JP2003064879A - Steel frame construction method and pallet for lifting steel frame beam - Google Patents

Steel frame construction method and pallet for lifting steel frame beam

Info

Publication number
JP2003064879A
JP2003064879A JP2001252037A JP2001252037A JP2003064879A JP 2003064879 A JP2003064879 A JP 2003064879A JP 2001252037 A JP2001252037 A JP 2001252037A JP 2001252037 A JP2001252037 A JP 2001252037A JP 2003064879 A JP2003064879 A JP 2003064879A
Authority
JP
Japan
Prior art keywords
pallet
steel frame
girder
floor
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001252037A
Other languages
Japanese (ja)
Inventor
Yuichi Ikeda
雄一 池田
Shigeru Uchida
茂 内田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2001252037A priority Critical patent/JP2003064879A/en
Publication of JP2003064879A publication Critical patent/JP2003064879A/en
Pending legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a steel frame construction method and a pallet for lifting a steel frame beam capable of securing good workability of steel frame construction while improving lifting efficiency of the steel frame beam. SOLUTION: This pallet 10 includes a floor member 13 functioning as a working floor and a clamp 14 for fixing a girder 22. In construction of the steel frame, the girder 22 is fixed to the pallet 10 by means of the clamp 14, a beam 24 is placed on the pallet 10 additionally, and then, the pallet 10 is lifted to a construction level. After the girder 22 is constructed, the beam 22 is constructed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、鉄骨建方工法およ
び鉄骨梁の建方に用いられる鉄骨梁揚重用パレットに関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel frame erection method and a pallet for lifting a steel beam used for erection of a steel beam.

【0002】[0002]

【従来の技術】鉄骨工事では、鉄骨梁をクレーン等の重
機によって施工階まで揚重して建方施工を行う。その場
合、重機の揚重能力は最重量部材である柱によって決ま
ることが多いため、特に小梁を揚重する際には、2〜3
本まとめて揚重したとしても、揚重効率はかなり低くな
ってしまう。また、鉄骨建方の工期の中で重機による揚
重往復時間が占める割合が大きいため、揚重効率が低い
と工期の短縮を図ることも難しい。
2. Description of the Related Art In steel construction, steel beams are hoisted to the construction floor by a heavy machine such as a crane, and erection work is performed. In that case, since the lifting capacity of heavy equipment is often determined by the pillar, which is the heaviest member, it is possible to use a few
Even if the whole book is lifted, the lifting efficiency will be considerably low. In addition, since the lifting and reciprocating time by heavy machinery occupies a large part of the construction period of steel frame construction, it is difficult to shorten the construction period if the lifting efficiency is low.

【0003】そこで、揚重効率を上げるために、梁パレ
ットを用いる方法が提案されている。この方法では、図
5に示すように、梁部材100を井桁状に組んで構成し
た梁パレット102上に鉄骨梁104を積載する。そし
て、この梁パレット102を作業階まで揚重し、作業床
上に仮置したうえで鉄骨梁104の建方を行う。
Therefore, a method using a beam pallet has been proposed in order to increase the lifting efficiency. In this method, as shown in FIG. 5, a steel beam 104 is loaded on a beam pallet 102 formed by assembling beam members 100 in a cross beam shape. Then, the beam pallet 102 is lifted up to the work floor, temporarily placed on the work floor, and then the steel beam 104 is erected.

【0004】[0004]

【発明が解決しようとする課題】しかし、この方法で
は、上記のようにパレットを作業床上に仮置するため、
作業床上のスペースが狭くなって、作業性が低下してし
まう。また、梁パレットはかなりの重量があるので、仮
置位置は作業階の大梁上に限定される。したがって、建
方が済んだ一階上の大梁の真下に梁パレットが位置する
こととなり、この大梁が小梁の玉掛け作業の邪魔になっ
て、作業性は更に低下する。
However, in this method, since the pallet is temporarily placed on the work floor as described above,
The space on the work floor is reduced, and workability is reduced. Moreover, since the beam pallet is heavy, the temporary placement position is limited to the large beam on the working floor. Therefore, the beam pallet is located directly below the girder on the first floor, which has been built, and this girder interferes with the slinging work of the girder, further lowering the workability.

