JP2003032914A - Automation system of power distribution, and monitoring method thereof - Google Patents
Automation system of power distribution, and monitoring method thereofInfo
- Publication number
- JP2003032914A JP2003032914A JP2001216964A JP2001216964A JP2003032914A JP 2003032914 A JP2003032914 A JP 2003032914A JP 2001216964 A JP2001216964 A JP 2001216964A JP 2001216964 A JP2001216964 A JP 2001216964A JP 2003032914 A JP2003032914 A JP 2003032914A
- Authority
- JP
- Japan
- Prior art keywords
- slave stations
- control terminal
- data
- distribution line
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/20—Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/30—State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、配電線路を自動的
に監視制御する配電自動化システム及びかかるシステム
における子局の監視方法に関わり、特に、同時刻性のあ
る子局データの収集を可能とする配電自動化システム及
びかかるシステムにおける監視方法に関するものであ
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a distribution automation system for automatically monitoring and controlling a distribution line and a slave station monitoring method in such a system, and in particular, enables collection of slave station data at the same time. The present invention relates to a distribution automation system and a monitoring method in such a system.
【0002】[0002]
【従来の技術】配電自動化システムは、配電線路におい
て、例えば、その線路の区分となる開閉器単位などに、
複数の子局を設置し、これら複数の子局により監視され
た計測値を基にして、上位装置である監視制御端末が、
当該配電線路における状況を自動的に監視(停電してい
る区間がないことを確認すること等)すると共に、配電
線路に複雑に多数設置され区分開閉器の入り切りの制御
を行うものである。2. Description of the Related Art An automatic distribution system is used in a distribution line, for example, in a switch unit which is a section of the line.
Multiple slave stations are installed, and based on the measurement values monitored by these slave stations, the supervisory control terminal, which is a higher-level device,
The condition of the distribution line is automatically monitored (for example, by confirming that there is no power failure section), and a large number of complicated distribution lines are installed on the distribution line to control the opening and closing of the switch.
【0003】ところで、従来の配電自動化システムで
は、その監視機能として、上位装置である監視制御端末
が、各子局に対し、即ち、1台毎に、その都度、監視す
る方法が一般的に採用されていた。そのため、上記従来
の配電自動化システムでは、上位装置である監視制御端
末が複数の子局を監視する際には、配電線路の全ての子
局を監視するまでに時間差が発生してしまい、これで
は、各子局から監視制御端末に収集されるデータは、同
時刻性の薄いデータベースとなっていた。By the way, in the conventional distribution automation system, as a monitoring function, a method in which a supervisory control terminal which is a higher-level device monitors each slave station, that is, one by one, is generally adopted. It had been. Therefore, in the conventional distribution automation system described above, when the supervisory control terminal, which is a higher-level device, monitors a plurality of slave stations, a time lag occurs until it monitors all the slave stations on the distribution line, which is The data collected from each slave station to the supervisory control terminal was a database with a low time synchronization.
【0004】一方、配電線路における地絡事故などの検
出を、電流あるいは電圧の高周波成分を計測することに
より行うことが、例えば、特開平11−38073号公
報、特開平5−22851号公報などにより知られてい
る。また、例えば、特開平6−78454号公報や特開
平6−174777号公報にも示されるように、電力系
統における故障区間を標定するためには、電路の状態量
を検出する子局の検出タイミングを一致させる必要があ
ることが知られている。加えて、特開平4−47899
号公報によれば、通信回線を介して接続された複数の子
局(被監視局装置)と複数の監視局装置を備えた遠方監
視方式において、当該監視局装置が、複数の被監視局装
置に対して一斉に情報送出要求信号を送出し、もって、
被監視局装置から必要な監視情報を収集するものが知ら
れている。On the other hand, it is possible to detect a ground fault in a power distribution line by measuring a high frequency component of current or voltage, for example, as disclosed in Japanese Patent Laid-Open Nos. 11-38073 and 5-22851. Are known. Further, for example, as disclosed in Japanese Patent Laid-Open Nos. 6-78454 and 6-174777, in order to locate a faulty section in the power system, the detection timing of the slave station that detects the state quantity of the electric line is detected. Are known to need to match. In addition, JP-A-4-47899
According to the publication, in a remote monitoring system including a plurality of slave stations (monitored station devices) and a plurality of monitoring station devices connected via a communication line, the monitoring station device includes a plurality of monitored station devices. To send information transmission request signals to
It is known to collect necessary monitoring information from monitored station devices.
【0005】特に、上記のような高調波の測定に関して
は、時々刻々、その高調波が変動する為、同時刻に、複
数の配電線路の地点(当該配電自動化システムにおいて
は、子局単位)において高調波の計測を実施することが
望ましい。かかる高調波の同時刻での測定は、かかる高
調波の発生源探索などに活用する場合などには、特に重
要となる。しかしながら、上述したように、現在採用さ
れている従来技術になる配電線自動化システム、特に、
時計機能などを持たないシステム構成機器においては、
上位装置である監視制御端末が子局と通信する為の高速
な通信設備、すなわち、複数の子局から同時刻に計測し
たデータを収集するほどの高速な通信速度は持ってない
のが現状であった。In particular, regarding the above harmonic measurement, since the harmonics vary from moment to moment, at the same time, at a plurality of distribution line points (slave station units in the distribution automation system). It is desirable to measure harmonics. The measurement of such harmonics at the same time is especially important when utilized for searching the source of such harmonics. However, as described above, the conventional distribution line automation system that is currently adopted, in particular,
For system components that do not have a clock function,
Currently, the supervisory control terminal, which is a higher-level device, does not have a high-speed communication facility for communicating with a slave station, that is, a communication speed that is high enough to collect data measured from multiple slave stations at the same time. there were.
