9の作業期間を変更すると、開発プロセスシート81に
おける矢印の表示が作業期間の変更に対応して表示され
るようになっている。一方、開発プロセスシート81上
で、矢印の長さを変更した場合は、図示しない画面によ
り、「矢印の長さを変更すると、この作業の開始時期が
●月●日、終了時期が▲月▲日に変更されます。よろし
いですか。」といった確認の表示がなされる。これに同
意した場合に、所望の長さに矢印が変更される。なお、
当該矢印が移動すれば、その矢印が示す作業項目の表示
及び解説書等の作業付帯情報もともに移動して表示され
る。
Further, the registration data 3 for the development process sheet
When the work period 9 is changed, the arrow on the development process sheet 81 is displayed corresponding to the change of the work period. On the other hand, on the development process sheet 81, when the length of the arrow is changed, a screen (not shown) indicates, "If the length of the arrow is changed, the start time of this work is ● month ● day and the end time is ▲ month ▲. The date will be changed. Are you sure? "Is displayed. If you agree with this, the arrow is changed to the desired length. In addition,
When the arrow moves, the work item indicated by the arrow and work supplementary information such as a manual are also moved and displayed.

【0060】また、一の作業の進行が他の作業の進行に
影響を与える関連性がある場合において、管理コンピュ
ータ21が、前記一の作業の予定の変更を記録した場合
に、前記他の作業の予定が変更されることを端末31に
通知されるようになっている。例えば、(1)先行調
査、(3)インパネ部品構成立案及び(5)ディメンジ
ョンチェックがこの順番でかつ、それぞれの完了が確認
された上で次の作業に移行できるものであったとする。
この場合、例えば(1)先行調査を移動したり、作業期
間を変更したりしようとすると、図示しない画面によ
り、「(1)先行調査を変更すると、以下の項目も影響
されます。(3)インパネ部品構成立案。(5)ディメ
ンジョンチェック。よろしいですか。」といった確認の
表示がなされる。これに同意した場合に、(3)インパ
ネ部品構成立案及び(5)ディメンジョンチェックにつ
いても日程が変更される。
Further, in the case where there is a relation that the progress of one work influences the progress of another work, when the management computer 21 records the change in the schedule of the one work, the other work is performed. The terminal 31 is notified that the schedule is changed. For example, it is assumed that (1) preceding survey, (3) instrument panel component configuration planning, and (5) dimension check can be performed in this order, and after completion of each is confirmed, the next work can be performed.
In this case, for example, if you try to move (1) the preliminary survey or change the work period, the following items will be affected by the "(1) Changing the preliminary survey." Instrument panel parts composition planning. (5) Dimension check. Are you sure? "Is displayed. If you agree to this, the schedule will be changed for (3) Instrument panel component configuration planning and (5) Dimension check.

【0061】また、開発プロセスシート81上には、図
4に示したリンクページ37が表示されており、各リン
ク情報へアクセスできるようになっている。本実施形態
の開発プロセス管理システムによれば、以下のような効
果を得ることができる。
On the development process sheet 81, the link page 37 shown in FIG. 4 is displayed so that each link information can be accessed. According to the development process management system of this embodiment, the following effects can be obtained.

