JP2001306772A - Method and system for managing job, central unit and recording medium - Google Patents

Method and system for managing job, central unit and recording medium

Info

Publication number
JP2001306772A
JP2001306772A JP2000126597A JP2000126597A JP2001306772A JP 2001306772 A JP2001306772 A JP 2001306772A JP 2000126597 A JP2000126597 A JP 2000126597A JP 2000126597 A JP2000126597 A JP 2000126597A JP 2001306772 A JP2001306772 A JP 2001306772A
Authority
JP
Japan
Prior art keywords
work
information
unit
terminal device
job
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000126597A
Other languages
Japanese (ja)
Inventor
Yasuaki Mori
泰秋 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Refrigeration Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Refrigeration Co filed Critical Matsushita Refrigeration Co
Priority to JP2000126597A priority Critical patent/JP2001306772A/en
Publication of JP2001306772A publication Critical patent/JP2001306772A/en
Pending legal-status Critical Current

Links

Landscapes

  • Small-Scale Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method and a system for managing job, a central unit and a recording medium by which a job is performed promptly and efficiently by easily realizing the grasp of the progress condition of the job composed of plural unit jobs, the operation of job information corresponding to each of unit jobs and the observance of rules or the like on an existent system. SOLUTION: In terminal equipment 20, concerning the job composed of plural unit jobs, graphics showing the respective unit jobs are linked buy arrows so that a flow chart showing the relation of respective unit jobs can be displayed and when an operator points out graphic expressing an arbitrary unit job, job information corresponding to the unit job pointed from a central unit 20 is extracted from a connected device on the system and transmitted to the terminal equipment 20. When the received job information corresponds to different processing bases, in the terminal equipment 20, converting processing is automatically performed and the information is converted to a form operable for the terminal equipment 20.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】複数の単位仕事により構成さ
れる仕事の進捗状況を管理する仕事管理方法、その方法
を適用した仕事管理システム、そのシステムに用いられ
る中央装置、及びその装置を実現するためのプログラム
が記録された記録媒体に関する。
The present invention relates to a job management method for managing the progress of a job constituted by a plurality of unit jobs, a job management system to which the method is applied, a central device used in the system, and a device for realizing the device. Related to a recording medium on which the program is recorded.

【0002】[0002]

【従来の技術】一般的に企業における仕事では、部署及
び職務の異なる複数の担当者が、夫々の単位仕事を所定
の順序で実行することにより遂行される。各単位仕事同
士は、互いに関係しあい、通常上流側の仕事が完了後、
下流側の仕事が行われ、上流側の仕事結果に基づいて下
流側の仕事が実施される。
2. Description of the Related Art In general, a job in a company is performed by a plurality of persons in different departments and duties by executing respective unit jobs in a predetermined order. Each unit work is related to each other and usually after the upstream work is completed,
Downstream work is performed, and downstream work is performed based on the upstream work results.

【0003】そして各担当者間での仕事の受け渡しは、
仕事の結果を文書及び帳票等の書類、並びに電子メール
等の通信手段を用いて行われる。各仕事の管理を担当す
る管理者は、承認権限を有する単位仕事の結果を示す文
書及び帳票等の書類を確認し、承認することで、各単位
仕事は下流側の単位仕事の担当者へ受け渡される。
[0003] The transfer of work between each person in charge is
The work result is performed using documents such as documents and forms, and communication means such as e-mail. The manager in charge of the management of each job confirms and approves the document showing the result of the unit job and the form, etc., having the approval authority, and approves it. Passed.

【0004】また仕事全体の流れは、各単位仕事同士の
関係を示す流れ図を用いて管理されることがあり、流れ
図を用いることにより、全体の進捗状況を把握すること
が可能である。
[0004] The flow of the entire work may be managed using a flow chart showing the relationship between the unit works, and it is possible to grasp the overall progress of the work by using the flow chart.

【0005】図10は従来の仕事の管理方法における各
単位仕事の関係を示す流れ図である。図10に示すよう
に、営業、フロント営業、及び生産管理等の各部署にお
ける販売計画表作成、チェック承認、及び機種別販売計
画策定等の各単位仕事が所定の図形で示され、夫々の単
位仕事の関係が仕事の流れを示す矢印により結びつけら
れている。これにより管理者及び各担当者は、仕事全体
の流れを把握することができる。
FIG. 10 is a flowchart showing the relationship between unit jobs in the conventional job management method. As shown in FIG. 10, each unit work such as creation of a sales plan table, check approval, and formulation of a model-specific sales plan in each department such as sales, front sales, and production management is indicated by a predetermined graphic. Work relationships are linked by arrows indicating work flow. Thereby, the manager and each person in charge can grasp the flow of the entire work.

【0006】[0006]

【発明が解決しようとする課題】しかしながら従来の仕
事の管理方法では、進捗状況を管理する流れ図及び各単
位仕事に用いられる書類は、両方とも紙製の書類である
か、又は一方だけがコンピュータで取り扱える電子ファ
イルである場合がほとんどであり、両方とも電子ファイ
ルであるとしても、夫々独立した電子ファイルで、互換
性に欠けていた。
However, in the conventional work management method, the flow chart for managing the progress and the documents used for each unit work are both paper documents, or only one is a computer. In most cases, the files could be handled, and even if both were electronic files, they were independent electronic files and lacked compatibility.

【0007】互換性に欠ける理由としては、元々統合し
て管理するという考え方がなく、コンピュータの処理に
おける処理基盤(プラットフォーム)、具体的には夫々
の電子ファイルを起動させる表計算用ソフトウエア及び
図形作成用ソフトウエア等の応用ソフトウエア、並びに
OS等の基本ソフトウエア等の仕様が異なった環境で作
成されていることにある。
[0007] The reason for the lack of compatibility is that there is no concept of integration and management from the start, and there is no processing base (platform) in computer processing, specifically, spreadsheet software and graphics for starting each electronic file. It is that specifications of application software such as creation software and basic software such as OS are created in different environments.

【0008】ただし夫々単位仕事を行う上で、夫々の処
理基盤は適した状態に発展しており、既存の処理環境を
撤廃し、改めて処理基盤を統一していくには、多大な作
業量、時間、及び費用を必要とするという問題がある。
[0008] However, each processing base has been developed to be suitable for performing each unit work, and a great amount of work and a large amount of work are required to eliminate the existing processing environment and unify the processing base again. There is a problem that time and cost are required.

【0009】そこで実際に異なる処理基盤で作成された
電子ファイルを使用するためには、異なる処理基盤で作
成された電子ファイルを使用するため、夫々の処理基盤
に対応するエミュレータの起動等の処理を行わなければ
ならず、作業量及び相当の知識が必要となる。
In order to actually use electronic files created on different processing platforms, an electronic file created on a different processing platform is used. Must be done, requiring a lot of work and considerable knowledge.

【0010】このように互換性が欠けること、及び紙製
の書類により各単位仕事の受け渡しがなされることは、
仕事の全体の速度を向上させる上での障害になるという
問題があり、しかも各書類の管理には、多大な作業量及
び大きな物理的空間を必要とするため、仕事の効率化の
妨げとなるという問題がある。
[0010] The lack of compatibility and the transfer of each unit work by paper documents are as follows.
There is a problem in that it hinders the overall speed of work, and the management of each document requires a large amount of work and a large amount of physical space, which hinders work efficiency. There is a problem.

【0011】また管理者から見た場合、仕事全体の進捗
状況が把握し難く、予定に対して遅れが発生した場合、
又は発生する恐れがある場合において、各単位仕事の計
画変更等の対応を速やかにとることができないという問
題がある。
From the point of view of the manager, it is difficult to grasp the progress of the entire work, and if the schedule is delayed,
Or, when there is a possibility of occurrence, there is a problem that it is not possible to promptly take measures such as a plan change of each unit work.

【0012】そして管理者が進捗状況を把握し難いこと
による弊害として、各担当者が本来の規則から外れる行
為、例えば承認権限外である単位仕事の指示、また不注
意により単位仕事の順序を間違う恐れがあるという問題
がある。
[0012] As an adverse effect due to the difficulty of the manager in grasping the progress status, each person in charge deviates from the original rules, for example, instructs the unit work which is out of the approval authority, or mistakes the order of the unit work due to carelessness. There is a problem of fear.

【0013】本発明は斯かる事情に鑑みてなされたもの
であり、既存の環境にある各装置を通信ネットワークに
接続し、流れ図及び各単位仕事を電子ファイルとして管
理し、流れ図上の各単位仕事を示す図形を指示すること
により、対応する各単位仕事の電子ファイルを起動する
ことができ、また夫々の電子ファイルを管理する装置の
処理基盤が異なる場合でも、対応するエミュレータの起
動等の処理を自動的に行うことにより、仕事の効率化及
び迅速化を可能にする仕事管理方法、その方法を適用し
た仕事管理システム、そのシステムに用いられる中央装
置、及びその装置を実現するためのプログラムが記録さ
れた記録媒体の提供を主たる目的とする。
The present invention has been made in view of such circumstances, and connects each device in an existing environment to a communication network, manages a flow chart and each unit work as an electronic file, and executes each unit work on the flow chart. The electronic file of each corresponding unit work can be started by designating the figure indicating the, and even if the processing base of the device that manages each electronic file is different, the processing such as the start of the corresponding emulator can be performed. A job management method that enables the efficiency and speed of work by performing automatically, a job management system to which the method is applied, a central device used in the system, and a program for realizing the device are recorded. The main purpose is to provide a recorded recording medium.

【0014】さらに各単位仕事の進捗状況を流れ図上の
図形の表示色の変更等の処理にて表示し、上流側の単位
仕事の進捗状況に応じて、下流側の単位仕事の実施を制
限することにより、単位仕事の進捗状況の管理及び規則
の遵守を実施することが可能な仕事管理システム等の提
供を他の目的とする。
Further, the progress status of each unit work is displayed by processing such as changing the display color of a graphic on the flow chart, and the execution of the downstream unit work is restricted according to the progress status of the upstream unit work. Another object of the present invention is to provide a work management system and the like capable of managing the progress of unit work and complying with rules.

【0015】また例えば経営指標の管理等の上流側と下
流側とで共有する情報が存在する場合、その受け渡しを
自動的に行うことにより仕事を効率化することが可能な
仕事管理システム等の提供を更に他の目的とする。
Also, when there is information shared between the upstream side and the downstream side, for example, management index management, etc., there is provided a work management system and the like capable of streamlining work by automatically transferring the information. For still another purpose.

【0016】しかも各単位仕事の関係の変更等の処理を
流れ図上で実施することができるので、計画変更等の処
理を迅速に行うことが可能な仕事管理システム等の提供
を更に他の目的とする。
In addition, since a process such as a change in the relationship between unit jobs can be carried out on a flow chart, it is still another object of the present invention to provide a job management system and the like capable of quickly performing a process such as a plan change. I do.