【0006】なお、かかる従来技術における同時刻性の
問題に対しては、更に、例えば、各子局と監視制御端末
との間を、高速通信が可能な光ケーブルを通信線として
使用し、子局の1台1台をポーリングする方法などが提
案されている。To solve the problem of the same time in the prior art, for example, an optical cable capable of high-speed communication is used as a communication line between each slave station and the supervisory control terminal, There has been proposed a method of polling each one of the above.
【0007】しかしながら、上記のように各子局と監視
制御端末との間を高速な光ケーブルで高速にポーリング
する方法では、各子局に配置されている種々の装置に対
しても、これに対応する高速の応答性が求められ、ま
た、敷設される光ケーブル網に関しても、光の減衰など
の技術的問題があり、更には、その価格も高価になると
いう問題がある。そのため、かかる提案は、特に、配電
線路に複雑に多数設置された区分開閉器の入り切り制御
を主としている配電自動化システムにおいては、実用的
な解決手段ではなかった。However, the method of polling between each slave station and the supervisory control terminal at high speed with a high-speed optical cable as described above is applicable to various devices arranged in each slave station. High-speed response is required, and the optical cable network to be laid also has technical problems such as attenuation of light, and also has a problem that its price becomes expensive. Therefore, such a proposal has not been a practical solution, especially in a distribution automation system that mainly controls opening / closing of a plurality of partition switches that are installed in a complicated manner on a distribution line.
【0008】[0008]
【発明が解決しようとする課題】上述したように、従来
技術になる配電自動化システム、特に、配電線の地絡短
絡事故を検出する機能を持った複数の子局を管理する配
電自動化システムでは、配電線路における高調波の計測
データに対して各子局での計測の同時刻性が要求される
が、しかしながら、従来の通信ネットワークを介してか
かる要求を実現することは困難であった。As described above, in the conventional distribution automation system, in particular, in the distribution automation system for managing a plurality of slave stations having a function of detecting a ground fault short-circuit accident of a distribution line, Although it is required that the slave stations measure the harmonics in the distribution line at the same time, it is difficult to realize such a requirement through the conventional communication network.
【0009】特に、上位装置である監視制御端末が、従
来の通信ネットワークを介して、複数(多数)の子局か
ら同時刻性の高い計測データを収集しようとする場合に
は、各子局から返信される計測データを短くして通信時
間を短縮せざるを得ないが、これでは、最低限の計測デ
ータ長とせざるをえないため、必要な高精度な計測デー
タが得られなくなってしまう。他方、配電線路における
状態量について高精度な計測を行う程、その計測データ
が長くなり、そのための通信時間がかかってしまう。こ
れでは、監視制御端末で得られる計測データの同時刻性
が失われてしまい、あるいは、停電している区間がない
ことを確認することが第一の目的であり、区分開閉器の
入り切り状態を監視することを主目的としている配電自
動化システムでは、その本来の機能が達成できなくなっ
てしまうことともなってしまう。In particular, when the supervisory control terminal, which is a higher-level device, wants to collect measurement data with high time synchronization from a plurality (a large number) of slave stations via a conventional communication network, Although it is unavoidable to shorten the communication data by shortening the measurement data to be returned, this requires the minimum measurement data length, which makes it impossible to obtain the necessary highly accurate measurement data. On the other hand, the more highly accurate the measurement of the state quantity in the distribution line, the longer the measurement data and the longer the communication time. In this case, the first purpose is to confirm that there is no simultaneous time of the measurement data obtained by the supervisory control terminal, or that there is no power outage. In the distribution automation system whose main purpose is to monitor, it may be impossible to achieve its original function.
【0010】そこで、本発明では、上記の従来技術にお
ける問題点に鑑み、例えば、上記の光ケーブルで高速に
ポーリングする方法などのように高価な設備の敷設を伴
うことなく、従来からの一般的な通信ネットワークを利
用して、高周波の計測などにおいて、より高い同時刻性
の計測データを複数の子局から収集することが可能であ
り、もって、優れた性能を有する配電自動化システム及
びかかるシステムにおける監視方法を提供することを目
的とする。In view of the above problems in the prior art, therefore, the present invention does not require the installation of expensive equipment such as the above-described method of polling at high speed with an optical cable, and the conventional general method. By using a communication network, it is possible to collect measurement data of higher co-simultaneity from a plurality of slave stations in high-frequency measurement, etc., and thus have an excellent distribution automation system and monitoring in such a system. The purpose is to provide a method.
【0011】[0011]
【課題を解決するための手段】上記の目的を達成するた
め、本発明により提案されるのは、まず、配電線路上に
設置した複数の子局と、ネットワークを介して当該子局
に接続され、当該子局からの監視データを収集して当該
配電線路を監視する監視制御端末とからなる配電自動化
システムにおいて、前記監視制御端末は、当該配電線路
における状態量を計測して計測データを格納することを
内容とするデータ格納指令を、接続された上記子局の全
てに対して同時に発生する手段と、格納した計測データ
を返信することを内容とする格納データ返信指令を、上
記子局の各々に対して順次発生する手段とを備えてお
り、かつ、前記監視制御端末に接続された全ての子局
は、それぞれ、前記監視制御端末から自己に対して発生
される前記データ格納指令に対し、前記状態量の計測を
行って計測データを格納する手段と、前記監視制御端末
から自己に対して発生される前記計測データ返信指令に
対し、前記格納手段に格納した前記状態量の計測データ
を返信する手段とを備えている配電自動化システムであ
る。In order to achieve the above object, the present invention proposes that a plurality of slave stations installed on a distribution line are connected to the slave stations via a network. In a distribution automation system that includes a monitoring control terminal that collects monitoring data from the slave station and monitors the distribution line, the monitoring control terminal measures the state quantity in the distribution line and stores the measurement data. Means for simultaneously generating a data storage command having the content to all of the connected slave stations, and a stored data reply command having the content to return the stored measurement data to each of the slave stations. All the slave stations connected to the supervisory control terminal, and each of the slave stations connected to the supervisory control terminal individually stores the data stored therein. In response to the command, a means for measuring the state quantity and storing the measurement data, and a response to the measurement data reply command issued to the self from the monitoring control terminal, the state quantity stored in the storage means The distribution automation system is provided with a means for returning measurement data.
