JP2003306289A - Method for installing long member and sling jig for long member - Google Patents

Method for installing long member and sling jig for long member

Info

Publication number
JP2003306289A
JP2003306289A JP2002113102A JP2002113102A JP2003306289A JP 2003306289 A JP2003306289 A JP 2003306289A JP 2002113102 A JP2002113102 A JP 2002113102A JP 2002113102 A JP2002113102 A JP 2002113102A JP 2003306289 A JP2003306289 A JP 2003306289A
Authority
JP
Japan
Prior art keywords
hanging
long
jig
load
long member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002113102A
Other languages
Japanese (ja)
Other versions
JP3658572B2 (en
Inventor
Yasuhiro Nagao
徳博 長尾
Katsuhiro Ishizuka
勝洋 石塚
Akira Hashimoto
朗 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji PS Corp
Original Assignee
Fuji PS Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji PS Corp filed Critical Fuji PS Corp
Priority to JP2002113102A priority Critical patent/JP3658572B2/en
Publication of JP2003306289A publication Critical patent/JP2003306289A/en
Application granted granted Critical
Publication of JP3658572B2 publication Critical patent/JP3658572B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method of installing a long member and a sling jig for a long member for safely and efficiently lifting a plurality of long members. <P>SOLUTION: In this method of installing the long members, the plurality of long members 11 are lifted simultaneously, and installed while unloading sequentially. Before the lifting, the gravity center of the sling jig is aligned with the gravity center of each of the lifted long members, a distance for mounting each long member on the sling jig for the long members is varied, and the long members are lifted so as not to interfered with each other and installed by sequentially removing the long members starting at the long member positioned on the lowermost position. As a result, the plurality of long members can be safely and efficiently lifted and installed. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、複数の長尺部材を
安全で且つ効率よく吊り上げることのできると共に、荷
卸しできる長尺部材の施工方法および長尺部材用荷吊り
治具に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a long member that can safely and efficiently hang up a plurality of long members and can be unloaded, and a load hanging jig for a long member. .

【0002】[0002]

【従来の技術】近年建築工事に際し、柱、梁、床等のコ
ンクリート構造部材をプレキヤスト化し工期短縮と省人
化などの施工の合理化を図る工法が多くなって来ている
が、特に床部材など部材数が多く高層階に荷揚げする場
合、所定場所への吊り上げ配置と次の部材の荷取りまで
の時間を多く要し、せっかくの合理化工法のメリットが
損なわれている。一般に工事現場に設置する揚重機は最
も重量の大きい柱、梁の吊り上げに十分対応できる吊り
上げ能力を有する揚重機を設置するが、床部材等比較的
軽量の部材を揚重する場合、図4に示すように部材1を
一個ずつワイヤ2で吊って、揚重機のフック3で吊り上
げていた。これは、揚重機の荷揚げ能力に対して極めて
小さなものであり、作業上のロスを生じている。これは
一度に複数の部材を安全に揚重し、さらに安全に据え付
け工事が可能で有効な吊り治具が存在しないためであ
る。
2. Description of the Related Art In recent years, during construction work, there have been many construction methods for precasting concrete structural members such as columns, beams, and floors to shorten the construction period and save labor, etc. When unloading to a high floor with a large number of parts, it takes a lot of time to lay it up at a predetermined place and unload the next part, which impairs the merits of the rationalized construction method. Generally, hoisting machines installed at construction sites are hoisting machines that have a hoisting capacity capable of sufficiently lifting the heaviest pillars and beams, but when hoisting relatively lightweight members such as floor members, As shown, each member 1 was hung by the wire 2 one by one, and was hung by the hook 3 of the lifting machine. This is extremely small relative to the lifting capacity of the lifting machine, resulting in operational loss. This is because there are no effective lifting jigs that can safely lift multiple members at the same time and can be installed safely.

【0003】これを解決するため、従来は図5、6に示
すように、複数の部材1a、1b、1cをそれぞれ長さ
の異なるワイヤ一4、5、6を掛けそれぞれのワイヤー
をクレーンのフック7に掛けて吊り上げ、最下段の部材
1aから順次、現場に据え付ける方法がとられていた。
In order to solve this, conventionally, as shown in FIGS. 5 and 6, a plurality of members 1a, 1b and 1c are hung on wires 4, 5 and 6 having different lengths, and the respective wires are hooked on a crane. The method was to hang it up from 7 and lift it up, and install it on the site sequentially from the lowest member 1a.