【0017】[0017]

【課題を解決するための手段】第1発明に係る仕事管理
方法は、複数の単位仕事により構成される仕事の進捗状
況を管理する中央装置及び該中央装置と通信する端末装
置を備える仕事管理方法において、前記端末装置は、各
単位仕事を示す図形を用いて各単位仕事同士の関係を示
す流れ図を表示し、任意の単位仕事を示す図形を指示す
る入力を受け付け、受け付けた入力を示す単位仕事指示
情報を、前記中央装置へ送信し、前記中央装置は、受信
した単位仕事指示情報が示す単位仕事に関する情報を前
記端末装置へ送信することを特徴とする。
According to a first aspect of the present invention, there is provided a job management method including a central device for managing the progress of a job composed of a plurality of unit jobs, and a terminal device communicating with the central device. In the terminal device, the terminal device displays a flowchart showing the relationship between the unit jobs using a figure indicating each unit work, accepts an input indicating a figure indicating any unit work, and indicates a unit work indicating the received input Instruction information is transmitted to the central device, and the central device transmits information on the unit work indicated by the received unit work instruction information to the terminal device.

【0018】第1発明に係る仕事管理方法では、流れ図
及び各単位仕事を電子ファイルとして管理し、単位仕事
を示す図形を指示することで、対応する単位仕事の電子
ファイルを起動させることにより、紙製の書類の受け渡
し等の行為を省いて仕事全体の速度を向上させ、また各
書類の管理に必要な作業量及び物理的な空間を削減し、
全体の仕事の流れの中での夫々の単位仕事の位置付けを
明確にするので、仕事の迅速化及び効率化を実施するこ
とが可能である。
In the job management method according to the first aspect of the present invention, the flow chart and each unit work are managed as an electronic file, and a figure indicating the unit work is designated to activate the electronic file of the corresponding unit work. To reduce the amount of work and the physical space required to manage each document, eliminating the need to transfer documents and other products.
Since the position of each unit work in the overall work flow is clarified, it is possible to execute the work faster and more efficiently.

【0019】第2発明に係る仕事管理方法は、複数の単
位仕事により構成される仕事の進捗状況を管理する中央
装置及び該中央装置と通信する端末装置を備える仕事管
理方法において、前記中央装置と通信し、前記端末装置
と異なる処理基盤にて処理される仕事情報を記録する記
録手段を有する通信装置を備え、前記端末装置は、各単
位仕事を示す図形を用いて各単位仕事同士の関係を示す
流れ図を表示し、任意の単位仕事を示す図形を指示する
入力を受け付け、受け付けた入力を示す単位仕事指示情
報を、前記中央装置へ送信し、前記中央装置は、受信し
た単位仕事指示情報が示す単位仕事に関する仕事情報
を、前記通信装置が有する記録手段から抽出し、抽出し
た仕事情報を、前記端末装置へ送信し、前記端末装置
は、更に、受信した仕事情報を、自機の処理基盤で処理
することが可能な形態に変換することを特徴とする。
A work management method according to a second aspect of the present invention is a work management method comprising a central device for managing the progress of a job constituted by a plurality of unit jobs and a terminal device communicating with the central device. The communication device includes a communication device that has a recording unit that records work information that is processed on a different processing base from the terminal device. The terminal device uses a graphic representing each unit work to define a relationship between the unit jobs. A flow chart is shown, an input indicating a figure indicating an arbitrary unit work is received, unit work instruction information indicating the received input is transmitted to the central device, and the central device receives the unit work instruction information. Job information relating to the indicated unit job is extracted from the recording means of the communication device, and the extracted job information is transmitted to the terminal device. The terminal device further receives the received job information. Information, and converting into the possible forms by treatment with the processing platform of its own.

【0020】第2発明に係る仕事管理方法では、流れ図
及び各単位仕事を電子ファイルとして管理し、単位仕事
を示す図形を指示することで、対応する単位仕事の電子
ファイルを起動させることにより、紙製の書類の受け渡
し等の行為を省いて仕事全体の速度を向上させ、また各
書類の管理に必要な作業量及び物理的な空間を削減し、
全体の仕事の流れの中での夫々の単位仕事の位置付けを
明確にするので、仕事の迅速化及び効率化を実施するこ
とが可能であり、しかも電子ファイルを記録する通信装
置の処理基盤に対応する形態の電子ファイルを、例えば
エミュレータを起動させて、端末装置の処理基盤に対応
する形態に自動的に変換するので、処理基盤が異なる通
信装置にて処理される電子ファイルを、特に専門的な知
識が無くとも操作することができ、これにより処理基盤
を統一する作業及び時間を要することなく仕事の迅速化
及び効率化を実施することが可能である。
In the job management method according to the second aspect of the present invention, the flow chart and each unit work are managed as an electronic file, a figure indicating the unit work is designated, and the electronic file of the corresponding unit work is started, so that the paper file is started. To reduce the amount of work and the physical space required to manage each document, eliminating the need to transfer documents and other products.
Clarify the position of each unit work in the overall work flow, so that work can be made faster and more efficient, and it also supports the processing infrastructure of communication devices that record electronic files Since the electronic file of the form to be processed is automatically converted into a form corresponding to the processing base of the terminal device by, for example, starting up an emulator, the electronic file processed by the communication device having a different processing base can be specially processed. The operation can be performed without knowledge, and thus, the work can be speeded up and the efficiency can be increased without requiring the work and time for unifying the processing base.

【0021】第3発明に係る仕事管理システムは、複数
の単位仕事により構成される仕事の進捗状況を管理する
中央装置及び該中央装置と通信する端末装置を備える仕
事管理システムにおいて、前記中央装置は、各単位仕事
を図形で示す流れ図により、各単位仕事同士の関係を表
示させる流れ図情報を記録する手段と、各単位仕事に対
応する仕事情報の記録位置を示す位置情報を記録する手
段とを備え、前記端末装置は、前記中央装置が管理する
流れ図情報に基づいて、流れ図を表示させる手段と、任
意の単位仕事を示す図形を指示する入力を受け付ける手
段と、受け付けた入力を示す単位仕事指示情報を、前記
中央装置へ送信する手段とを備え、前記中央装置は、更
に、受信した単位仕事指示情報が示す単位仕事に対応す
る仕事情報を示す位置情報に基づいて、仕事情報を抽出
する手段と、該仕事情報を前記端末装置へ送信する手段
とを備えることを特徴とする。
[0021] A work management system according to a third aspect of the present invention is a work management system comprising a central device for managing the progress of a job constituted by a plurality of unit jobs, and a terminal device for communicating with the central device. A unit for recording flow chart information for displaying a relationship between each unit work by a flowchart showing each unit work by a graphic, and a unit for recording position information indicating a recording position of work information corresponding to each unit work. The terminal device, based on the flow chart information managed by the central device, means for displaying a flow chart, means for receiving an input indicating a figure indicating an arbitrary unit work, and unit work instruction information indicating the received input To the central device, the central device further indicating work information corresponding to the unit work indicated by the received unit work instruction information. Based on the location information, characterized in that it comprises means for extracting work information, and means for transmitting the job information to the terminal device.

【0022】第3発明に係る仕事管理システムでは、流
れ図及び各単位仕事を電子ファイルとして管理し、単位
仕事を示す図形を指示することで、対応する単位仕事の
電子ファイルを起動させることにより、紙製の書類の受
け渡し等の行為を省いて仕事全体の速度を向上させ、ま
た各書類の管理に必要な作業量及び物理的な空間を削減
し、全体の仕事の流れの中での夫々の単位仕事の位置付
けを明確にするので、仕事の迅速化及び効率化を実施す
ることが可能である。
In the work management system according to the third aspect of the present invention, the flow chart and each unit work are managed as an electronic file, and a figure indicating the unit work is designated, thereby activating the corresponding unit work electronic file. To improve the speed of the entire work by omitting acts such as transfer of manufactured documents, to reduce the amount of work and physical space required for management of each document, and to make each unit in the overall work flow Since the position of the work is clarified, the work can be speeded up and the efficiency can be improved.

【0023】第4発明に係る仕事管理システムは、第3
発明において、前記中央装置と通信する通信装置を備
え、前記通信装置は、仕事情報を記録する手段を備える
ことを特徴とする。
The work management system according to the fourth aspect of the present invention provides
In the invention, a communication device for communicating with the central device is provided, and the communication device includes means for recording work information.

【0024】第4発明に係る仕事管理システムでは、中
央装置及び端末装置以外の通信装置に記録した仕事情報
を利用することができるように通信ネットワークを拡大
することにより、夫々の仕事情報を管理する既存設備と
の統合を行い、仕事の迅速化及び効率化を実施すること
が可能である。
In the work management system according to the fourth invention, each work information is managed by expanding the communication network so that the work information recorded in the communication device other than the central device and the terminal device can be used. By integrating with existing equipment, it is possible to carry out work faster and more efficiently.

【0025】第5発明に係る仕事管理システムは、第3
発明又は第4発明において、前記中央装置は、各単位仕
事に対応する仕事情報を記録する装置での処理基盤を示
す処理基盤情報を記録しており、仕事情報を前記端末装
置へ送信する場合に、当該仕事情報に対応する処理基盤
情報を抽出する手段と、該処理基盤情報を前記端末装置
へ送信する手段とを備え、前記端末装置は、受信した処
理基盤情報に基づいて、対応する仕事情報を、自機の処
理基盤で処理することが可能な形態に変換する手段を備
えることを特徴とする。
[0025] The work management system according to the fifth invention is characterized in that the work management system comprises:
In the invention or the fourth invention, the central device records processing base information indicating a processing base in a device that records work information corresponding to each unit work, and transmits work information to the terminal device. Means for extracting processing base information corresponding to the work information, and means for transmitting the processing base information to the terminal device, wherein the terminal device receives the corresponding work information based on the received processing base information. Is converted into a form that can be processed by the processing base of the own device.