【0012】また、本発明によれば、上記の配電自動化
システムにおいて、当該配電線路において計測する状態
量は前記配電線路上の高調波であり、かつ、前記監視制
御端末の前記データ格納指令発生手段は、前記子局の全
てに対して前記配電線路上の高調波を計測して計測デー
タを格納することを内容とする指令を発生し、かつ、前
記複数の子局は、それぞれ、前記配電線路上の高調波を
計測する手段を備えている。Further, according to the present invention, in the above distribution automation system, the state quantity measured in the distribution line is a harmonic on the distribution line, and the data storage command generating means of the monitoring control terminal. Generates a command for measuring harmonics on the power distribution line to all of the slave stations and storing the measured data, and the plurality of slave stations respectively include the distribution line. A means for measuring harmonics on the road is provided.
【0013】加えて、やはり、上記の目的を達成するた
め、本発明により提案されるのは、配電線路上に設置し
た複数の子局と、ネットワークを介して当該子局に接続
され、当該子局からの監視データを収集して当該配電線
路を監視する監視制御端末とからなる配電自動化システ
ムにおける監視方法であって、前記監視制御端末は、当
該配電線路における状態量を計測して計測データを格納
することを内容とするデータ格納指令を、接続された上
記子局の全てに対して同時に発生し、前記監視制御端末
に接続された全ての子局は、前記監視制御端末から自己
に対して発生される前記データ格納指令に対し、それぞ
れ、前記状態量の計測を行って計測データを格納し、前
記監視制御端末は、格納した計測データを返信すること
を内容とする格納データ返信指令を、上記子局の各々に
対して順次発生し、前記監視制御端末に接続された子局
は、それぞれ、前記監視制御端末から自己に対して発生
される前記計測データ返信指令に対し、前記格納した前
記状態量の計測データを返信し、もって、前記監視制御
端末は同時刻性の高い計測データを得る配電自動化シス
テムにおける監視方法である。In addition, again, in order to achieve the above object, it is proposed by the present invention that a plurality of slave stations installed on a distribution line and the slave stations connected via a network are connected to the slave stations. A monitoring method in a distribution automation system comprising a monitoring control terminal that collects monitoring data from a station and monitors the distribution line, wherein the monitoring control terminal measures a state quantity in the distribution line to obtain measurement data. A data storage command having the content of storing is simultaneously issued to all of the connected slave stations, and all slave stations connected to the supervisory control terminal are directed to themselves from the supervisory control terminal. Storage in which the state quantity is measured and the measured data is stored in response to each of the generated data storage commands, and the monitor control terminal returns the stored measured data. Data response command is sequentially generated for each of the slave stations, and the slave stations connected to the monitor control terminal respectively respond to the measurement data reply command generated from the monitor control terminal. On the other hand, it is a monitoring method in the distribution automation system in which the stored measurement data of the state quantity is returned so that the monitoring control terminal obtains measurement data with high time synchronization.
【0014】また、本発明によれば、前記した監視方法
において、当該配電線路において計測する状態量は前記
配電線路上の高調波であり、または、前記監視制御端末
は、瞬間地絡短絡事故が発生した場合に、当該配電線路
における状態量を計測して計測データを格納することを
内容とするデータ格納指令を、接続された上記子局の全
てに対して同時に発生するものである。Further, according to the present invention, in the above-mentioned monitoring method, the state quantity measured in the distribution line is a harmonic on the distribution line, or the monitoring control terminal is When it occurs, a data storage command having the content of measuring the state quantity in the distribution line and storing the measurement data is simultaneously issued to all of the connected slave stations.
【0015】[0015]
【発明の実施の形態】以下、本発明の実施の形態につい
て、添付の図面を参照しながら詳細に説明する。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
【0016】まず、図1は、本発明の一実施の形態にな
る配電自動化システムの概略を示しており、この図にお
いて、監視制御の対象である配電線路は、例えば、配電
用変圧器1及び配電線母線2などの設備から構成されて
おり、さらに、その配電線3を分割するための区分開閉
器4、4…が複数設けられている。そして、これら複数
の区分開閉器4には、それそれ、その区間において停電
がないことを確認し、また、区分開閉器の入り切り状態
を監視することを主な目的として、配電線の電圧電流を
検出する電圧電流センサ6と共に、これら区分開閉器4
を自動的に制御するための、所謂、子局5、5…が設け
られている。なお、図示はしないが、これら子局5に
は、高調波の発生源探索や配電線の地絡短絡事故を検出
する機能を持たせるため、配電線の高調波、又は、地絡
短絡リレー動作状態や基本波の電圧や電流などの状態量
を計測するための各種の計測装置が、それぞれ設けられ
ており、また、各子局5は、例えば、マイクロコンピュ
ータ等から構成されると共に、図示しないが、その計測
装置により計測された状態量である計測データを一旦格
納するための手段(例えば、メモリからなる)が設けら
れている。First, FIG. 1 schematically shows a distribution automation system according to an embodiment of the present invention. In this figure, the distribution line to be monitored and controlled is, for example, a distribution transformer 1 or a distribution transformer 1. The distribution line busbar 2 and other equipment are provided, and a plurality of division switches 4, 4, ... For dividing the distribution line 3 are further provided. Then, the voltage and current of the distribution line are mainly checked to confirm that there is no power failure in each of the plurality of section switches 4, and to monitor the on / off state of the section switches. These section switches 4 together with the voltage / current sensor 6 for detection
Are provided for automatically controlling the so-called slave stations 5, 5, ... Although not shown, in order to provide these slave stations 5 with a function of searching for a generation source of harmonics and detecting a ground fault short-circuit accident of a distribution line, a harmonic of a distribution line or a ground short-circuit relay operation is performed. Various measuring devices for measuring the state and state quantities such as voltage and current of the fundamental wave are provided respectively, and each slave station 5 is composed of, for example, a microcomputer, and is not shown. However, a means (for example, a memory) for temporarily storing the measurement data, which is the state quantity measured by the measuring device, is provided.
