JP2002212960A - Pile head reinforcement unit - Google Patents

Pile head reinforcement unit

Info

Publication number
JP2002212960A
JP2002212960A JP2001013731A JP2001013731A JP2002212960A JP 2002212960 A JP2002212960 A JP 2002212960A JP 2001013731 A JP2001013731 A JP 2001013731A JP 2001013731 A JP2001013731 A JP 2001013731A JP 2002212960 A JP2002212960 A JP 2002212960A
Authority
JP
Japan
Prior art keywords
bar
pile head
main
muscle
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001013731A
Other languages
Japanese (ja)
Other versions
JP4345951B2 (en
Inventor
Kazumi Nagai
一巳 永井
Michiko Hirao
美知子 平尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANROODO STEEL KK
Original Assignee
SANROODO STEEL KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANROODO STEEL KK filed Critical SANROODO STEEL KK
Priority to JP2001013731A priority Critical patent/JP4345951B2/en
Publication of JP2002212960A publication Critical patent/JP2002212960A/en
Application granted granted Critical
Publication of JP4345951B2 publication Critical patent/JP4345951B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a pile head reinforcement unit which suppresses strength degradation and welding stress occurrence at base portions of a column and a wall, where a shearing force is largely applied, thereby ensuring the durability thereof as a structure, has structural elasticity imparted thereto, thereby improving the working efficiency thereof, and therefore constructs a structure excellent in reliability. SOLUTION: The pile head reinforcement unit 10 has a long body with its lower portion embedded in a foundation of the structure via concrete, and comprised of (a) a plurality of rod-like main reinforcements 11, (b) a spiral hoop 12, (c) a cotter bar 16, and (d) rod-like cotter engaging bars 13, 14. The main reinforcements 11 are vertically arranged in parallel with each other. The hoop 12 is wound along the periphery of the main reinforcements 11 which are embedded in the foundation, and has its upper end bound to upper portions of the main reinforcements 11 via a binding means while its lower end bound to lower ends of the main reinforcements 11. The cotter bar 16 is arranged almost orthogonally to the main reinforcements 11 in the vicinity of the upper end of the hoop 12. The cotter engaging bars 13, 14 are arranged in parallel with a longitudinal direction of the main reinforcements and have their upper ends fixed to the cotter bar 16.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は住宅や工場、橋脚等
の構造物の杭基礎に適用され、柱部や壁部の支持力を強
化して耐久性を向上させると共に、施工に際して作業能
率を向上させることのできる杭頭補強筋ユニットに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is applied to a pile foundation for structures such as houses, factories, piers, etc., and enhances the supporting force of pillars and walls to improve durability and improve work efficiency during construction. The present invention relates to a pile head reinforcement unit that can be improved.

【0002】[0002]

【従来の技術】一般に住宅や工場、橋脚等の構造物は、
構造物の柱部や壁部等を支持する杭基礎によって地盤上
に支持されている。このような杭基礎はパイル等の内部
に配置された鉄筋枠等からなる杭頭補強筋ユニットで補
強されたコンクリート製の構造物で構成され、杭基礎上
の住宅等の柱部や壁部をこれに作用する重力や剪断力に
抗して支持している。
2. Description of the Related Art Generally, structures such as houses, factories, and piers are
It is supported on the ground by a pile foundation that supports columns and walls of the structure. Such a pile foundation is composed of a concrete structure reinforced by a pile head reinforcement unit composed of a reinforcing frame or the like disposed inside a pile or the like, and a pillar or wall of a house or the like on the pile foundation is formed. It supports against gravity and shear force acting on it.