【0004】[0004]

【発明が解決しようとする課題】しかし、従来の図4に
示す方法では、一度に1部材(製品)を揚重装置によっ
て吊り上げ所定の位置に据え付け(セッティング)する
ので、数量の多い部材(製品)を所定の位置に据え付け
る作業に多くの時間と手間を要し、高層建築物における
プレキヤスト組立工法による組立工事の施工は部材の吊
り上げに多大な時間的ロスを生じていた。
However, in the conventional method shown in FIG. 4, one member (product) is lifted by the lifting device at a time and set (set) at a predetermined position, so that a large number of members (product) are set. ) Requires a lot of time and labor to be installed in a predetermined position, and the assembly work by the precast assembly method in a high-rise building caused a great loss of time in lifting the members.

【0005】また、これを解決するべく図5、6に示す
様に、複数の部材を同時に吊り上げて所定の位置にセッ
ティングする場合、複数の部材を吊り上げた状態ではワ
イヤ4、5、6と吊り部材1a、1b、1cが互いに干
渉している為に、吊り荷の重心が安定せず、吊り荷を一
つずつ荷取りする度に吊り荷の重心が移動し、安全上大
きな問題があった。更に、この不安定な状態で吊り荷の
セッティングを行おうとすると、最下位の部材1aから
順次セッティングする事になるため、吊り荷1b、1c
の下で作業しなければならず、安全上の間題があった。
また、吊り上げる部材を水平面に直角方向に高さを変え
て吊り上げる方法もあるが、部材を据え付ける都度、9
0度部材の廻転をしなければならず足場の悪い高所での
安全作業に問題があった。このように、部材のセッティ
ングに多くの時間を要することは、工期短縮を目的とし
たプレキヤスト組立工法の施工効率が著しく阻害される
ことになる。このため効率的な吊り上げ治具の工夫と作
業上の安全確保が課題となっている。
In order to solve this problem, as shown in FIGS. 5 and 6, when a plurality of members are simultaneously lifted and set at a predetermined position, the wires 4, 5, and 6 are suspended when the plurality of members are lifted. Since the members 1a, 1b, and 1c interfere with each other, the center of gravity of the suspended load is not stable, and the gravity center of the suspended load moves every time the suspended loads are picked up one by one, which is a serious safety problem. . Furthermore, if an attempt is made to set the suspended load in this unstable state, the suspended members 1b and 1c will be set sequentially from the lowest member 1a.
I had to work under and there was a safety issue.
There is also a method of lifting the members to be lifted by changing the height in a direction perpendicular to the horizontal plane.
There was a problem in safety work in high places where the footing was poor because the member had to be rotated around 0 degrees. As described above, since it takes a lot of time to set the members, the construction efficiency of the precast assembly method for shortening the construction period is significantly impaired. For this reason, devising an efficient lifting jig and ensuring work safety are issues.

【0006】本発明は、前記実情に鑑み提案されたもの
で、複数の長尺部材を安全で且つ効率よく吊り上げるこ
とができ、かつ施工できる長尺部材の施工方法および長
尺部材用荷吊り治具を提供することを目的とする。
The present invention has been proposed in view of the above circumstances, and is capable of safely and efficiently hoisting a plurality of long members, and a work method for the long members, and a load suspending / fixing method for the long members. The purpose is to provide ingredients.

【0007】[0007]

【課題を解決するための手段】前記目的を達成するため
に、請求項1に記載の発明は、長尺部材を複数個同時に
吊り上げ、順次荷卸ししつつ施工する長尺部材の施工方
法であって、荷吊り治具の重心と、吊り上げる個々の長
尺部材の重心とを一致させて吊り上げると共に、各長尺
部材の前記荷吊り治具に対する取付け距離を変化させ、
各長尺部材は、相互に干渉しないように吊り上げ、前記
長尺部材の最下に位置するものから順次とり外して施工
することを特徴とするものである。
In order to achieve the above object, the invention according to claim 1 is a method for constructing a long member, in which a plurality of long members are simultaneously lifted up and sequentially unloading. Then, the center of gravity of the load-hanging jig and the center of gravity of each long member to be lifted are made to coincide with each other, and the attachment distance of each long-length member to the load-hanging jig is changed.
Each of the long members is hoisted so as not to interfere with each other, and the members located at the bottom of the long members are sequentially removed and then the long members are constructed.