【0026】第5発明に係る仕事管理システムでは、夫
々の電子ファイルを管理する装置の処理基盤が異なる場
合でも、流れ図上の図形を指示することにより、対応す
るエミュレータの起動等の処理が行われて、端末装置で
作業することが可能な処理基盤に自動的に変換するの
で、処理基盤が異なる既存設備と統合して、システムを
拡大した場合でも、特に専門的な知識が無くとも簡単な
作業で、異なる処理基盤で稼働する設備にて管理されて
いる電子ファイルを用いた操作を行うことができ、これ
により処理基盤を統一する作業及び時間を要することな
く仕事の迅速化及び効率化を実施することが可能であ
る。
In the work management system according to the fifth aspect of the present invention, even if the processing bases of the devices for managing the electronic files are different, processing such as activation of the corresponding emulator is performed by designating the figure on the flowchart. Automatically converts to a processing platform that can be operated on a terminal device, so even if the system is expanded by integrating with existing facilities with different processing platforms, simple tasks can be performed without special knowledge. In this way, it is possible to perform operations using electronic files managed by equipment that operates on different processing infrastructures, thereby speeding up work and improving efficiency without requiring time and work to unify processing infrastructures It is possible to

【0027】第6発明に係る仕事管理システムは、第3
発明乃至第5発明のいずれかにおいて、前記端末装置
は、仕事情報を更新する入力、及び当該仕事情報が示す
単位仕事の進捗状況を示す入力を受け付ける手段と、受
け付けた更新入力に基づいて、仕事情報を更新する更新
仕事情報を生成する手段と、受け付けた進捗状況入力に
基づいて、進捗状況情報を生成する手段と、生成した更
新仕事情報及び進捗状況情報を、前記中央装置へ送信す
る手段とを備え、前記中央装置は、受信した更新仕事情
報に基づいて、仕事情報を更新させる手段と、受信した
進捗状況情報に基づいて、当該進捗状況情報に対応する
単位仕事を示す図形の表示方法を変更する手段とを備え
ることを特徴とする。
[0027] The work management system according to the sixth aspect of the present invention is the work management system according to the third aspect.
The terminal device according to any one of the inventions, wherein the terminal device accepts an input for updating work information and an input for indicating a progress status of a unit job indicated by the work information, and a job based on the received update input. Means for generating updated work information for updating information; means for generating progress information based on the received progress input; means for transmitting the generated updated work information and progress information to the central device; The central device, based on the received updated work information, means for updating the work information, based on the received progress information, a display method of a graphic indicating a unit work corresponding to the progress information Changing means.

【0028】第6発明に係る仕事管理システムでは、各
単位仕事の進捗状況に応じて、図形の表示色の変更とい
うように、流れ図上の図形の表示方法を変更することに
より、流れ図を視認するだけで、仕事の進捗状況を把握
することができるので、単位仕事の進捗状況の管理を容
易にすることが可能である。
In the work management system according to the sixth aspect, the flow chart is visually recognized by changing the display method of the graphic on the flow chart, such as changing the display color of the graphic, according to the progress of each unit work. Only by doing so, it is possible to grasp the progress of the work, so that it is possible to easily manage the progress of the unit work.

【0029】第7発明に係る仕事管理システムは、第6
発明において、前記中央装置は、更新仕事情報に基づい
て変更される第1の仕事情報に含まれる所定のデータを
抽出する手段と、該データに基づいて、第1の仕事情報
と当該データを共有する第2の仕事情報を更新させる手
段とを備えることを特徴とする。
[0029] The work management system according to the seventh aspect of the present invention is the work management system according to the sixth aspect.
In the invention, the central device extracts predetermined data included in the first work information changed based on the updated work information, and shares the data with the first work information based on the data. Means for updating the second job information to be updated.

【0030】第7発明に係る仕事管理システムでは、経
営指標の管理等の上流側と下流側とで共有する情報が存
在する場合、上流側により更新された仕事情報に基づい
て、共有される下流側の仕事情報を変更するので、経営
指標の管理に必要な計算用のデータを共有することが可
能であり、書類等の受け渡しが不要となるので、仕事の
迅速化及び効率化を実施することが可能である。しかも
このとき用いられる表計算用ソフトウエア等の処理基盤
が異なる場合に自動的にその変換を行うようにすれば、
更なる迅速化及び効率化を実施することが可能である。
In the work management system according to the seventh aspect of the present invention, when there is information shared between the upstream side and the downstream side, such as management of a management index, the downstream side shared based on the work information updated by the upstream side. Since the work information on the side is changed, it is possible to share the data for calculation necessary for management of management indicators, and it is not necessary to transfer documents etc. Is possible. In addition, if the processing base such as spreadsheet software used at this time is different, the conversion is automatically performed,
Further speedup and efficiency can be implemented.

【0031】第8発明に係る仕事管理システムは、第6
発明又は第7発明において、前記中央装置は、第1の単
位仕事の進捗状況情報に基づいて、第1の単位仕事以降
に実施される第2の単位仕事の仕事情報の更新を制限す
る手段を備えることを特徴とする。
[0031] The work management system according to the eighth aspect of the present invention is the work management system according to the sixth aspect.
In the invention or the seventh invention, the central device, based on the progress information of the first unit work, means for restricting updating of the work information of the second unit work performed after the first unit work. It is characterized by having.

【0032】第8発明に係る仕事管理システムでは、上
流側の単位仕事の進捗に応じて、下流側の単位仕事を制
限するため、上流側の単位仕事が完了していないのに下
流側の単位仕事が開始される等の、本来の規則に反する
行為を防止することが可能である。
In the work management system according to the eighth aspect, the unit work on the downstream side is restricted in accordance with the progress of the unit work on the upstream side. It is possible to prevent acts that violate the original rules, such as when work is started.

【0033】第9発明に係る仕事管理システムは、第3
発明乃至第8発明のいずれかにおいて、前記端末装置
は、個人を特定する識別情報の入力を受け付ける手段
と、受け付けた識別情報を、前記中央装置へ送信する手
段とを備え、前記中央装置は、受信した識別情報に基づ
いて、抽出すべき仕事情報を制限する手段を備えること
を特徴とする。
[0033] The work management system according to the ninth invention has a third aspect.
In any one of the inventions to the eighth invention, the terminal device includes means for receiving input of identification information for specifying an individual, and means for transmitting the received identification information to the central device, wherein the central device comprises: It is characterized by comprising means for restricting work information to be extracted based on the received identification information.

【0034】第9発明に係る仕事管理システムでは、端
末装置を操作する操作者の職制に応じて、操作すること
ができる仕事情報を制限することにより、規則に反する
行為を防止し、しかも第8発明と組み合わせることによ
り、承認権限を有する管理者の承認が無い場合に、下流
側の仕事を実施できないように制限することができるの
で、更に規則に反する行為を防止することが可能であ
る。
In the work management system according to the ninth aspect, the work information that can be operated is restricted according to the job system of the operator who operates the terminal device, thereby preventing an action that violates the rules. By combining with the invention, it is possible to restrict the work on the downstream side from being performed when there is no approval of the administrator having the approval authority, so that it is possible to further prevent the act that violates the rules.

【0035】第10発明に係る仕事管理システムは、第
3発明乃至第9発明のいずれかにおいて、前記端末装置
は、流れ図上に表示された単位仕事の内容及び各単位仕
事同士の関係を変更する入力を受け付ける手段と、受け
付けた変更入力に基づいて、単位仕事の内容及び各単位
仕事同士の関係を変更する変更情報を生成する手段と、
該変更情報を、前記中央装置へ送信する手段とを備え、
前記中央装置は、受信した変更情報に基づいて、仕事情
報を更新させる手段と、受信した変更情報に基づいて、
流れ図情報を更新する手段とを備えることを特徴とす
る。
According to a tenth aspect of the present invention, in the job management system according to any one of the third to ninth aspects, the terminal device changes the content of the unit work displayed on the flowchart and the relationship between the unit works. Means for receiving input, and means for generating change information for changing the content of the unit work and the relationship between the unit works based on the received change input,
Means for transmitting the change information to the central device,
The central device, based on the received change information, means for updating the work information, based on the received change information,
Means for updating flow chart information.

【0036】第10発明に係る仕事管理システムでは、
各単位仕事の関係の変更等の処理を流れ図上で実施する
ことができるので、計画変更等の処理を迅速に行うこと
が可能である。
In the work management system according to the tenth aspect,
Since the processing such as the change of the relationship between the unit jobs can be performed on the flowchart, the processing such as the plan change can be performed quickly.

【0037】第11発明に係る中央装置は、端末装置と
通信する通信手段を備え、複数の単位仕事により構成さ
れる仕事の進捗状況を管理する中央装置において、各単
位仕事を図形で示す流れ図により、各単位仕事同士の関
係を表示させる流れ図情報を記録する手段と、各単位仕
事に対応する仕事情報の記録位置を示す位置情報を記録
する手段と、流れ図情報を前記端末装置へ送信する手段
と、任意の単位仕事を指示する単位仕事指示情報を、端
末装置から受信した場合に、受信した単位仕事指示情報
が示す単位仕事に対応する仕事情報を示す位置情報に基
づいて、仕事情報を抽出する手段と、該仕事情報を、単
位仕事指示情報の送信元の端末装置へ送信する手段とを
備えることを特徴とする。
A central device according to an eleventh aspect of the present invention is provided with a communication device for communicating with a terminal device, wherein the central device manages the progress of work composed of a plurality of unit jobs. Means for recording flow chart information for displaying a relationship between each unit work, means for recording position information indicating a recording position of work information corresponding to each unit work, and means for transmitting flow chart information to the terminal device, In a case where unit work instruction information indicating an arbitrary unit work is received from a terminal device, work information is extracted based on position information indicating work information corresponding to the unit work indicated by the received unit work instruction information. Means, and means for transmitting the work information to the terminal device that has transmitted the unit work instruction information.

【0038】第11発明に係る中央装置では、流れ図及
び各単位仕事を電子ファイルとして管理し、単位仕事を
示す図形を指示することで、対応する単位仕事の電子フ
ァイルを起動することにより、紙製の書類の受け渡し等
の行為を省いて仕事全体の速度を向上させ、また各書類
の管理に必要な作業量及び物理的な空間を削減し、全体
の仕事の流れの中での夫々の単位仕事の位置付けを明確
にするので、仕事の迅速化及び効率化を実施することが
可能である。
In the central device according to the eleventh aspect, the flow chart and each unit work are managed as an electronic file, and a figure showing the unit work is designated, and the electronic file of the corresponding unit work is activated, thereby making the paper work. To reduce the amount of work and physical space required to manage each document by eliminating the transfer of documents, etc. Since the position of the work is clarified, it is possible to speed up work and increase efficiency.

【0039】第12発明に係るコンピュータでの読み取
りが可能な記録媒体は、端末装置と通信する通信手段を
備えるコンピュータに、複数の単位仕事により構成され
る仕事の進捗状況を管理させるプログラムを記録してあ
る、コンピュータでの読み取りが可能な記録媒体におい
て、コンピュータに、各単位仕事を図形で示す流れ図に
より、各単位仕事同士の関係を表示させる流れ図情報
を、前記端末装置へ送信させるプログラムコード手段
と、コンピュータに、任意の単位仕事を指示する単位仕
事指示情報を、端末装置から受信した場合に、受信した
単位仕事指示情報が示す単位仕事に対応する仕事情報を
抽出させるプログラムコード手段と、コンピュータに、
抽出した仕事情報を、単位仕事指示情報の送信元の端末
装置へ送信させるプログラムコード手段とを含むコンピ
ュータプログラムを記録してあることを特徴とする。
According to a twelfth aspect of the present invention, a computer-readable recording medium records a program for causing a computer having communication means for communicating with a terminal device to manage the progress of a task constituted by a plurality of unit tasks. Program code means for transmitting, to the terminal device, flow chart information for displaying, by a flow chart showing each unit work by a computer, a relation between each unit work, on a computer-readable recording medium. Program code means for causing a computer to extract work information corresponding to a unit work indicated by the received unit work instruction information, when the unit work instruction information indicating an arbitrary unit work is received from the terminal device; ,
A computer program including program code means for transmitting the extracted work information to a terminal device that has transmitted the unit work instruction information is recorded.