【0062】(1)本実施形態では、管理コンピュータ
21により、作業項目、作業期間及び必要な作業付帯情
報(実施結果情報、解説情報、チェック情報、数値情報
及び他システムへのリンク情報)が関連付けて記録され
ている。そして、開発プロセスシート81により、複数
の作業識別子、作業期間及び作業付帯情報が時系列に従
って直接的又は間接的に表示される。また、作業項目、
作業期間及び作業付帯情報のいずれかが間接的に表示さ
れた状態で、端末31からの要求を受信した場合に、該
作業識別子、作業期間又は作業付帯情報が直接的に表示
可能に端末31に提供される。従って、開発プロセスに
関連付けられた開発情報を効率的に蓄積及び活用するこ
とができる。また、開発プロセスが時系列で表示される
ため、ユーザによる開発状況の把握が容易となる。特
に、各種の作業付帯情報が表示されるため、開発情報の
活用や的確なフォローが可能となる。また、開発情報が
管理コンピュータ21に集中して蓄積され、ユーザに対
して利用可能に提供されるため、開発ノウハウのより確
実な伝承が可能となる。
(1) In this embodiment, the management computer 21 associates work items, work periods, and necessary work incidental information (execution result information, commentary information, check information, numerical information, and link information to other systems) with each other. Is recorded. Then, the development process sheet 81 displays a plurality of work identifiers, work periods, and work incidental information directly or indirectly in time series. Also, work items,
When a request is received from the terminal 31 in a state where either the work period or the work incidental information is indirectly displayed, the work identifier, the work period, or the work incidental information can be directly displayed on the terminal 31. Provided. Therefore, it is possible to efficiently accumulate and utilize the development information associated with the development process. Further, since the development process is displayed in time series, the user can easily understand the development status. In particular, since various work incidental information is displayed, it is possible to utilize development information and follow up accurately. Further, since the development information is centrally stored in the management computer 21 and provided so as to be available to the user, the development know-how can be transmitted more reliably.

【0063】(2)本実施形態では、開発プロセスシー
ト81が分類毎に区分けして端末31に表示される。従
って、ユーザは分類された状態で開発プロセスシート8
1のデータを利用することができる。特に、本実施形態
では、分類識別子には、大日程、設計ステップ、全体日
程、本体日程等と階層的な開発プロセスに分類されてお
り、その管理を容易に行うことができる。
(2) In the present embodiment, the development process sheet 81 is displayed on the terminal 31 by classifying it. Therefore, the users are classified in the development process sheet 8
1 data can be used. Particularly, in this embodiment, the classification identifiers are classified into hierarchical development processes such as a large schedule, a design step, an entire schedule, and a main schedule, and the management can be easily performed.

【0064】(3)本実施形態では、管理コンピュータ
21が、端末31からの要求により、開発プロセス一覧
表表示画面74が提供される。また、この開発プロセス
一覧表表示画面74に基づいて選択された開発プロセス
識別子についての開発プロセスシート81が、通信ネッ
トワークを介して該端末に提供される。従って、ユーザ
は開発プロセス一覧表表示画面74のデータを参照して
必要な開発プロセス表のデータを入手することができ
る。
(3) In this embodiment, the management computer 21 is provided with the development process list display screen 74 in response to a request from the terminal 31. Further, the development process sheet 81 for the development process identifier selected based on the development process list display screen 74 is provided to the terminal via the communication network. Therefore, the user can obtain the necessary data of the development process table by referring to the data on the development process list display screen 74.

【0065】(4)本実施形態では、管理コンピュータ
21が、プロジェクト、開発プロセス及び作業識別子の
少なくともいずれか一つについて、作成、追加、変更及
び削除の少なくともいずれか一つを実行する。従って、
プロジェクト、開発プロセス又は作業識別子について、
複数の者が作成、追加、変更又は削除を行うことができ
る。特に、アクセス権限設定テーブル38により、アク
セス権の管理がされており、権限のない者が作成、追
加、変更及び削除を行うことを防止できる。
(4) In this embodiment, the management computer 21 executes at least one of creation, addition, change and deletion for at least one of a project, a development process and a work identifier. Therefore,
For a project, development process or work identifier,
Multiple persons can create, add, change or delete. In particular, the access right is managed by the access right setting table 38, and it is possible to prevent an unauthorized person from creating, adding, changing, and deleting.

【0066】(5)本実施形態によれば、開発プロセス
シート81において、各作業期間表示は、その作業期間
に応じた矢印により行われる。従って、ユーザは各作業
の作業期間を視覚的に容易に把握することができる。
(5) According to this embodiment, in the development process sheet 81, each work period is displayed by an arrow corresponding to the work period. Therefore, the user can easily visually grasp the work period of each work.