【0003】以下、従来の杭頭補強筋ユニット及びそれ
を用いた杭の施工方法について図面を用いて説明する。
図9は杭基礎に適用される従来の杭頭補強筋ユニットの
設置施工前の状態を示す部分断面図であり、図10はそ
の設置施工後の状態を示す部分断面図である。図9及び
図10において、50は従来例の杭頭補強筋ユニット、
51は複数本の異形鉄筋で形成された主筋、52は複数
の主筋51の外周囲に巻き回されて主筋51との接点が
溶接部Xにより固定され螺旋状に形成されたフープ筋、
53は上部側からコンクリートミキサー等で供給される
生コンクリートを保持させるための生コンクリート受
部、54は杭頭補強筋ユニット50の下部が挿入され地
盤に穿設されたコンクリートパイル(以下パイルと略
す)、55はパイル54の上端に係止される主筋51の
中間部に設けられたカンザシ筋である。従来例の杭頭補
強筋ユニット50を用いて杭基礎の施工を行う場合、ま
ず、図9に示すようにカンザシ筋55の水平に突出した
部分をパイル54の上端に載置して全体を支持させて、
パイル54内の杭頭に杭頭補強筋ユニット50を配置す
る。つぎに、杭頭補強筋ユニット50の周囲に所定間隔
を置いて、図示しない型枠を配置し、この間隔の部分に
生コンクリートを流し込んで硬化させる。この型枠を取
り外すことにより、図10に示すように杭頭補強筋ユニ
ット50を打設されたコンクリート56に埋設させて補
強された構造物の柱部等を施工していた。
A conventional pile head reinforcement unit and a method of constructing a pile using the same will be described below with reference to the drawings.
FIG. 9 is a partial sectional view showing a state before installation of a conventional pile head reinforcing bar unit applied to a pile foundation, and FIG. 10 is a partial sectional view showing a state after the installation. 9 and 10, 50 is a conventional pile head reinforcement unit,
51 is a main bar formed of a plurality of deformed reinforcing bars, 52 is a hoop bar formed in a spiral shape, wound around the outer periphery of the plurality of main bars 51, and a contact point with the main bar 51 is fixed by a welded portion X;
53 is a ready-mixed concrete receiving portion for holding the ready-mixed concrete supplied from the upper side by a concrete mixer or the like, and 54 is a concrete pile (hereinafter abbreviated as a pile) into which the lower part of the pile head reinforcing bar unit 50 is inserted and is drilled in the ground. ) And 55 are kansashi muscles provided at an intermediate portion of the main muscle 51 locked at the upper end of the pile 54. In the case of constructing a pile foundation using the conventional pile head reinforcement unit 50, first, as shown in FIG. 9, the horizontally projecting portion of the kansashi bar 55 is placed on the upper end of the pile 54 to support the whole. Let me
The pile head reinforcement unit 50 is arranged at the pile head in the pile 54. Next, a mold (not shown) is arranged around the pile head reinforcing bar unit 50 at a predetermined interval, and ready-mixed concrete is poured into this interval to be hardened. By removing the formwork, as shown in FIG. 10, the pile head reinforcing bar unit 50 was buried in the cast concrete 56 to construct a pillar portion or the like of a structure reinforced.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、前記従
来の杭基礎に適用される杭頭補強筋ユニット50は、以
下のような課題を有していた。 (1)剪断力が大きくかかる柱部や壁部の基部におい
て、フープ筋52の上端部やカンザシ筋55が主筋51
に溶接部Xで固定されているので、この部分の主筋51
が溶接時の熱により強度劣化や、溶接金属が冷却して収
縮する際の自由変形が阻止されることによる残留応力
(溶接応力)が生じて構造体としての耐久性が低下する
という課題を有していた。 (2)フープ筋52の上端部やカンザシ筋55が主筋5
1に溶接部Xを介して強固に固定されているので、杭頭
補強筋ユニット50の構造自体に弾力性や柔軟性が乏し
く、施工時の移動やハンドリング等に伴って、この溶接
の接合部が破損し易く施工における作業能率が悪くなる
という課題を有していた。 (3)剪断力が特に作用する柱部等の基端側の杭頭部
分、即ち、フープ筋52の上部が主筋51に溶接で直接
固定されているので、バイブレーター等を用いて振動さ
せながら生コンクリートを型枠内に流し込む際に振動を
効果的に伝達することができず、鉄筋回りの生コンクリ
ートの充填が不均一となって欠陥部分を生じ易く、信頼
性に優れた構造物を施工することが困難であり、地震等
の災害に対して十分な安全性を確保できないという課題
があった。
However, the pile head reinforcing bar unit 50 applied to the conventional pile foundation has the following problems. (1) At the base of a column or a wall to which a large shearing force is applied, the upper end of the hoop streak 52 or the kansashi streak 55 is the main streak 51
Is fixed at the welded portion X, so that the main reinforcement 51
However, there is a problem in that the durability of the structure is reduced due to the occurrence of residual stress (welding stress) due to the strength deterioration due to heat during welding and the prevention of free deformation when the weld metal cools and contracts. Was. (2) The upper end of the hoop muscle 52 and the kansashi muscle 55 are the main muscle 5
1 is strongly fixed via the welded portion X, so that the structure itself of the pile head reinforcing bar unit 50 has poor elasticity and flexibility, and the joint portion of this weld is accompanied by movement and handling during construction. However, there is a problem that the work efficiency is deteriorated and the work efficiency in construction is deteriorated. (3) Since the base of the pile head on which the shear force acts particularly, that is, the upper portion of the hoop streak 52, that is, the upper portion of the hoop streak 52, is directly fixed to the main streak 51 by welding, it is vibrated using a vibrator or the like. Vibration cannot be transmitted effectively when concrete is poured into the formwork, and the filling of the ready-mixed concrete around the rebar becomes uneven and defects are likely to occur, so construct a highly reliable structure. There was a problem that it was difficult to secure sufficient safety against disasters such as earthquakes.