【0040】第12発明に係るコンピュータでの読み取
りが可能な記録媒体では、記録されているプログラムを
コンピュータにて実行することで、流れ図及び各単位仕
事を電子ファイルとして管理し、単位仕事を示す図形を
指示することで、対応する単位仕事の電子ファイルを起
動することにより、紙製の書類の受け渡し等の行為を省
いて仕事全体の速度を向上させ、また各書類の管理に必
要な作業量及び物理的な空間を削減し、全体の仕事の流
れの中での夫々の単位仕事の位置付けを明確にするの
で、仕事の迅速化及び効率化を実施することが可能であ
る。
In the computer-readable recording medium according to the twelfth aspect, the recorded program is executed by a computer to manage a flowchart and each unit work as an electronic file, and to display a graphic representing the unit work. By starting the electronic file of the corresponding unit work by instructing, the action such as the delivery of paper documents is omitted, the speed of the entire work is improved, and the amount of work required for the management of each document and Since the physical space is reduced and the position of each unit work in the overall work flow is clarified, the work can be made faster and more efficient.

【0041】[0041]

【発明の実施の形態】以下、本発明をその実施の形態を
示す図面に基づいて詳述する。図1は本発明の仕事管理
システムの概念を示す説明図であり、図2は本発明の仕
事管理システムの構成を示すブロック図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the drawings showing the embodiments. FIG. 1 is an explanatory diagram showing the concept of the work management system of the present invention, and FIG. 2 is a block diagram showing the configuration of the work management system of the present invention.

【0042】図中10はサーバコンピュータを用いた本
発明の中央装置であり、中央装置10は、LAN(Local
Area Network)等の内部通信ネットワーク101に接続
しており、内部通信ネットワーク101には、各単位仕
事に関する入力を担当する担当者が管理する端末装置2
0,20,…、メインフレーム等の通信装置である大型
処理装置30、及びインターネット等の外部通信ネット
ワーク102に接続する通信用サーバコンピュータ等の
通信装置である通信処理装置40が接続されている。
In the figure, reference numeral 10 denotes a central unit of the present invention using a server computer.
Area Network), etc., and a terminal device 2 managed by a person in charge of input relating to each unit job is connected to the internal communication network 101.
, A large processing device 30 as a communication device such as a mainframe, and a communication processing device 40 as a communication device such as a communication server computer connected to an external communication network 102 such as the Internet.

【0043】中央装置10は、本発明の中央装置用のプ
ログラム及びデータ等の情報を記録したCD−ROM等
の記録媒体200からプログラム及びデータ等の情報を
読み取る補助記憶手段12、並びに補助記憶手段12に
より読み取られたプログラム及びデータ等の情報を記録
するハードディスク等の記録手段13を備えている。
The central unit 10 includes an auxiliary storage unit 12 for reading information such as programs and data from a recording medium 200 such as a CD-ROM on which information such as programs and data for the central unit of the present invention is recorded. A recording unit 13 such as a hard disk for recording information such as a program and data read by the unit 12 is provided.

【0044】そして記録手段13からプログラム及びデ
ータ等の情報を読み取り、情報を記憶するRAM14に
記憶してCPU11により実行することで、コンピュー
タは本発明の中央装置10として動作する。なお記録手
段13の記録領域の一部は、仕事に関する情報を記録す
る仕事データベース10aに割り当てられている。
The computer operates as the central device 10 of the present invention by reading information such as programs and data from the recording means 13, storing the information in the RAM 14 for storing the information, and executing the information by the CPU 11. A part of the recording area of the recording means 13 is allocated to a work database 10a for recording information on work.

【0045】さらに中央装置10は、内部通信ネットワ
ーク101に接続する通信手段15、マウス及びキーボ
ード等の入力手段16、並びにモニタ及びプリンタ等の
出力手段17を備えている。なお外部の記録装置を、中
央装置10に接続し、仕事データベース10aとして用
いてもよい。
The central unit 10 further includes a communication unit 15 connected to the internal communication network 101, an input unit 16 such as a mouse and a keyboard, and an output unit 17 such as a monitor and a printer. Note that an external recording device may be connected to the central device 10 and used as the work database 10a.

【0046】図3は本発明の仕事管理システムにて用い
られる中央装置が備える仕事データベース10aの記録
内容を概念的に示す説明図である。仕事データベース1
0aには、仕事に関する情報として、帳票及び計画等の
書類作成並びに承認等の単位仕事を図形で示し、夫々の
単位仕事の関係を、仕事の流れを示す矢印により結びつ
けた流れ図を示す流れ図情報と、単位仕事を特定する仕
事ID、各単位仕事の前後の単位仕事を示す前後関係情
報、各単位仕事に対応する文書及び数値情報等の仕事情
報が電子ファイルとして記録されている位置を示す位置
情報、仕事情報が電子ファイルとして記録されている装
置の処理基盤を示す処理基盤情報、単位仕事の進捗状況
を示す進捗状況情報、及び仕事情報のアクセス権限を有
する個人を特定する識別情報が対応付けられたレコード
とが記録されている。
FIG. 3 is an explanatory diagram conceptually showing the recorded contents of the work database 10a provided in the central device used in the work management system of the present invention. Work database 1
In 0a, as the information on the work, unit work such as creation of a form and a plan and approval of the work are shown by a graphic, and the flow chart information showing a flow chart in which the relation of each unit work is linked by an arrow showing the work flow. , A job ID specifying a unit job, contextual information indicating unit jobs before and after each unit job, position information indicating a position where job information such as a document and numerical information corresponding to each unit job is recorded as an electronic file The processing base information indicating the processing base of the device in which the work information is recorded as an electronic file, the progress information indicating the progress of the unit work, and the identification information for identifying the individual who has the access authority for the work information are associated with each other. Record is recorded.

【0047】前後関係情報は、各単位仕事の時系列的な
関係を示す情報であり、流れ図の上では、前の単位仕事
を示す図形から、後の単位仕事を示す図形の方向へ向け
て、矢印が表示される。
The contextual information is information indicating the time-series relationship of each unit work. In the flow chart, the figure indicating the previous unit work is shifted from the figure indicating the unit work to the figure indicating the subsequent unit work. An arrow appears.

【0048】位置情報は、仕事情報を記録する中央装置
10、大型処理装置30、通信処理装置40、及び外部
通信ネットワークに接続される外部の装置を示す装置コ
ード、及び記録しているアドレス又はパスを示す位置コ
ードを含んでいる。
The location information includes a central device 10 for recording job information, a large-scale processing device 30, a communication processing device 40, and device codes indicating external devices connected to an external communication network, and recorded addresses or paths. Includes a position code indicating

【0049】処理基盤情報は、対応する仕事情報を処理
するための応用ソフトウエア及び基本ソフトウエア等の
処理基盤(プラットフォーム)を示す情報である。
The processing base information is information indicating a processing base (platform) such as application software and basic software for processing the corresponding job information.

【0050】進捗状況情報は、未着手、継続中、及び完
了等の単位仕事の進捗状況を示す情報である。
The progress information is information indicating the progress of the unit work such as unstarted, ongoing, and completed.

【0051】識別情報は、個人を特定するID番号及び
パスワードを含み、特定の操作者のみが、対応する仕事
情報を確認及び更新することができるように制限する情
報であり、操作者の職制、例えば課長級及び部長級等の
等級に応じて、確認及び更新することができる仕事情報
を制限し、そして担当者による不正を防止し、機密性を
保つ効果を有する。
The identification information includes an ID number and a password for specifying an individual, and is information for limiting only a specific operator to confirm and update the corresponding job information. For example, according to the grades such as the section manager grade and the department manager grade, the work information that can be confirmed and updated is limited, and the fraud by the person in charge is prevented, and the confidentiality is maintained.

【0052】端末装置20は、中央装置10とほぼ同様
の構成であり、CPU21、記録手段22、RAM2
3、通信手段24、入力手段25、及びモニタ等の表示
手段26を備えており、記録手段22には、各処理基盤
上で処理される仕事情報を、自機の処理基盤で処理する
ことができる形態に変換するエミュレータ等のプログラ
ムが記録されている。
The terminal device 20 has substantially the same configuration as the central device 10, and includes a CPU 21, a recording unit 22, and a RAM 2.
3. It has a communication means 24, an input means 25, and a display means 26 such as a monitor. The recording means 22 is capable of processing work information processed on each processing base by its own processing base. A program such as an emulator for converting into a form that can be converted is recorded.

【0053】大型処理装置30は、中央装置10とほぼ
同様の構成であり、CPU31、記録手段32、RAM
33、通信手段34、入力手段35、及び出力手段36
を備えている。
The large processing device 30 has substantially the same configuration as the central device 10, and includes a CPU 31, a recording means 32, and a RAM.
33, communication means 34, input means 35, and output means 36
It has.

【0054】通信処理装置40は、中央装置10とほぼ
同様の構成であり、CPU41、記録手段42、RAM
43、内部通信ネットワーク101に接続する内部通信
手段44a、外部通信ネットワーク102に接続する外
部通信手段44b、入力手段45、及び出力手段46を
備えている。
The communication processing device 40 has substantially the same configuration as the central device 10, and includes a CPU 41, a recording means 42, and a RAM.
43, an internal communication unit 44a connected to the internal communication network 101, an external communication unit 44b connected to the external communication network 102, an input unit 45, and an output unit 46.

【0055】なお各仕事情報は、夫々の仕様に応じて、
中央装置10、大型処理装置30、及び通信処理装置4
0の中の最も適した装置に記録されるのが一般的であ
り、状況に応じて通信処理装置40から外部通信ネット
ワーク102に接続する外部の装置に記録させることも
可能である。
Each piece of work information is defined according to its specifications.
Central unit 10, large processing unit 30, and communication processing unit 4
In general, recording is performed on the most suitable device among 0, and it is also possible to record on an external device connected to the external communication network 102 from the communication processing device 40 depending on the situation.

【0056】次に本発明の仕事管理システムにて用いら
れる中央装置10及び端末装置20における流れ図表示
処理を図4に示すフローチャートを用いて説明する。端
末装置20を管理する操作者は、端末装置20を起動さ
せて、内部通信ネットワーク101に接続し、ID番号
及びパスワード等の識別情報を入力する。
Next, the flow chart display processing in the central device 10 and the terminal device 20 used in the work management system of the present invention will be described with reference to the flowchart shown in FIG. An operator who manages the terminal device 20 activates the terminal device 20, connects to the internal communication network 101, and inputs identification information such as an ID number and a password.

【0057】端末装置20では、識別情報の入力を受け
付け(S101)、受け付けた識別情報を中央装置10
へ送信する(S102)。
The terminal device 20 receives the input of the identification information (S 101), and transmits the received identification information to the central device 10.
(S102).