【0067】(6)本実施形態によれば、開発プロセス
シート81において、作業項目の完了の有無は、表示さ
れる作業識別子を実施及び未実施によって異なる色で表
示される。従って、ユーザは、作業の完了の有無を色に
よって容易に把握することができる。また、開発プロセ
スシート81では、現時点の月を黄色で、日を赤線で表
示している。従って、ユーザは、開発プロセスに従って
作業をする場合に、容易に現時点を把握することができ
る。
(6) According to the present embodiment, in the development process sheet 81, the presence / absence of completion of a work item is displayed in different colors depending on whether the work identifier is displayed or not. Therefore, the user can easily recognize the completion of the work by the color. In the development process sheet 81, the current month is displayed in yellow and the day is displayed in red. Therefore, the user can easily grasp the present time when working according to the development process.

【0068】(7)本実施形態によれば、複数の作業に
ついて、一の作業の進行が他の作業の進行に影響を与え
る関連性がある場合において、管理コンピュータ21
が、前記一の作業の予定の変更を記録した場合に、前記
他の作業の予定が変更されることを端末31に通知す
る。そして、端末31からの要求があった場合に、前記
他の作業の予定の変更を記録する。従って、一の作業が
遅れる場合又は早まる場合には、ユーザに対して通知を
した上で、他の作業の変更がされる。このため、ユーザ
が意図しない変更等がある場合にこれを未然に防止する
ことができる。
(7) According to the present embodiment, when there is a relation that the progress of one work influences the progress of another work among a plurality of works, the management computer 21
However, when the change of the schedule of the one work is recorded, the terminal 31 is notified that the schedule of the other work is changed. Then, when there is a request from the terminal 31, the change in the schedule of the other work is recorded. Therefore, when one work is delayed or hastened, the other work is changed after notifying the user. Therefore, when there is a change or the like that the user does not intend, this can be prevented in advance.

【0069】なお、上記実施形態は以下のように変更し
てもよい。 ・ 上記実施形態において、管理コンピュータ21に、
チェックシート実施状況把握の手段をさらに設けてもよ
い。即ち、チェックシートの実施・未実施を記録する領
域を設けて、この統計を端末31のディスプレイ上に表
示するようにしてもよい。さらに、未実施の担当者又は
担当部署に対して、管理コンピュータ21から警告を送
信するようにしてもよい。
The above embodiment may be modified as follows. In the above embodiment, the management computer 21
A means for ascertaining the check sheet implementation status may be further provided. That is, an area for recording whether or not the check sheet is executed may be provided so that the statistics are displayed on the display of the terminal 31. Further, the management computer 21 may send a warning to a person or department in charge who has not performed the operation yet.

【0070】・ 上記実施形態において、各作業項目に
おいてさらに詳細な日程がある場合には、各作業項目に
ついての開発プロセスシートが表示されるようにしても
よい。即ち、開発プロセスシートの中にさらに開発プロ
セスシートが設けられるといった、複数階層の構造にし
てもよい。このようにすることにより、一作業項目でも
作業工程数の多いものについては、開発プロセスシート
によるプロセス管理が可能となる。
In the above embodiment, if there is a more detailed schedule for each work item, the development process sheet for each work item may be displayed. That is, a multi-layered structure may be adopted in which a development process sheet is further provided in the development process sheet. By doing so, even for one work item having a large number of work steps, it becomes possible to perform process management by the development process sheet.

【0071】・ 上記実施形態では、端末31は一対若
しくは複数台の表示ディスプレイを有するパソコンとし
たが、一対のプロジェクタを使用して表示を行うことと
してもよい。この場合、開発プロセスシート81を大き
く表示できるため、多数のユーザが同時に閲覧を行うこ
ともできる。また、表示ディスプレイは1つでも3つ以
上でもよく、表示ディスプレイとプロジェクタとの組合
せであってもよい。
In the above embodiment, the terminal 31 is a personal computer having a pair or a plurality of display displays, but it is also possible to use a pair of projectors for displaying. In this case, since the development process sheet 81 can be displayed in a large size, a large number of users can view it at the same time. Further, the number of display displays may be one, three or more, and may be a combination of the display and the projector.