【0005】本発明は上記従来の課題を解決するもの
で、剪断力が大きくかかる柱部や壁部の基部における強
度劣化や溶接応力の発生を防止して、機械的強度(特に
曲げや圧縮応力)を向上させると共に、生産性に優れ、
構造的弾力性を備え施工における作業能率を向上させ、
信頼性に優れた構造物を施工することができ、更に構造
が簡単で生産性に優れた杭頭補強筋ユニットを提供する
ことを目的とする。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned conventional problems and prevents mechanical strength (particularly bending and compressive stresses) by preventing strength deterioration and welding stress at the base of a column or wall to which a large shearing force is applied. ) While improving productivity,
Equipped with structural elasticity to improve work efficiency in construction,
An object of the present invention is to provide a pile head reinforcing bar unit capable of constructing a highly reliable structure, having a simple structure, and having excellent productivity.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に本発明は以下の構成を有している。本発明の請求項1
に記載の杭頭補強筋ユニットは、下部が構造物の基礎部
にコンクリートを介して埋設され、その上部が前記構造
物の柱部や壁部の内部に配置される長尺状に形成された
杭頭補強筋ユニットであって、(a)上下方向に互いに
平行して複数配置される略棒状の主筋と、(b)前記基
礎部に埋設される前記主筋の周囲に沿って巻き回され
て、その上端部が前記主筋の上部に結束手段を介して結
束され下端部が前記主筋の下端側で固定される螺旋状の
フープ筋と、(c)前記フープ筋の上端部に近接して前
記主筋に略直交して配置されたカンザシ筋と、(d)前
記主筋の長さ方向と平行して配置され、その上部が前記
カンザシ筋に固定された略棒状のカンザシ係止筋と、を
有して構成されている。この構成によって以下の作用が
得られる。 (1)特に剪断力が大きくかかる柱部や壁部の基部にお
いて、この部分に対応する位置のフープ筋の上端部が主
筋に固定されることなく、結束手段により支持されてい
るので、この主筋の部分の強度劣化がなく機械的強度を
維持できる。 (2)フープ筋の上端部が主筋に溶接手段による溶接部
を介して固定されていず、温度変化に伴う主筋の伸縮や
生コンクリートの充填等に際しての振動に対して動き得
る自由度を有しているので残留応力等が緩和され、構造
体としての柔軟性に優れると共に、構造物の信頼性に優
れる。 (3)主筋とフープ筋との当接部の全てを溶接手段を用
いて溶接固定する必要がないので、現場の状況に応じて
微妙な位置調整を容易に行うことができ、施工作業の効
率化が図れる。 (4)コンクリートを杭頭補強筋ユニットに流し込んで
これを硬化させて形成される構造物の柱部や壁部におい
て、補強の必要箇所をフープ筋を用いて補強するので、
材料の無駄がなくしかも基礎の耐久性を効果的に向上で
きる。 (5)主筋の長さ方向の中間位置で水平に突出して、前
記構造物の基礎部の上端位置に係止されるカンザシ筋を
有するので、杭頭補強筋ユニットの下部をパイル等の基
礎部に挿入して、カンザシ筋をパイルの上端に係止させ
て設計位置への位置決めを確実に行うことができ、施工
の際の作業性と信頼性に優れている。 (6)水平又は左右に突出したカンザシ筋を有するの
で、これを施工や運搬の際の把持部や係止部としても利
用することができ、ハンドリング性に優れる。
In order to achieve the above object, the present invention has the following arrangement. Claim 1 of the present invention
The lower part of the pile head reinforcing bar unit described in (1) is buried in the foundation of the structure via concrete, and the upper part is formed in a long shape arranged inside the column and the wall of the structure. A pile head reinforcing bar unit, comprising: (a) a plurality of substantially bar-shaped main bars arranged in parallel with each other in a vertical direction; and (b) wound around the main bars buried in the foundation. A spiral hoop muscle whose upper end is bound to the upper part of the main muscle via a tying means and whose lower end is fixed at the lower end side of the main muscle, and (c) the spiral hoop muscle is located near the upper end of the hoop muscle. A kansashi muscle arranged substantially perpendicular to the main muscle, and (d) a substantially bar-shaped kansashi locking muscle arranged parallel to the length direction of the main muscle and having an upper portion fixed to the kansima muscle. It is configured. With this configuration, the following operation is obtained. (1) In particular, at the base of a column or a wall to which a large shearing force is applied, the upper end of the hoop at a position corresponding to this portion is supported by the binding means without being fixed to the main, so that this main is used. The mechanical strength can be maintained without the strength deterioration of the portion. (2) The upper end of the hoop streak is not fixed to the main streak through a welded portion by a welding means, and has a degree of freedom to move with respect to vibration caused by expansion and contraction of the main streak due to a temperature change and filling of ready-mixed concrete. As a result, residual stress and the like are reduced, and the flexibility of the structure is excellent, and the reliability of the structure is excellent. (3) Since it is not necessary to weld and fix all the contact portions between the main bar and the hoop bar using welding means, fine adjustment of the position can be easily performed according to the situation at the site, and the efficiency of construction work can be improved. Can be achieved. (4) Since concrete is poured into the pile head reinforcement unit and hardened, the necessary portions of the pillars and walls of the structure are reinforced using hoop bars.
There is no waste of material, and the durability of the foundation can be effectively improved. (5) Since there is a kansashi bar which projects horizontally at an intermediate position in the length direction of the main bar and is locked at the upper end position of the base portion of the structure, the lower portion of the pile head reinforcing bar unit is connected to the base portion such as a pile. And secures the kansashi streaks to the upper end of the pile to ensure the positioning at the design position, and is excellent in workability and reliability during construction. (6) Since it has kansuji streaks protruding horizontally or left and right, it can be used as a gripping part or a locking part at the time of construction or transportation, and is excellent in handling properties.