【0058】中央装置10では、識別情報を受信し(S
103)、受信した識別情報を、仕事データベース10
aに記録している情報と照合することにより、アクセス
権限を有するか否かを判別する(S104)。
The central unit 10 receives the identification information (S
103), the received identification information is stored in the work database 10
It is determined whether or not the user has the access right by collating with the information recorded in “a” (S104).

【0059】ステップS104において、アクセス権限
を有すると判別された場合(S104:Y)、仕事デー
タベース10aに記録している流れ図情報を、端末装置
20へ送信する(S105)。
If it is determined in step S104 that the user has the access right (S104: Y), the flow chart information recorded in the work database 10a is transmitted to the terminal device 20 (S105).

【0060】なおステップS104において、アクセス
権限が無いと判別された場合(S104:N)、流れ図
情報の送信を禁止し、その旨を端末装置20へ通知して
所定の異常処理が行われる(S106)。
In step S104, when it is determined that the user does not have the access right (S104: N), the transmission of the flow chart information is prohibited, and the fact is notified to the terminal device 20, and a predetermined abnormal process is performed (S106). ).

【0061】端末装置20では、流れ図情報を受信し
(S107)、受信した流れ図情報により示される流れ
図を表示手段26に表示する(S108)。
The terminal device 20 receives the flow chart information (S107), and displays the flow chart indicated by the received flow chart information on the display means 26 (S108).

【0062】図5は本発明の仕事管理システムにて用い
られる端末装置20の表示手段26に表示される流れ図
を示す説明図である。図5に示すように、営業、フロン
ト営業、及び生産管理等の各部署における販売計画表作
成、チェック承認、及び機種別販売計画策定等の各単位
仕事が所定の図形で示され、夫々の単位仕事の関係が仕
事の流れを示す矢印により結びつけられている。
FIG. 5 is an explanatory diagram showing a flowchart displayed on the display means 26 of the terminal device 20 used in the work management system of the present invention. As shown in FIG. 5, each unit work such as sales plan creation, check approval, and model-specific sales plan formulation in each department such as sales, front sales, and production management is indicated by a predetermined figure, and each unit is shown. Work relationships are linked by arrows indicating work flow.

【0063】なお仕事データベース10aに記録され、
端末装置20へ送信される流れ図情報は、例えばJav
a等のプログラム言語、並びにHTML(Hyper Text Ma
rkupLanguage)及びXML(eXtensible Markup Languag
e)等のページ記述言語にて記述することにより、操作性
を向上させることを目的とするが、その記述方法につい
ては、これらに限定するものではなく、システムの構成
及び目的に応じて、適当な記述方法を選択することが可
能である。また中央装置10に記録されている流れ図情
報がHTMLで記述されている場合、流れ図情報そのも
のが、中央装置10に記録された位置情報を含むことに
なる。
It is recorded in the work database 10a,
The flowchart information transmitted to the terminal device 20 is, for example, Java.
a and other programming languages, and HTML (Hyper Text Ma
rkupLanguage) and XML (eXtensible Markup Languag)
The purpose is to improve operability by describing in a page description language such as e) .However, the description method is not limited to these, and it is appropriate according to the system configuration and purpose. It is possible to select a suitable description method. When the flowchart information recorded in the central device 10 is described in HTML, the flowchart information itself includes the positional information recorded in the central device 10.

【0064】次に本発明の仕事管理システムにて用いら
れる中央装置10及び端末装置20における仕事情報抽
出処理を図6に示すフローチャートを用いて説明する。
端末装置20の操作者は、マウス等の入力手段25を用
いて、カーソル等のポインタを操作し、任意の単位仕事
を示す図形に重畳させ、入力釦を押下することにより、
単位仕事を指示する入力を行う。
Next, the work information extraction processing in the central device 10 and the terminal device 20 used in the work management system of the present invention will be described with reference to the flowchart shown in FIG.
The operator of the terminal device 20 operates a pointer such as a cursor using the input unit 25 such as a mouse to superimpose the cursor on a figure indicating an arbitrary unit work, and presses an input button.
Input to instruct unit work.

【0065】端末装置20では、単位仕事を指示する入
力を受け付け(S201)、受け付けた入力を示す単位
仕事指示情報を、中央装置10へ送信する(S20
2)。
The terminal device 20 receives an input indicating a unit work (S201), and transmits unit work instruction information indicating the received input to the central device 10 (S20).
2).

【0066】中央装置10では、単位仕事指示情報を受
信し(S203)、仕事データベース10aより、受信
した単位仕事指示情報が示す仕事情報に対応付けられて
いる識別情報に基づいて、指示する仕事情報を抽出する
権限を有するか否かを判別する(S204)。
The central unit 10 receives the unit work instruction information (S203) and, based on the identification information associated with the work information indicated by the received unit work instruction information, from the work database 10a, specifies the designated work information. Is determined (S204).

【0067】ステップS204において、抽出する権限
を有する場合(S204:Y)、当該単位仕事を抽出す
る権限を有する操作者が操作していると判断し、更に単
位仕事より上流側の単位仕事の進捗状況情報が「完了」
であるか否かを判別する(S205)。
In step S204, if the user has the authority to extract (S204: Y), it is determined that the operator having the authority to extract the unit work is operating, and the progress of the unit work upstream of the unit work is further performed. Status information is "Complete"
Is determined (S205).

【0068】ステップS204において、抽出する権限
が無い場合(S204:N)、操作している操作者は、
当該単位仕事を抽出する権限が無いと判断して、その旨
を端末装置20へ通知し、所定の異常処理が行われる
(S206)。
In step S204, if there is no authority to extract (S204: N), the operating operator
It is determined that the user does not have the authority to extract the unit work, and the fact is notified to the terminal device 20, and a predetermined abnormal process is performed (S206).

【0069】ステップS205において、上流側の単位
仕事の進捗状況情報が「完了」である場合(S205:
Y)、上流側の単位仕事は完了しており、当該単位仕事
に着手可能と判断し、当該単位仕事に対応する仕事情報
の記録位置を示す位置情報に基づいて、当該仕事情報が
記録されている装置、例えば大型処理装置30にアクセ
スし、仕事情報を抽出する(S207)。
In step S205, when the progress status information of the upstream unit work is "completed" (S205:
Y), the unit work on the upstream side has been completed, it is determined that the unit work can be started, and the work information is recorded based on the position information indicating the recording position of the work information corresponding to the unit work. The apparatus accesses the existing apparatus, for example, the large-sized processing apparatus 30, and extracts work information (S207).

【0070】ステップS205において、上流側の単位
仕事の進捗状況情報が「完了」でない場合(S205:
N)、上流側の単位仕事は完了しておらず、当該単位仕
事は着手不可能と判断し、その旨を端末装置20へ通知
し、所定の異常処理が行われる(S208)。
In step S205, when the progress information of the unit work on the upstream side is not "completed" (S205:
N), the unit work on the upstream side has not been completed, and it is determined that the unit work cannot be started, the fact is notified to the terminal device 20, and a predetermined abnormal process is performed (S208).

【0071】なお上流側の単位仕事が完了していなけれ
ば、以降の単位仕事を示す仕事情報を抽出することがで
きないという制限だけでなく、進捗状況が継続中の場合
には、仕事情報の抽出は行われるが、更新は行われない
ようにする等、様々な制限を設けることが可能である。
同様に識別情報によっては、仕事情報の抽出は行われる
が、更新は行われないようにするという制限を設けるこ
とも可能である。
It is to be noted that if the upstream unit work has not been completed, the work information indicating the subsequent unit work cannot be extracted. In addition, if the progress status is ongoing, the work information is not extracted. However, various restrictions can be provided, such as not updating.
Similarly, depending on the identification information, it is possible to provide a restriction that the work information is extracted but not updated.

【0072】そして抽出した仕事情報に対応する処理基
盤情報を抽出し(S209)、仕事情報及び処理基盤情
報を、端末装置20へ送信する(S210)。
Then, the processing base information corresponding to the extracted work information is extracted (S209), and the work information and the processing base information are transmitted to the terminal device 20 (S210).

【0073】端末装置20では、仕事情報及び処理基盤
情報を受信し(S211)、受信した処理基盤情報に基
づいて、エミュレータを起動して、受信した仕事情報を
端末装置20の処理基盤で処理することが可能な形態に
変換し(S212)、変換した仕事情報を表示する(S
213)。このようにエミュレータの起動を自動的に行
うことにより、操作者は処理基盤の違いを意識すること
なく操作を行うことができる。
The terminal device 20 receives the work information and the processing base information (S211), activates an emulator based on the received processing base information, and processes the received work information on the processing base of the terminal device 20. (S212), and the converted work information is displayed (S212).
213). By automatically starting the emulator in this way, the operator can perform an operation without being conscious of the difference between the processing boards.

【0074】次に本発明の仕事管理システムにて用いら
れる中央装置10及び端末装置20における仕事情報更
新処理を図7に示すフローチャートを用いて説明する。
端末装置20の操作者は、仕事情報が示す単位仕事を実
施し、実施した結果、例えば生産計画の作成であれば作
成した生産計画の入力、文書及び帳票の作成であれば文
書及び数値の入力、そして上流側の担当者が行った単位
仕事の承認処理であれば承認を示す入力、即ち仕事情報
を更新する入力を行い、更に進捗状況の入力を行う。
Next, the work information updating process in the central device 10 and the terminal device 20 used in the work management system of the present invention will be described with reference to the flowchart shown in FIG.
The operator of the terminal device 20 performs the unit work indicated by the work information and, as a result, for example, inputs a created production plan when creating a production plan, and inputs a document and numerical values when creating a document and a form. In the case of a unit job approval process performed by a person in charge on the upstream side, an input indicating approval, that is, an input for updating job information is performed, and further, a progress status is input.

【0075】端末装置20では、仕事情報を更新する入
力及び進捗状況の入力を受け付け(S301)、受け付
けた更新入力に基づいて、仕事情報を更新する更新仕事
情報を生成し(S302)、また受け付けた進捗状況入
力に基づいて、進捗状況情報を生成して(S303)、
生成した更新仕事情報及び進捗状況情報を、中央装置1
0へ送信する(S304)。
The terminal device 20 receives the input for updating the work information and the input of the progress status (S301), generates the updated work information for updating the work information based on the received update input (S302), and receives the updated work information. The progress information is generated based on the progress input (S303).
The generated update work information and progress information are transmitted to the central device 1.
0 (S304).

【0076】中央装置10では、更新仕事情報及び進捗
状況情報を受信し(S305)、受信した更新仕事情報
に基づいて仕事情報を更新し(S306)、また受信し
た進捗状況情報に基づいて仕事データベース10aに記
録している進捗状況情報を更新し(S307)、更新し
た進捗状況情報に基づいて、当該進捗状況情報に対応す
る単位仕事を示す図形の表示方法、例えば表示色を変更
する(S308)。
The central unit 10 receives the updated job information and the progress information (S305), updates the job information based on the received updated job information (S306), and updates the job database based on the received progress information. The progress status information recorded in 10a is updated (S307), and based on the updated progress status information, a display method, for example, a display color of a graphic indicating a unit work corresponding to the progress status information is changed (S308). .