【0017】そして、かかる構成の配電自動化システム
による監視制御の自動化を図るための設備として、上記
複数配置された子局5、5…から各種の計測データを収
集して配電線路を自動的に監視制御するための上位装置
としての監視制御端末8が設けられており、例えば、コ
ンピュータ等から構成されるいる。なお、図にも示すよ
うに、上記複数配置された子局5、5…には、それぞ
れ、そのアドレス番号が付されており(例えば、「00
1」,「002」,「003」…)、さらには、これら
子局5、5…は、通常の通信回線(ネットワーク)7、
及び、信号を中継するための中継装置9を介して、上記
した上位装置としての監視制御端末8に接続されてい
る。Then, as equipment for automating the monitoring control by the distribution automation system having such a configuration, various measurement data are collected from the plurality of slave stations 5, 5, ... A supervisory control terminal 8 is provided as a higher-level device for controlling, and is composed of, for example, a computer. As shown in the figure, the plurality of slave stations 5, 5, ... Are assigned their address numbers (for example, "00").
1 ”,“ 002 ”,“ 003 ”...), and further, these slave stations 5, 5 ...
Also, it is connected to the supervisory control terminal 8 as the above-mentioned upper device via a relay device 9 for relaying a signal.
【0018】上述した構成になる配電自動化システムに
おいて、例えば、アドレス「001」を有する子局5に
接続された区分開閉器4の制御監視、又は、その区分で
の配電線3の電気量を計測する場合には、監視制御端末
8は、上記の中継装置9及び通信回線7を介して、上記
の子局5、5…に指令を発信する。他方、子局5、5…
側では、送信された信号にあるアドレスデータ「00
1」から、そのアドレス番号が「001」である子局5
のみが、上記の指令に沿って、その機能である、制御監
視動作又は電気量を計測する動作を実行し、その後、そ
の実行計測結果(データ)を返信する。これが、一般的
な配電自動化システムにおける動作の概要である。In the distribution automation system having the above-mentioned configuration, for example, control and monitoring of the section switch 4 connected to the slave station 5 having the address "001", or the amount of electricity of the distribution line 3 in that section is measured. In this case, the monitor control terminal 8 sends a command to the slave stations 5, 5, ... Via the relay device 9 and the communication line 7. On the other hand, slave stations 5, 5 ...
On the side, the address data “00
1 ”to slave station 5 whose address number is“ 001 ”
In accordance with the above command, only performs the control monitoring operation or the operation of measuring the amount of electricity, which is its function, and then returns the execution measurement result (data). This is an outline of operation in a general distribution automation system.
【0019】なお、本発明の配電自動化システムでは、
上記監視制御端末8は、例えば、配電線の引き出し口の
フィーダ遮断機がトリップしない程度の瞬間地絡短絡事
故が発生した場合、即ち、配電線の高調波など、同時刻
性が要求される状態量の計測データが必要な場合には、
まず、全ての子局に対し、所望の状態量についての計測
を実行してその結果を格納することを内容とする指令、
すなわち、データ格納指令を送信する。その後、その計
測された状態量についてのデータを監視制御端末へ返信
することを内容とする指令、すなわち、格納データ返信
指令を、順次、送信する。なお、これらの動作は、上記
監視制御端末8を構成するコンピュータの、例えば、記
憶(メモリ)装置内に予め格納されたソフトウェアなど
に従って実行される。その結果、これらのデータ格納指
令と格納データ返信指令を受信した全部の子局5、5…
は、以下にその動作の詳細内容を示すように、同時刻性
のあるデータを監視制御端末8へ送信することとなり、
監視制御端末8は、同時刻性のあるデータベースを持つ
ことが可能となる。In the distribution automation system of the present invention,
The supervisory control terminal 8 is, for example, in the case where a momentary short-to-ground fault occurs to the extent that the feeder breaker at the outlet of the distribution line does not trip, that is, a state in which the same time is required, such as harmonics of the distribution line. If you need quantity measurement data,
First, for all slave stations, a command whose content is to perform measurement of a desired state quantity and store the result,
That is, the data storage command is transmitted. After that, a command having the content of returning the data about the measured state quantity to the monitor control terminal, that is, a stored data reply command is sequentially transmitted. It should be noted that these operations are executed in accordance with, for example, software stored in advance in a storage (memory) device of a computer constituting the monitoring control terminal 8. As a result, all of the slave stations 5, 5, ... Which have received the data storage command and the stored data reply command.
Transmits the data having the same time to the monitor control terminal 8 as shown in the detailed contents of the operation below.
The monitor control terminal 8 can have a database with the same time.
【0020】図2は、本発明の配電自動化システムの、
特に、各子局5における処理の内容を示すフロチャート
である。なお、これらの動作は、上記各子局5を構成す
るマイクロコンピュータの記憶(メモリ)装置内に予め
格納されたソフトウェアなどに従って実行される。FIG. 2 shows the distribution automation system of the present invention.
In particular, it is a flowchart showing the contents of processing in each slave station 5. It should be noted that these operations are executed in accordance with software or the like stored in advance in the storage (memory) device of the microcomputer that constitutes each slave station 5.