【0008】また、請求項2に記載の発明は、長尺部材
を複数個同時に揚重し順次一個づつ荷卸しする長尺部材
用荷吊り治具であって、複数の吊り索部材で略水平に吊
り上げられる荷吊り治具と、前記荷吊り治具の重心から
同心円上に配置された複数の吊り金具と該吊り金具に取
付けられた複数対の吊り索とを備え、該各対となったの
吊り索により吊り上げられた長尺部材の重心は、前記荷
吊り治具の重心と一致することを特徴とするものであ
る。
The invention according to claim 2 is a long member loading jig for lifting a plurality of long members at the same time and unloading them one by one, wherein the plurality of hanging members are substantially horizontal. Each of the pairs of hanging jigs, a plurality of hanging fittings arranged concentrically from the center of gravity of the hanging jig, and a plurality of pairs of hanging ropes attached to the hanging fittings. The center of gravity of the long member hoisted by the hanging rope is the same as the center of gravity of the load hoisting jig.

【0009】また、請求項3に記載の発明において、前
記荷吊り治具における吊り索部材の取付け位置と、前記
吊り金具の取付け位置とが一致することを特徴とするも
のである。
Further, the invention according to claim 3 is characterized in that the mounting position of the hanging rope member in the load hanging jig and the mounting position of the hanging metal fitting coincide with each other.

【0010】また、請求項4に記載の発明において、前
記複数対の吊り索は、それぞれ対毎に長さが異なること
を特徴するものである。
Further, in the invention as set forth in claim 4, the plurality of pairs of slings have different lengths for each pair.

【0011】また、請求項5に記載の発明において、前
記吊り索は、吊り上げる各長尺部材と干渉しない位置に
配置されたことを特徴とするものである。
Further, in the invention according to claim 5, the hanging rope is arranged at a position where it does not interfere with each of the long members to be lifted.

【0012】また、請求項6に記載の発明において、前
記長尺部材は、荷吊り治具に対する取付け角度が所定角
度ずつ変化していることを特徴とするものである。
Further, in the invention according to claim 6, the elongated member is characterized in that an attachment angle with respect to the load-hanging jig is changed by a predetermined angle.

【0013】また、請求項7に記載の発明において、前
記荷吊り治具は、吊り上げる長尺部材の個数と同数の主
梁を同一平面に配置して構成し、前記主梁のそれぞれに
長尺部材吊り上げ用の吊り索を直接取付けたことを特徴
とするものである。
Further, in the invention of claim 7, the load hoisting jig is configured by arranging the same number of main beams as the number of long members to be hoisted on the same plane, and each of the main beams is long. It is characterized in that a hanging rope for lifting members is directly attached.

【0014】[0014]

【発明の実施の形態】以下、一実施の形態を示す図面に
基づいて本発明を詳細に説明する。図1は、本発明に係
る長尺部材用荷吊り治具の使用状態を示す正面図、図2
は、本発明の長尺部材用荷吊り治具の使用状態を示す平
面図である。本発明の長尺部材用荷吊り治具10は、長
尺部材11を複数個同時に揚重し順次一個づつ荷卸しす
るものであって、複数の吊り索部材12で略水平に吊り
上げられる荷吊り治具13と、荷吊り治具13の重心G
0から同心円上に配置された複数の吊り金具15とこの
吊り金具15に取付けられた複数対の吊り索14とを備
え、該各対となったの吊り索14により吊り上げられた
長尺部材11の重心G1〜G4は、前記荷吊り治具13の
重心と一致している。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described in detail below with reference to the drawings showing one embodiment. FIG. 1 is a front view showing a usage state of a long member load lifting jig according to the present invention, and FIG.
FIG. 4 is a plan view showing a usage state of the long member load lifting jig of the present invention. The long member load lifting jig 10 of the present invention is for lifting a plurality of long members 11 at the same time and sequentially unloading them one by one. The center of gravity G of the jig 13 and the load hanging jig 13
A long member 11 that is provided with a plurality of hanging fittings 15 arranged concentrically from 0 and a plurality of pairs of hanging ropes 14 attached to the hanging fittings 15 and is hoisted by each pair of hanging ropes 14. Centers of gravity G 1 to G 4 of the same coincide with the center of gravity of the load hanging jig 13.