【0005】本発明は上記の点に鑑みてなされたもので
あり、鉄骨梁の揚重効率を高めつつ、鉄骨建方の良好な
作業性を確保することが可能な鉄骨建方工法および鉄骨
梁揚重用パレットを提供することを目的とする。
The present invention has been made in view of the above points, and a steel frame erection method and a steel frame beam capable of ensuring good workability of a steel frame erection while enhancing the lifting efficiency of the steel frame girder. It is intended to provide a lifting pallet.

【0006】[0006]

【課題を解決するための手段】上記の目的は、請求項1
に記載する如く、パレットに大梁を固定すると共に、こ
の大梁と同じ階に施工すべき他の梁を前記パレットに積
載した後、前記パレットを施工階へ吊り上げ、前記大梁
の建方を行った後、前記他の梁の建方を行う鉄骨建方工
法により達成される。
The above-mentioned object is defined in claim 1.
After fixing the girder to the pallet, loading other beams to be constructed on the same floor as this girder on the pallet, and then hoisting the pallet to the construction floor and constructing the girder as described in 1. This is achieved by the steel frame erection method for erection of the other beam.

【0007】請求項1記載の発明によれば、パレットに
大梁およびこの大梁と同じ階に施工すべき梁を積載して
吊り上げるので、揚重効率が向上する。また、その際、
大梁をパレットに固定するので、大梁の建方が完了する
と、パレットは自動的に大梁と同じ高さに仮置されるこ
ととなる。すなわち、パレットを作業床に仮置する必要
がなくなるため、作業床を広く使用することができ、作
業性が向上する。
According to the first aspect of the present invention, since the girder and the beam to be constructed on the same floor as the girder are loaded on the pallet and hoisted, the lifting efficiency is improved. Also, at that time,
Since the girder is fixed to the pallet, when the construction of the girder is completed, the pallet will automatically be temporarily placed at the same height as the girder. That is, since it is not necessary to temporarily place the pallet on the work floor, the work floor can be widely used and workability is improved.

【0008】また、請求項2に記載された発明は、鉄骨
梁の建方において鉄骨梁を揚重するためのパレットであ
って、作業床として機能し得る床部を含むパレット本体
と、該パレット本体に大梁を固定するための固定手段と
を備えることを特徴とする。
Further, the invention described in claim 2 is a pallet for lifting a steel frame beam in constructing the steel frame beam, and a pallet body including a floor portion that can function as a working floor, and the pallet. And a fixing means for fixing the girder to the main body.

【0009】本発明によれば、パレットは、作業床とし
て機能し得る床部と、パレット本体に大梁を固定するた
めの固定手段とを含む。このため、固定手段により固定
された大梁の建方を行うと、パレットは自動的に大梁と
同じ高さに仮置されることとなる。したがって、パレッ
トを作業床に仮置することが不要となると共に、パレッ
トの床部を作業床として、パレットに積載された他の梁
の建方作業を行うことができる。
According to the present invention, the pallet includes a floor portion that can function as a work floor, and fixing means for fixing the girder to the pallet body. Therefore, when the girder fixed by the fixing means is erected, the pallet is automatically temporarily placed at the same height as the girder. Therefore, it is not necessary to temporarily place the pallet on the work floor, and it is possible to perform erection work for other beams loaded on the pallet using the floor portion of the pallet as the work floor.

【0010】[0010]

【発明の実施の形態】図1〜図3は、本発明の一実施形
態である鉄骨建方工法を説明するための図であり、図1
は、この工法で用いられるパレット10を示す斜視図、
図2は、パレット10に鉄骨梁を積載した状態を示す斜
視図、図3は、鉄骨梁を積載したパレット10を施工階
まで揚重して大梁の建方が完了した状態を示す斜視図で
ある。
1 to 3 are views for explaining a steel frame erection method which is an embodiment of the present invention.
Is a perspective view showing the pallet 10 used in this method,
FIG. 2 is a perspective view showing a state where the steel beams are loaded on the pallet 10, and FIG. 3 is a perspective view showing a state where the construction of the girder is completed by hoisting the pallets 10 loaded with the steel beams to the construction floor. is there.