【0021】まず、上記した監視制御端末8から送信さ
れた指令を受信し(処理S101)、その指令が上記の
データ格納指令であるか否かを判定する(処理S10
2)。その結果、データ格納指令であると判定した(図
の「YES」)場合、例えば、子局に設けられた上記各
種の計測装置によって所望の状態量を計測し、その計測
結果を計測データとして格納し(処理S103)、その
動作を終了する。即ち、各子局が現状の最新(一番最
後)の地絡短絡事故の検出データを格納することとな
る。First, the command transmitted from the monitor control terminal 8 is received (process S101), and it is determined whether the command is the data storage command (process S10).
2). As a result, when it is determined that the command is a data storage command (“YES” in the figure), for example, the desired state quantity is measured by the various measuring devices provided in the slave station, and the measurement result is stored as measurement data. Then, the process ends (S103). That is, each slave station stores the latest (latest) current ground fault short-circuit accident detection data.
【0022】他方、上記処理S102における判定にお
いて、上記監視制御端末8から受信した指令が上記のデ
ータ格納指令以外であると判断された(図の「NO」)
場合には、次に、当該指令が自分のアドレスに送信され
た指令であるか否かの判定を行う(処理S104)。そ
の結果、当該指令が自分のアドレスに送信された指令で
ない(図の「NO」)と判定された場合には、そのま
ま、その処理を終了する。他方、当該指令が自分のアド
レスに送信された指令である(図の「YES」)と判定
された場合には、更に、当該指令の内容が上記の格納デ
ータ返信指令であるか否かを判定する(処理S10
5)。On the other hand, in the judgment in the step S102, it is judged that the command received from the supervisory control terminal 8 is other than the above data storage command ("NO" in the figure).
In this case, next, it is determined whether or not the command is a command transmitted to its own address (process S104). As a result, when it is determined that the instruction is not the instruction transmitted to its own address (“NO” in the figure), the processing is ended as it is. On the other hand, when it is determined that the command is the command transmitted to its own address (“YES” in the figure), it is further determined whether the content of the command is the above stored data reply command. Yes (Process S10
5).
【0023】上記の判定(処理S105)の結果、格納
データ返信指令である(図の「YES」)と判定された
場合には、既に格納していた格納データを監視制御端末
へ返信する(処理S106)。他方、格納データ返信指
令でもないと判定された(図の「NO」)場合には、上
記の判定(処理S102)の結果からも、既に、データ
格納指令でもなく、そのため、同時刻性が要求されない
状態量に関するものと判断される。そこで、かかる指令
に対しては、従来と同様に、当該指令に沿った動作(例
えば、区間開閉器の入り切りやその監視制御など)を実
行し(処理S107)、さらに、その実行結果を監視制
御端末へ返信し(処理S108)、その処理を終了す
る。As a result of the above determination (process S105), when it is determined that the stored data is a return command (“YES” in the figure), the stored data that has already been stored is returned to the monitoring control terminal (process). S106). On the other hand, when it is determined that the stored data return command is not received (“NO” in the figure), the result of the above determination (process S102) indicates that the data storage command has not already been received, and therefore the same time property is required. It is determined that this is related to the state quantity that is not satisfied. Therefore, in response to such a command, an operation according to the command (for example, opening / closing of a section switch and its monitoring control) is executed (process S107), and the execution result is monitored and controlled as in the conventional case. A reply is sent to the terminal (process S108), and the process ends.
【0024】次に、添付の図3には、上記図1及び図2
に示した本発明になる配電自動化システムの動作を説明
する。なお、この図では、上記のように電圧電流センサ
6や区分開閉器4を備えて構成される子局5は、説明を
簡素化するため、これらを纏めて、ここでは、単に子局
5として示している。Next, referring to FIG. 3 attached herewith, FIG. 1 and FIG.
The operation of the distribution automation system according to the present invention shown in FIG. In the figure, the slave station 5 including the voltage / current sensor 6 and the division switch 4 as described above is collectively referred to as a slave station 5 here for simplification of description. Shows.
【0025】この図3において、本発明になる配電線路
を自動的に監視制御する配電自動化システムでは、配電
線の高調波(又は、地絡短絡リレー動作状態及び基本波
の電圧電流)を計測したい任意の時間(図では、時刻t
1)に、上位装置である監視制御端末8より、上記のデ
ータ格納指令11を送信する。なお、このデータ格納指
令11は、中継装置9を介して全子局(あるいは、特定
の複数の子局)5、5…に対して同時に送信され、これ
により、指令を受信した各子局5は、当該指令に基づい
て、各区間における所望の量を計測して格納しておく。In FIG. 3, in the distribution automation system for automatically monitoring and controlling the distribution line according to the present invention, it is desired to measure the harmonics of the distribution line (or the ground-short-circuit relay operating state and the voltage / current of the fundamental wave). Arbitrary time (time t in the figure)
In 1), the data storage command 11 is transmitted from the supervisory control terminal 8 which is a higher-level device. The data storage command 11 is simultaneously transmitted to all the slave stations (or a plurality of specific slave stations) 5, 5 ... Through the relay device 9, whereby each slave station 5 that has received the command. Measures and stores a desired amount in each section based on the command.
【0026】その後、監視制御端末8は、例えば、アド
レス「001」,「002」,「003」…の子局に対
して、上記の格納データ返信指令12、14、16…を
順次(時刻t2,t3,t4…)発信する。そして、こ
れら格納データ返信指令12、14、16…を受信した
子局5、5…は、それぞれ、その格納した計測データを
監視制御端末8へ、順次(時刻t2’,t3’,t4’
…)、返信13、15、17…を実行することとなる。Thereafter, the supervisory control terminal 8 sequentially sends the stored data reply commands 12, 14, 16 ... To the slave stations at addresses "001", "002", "003" ... (Time t2). , T3, t4 ...). Then, the slave stations 5, 5 ... Receiving these stored data reply commands 12, 14, 16 ... Sequentially send the stored measurement data to the monitoring control terminal 8 (time t2 ′, t3 ′, t4 ′).