【0015】荷吊り治具13は、本実施の形態において
荷吊り治具13における吊り索部材12の取付け位置
と、吊り金具15の取付け位置とが一致するように、荷
吊り治具13の下面から上面まで貫通した吊り金具15
としてもよい。この様に構成した場合、吊り金具15の
上端に吊り索部材12を連結し、吊り金具15の下端に
吊り索14を取付ける。吊り索部材12は、同一長さの
ワイヤ、チェーンスリング等が使用され、上端がシャッ
クル16に連結されている。
In the present embodiment, the load-hanging jig 13 has a lower surface of the load-hanging jig 13 so that the mounting position of the hanging rope member 12 in the load-hanging jig 13 and the mounting position of the hanging metal fitting 15 are aligned with each other. Hanging fitting 15 that penetrates from the top to the top
May be In the case of such a configuration, the hanging rope member 12 is connected to the upper end of the hanging fitting 15 and the hanging rope 14 is attached to the lower end of the hanging fitting 15. As the sling member 12, a wire, a chain sling, and the like having the same length are used, and the upper end is connected to the shackle 16.

【0016】荷吊り治具13は、吊り上げる長尺部材1
1の個数と同数の主梁17を同一平面に配置して構成さ
れている。主梁17は、所定の角度αで本実施の形態で
は、4本配設されている。また、中央に取付け板18が
配置されると共に、周囲に枠体19が取付けられてい
る。そして、この主梁17のそれぞれに長尺部材吊り上
げ用の吊り金具15が重心G0から等距離の位置に直接
取付けられている。更に、本実施の形態では吊り金具1
5に2本の吊り索14が取付けられている。ここで、重
心G0を中心として等距離に取付けられた左右の吊り索
14a、14aは、それぞれ長さが等しく構成されてい
る。同様に吊り索14b、14bの長さが等しく、吊り
索14c、14cおよび吊り索14d、14dもそれぞ
れ等しい。また、吊り索14a>吊り索14b>吊り索
14c>吊り索14dの順に長さが異なっている。
The loading jig 13 is a long member 1 for lifting.
The same number of main beams 17 as one is arranged on the same plane. In this embodiment, four main beams 17 are arranged at a predetermined angle α. Further, a mounting plate 18 is arranged in the center, and a frame body 19 is mounted on the periphery. Then, a hanging metal member 15 for lifting the long member is directly attached to each of the main beams 17 at a position equidistant from the center of gravity G 0 . Further, in the present embodiment, the hanging fitting 1
Two suspension ropes 14 are attached to the cable 5. Here, the left and right suspension lines 14a, 14a attached equidistantly about the center of gravity G 0 are configured to have the same length. Similarly, the hanging ropes 14b and 14b have the same length, and the hanging ropes 14c and 14c and the hanging ropes 14d and 14d have the same length. Further, the lengths are different in the order of the hanging rope 14a> the hanging rope 14b> the hanging rope 14c> the hanging rope 14d.

【0017】次に、以上のように構成された本発明に係
る長尺部材用荷吊り治具10を使用した長尺部材の施工
方法について説明する。先ず、図1に示すように長尺部
材11を吊り索14によりそれぞれ吊り上げる。この
際、吊り索14の長さがそれぞれ異なるので、長尺部材
i、ii、iii、ivは、垂直位置が異なっている。
また、長尺部材iの重心G1と長尺部材iiの重心G2
長尺部材iiiの重心G 3と長尺部材ivの重心G4は、
荷吊り治具13の重心G0と同一鉛直線上に在る。更
に、図2に示すように長尺部材i、ii、iii、iv
は、重心G0を中心として角度αずつ旋回した位置に吊
り上げられているので、吊り索14と長尺部材11が干
渉することなく、長尺部材を順次取り外しても全体の重
心が変動することがない。
Next, the present invention constructed as described above
Construction of long members using the long member loading jig 10
The method will be described. First, as shown in FIG.
The material 11 is lifted by the hanging ropes 14, respectively. this
At this time, since the lengths of the hanging ropes 14 are different from each other, the long member
The vertical positions of i, ii, iii, and iv are different.
Also, the center of gravity G of the long member i1And the center of gravity G of the long member ii2When
Center of gravity G of long member iii 3And the center of gravity G of the long member ivFourIs
Center of gravity G of the lifting jig 130Is on the same vertical line as. Change
In addition, as shown in FIG. 2, the long members i, ii, iii, iv.
Is the center of gravity G0Suspended at a position that is rotated by angle α around
Since it has been lifted, the hanging rope 14 and the long member 11 are dried.
Even if the long members are removed one by one without
My heart never fluctuates.