【0007】ここで、主筋は、例えばSD295A等の
鋼材からなり、その表面にコンクリートの抜け落ち防止
用の凹凸が形成された直径が10mm〜30mm、長さ
が約400mm〜2000mmの棒状体、例えば異形鉄
筋が用いられる。この棒状体を複数本、例えば、2本〜
10本をそれぞれ間隔をおいて全体が円柱状になるよう
に平行配置して、杭頭補強筋ユニットを構成させてい
る。フープ筋は、鉄筋の周囲を螺旋状に周回するように
配置した補強用の線条材であって、その太さが約10m
m〜30mmの鋼鉄又はステンレス製等のもの、例えば
異形鉄筋で、表面に凹凸等を形成して周囲に充填される
コンクリートとの結合性を高めたもの等が用いられる。
フープ筋は主筋に巻き回されて当接する所定箇所をアー
ク溶接等の溶接手段や、針金等の線状物等を用いた結束
手段で主筋に固定されるが、カンザシ筋が設けられる近
傍となるフープ筋の上端部は、溶接手段を用いることな
く、結束手段を介して主筋に固定される。なお、フープ
筋の太さが10mmより少ないとこれによる補強効果が
少なく、太さが30mmより大きいと、剛性が高くなっ
て施工が困難となる上に材料の使用量が増すので好まし
くない。フープ筋の上端部はカンザシ係止筋の上端部と
溶接して直接固定したり、あるいは、主筋とは別に配置
されたカンザシ筋等の係止部材を介して間接的に固定し
たりして支持される。
Here, the main reinforcing bar is made of a steel material such as SD295A, for example, and a bar-shaped body having a diameter of 10 mm to 30 mm and a length of about 400 mm to 2000 mm, having irregularities formed thereon for preventing concrete from falling off, for example, a deformed shape. Rebar is used. A plurality of the rods, for example, two to
Ten piles are arranged in parallel so as to form a columnar shape at intervals, thereby forming a pile head reinforcing bar unit. The hoop is a reinforcing wire material arranged to spiral around the reinforcing bar, and has a thickness of about 10 m.
For example, a steel or stainless steel having a diameter of 30 to 30 mm, such as a deformed reinforcing bar having irregularities or the like on the surface to enhance the bonding property with concrete to be filled in the periphery is used.
The hoop streak is fixed to the main streak by a welding means such as arc welding or a bundling means using a linear object such as a wire at a predetermined position which is wound around and abuts on the main streak. The upper end of the hoop streak is fixed to the main streak via the binding means without using welding means. If the thickness of the hoop streak is less than 10 mm, the reinforcing effect due to this is small, and if the thickness is more than 30 mm, the rigidity is increased, the construction becomes difficult, and the amount of material used is undesirably increased. The upper end of the hoop stud is supported by welding directly to the upper end of the kansashi anchoring bar, or indirectly fixed via a buckling bar or other anchoring member placed separately from the main bar. Is done.

【0008】カンザシ筋は、主筋に対して略直交して配
置され、この水平に突出した部分をパイルの上端に係止
させることにより位置決めを行うことができると共に、
杭頭補強筋ユニットのハンドリングを容易にする部材で
ある。このカンザシ筋は、例えば主筋と同材質の鋼材等
からなり、複数の主筋で構成される円柱状の直径Dに対
して、1.1D〜1.5D程度の長さの棒状体であり、
この棒状体の直径は、主筋の直径dに対して0.1d〜
dの範囲とすることが好ましい。カンザシ係止筋は、主
筋の長さ方向に伸延して配置された棒状の鋼材からな
り、その上端部側でカンザシ筋をアーク溶接などの溶接
手段や金属線を用いて結束する結束手段を用いて支持す
るための係止部材である。このカンザシ係止筋は複数本
をセットにして互いに平行に配置したり、一本の棒状鋼
材を杭頭補強筋ユニットの中心部分に上下に配置した
り、あるいは一本の棒状鋼材をU字型に折曲げたU字型
の左右の部分を主筋に当接させた状態で杭頭補強筋ユニ
ットの下部に配置して用いることもできる。
The kansashi muscles are arranged substantially perpendicular to the main muscles, and can be positioned by locking the horizontally protruding portion to the upper end of the pile.
It is a member that facilitates handling of the pile head reinforcement unit. This kansashi bar is, for example, a rod-shaped body made of steel or the like of the same material as the main bar, and having a length of about 1.1D to 1.5D with respect to a columnar diameter D composed of a plurality of main bars.
The diameter of this rod is 0.1 d to
It is preferable to set the range of d. The kansashi anchoring bar is made of a rod-shaped steel material that is arranged to extend in the length direction of the main bar, and uses a tying unit that binds the kansashi bar with welding means such as arc welding or a metal wire at the upper end side. It is a locking member for supporting the camera. This kansashi retaining bar is set as a plurality of bars and arranged in parallel with each other, one bar-shaped steel material is vertically arranged at the center of the pile head reinforcing bar unit, or one bar-shaped steel material is U-shaped. The left and right portions of the U-shape bent at a right angle may be disposed below the pile head reinforcing bar unit in a state of contacting the main bar.