【0077】これにより例えば、未着手の単位仕事を示
す図形は赤で、継続中の単位仕事を示す図形は黄で、そ
して完了した単位仕事を示す図形は青で表示させること
により、流れ図を視認するだけで、全体の仕事の進捗状
況を把握することができる。なお更新される仕事情報
が、大型処理装置30及び通信処理装置40等の他の通
信装置に記録されている場合、中央装置10では、仕事
情報の更新処理として、該当する装置へ更新仕事情報を
送信する処理が行われ、夫々の通信装置にて仕事情報が
更新される。また中央装置20において、仕事情報を抽
出した作業開始日時、及び更新情報を送信した作業完了
日時を記録していくことにより、各操作者の作業状況を
管理することが可能となる。
Thus, for example, the flow chart is visually recognized by displaying a figure indicating an unstarted unit work in red, a figure indicating an ongoing unit work in yellow, and a figure indicating a completed unit work in blue. You can keep track of the progress of the whole job. When the work information to be updated is recorded in another communication device such as the large-sized processing device 30 and the communication processing device 40, the central device 10 transmits the updated work information to the corresponding device as a work information update process. Transmission processing is performed, and work information is updated in each communication device. Further, by recording the work start date and time at which the work information was extracted and the work completion date and time at which the update information was transmitted in the central device 20, it is possible to manage the work status of each operator.

【0078】次に本発明の仕事管理システムにて用いら
れる中央装置10におけるデータ共有処理を図8に示す
フローチャートを用いて説明する。各仕事情報にてデー
タを共有する場合、例えば経営指標を示す表形式の数値
データのように異なる単位仕事間で共有するデータを用
いる場合、予め中央装置10の仕事データベース10a
に関連付けを行っておくことにより、上流側の単位仕事
にて変更した共有すべきデータを下流側の単位仕事にて
用いることができる。
Next, data sharing processing in the central device 10 used in the job management system of the present invention will be described with reference to the flowchart shown in FIG. When data is shared by each job information, for example, when data shared between different unit jobs such as numerical data in a tabular format showing management indexes is used, the job database 10a of the central device 10 is used in advance.
The data to be shared changed in the upstream unit work can be used in the downstream unit work.

【0079】即ちステップS306において仕事情報を
更新した後、中央装置10では、上流側の単位仕事に対
応する第1の仕事情報の更新に伴って更新されたデータ
を抽出し(S401)、抽出したデータに基づいて、下
流側の単位仕事に対応する第2の仕事情報のデータを更
新する(S402)。
That is, after the work information is updated in step S306, the central unit 10 extracts and updates the data updated with the update of the first work information corresponding to the unit work on the upstream side (S401). The data of the second work information corresponding to the unit work on the downstream side is updated based on the data (S402).

【0080】このとき共有されるべきデータの処理基盤
が異なる場合、変換処理も同時に行われる。例えば共有
されるべきデータが、経営指標を示す表形式の数値デー
タである場合で、夫々の仕事情報の表示及び更新に用い
る表計算用ソフトウエアが異なるとき、第1の仕事情報
の更新されたデータを、汎用性の高いデータ形式である
CSV(Comma Separated Value) 形式に変換した状態で
抽出し、抽出したデータに基づいて第2の仕事情報のデ
ータを更新する。
At this time, if the processing base of the data to be shared is different, the conversion processing is performed at the same time. For example, in a case where the data to be shared is numerical data in the form of a table indicating a management index, and the spreadsheet software used for displaying and updating the respective job information is different, the first job information is updated. The data is extracted in a state of being converted into a CSV (Comma Separated Value) format which is a highly versatile data format, and the data of the second work information is updated based on the extracted data.

【0081】次に本発明の仕事管理システムにて用いら
れる中央装置10及び端末装置20における流れ図情報
編集処理を図9に示すフローチャートを用いて説明す
る。端末装置20の操作者、特に仕事の計画を変更する
権限を有する管理者が仕事の計画を変更する場合、ステ
ップS101〜S108の処理により流れ図を表示させ
た後、編集処理機能を起動し、流れ図上に表示されてい
る図形により示される仕事情報に対し、追加、削除、及
び修正等の変更を加える単位仕事内容を入力し、更に流
れ図上に表示されている矢印により示される単位仕事同
士の関係を変更する単位仕事関係を入力する。
Next, the flow chart information editing processing in the central device 10 and the terminal device 20 used in the work management system of the present invention will be described with reference to the flowchart shown in FIG. When the operator of the terminal device 20, especially the administrator who has the authority to change the work plan, changes the work plan, the flow chart is displayed by the processing of steps S101 to S108, and then the editing processing function is started and the flow chart is started. Enter the details of the unit work to add, delete, modify, etc. to the work information indicated by the graphic displayed above, and further, the relationship between the unit work indicated by the arrows displayed on the flowchart. Change the unit work relationship.

【0082】なおこのときの入力は、流れ図上に表示さ
れている図形及び矢印を指示し(クリック)、入力釦を
押下しながら所望の位置まで移動させ(ドラッグ)、所
望の位置にて入力釦を放す(ドロップ)等の操作により
行うことができるので、操作者は特に高度な知識及び複
雑な操作を必要とすることなく編集処理を行うことがで
きる。
In this case, the input is performed by pointing (clicking) on a figure and an arrow displayed on the flowchart, moving the input button to a desired position while pressing the input button (drag), and pressing the input button at the desired position. Can be performed by an operation such as releasing (dropping), so that the operator can perform the editing processing without requiring particularly sophisticated knowledge and complicated operations.

【0083】また流れ図上で編集できる処理は上述した
図形(単位仕事)の移動だけでなく、例えば単位仕事を
示す図形を追加する場合、流れ図上の所望の位置にポイ
ンタを移動させ、図形の種類及び仕事情報を示す位置情
報の入力等の操作を行うことにより処理が行われる。
The processing that can be edited on the flow chart is not limited to the movement of the figure (unit work) described above. For example, when a figure indicating a unit work is added, the pointer is moved to a desired position on the flow chart and the type of the figure is changed. The processing is performed by performing an operation such as inputting position information indicating work information and the like.

【0084】端末装置20では、単位仕事内容の入力を
受け付け(S501)、更に単位仕事関係の入力を受け
付ける(S502)。そして受け付けた単位仕事内容及
び単位仕事関係に基づいて、変更情報を生成し(S50
3)、生成した変更情報を中央装置10へ送信する(S
504)。
The terminal device 20 receives the input of the unit work content (S501), and further receives the input of the unit work related (S502). Then, change information is generated based on the received unit work content and unit work relationship (S50).
3), transmitting the generated change information to the central device 10 (S
504).

【0085】変更情報を生成する段階では、変更した単
位仕事に対する前後関係の整合性の確認等の処理も行わ
れる。例えば図形を消去した場合、当該図形に関連する
情報及び表示される矢印を消去し、共有データの設定等
の整合性の確認も行われ、問題がある場合には、再入力
が要求される。
At the stage of generating the change information, processing such as confirmation of the consistency of the context of the changed unit work is also performed. For example, when a figure is deleted, information related to the figure and the displayed arrow are deleted, and consistency such as setting of shared data is checked. If there is a problem, re-input is required.

【0086】中央装置10では、変更情報を受信し(S
505)、受信した変更情報に基づいて、仕事情報を更
新し(S506)、更に流れ図情報を更新する(S50
7)。
The central device 10 receives the change information (S
505), the task information is updated based on the received change information (S506), and the flow chart information is further updated (S50).
7).

【0087】前記実施の形態では、1台の中央装置、複
数台の端末装置、1台の大型処理装置、及び1台の通信
装置を接続するシステム構成を示したが、本発明はこれ
に限らず、様々なシステム構成に適用可能である。
In the above embodiment, a system configuration for connecting one central unit, a plurality of terminal units, one large processing unit, and one communication unit has been described, but the present invention is not limited to this. Instead, it can be applied to various system configurations.

【0088】また前記実施の形態では、一般的な操作に
用いられる端末装置以外の装置、即ち、中央装置、大型
処理装置、及び通信処理装置に仕事情報を記録する形態
を示したが、本発明はこれに限らず、端末装置に仕事情
報を記録し、流れ図に示される単位仕事を指示する入力
を受け付けた場合に、端末装置に記録された仕事情報を
処理することができるようにしてもよく、特に端末装置
上で動作させることに適したプログラム言語を用いて記
述された仕事情報を記録しておくことにより、その仕事
情報を用いて行う処理の幅を拡大することが可能であ
る。
In the above-described embodiment, the form in which work information is recorded in devices other than the terminal device used for general operations, that is, the central device, the large-sized processing device, and the communication processing device has been described. The present invention is not limited to this. Job information may be recorded in the terminal device, and when input indicating a unit job shown in the flowchart is received, the job information recorded in the terminal device may be processed. In particular, by recording work information described using a program language suitable for operating on a terminal device, it is possible to expand the range of processing performed using the work information.

【0089】即ち本発明のシステム構成の特徴は、処理
基盤の異なる既存の装置、並びにLAN及びWAN(Wid
e Area Network) を利用し、各種の装置に記録された仕
事情報を中央装置により管理し、端末装置を用いて全体
の進捗状況を視認により把握し、しかも操作することが
容易なユーザーインターフェースを提供するところにあ
る。
That is, the feature of the system configuration of the present invention is that an existing device having a different processing base, a LAN and a WAN (Wid
(e Area Network), using a central device to manage work information recorded in various devices, provide a user interface that allows the user to visually grasp the overall progress status using terminal devices, and to operate the device easily. Where you do it.

【0090】[0090]

【発明の効果】以上詳述した如く本発明に係る仕事管理
方法、仕事管理システム、中央装置、及び記録媒体で
は、流れ図及び各単位仕事を電子ファイルとして管理
し、単位仕事を示す図形を指示することで、対応する単
位仕事の電子ファイルを起動させることにより、紙製の
書類の受け渡し等の行為を省いて仕事全体の速度を向上
させ、また各書類の管理に必要な作業量及び物理的な空
間を削減し、全体の仕事の流れの中での夫々の単位仕事
の位置付けを明確にするので、仕事の迅速化及び効率化
を実施することが可能であり、しかも電子ファイルを記
録する通信装置の処理基盤に対応する形態の電子ファイ
ルを、端末装置の処理基盤に対応する形態に自動的に変
換するので、処理基盤が異なる通信装置にて処理される
電子ファイルを、特に専門的な知識が無くとも操作する
ことができ、これにより処理基盤を統一する作業及び時
間を要することなく仕事の迅速化及び効率化を実施する
ことが可能である等、優れた効果を奏する。
As described in detail above, in the work management method, work management system, central device, and recording medium according to the present invention, a flow chart and each unit work are managed as an electronic file, and a figure indicating the unit work is specified. By activating the electronic file of the corresponding unit work, it is possible to improve the speed of the entire work by omitting the transfer of paper documents and the like, and to reduce the amount of work and physical A communication device that saves space and clarifies the position of each unit work in the overall work flow, so that work can be performed faster and more efficiently, and a communication device that records electronic files Since the electronic file of the form corresponding to the processing base of the terminal device is automatically converted to the form corresponding to the processing base of the terminal device, the electronic file processed by the communication device having the different processing base can be Even without gates knowledge it can operate, etc. This makes it possible to carry out faster and more efficient work without requiring work and time unifying processing infrastructure, an excellent effect.