【0018】以上のようにして吊り上げた長尺部材1
1、例えば床部材を建築物の高層階に揚重し、図2に示
すように作業者が長尺部材iから施工して行く。この
際、同時に揚重している他の長尺部材ii、iii、i
vが作業者の頭上に来ることがないので安元に作業を進
めることができる。また、施工の為に取り外す長尺部材
iの重心G1は、荷吊り治具13の重心G0と一致してい
るので、吊り荷の重心が移動することなく安全に作業が
できる。したがって、足場の悪い高所での作業にも安全
である。
The long member 1 lifted as described above
1. For example, a floor member is hoisted on a higher floor of a building, and an operator constructs a long member i as shown in FIG. At this time, the other long members ii, iii, i that are simultaneously lifted
Since v does not come over the worker's head, the work can be safely performed. In addition, since the center of gravity G 1 of the long member i to be removed for construction matches the center of gravity G 0 of the load hanging jig 13, the work can be performed safely without the center of gravity of the suspended load moving. Therefore, it is safe to work in high places with poor footing.

【0019】図3は、長尺部材iiを施工する場合を示
すものである。吊り荷全体をαだけ矢印方向に旋回さ
せ、長尺部材iiを取り外して、長尺部材iの隣に並べ
る。この際も、作業者は吊り荷の下に位置することなく
安全である。また、長尺部材iiを取り外しても、吊り
荷全体の重心が移動することなく安全に作業ができる。
順次このような作業を繰り返して作業ができる。なお、
本実施の形態では、4本の長尺部材を吊り上げる場合に
ついて説明したが、それ以上の本数であっても同様に適
用することができる。
FIG. 3 shows a case where the long member ii is constructed. The entire suspended load is swung by α in the direction of the arrow, the long member ii is removed, and the long member is arranged next to the long member i. Also in this case, the worker is safe because he / she is not located under the suspended load. Further, even if the long member ii is removed, the work can be performed safely without the center of gravity of the entire suspended load moving.
Such work can be repeated in order to perform work. In addition,
In the present embodiment, the case where four long members are hoisted has been described, but the same can be applied to the case where the number is more than that.

【0020】[0020]

【発明の効果】この発明は前記した構成からなるので、
以下に説明するような効果を奏することができる。
Since the present invention has the above-mentioned structure,
The effects described below can be achieved.

【0021】請求項1に記載の発明では、長尺部材を複
数個同時に吊り上げ、順次荷卸ししつつ施工する長尺部
材の施工方法であって、荷吊り治具の重心と、吊り上げ
る個々の長尺部材の重心とを一致させて吊り上げると共
に、各長尺部材の前記荷吊り治具に対する取付け距離を
変化させ、各長尺部材は、相互に干渉しないように吊り
上げ、前記長尺部材の最下に位置するものから順次とり
外して施工するものである。
According to the first aspect of the present invention, there is provided a method for constructing a long member in which a plurality of long members are simultaneously lifted and sequentially loaded and unloaded. The long member is hoisted so as to coincide with the center of gravity of the long member, and the mounting distance of each long member to the load hanging jig is changed so that each long member is hoisted so as not to interfere with each other. It will be installed by sequentially removing from the one located at.

【0022】このような構成としたことによって、本発
明の長尺部材の施工方法は複数の長尺部材を安全で且つ
効率よく吊り上げることができると共に、高層建築物に
おけるプレキャスト組立工事を効率良く施工できる。ま
た、長尺部材のセッティング時および荷卸し作業時に荷
下作業となることがない。
With such a construction, the method for constructing a long member of the present invention allows a plurality of long members to be safely and efficiently hoisted, and precast assembly work in a high-rise building can be efficiently constructed. it can. In addition, unloading work does not occur during setting of the long member and unloading work.

【0023】また、請求項2に記載の発明において、長
尺部材を複数個同時に揚重し順次一個づつ荷卸しする長
尺部材用荷吊り治具であって、複数の吊り索部材で略水
平に吊り上げられる荷吊り治具と、前記荷吊り治具の重
心から同心円上に配置された複数の吊り金具と該吊り金
具に取付けられた複数対の吊り索とを備え、該各対とな
ったの吊り索により吊り上げられた長尺部材の重心は、
前記荷吊り治具の重心と一致するので、複数個吊り上げ
られた長尺部材を下から取り外しても全体のバランスが
崩れることがなく、高所における荷卸し作業を安全に行
うことができる。
Further, in the invention according to claim 2, there is provided a long member loading jig for hoisting a plurality of long members at the same time and sequentially unloading them one by one, wherein the plurality of hoisting members are substantially horizontal. Each of the pairs of hanging jigs, a plurality of hanging fittings arranged concentrically from the center of gravity of the hanging jig, and a plurality of pairs of hanging ropes attached to the hanging fittings. The center of gravity of the long member lifted by the hanging rope of
Since it coincides with the center of gravity of the load hoisting jig, the whole balance will not be lost even if a plurality of long members that have been hoisted are removed from below, and the work of unloading at high places can be performed safely.