...) and replies 13, 15, 17 ...
【0027】この図からも明らかなように、このデータ
格納指令11は、特定子局に向けた指令ではなく、1回
の指令で全子局へ向けた指令である。そのため、このデ
ータ格納指令11を受信した複数の全子局は、時刻t1
において、各区間における所望の状態量を計測し、その
計測データを格納することとなる。即ち、同時刻性のデ
ータを格納したこととなる。As is apparent from this figure, the data storage command 11 is not a command directed to a specific slave station, but a command directed to all slave stations in one command. Therefore, all of the slave stations that have received the data storage command 11 have time t1.
In, the desired state quantity in each section is measured and the measured data is stored. That is, it means that the data of the same time is stored.
【0028】その後、上記監視制御端末8から、順次
(時刻t2,t3,t4…)格納データ返信指令12、
14、16…を受けた子局5、5…は、現状の(同時刻
性の高い)、即ち、時刻t1において計測された高調波
(又は、地絡短絡リレー動作状態及び基本波の電圧電
流)の計測データを、順次(時刻t2’,t3’,t
4’…)、監視制御端末8へ返信する。その後、全ての
子局5、5…から所望の計測データを収集した監視制御
端末8は、全子局5の1台1台の情報をデータベース化
させるが、このデータベースを構築するデータは、同時
刻性の高いものとなる。Thereafter, from the monitoring control terminal 8, the stored data reply command 12, sequentially (time t2, t3, t4 ...),
The slave stations 5, 5, ... Receiving 14, 16, ... Are current (highly synchronized), that is, harmonics measured at time t1 (or ground fault short circuit relay operating state and fundamental wave voltage / current). ) Measurement data sequentially (time t2 ', t3', t
4 '...), and reply to the monitor control terminal 8. After that, the supervisory control terminal 8 that has collected the desired measurement data from all the slave stations 5, 5 ... Creates a database of the information of each slave station 5, but the data for constructing this database is the same. It becomes time-sensitive.
【0029】なお、上記監視制御端末8から各々の子局
5、5…へ送信される上記格納データ返信指令12、1
4、16は、必要な計測データは子局が既に格納してい
るため、監視制御端末8は、その後いつ送信しても良
く、例えば、演算処理が空いた時間など、システムが使
用していない空き時間などを利用して、送信を行うこと
ができる。また、監視制御端末8と全ての子局5、5…
との間で行なわれる通信は、特定の時間に集中して実施
される必要がないので(時刻t2,t3,t4…や時刻
t2’,t3’,t4’…を参照)、配電自動化システ
ムにおいて、かかる同時刻性の高い計測データを収集す
るために時間を集中してネットワーク7を独占して占有
することなく、断片的に、分散して実現(データの転
送)することが可能となる。すなわち、配電自動化シス
テムにおいて、複数の子局を監視する際に、同時刻性の
データを得たい場合、ある時刻に、一旦、全子局にデー
タを格納させ、その格納データを、後からでも収集する
ことで、従来、一般に使用されている通信ネットワーク
を利用して、安価に、同時刻性のデータを得ることがで
きる。The stored data reply commands 12, 1 sent from the supervisory control terminal 8 to the respective slave stations 5, 5 ...
As for 4 and 16, the necessary measurement data is already stored in the slave station, so the monitor control terminal 8 may transmit it anytime after that, for example, when the system is not using it, for example, when the arithmetic processing is idle. Transmission can be performed by using free time. Further, the supervisory control terminal 8 and all the slave stations 5, 5, ...
Since it is not necessary to concentrate communication between and with a specific time (see time t2, t3, t4 ... and time t2 ', t3', t4 '...), in the distribution automation system. In order to collect such measurement data with high time synchronization, it is possible to disperse the data in a fragmentary manner (transfer data) without concentrating the time and monopolizing the network 7. In other words, when monitoring a plurality of slave stations in a distribution automation system, if you want to obtain data with the same time, at a certain time, all slave stations are temporarily stored with the data, and the stored data can be stored later. By collecting the data, it is possible to inexpensively obtain the same-time data by using a communication network that is generally used conventionally.
【0030】また、このことによれば、監視制御端末が
必要とする所望の計測量の計測データを、そのデータ長
に拘わらず(即ち、データ長が長くても)、ネットワー
クを独占することなく、確実に収集することが可能とな
る。また、各子局5では、その主な動作である区分開閉
器の入り切りや監視などに悪影響が及ぶことから回避す
ることができる。すなわち、配電自動化システムは、同
時刻性が必要とされる高調波などの状態量の計測データ
の転送動作に影響されることなく、その基本的動作であ
る配電線の電気量(基本波電圧・電流など)のデータの
収集格納や区間開閉器の入り切りやその監視制御などを
確実に実行することが可能となり、もって、その基本性
能にも優れた配電自動化システムを提供できることとな
る。Further, according to this, regardless of the data length (that is, even if the data length is long), the measurement data of the desired measurement amount required by the monitoring control terminal is not monopolized in the network. , It is possible to collect surely. Further, each slave station 5 can be avoided because it has a bad influence on the main operation of the slave station 5, such as switching on / off and monitoring of the division switch. In other words, the distribution automation system does not affect the transfer operation of the measurement data of state quantities such as harmonics that require the same time, and its basic operation is the electric quantity of the distribution line (fundamental voltage It becomes possible to surely execute collection and storage of data such as electric current, turning on and off of a section switch, and monitoring control thereof, and thus it is possible to provide a distribution automation system excellent in its basic performance.
