JP2003000006U - Wooden shaft partition of building - Google Patents

Wooden shaft partition of building

Info

Publication number
JP2003000006U
JP2003000006U JP2003003086U JP2003003086U JP2003000006U JP 2003000006 U JP2003000006 U JP 2003000006U JP 2003003086 U JP2003003086 U JP 2003003086U JP 2003003086 U JP2003003086 U JP 2003003086U JP 2003000006 U JP2003000006 U JP 2003000006U
Authority
JP
Japan
Prior art keywords
floor
wooden
lvl
ceiling
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003003086U
Other languages
Japanese (ja)
Inventor
謙作 渡辺
忠士 本間
Original Assignee
セイホク株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by セイホク株式会社 filed Critical セイホク株式会社
Priority to JP2003003086U priority Critical patent/JP2003000006U/en
Publication of JP2003000006U publication Critical patent/JP2003000006U/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

(57)【要約】 【課題】 この考案は2×4等壁構造の木造建物、鉄筋
コンクリート造りの建物およびその他の建物における木
軸間仕切りを提供する。 【構成】 建物の床面および天井面に防食加工を施した
溝形鉄板からなる床ランナーおよび天井ランナーが適宜
固着手段により固定され、この床ランナーおよび天井ラ
ンナーに縦棧用のLVL木軸間柱が、その上下端を嵌合
し、適当なピッチで列置され、出隅、入隅およびドア開
口部は、必要により複数本を重合され、ドア枠等をセッ
ト組みで取付けられた後、LVL木軸間柱にボードが張
られてなる建物の木軸間仕切り。
(57) [Summary] [PROBLEMS] The present invention provides a wooden shaft partition in a wooden building, a reinforced concrete building, and other buildings of 2 × 4 equal wall structure. [Constitution] A floor runner and a ceiling runner made of a corrugated iron plate on which the floor and ceiling of a building are subjected to anticorrosion treatment are appropriately fixed by fixing means. The upper and lower ends are fitted and arranged at an appropriate pitch. Outer corners, inner corners, and door openings are overlapped as necessary, and a plurality of door frames and the like are attached in a set, and then the LVL tree is mounted. A wooden axle partition with a board stretched on an axle pillar.