【0024】また、請求項3に記載の発明において、前
記荷吊り治具における吊り索部材の取付け位置と、前記
吊り金具の取付け位置とが一致するので、荷吊り治具に
曲げ応力が生じることなく、荷吊り治具の構造を軽量化
することができる。
In the invention according to claim 3, since the mounting position of the hanging rope member in the load hanging jig and the mounting position of the hanging metal fitting coincide with each other, bending stress is generated in the load hanging jig. Therefore, the structure of the load lifting jig can be reduced in weight.

【0025】また、請求項4に記載の発明において、前
記複数対の吊り索は、それぞれ対毎に長さが異なるた
め、複数の長尺部材を下から順番に荷卸しすることがで
き、作業の能率化、および安全化を図ることができる。
Further, in the invention according to claim 4, since the plurality of pairs of hanging ropes have different lengths for each pair, a plurality of long members can be unloaded in order from the bottom. The efficiency and safety of can be achieved.

【0026】また、請求項5に記載の発明において、前
記吊り索は、吊り上げる各長尺部材と干渉しない位置に
配置されたので、長尺部材を取り外す際に他の長尺部材
に影響を与えることなく荷卸し作業を行うことができ
る。
Further, in the invention according to claim 5, since the hanging rope is arranged at a position where it does not interfere with each of the long members to be lifted, it affects other long members when removing the long member. Unloading work can be done without

【0027】また、請求項6に記載の発明において、前
記長尺部材は、荷吊り治具に対する取付け角度が所定角
度ずつ変化しているので、荷積み作業および荷卸し作業
をする際に同時に吊り上ている長尺部材の荷下になるこ
となく、安全に作業することができる。また、より多く
の長尺部材を互いに干渉することなく吊り下げることが
できる。
Further, in the invention according to claim 6, since the mounting angle of the long member with respect to the load hanging jig is changed by a predetermined angle, the long member is hung at the same time when the loading work and the unloading work are performed. It is possible to work safely without being unloaded from the long member that is on top. Moreover, more long members can be suspended without interfering with each other.

【0028】また、請求項7に記載の発明において、前
記荷吊り治具は、吊り上げる長尺部材の個数と同数の主
梁を同一平面に配置して構成し、前記主梁のそれぞれに
長尺部材吊り上げ用の吊り索を直接取付けたので、荷吊
り治具の構造を簡易で強固なものとすることができる。
Further, in the invention according to claim 7, the load hoisting jig is configured by arranging the same number of main beams as the number of long members to be lifted on the same plane, and each of the main beams is long. Since the hanging rope for lifting the member is directly attached, the structure of the load hanging jig can be made simple and strong.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明に係る長尺部材用荷吊り治具の
使用状態を示す正面図である。
FIG. 1 is a front view showing a usage state of a long member load lifting jig according to the present invention.

【図2】図2は、同長尺部材用荷吊り治具の使用状態を
示す平面図である。
FIG. 2 is a plan view showing a usage state of the load suspending jig for the long member.

【図3】図3は、同長尺部材用荷吊り治具の使用状態を
示す平面図である。
FIG. 3 is a plan view showing a usage state of the load hanging jig for the long member.

【図4】図4は、従来の長尺部材用荷吊り方法を説明す
る説明図である。
FIG. 4 is an explanatory diagram illustrating a conventional method for suspending a load for a long member.

【図5】図5は、従来の複数の長尺部材を吊り上げた場
合を示す正面図である。
FIG. 5 is a front view showing a case where a plurality of conventional long members are suspended.

【図6】図6は、図5の側面図である。FIG. 6 is a side view of FIG.