【0031】[0031]
【発明の効果】以上の詳細な説明からも明らかなよう
に、本発明によれば、光ケーブルによるポーリング方法
などの高価な設備を必要とせず、従来からの一般的な通
信ネットワークを利用して、配電線の電気量(基本波電
圧・電流)などの計測データの収集と共に、高調波の計
測においてもより同時刻性の高い計測データを複数の子
局から収集することが可能であり、もって、優れた性能
を有する配電自動化システム及びかかるシステムにおけ
る監視方法を提供することを可能とするという優れた効
果を発揮する。As is apparent from the above detailed description, according to the present invention, expensive conventional equipment such as a polling method using an optical cable is not required, and a conventional general communication network is used. It is possible to collect measurement data such as the amount of electricity (fundamental wave voltage / current) of the distribution line and also to measure harmonics with higher time synchronization from multiple slave stations. It is possible to provide a distribution automation system having excellent performance and a monitoring method in such a system, which is an excellent effect.
【図1】本発明の一実施の形態になる配電自動化システ
ムの全体構成を示すシステムブロック図である。FIG. 1 is a system block diagram showing an overall configuration of a distribution automation system according to an embodiment of the present invention.
【図2】上記配電自動化システムにおける、特に、各子
局における処理内容を説明するためのフロチャート図で
ある。FIG. 2 is a flow chart diagram for explaining processing contents in the above-described distribution automation system, particularly in each slave station.
【図3】上記配電自動化システムにおける監視制御端末
と各子局の動作タイミングを説明する説明図である。FIG. 3 is an explanatory diagram illustrating operation timings of a supervisory control terminal and each slave station in the distribution automation system.
3 配電線 4 開閉器 5 子局 6 電圧電流センサ 7 通信回線(ネットワーク) 8 監視制御端末 9 中継装置 11 データ格納指令 12、13、14 格納データ返信指令 3 distribution lines 4 switch 5 slave stations 6 Voltage / current sensor 7 communication lines (network) 8 supervisory control terminals 9 Relay device 11 Data storage command 12, 13, 14 Store data return command
───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 5G064 AA04 AB03 AC01 AC09 CB06 CB19 DA03 5H223 AA19 BB08 CC08 DD01 DD03 EE11 EE21 ─────────────────────────────────────────────────── ─── Continued front page F-term (reference) 5G064 AA04 AB03 AC01 AC09 CB06 CB19 DA03 5H223 AA19 BB08 CC08 DD01 DD03 EE11 EE21
Claims (5)
ットワークを介して当該子局に接続され、当該子局から
の監視データを収集して当該配電線路を監視する監視制
御端末とからなる配電自動化システムにおいて、前記監
視制御端末は、当該配電線路における状態量を計測して
計測データを格納することを内容とするデータ格納指令
を、接続された上記子局の全てに対して同時に発生する
手段と、格納した計測データを返信することを内容とす
る格納データ返信指令を、上記子局の各々に対して順次
発生する手段とを備えており、かつ、前記監視制御端末
に接続された全ての子局は、それぞれ、前記監視制御端
末から自己に対して発生される前記データ格納指令に対
し、前記状態量の計測を行って計測データを格納する手
段と、前記監視制御端末から自己に対して発生される前
記計測データ返信指令に対し、前記格納手段に格納した
前記状態量の計測データを返信する手段とを備えている
ことを特徴とする配電自動化システム。1. A plurality of slave stations installed on a distribution line, and a supervisory control terminal that is connected to the slave station via a network and collects monitoring data from the slave station to monitor the distribution line. In the distribution automation system, the monitoring control terminal simultaneously generates a data storage command for measuring the state quantity in the distribution line and storing the measurement data to all of the connected slave stations. And a means for sequentially generating a stored data reply command having the content of returning stored measurement data to each of the slave stations, and being connected to the monitoring control terminal. All the slave stations respectively measure the state quantity and store measurement data in response to the data storage command generated from the supervisory control terminal, and the supervisory control. An automatic power distribution system comprising: means for returning the measurement data of the state quantity stored in the storage means in response to the measurement data reply command generated from the terminal.
前記配電線路上の高調波であり、かつ、前記監視制御端
末の前記データ格納指令発生手段は、前記子局の全てに
対して前記配電線路上の高調波を計測して計測データを
格納することを内容とする指令を発生し、かつ、前記複
数の子局は、それぞれ、前記配電線路上の高調波を計測
する手段を備えていることを特徴とする請求項1の配電
自動化システム。2. A state quantity measured in the distribution line is a harmonic wave on the distribution line, and the data storage command generation means of the monitor control terminal is arranged on the distribution line for all of the slave stations. A command for generating harmonics on the road and storing the measured data is generated, and each of the plurality of slave stations is provided with means for measuring the harmonics on the distribution line. The distribution automation system according to claim 1.
ットワークを介して当該子局に接続され、当該子局から
の監視データを収集して当該配電線路を監視する監視制
御端末とからなる配電自動化システムにおける監視方法
であって、 前記監視制御端末は、当該配電線路における状態量を計
測して計測データを格納することを内容とするデータ格
納指令を、接続された上記子局の全てに対して同時に発
生し、 前記監視制御端末に接続された全ての子局は、前記監視
制御端末から自己に対して発生される前記データ格納指
令に対し、それぞれ、前記状態量の計測を行って計測デ
ータを格納し、 前記監視制御端末は、格納した計測データを返信するこ
とを内容とする格納データ返信指令を、上記子局の各々
に対して順次発生し、 前記監視制御端末に接続された子局は、それぞれ、前記
監視制御端末から自己に対して発生される前記計測デー
タ返信指令に対し、前記格納した前記状態量の計測デー
タを返信し、もって、前記監視制御端末は同時刻性の高
い計測データを得ることを特徴とする配電自動化システ
ムにおける監視方法。3. A plurality of slave stations installed on a distribution line, and a supervisory control terminal connected to the slave station via a network and collecting monitoring data from the slave station to monitor the distribution line. A monitoring method in the distribution automation system, wherein the monitoring control terminal is a data storage command that stores the measurement data by measuring the state quantity in the distribution line, all of the connected slave stations. For all the slave stations connected to the monitor control terminal, in response to the data storage command generated from the monitor control terminal to itself, respectively, measure the state quantity. The monitoring control terminal stores measurement data, and the monitoring control terminal sequentially issues a stored data reply command having the content of returning the stored measurement data to each of the slave stations. Each of the slave stations connected to returns the measurement data of the stored state quantity in response to the measurement data reply command generated from the monitor control terminal to itself. A monitoring method in a distribution automation system, which is characterized by obtaining measurement data with high time synchronization.