【0072】・ 上記実施形態では、解説書として画像
ファイルのものを使用したが、テキストファイル、音声
ファイル、映像ファイル、実行ファイル等その他の形式
のファイルを使用してもよい及びこれら各ファイルを適
宜組み合わせた複合ファイルであってもよい。
In the above embodiment, an image file is used as a manual, but a text file, a voice file, a video file, an executable file, or any other format may be used. It may be a combined file.

【0073】・ 上記実施形態では、自動車の開発にお
ける開発プロセス管理システムとして説明したが、これ
に限定されず、他の多くの業務プロセス管理システムと
して適用が可能である。
In the above-described embodiment, the development process management system in automobile development has been described, but the invention is not limited to this and can be applied to many other business process management systems.

【0074】[0074]

【発明の効果】以上、本発明によれば、業務プロセスに
関連付けられた業務情報の効率的な蓄積及び活用が可能
となる。また、作業状況の把握及び的確なフォローが可
能となるとともに、業務ノウハウのより確実な伝承が可
能となる。
As described above, according to the present invention, it is possible to efficiently store and utilize business information associated with business processes. Further, it becomes possible to grasp the work status and follow up accurately, and more surely transfer the work know-how.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の開発プロセス管理システムの一実施
形態を示すシステム概略図。
FIG. 1 is a system schematic diagram showing an embodiment of a development process management system of the present invention.

【図2】 個人情報ファイルのデータ構造を示す説明
図。
FIG. 2 is an explanatory diagram showing a data structure of a personal information file.

【図3】 職位コード対照テーブルのデータ構造を示す
説明図。
FIG. 3 is an explanatory diagram showing a data structure of a position code comparison table.

【図4】 リンクページを示す説明図。FIG. 4 is an explanatory diagram showing a link page.

【図5】 アクセス権限設定テーブルのデータ構造を示
す説明図。
FIG. 5 is an explanatory diagram showing a data structure of an access authority setting table.

【図6】 開発プロセスシート用登録データのデータ構
造を示す説明図。
FIG. 6 is an explanatory diagram showing a data structure of development process sheet registration data.

【図7】 解説書情報のデータ構造を示す説明図。FIG. 7 is an explanatory diagram showing a data structure of manual information.

【図8】 解説書表示画面を示す説明図。FIG. 8 is an explanatory diagram showing a manual display screen.

【図9】 実施結果情報のデータ構造を示す説明図。FIG. 9 is an explanatory diagram showing a data structure of implementation result information.

【図10】 実施結果表示画面を示す説明図。FIG. 10 is an explanatory diagram showing an implementation result display screen.

【図11】 解説書・実施結果一覧表表示画面を示す説
明図。
FIG. 11 is an explanatory diagram showing a manual / implementation result list display screen.

【図12】 車両寸法値情報のデータ構造を示す説明
図。
FIG. 12 is an explanatory diagram showing a data structure of vehicle dimension value information.

【図13】 車両寸法値一覧表画面を示す説明図。FIG. 13 is an explanatory diagram showing a vehicle dimension value list screen.

【図14】 チェックシート表示画面を示す説明図。FIG. 14 is an explanatory diagram showing a check sheet display screen.

【図15】 見栄えチェックシート表示画面を示す説明
図。
FIG. 15 is an explanatory diagram showing an appearance check sheet display screen.

【図16】 個人認証画面を示す説明図。FIG. 16 is an explanatory diagram showing a personal authentication screen.

【図17】 開発プロセス一覧表表示画面を示す説明
図。
FIG. 17 is an explanatory diagram showing a development process list display screen.

【図18】 開発プロセスシート81を示す説明図。FIG. 18 is an explanatory diagram showing a development process sheet 81.

【図19】 開発プロセスシート81の詳細を示す説明
図。
FIG. 19 is an explanatory diagram showing details of a development process sheet 81.