【0011】図1に示す如く、パレット10は、井桁状
に組まれた鉄骨材12と、鉄板等で構成され、パレット
10上での作業床として機能し得る床部材13とを備え
ている。パレット10の両側部に位置する鉄骨材12
A、12Bには、夫々、クランプ14が取り付けられて
いる。各クランプ14は、一対のクランプ部材14a
と、各クランプ部材14aに取り付けられたクランプボ
ルト14bとにより構成されている。クランプ部材14
aは、その基部が鉄骨材12A、12Bに設けられた溝
16をガイドとしてスライド可能に設けられており、こ
れにより、クランプ部材14a間の間隔を調整できるよ
うになっている。また、鉄骨材12A、12Bの夫々の
両端部(すなわち、パレット10の四隅)には、ポール
部材18が立設されており、ポール部材18間には親綱
20が掛け渡されている。
As shown in FIG. 1, the pallet 10 is provided with a steel frame member 12 assembled in a cross beam shape, and a floor member 13 made of an iron plate or the like and capable of functioning as a work floor on the pallet 10. Steel aggregates 12 located on both sides of the pallet 10
A clamp 14 is attached to each of A and 12B. Each clamp 14 includes a pair of clamp members 14a.
And a clamp bolt 14b attached to each clamp member 14a. Clamp member 14
The base a is slidably provided with the groove 16 provided in the steel frame members 12A and 12B as a guide, whereby the spacing between the clamp members 14a can be adjusted. Further, pole members 18 are erected at both ends of each of the steel frame members 12A and 12B (that is, four corners of the pallet 10), and a master rope 20 is stretched between the pole members 18.

【0012】鉄骨建方施工にあたっては、上記のパレッ
ト10に、図2に示す如く、施工階へ揚重すべき大梁2
2および小梁24を積載する。このうち、大梁22につ
いては、クランプ14によってパレット10に固定す
る。すなわち、クランプ14を構成するクランプ部材1
4a間の間隔を広げて、大梁22をそのフランジ部22
aがクランプ部材14a間に位置するように載置した
後、クランプ部材14a間の距離を縮め、クランプボル
ト14bによりフランジ部22aを締め付けることによ
り大梁22をパレット10に固定するのである。また、
パレット10上の小梁24については、ラッシングベル
ト等で落下養生を行うことで、落下を防止する。
In constructing the steel frame, the pallet 10 is to be lifted to the construction floor as shown in FIG.
2 and beam 24 are loaded. Of these, the girder 22 is fixed to the pallet 10 by the clamp 14. That is, the clamp member 1 forming the clamp 14
4a is widened and the girder 22 is attached to the flange portion 22
The girders 22 are fixed to the pallet 10 by placing them so that a is located between the clamp members 14a, shortening the distance between the clamp members 14a, and tightening the flange portions 22a with the clamp bolts 14b. Also,
The beam 24 on the pallet 10 is prevented from falling by performing drop curing with a lashing belt or the like.

【0013】大梁22および小梁24をパレット10に
積載した後、大梁22に設けた梁吊金具25をクレーン
により吊り上げて、施工階の大梁位置付近まで揚重す
る。そして、図3に示す如く、大梁22を鉄骨柱26へ
結合してその建方を完了する。上記のように大梁22は
パレット10にクランプ固定されているので、大梁22
の建方が完了すると、パレット10も自動的に大梁22
と同じ高さに仮置されることとなる。
After loading the girders 22 and the girders 24 on the pallet 10, the beam hanging metal fittings 25 provided on the girders 22 are lifted by a crane and lifted to near the girder position on the construction floor. Then, as shown in FIG. 3, the girder 22 is connected to the steel frame column 26 to complete the erection. Since the girder 22 is clamped to the pallet 10 as described above,
When the construction of the pallet is completed, the pallet 10 will automatically
It will be temporarily placed at the same height as.

【0014】こうしてパレット10が仮置された状態
で、パレット10上に積載された小梁24についてクロ
ーラクレーンやタワークレーン等を用いて玉掛けして建
方を順次行っていく。その際、パレット10の床部材1
3を小梁24の玉掛け作業の作業床とすることができ、
また、親綱20が設けられていることで、作業の安全性
を確保することができる。
Thus, with the pallet 10 temporarily placed, the beam 24 loaded on the pallet 10 is slid using a crawler crane, a tower crane, etc., and the construction is sequentially performed. At that time, the floor member 1 of the pallet 10
3 can be a work floor for slinging the beam 24,
Further, since the master rope 20 is provided, work safety can be ensured.