【0091】さらに本発明では、各単位仕事の進捗状況
に応じて、図形の表示色の変更というように、流れ図上
の図形の表示方法を変更することにより、流れ図を視認
するだけで、仕事の進捗状況を把握することができるの
で、単位仕事の進捗状況の管理を容易にすることが可能
である等、優れた効果を奏する。
Further, according to the present invention, by changing the display method of a graphic on a flow chart, such as changing the display color of the graphic, according to the progress of each unit work, the work flow of the work can be viewed only by visually recognizing the flow chart. Since the progress status can be grasped, excellent effects such as easy management of the progress status of the unit work can be achieved.

【0092】また本発明では、上流側と下流側とで共有
する情報が存在する場合、上流側により更新された仕事
情報に基づいて、共有される下流側の仕事情報を変更す
るので、必要なデータを共有することが可能であり、書
類等の受け渡しが不要となるので、仕事の迅速化及び効
率化を実施することが可能である等、優れた効果を奏す
る。
In the present invention, if there is information shared between the upstream side and the downstream side, the shared downstream work information is changed based on the work information updated by the upstream side. Since the data can be shared and the delivery of documents and the like becomes unnecessary, it is possible to achieve excellent effects such as speeding up work and increasing efficiency.

【0093】そして本発明では、上流側の単位仕事の進
捗に応じて、下流側の単位仕事を制限するため、上流側
の単位仕事が完了していないのに下流側の単位仕事が開
始される等の、本来の規則に反する行為を防止し、しか
も端末装置を操作する操作者の職制に応じて、操作する
ことができる仕事情報を制限することにより、承認権限
を有する管理者の承認無い場合に、下流側の仕事を実施
できないように制限することができる等、優れた効果を
奏する。
In the present invention, since the downstream unit work is limited according to the progress of the upstream unit work, the downstream unit work is started even though the upstream unit work has not been completed. In the case where there is no approval of the administrator who has the authority to approve by restricting the work information that can be operated according to the job system of the operator who operates the terminal device by preventing acts that violate the original rules such as In addition, the present invention has excellent effects such as being able to restrict the work on the downstream side from being performed.

【0094】さらに本発明では、各単位仕事の関係の変
更等の処理を流れ図上で実施することができるので、計
画変更等の処理を容易に、しかも迅速に行うことが可能
である等、優れた効果を奏する。
Further, according to the present invention, processes such as a change in the relationship between unit jobs can be performed on a flow chart, so that a process such as a plan change can be performed easily and quickly. It has the effect.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の仕事管理システムの概念を示す説明図
である。
FIG. 1 is an explanatory diagram showing the concept of a work management system of the present invention.

【図2】本発明の仕事管理システムの構成を示すブロッ
ク図である。
FIG. 2 is a block diagram illustrating a configuration of a work management system according to the present invention.

【図3】本発明の仕事管理システムにて用いられる中央
装置が備える仕事データベースの記録内容を概念的に示
す説明図である。
FIG. 3 is an explanatory diagram conceptually showing recorded contents of a work database provided in a central device used in the work management system of the present invention.

【図4】本発明の仕事管理システムにて用いられる中央
装置及び端末装置における流れ図表示処理を示すフロー
チャートである。
FIG. 4 is a flowchart showing a flowchart display process in a central device and a terminal device used in the work management system of the present invention.

【図5】本発明の仕事管理システムにて用いられる端末
装置の表示手段に表示される流れ図を示す説明図であ
る。
FIG. 5 is an explanatory diagram showing a flowchart displayed on display means of a terminal device used in the work management system of the present invention.

【図6】本発明の仕事管理システムにて用いられる中央
装置及び端末装置における仕事情報抽出処理を示すフロ
ーチャートである。
FIG. 6 is a flowchart showing work information extraction processing in a central device and a terminal device used in the work management system of the present invention.

【図7】本発明の仕事管理システムにて用いられる中央
装置及び端末装置における仕事情報更新処理を示すフロ
ーチャートである。
FIG. 7 is a flowchart showing work information update processing in a central device and a terminal device used in the work management system of the present invention.

【図8】本発明の仕事管理システムにて用いられる中央
装置におけるデータ共有処理を示すフローチャートであ
る。
FIG. 8 is a flowchart showing a data sharing process in a central device used in the work management system of the present invention.

【図9】本発明の仕事管理システムにて用いられる中央
装置及び端末装置における流れ図情報編集処理を示すフ
ローチャートである。
FIG. 9 is a flowchart showing a flowchart information editing process in a central device and a terminal device used in the work management system of the present invention.

【図10】従来の仕事の管理方法における各単位仕事の
関係を示す流れ図である。
FIG. 10 is a flowchart showing a relationship between unit jobs in a conventional job management method.

【符号の説明】[Explanation of symbols]

10 中央装置 20 端末装置 30 大型処理装置 40 通信処理装置 101 内部通信ネットワーク 102 外部通信ネットワーク 200 記録媒体 DESCRIPTION OF SYMBOLS 10 Central apparatus 20 Terminal apparatus 30 Large-scale processing apparatus 40 Communication processing apparatus 101 Internal communication network 102 External communication network 200 Recording medium

Claims (12)