【符号の説明】[Explanation of symbols]

21…管理コンピュータ、23…個人情報記録部、24
…アクセス権限情報記録部、25…リンク情報記録部、
26…開発プロセスシート記録部、27…解説書記録
部、28…実施結果情報記録部、29…寸法値記録部、
30…チェックシート情報記録部、81…開発プロセス
シート、I…通信ネットワークとしてのインターネッ
ト、N1,N2…通信ネットワークとしてのネットワー
ク。
21 ... Management computer, 23 ... Personal information recording unit, 24
... access authority information recording unit, 25 ... link information recording unit,
26 ... Development process sheet recording unit, 27 ... Manual recording unit, 28 ... Implementation result information recording unit, 29 ... Dimension value recording unit,
30 ... Check sheet information recording unit, 81 ... Development process sheet, I ... Internet as communication network, N1, N2 ... Network as communication network.

Claims (17)

【特許請求の範囲】[Claims] 【請求項1】 特定プロジェクトについての業務プロセ
スを管理コンピュータによって管理する方法であって、 前記管理コンピュータが、 前記業務プロセスに必要な作業を示す作業識別子及びそ
の作業期間を関連付けて記録する段階と、 前記作業に関連する作業付帯情報がある場合に、該作業
付帯情報を前記作業識別子に関連付けて記録する段階
と、 複数の前記作業識別子、作業期間及び作業付帯情報を時
系列に従って直接的又は間接的に表示する業務プロセス
表のデータを記録する段階と、 前記業務プロセス表のデータを、通信ネットワークを介
して、一以上の端末に対し提供する段階と、 前記作業識別子、作業期間及び作業付帯情報のいずれか
が間接的に表示されるように前記端末に提供された状態
で、該端末からの要求を受信した場合に、該作業識別
子、作業期間又は作業付帯情報を直接的に表示可能に該
端末に提供する段階とを備えたことを特徴とする業務プ
ロセス管理方法。
1. A method of managing a business process for a specific project by a management computer, wherein the management computer records a work identifier indicating a work required for the business process and its work period in association with each other. When there is work incidental information related to the work, a step of recording the work incidental information in association with the work identifier, and a plurality of the work identifiers, work periods, and work incidental information directly or indirectly in time series. The step of recording the data of the business process table to be displayed on the computer, the step of providing the data of the business process table to one or more terminals via a communication network, When a request from the terminal is received in a state in which one of them is provided to be indirectly displayed, And a step of providing the work identifier, work period, or work incidental information to the terminal in a directly displayable manner.
【請求項2】 前記管理コンピュータが、 前記作業識別子が属する分類を示す分類識別子を記録す
る段階と、 前記業務プロセス表のデータを、前記分類識別子毎に分
類して前記端末に表示されるようなデータとして記録す
る段階とをさらに備えたことを特徴とする請求項1に記
載の業務プロセス管理方法。
2. The management computer records a classification identifier indicating a classification to which the work identifier belongs, and the data of the business process table is classified for each classification identifier and displayed on the terminal. The business process management method according to claim 1, further comprising a step of recording as data.
【請求項3】 前記分類識別子には、業務の全体に関す
るプロセスの分類及び該業務の各構成要素に関するプロ
セスの分類が含まれることを特徴とする請求項2に記載
の業務プロセス管理方法。
3. The business process management method according to claim 2, wherein the classification identifier includes a classification of processes related to the entire business and a classification of processes related to each component of the business.
【請求項4】 前記管理コンピュータが、 業務プロセスを示す業務プロセス識別子を記録する段階
と、 前記業務プロセスが属するプロジェクトを示すプロジェ
クト識別子を記録する段階と、 前記端末からの要求により、前記業務プロセス識別子又
はプロジェクト識別子の一覧表のデータを、通信ネット
ワークを介して提供する段階と、 前記一覧表に基づいて選択された前記業務プロセス識別
子についての業務プロセス表のデータを、通信ネットワ
ークを介して該端末に提供する段階とをさらに備えたこ
とを特徴とする請求項1〜3のいずれかに記載の業務プ
ロセス管理方法。
4. The business computer records a business process identifier indicating a business process, a project identifier indicating a project to which the business process belongs, and the business process identifier according to a request from the terminal. Alternatively, the step of providing the data of the list of project identifiers via the communication network, and the data of the business process table for the business process identifier selected based on the list to the terminal via the communication network. The business process management method according to claim 1, further comprising a step of providing.