【0015】図4は、パレット10が仮置された施工階
を模式的に表す平面図である。図4に示す如く、大梁2
2に仮置されたパレット10を用いて、パレット10が
建方の邪魔にならない位置の小梁24A、24B、24
C等の建方を行うことができる。なお、パレット10の
寸法が大きすぎると、パレット10が邪魔になって建方
を行えない小梁の数が多くなるので、パレット10の寸
法は、その揚重荷重と、梁建方の施工手順とを勘案しな
がら設計するようにする。
FIG. 4 is a plan view schematically showing a construction floor on which the pallet 10 is temporarily placed. As shown in FIG. 4, the girder 2
2 using the pallet 10 temporarily placed, the crossbeams 24A, 24B, 24 at positions where the pallet 10 does not interfere with the construction.
It is possible to construct C etc. If the size of the pallet 10 is too large, the number of beam beams that the pallet 10 interferes with and cannot be built increases, so the size of the pallet 10 depends on its lifting load and the beam erection construction procedure. Try to design with consideration.

【0016】パレット10に積載した大梁22および小
梁24の建方が完了すると、パレット10にワイヤを掛
けた状態でクランプ対14のクランプを緩めて大梁22
から取り外し、タワークレーン等によってパレット10
を地上階まで吊り降ろす。なお、パレット10は軽量で
あるので、数個(例えば5個程度)のパレットをまとめ
て吊り降ろすことで、効率を高めることができる。
When the erection of the girders 22 and the girders 24 loaded on the pallet 10 is completed, the clamps of the clamp pair 14 are loosened while the pallet 10 is wire-wound.
Remove from the pallet 10 by tower crane etc.
Is hung to the ground floor. Since the pallet 10 is lightweight, efficiency can be improved by suspending several (for example, about 5) pallets together.

【0017】以上説明したように、本実施形態の鉄骨建
方工法によれば、パレット10に大梁22およびこれと
同じ階の小梁22を積載して、施工階まで揚重する。こ
のため、軽量の小梁を揚重するためにパレット10を施
工階と地上との間を何度も往復させる必要がなくなり、
揚重効率が向上する。また、施工位置の高さ付近で同じ
階の大梁22および小梁24の建方を継続して行えるの
で、工期短縮も図られると共に、先に建方を完了した大
梁22が小梁24の玉掛け作業の邪魔になることもな
い。
As described above, according to the steel frame erection method of this embodiment, the large beam 22 and the small beam 22 on the same floor as this are loaded on the pallet 10 and lifted to the construction floor. Therefore, it is not necessary to repeatedly reciprocate the pallet 10 between the construction floor and the ground to lift the light beam.
Lifting efficiency is improved. In addition, since the erection of the girder 22 and the girder 24 on the same floor can be continued near the height of the construction position, the construction period can be shortened and the girder 22 of the girder 24 can be slid on the girder 24 which has been completed before. It does not interfere with work.

【0018】また、大梁24の建方が完了すると、自動
的にパレット10がこの大梁24に仮置されることにな
るので、パレット10を施工階の作業床上に仮置するこ
とが不要となる。このため、作業床上のスペースがパレ
ット10により制約されることもなくなって作業性が向
上し、安全通路の確保等も十分に行うことができる。
When the construction of the girder 24 is completed, the pallet 10 is automatically temporarily placed on the girder 24, so that it is unnecessary to temporarily place the pallet 10 on the working floor on the construction floor. . Therefore, the space on the work floor is not restricted by the pallet 10, the workability is improved, and the safety passage can be sufficiently secured.

【0019】また、パレット10を揚重する際、大梁2
2に設けた2つの梁吊金具25を吊ることで、パレット
10の四隅を吊る場合に比べて、バランスが取り易くな
り、玉掛けの作業性が大幅に向上する。
When hoisting the pallet 10, the girder 2
By suspending the two beam suspension fittings 25 provided on the No. 2, it becomes easier to balance and the workability of slinging is greatly improved, as compared with the case where the four corners of the pallet 10 are suspended.

【0020】[0020]

【発明の効果】本発明によれば、鉄骨梁の揚重効率を高
めつつ、鉄骨建方の良好な作業性を確保することができ
る。
According to the present invention, it is possible to increase the lifting efficiency of the steel beam and ensure good workability of the steel frame construction.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施形態である鉄骨建方工法で用い
られるパレットを示す斜視図である。
FIG. 1 is a perspective view showing a pallet used in a steel frame erection method according to an embodiment of the present invention.

【図2】パレットに鉄骨梁を積載した状態を示す斜視図
である。
FIG. 2 is a perspective view showing a state where steel frame beams are loaded on a pallet.