【特許請求の範囲】[Claims] 【請求項1】 複数の単位仕事により構成される仕事の
進捗状況を管理する中央装置及び該中央装置と通信する
端末装置を備える仕事管理方法において、 前記端末装置は、 各単位仕事を示す図形を用いて各単位仕事同士の関係を
示す流れ図を表示し、 任意の単位仕事を示す図形を指示する入力を受け付け、 受け付けた入力を示す単位仕事指示情報を、前記中央装
置へ送信し、 前記中央装置は、 受信した単位仕事指示情報が示す単位仕事に関する情報
を前記端末装置へ送信することを特徴とする仕事管理方
法。
1. A work management method comprising: a central device that manages the progress of a job constituted by a plurality of unit jobs; and a terminal device that communicates with the central device. A flow chart showing the relationship between each unit work is displayed using the input unit, an input indicating a figure indicating an arbitrary unit work is received, unit work instruction information indicating the received input is transmitted to the central unit, and the central unit is displayed. Transmitting information about the unit work indicated by the received unit work instruction information to the terminal device.
【請求項2】 複数の単位仕事により構成される仕事の
進捗状況を管理する中央装置及び該中央装置と通信する
端末装置を備える仕事管理方法において、 前記中央装置と通信し、前記端末装置と異なる処理基盤
にて処理される仕事情報を記録する記録手段を有する通
信装置を備え、 前記端末装置は、 各単位仕事を示す図形を用いて各単位仕事同士の関係を
示す流れ図を表示し、 任意の単位仕事を示す図形を指示する入力を受け付け、 受け付けた入力を示す単位仕事指示情報を、前記中央装
置へ送信し、 前記中央装置は、 受信した単位仕事指示情報が示す単位仕事に関する仕事
情報を、前記通信装置が有する記録手段から抽出し、 抽出した仕事情報を、前記端末装置へ送信し、 前記端末装置は、更に、受信した仕事情報を、自機の処
理基盤で処理することが可能な形態に変換することを特
徴とする仕事管理方法。
2. A work management method comprising: a central device for managing the progress of a job constituted by a plurality of unit jobs; and a terminal device for communicating with the central device, wherein the terminal device communicates with the central device and is different from the terminal device. A communication device having recording means for recording work information processed by the processing base, wherein the terminal device displays a flowchart showing a relationship between the unit jobs using a graphic indicating each unit job, and An input indicating a figure indicating a unit work is received, and unit work instruction information indicating the received input is transmitted to the central device.The central device transmits work information on the unit work indicated by the received unit work instruction information, The work information extracted from the recording means of the communication device, and the extracted work information is transmitted to the terminal device. The terminal device further transmits the received work information to its own processing base. A job management method characterized in that the job is converted into a form that can be processed by a computer.
【請求項3】 複数の単位仕事により構成される仕事の
進捗状況を管理する中央装置及び該中央装置と通信する
端末装置を備える仕事管理システムにおいて、 前記中央装置は、 各単位仕事を図形で示す流れ図により、各単位仕事同士
の関係を表示させる流れ図情報を記録する手段と、 各単位仕事に対応する仕事情報の記録位置を示す位置情
報を記録する手段とを備え、 前記端末装置は、 前記中央装置が管理する流れ図情報に基づいて、流れ図
を表示させる手段と、 任意の単位仕事を示す図形を指示する入力を受け付ける
手段と、 受け付けた入力を示す単位仕事指示情報を、前記中央装
置へ送信する手段とを備え、 前記中央装置は、更に、 受信した単位仕事指示情報が示す単位仕事に対応する仕
事情報を示す位置情報に基づいて、仕事情報を抽出する
手段と、 該仕事情報を前記端末装置へ送信する手段と を備えることを特徴とする仕事管理システム。
3. A work management system comprising a central device for managing the progress of a job constituted by a plurality of unit jobs and a terminal device communicating with the central device, wherein the central device indicates each unit job by a graphic. A means for recording flow chart information for displaying a relationship between each unit work according to a flow chart; and a means for recording position information indicating a recording position of work information corresponding to each unit work. A means for displaying a flow chart based on the flow chart information managed by the apparatus; a means for receiving an input indicating a figure indicating an arbitrary unit work; and transmitting unit work instruction information indicating the received input to the central apparatus. Means, based on position information indicating work information corresponding to the unit work indicated by the received unit work instruction information. And a means for transmitting the work information to the terminal device.
【請求項4】 前記中央装置と通信する通信装置を備
え、 前記通信装置は、仕事情報を記録する手段を備えること
を特徴とする請求項3に記載の仕事管理システム。
4. The work management system according to claim 3, further comprising a communication device that communicates with the central device, wherein the communication device includes a unit that records work information.
【請求項5】 前記中央装置は、 各単位仕事に対応する仕事情報を記録する装置での処理
基盤を示す処理基盤情報を記録しており、 仕事情報を前記端末装置へ送信する場合に、当該仕事情
報に対応する処理基盤情報を抽出する手段と、 該処理基盤情報を前記端末装置へ送信する手段とを備
え、 前記端末装置は、受信した処理基盤情報に基づいて、対
応する仕事情報を、自機の処理基盤で処理することが可
能な形態に変換する手段を備えることを特徴とする請求
項3又は請求項4に記載の仕事管理システム。
5. The central device records processing base information indicating a processing base in a device that records work information corresponding to each unit work, and when transmitting work information to the terminal device, Means for extracting processing base information corresponding to the work information; and means for transmitting the processing base information to the terminal device. The terminal device outputs the corresponding work information based on the received processing base information, The job management system according to claim 3, further comprising a unit configured to convert the data into a form that can be processed by a processing platform of the own device.
【請求項6】 前記端末装置は、 仕事情報を更新する入力、及び当該仕事情報が示す単位
仕事の進捗状況を示す入力を受け付ける手段と、 受け付けた更新入力に基づいて、仕事情報を更新する更
新仕事情報を生成する手段と、 受け付けた進捗状況入力に基づいて、進捗状況情報を生
成する手段と、 生成した更新仕事情報及び進捗状況情報を、前記中央装
置へ送信する手段とを備え、 前記中央装置は、 受信した更新仕事情報に基づいて、仕事情報を更新させ
る手段と、 受信した進捗状況情報に基づいて、当該進捗状況情報に
対応する単位仕事を示す図形の表示方法を変更する手段
とを備えることを特徴とする請求項3乃至請求項5のい
ずれかに記載の仕事管理システム。
6. The terminal device, comprising: means for receiving an input for updating work information and an input for indicating a progress status of a unit work indicated by the work information; and an update for updating the work information based on the received update input. Means for generating work information; means for generating progress information based on the received progress input; and means for transmitting the generated updated work information and progress information to the central device. The apparatus includes: means for updating the work information based on the received updated work information; and means for changing a display method of a graphic indicating a unit work corresponding to the progress information based on the received progress information. The work management system according to any one of claims 3 to 5, further comprising:
【請求項7】 前記中央装置は、 更新仕事情報に基づいて変更される第1の仕事情報に含
まれる所定のデータを抽出する手段と、 該データに基づいて、第1の仕事情報と当該データを共
有する第2の仕事情報を更新させる手段とを備えること
を特徴とする請求項6に記載の仕事管理システム。
7. The central unit includes: means for extracting predetermined data included in first job information changed based on updated job information; and first job information and the data based on the data. 7. The job management system according to claim 6, further comprising: means for updating the second job information sharing the job information.
【請求項8】 前記中央装置は、第1の単位仕事の進捗
状況情報に基づいて、第1の単位仕事以降に実施される
第2の単位仕事の仕事情報の更新を制限する手段を備え
ることを特徴とする請求項6又は請求項7に記載の仕事
管理システム。
8. The apparatus according to claim 1, wherein the central unit includes means for restricting update of work information of a second unit work performed after the first unit work based on progress information of the first unit work. The work management system according to claim 6 or 7, wherein:
【請求項9】 前記端末装置は、 個人を特定する識別情報の入力を受け付ける手段と、 受け付けた識別情報を、前記中央装置へ送信する手段と
を備え、 前記中央装置は、受信した識別情報に基づいて、抽出す
べき仕事情報を制限する手段を備えることを特徴とする
請求項3乃至請求項8のいずれかに記載の仕事管理シス
テム。
9. The terminal device comprises: means for receiving input of identification information for identifying an individual; and means for transmitting the received identification information to the central device. The central device transmits the received identification information to the central device. 9. The work management system according to claim 3, further comprising means for restricting work information to be extracted based on the work information.
【請求項10】 前記端末装置は、 流れ図上に表示された単位仕事の内容及び各単位仕事同
士の関係を変更する入力を受け付ける手段と、 受け付けた変更入力に基づいて、単位仕事の内容及び各
単位仕事同士の関係を変更する変更情報を生成する手段
と、 該変更情報を、前記中央装置へ送信する手段とを備え、 前記中央装置は、 受信した変更情報に基づいて、仕事情報を更新させる手
段と、 受信した変更情報に基づいて、流れ図情報を更新する手
段とを備えることを特徴とする請求項3乃至請求項9の
いずれかに記載の仕事管理システム。
10. The terminal device, comprising: means for receiving an input for changing the content of the unit work displayed on the flow chart and the relationship between the unit jobs; and the content of the unit work and each of the contents based on the received change input. Means for generating change information for changing the relationship between unit jobs; and means for transmitting the change information to the central device, wherein the central device updates the work information based on the received change information. The job management system according to any one of claims 3 to 9, further comprising means for updating flow chart information based on the received change information.
【請求項11】 端末装置と通信する通信手段を備え、
複数の単位仕事により構成される仕事の進捗状況を管理
する中央装置において、 各単位仕事を図形で示す流れ図により、各単位仕事同士
の関係を表示させる流れ図情報を記録する手段と、 各単位仕事に対応する仕事情報の記録位置を示す位置情
報を記録する手段と、 流れ図情報を前記端末装置へ送信する手段と、 任意の単位仕事を指示する単位仕事指示情報を、端末装
置から受信した場合に、受信した単位仕事指示情報が示
す単位仕事に対応する仕事情報を示す位置情報に基づい
て、仕事情報を抽出する手段と、 該仕事情報を、単位仕事指示情報の送信元の端末装置へ
送信する手段とを備えることを特徴とする中央装置。
11. A communication device for communicating with a terminal device,
In a central device that manages the progress of work composed of a plurality of unit jobs, means for recording flow chart information for displaying a relationship between each unit work by a flow chart showing each unit work by a graphic, Means for recording position information indicating the recording position of the corresponding work information, means for transmitting flow chart information to the terminal device, and unit work instruction information indicating an arbitrary unit work, when received from the terminal device, Means for extracting work information based on position information indicating work information corresponding to the unit work indicated by the received unit work instruction information, and means for transmitting the work information to a terminal device that has transmitted the unit work instruction information A central device comprising:
【請求項12】 端末装置と通信する通信手段を備える
コンピュータに、複数の単位仕事により構成される仕事
の進捗状況を管理させるプログラムを記録してある、コ
ンピュータでの読み取りが可能な記録媒体において、 コンピュータに、各単位仕事を図形で示す流れ図によ
り、各単位仕事同士の関係を表示させる流れ図情報を、
前記端末装置へ送信させるプログラムコード手段と、 コンピュータに、任意の単位仕事を指示する単位仕事指
示情報を、端末装置から受信した場合に、受信した単位
仕事指示情報が示す単位仕事に対応する仕事情報を抽出
させるプログラムコード手段と、 コンピュータに、抽出した仕事情報を、単位仕事指示情
報の送信元の端末装置へ送信させるプログラムコード手
段とを含むコンピュータプログラムを記録してあること
を特徴とするコンピュータでの読み取りが可能な記録媒
体。
12. A computer-readable recording medium in which a computer having communication means for communicating with a terminal device has recorded thereon a program for managing the progress of a task constituted by a plurality of unit jobs, The flow chart information for displaying the relationship between each unit work by a flow chart showing each unit work by a graphic on a computer is:
Program code means for transmitting to the terminal device; and, when receiving, from the terminal device, unit work instruction information for instructing an arbitrary unit work to the computer, job information corresponding to the unit work indicated by the received unit work instruction information. And a computer code program for causing the computer to transmit the extracted work information to the terminal device that transmitted the unit work instruction information. Readable recording medium.
JP2000126597A 2000-04-26 2000-04-26 Method and system for managing job, central unit and recording medium Pending JP2001306772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000126597A JP2001306772A (en) 2000-04-26 2000-04-26 Method and system for managing job, central unit and recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000126597A JP2001306772A (en) 2000-04-26 2000-04-26 Method and system for managing job, central unit and recording medium

Publications (1)

Publication Number Publication Date
JP2001306772A true JP2001306772A (en) 2001-11-02

Family

ID=18636351

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000126597A Pending JP2001306772A (en) 2000-04-26 2000-04-26 Method and system for managing job, central unit and recording medium

Country Status (1)

Country Link
JP (1) JP2001306772A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003228648A (en) * 2002-02-05 2003-08-15 Toyota Auto Body Co Ltd Business process management method, business process management system, its program and recording medium
JP2016042225A (en) * 2014-08-14 2016-03-31 グローリー株式会社 Business management system and business management method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0969057A (en) * 1995-08-31 1997-03-11 Fuji Xerox Co Ltd Device and method for state totalization
JPH10143574A (en) * 1996-11-08 1998-05-29 Hitachi Ltd Job execution supporting system
JP2000076367A (en) * 1998-08-27 2000-03-14 Fuji Xerox Co Ltd Work process managing device
JP2000099588A (en) * 1998-09-18 2000-04-07 Fuji Xerox Co Ltd Work environment managing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0969057A (en) * 1995-08-31 1997-03-11 Fuji Xerox Co Ltd Device and method for state totalization
JPH10143574A (en) * 1996-11-08 1998-05-29 Hitachi Ltd Job execution supporting system
JP2000076367A (en) * 1998-08-27 2000-03-14 Fuji Xerox Co Ltd Work process managing device
JP2000099588A (en) * 1998-09-18 2000-04-07 Fuji Xerox Co Ltd Work environment managing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003228648A (en) * 2002-02-05 2003-08-15 Toyota Auto Body Co Ltd Business process management method, business process management system, its program and recording medium
JP2016042225A (en) * 2014-08-14 2016-03-31 グローリー株式会社 Business management system and business management method

Similar Documents

Publication Publication Date Title
JPH07200278A (en) Program system using graphic
US20160019488A1 (en) Workflow management device and workflow management method
JP2003242321A (en) Project information processor and computer software
JP4100156B2 (en) Data conversion system
JP2006285914A (en) Data retrieval processor and program
TW573265B (en) Task management system and task management method
US20130021238A1 (en) Systems and methods for electronic discovery
JP5355032B2 (en) Client device, server device, and document management system, document management method, and document management program using them
US20020152108A1 (en) Apparatus and method for displaying information concerning business schedule
JPH11282918A (en) Document management method and device therefor and computer readable storage medium
JP2009276904A (en) Project management device, project management method, project management program and recording medium
JP2001306772A (en) Method and system for managing job, central unit and recording medium
JP2011186651A (en) Work management system, work management method, and program thereof
JP2003150762A (en) Cooperation method for project information and its system
JP2009069876A (en) Workflow system, workflow control method and program
EP2503474A1 (en) Database, ticket data management server and index data management program
JPH10187319A (en) Method for guiding unprocessing and device therefor and storage medium for storing unprocessing guiding program
Analyzer User manual
US20030076360A1 (en) Project management system
JP2002007651A (en) Workflow preparation system
JP2010257327A (en) Project management supporting device, project management supporting method, and project management supporting program
JP2007108845A (en) Intellectual property management system, trigger processing method and program
WO2021229810A1 (en) Operation assistance system, operation assistance method, and operation assistance program
JP4307122B2 (en) Workflow processing method and program
JP4507227B2 (en) File storage device and storage medium storing file management program