【0009】請求項2に記載の発明は、請求項1に記載
の杭頭補強筋ユニットにおいて、前記カンザシ筋が前記
主筋に結束手段を介して結合され、前記カンザシ筋が前
記カンザシ係止筋の上端部に溶接手段を介して結合され
て構成されている。この構成によって請求項1の作用の
他、以下の作用が得られる。 (1)カンザシ筋が主筋に結束手段を介して結合され、
カンザシ筋がカンザシ係止筋の上端部に溶接手段を介し
て結合されているので、施工時や施工後における振動等
で過大な応力が主筋に直接的に加わることがなく、しか
も溶接の際の熱による強度劣化を効果的に防止できる。 (2)カンザシ筋が主筋に溶接されていないので、施工
時におけるカンザシ筋の位置調整を容易に行うことがで
きる。 ここで、結束手段としては、ステンレスやスチール等の
金属線や、合成樹脂等からなる線材を用いることができ
る。
According to a second aspect of the present invention, in the pile head reinforcement unit according to the first aspect, the kansashi muscle is connected to the main muscle via a binding means, and the kansashi muscle is connected to the kansashi anchoring muscle. It is configured to be connected to the upper end via welding means. With this configuration, the following operation is obtained in addition to the operation of the first aspect. (1) The scorpion muscle is connected to the main muscle via a tying means,
Since the kansashi bar is connected to the upper end of the kansashi locking bar via welding means, excessive stress is not directly applied to the main bar due to vibrations during construction or after construction, and furthermore, during welding, The strength deterioration due to heat can be effectively prevented. (2) Since the kansushi bars are not welded to the main bars, the position of the kansashi bars can be easily adjusted during construction. Here, as the binding means, a metal wire such as stainless steel or steel, or a wire made of synthetic resin or the like can be used.

【0010】請求項3に記載の発明は、請求項1又は2
に記載の杭頭補強筋ユニットにおいて、前記カンザシ係
止筋の下部が前記フープ筋の下端部や前記主筋の下端側
に連結されて構成されている。この構成によって、請求
項1又は2の作用の他、以下の作用が得られる。 (1)カンザシ係止筋の下部がフープ筋の下端部や主筋
の下端側に連結されるので、主筋に対して水平方向に配
置される水平横行筋等の係止部材を用いることなく、安
定にカンザシ係止筋を固定して保持させることができ
る。 (2)専用の係止部材を省略して部品数を減らすことが
でき、生産性や経済性に優れる。
[0010] The invention described in claim 3 is the invention according to claim 1 or 2.
In the pile head reinforcing bar unit described in the above, the lower part of the kansashi locking bar is connected to a lower end of the hoop bar or a lower end of the main bar. With this configuration, the following operation is obtained in addition to the operation of the first or second aspect. (1) Since the lower part of the Kansashi locking bar is connected to the lower end of the hoop bar or the lower side of the main bar, it is stable without using a locking member such as a horizontal transverse bar disposed horizontally with respect to the main bar. Can fix and hold the kansashi locking bar. (2) The number of parts can be reduced by omitting a dedicated locking member, which is excellent in productivity and economy.

【0011】請求項4に記載の発明は、請求項1乃至3
の内いずれか1項に記載の杭頭補強筋ユニットにおい
て、前記カンザシ係止筋の端部には、J字状に湾曲して
形成されたフック部が設けられて構成されている。この
構成によって、請求項1乃至3の内いずれか1項の作用
の他、以下の作用が得られる。 (1)J字状に湾曲したフック部を有するので、カンザ
シ係止筋を確実かつ簡単に杭頭補強筋ユニット上に配置
することができ、施工性に優れている。 (2)フック部を設けることにより、ここに固定される
フープ筋との接合強度を高めることができ、構造体とし
ての機械的強度を高めて、杭頭補強筋ユニットが適用さ
れる構造物の耐久性をさらに向上させることができる。
ここでフック部は、前記カンザシ係止筋の先端部を所定
の熱処理して加熱した条件下で機械的に曲げて形成する
ことができる。
[0011] The invention according to claim 4 is the invention according to claims 1 to 3.
In the pile head reinforcing bar unit according to any one of the above, a hook portion curved in a J-shape is provided at an end of the kansashi locking bar. With this configuration, the following operation is obtained in addition to the operation of any one of the first to third aspects. (1) Since it has a hook portion curved in a J-shape, it is possible to securely and easily arrange the kansashi locking bar on the pile head reinforcing bar unit, which is excellent in workability. (2) By providing the hook portion, it is possible to increase the bonding strength with the hoop reinforce fixed here, to enhance the mechanical strength of the structure, and to improve the structure to which the pile head reinforcement unit is applied. The durability can be further improved.
Here, the hook portion can be formed by mechanically bending the distal end portion of the kansashi locking bar under a predetermined heat-treated and heated condition.