Description

【考案の詳細な説明】 【0001】 【考案が属する技術分野】 この考案は、鉄筋コンクリート造りの建物およびその他の建物における木軸間 仕切りに関する。 【0002】 【従来の技術】 従来、鉄筋コンクリート造りの建物における木軸間仕切り骨組み施工方法は、 次のような施工手順により行っていた。すなわち、始めに、コンクリート床面お よび天井面に墨付を行う。 【0003】 次に、前記墨付けにしたがって、床面および天井面に製材品木軸を用いて床土 台および天井頭押さえを固定する。 【0004】 床土台と天井頭押さえとの間の寸法を採寸し、縦棧用の製材品木軸間柱の長さ を正確にカットする。 【0005】 縦棧用の製材品木軸間柱を所定のピッチでセットし、その間柱の位置を保持し ながら床土台および天井頭押さえに釘あるいはステイプルで固定する。 【0006】 補強のための製材品木軸横棧を間柱の所定の位置にイゲタ組みに釘あるいはス テイプルで固定し、間仕切り骨組みを設けている。 【0007】 【考案が解決しようとする課題】 前記、従来の間仕切り軸組み施工では、次のような問題点があった。 【0008】 従来の木質材料は、未乾燥の無垢材による製材品木軸を使用するため、反りや 曲がりが生じ易く、施工後における真直な壁の仕上がりが難しい。 【0009】 未乾燥の無垢材による製材品木軸を使用するため、材質の当たり外れが大きく 、強度および精密度が安定しない。 【0010】 また、未乾燥の無垢材による製材品木軸は、含水率が19%以上あるので、密 度が0.7以上と大きく、相対的に材料が重いため、施工現場への搬入など取扱 いに困難がある。 【0011】 縦棧の取扱いについては、床面および天井面に固定されていた床土台および天 井頭押えに対し、製材品木軸間柱の所定位置を手で保持しながら釘打ちあるいは ステイプル打ち作業を行うため、余分の労力が掛かり作業性が低下する。 【0012】 補強のための横棧を固定する施工工程が必要であるため、施工労力および施工 時間が余分に掛かる。 【0013】 同時に、この施工工程に伴う横棧用の木軸、釘、ステイプルなどの材料費が余 分に掛かる。 【0014】 材料費は縦棧用の木軸間柱の他に、床面用、天井面用および横棧用の木軸材が 余分に掛かり、従来の製材品木軸は単価では安価であるが、カットロス分や反り 、曲り、節などによるハネ材ロスも大きく、ハネ材仕分けの手間も余分に掛かる など、結果的にはコスト高になる。 【0015】 人件費は前記に述べた作業性の低下や、施工労力および施工時間の増大などに より、所要作業員の人数および施工日数が余分に掛かるため、人件費がコスト高 になる。 【0016】 その他のコストとしては、従来の製材品木軸の密度が大きいために材料の搬入 率が低下する他、従来製材品木軸はカットロス分だけでも、ゴミとしての廃材が 多量に発生するために、廃材搬出の手間およびゴミ処理費が余分に掛かる。 【0017】 この考案は、これら従来の欠点を除去する木軸間仕切りおよびその施工方法を 提案するものである。 【0018】 【課題を解決するための手段】 建物の床面および天井面に防食加工を施した溝形鉄板からなる床ランナーおよ び天井ランナーが適宜固着手段により固定され、この床ランナーおよび天井ラン ナーに縦棧用のLVL木軸間柱が、その上下端を嵌合し、適当なピッチで列置さ れ、出隅、入隅およびドア開口部は、必要により複数本を重合され、ドア枠等を セット組みで取付けられた後、LVL木軸間柱にボードが張られてなる建物の木 軸間仕切りにある。 【0019】 【作用】 この考案は、上記のように構成されるものであるから、構成材である木質材料 のLVL木軸間柱は反りや曲がりが殆んど生じないため、真直な壁に仕上る。 【0020】 使用するLVL木軸間柱は乾燥単板の使用・縦つぎ部の分散・多層の積層によ る欠点の分散などにより、機械的性質にバラツキが少なく、強度および精度が安 定している。 【0021】 また、LVL木軸間柱は、含水率は14%以下に規格化されているので、密度 は0.5〜0.6となり、相対的に材料が軽いため、施工現場への搬入など取扱 いが簡便である。 【0022】 縦棧の取扱いについては、床面および天井面に固定された亜鉛引溝形(C型) 鉄板のランナー内に、LVL木軸間柱を差し込んだ後、縦棧処定位置へ、間柱を ずらしながらセットするだけで、釘を打たずに仮りの固定ができるため、間柱の 位置決めが簡単で、作業労力が軽微となり、作業時間が短縮される。 【0023】 また間仕切り施工後のボード張りでは、内壁用ボードの寸法や張り作業手順に 合わせて、間柱をずらすだけで間柱間隔を調節できる。 【0024】 補強のための横棧を固定する施工工程は不必要である。 【0025】 縦棧用のLVL木軸間柱および出隅、入隅に使用するLVL木軸はマンション 各フロアの標準高さに合せて長さが定尺化されているため、現場でのカット作業 が少なく、カットロス分や反り、曲がり、節などによるハネ材ロス分も少なく、 ハネ材仕分けの手間もほとんど掛からないなど、結果的には施工時間の短縮と材 料費のコスト削減ができる。 【0026】 【実施例】 以下、この考案の建物の木軸間仕切りを鉄筋コンクリート造りの建物を実施の 一例とし、図面を参照して説明すると、建物のコンクリート床面1および天井面 2に間仕切りを設ける位置にしたがって墨付け3aおよび天井面2に同様の墨付 けを行う。 【0027】 次に、その墨付けにしたがって、建物のコンクリート床面1および天井面2に 亜鉛引き溝形(C形)鉄板4を用いて床ランナー5および天井ランナー6をコン クリートねじ釘7を所要の間隔ごとに打って固定する。 【0028】 縦棧用のLVL木軸間柱8を前記床ランナー5および天井ランナー6に上下端 を嵌合し、適当なピッチ、例えば、おおよそ30センチメートルの間隔で並列置 する。 【0029】 前記床ランナー5および天井ランナー6とLVL木軸間柱8とは、釘打ちによ る固定は、ここで原則としてはしない。必要とする場合、例えば、図6に示すよ うに、ハッチ開口部9のように開口部横棧10に開口部縦棧11の下端が接続す る場合は、釘、ねじ釘、またはその他の固定手段で固着をする。 【0030】 出隅、入隅は、LVL木軸間柱8を、必要により複数本を重合して施工する。 【0031】 木軸間柱8の重合は、主として釘打ちによるが、その他の重合手段によること もある。 【0032】 ドア開口部12はLVL木軸間柱8を、必要により複数本を用いて重合補強し 、そしてドア枠13等をセット組みで取付ける。 【0033】 LVL木軸間柱8に釘、ねじ釘、またはその他の固定手段でボード14を張り 間仕切りができる。 【0034】 上記実施例は、建物のコンクリート床面に壁を設けて間仕切りを作り、それか ら部屋の床を作る壁先行システムという工法例にしたがって説明したが、コンク リート床面に床張りを先行させ、それから間仕切りを行う床先行システム工法に も、この考案は実施できるものであり、張り床の上に、間仕切り墨付けをなし、 それから前記実施例同様に床ランナーを固着し、コンクリート天井面の天井ラン ナーと組合せてもよいのである。 【0035】 【考案の効果】 この考案の建物の木軸間仕切りは上述のようになるから、次の利点が得られる 。 【0036】 本考案の構成材である木質材料のLVL木軸間柱は、反りや曲がりが殆んど生 じないため、施工後における真直な壁の仕上がりが容易にできる。 【0037】 使用するLVL木軸間柱は乾燥単板の使用・縦つぎ部の分散・多層の積層によ る欠点の分散などにより、機械的性質にバラツキが少なく、強度および精度が安 定している。 【0038】 また、LVL木軸間柱は、含水率は14%以下に規格化されているので、密度 は0.5〜0.6となり、相対的に材料が軽いため、施工現場への搬入など取扱 いが簡便である。 【0039】 縦棧の取扱いについては、床面および天井面に固定された亜鉛引溝形(C型) 鉄板のランナー内に、LVL木軸間柱を差し込んだ後、縦棧処定位置へ、間柱を ずらしながらセットするだけで、釘を打たずに仮りの固定ができるため、間柱の 位置決めが簡単で、作業労力が軽微となり、作業時間が短縮される。 【0040】 また間仕切り施工後のボード張りでは、内壁用ボードの寸法や張り作業手順に 合わせて、間柱をずらすだけで間柱間隔を容易に調節できる。 【0041】 補強のための横棧を固定する施工工程は不必要であるため、施工労力および施 工時間が大幅に削減できる。 【0042】 縦棧用のLVL木軸間柱および出隅、入隅に使用するLVL木軸はマンション 各フロアの標準高さに合せて長さが定尺化されているため、現場でのカット作業 が少なく、カットロス分や反り、曲がり、節などによるハネ材ロス分も少なく、 ハネ材仕分けの手間もほとんど掛からないなど、結果的には施工時間の短縮と材 料費のコスト削減ができる。 【0043】 前記に述べた作業性の向上、施工労力および施工時間の削減により、所要作業 員の人数および施工日数が大幅に縮小できるため、人件費の大幅な低減ができる 。 【0044】 その他としては、LVL木軸の密度が比較的小さいために材料の搬入率が高ま る他、カットロス分でもゴミとしての廃材量が少いため、廃材搬出の手間および ゴミ処理費が低減できるので、トータルコストでのコストダウンが大きい。 【0045】 従来工法と、この考案の建物の木軸間仕切りの施工コスト比較は、この考案の 建物の木軸間仕切り工法において軸組施工時間が大巾に短縮されるため、約3割 のコストダウンをはかることができる。 【提出日】平成15年6月26日(2003.6.26) 【手続補正1】 【補正対象書類名】明細書 【補正対象項目名】全文 【補正方法】変更 【補正内容】 【考案の詳細な説明】 【0001】 【考案が属する技術分野】 この考案は、鉄筋コンクリート造り建物およびその他の建物における間仕切り に関する。 【0002】 【従来の技術】 第1に、従来、一般の大工が製材品の木軸を用いて行う、鉄筋コンクリート造 り建物等における間仕切りの骨組み施工方法は、始めに、コンクリート床面およ び天井面に墨付を行う。それから、前記墨付けにしたがって、床面および天井面 に製材品木軸を用いて床土台および天井頭押さえを固定する。 床土台と天井頭押さえとの間の寸法を採寸し、縦桟用の製材品木軸間柱の長さ を正確にカットする。 縦桟用の製材品木軸間柱を所定のピッチでセットし、その間柱の位置を保持し ながら床土台および天井頭押さえに釘あるいはステイプルで固定する。 補強のための製材品木軸横桟を間柱の所定の位置にイゲタ組みに釘あるいはス テイプルで固定し、間仕切りの骨組みを設けている。 【0003】 第2に、特開平3−194047号公開公報に掲載されるように、一般の大工 がLVL木軸の上端に、伸縮連結金具を取付け、反対の下端に凸ホゾを形成し、 上端の伸縮連結金具を天井頭押さえ(天井桟)の高さに合わせて調整固定した後 、下端の凸ホゾを木製の床土台(床桟)の凹溝に嵌合して天井頭押さえ(天井桟 )と床土台(床桟)の間に嵌合した後、天井頭押さえ(天井桟)と床土台(床桟 )に釘打ちして間仕切りの骨組みを設ける施工方法が行われている。 【0004】 第3に、実開平1−36410号公報、実開平4−105307号公報に掲載 されるように、建築用鋼製下地材であるスタッド、ランナー、スペーサー、振れ 止め、固定金具等を用い、鉄筋コンクリート造り建物において間仕切りの骨組み 施工も行われている。 【0005】 【考案が解決しようとする課題】 前記、第1の従来例の一般の大工が製材品の木軸を用いて行う従来の間仕切り 軸組み施工では、次のような問題点があった。 従来の木質材料は、未乾燥の製材品木軸を使用するため、反りや曲がりが生じ 易く、施工後における真直な壁の仕上がりが難しい。 未乾燥の製材品木軸を使用するため、材質の当たり外れが大きく、強度および 精密度が安定しない。 また、未乾燥の製材品木軸は、含水率が19%以上あるので、相対的に材料が 重いため、施工現場への搬入など取扱いに困難がある。 縦桟の取扱いについては、床面および天井面に固定されていた床土台および天 井頭押えに対し、製材品木軸間柱の所定位置を手で保持しながら釘打ちあるいは ステイプル打ち作業を行うため、余分の労力が掛かり作業性が低下する。 補強のための横桟を固定する施工工程が必要であるため、施工労力および施工 時間が余分に掛かる。 同時に、この施工工程に伴う横桟用の木軸、釘、ステイプルなどの材料費が余 分に掛かる。 材料費は縦桟用の木軸間柱の他に、床面用、天井面用および横桟用の木軸材が 余分に掛かり、従来の製材品木軸は単価では安価であるが、カットロス分や反り 、曲り、節などによるハネ材ロスも大きく、ハネ材仕分けの手間も余分に掛かる など、結果的にはコスト高になる。 前記に述べた作業性の低下や、施工労力および施工時間の増大などにより、所 要作業員の人数および施工日数が余分に掛かるため、人件費がコスト高になる。 その他のコストとしては、従来の製材品木軸の重量が相対的に大きいために材 料の搬入率が低下する他、従来製材品木軸はカットロス分だけでも、ゴミとして の廃材が多量に発生するために、廃材搬出の手間およびゴミ処理費が余分に掛か る。 【0006】 前記第2の従来例の特開平3−194047号公開公報に掲載される間仕切り 軸組み施工方法では、LVL木軸の下端の凸ホゾ加工と、LVL木軸の上端に伸 縮連結金具の取付け加工と、伸縮連結金具の上端の長さを天井頭押さえ(天井桟 )に適合する調整固定加工と、それら全てのLVL木軸における上下端を木製の 床桟と木製の天井頭押さえ(天井桟)に釘打加工とがあるから、作業工程では、 前記、従来の一般の大工が製材品の木軸を用いて行う従来の間仕切り軸組み施工 とほとんど変わらず、その作業の簡易化にはあまり効果がなかったのである。 【0007】 前記第3の従来例の前記実開平1−36410号公報および実開平4−105 307号公報に掲載されるように、建築用鋼製下地材を用いる施工方法では、事 務所等の広い部屋の間仕切りには、その建築用鋼製下地材の大量工業製品として 量産メリットの利益と、同一資材による壁面を設けるような画一的施工には効果 を得られたが、個人の集合住宅のように各部屋の面積が小さく、その仕様も和室 、洋室、玄関回り、台所、トイレ、浴室というように多様化する施工では、表面 に木質材を接続する下地加工を含めて各種部材の前加工、組付け、溶接の本加工 と加工作業が複雑化し、作業面とコスト面で対応できなかったのである。 【0008】 この考案は、これら従来の欠点を作業面とコスト面で除去する画期的な木軸間 仕切りを提案するものである。 【0009】 【課題を解決するための手段】 建物の床面および天井面に防食加工を施した溝形鉄板からなる鋼製下地ランナ ーが適宜固着手段により固定され、この固定された床面および天井面の鋼製下地 ランナーに芯材としてのLVL等のエンジニアリングウッド木軸間柱が、その上 下端を嵌合し、適当なピッチで列置され、出隅・入隅およびドア開口部では、必 要により複数本が重合され、ドア枠等をセット組みで取付けられた後、上記LV L等のエンジニアリングウッド木軸間柱に面材としてのボードが張られてなる建 物の木軸間仕切りにある。 【0010】 【実施例】 以下、この考案の建物の木軸間仕切りを、鉄筋コンクリート造り建物における 施工方法を実施の一例とし、図面を参照して説明すると、建物のコンクリート床 面1および天井面2に間仕切りを設ける位置にしたがって墨付け3aおよび天井 面2に同様の墨付けを行う。 【0011】 次に、その墨付けにしたがって、建物のコンクリート床面1および天井面2に 亜鉛引溝形鉄板4からなる鋼製下地ランナー5、6をコンクリート釘7を所要の 間隔ごとに打って固定する。 【0012】 芯材である縦桟用のLVL等のエンジニアリングウッド木軸間柱8を前記鋼製 下地ランナー5、6に上下端を嵌合し、適当なピッチ、例えば、おおよそ30セ ンチメートルの間隔で並列置する。 【0013】 前記鋼製下地ランナー5、6と前記LVL等のエンジニアリングウッド木軸間 柱8とは、釘打ちによる固定は、ここで原則としてはしない。必要とする場合、 例えば、図6に示すように、ハッチ開口部9のように開口部横桟10に開口部縦 桟11の下端が接続する場合は、釘、ねじ釘、またはその他の固定手段で固着を する。 【0014】 出隅・入隅は、前記木軸間柱8を、必要により複数本を重合して施工する。 【0015】 前記木軸間柱8の重合は、主として釘打ちによるが、その他の重合手段による こともある。 【0016】 ドア開口部12は前記木軸間柱8を、必要により複数本を用いて重合補強し、 そしてドア枠13等をセット組みで取付ける。 【0017】 前記木軸間柱8に釘、ねじ釘、またはその他の固定手段でボード14を張り間 仕切りができる。 【0018】 上記実施例は、建物のコンクリート床面に壁を設けて間仕切りを作り、それか ら部屋の床を作る壁先行システムという工法例にしたがって説明したが、コンク リート床面に床張りを先行させ、それから間仕切りを行う床先行システム工法に も、この考案は実施できるものであり、張り床の上に、間仕切り墨付けをなし、 それから前記実施例同様に鋼製下地ランナーを固着し、コンクリート天井面の鋼 製下地ランナーと組合せてもよいのである。 【0019】 この考案は、上記のように構成されるから、前記第1の従来例との比較では、 その資材の特質および構造の特色で、また前記第2の従来例に比較しては、その 構造の特色で、木質材料のLVL等のエンジニアリングウッド木軸間柱は反りや 曲がりが殆んど生じないため、施工後における真直な壁に仕上るものである。 【0020】 またこの考案は、上記のように構成されるものであるから、前記第2の従来例 および前記第3の従来例との比較では、その構造の特色で、その縦桟の取扱いに ついては、床面および天井面に固定された亜鉛引溝形鉄板からなる鋼製下地ラン ナー内に、LVL等のエンジニアリングウッド木軸間柱を差し込んだ後、所定位 置へ、間柱をずらすことができ、しかも、その位置にセットするだけで、釘を打 たずに仮りの固定ができる。 【0021】 また間仕切り施工後のボード張りでは、内壁用ボードの寸法や張り作業手順に 合わせて、LVL等のエンジニアリングウッド木軸間柱をずらすだけで間柱間隔 を調節できる。 【0022】 また鋼製下地ランナーにLVL等のエンジニアリングウッド木軸間柱は挟圧さ れて仮固定されるから、補強のための横桟を固定する施工工程は不必要である。 【0023】 【考案の効果】 この考案は、上記のように、建物内部の間仕切り全体の施工を目的とするもの であって、上記のようになるから、LVL等エンジニアリングウッドの木質軸材 の有する特性と鋼板製下地ランナーの有する長所および欠点を相補うように有効 に組み合わせて用いて間仕切り下地組を行い、壁面材である石膏ボード等を張る ことによって所望の強度を確保する簡便で、ねじれ、ゆがみが発生することがな く、堅牢で耐久性ある木軸間仕切りである。 【0024】 そして、前記第1の従来例に比較しては、その資材の特質および構造の特色で 、また前記第2の従来例に比較しては、その構造の特色で、木質材料のLVL等 のエンジニアリングウッド木軸間柱は反りや曲がりが殆んど生じないため、施工 後における真直な壁に仕上りが容易にできる。 【0025】 また使用するLVL等のエンジニアリングウッドは乾燥単板或いはストランド を使用した多層の積層により欠点が分散され、機械的性質にバラツキが少なく、 強度および精度が安定しており、上述の真直な壁に仕上げる上に効果がある。 【0026】 また、LVL等のエンジニアリングウッドは、含水率は14%以下に規格化さ れているので、未乾燥の製材品と比べて相対的に材料が軽いため、施工現場への 搬入など取扱いが簡便である。 【0027】 また芯材である縦桟用の間柱および出隅・入隅に使用するLVL等のエンジニ アリングウッドは、マンション各フロアの標準高さに合せて長さが定尺化されて いるため、現場でのカット作業が少なく、カットロス分や反り、曲がり、節など によるハネ材ロス分も少なく、ハネ材仕分けの手間もほとんど掛からないなど、 結果的には施工時間の短縮と材料費のコスト削減ができる。 【0028】 またこの考案は、上記のようになるから、前記第2の従来例および前記第3の 従来例に比較しては、その構造の特色で、その縦桟の取扱いについては、床面お よび天井面に固定された亜鉛引溝形鉄板からなる鋼製下地ランナー内に、LVL 等のエンジニアリングウッド木軸間柱を差し込んだ後、所定位置へ、間柱をずら すことができ、しかも、その位置にセットするだけで、釘を打たずに仮りの固定 ができるため、間柱の位置決めが簡単で、作業労力が軽微となり、作業時間が短 縮される。 【0029】 またボード張りでは、内壁用ボードの寸法や張り作業手順に合わせて、LVL 等のエンジニアリングウッド木軸間柱をずらすだけで間柱間隔を調節できる。 【0030】 前記第3の従来例の鋼板製縦骨は、計算された強度、剛性を有するが、施工中 またはその後に衝突などの限界を超える応力を受けると、湾曲したままとなり、 復元性に乏しいものである。そこで、縦骨を所要に起立する支持部材として、ス ペーサーを配し、振れ止めを取付けて補強することが必要であり、各種多様の付 属金具を準備しなければならないものである。 しかるに、この考案のLVL等のエンジニアリングウッドの木軸間柱では、弾 力性に富み、大きな応力を受けても撓るだけで元の真直ぐな状態に復元するもの である。したがって、LVL等のエンジニアリングウッドの木軸間柱と鋼製下地 ランナーを組合わせるので、補強金具を必要とせず、施工中も横にずらして内部 の作業が容易に行うことができる。 【0031】 また鋼製下地ランナーに木軸間柱は挟圧されて仮固定されるから、木軸間柱に 補強のための横桟を固定する施工工程は、不必要になるほどの強度を得ることが でき、その省略で施工労力および施工時間が大幅に削減できる。 【0032】 前記に述べた作業性の向上、施工労力および施工時間の削減により、所要作業 員の人数および施工日数が大幅に縮小できるため、人件費の大幅な低減ができる 。 【0033】 その他としては、LVL等のエンジニアリングウッド木軸は、重量が相対的に 小さいために材料の搬入率が高まる他、カットロス分でもゴミとしての廃材量が 少いため、廃材搬出の手間およびゴミ処理費が低減できるので、トータルコスト でのコストダウンが大きい。[Detailed description of the invention]       [0001]     [Technical field to which the invention belongs]   The idea is to use a wooden shaft between reinforced concrete buildings and other buildings. About partitions.       [0002]     [Prior art]   Conventionally, wooden shaft partition framing construction method in reinforced concrete building, The following construction procedure was used. That is, first, the concrete floor And black ink on the ceiling.       [0003]   Next, in accordance with the above-mentioned sumi-toning, the floor and the ceiling were laid on the floor soil using a lumber-made wooden shaft. Fix the table and the ceiling support.       [0004]   Measures the distance between the floor base and the ceiling head support, and the length of the lumber timber axle for the lumber Cut accurately.       [0005]   Set lumber lumber studs for longitudinal jog at a predetermined pitch and hold the position of the studs And fix it with nails or staples to the floor base and ceiling head holder.       [0006]   Lumber lumber horizontal reinforcements for reinforcement are nailed or swaged in place at the predetermined positions It is fixed with a tuple and a partition frame is provided.       [0007]     [Problems to be solved by the invention]   The above-described conventional partition frame construction has the following problems.       [0008]   Conventional wood materials use wood shafts made of undried solid wood, It is easy to bend and it is difficult to finish a straight wall after construction.       [0009]   The lumber is made of undried solid wood. , Strength and precision are not stable.       [0010]   In addition, the wood shaft of lumber made of undried solid wood has a moisture content of 19% or more. The degree is as large as 0.7 or more and the material is relatively heavy. There are difficulties.       [0011]   Regarding the handling of buns, the floor base and ceiling fixed to the floor and ceiling While holding the specified position of the lumber timber studs against the Since the stapling operation is performed, extra work is required and the workability is reduced.       [0012]   Since a construction process is required to fix the horizontal ridges for reinforcement, construction labor and construction Takes extra time.       [0013]   At the same time, material costs such as wooden shafts, nails, staples, etc. for the horizontal joints accompanying this construction process are extra. It takes minutes.       [0014]   The material cost is for wooden shafts for floors, ceilings, and horizontals, in addition to wooden shaft studs for longitudinals. Although it takes extra time, the conventional lumber product wood shaft is inexpensive at the unit price, but it has cut loss and warpage Large loss of sprout due to bending, knots, etc., and extra time for sorting sprout As a result, the cost increases.       [0015]   Labor costs are reduced due to the decrease in workability and increase in construction labor and construction time. As the number of required workers and the number of construction days are increased, labor costs increase. become.       [0016]   The other cost is that materials are imported because of the high density of conventional lumber timber shafts. In addition to the reduction in the rate, the conventional sawmill wood shaft is not Since a large amount is generated, extra time and waste disposal costs are required for carrying out waste materials.       [0017]   The present invention provides a wooden shaft partition that eliminates these conventional disadvantages and a method of constructing the same. It is a suggestion.       [0018]     [Means for Solving the Problems]   Floor runners made of corrugated iron plates with anticorrosion treatment on the floor and ceiling of the building The ceiling runner and the ceiling runner are appropriately fixed by fastening means. LVL wooden shaft studs for longitudinal joints are fitted on the upper and lower ends, and are arranged at an appropriate pitch. Outer corners, inner corners and door openings are overlapped with multiple if necessary, and door frames etc. After being installed as a set, a tree of a building in which a board is stretched on the LVL wooden shaft stud In the shaft partition.       [0019]     [Action]   Since the present invention is configured as described above, the wooden material which is the constituent material is used. LVL wooden shaft studs have almost no warp or bend, so they are finished as straight walls.       [0020]   LVL wooden shaft studs to be used are by using dry veneers, dispersing vertical joints, and laminating multiple layers. Variation in mechanical properties due to dispersion of defects, etc., and low strength and accuracy I have decided.       [0021]   In addition, since the water content of the LVL wood shaft stud is standardized to 14% or less, the density is low. Is 0.5 to 0.6, and the material is relatively light. It is convenient.       [0022]   Regarding the handling of longitudinal ridges, zinc drawn groove type (C type) fixed to the floor and ceiling After inserting the LVL wooden shaft studs into the iron plate runner, move the studs to Just by setting it while shifting it, you can temporarily fix it without hitting a nail. The positioning is simple, the working labor is light, and the working time is shortened.       [0023]   In addition, in the board tension after the partition construction, the dimensions of the inner wall board and the tensioning procedure are In addition, the stud spacing can be adjusted simply by shifting the stud.       [0024]   An installation process for fixing the horizontal stay for reinforcement is unnecessary.       [0025]   LVL wooden axle for longitudinal sash and LVL wooden axle used for protruding and entering corners are condominiums Since the length is fixed to the standard height of each floor, on-site cutting work There is little cut loss and warp, bending, knot material loss due to nodes, etc., As a result, it takes less time and effort to sort the material. Cost reduction can be achieved.       [0026]     【Example】   Below, the wooden shaft partition of the building of this invention was implemented in a reinforced concrete building. As an example, a concrete floor surface 1 and a ceiling surface of a building will be described with reference to the drawings. 2 and a similar black ink on the ceiling surface 2 according to the position where the partition is provided on the ceiling 2 Perform       [0027]   Next, the concrete floor 1 and ceiling 2 of the building were The floor runner 5 and the ceiling runner 6 are connected using zinc-plated (C-shaped) iron plate 4. The cleat screw nails 7 are hit and fixed at required intervals.       [0028]   LVL wooden shaft studs 8 for longitudinal ridges are attached to the floor runner 5 and the ceiling runner 6 by upper and lower ends. And placed side by side at an appropriate pitch, for example, approximately 30 cm apart I do.       [0029]   The floor runner 5 and the ceiling runner 6 and the LVL wooden shaft stud 8 are nailed. This is not fixed here in principle. If necessary, for example, as shown in FIG. Thus, the lower end of the opening longitudinal ridge 11 is connected to the opening transverse ridge 10 like the hatch opening 9. If necessary, fix them with nails, screws or other fixing means.       [0030]   The outer corner and the inner corner are constructed by overlapping a plurality of LVL wooden shaft studs 8 as necessary.       [0031]   Stacking of wooden shaft studs 8 is mainly by nailing, but by other stacking means There is also.       [0032]   The door opening 12 is reinforced by using a plurality of LVL wooden studs 8 as necessary. , And the door frame 13 and the like are mounted as a set.       [0033]   The board 14 is attached to the LVL wooden stud 8 with a nail, a screw nail, or other fixing means. You can partition.       [0034]   In the above embodiment, a partition is made by providing a wall on the concrete floor of the building, We explained according to the example of the method of wall leading system that creates the floor of the room. A floor-leading system construction method in which flooring precedes the REIT floor surface and then partitions However, this invention can be implemented, and on the floor, partition ink is applied, Then, the floor runner was fixed in the same manner as in the previous embodiment, and the ceiling run was It may be combined with a knives.       [0035]     [Effect of the invention]   The wooden shaft partition of the building according to the present invention is as described above, so that the following advantages can be obtained. .       [0036]   The LVL wooden shaft pillar made of wood material, which is a constituent material of the present invention, has almost no warpage or bending. Since it does not foul, it is easy to finish a straight wall after construction.       [0037]   LVL wooden shaft studs to be used are by using dry veneers, dispersing vertical joints, and laminating multiple layers. Variation in mechanical properties due to dispersion of defects, etc., and low strength and accuracy I have decided.       [0038]   In addition, since the water content of the LVL wood shaft stud is standardized to 14% or less, the density is low. Is 0.5 to 0.6, and the material is relatively light. It is convenient.       [0039]   Regarding the handling of longitudinal ridges, zinc drawn groove type (C type) fixed to the floor and ceiling After inserting the LVL wooden shaft studs into the iron plate runner, move the studs to Just by setting it while shifting it, you can temporarily fix it without hitting a nail. The positioning is simple, the working labor is light, and the working time is shortened.       [0040]   In addition, in the board tension after the partition construction, the dimensions of the inner wall board and the tensioning procedure are In addition, the stud spacing can be easily adjusted simply by shifting the stud.       [0041]   Since the construction process for fixing the reinforcements for reinforcement is unnecessary, Work time can be greatly reduced.       [0042]   LVL wooden axle for longitudinal sash and LVL wooden axle used for protruding and entering corners are condominiums Since the length is fixed to the standard height of each floor, on-site cutting work There is little cut loss and warp, bending, knot material loss due to nodes, etc., As a result, it takes less time and effort to sort the material. Cost reduction can be achieved.       [0043]   Improvement of workability, reduction of construction labor and construction time The number of staff and the number of construction days can be significantly reduced, resulting in a significant reduction in labor costs .       [0044]   In other cases, the density of LVL wood shafts is relatively low, increasing the material loading rate. In addition, the amount of waste material as garbage is small even for the cut loss, Since the waste disposal cost can be reduced, the total cost is greatly reduced.       [0045]   The comparison between the conventional construction method and the construction cost of the wooden shaft partition of the building of this invention Approximately 30% of the time required for framing is greatly reduced in the wooden shaft partitioning method for buildings. Cost can be reduced.    [Submission date] June 26, 2003 (2003.26.26) [Procedure amendment 1] [Document name to be amended] Statement [Correction target item name] Full text [Correction method] Change [Correction contents]     [Detailed description of the invention]       [0001]     [Technical field to which the invention belongs]   This invention was developed for partitions in reinforced concrete buildings and other buildings. About.       [0002]     [Prior art]   First, a reinforced concrete structure conventionally used by a general carpenter using a wooden shaft of lumber is conventionally used. First, the method of constructing the frame of the partition in the building, etc. And ink on the ceiling. Then, according to the above-mentioned summing, floor and ceiling Attach the floor base and the ceiling head retainer using the lumber timber shaft.   Measures the distance between the floor base and the ceiling head support, and the length of the timber axle for lumber for the vertical bar Cut accurately.   Set the timber studs for lumber for vertical crossings at a predetermined pitch, and hold the position of the studs. And fix it with nails or staples to the floor base and ceiling head holder.   Lumber lumber for reinforcement. It is fixed with a tape and has a partition frame.       [0003]   Second, as described in JP-A-3-194407, a general carpenter Attaches a telescopic connecting bracket to the upper end of the LVL wooden shaft and forms a convex tenon at the opposite lower end, After adjusting the expansion joint at the top according to the height of the ceiling holder , The convex tenon at the lower end is fitted into the groove of the wooden floor base (floor beam), ) And the floor base (floor beam), and then the ceiling head holder (ceiling beam) and the floor foundation (floor beam) ), There is a construction method in which a frame of a partition is provided by nailing.       [0004]   Third, published in Japanese Utility Model Laid-Open No. 1-36410 and Japanese Utility Model Laid-Open No. 4-105307. As mentioned, the studs, runners, spacers, run-outs Frames for partitions in reinforced concrete buildings using fasteners, fixtures, etc. Construction is also taking place.       [0005]     [Problems to be solved by the invention]   A conventional partition performed by a general carpenter of the first conventional example using a wooden shaft of a lumber product. There were the following problems in frame construction.   Conventional wood materials use undried lumber timber shafts, which can cause warpage and bending. Easy, straight wall finish is difficult after construction.   The use of undried lumber timber shafts results in large hits and tears of material, Precision is not stable.   In addition, since the undried lumber product wood shaft has a water content of 19% or more, the material is relatively relatively small. Due to its heavy weight, there is difficulty in handling such as carrying it into the construction site.   Regarding the handling of the vertical beam, the floor base and ceiling fixed on the floor and ceiling While holding the specified position of the lumber timber studs against the Since the stapling operation is performed, extra work is required and the workability is reduced.   Since a construction process to fix the crossbar for reinforcement is necessary, construction labor and construction Takes extra time.   At the same time, material costs such as wooden shafts, nails, staples, etc. It takes minutes.   The material costs are for wooden shafts for floors, ceilings and horizontal shafts in addition to wooden shafts for vertical shafts. Although it takes extra time, the conventional lumber product wood shaft is inexpensive at the unit price, but it has cut loss and warpage Large loss of sprout due to bending, knots, etc., and extra time for sorting sprout As a result, the cost increases.   Due to the decrease in workability and the increase in construction labor and construction time, Since the number of required workers and the number of construction days are increased, labor costs are increased.   Other costs include the relatively large weight of conventional lumber timber shafts, In addition to lowering the rate of import of materials, conventional sawmill wood shafts are not A large amount of waste material is generated, which takes extra time to transport waste material and waste disposal costs. You.       [0006]   A partition disclosed in Japanese Unexamined Patent Publication No. 3-194407 of the second conventional example. In the framing construction method, a convex tenon processing is performed on the lower end of the LVL wooden shaft, and the upper end of the LVL wooden shaft is extended. Attach the shrink fittings and adjust the length of the upper ends of the telescoping fittings to the ceiling ) And the upper and lower ends of all LVL wooden axes are made of wooden. Because there is a nailing process on the floor beam and the wooden ceiling holder (ceiling beam), The conventional partitioning framing construction performed by the conventional general carpenter using the wooden shaft of the lumber product It did not change much, and it was not so effective in simplifying the work.       [0007]   Japanese Utility Model Laid-Open No. 1-36410 and Japanese Utility Model Laid-Open No. 4-105 of the third conventional example. As disclosed in Japanese Patent Publication No. 307, the construction method using a building steel base material For large rooms such as offices, large-scale industrial products with base steel Effective for mass production benefits and uniform construction, such as installing walls of the same material But the area of each room is small like a private apartment, and the specifications are Japanese style In diversified constructions such as, Western rooms, around doorways, kitchens, toilets, and bathrooms, Pre-processing, assembling, and welding of various members, including groundwork for connecting wooden materials And the processing work became complicated, and it was not possible to cope with work and cost.       [0008]   This invention is a revolutionary wooden shaft that eliminates these conventional disadvantages in terms of work and cost. It proposes a partition.       [0009]     [Means for Solving the Problems]   Steel base runner made of grooved iron plate with anticorrosion treatment on the floor and ceiling of the building Is fixed by an appropriate fixing means, and the steel floor on the fixed floor and ceiling is fixed. The runner is equipped with an engineering wood wood shaft such as LVL as the core material. The lower ends are fitted and arranged at an appropriate pitch. If necessary, a plurality of tubes are superimposed and the door frame etc. A building made of engineering wood such as L It is in the partition of the wooden shaft.       [0010]     【Example】   Hereinafter, the wooden shaft partition of the building of this invention is used in a reinforced concrete building. The construction method will be described as an example and will be described with reference to the drawings. Inking 3a and ceiling according to the position where a partition is provided on surface 1 and ceiling surface 2 The same blacking is performed on the surface 2.       [0011]   Next, the concrete floor 1 and ceiling 2 of the building were Steel runners 5 and 6 consisting of zinc-drawn grooved iron plate 4 and concrete nails 7 Hit and fix every interval.       [0012]   An engineering wood wooden shaft stud 8 such as LVL for a vertical rail as a core material is made of the above-described steel. The upper and lower ends are fitted to the base runners 5 and 6, and a suitable pitch, for example, about 30 sec. Place in parallel at intervals of one centimeter.       [0013]   Between the steel base runners 5, 6 and the wood shaft of the engineering wood such as the LVL The pillar 8 is not fixed by nailing in principle here. If you need it, For example, as shown in FIG. When the lower end of the bar 11 is connected, fix it with nails, screw nails, or other fixing means. I do.       [0014]   Outer corners and inner corners are constructed by stacking a plurality of wooden shaft studs 8 as necessary.       [0015]   The superposition of the wooden shaft stud 8 is mainly performed by nailing, but by other superimposing means. Sometimes.       [0016]   The door opening 12 is reinforced by using a plurality of wooden shaft studs 8 as necessary, Then, the door frame 13 and the like are mounted as a set.       [0017]   The board 14 is stretched between the wooden studs 8 with a nail, a screw nail, or other fixing means. You can partition.       [0018]   In the above embodiment, a partition is made by providing a wall on the concrete floor of the building, We explained according to the example of the method of wall leading system that creates the floor of the room. A floor-leading system construction method in which flooring precedes the REIT floor surface and then partitions However, this invention can be implemented, and on the floor, partition ink is applied, Then, a steel base runner was fixed in the same manner as in the previous embodiment, and the steel It may be combined with a base runner.       [0019]   Since the present invention is configured as described above, in comparison with the first conventional example, Due to the characteristics of the material and the characteristics of the structure, and compared to the second conventional example, The characteristic of the structure is that the wooden studs of engineering wood such as LVL of wood material are warped and Since it is hardly bent, it is a straight wall after construction.       [0020]   Further, since the present invention is configured as described above, the second conventional example And in comparison with the third conventional example, the feature of the structure is that The steel base run consists of a zinc-plated channel iron plate fixed to the floor and ceiling. After inserting an engineering wood wood shaft stud such as LVL The stud can be shifted to the position, and just by setting it in that position, Temporary fixation can be performed without any delay.       [0021]   In addition, in the board tension after the partition construction, the dimensions of the inner wall board and the tensioning procedure are At the same time, the stud spacing can be achieved simply by shifting the studs of the engineering wood wood shaft such as LVL. Can be adjusted.       [0022]   Also, an engineering wood wooden shaft such as LVL is pinched on the steel base runner. Therefore, there is no need for a construction process for fixing the cross beam for reinforcement.       [0023]     [Effect of the invention]   The purpose of this invention is to construct the entire partition inside the building as described above. Therefore, as described above, the wood shaft of engineering wood such as LVL To complement the advantages and disadvantages of steel base runners And use it as a base material for partitioning, and put gypsum board as wall material As a result, it is easy to secure the desired strength, and twisting and distortion do not occur. It is a robust, durable wooden shaft partition.       [0024]   Compared with the first conventional example, the characteristics of the material and the characteristics of the structure are different. Also, as compared with the second conventional example, the feature of the structure is that the LVL of the wooden material and the like are different. Engineering wood wood shaft studs are hardly warped or bent. A straight wall later can be easily finished.       [0025]   The engineering wood such as LVL used is a dry veneer or strand. The defects are dispersed by lamination of multiple layers using, there is little variation in mechanical properties, The strength and accuracy are stable, and are effective in finishing the above-mentioned straight wall.       [0026]   In addition, the water content of engineering wood such as LVL is standardized to 14% or less. Material is relatively lighter than undried lumber products, Handling such as loading is easy.       [0027]   In addition, engineers such as LVL used for studs for vertical crossbars and protruding and entering corners which are core materials Allingwood is standardized in length according to the standard height of each apartment floor. Less on-site cutting work, cut loss, warpage, bending, joints, etc. The amount of the loss of the fly material is small, and the work of sorting the fly material is hardly required. As a result, the construction time can be shortened and the material cost can be reduced.       [0028]   Further, since the present invention is as described above, the second conventional example and the third Compared to the conventional example, it is a feature of its structure. And LVL in a steel base runner made of zinc-plated channel iron plate fixed to the ceiling surface After inserting the wooden studs of the engineering wood, etc., shift the studs into place. It can be set in that position, and it can be temporarily fixed without hitting a nail. , The stud positioning is easy, the work effort is light, and the working time is short. Contracted.       [0029]   In addition, for board upholstery, LVL should be adjusted according to the dimensions of The stud spacing can be adjusted simply by shifting the engineering wood studs.       [0030]   The third conventional steel plate vertical bone has the calculated strength and rigidity, Or if it receives stress beyond the limit such as collision afterwards, it will remain curved, It has poor resilience. Therefore, as a supporting member that erects the vertical bone as necessary, It is necessary to arrange the pacer and attach a steady rest to reinforce it. It is necessary to prepare metal fittings.   However, the wooden studs of the engineering wood such as LVL of the present invention, It is rich in power and restores its original straight state only by bending even under large stress It is. Therefore, wooden shaft studs of engineering wood such as LVL and steel base Combines runners, so no reinforcements are required, and can be shifted sideways during construction Can be easily performed.       [0031]   In addition, the wooden shaft stud is clamped and temporarily fixed to the steel base runner. The construction process to fix the cross beam for reinforcement can obtain strength that is unnecessary. It is possible to greatly reduce construction labor and construction time by omitting it.       [0032]   Improvement of workability, reduction of construction labor and construction time The number of staff and the number of construction days can be significantly reduced, resulting in a significant reduction in labor costs .       [0033]   In addition, engineering wood wood shafts such as LVL are relatively The small size increases the material loading rate and reduces the amount of waste material as garbage The total cost is reduced because the time and effort required to carry out waste materials and waste disposal costs can be reduced. Cost reduction is large.

【図面の簡単な説明】 【図1】この考案の建物の木軸間仕切りを実施するコン
クリート集合住宅の間取り図である。 【図2】この考案の建物の木軸間仕切りを実施するコン
クリート集合住宅の床面に間取りを墨付けした状態の説
明平面図である。 【図3】同じくその間取りを墨付けにしたがって床ラン
ナーを釘打ちにより取付けた状態の説明平面図である。 【図4】同じく墨付けにしたがって床ランナーと天井ラ
ンナーとを釘打ちにより取付け、LVL木軸を嵌合立設
した状態の説明断面図である。 【図5】同じくLVL木軸を用いて軸組した状態の側面
図である。 【図6】同じくLVL木軸を用いて軸組した開口部の一
例を示す側面図である。 【図7】同じくLVL木軸軸組にボードを貼って間仕切
りが完成した状態の側面図である。 【図8】同じくLVL木軸単体の斜視図である。 【図9】同じく床ランナーと天井ランナーとなる亜鉛引
き溝形鉄板単体の実施例を示す斜視図である。 【符号の説明】 1 建物のコンクリート床面 2 天井面 3a 墨付け 4 亜鉛引溝形(C形)鉄板 5 床ランナー 6 天井ランナー 7 コンクリート釘 8 LVL木軸間柱 9 ハッチ開口部 10 開口部横棧 11 開口部縦棧 12 ドア開口部 13 ドア枠 14 ボード
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a floor plan of a concrete apartment house implementing a wooden shaft partition of the building of the present invention. FIG. 2 is an explanatory plan view showing a state in which a floor plan of a concrete apartment house that implements a wooden shaft partition of the building of the present invention has a floor plan. FIG. 3 is an explanatory plan view showing a state in which a floor runner is attached by nailing in accordance with blacking of the floor plan. FIG. 4 is an explanatory sectional view of a state in which a floor runner and a ceiling runner are attached by nailing in accordance with black ink, and an LVL wooden shaft is fitted upright. FIG. 5 is a side view showing a state where the shaft is assembled using an LVL tree shaft. FIG. 6 is a side view showing an example of an opening part assembled using an LVL wooden shaft. FIG. 7 is a side view showing a state in which a partition is completed by attaching a board to the LVL wooden shaft set. FIG. 8 is a perspective view of the LVL wooden shaft alone. FIG. 9 is a perspective view showing an embodiment of a single zinc-plated grooved iron plate serving as a floor runner and a ceiling runner. [Description of Signs] 1 Concrete floor surface of building 2 Ceiling surface 3a Inking 4 Zinc grooved (C type) iron plate 5 Floor runner 6 Ceiling runner 7 Concrete nail 8 LVL wooden shaft pillar 9 Hatch opening 10 Opening horizontal DESCRIPTION OF SYMBOLS 11 Opening ridge 12 Door opening 13 Door frame 14 Board

─────────────────────────────────────────────────────
【手続補正書】 【提出日】平成15年6月26日(2003.6.2
6) 【手続補正1】 【補正対象書類名】明細書 【補正対象項目名】全文 【補正方法】変更 【補正内容】 【書類名】 明細書 【考案の名称】 建物の木軸間仕切り 【実用新案登録請求の範囲】 【請求項1】 建物の床面および天井面に防食加工を施
した溝形鉄板からなる鋼製下地ランナーが適宜固着手段
により固定され、この固定された床面および天井面の鋼
製下地ランナーに芯材としてのLVL等のエンジニアリ
ングウッド木軸間柱が、その上下端を嵌合し、適当なピ
ッチで列置され、出隅・入隅およびドア開口部では、必
要により複数本が重合され、ドア枠等をセット組みで取
付けられた後、上記LVL等のエンジニアリングウッド
木軸間柱に面材としてのボードが張られてなる建物の木
軸間仕切り。 【図面の簡単な説明】 【図1】この考案建物の間仕切りを実施するコンクリー
ト造り集合住宅の間取り図である。 【図2】この考案建物の間仕切りを実施するコンクリー
ト造り集合住宅の床面に間取りを墨付けした状態の説明
平面図である。 【図3】同じくその間取り墨付けにしたがって鋼製下地
ランナーを打ち付けた状態の説明平面図である。 【図4】同じく墨付けにしたがって鋼製下地ランナーを
打ち付けLVL等のエンジニアリングウッド木軸を嵌合
立設した状態の説明断面図である。 【図5】同じく当該木軸を用いて軸組した状態の側面図
である。 【図6】同じく当該木軸を用いて軸組した開口部の一例
を示す側面図である。 【図7】同じく当該木軸の軸組にボードを貼って間仕切
りが完成した状態の側面図である。 【図8】同じくエンジニアリングウッドの一例としての
LVL木軸単体の斜視図である。 【図9】同じく鋼製下地ランナーとなる亜鉛引き溝形鉄
板単体の実施例を示す斜視図である。 【符号の説明】 1 建物のコンクリート床面 2 天井面 3a 墨付 4 亜鉛引溝形鉄板 5 鋼製下地ランナー 6 鋼製下地ランナー 7 コンクリート釘 8 LVL等のエンジニアリングウッド木軸間柱 9 ハッチ開口部 10 開口部横桟 11 開口部縦桟 12 ドア開口部 13 ドア枠 14 ボード
────────────────────────────────────────────────── ───
[Procedure amendment] [Submission date] June 26, 2003 (2003.6.2
6) [Procedure amendment 1] [Document name to be amended] Description [Item name to be amended] Full text [Amendment method] Change [Content of amendment] [Document name] Specification [Name of device] Partition between wooden axes of building [Utility model] Claims: 1. A steel base runner made of a corrugated iron plate subjected to corrosion protection on the floor surface and ceiling surface of a building is fixed by an appropriate fixing means, and the fixed floor surface and ceiling surface are fixed. An engineering wood wooden stud, such as LVL, as a core material is fitted to a steel base runner, and its upper and lower ends are fitted and arranged at an appropriate pitch. Is laminated, a door frame and the like are attached in a set, and a board as a surface material is stretched on an engineering wood wooden pillar such as the above-mentioned LVL. BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a floor plan of a concrete apartment house that partitions the building according to the present invention. FIG. 2 is an explanatory plan view showing a state in which a floor plan of a condominium made of concrete in which partitioning of the devised building is performed is marked with a floor plan. FIG. 3 is an explanatory plan view of a state in which a steel base runner is similarly struck in accordance with the interval blacking. FIG. 4 is an explanatory cross-sectional view showing a state in which a steel base runner is hit in accordance with black ink and an engineering wood wooden shaft such as LVL is fitted and erected. FIG. 5 is a side view of a state where the wooden shaft is assembled using the wooden shaft. FIG. 6 is a side view showing an example of an opening framed using the wooden shaft. FIG. 7 is a side view of a state in which a partition is completed by attaching a board to the wooden shaft set. FIG. 8 is a perspective view of an LVL wooden shaft as an example of an engineering wood. FIG. 9 is a perspective view showing an example of a single zinc-plated grooved iron plate serving as a steel base runner. [Description of Signs] 1 Concrete floor surface of building 2 Ceiling surface 3a Blackened 4 Zinc-drawn grooved iron plate 5 Steel base runner 6 Steel base runner 7 Concrete nails 8 Engineering wood wooden shaft pillar such as LVL 9 Hatch opening 10 Opening Horizontal bar 11 opening vertical bar 12 door opening 13 door frame 14 board

Claims (1)

【実用新案登録請求の範囲】 【請求項1】 建物の床面および天井面に防食加工を施
した溝形鉄板からなる床ランナーおよび天井ランナーが
適宜固着手段により固定され、この床ランナーおよび天
井ランナーに縦棧用のLVL木軸間柱が、その上下端を
嵌合し、適当なピッチで列置され、出隅、入隅およびド
ア開口部では、必要により複数本が重合され、ドア枠等
をセット組みで取付けられた後、LVL木軸間柱にボー
ドが張られてなる建物の木軸間仕切り。
[Claim 1] A floor runner and a ceiling runner made of a corrugated iron plate on which the floor and ceiling of a building are subjected to anticorrosion processing are appropriately fixed by fixing means, and the floor runner and the ceiling runner are appropriately fixed. LVL wooden shaft studs for longitudinal joints are fitted at the upper and lower ends and are arranged at an appropriate pitch. At the outside corner, the inside corner and the door opening, a plurality of pillars are overlapped as necessary, and the door frame etc. After being installed as a set, a wooden shaft partition of a building in which boards are stretched on LVL wooden shaft posts.
JP2003003086U 2003-05-28 2003-05-28 Wooden shaft partition of building Pending JP2003000006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003003086U JP2003000006U (en) 2003-05-28 2003-05-28 Wooden shaft partition of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003003086U JP2003000006U (en) 2003-05-28 2003-05-28 Wooden shaft partition of building

Publications (1)

Publication Number Publication Date
JP2003000006U true JP2003000006U (en) 2003-11-07

Family

ID=43250655

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003003086U Pending JP2003000006U (en) 2003-05-28 2003-05-28 Wooden shaft partition of building

Country Status (1)

Country Link
JP (1) JP2003000006U (en)

Similar Documents

Publication Publication Date Title
US5333426A (en) Wood frame construction system with prefabricated components
US6643986B2 (en) Diaphragm with perimeter edging on structural panels
US20100058687A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
JPH11222960A (en) Building wall endurable to lateral force
CZ20003911A3 (en) Building construction process
US6389762B2 (en) Lintel
US4301635A (en) Composite joists, joist assemblies and building panels including such joist assemblies
WO2008007325A2 (en) Building method
US20050126084A1 (en) System of building modular log homes
JPH02292438A (en) Building structure of wooden house
JP2003000006U (en) Wooden shaft partition of building
JP2008231889A (en) Reinforcement structure of bearing wall
US3313070A (en) Composite structural pillar and rafter beams with nailing strips
CA2639339A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
ZA200505004B (en) Structural framework
RU169083U1 (en) STRUCTURE OF A WOODEN HOUSE BASED ON CONSTRUCTIVE ELEMENTS
RU61741U1 (en) WALL PANEL ELEMENT
GB2470721A (en) A stud for use in timber frame walls
JPH11247339A (en) Wooden framework partition of building
JP2761456B2 (en) Wooden construction method and wooden building
JP3720167B2 (en) High wall magnification panel
AU749109B2 (en) Lintel
JP3571485B2 (en) Insulation inner wall foundation method of window opening
JP3022873U (en) Partition wall panel
JP2004232384A (en) Panel for wooden building structure, and wooden building structure

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20031202

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040202

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040202

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040330