【請求項5】 前記作業付帯情報は、前記作業に対する
実施結果を示す実施結果情報、前記作業についての解説
である解説情報、チェック項目を示すチェック情報、作
業に必要な数値についての数値情報及び他システムへの
リンク情報の少なくともいずれか一つであることを特徴
とする請求項1〜4のいずれかに記載の業務プロセス管
理方法。
5. The work incidental information includes execution result information indicating an execution result for the work, commentary information for explaining the work, check information indicating a check item, numerical information about numerical values necessary for the work, and others. 5. The business process management method according to claim 1, wherein the business process management information is at least one of link information to the system.
【請求項6】 前記管理コンピュータが、該管理コンピ
ュータ又は前記端末からの要求により、プロジェクト、
業務プロセス及び作業識別子の少なくともいずれか一つ
について、作成、追加、変更及び削除の少なくともいず
れか一つを実行する段階をさらに備えたことを特徴とす
る請求項1〜5のいずれかに記載の業務プロセス管理方
法。
6. The management computer, in response to a request from the management computer or the terminal, a project,
6. The method according to claim 1, further comprising a step of performing at least one of creation, addition, modification and deletion for at least one of business process and work identifier. Business process management method.
【請求項7】 前記管理コンピュータが、 ユーザの個人識別子を記録する段階と、 各ユーザについて前記端末を利用して、プロジェクト、
業務プロセス又は作業識別子について、表示、作成、追
加、変更若しくは削除の権限を与えるかどうかのアクセ
ス権限情報を前記個人識別子と関連付けて記録する段階
とをさらに備えたことを特徴とする請求項1〜6のいず
れかに記載の業務プロセス管理方法。
7. The management computer records a user's personal identifier, and a project is performed by using the terminal for each user.
The method further comprises the step of recording access authority information as to whether to give the authority to display, create, add, change or delete the business process or the work identifier in association with the personal identifier. 6. The business process management method according to any one of 6.
【請求項8】 各作業期間の前記端末への表示は、その
作業期間に応じた長さの線又は矢印により表示するもの
であることを特徴とする請求項1〜7のいずれかに記載
の業務プロセス管理方法。
8. The display of each work period on the terminal is performed by a line or an arrow having a length corresponding to the work period, according to any one of claims 1 to 7. Business process management method.
【請求項9】 前記管理コンピュータが、作業の実施及
び未実施の別を表示する段階をさらに備えたことを特徴
とする請求項1〜8のいずれかに記載の業務プロセス管
理方法。
9. The business process management method according to claim 1, wherein the management computer further comprises a step of displaying whether work has been performed or not.
【請求項10】 前記作業の実施及び未実施の別を表示
する段階は、表示される前記作業識別子を実施及び未実
施によって異なる色で表示することを特徴とする請求項
9に記載の業務プロセス管理方法。
10. The business process according to claim 9, wherein in the step of displaying whether the work is performed or not performed, the displayed work identifier is displayed in a different color depending on whether the work is performed or not performed. Management method.
【請求項11】 前記管理コンピュータが、業務プロセ
スにおける現時点を、年、月、週、日又は時間によって
他と識別可能に表示する段階をさらに備えたことを特徴
とする請求項1〜10のいずれかに記載の業務プロセス
管理方法。
11. The management computer according to claim 1, further comprising a step of displaying the present time in the business process so as to be distinguishable from others by year, month, week, day or time. Business process management method described in Crab.
【請求項12】 前記管理コンピュータが、プロジェク
トのうち、ユーザ又は部署が担当する業務プロセス又は
作業識別子について表示する段階をさらに備えたことを
特徴とする請求項1〜11のいずれかに記載の業務プロ
セス管理方法。
12. The business according to any one of claims 1 to 11, wherein the management computer further comprises a step of displaying a business process or a work identifier of a user in charge of a project in a project. Process management method.
【請求項13】 複数の作業について、一の作業の進行
が他の作業の進行に影響を与える関連性がある場合にお
いて、 前記管理コンピュータが、 これらの作業を関連付けて記録する段階と、 前記一の作業の予定の変更を記録した場合に、前記他の
作業の予定を変更して記録する段階とをさらに備えたこ
とを特徴とする請求項1〜12のいずれかに記載の業務
プロセス管理方法。