【0012】請求項5に記載の発明は、請求項至1乃至
4の内いずれか1項に記載の杭頭補強筋ユニットにおい
て、前記主筋の下端部を集合させて固定する底部固定筋
と、前記主筋の底部側に、前記複数の主筋で形成される
外周囲を拡径させて形成された生コンクリート受部とを
有して構成されている。この構成によって、請求項至1
乃至4の内いずれか1項の作用の他、以下の作用が得ら
れる。 (1)底部固定筋により主筋やフープ筋等を予め集合さ
せた状態で保持することができるので、杭頭補強筋ユニ
ット製造時における組立てを容易に行え、少ない労力で
製造でき、低コストでの生産を行うことができる。 (2)杭頭補強筋ユニットの構造体としての強度を高め
ることにより、この耐久性をさらに向上できる。 (3)外周囲を拡径させて形成された生コンクリート受
部を有しているので、特別に充填材等をパイル内に予め
充填するような施工時の準備作業や生コンクリートの過
剰な充填を省略して、構造物の柱部や壁部を補強する杭
頭補強筋ユニットを低コストで設定できる。 (4)生コンクリート受部を主筋の下端部に螺子部等を
用いて着脱自在に取付けることもできるので、運搬時に
嵩張るようなことがなく、ハンドリング性や施行性に優
れる。ここで底部固定筋は、主筋と同材質の棒状鋼材か
らなり、これをV字状やU字状等に形成して、この端部
側を主筋の下端部に溶接固定して用いられる。生コンク
リート受部は、スチール製やステンレス製等でトレイ状
に形成され、その中心部に穿孔された螺子孔等の穿孔部
を介して、主筋の下部に取付けられる。なお、生コンク
リート受部を主筋の下部に直接又は、主筋の下端部を支
持する底部固定筋に溶接して取付けることもできる。
According to a fifth aspect of the present invention, in the pile head reinforcing bar unit according to any one of the first to fourth aspects, a bottom fixing bar for collecting and fixing a lower end portion of the main bar is provided, On the bottom side of the main reinforcement, there is provided a ready-mixed concrete receiving portion formed by expanding the outer periphery formed by the plurality of main reinforcements. With this configuration, claim 1
In addition to the operation of any one of the above items 4 to 4, the following operation is obtained. (1) Since the main reinforcement and the hoop reinforcement can be held in a pre-assembled state by the bottom fixing bar, the assembly at the time of manufacturing the pile head reinforcement unit can be easily performed, the production can be performed with less labor, and the cost can be reduced. Production can be done. (2) By increasing the strength of the pile head reinforcement unit as a structure, the durability can be further improved. (3) Since it has a ready-mixed concrete receiving part formed by enlarging the outer periphery, it is necessary to perform preparatory work during construction, such as pre-filling a filler, etc. in the pile in advance, or excessive filling of ready-mixed concrete. Can be omitted, and a pile head reinforcement unit that reinforces a column or a wall of a structure can be set at low cost. (4) Since the ready-mixed concrete receiving portion can be detachably attached to the lower end of the main bar using a screw portion or the like, it does not become bulky during transportation, and is excellent in handleability and workability. Here, the bottom fixing bar is made of a bar-shaped steel material of the same material as the main bar, and is formed in a V-shape, U-shape, or the like, and the end side is welded and fixed to the lower end of the main bar. The ready-mixed concrete receiving portion is made of steel, stainless steel, or the like, is formed in a tray shape, and is attached to a lower portion of the main bar through a perforated portion such as a screw hole perforated at the center thereof. The ready-mixed concrete receiving portion can be attached directly to the lower portion of the main reinforcement or by welding to a bottom fixing reinforcement supporting the lower end of the main reinforcement.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施の形態につき
図面を用いて説明する。 (実施の形態1)図1は実施の形態1の杭頭補強筋ユニ
ットを示す平面図であり、図2は実施の形態1の杭頭補
強筋ユニットの正面図である。図1及び図2において、
10は実施の形態1における杭頭補強筋ユニット、11
は棒状鋼材からなる4本の主筋、12はこれらの主筋1
1の外周囲に巻き回され棒状鋼材を螺旋状に形成したフ
ープ筋、13、14は主筋11の長さ方向に伸延して左
右両側に対向して配置されフープ筋12の上端部と下端
部とがそれぞれ溶接手段を用いて溶接部Xを介して連結
された一対のカンザシ係止筋、15はカンザシ係止筋1
3、14の上下の両端部をJ字状に湾曲させて形成した
フック部、16は主筋11の長さ方向の中間位置で水平
に突出してカンザシ係止筋13、14の上端部に固定配
置され、構造物の基礎部の上端位置に結束手段を用いて
結束部Yを介して係止され棒状鋼材からなるカンザシ
筋、17は主筋11の下端側のそれぞれを結合させて溶
接固定するための略逆円錐状に形成された底部固定筋、
18は底部固定筋17の底部に形成された螺子係合部、
19は螺子係合部18を介して着脱自在に取付けられ杭
頭補強筋ユニット10が挿入されるパイルの内径に合わ
せて杭頭補強筋ユニット10上部の外径より拡径された
トレイ状部を有する生コンクリート受部である。なお、
フープ筋12の下端側は主筋11の下部に溶接して固定
されるか、又は金属線を用いて主筋11に結束された状
態で支持されるようになっている。
Embodiments of the present invention will be described below with reference to the drawings. (Embodiment 1) FIG. 1 is a plan view showing a pile head reinforcing bar unit of Embodiment 1, and FIG. 2 is a front view of the pile head reinforcing bar unit of Embodiment 1. 1 and 2,
10 is a pile head reinforcement unit in Embodiment 1, 11
Denotes four main bars made of a steel bar, and 12 denotes these main bars.
Hoop bars 13 and 14 wound around the outer periphery of 1 and formed of a bar-shaped steel material in a spiral shape extend in the longitudinal direction of the main bar 11 and are disposed opposite to the left and right sides, and are disposed at the upper and lower ends of the hoop bar 12 Are connected to each other via a welded portion X using welding means, and a pair of kanseki locking bars 15 are
Hook portions formed by bending both upper and lower end portions of the upper and lower portions 3 and 14 into a J-shape, and 16 project horizontally at an intermediate position in the longitudinal direction of the main bar 11 and are fixedly disposed on the upper end portions of the kansashi locking bars 13 and 14. The kansashi bar 17 made of a bar-shaped steel material and locked at the upper end position of the foundation portion of the structure through the tying portion Y by using a tying means is used for joining and welding each lower end side of the main bar 11 by welding. A bottom fixing muscle formed in a substantially inverted conical shape,
18 is a screw engaging portion formed at the bottom of the bottom fixing streak 17,
Reference numeral 19 denotes a tray-like portion which is detachably attached via the screw engaging portion 18 and whose diameter is larger than the outer diameter of the upper portion of the pile head reinforcing bar unit 10 in accordance with the inner diameter of the pile into which the pile head reinforcing bar unit 10 is inserted. It is a ready-mixed concrete receiving part. In addition,
The lower end side of the hoop bar 12 is fixed to the lower portion of the main bar 11 by welding or is supported by being bound to the main bar 11 using a metal wire.