【符号の説明】[Explanation of symbols]

G 重心 10 長尺部材用荷吊り治具 11 長尺部材 12 吊り索部材 13 荷吊り治具 14 吊り索 15 吊り金具 16 シャックル 17 主梁 18 取付け板 19 枠体 G center of gravity 10 Loading jig for long members 11 Long member 12 Hanging rope members 13 Loading jig 14 hanging rope 15 Hanging bracket 16 shackles 17 Main beams 18 Mounting plate 19 frame

【手続補正書】[Procedure amendment]

【提出日】平成14年4月24日(2002.4.2
4)
[Submission date] April 24, 2002 (2002.4.2)
4)

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0018[Correction target item name] 0018

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0018】以上のようにして吊り上げた長尺部材1
1、例えば床部材を建築物の高層階に揚重し、図2に示
すように作業者が長尺部材iから施工して行く。この
際、同時に揚重している他の長尺部材ii、iii、i
vが作業者の頭上に来ることがないので安全に作業を進
めることができる。また、施工の為に取り外す長尺部材
iの重心G1は、荷吊り治具13の重心G0と一致してい
るので、吊り荷の重心が移動することなく安全に作業が
できる。したがって、足場の悪い高所での作業にも安全
である。
The long member 1 lifted as described above
1. For example, a floor member is hoisted on a higher floor of a building, and an operator constructs a long member i as shown in FIG. At this time, the other long members ii, iii, i that are simultaneously lifted
Since v does not come over the worker's head, the work can be safely carried out. In addition, since the center of gravity G 1 of the long member i to be removed for construction matches the center of gravity G 0 of the load hanging jig 13, the work can be performed safely without the center of gravity of the suspended load moving. Therefore, it is safe to work in high places with poor footing.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 橋本 朗 東京都港区新橋4−24−8 株式会社富士 ピー・エス東京支店内 Fターム(参考) 2E174 AA01 BA03 CA03 CA38 3F004 EA04 KA01    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Akira Hashimoto             4-24-8 Shimbashi, Minato-ku, Tokyo Fuji Co., Ltd.             PS Tokyo Branch F-term (reference) 2E174 AA01 BA03 CA03 CA38                 3F004 EA04 KA01

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 長尺部材を複数個同時に吊り上げ、順次
荷卸ししつつ施工する長尺部材の施工方法であって、荷
吊り治具の重心と、吊り上げる個々の長尺部材の重心と
を一致させて吊り上げると共に、各長尺部材の前記荷吊
り治具に対する取付け距離を変化させ、各長尺部材は、
相互に干渉しないように吊り上げ、前記長尺部材の最下
に位置するものから順次とり外して施工することを特徴
とする長尺部材の施工方法。
1. A method for constructing a long member in which a plurality of long members are simultaneously lifted and sequentially loaded and unloaded, wherein the center of gravity of a load-hanging jig and the center of gravity of each long member to be hoisted are matched. And lifting, changing the attachment distance of each long member to the load hanging jig, each long member,
A method for constructing a long member, characterized in that the long members are lifted so that they do not interfere with each other, and the ones located at the bottom of the long members are sequentially removed for construction.
【請求項2】 長尺部材を複数個同時に揚重し順次一個
づつ荷卸しする長尺部材用荷吊り治具であって、複数の
吊り索部材で略水平に吊り上げられる荷吊り治具と、前
記荷吊り治具の重心から同心円上に配置された複数の吊
り金具と該吊り金具に取付けられた複数対の吊り索とを
備え、該各対となったの吊り索により吊り上げられた長
尺部材の重心は、前記荷吊り治具の重心と一致すること
を特徴とする長尺部材用荷吊り治具。
2. A loading jig for a long member for simultaneously lifting a plurality of long members and unloading them one by one, wherein the loading jig is hoisted substantially horizontally by a plurality of hoisting members. A plurality of hanging fittings arranged concentrically from the center of gravity of the load hanging jig and a plurality of pairs of hanging ropes attached to the hanging fittings, and a long piece that is hoisted by the hanging ropes of each pair. The load-carrying jig for a long member, wherein the center of gravity of the member coincides with the center of gravity of the load-carrying jig.
【請求項3】 前記荷吊り治具における吊り索部材の取
付け位置と、前記吊り金具の取付け位置とが一致するこ
とを特徴とする請求項2に記載の長尺部材用荷吊り治
具。
3. The load-hanging jig for a long member according to claim 2, wherein a mounting position of the hanging rope member in the load-hanging jig and a mounting position of the hanging metal fitting coincide with each other.
【請求項4】 前記複数対の吊り索は、それぞれ対毎に
長さが異なることを特徴とする請求項2または3に記載
の長尺部材用荷吊り治具。
4. The load hanging jig for a long member according to claim 2, wherein the plurality of pairs of hanging ropes have different lengths for each pair.
【請求項5】 前記吊り索は、吊り上げる各長尺部材と
干渉しない位置に配置されたことを特徴とする請求項2
〜4の何れか1に記載の長尺部材用荷吊り治具。
5. The hanging rope is arranged at a position where it does not interfere with each of the long members to be hoisted.
The load-hanging jig for a long member according to any one of 1 to 4.
【請求項6】 前記長尺部材は、荷吊り治具に対する取
付け角度が所定角度ずつ変化していることを特徴とする
請求項2〜5の何れか1に記載の長尺部材用荷吊り治
具。
6. The load-fixing jig for a long member according to claim 2, wherein an attachment angle of the long member with respect to a load-hanging jig is changed by a predetermined angle. Ingredient
【請求項7】 前記荷吊り治具は、吊り上げる長尺部材
の個数と同数の主梁を同一平面に配置して構成し、前記
主梁のそれぞれに長尺部材吊り上げ用の吊り金具を直接
取付けたことを特徴とする請求項1〜6の何れか1に記
載の長尺部材用荷吊り治具。
7. The load hoisting jig is configured by arranging the same number of main beams as the number of long members to be hoisted on the same plane, and a hanging metal fitting for hoisting long members is directly attached to each of the main beams. The load-hanging jig for a long member according to any one of claims 1 to 6, characterized in that.
JP2002113102A 2002-04-16 2002-04-16 Load lifting jig for long members Expired - Fee Related JP3658572B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002113102A JP3658572B2 (en) 2002-04-16 2002-04-16 Load lifting jig for long members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002113102A JP3658572B2 (en) 2002-04-16 2002-04-16 Load lifting jig for long members