13. When the progress of one work influences the progress of another work with respect to a plurality of works, the management computer records these works in association with each other, 13. The business process management method according to claim 1, further comprising a step of changing and recording the schedule of the other work when the schedule of the work is recorded. .
【請求項14】 複数の作業について、一の作業の進行
が他の作業の進行に影響を与える関連性がある場合にお
いて、 前記管理コンピュータが、 これらの作業を関連付けて記録する段階と、 前記一の作業の予定の変更を記録した場合に、前記他の
作業の予定が変更されることを前記端末に通知する段階
と、 前記端末からの要求があった場合に、前記他の作業の予
定の変更を記録する段階とをさらに備えたことを特徴と
する請求項1〜12のいずれかに記載の業務プロセス管
理方法。
14. When a plurality of works have a relationship in which the progress of one work affects the progress of another work, the management computer records these works in association with each other, The step of notifying the terminal that the schedule of the other work is to be changed in the case of recording the change of the schedule of the work, and the schedule of the other work when the request from the terminal is made. 13. The business process management method according to claim 1, further comprising a step of recording the change.
【請求項15】 特定プロジェクトについての業務プロ
セスを管理コンピュータによって管理する業務プロセス
管理システムであって、 前記管理コンピュータが、 前記業務プロセスに必要な作業を示す作業識別子及びそ
の作業期間を関連付けて記録する第1の記録手段と、 前記作業に関連する作業付帯情報がある場合に、該作業
付帯情報を前記作業識別子に関連付けて記録する第2の
記録手段と、 前記作業識別子、作業期間及び作業付帯情報を時系列に
従って直接的又は間接的に表示する業務プロセス表のデ
ータを記録する第3の記録手段と、 前記業務プロセス表のデータを、通信ネットワークを介
して、一以上の端末に対し提供する業務プロセス表デー
タ提供手段とを備え、 前記作業識別子、作業期間及び作業付帯情報のいずれか
が間接的に表示されるように前記端末に提供された状態
で、該端末からの要求を受信した場合に、前記業務プロ
セス表データ提供手段が、該作業識別子、作業期間及び
作業付帯情報を直接的に表示可能に該端末に提供するこ
とを特徴とする業務プロセス管理システム。
15. A business process management system for managing a business process for a specific project by a management computer, wherein the management computer records a work identifier indicating a work required for the business process and its work period in association with each other. A first recording means; a second recording means for recording the work supplementary information in association with the work identifier when there is work supplementary information related to the work; the work identifier, the work period and the work supplementary information; And a third recording means for recording data of a business process table for displaying directly or indirectly according to a time series, and a business of providing the data of the business process table to one or more terminals via a communication network. Process table data providing means, and any of the work identifier, work period, and work incidental information is indirectly When a request is received from the terminal in a state where the work process table data is provided to the terminal so that the work identifier, the work period, and the work incidental information are directly displayed. A business process management system, which is provided to the terminal in a displayable manner.
【請求項16】 請求項1〜14のいずれかに記載の業
務プロセス管理方法を実行させるためのプログラム。
16. A program for executing the business process management method according to claim 1.
【請求項17】 請求項1〜14のいずれかに記載の業
務プロセス管理方法を実行させるためのプログラムを記
録したコンピュータ読み取り可能な記録媒体。
17. A computer-readable recording medium in which a program for executing the business process management method according to any one of claims 1 to 14 is recorded.
JP2002028178A 2002-02-05 2002-02-05 Business process management method, business process management system, its program and recording medium Pending JP2003228648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002028178A JP2003228648A (en) 2002-02-05 2002-02-05 Business process management method, business process management system, its program and recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002028178A JP2003228648A (en) 2002-02-05 2002-02-05 Business process management method, business process management system, its program and recording medium

Publications (1)

Publication Number Publication Date
JP2003228648A true JP2003228648A (en) 2003-08-15

Family

ID=27749479

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002028178A Pending JP2003228648A (en) 2002-02-05 2002-02-05 Business process management method, business process management system, its program and recording medium

Country Status (1)

Country Link
JP (1) JP2003228648A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020530927A (en) * 2017-08-10 2020-10-29 成都牽牛草信息技術有限公司Chengdu Qianniucao Information Technology Co., Ltd. How to authorize the authorization process and its authorization node
CN115658989A (en) * 2022-12-29 2023-01-31 炫我云计算技术(北京)有限公司 User data display method and device, storage medium and electronic equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11282918A (en) * 1998-03-31 1999-10-15 Kawasaki Steel Systems R & D Corp Document management method and device therefor and computer readable storage medium
JP2001209738A (en) * 2000-01-26 2001-08-03 Hitachi Ltd Processing time display method and processing period setting method in workflow system
JP2001306772A (en) * 2000-04-26 2001-11-02 Matsushita Refrig Co Ltd Method and system for managing job, central unit and recording medium

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11282918A (en) * 1998-03-31 1999-10-15 Kawasaki Steel Systems R & D Corp Document management method and device therefor and computer readable storage medium
JP2001209738A (en) * 2000-01-26 2001-08-03 Hitachi Ltd Processing time display method and processing period setting method in workflow system
JP2001306772A (en) * 2000-04-26 2001-11-02 Matsushita Refrig Co Ltd Method and system for managing job, central unit and recording medium

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020530927A (en) * 2017-08-10 2020-10-29 成都牽牛草信息技術有限公司Chengdu Qianniucao Information Technology Co., Ltd. How to authorize the authorization process and its authorization node
JP7429390B2 (en) 2017-08-10 2024-02-08 成都牽牛草信息技術有限公司 How to authorize users for an approval process and its approval nodes
CN115658989A (en) * 2022-12-29 2023-01-31 炫我云计算技术(北京)有限公司 User data display method and device, storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
US7024433B2 (en) Parts design change supporting system, program, and recording medium
US7747572B2 (en) Method and system for supply chain product and process development collaboration
US7600182B2 (en) Electronic data capture and verification
US7493591B2 (en) Methods and systems for animating a workflow and a project plan
US6351734B1 (en) System and method for resource allocation and planning
Rosemann et al. Preparation of process modeling
JP5178417B2 (en) Design support apparatus, design support system, design support method, and design support program
US8429528B2 (en) Label data procurement and management system
CN109712037B (en) Intelligent law enforcement system based on standardized panoramic business process
WO2020225861A1 (en) Project management system
JP2014089674A (en) Database access right setting management system
US8626760B2 (en) System and method for document management
US20080228815A1 (en) Methods and systems for managing risk
JP4252257B2 (en) Elevator new installation specification setting support system
US20080281455A1 (en) Materials, Operations and Tooling Interface and Methods for Managing a Remote Production Facility
Cobb Enterprise Process Mapping
US7698224B2 (en) System and method for certification
US20040193634A1 (en) Managing regulatory information
US20040267814A1 (en) Master test plan/system test plan database tool
JP2004054716A (en) Work management method and display method for work
JP2003228648A (en) Business process management method, business process management system, its program and recording medium
Zahedi et al. Interaction with analysis and simulation methods via minimized computer-readable BIM-based communication protocol
JP2003108735A (en) Project management system, program and recording medium
JP7300567B1 (en) Privilege management system for business systems
JP4134594B2 (en) Theme management system and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061219

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070417