前記配電線路上の高調波であることを特徴とする請求項
3の配電自動化システムにおける監視方法。4. The monitoring method in a distribution automation system according to claim 3, wherein the state quantity measured in the distribution line is a harmonic wave on the distribution line.
が発生した場合に、当該配電線路における事故検出して
いる状態量を計測して計測データを格納することを内容
とするデータ格納指令を、接続された上記子局の全てに
対して同時に発生することを特徴とする請求項3の配電
自動化システムにおける監視方法。5. The data storage command, wherein the supervisory control terminal measures, when an instantaneous ground fault short-circuit accident occurs, the state quantity at which the accident is detected in the power distribution line and stores the measured data. Is simultaneously generated for all of the connected slave stations, the monitoring method in the distribution automation system according to claim 3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001216964A JP2003032914A (en) | 2001-07-17 | 2001-07-17 | Automation system of power distribution, and monitoring method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001216964A JP2003032914A (en) | 2001-07-17 | 2001-07-17 | Automation system of power distribution, and monitoring method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2003032914A true JP2003032914A (en) | 2003-01-31 |
Family
ID=19051367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001216964A Pending JP2003032914A (en) | 2001-07-17 | 2001-07-17 | Automation system of power distribution, and monitoring method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2003032914A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100537217B1 (en) * | 2005-09-23 | 2005-12-16 | 주식회사 세니온 | Distribution control system of separating failure of sections from distribution line and method for operating the system |
JP2010130712A (en) * | 2008-11-25 | 2010-06-10 | Toshiba Corp | Slave station device for automation of distribution line |
JP2010161923A (en) * | 2009-01-12 | 2010-07-22 | Kinects Solutions Inc | System for automatically detecting power system configuration |
JP2016207000A (en) * | 2015-04-24 | 2016-12-08 | 株式会社日立製作所 | Control system and information monitoring method in control system |
JP2019146464A (en) * | 2018-02-23 | 2019-08-29 | 東北電力株式会社 | Measurement correction device and method for correcting measurement |
-
2001
- 2001-07-17 JP JP2001216964A patent/JP2003032914A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100537217B1 (en) * | 2005-09-23 | 2005-12-16 | 주식회사 세니온 | Distribution control system of separating failure of sections from distribution line and method for operating the system |
JP2010130712A (en) * | 2008-11-25 | 2010-06-10 | Toshiba Corp | Slave station device for automation of distribution line |
JP2010161923A (en) * | 2009-01-12 | 2010-07-22 | Kinects Solutions Inc | System for automatically detecting power system configuration |
JP2016207000A (en) * | 2015-04-24 | 2016-12-08 | 株式会社日立製作所 | Control system and information monitoring method in control system |
JP2019146464A (en) * | 2018-02-23 | 2019-08-29 | 東北電力株式会社 | Measurement correction device and method for correcting measurement |
JP7020962B2 (en) | 2018-02-23 | 2022-02-16 | 東北電力株式会社 | Measurement correction device and measurement correction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR0176245B1 (en) | Electric power system with remote monitoring and control of protective relays | |
US6285917B1 (en) | Electric power system protection and control system and distributed control system | |
JP5249950B2 (en) | Method and system for utility network outage detection | |
CN106451763B (en) | A kind of intelligent substation station level bus network system without global synchronization system | |
CN111678554B (en) | Trench cable state monitoring device and state monitoring method thereof | |
WO2000057527A1 (en) | Fault data synchronization via peer-to-peer communications network | |
CN104993596A (en) | A distribution network automation remote terminal unit based on embedded multiple ARM processors | |
CN101546180A (en) | Information collection apparatus, method, and program | |
EP3407465A1 (en) | Method and system for operation monitoring and optimization of operation of a set of photovoltaic panels | |
KR101698227B1 (en) | Apparatus for time synchronization of substation automation system | |
CN203719782U (en) | Temperature monitoring device for large-scale bus duct | |
CN110350516B (en) | Automatic identification method for single-ring network topology of high-voltage distribution network | |
JP2003032914A (en) | Automation system of power distribution, and monitoring method thereof | |
US12000875B1 (en) | Intelligent electronic device and method thereof | |
CN112186891A (en) | Power conversion device, control device, server, and system | |
CN116668261A (en) | Multi-source data fusion-based power transformation intelligent gateway system | |
CN103001323A (en) | Relay and data processing method | |
EP3982087B1 (en) | An electricity metering device | |
CN113252978A (en) | Phase identification method and identification device for target power supply area | |
CN114518986A (en) | Alarm arbitration in a metering point | |
CN109256863B (en) | Micro-grid energy control method and micro-grid system | |
CN107809106B (en) | Device and method for synchronously processing voltage and current data of protection measurement and control of power distribution network | |
CN116646901B (en) | Multi-terminal differential protection implementation method based on EtherCat | |
CN112003373B (en) | Distributed feeder system and power distribution system | |
KR20200076214A (en) | Method And Apparatus for Relaying Measuring Information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051026 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070928 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071009 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20080226 |