【図3】鉄骨梁を積載したパレットを作業床階まで揚重
して大梁の建方が完了した状態を示す斜視図である。
FIG. 3 is a perspective view showing a state in which a pallet loaded with steel beams is hoisted to a work floor and the construction of the girder is completed.

【図4】パレットが仮置された施工階を模式的に表す平
面図である。
FIG. 4 is a plan view schematically showing a construction floor on which pallets are temporarily placed.

【図5】梁パレットを用いた従来の工法を示す斜視図で
ある。
FIG. 5 is a perspective view showing a conventional construction method using a beam pallet.

【符号の説明】[Explanation of symbols]

10 パレット 12 鉄骨材 13 床部材 14 クランプ 20 親綱 22 大梁 24 小梁 10 pallets 12 Steel aggregate 13 Floor material 14 Clamp 20 Parent Line 22 Large beam 24 beam

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 パレットに大梁を固定すると共に、この
大梁と同じ階に施工すべき他の梁を前記パレットに積載
した後、前記パレットを施工階へ吊り上げ、前記大梁の
建方を行った後、前記他の梁の建方を行うことを特徴と
する鉄骨建方工法。
1. A girder is fixed to a pallet, another beam to be constructed on the same floor as this girder is loaded on the pallet, and then the pallet is lifted to a construction floor to construct the girder. A steel frame erection method characterized by erection of another beam.
【請求項2】 鉄骨梁の建方において鉄骨梁を揚重する
ためのパレットであって、作業床として機能し得る床部
を含むパレット本体と、該パレット本体に大梁を固定す
るための固定手段とを備えることを特徴とする鉄骨梁揚
重用パレット。
2. A pallet for lifting a steel beam in constructing a steel beam, the pallet body including a floor portion that can function as a working floor, and a fixing means for fixing the girder to the pallet body. A pallet for hoisting a steel beam, comprising:
JP2001252037A 2001-08-22 2001-08-22 Steel frame construction method and pallet for lifting steel frame beam Pending JP2003064879A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001252037A JP2003064879A (en) 2001-08-22 2001-08-22 Steel frame construction method and pallet for lifting steel frame beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001252037A JP2003064879A (en) 2001-08-22 2001-08-22 Steel frame construction method and pallet for lifting steel frame beam

Publications (1)

Publication Number Publication Date
JP2003064879A true JP2003064879A (en) 2003-03-05

Family

ID=19080581

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001252037A Pending JP2003064879A (en) 2001-08-22 2001-08-22 Steel frame construction method and pallet for lifting steel frame beam

Country Status (1)

Country Link
JP (1) JP2003064879A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016204964A (en) * 2015-04-22 2016-12-08 鹿島建設株式会社 Movable type safety net

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016204964A (en) * 2015-04-22 2016-12-08 鹿島建設株式会社 Movable type safety net

Similar Documents

Publication Publication Date Title
JP5169549B2 (en) Large beam block lifting method and jack-up stage used for it
JP6017083B1 (en) Floor slab unit, floor slab construction method, and floor construction method
CN111960249A (en) Laminated slab lifting appliance and steel beam
CN209988942U (en) Assembled building superimposed sheet lifting device
CN112709434B (en) Steel beam mounting method
CN103743581B (en) Internal-climbing tower crane test platform device and test method
JP2003064879A (en) Steel frame construction method and pallet for lifting steel frame beam
JPH06323503A (en) Assembling method for large size suspension type boiler
JPH09240988A (en) Assembling method of bridge crane
KR200195457Y1 (en) A supporting apparatus for tower crane
CN214003793U (en) Lifting platform for mounting inner component of pipe culvert
JPH0513862Y2 (en)
JPH08114302A (en) Boiler installing method and boiler installation structural body
JPH06127889A (en) Flexible climbing method of crane
JP3014752U (en) Assembled heavy equipment
JPH11199173A (en) Long structure construction method and lifting beam used in this method
JP6814717B2 (en) How to install horizontal members and how to build a building frame
JPH0643362Y2 (en) Steel frame pillar hanging jig
JP2000257266A (en) Building skeleton constructing method
JPH11107534A (en) Method for erecting large roof by direct hanging
JPH04153460A (en) Constructing method for building, and its equipment
JP2001089076A (en) Heavy cargo lifting auxiliary fixture, and its installing method
JP2020200601A (en) Hoisting jig and method for disassembling steel tower
JP2003306289A (en) Method for installing long member and sling jig for long member
JP2000169058A (en) Hoist of elevator machine room equipment