Publications (2)

Publication Number Publication Date
JP2003306289A true JP2003306289A (en) 2003-10-28
JP3658572B2 JP3658572B2 (en) 2005-06-08

Family

ID=29395376

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002113102A Expired - Fee Related JP3658572B2 (en) 2002-04-16 2002-04-16 Load lifting jig for long members

Country Status (1)

Country Link
JP (1) JP3658572B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4988941B1 (en) * 2011-04-27 2012-08-01 グリーンリバー株式会社 Support jig transfer jig and support transfer method
CN102767289A (en) * 2012-07-12 2012-11-07 广州建筑股份有限公司 Asymmetric and integrated lifting construction method for large scale grid structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4988941B1 (en) * 2011-04-27 2012-08-01 グリーンリバー株式会社 Support jig transfer jig and support transfer method
CN102767289A (en) * 2012-07-12 2012-11-07 广州建筑股份有限公司 Asymmetric and integrated lifting construction method for large scale grid structure

Also Published As

Publication number Publication date
JP3658572B2 (en) 2005-06-08

Similar Documents

Publication Publication Date Title
JP6012578B2 (en) Heavy material transport method and heavy material transport device
JP6969686B2 (en) How to extend the lift of a construction elevator
JPH061568A (en) Erection method for elevator counter weight and counter weight
JP2008222382A (en) Method for moving lifting device for installation
JP2003306289A (en) Method for installing long member and sling jig for long member
JP2004269096A (en) Heavy article hoisting tool
JPH05116881A (en) Plate-shaped lifting tool
JP3180203B2 (en) Material lifting assembly equipment used for construction of high-rise structures
JP3495928B2 (en) Main rope replacement method for side fork type elevator
JP2001354374A (en) Lifting device in hoistway of elevator
JP2012001894A (en) Continuous lifting device
JPH092774A (en) Heavy object suspending device
JP2001335280A (en) Hoisting jig
JPH07259321A (en) Hanging scaffold
JPH0734069Y2 (en) Lifting device for car or counterweight in elevator
JP3272683B2 (en) Counterweight self-removal device
JP7358298B2 (en) How to attach a backstay for a boiler
CN217867679U (en) Lifting appliance for lifting fabricated building components
JP5410322B2 (en) Structure building method and structure building jig used therefor
JP3004731U (en) Multi-point hanging jig
CN217173051U (en) Convenient and easy-to-use building material hoisting machine
JPH092767A (en) Lifting method for escalator truss
CN213572929U (en) Annular hanger
JP3811419B2 (en) Building material lifting device and building material lifting method
JP4343525B2 (en) Elevator hoistway unit

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040419

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040601

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040623

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040623

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040730

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050314

R150 Certificate of patent or registration of utility model

Ref document number: 3658572

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090318

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100318

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110318

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120318

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140318

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees