JP2002322642A - Installation of cage - Google Patents

Installation of cage

Info

Publication number
JP2002322642A
JP2002322642A JP2001129755A JP2001129755A JP2002322642A JP 2002322642 A JP2002322642 A JP 2002322642A JP 2001129755 A JP2001129755 A JP 2001129755A JP 2001129755 A JP2001129755 A JP 2001129755A JP 2002322642 A JP2002322642 A JP 2002322642A
Authority
JP
Japan
Prior art keywords
cage
trench
reinforcing
wire
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001129755A
Other languages
Japanese (ja)
Inventor
Hidetoshi Takizawa
英俊 滝沢
Junichi Furukawa
淳一 古川
Masami Ito
正己 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2001129755A priority Critical patent/JP2002322642A/en
Publication of JP2002322642A publication Critical patent/JP2002322642A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an installation for a cage capable of efficiently and economically positioning the cage without using any large-scale crane even when the heavy cage is constructed in a deep trench in a narrow construction area under the ground with insufficient ground strength. SOLUTION: This installation method is carried out through five processes. In the first process, a wire jack A serving as a small hanging means is installed on an opening circumference edge of the trench T. In the second process, the cage 10a in the lowermost level is inserted into the trench T. In the third process, a hanging frame 30 arranged in the cage 10a is connected to a wire W held movably in the vertical direction by means of the wire jack A. In the fourth process, a cage 10b in the following level is connected to the cage 10a. In the fifth process, these connected cages are lowered to a predetermined depth inside the trench T by means of the wire jack A.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は鉄筋コンクリート構
造物等の構築に際して鉄筋籠をトレンチに建て込む鉄筋
籠の建込み方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of building a reinforced cage in which a reinforced cage is built in a trench when a reinforced concrete structure or the like is constructed.

【0002】[0002]

【従来の技術】土地の有効利用を図って効率的な構造物
配置を実現したり、或いはそれにより既存構造物に干渉
しない地下構造物を構築したりと、施工に対する効率
性、緻密性等が一段と要求されているのが建設現場にお
ける現状である。かかる状況の下、過密化した都市部等
における狭隘な施工領域で計画される複雑で大規模な鉄
筋コンクリート構造物は需要を増大させており、構造強
度、大深度への対応性及び環境保全性などに優れている
地中連続壁工法等が採用される場面も増えてきている。
2. Description of the Related Art Efficiency, denseness, etc., for construction, such as realization of efficient structure arrangement by effective use of land or construction of an underground structure that does not interfere with existing structures, are improved. What is more demanding is the current situation at construction sites. Under such circumstances, the demand for complex and large-scale reinforced concrete structures planned in narrow construction areas in overcrowded urban areas, etc. is increasing in demand, such as structural strength, adaptability to large depths, and environmental conservation. In many cases, the underground diaphragm wall method, which is excellent in the field, is adopted.

【0003】従来この工法は、施工性質上、連続壁の芯
材となる鉄筋籠を予め地上の鉄筋籠製作ヤード等におい
て適宜段階まで製作しておく必要があり、例えば長さ1
0m程度の鉄筋籠(未完成)にまで製作する。この未完
成の鉄筋籠は大型クレーンにより仮置き台等に搬送され
トレンチへの建込みを待つこととなる。
Conventionally, in this construction method, due to the nature of construction, it is necessary to produce a reinforcing bar basket as a core material of a continuous wall in advance at an appropriate stage in a reinforcing bar manufacturing yard or the like on the ground.
It is manufactured up to about 0m (incomplete). The unfinished steel cage is transported to a temporary placing table or the like by a large crane and is waiting to be built in a trench.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来の
鉄筋籠の建込み施工にあっては、一般に限られた領域し
か確保できないことが多い施工ヤードにおいて、ただで
さえ各種機械や配筋材料等が錯綜した状況の下、鉄筋籠
製作作業等を行いつつその付近を大型クレーンが走行す
る必要に迫られることになるが、一方、鉄筋籠を建て込
むトレンチの深度が深く、更に土質的にも軟弱であった
りするとかなりの重量物である大型クレーンなどトレン
チに接近することさえままならず、大型クレーンの使用
自体が難しくなる。加えて、鉄筋籠重量が過大であった
りすればその困難さは更に増大する。
However, in the construction of a conventional reinforcing cage, in a construction yard where only a limited area is generally secured in many cases, various machines and reinforcing materials are used. In a complicated situation, a large crane will be required to run around the area while making reinforced cages, but on the other hand, the depth of the trenches where the reinforced cages will be built is deep, and the soil is also soft. In such a case, a large crane, which is a considerably heavy object, cannot even approach a trench, and the use of the large crane itself becomes difficult. In addition, the difficulty is further increased if the rebar basket weight is excessive.

【0005】つまりは、狭隘な施工領域において、トレ
ンチ深度が深くその地盤が軟弱な状況に大型クレーンが
対応することは元来非常な困難さを伴うことであり、こ
れにより著しい作業効率の低下と対応措置に要する人件
費、機材コスト等の上昇は避けがたいものとなってい
た。他方、たとえ大型クレーンを使用可能であったとし
ても、使用機会は鉄筋籠建込み時にほぼ限定されてしま
い、高額なレンタル料金に見合う成果は得られにくかっ
た。
[0005] In other words, in a narrow construction area, it is inherently very difficult for a large crane to cope with a situation where the trench depth is deep and the ground is soft, which significantly reduces the work efficiency. Increases in personnel costs and equipment costs required for response measures were unavoidable. On the other hand, even if a large crane could be used, the opportunity to use it was almost limited when building a reinforced cage, and it was difficult to obtain results worth the high rental fee.

【0006】そこで、本発明はこのような従来の課題に
着目してなされたもので、大型クレーンを使用すること
なく、施工領域が狭隘で、トレンチ深度が深い上に地盤
強度が良好でなく、更には鉄筋籠重量が大きいといった
施工状況においても効率的かつ経済的に鉄筋籠の建込み
を可能にする鉄筋籠の建込み方法を提供するものであ
る。
Accordingly, the present invention has been made in view of such conventional problems, and without using a large crane, the construction area is narrow, the trench depth is deep, and the ground strength is not good. It is another object of the present invention to provide a method for installing a reinforcing bar cage that enables efficient and economical mounting of the reinforcing bar cage even in a construction situation where the weight of the reinforcing bar cage is large.

【0007】[0007]

【課題を解決するための手段】上記の目的を達成するた
め、請求項1に記載された発明は、複数段に分割された
鉄筋籠をトレンチ内に順次建込む鉄筋籠の建込み方法で
あって、前記トレンチの開口周縁上に小型吊下手段を設
置する第1の工程と、最下段の鉄筋籠を前記トレンチへ
挿入する第2の工程と、該小型吊下手段により上下に移
動可能に保持された吊下線条を、前記最下段の鉄筋籠に
設けられた吊り枠に連結する第3の工程と、次段の鉄筋
籠を前記最下段の鉄筋籠に連結する第4の工程と、これ
ら連結した鉄筋籠を前記小型吊下手段により前記トレン
チ内の所定深さまで降下させる第5の工程とを含むこと
を特徴とする。
In order to achieve the above-mentioned object, the invention described in claim 1 is a method for installing a reinforcing bar cage in which a plurality of reinforcing bar cages are sequentially built in a trench. A first step of installing a small suspending means on the periphery of the opening of the trench, a second step of inserting a lowermost reinforcing rod cage into the trench, and a vertically movable means by the small suspending means. A third step of connecting the held suspension wire to a suspension frame provided on the lowermost reinforced cage, a fourth step of connecting a next reinforced basket to the lowermost reinforced cage, A fifth step of lowering the connected rebar baskets to a predetermined depth in the trench by the small suspension means.

【0008】また、請求項2に記載された発明は、請求
項1記載の鉄筋籠の建込み方法において、前記吊り枠
が、前記最下段の鉄筋籠の上端部近傍の補強枠と一体化
されていることを特徴とする。
According to a second aspect of the present invention, in the method of constructing a reinforced cage according to the first aspect, the suspension frame is integrated with a reinforcing frame near an upper end portion of the lowermost reinforced cage. It is characterized by having.

【0009】また、請求項3に記載された発明は、請求
項1または2記載の鉄筋籠の建込み方法において、鉄筋
籠が所望長さに建込まれるまで前記第4の工程および前
記第5の工程を繰り返すことを特徴とする。
According to a third aspect of the present invention, there is provided the method for building a reinforcing bar cage according to the first or second aspect, wherein the fourth step and the fifth step are performed until the reinforcing bar is built to a desired length. Is repeated.

【0010】[0010]

【発明の実施の形態】以下、本発明の好ましい実施の形
態につき、添付図面を参照して詳細に説明する。図1
(a)は本実施形態において、小型吊下手段として用い
るワイヤジャッキAの設置構造を示す平面図であり、
(b)は同要部側面図である。図2はワイヤジャッキA
の構成を示す正面図である。また、図3〜図7は、本実
施形態における鉄筋籠の建込み方法の工程を示す説明図
であり、図8(a),(b)は夫々最下段に建込まれる
鉄筋籠10aの正面図および平面図である。
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG.
(A) is a top view which shows the installation structure of the wire jack A used as a small suspension means in this embodiment,
(B) is a side view of the main part. Figure 2 shows wire jack A
It is a front view which shows the structure of. FIGS. 3 to 7 are explanatory views showing the steps of the method of building a reinforcing cage in the present embodiment, and FIGS. 8A and 8B are front views of the reinforcing cage 10a built at the lowermost level, respectively. It is a figure and a top view.

【0011】本実施形態では、例えば道路の橋脚基礎部
等を想定し、その構造物の側壁部を施工するに際し本発
明を採用し施工を行う場合について説明する。地下の掘
削領域たる狭隘空間にてコンクリート打設作業等の施工
を行う関係上、側壁の配筋構造たる鉄筋籠10は地上に
おいて製作しておく。その際、鉄筋籠10を、最終的な
鉄筋籠建込み全長に応じた適宜な個数の鉄筋籠10a,
10b等に分割製作しておく。
In the present embodiment, a case will be described in which, for example, a bridge pier foundation portion of a road is assumed, and the present invention is employed when the side wall portion of the structure is constructed. In order to carry out concrete casting work and the like in a narrow space, which is an underground excavation area, the reinforcing bar cage 10 as a reinforcing structure of the side wall is manufactured on the ground. At this time, the reinforcing bar cage 10 is replaced with an appropriate number of reinforcing bar cages 10a,
It is divided and manufactured in 10b or the like.

【0012】鉄筋籠の建込みにあたっては、図8
(a),(b)に示すように、予め、最下段に建込まれ
る鉄筋籠10aの上端部近傍に、ワイヤジャッキAで把
持されたワイヤWを連結するための吊り枠30を固定し
ておく。より詳細には、鉄筋籠10aの鉄筋を保持する
ために上下方向に適宜な間隔で設けられた補強枠32の
うち最上部近傍の補強枠32aをその厚さを大きくする
こと等により高強度化しておく。そして、この補強枠3
2aの対向する辺を接続するように例えば2本の吊り枠
30を固定し、吊り枠30を補強枠32aに一体化す
る。ただし、吊り枠30の個数は、鉄筋籠10aの自重
等に応じて適宜定めればよい。また、吊り枠30を固定
する構成は上記のものに限らず、鉄筋籠10aの自重を
支え得る強度で、かつ、鉄筋籠10aの変形を招くこと
なく鉄筋籠10aに固定できる構成であればよい。ある
いは、補強枠32a自体を吊り枠30として用い、ワイ
ヤWを直接補強枠32aに連結する構成としてもよい。
FIG. 8 shows the construction of the reinforcing rod cage.
As shown in (a) and (b), a suspension frame 30 for connecting the wire W held by the wire jack A is fixed in advance near the upper end of the reinforcing bar cage 10a to be built at the lowermost stage. deep. More specifically, of the reinforcing frames 32 provided at appropriate intervals in the vertical direction in order to hold the reinforcing bars of the reinforcing bar cage 10a, the reinforcing frames 32a near the uppermost portion are strengthened by increasing the thickness or the like. Keep it. And this reinforcement frame 3
For example, two suspension frames 30 are fixed so as to connect opposite sides of 2a, and the suspension frames 30 are integrated with the reinforcing frame 32a. However, the number of the suspension frames 30 may be appropriately determined according to the weight of the reinforcing bar cage 10a or the like. Further, the configuration for fixing the suspension frame 30 is not limited to the above-described configuration, and any configuration may be used as long as it is strong enough to support the weight of the reinforcing bar cage 10a and can be fixed to the reinforcing bar cage 10a without causing deformation of the reinforcing bar cage 10a. . Alternatively, the reinforcement frame 32a itself may be used as the suspension frame 30, and the wire W may be directly connected to the reinforcement frame 32a.

【0013】鉄筋籠10が建て込まれるトレンチTの開
口周縁上には、小型吊下手段であるワイヤジャッキAを
設置する。ワイヤジャッキAの設置は、図1(a)、
(b)に示す如く、トレンチTの開口周縁に跨設された
架台枠Fに固定されたジャッキ架台11上にジャッキ取
付けピース12を介して行われ、その設置数や設置パタ
ーン等は建て込まれる鉄筋籠10の重量や形状、建込み
速度等に応じて適宜決定される。本実施形態では、上記
した吊り枠30の構成に対応して、架台枠Fの対向する
2辺に2台ずつ、計4台のワイヤジャッキAを配置して
いる。なお、ワイヤジャッキAが上下に移動可能に把持
するワイヤ等のワイヤWが前記架台枠Fや架台11等に
過度に接触して摩耗し断裂したりしないよう、適宜形状
と滑動機能等を備えるワイヤガイド13が架台枠Fの内
周縁部に取付けられている。
On the periphery of the opening of the trench T in which the reinforcing cage 10 is to be built, a wire jack A as a small suspension means is installed. The installation of the wire jack A is shown in FIG.
As shown in (b), the mounting is performed via a jack mounting piece 12 on a jack gantry 11 fixed to a gantry frame F laid over the periphery of the opening of the trench T, and the number of installations and the installation pattern are built. It is appropriately determined according to the weight and shape of the reinforcing bar cage 10, the building speed, and the like. In the present embodiment, four wire jacks A are arranged, two on each of two opposing sides of the gantry frame F, corresponding to the configuration of the suspension frame 30 described above. A wire having an appropriate shape and a sliding function so that a wire W such as a wire which the wire jack A grips so as to be vertically movable does not excessively come into contact with the gantry frame F, the gantry 11 or the like to be worn and torn. A guide 13 is attached to the inner peripheral edge of the frame F.

【0014】ワイヤジャッキAは、図2に示すように、
円筒体が連結した搭状の外形を有するものであり、その
円心部にはワイヤWが挿通されている。連結された円筒
体はそれぞれ一体となって機能しワイヤWの確実な上下
動機能を発現するのである。それらはワイヤジャッキA
の上部から順に、ジャッキ側チャック21、ジャッキ側
爪開放ジャッキ22、センターホールジャッキ23、盛
替側チャック24、盛替側爪開放ジャッキ25であり、
実際の機能としては、センターホールジャッキ23を仲
立ちとしてその両端に位置するジャッキ側爪開放ジャッ
キ22および盛替側爪開放ジャッキ25がワイヤWを移
動させる方向に応じてワイヤWを挿通させた状態で各々
が互いに摺動運動しワイヤWを随意移動させると共に、
かかる摺動運動を連続させながらジャッキ側チャック2
1及び盛替側チャック24がワイヤWを緊締する把持機
能を発揮して吊下線条移動時のずれ等を抑止し、重量物
を吊下した状況などにおいても確実かつ安定したジャッ
キ機能を発現する。
The wire jack A is, as shown in FIG.
It has a tower-like outer shape in which cylindrical bodies are connected, and a wire W is inserted through the center of the circle. The connected cylinders function as a single unit and exhibit a reliable vertical movement function of the wire W. They are Wire Jack A
In order from the upper part of the figure, there are a jack-side chuck 21, a jack-side claw opening jack 22, a center hole jack 23, a changeover-side chuck 24, and a changeover-side claw opening jack 25.
As an actual function, the center hole jack 23 is used as an intermediary, and the jack-side claw opening jacks 22 and the replacement side claw-opening jacks 25 located at both ends of the center hole jack 23 are inserted with the wire W in accordance with the direction in which the wire W is moved. Each slides and moves the wire W arbitrarily,
While continuing such a sliding motion, the jack-side chuck 2
1 and the transfer side chuck 24 exert a gripping function of tightening the wire W to suppress a shift or the like during the movement of the suspension wire, and to exhibit a reliable and stable jack function even in a situation where a heavy object is suspended. .

【0015】以下、図3〜図7を参照して、ワイヤジャ
ッキAの設置から鉄筋籠建込み完了までの実際の手順を
詳述する。
Hereinafter, the actual procedure from the installation of the wire jack A to the completion of the installation of the reinforcing rod cage will be described in detail with reference to FIGS.

【0016】先ず、図3に示すように、安定液Lが注入
されたトレンチTの開口部周縁上にワイヤジャッキAを
設置する。次に、図4に示すように、最下段の鉄筋籠1
0aをクローラークレーン40等の適宜な手段により吊
下げ、鉄筋籠10aの上端部近傍に固定された吊り枠3
0が地表面近傍に達するまでトレンチTの内部へ挿入す
る。
First, as shown in FIG. 3, a wire jack A is placed on the periphery of the opening of the trench T into which the stabilizing solution L has been injected. Next, as shown in FIG.
0a is suspended by an appropriate means such as a crawler crane 40 or the like, and the suspension frame 3 fixed near the upper end portion of the reinforcing bar cage 10a.
It is inserted into the trench T until 0 reaches near the ground surface.

【0017】次に、図5に示すように、鉄筋籠10aに
固定された吊り枠30に、ワイヤジャッキAにより把持
されたワイヤWを適宜な結束具34を用いて連結した
後、鉄筋籠10aをその重量が完全にワイヤWで支持さ
れるようになるまでクローラクレーン40で更に吊り降
ろす。
Next, as shown in FIG. 5, the wire W gripped by the wire jack A is connected to the suspension frame 30 fixed to the reinforcing cage 10a by using a suitable binding tool 34, and then the reinforcing cage 10a Is further suspended by the crawler crane 40 until its weight is completely supported by the wire W.

【0018】次に、図6に示すように、2段目の鉄筋籠
10bをトレンチTの上方から吊り降ろし、この鉄筋籠
10bの下端を、先にトレンチT内に挿入した鉄筋籠1
0aの上端にカプラジョイント36等の連結具を用いて
結合する。そして、図7に示すように、鉄筋籠10を、
その上端部が地表面近傍に達するまでワイヤジャッキA
を徐々にジャッキダウンさせる。以後、全ての鉄筋籠1
0が建込まれるまで、次段の鉄筋籠10を連結してジャ
ッキダウンする工程を繰り返し、最終的に求める建込み
全長を確保する。
Next, as shown in FIG. 6, the reinforcing bar cage 10b of the second stage is suspended from above the trench T, and the lower end of the reinforcing bar cage 10b is inserted into the reinforcing bar cage 1 previously inserted into the trench T.
0a is connected to the upper end using a coupler such as a coupler joint 36. Then, as shown in FIG.
Wire jack A until the upper end reaches near the ground surface
Gradually jack down. Since then, all reinforced baskets 1
Until 0 is built, the process of connecting the next-stage rebar basket 10 and jacking down is repeated to secure the finally required total building length.

【0019】上述の工程を経て所定の建込み全長を得た
鉄筋籠10は、その上端を構造物上端部等に接合固定さ
せることで建込み完了となる。鉄筋籠10の建込みが完
了したトレンチTにはその後コンクリート等の固化材打
設が行われ目的の構造物が構築される。なお、ワイヤW
および吊り枠30は、そのまま鉄筋籠10と一緒に埋め
殺しにして各種作業を進行させると作業効率向上の観点
から好ましい。
The rebar cage 10 having a predetermined total length of building through the above-described steps is completed by joining and fixing the upper end thereof to the upper end portion of the structure. After that, the solidification material such as concrete is poured into the trench T where the reinforced cage 10 has been completely built, and the target structure is constructed. Note that the wire W
The hanging frame 30 is preferably buried together with the rebar cage 10 as it is to carry out various operations, from the viewpoint of improving work efficiency.

【0020】以上のように、本実施形態では、最下段の
鉄筋籠10aに固定された吊り枠30を、小型吊下げ手
段であるワイヤジャッキAでトレンチ内に吊下げ、この
鉄筋籠10aに次段の鉄筋籠10bを連結してジャッキ
ダウンにより吊り降ろすことにより、鉄筋籠10の建込
みを行う。このため、限られた狭隘な領域しか確保でき
ないことが多い施工ヤードにおいて、必要な作業高や作
業半径等がクレーン等の重機と比較して著しく小さなワ
イヤジャッキAを用いて建込み作業を行うことができ
る。したがって、本実施形態によれば、鉄筋籠建込み作
業にあたり供される機器と他の各種機械や配筋材料等と
が錯綜した状況を形成することもなく、良好な作業環境
と作業効率とを実現することが可能となる。
As described above, in the present embodiment, the suspension frame 30 fixed to the lowermost reinforcing rod cage 10a is suspended in the trench by the wire jack A, which is a small suspending means. The rebar basket 10 is built by connecting the rebar baskets 10b of the step and hanging down by jack-down. For this reason, in a construction yard where only a limited narrow area can often be secured, the necessary work height, work radius, etc., should be set up using a wire jack A that is significantly smaller than a heavy machine such as a crane. Can be. Therefore, according to the present embodiment, it is possible to improve the working environment and the working efficiency without forming a situation in which the equipment used for the reinforced cage building work and other various machines and the reinforcing materials are complicated. It can be realized.

【0021】また、上記の各工程において必要となる主
な装置類は、ワイヤジャッキAとクローラクレーン40
のみであり、大型クレーンを使用する必要は全く無い。
このため、鉄筋籠10を建て込むトレンチ深度が深く、
また土質的にも軟弱であったり、更に鉄筋籠重量が過大
であるなどの施工状況では大型クレーンの使用自体が困
難になるといった、大型クレーンを必要とする従来方法
における問題点や、大型クレーンの使用コスト高といっ
た施工コスト上の問題点も解消することができる。
The main equipment required in each of the above steps is a wire jack A and a crawler crane 40.
Only, there is no need to use a large crane.
For this reason, the trench depth at which the reinforcing bar cage 10 is built is deep,
In addition, problems with conventional methods that require a large crane, such as the difficulty of using a large crane under construction conditions such as soil being soft and the weight of the reinforcing cage being excessive, Problems in construction costs such as high use costs can also be solved.

【0022】また、吊り枠30を鉄筋籠10aの上端部
近傍に設けたので、ワイヤジャッキAで吊り枠30を介
して鉄筋籠10aを吊下げた際に、鉄筋籠10aの安定
性が高くなり、施工性が向上すると共に、吊り枠30の
固定を容易に行うことができる。また、吊り枠30を補
強枠32aに固定して補強枠32aと一体化させること
で、鉄筋籠10aを吊下げた際に、鉄筋籠10aが変形
するのを防止することができ、鉄筋籠10a変形防止の
対策を講ずることも不要となる。
Further, since the suspension frame 30 is provided near the upper end of the reinforcing cage 10a, the stability of the reinforcing cage 10a is improved when the reinforcing rod cage 10a is suspended via the suspension frame 30 by the wire jack A. The workability is improved, and the suspension frame 30 can be easily fixed. Further, by fixing the hanging frame 30 to the reinforcing frame 32a and integrating it with the reinforcing frame 32a, it is possible to prevent the reinforcing cage 10a from being deformed when the reinforcing cage 10a is hung, and to prevent the reinforcing cage 10a from being deformed. It is not necessary to take measures to prevent deformation.

【0023】また、吊り枠30を予め鉄筋籠10aに固
定しておくため、鉄筋籠10aを吊下げるための吊り枠
を鉄筋籠10aとは別体にする場合に比べて、建込み作
業中に吊り枠と鉄筋籠10aとを結合する作業が不要と
なる。このため、建込み作業に要する時間の短縮を図る
こともできる。
In addition, since the hanging frame 30 is fixed to the reinforcing bar cage 10a in advance, the hanging frame for hanging the reinforcing bar cage 10a is separated from the reinforcing bar cage 10a during the construction work. The operation for connecting the suspension frame and the reinforcing rod cage 10a is not required. For this reason, the time required for the erection work can be reduced.

【0024】さらに、吊り枠を鉄筋籠10aと別体にす
ると、作業性の都合上、吊り枠の上に鉄筋籠10aを載
置する必要があるが、この場合、吊り枠の厚さ分だけ建
込み対象の全高が大きくなり、したがって、その分だけ
トレンチTを深くする必要がある。これに対して、本実
施形態では、吊り枠30を鉄筋籠10aの補強枠32a
に直接固定するようにしているので、トレンチTを深く
することが不要となり、トレンチTの掘削時間が短縮さ
れることにもなる。
Further, if the hanging frame is formed separately from the reinforcing bar cage 10a, it is necessary to place the reinforcing bar cage 10a on the hanging frame for the convenience of work. In this case, only the thickness of the hanging frame is required. The total height of the object to be built is increased, and therefore, it is necessary to make the trench T deeper. On the other hand, in the present embodiment, the suspension frame 30 is connected to the reinforcing frame 32a of the reinforcing bar cage 10a.
, It is not necessary to make the trench T deep, and the excavation time of the trench T is shortened.

【0025】[0025]

【発明の効果】以上説明したように、本発明によれば、
大型クレーンを使用することなく、施工領域が狭隘で、
トレンチ深度が深い上に地盤強度が良好でなく、更には
鉄筋籠重量が大きいといった施工状況においても効率的
かつ経済的に鉄筋籠の建込みを行うことができる。ま
た、吊下線条を連結する吊り枠を鉄筋籠の上端部近傍の
補強枠に設けることにより、鉄筋籠を安定に吊下げなが
ら建込み作業を行うことができ、作業性が向上すると共
に、吊り枠の固定が容易となり、また、吊下げ時におけ
る鉄筋籠の変形も防止できる。
As described above, according to the present invention,
Without using a large crane, the construction area is narrow,
In a construction situation where the trench depth is deep, the ground strength is not good, and the weight of the reinforcing bar is large, the reinforcing bar can be built efficiently and economically. In addition, by providing a suspension frame for connecting the suspension wire to the reinforcement frame near the upper end of the reinforcing cage, it is possible to perform the erection work while hanging the reinforcing cage in a stable manner. The fixing of the frame is facilitated, and the deformation of the reinforcing bar cage during suspension can be prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)は本発明の鉄筋籠の建込み方法において
小型吊下手段として用いるワイヤジャッキの設置構造を
示す平面図であり、(b)は同要部側面図である。
FIG. 1 (a) is a plan view showing an installation structure of a wire jack used as a small suspension means in a method of installing a reinforcing rod cage according to the present invention, and FIG. 1 (b) is a side view of the relevant part.

【図2】ワイヤジャッキの構成を示す正面図である。FIG. 2 is a front view showing a configuration of a wire jack.

【図3】本実施形態における鉄筋籠の建込み施工手順の
第1の工程を示す説明図である。
FIG. 3 is an explanatory diagram showing a first step of a procedure for installing a reinforcing cage in the embodiment.

【図4】本実施形態における鉄筋籠の建込み施工手順の
第2の工程を示す説明図である。
FIG. 4 is an explanatory view showing a second step of the procedure for installing a reinforcing rod cage in the present embodiment.

【図5】本実施形態における鉄筋籠の建込み施工手順の
第3の工程を示す説明図である。
FIG. 5 is an explanatory diagram showing a third step in the procedure for installing a reinforcing cage in the present embodiment.

【図6】本実施形態における鉄筋籠の建込み施工手順の
第4の工程を示す説明図である。
FIG. 6 is an explanatory view showing a fourth step of the procedure for installing a reinforcing cage in the present embodiment.

【図7】本実施形態における鉄筋籠の建込み施工手順の
第5の工程を示す説明図である。
FIG. 7 is an explanatory view showing a fifth step in the procedure for installing a reinforcing bar cage in the embodiment.

【図8】最下段に建込まれる鉄筋籠の構成を示す図であ
り、(a)は正面図、(b)は平面図である。
FIGS. 8A and 8B are diagrams showing a configuration of a rebar basket built at the lowermost stage, wherein FIG. 8A is a front view and FIG. 8B is a plan view.

【符号の説明】[Explanation of symbols]

A ワイヤジャッキ(小型吊下手段) T トレンチ W ワイヤ(吊下線条) 10(10a,10b) 鉄筋籠 30 吊り枠 A wire jack (small suspension means) T trench W wire (suspension wire) 10 (10a, 10b) Reinforcing cage 30 suspension frame

───────────────────────────────────────────────────── フロントページの続き (72)発明者 伊藤 正己 東京都港区港南2丁目15番2号 株式会社 大林組東京本社内 Fターム(参考) 2D049 GB01 GC03 GD01 GD09 GE15 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Masaki Ito 2-15-2 Konan, Minato-ku, Tokyo F-term (reference) 2D049 GB01 GC03 GD01 GD09 GE15

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 複数段に分割された鉄筋籠をトレンチ内
に順次建込む鉄筋籠の建込み方法であって、 前記トレンチの開口周縁上に小型吊下手段を設置する第
1の工程と、最下段の鉄筋籠を前記トレンチへ挿入する
第2の工程と、該小型吊下手段により上下に移動可能に
保持された吊下線条を、前記最下段の鉄筋籠に設けられ
た吊り枠に連結する第3の工程と、次段の鉄筋籠を前記
最下段の鉄筋籠に連結する第4の工程と、これら連結し
た鉄筋籠を前記小型吊下手段により前記トレンチ内の所
定深さまで降下させる第5の工程とを含むことを特徴と
する方法。
1. A method of building a reinforcing cage in which a plurality of divided reinforcing cages are sequentially built in a trench, comprising: a first step of installing a small suspension means on an opening periphery of the trench; A second step of inserting the lowermost rebar basket into the trench, and connecting a suspension wire movably held up and down by the small suspension means to a suspension frame provided in the lowermost rebar basket. A third step of connecting the next-stage rebar basket to the lowermost rebar basket, and lowering the connected rebar basket to a predetermined depth in the trench by the small suspension means. 5. A method comprising the steps of:
【請求項2】 前記吊り枠は、前記最下段の鉄筋籠の最
上部近傍の補強枠と一体化されていることを特徴とする
請求項1記載の鉄筋籠の建込み方法。
2. The method according to claim 1, wherein the hanging frame is integrated with a reinforcing frame near an uppermost portion of the lowermost cage.
【請求項3】 鉄筋籠が所望長さに建込まれるまで前記
第4の工程および前記第5の工程を繰り返すことを特徴
とする請求項1または2記載の鉄筋籠の建込み方法。
3. The method according to claim 1, wherein the fourth step and the fifth step are repeated until the reinforcing bar is built to a desired length.
JP2001129755A 2001-04-26 2001-04-26 Installation of cage Pending JP2002322642A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001129755A JP2002322642A (en) 2001-04-26 2001-04-26 Installation of cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001129755A JP2002322642A (en) 2001-04-26 2001-04-26 Installation of cage

Publications (1)

Publication Number Publication Date
JP2002322642A true JP2002322642A (en) 2002-11-08

Family

ID=18978237

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001129755A Pending JP2002322642A (en) 2001-04-26 2001-04-26 Installation of cage

Country Status (1)

Country Link
JP (1) JP2002322642A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100743474B1 (en) 2007-05-21 2007-07-30 (주)한터인종합건축사사무소 Earth of building land-side protection wall structure
JP2017078311A (en) * 2015-10-21 2017-04-27 株式会社大林組 Heavy load installation device
CN109736299A (en) * 2018-12-30 2019-05-10 中铁十四局集团有限公司 Bored pile construction method
JP7036357B1 (en) * 2021-09-22 2022-03-15 山本建設 株式会社 Reinforcing bar construction method
JP7058391B1 (en) * 2021-09-22 2022-04-22 山本建設 株式会社 Reinforcing bar construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100743474B1 (en) 2007-05-21 2007-07-30 (주)한터인종합건축사사무소 Earth of building land-side protection wall structure
JP2017078311A (en) * 2015-10-21 2017-04-27 株式会社大林組 Heavy load installation device
CN109736299A (en) * 2018-12-30 2019-05-10 中铁十四局集团有限公司 Bored pile construction method
JP7036357B1 (en) * 2021-09-22 2022-03-15 山本建設 株式会社 Reinforcing bar construction method
JP7058391B1 (en) * 2021-09-22 2022-04-22 山本建設 株式会社 Reinforcing bar construction method
WO2023047887A1 (en) * 2021-09-22 2023-03-30 山本建設 株式会社 Reinforced concrete construction method

Similar Documents

Publication Publication Date Title
KR101859367B1 (en) Method for constructing vertical structure in vertical tunnel using top down method
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN108643192A (en) Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN208363271U (en) A kind of basement steel pipe congruent band of column girder connection using reverse construction
CN110904956B (en) Cast-in-place pile construction process
CN105178358B (en) Vertical supporting system for reverse construction method and construction method of vertical supporting system
CN109898669B (en) Construction method for underground first-layer beam column joint by reverse construction method
CN105275013B (en) Core tube inverse superimposed underground diaphragm wall and construction method thereof
CN107558483B (en) A kind of construction method of building foundation that installing wallboard
CN109930624A (en) A kind of embedding petrographic province blower foundation of offshore wind farm and construction method
JP2002322642A (en) Installation of cage
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN205188999U (en) Vertical supporting system of reverse construction method
CN105297758B (en) Prestress square pile and the integrated column of steel lattice column
JPH0684690B2 (en) Building basement extension method
CN212743357U (en) Reverse construction method hanging die template
CN112813969A (en) Steel pipe pile foundation and construction method thereof
CN202689531U (en) Flexible and retractable climbing shuttering system for single-cylinder-body structure
JP4325340B2 (en) How to build a reinforcing bar
JP2004176434A (en) Method for constructing structure and underground skeleton
JP2001131962A (en) Installation of cage
CN207109852U (en) Pre-groove and pre-groove component
JP3692866B2 (en) Reinforcing bar installation method
CN113529693B (en) Construction method for penetrating pipeline through cutter-suction type corner amplitude diaphragm wall
JPH04319121A (en) Construction of underground base of building

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040927