【0014】杭頭補強筋ユニット10を構成する各筋
(主筋11、フープ筋12、カンザシ係止筋13、1
4、カンザシ筋16、底部固定筋17)はSD295A
等の鋼材からなり、その表面にコンクリート中に配置し
た時に抜けないように凹凸が形成された棒状鋼材(異形
鉄筋)を使用した。生コンクリート受部19は、スチー
ル、ステンレス等の金属材料の他、ポリエチレン、ポリ
イミド、ポリカーボネイト等の合成樹脂材料を素材とし
てトレイ状に形成されている。
Each of the muscles (the main muscle 11, the hoop muscle 12, the stake anchoring muscle 13, 1
4. Kansashi muscle 16, bottom fixed muscle 17) SD295A
A bar-shaped steel material (deformed rebar) made of such a steel material and having irregularities formed on its surface so that it does not come off when placed in concrete. The ready-mixed concrete receiving portion 19 is formed in a tray shape using a synthetic resin material such as polyethylene, polyimide, and polycarbonate in addition to a metal material such as steel and stainless steel.

【0015】次に杭頭補強筋ユニット10の製造方法に
ついて説明する。まず、例えば長さの等しい4本の主筋
11がそれぞれ四角柱体の各側辺となるようにその底部
に配置した底部固定筋17でそれぞれの基端側を固定し
て配列する。次に、主筋11で形成された四角柱体状の
周囲に予め所定径となる螺旋状に形成したフープ筋12
を配置する。さらに、フープ筋12の上端部及び下端部
を溶接固定するためのカンザシ係止筋13、14を前記
四角柱状体の中に挿入して、カンザシ係止筋13の上端
部が杭頭補強筋ユニット10が設置される構造物の基礎
部の上端位置近傍に位置付ける。こうして、各筋を所定
位置に配置した後、フープ筋12の上端部をカンザシ係
止筋13のフック部15に嵌合させ溶接手段を用いて固
定する。なお、カンザシ係止筋13の下端部はフープ筋
12の下端が係止されると共に、主筋11の下部に溶接
手段又は鋼線等の線状物からなる結束手段により取り付
けられる。又、カンザシ筋16はカンザシ係止筋13の
上端部に溶接手段又は結束手段により取り付けられる。
ここで溶接手段には、スタッド溶接、金属アーク溶接等
の消耗式のアーク溶接や、酸素アセチレン溶接、空気ア
セチレン溶接等のガス溶接を適用することができる。最
後にフープ筋12と主筋11とが当接する所定箇所を針
金等の金属線で結束して、構造的に適度の柔軟性を有し
た杭頭補強筋ユニット10を組み立てる。
Next, a method of manufacturing the pile head reinforcing bar unit 10 will be described. First, for example, four base bars 11 having the same length are arranged at the base ends thereof by bottom fixing bars 17 arranged at the bottom thereof so that the four main bars 11 become the respective sides of the quadrangular prism. Next, the hoop streaks 12 formed in a spiral shape having a predetermined diameter in advance around the quadrangular prism body formed by the main streaks 11.
Place. Further, kanseki retaining bars 13 and 14 for welding and fixing the upper and lower ends of the hoop bars 12 are inserted into the rectangular columnar body, and the upper ends of the kansashi retaining bars 13 are connected to the pile head reinforcing bar unit. 10 is located near the upper end position of the foundation of the structure on which it is installed. After arranging each streak at a predetermined position in this way, the upper end of the hoop streak 12 is fitted to the hook portion 15 of the kanzashi locking streak 13 and fixed using welding means. The lower end of the hoop reinforcing bar 13 is locked to the lower end of the hoop bar 12 and attached to the lower portion of the main bar 11 by a welding unit or a binding unit made of a linear material such as a steel wire. In addition, the kansushi streaks 16 are attached to the upper end of the kansashi engaging streaks 13 by welding means or binding means.
Here, consumable arc welding such as stud welding and metal arc welding, and gas welding such as oxygen acetylene welding and air acetylene welding can be applied to the welding means. Finally, a predetermined portion where the hoop bar 12 and the main bar 11 are in contact with each other is bound with a metal wire such as a wire to assemble the pile head reinforcing bar unit 10 having a moderate flexibility in structure.

【0016】以上のように構成される実施の形態1の杭
頭補強筋ユニット10を用いて構造物の柱部や壁部を補
強する施行方法について説明する。図3は実施の形態1
の杭頭補強筋ユニットの設置施工前の状態を示す部分断
面図であり、図4はその設置施工後の状態を示す部分断
面図である。図3において、19aは住宅等の構造物が
配置される地盤、19bは地盤に垂直に打設されたコン
クリートや金属材で円筒状に形成されたパイルである。
図4において、19cは杭頭補強筋ユニット10の周囲
に所定間隔を置いて配置した型枠により打設されたコン
クリートである。杭頭補強筋ユニット10を用いて杭基
礎の施工を行う場合、まず、図3に示すようにカンザシ
筋16をパイル19bの上端に係止させ、パイル19b
内の所定深さに杭頭補強筋ユニット10を配置する。つ
ぎに、杭頭補強筋ユニット10の周囲に所定間隔を置い
て、図示しない型枠を配置し、この型枠内に生コンクリ
ートを流し込んだ状態で保持して硬化させる。この生コ
ンクリートの硬化後に型枠を取り外して、図4に示すよ
うに杭頭補強筋ユニット10をコンクリート19cに埋
設させて補強された構造物の壁部又は柱部が施工され
る。
A method of reinforcing a column or a wall of a structure by using the pile head reinforcing bar unit 10 of the first embodiment configured as described above will be described. FIG. 3 shows the first embodiment.
FIG. 4 is a partial cross-sectional view showing a state before installation of the pile head reinforcement unit of FIG. 1, and FIG. 4 is a partial cross-sectional view showing a state after the installation. In FIG. 3, reference numeral 19a denotes a ground on which a structure such as a house is disposed, and 19b denotes a cylindrical pile formed of concrete or a metal material which is vertically installed on the ground.
In FIG. 4, reference numeral 19c denotes concrete cast by a formwork arranged at a predetermined interval around the pile head reinforcing bar unit 10. When constructing a pile foundation using the pile head reinforcing bar unit 10, first, as shown in FIG. 3, the kansashi bar 16 is engaged with the upper end of the pile 19b, and the pile 19b is piled.
The pile head reinforcement unit 10 is arranged at a predetermined depth in the inside. Next, a mold (not shown) is arranged at predetermined intervals around the pile head reinforcing bar unit 10, and the ready-mixed concrete is poured into the mold and held and hardened. After the hardening of the ready-mixed concrete, the mold is removed, and as shown in FIG. 4, the pile head reinforcing bar unit 10 is buried in the concrete 19c, and the walls or columns of the reinforced structure are constructed.

【0017】実施の形態1の杭頭補強筋ユニット10は
以上のように構成されるので、以下の作用を有する。 (a)剪断力が大きくかかる柱部や壁部の基部におい
て、この部分の主筋11の熱処理による強度劣化を回避
し、基部にかかる剪断力に対抗できる強度を保持させ耐
久性に優れた杭頭補強筋ユニット10を提供できる。 (b)主筋11とフープ筋12との当接部の全てが完全
に固定しない状態で立設でき、現場の状況に応じた微妙
な位置調整が容易にでき、施工作業の効率化が図れる。 (c)構造物の基礎部の上端位置に係止されるカンザシ
筋16を有するので、杭頭補強筋ユニットをパイル等の
基礎部に挿入して、設計位置への位置決め(深さ)を確
実に行うことができ、施工の際の作業性と信頼性に優れ
ている。 (d)水平又は左右に突出したカンザシ筋16を有する
ので、これを施工や運搬の際の把持部や係止部としても
利用でき、ハンドリング性に優れる。 (e)J字状のフック部15を有するので、カンザシ係
止筋13、14を確実かつ簡単に杭頭補強筋ユニット1
0に配置することができ、施工性及び耐久性に優れてい
る。 (f)底部固定筋17を有するので、杭頭補強筋ユニッ
ト10の製造時における組立てを容易に行え、少ない労
力で製造でき、低コストでの生産を行うことができる。 (g)生コンクリート受部19を有しているので、必要
最小限度の生コンクリートを使用して杭頭補強筋ユニッ
ト10の施工を低コストで行うことができる。 (h)生コンクリート受部19を主筋11の下端部に螺
子係合部18を用いて着脱自在に取付けるので、運搬時
等に取り外すことができ、ハンドリング性や施行性に優
れる。
The pile head reinforcing bar unit 10 according to the first embodiment has the following operation since it is configured as described above. (A) At the base of a column or a wall to which a large shearing force is applied, the strength of the main bar 11 is prevented from deteriorating due to heat treatment, and a pile head having excellent durability against the shearing force applied to the base is maintained. A reinforcement unit 10 can be provided. (B) All of the contact portions between the main bar 11 and the hoop bar 12 can be erected without being completely fixed, fine adjustment of the position according to the situation at the site can be easily performed, and the efficiency of the construction work can be increased. (C) Since the stake bar 16 is locked at the upper end position of the foundation of the structure, the pile head reinforcement unit is inserted into the foundation such as a pile, and the positioning (depth) at the design position is ensured. The workability and reliability during construction are excellent. (D) Since it has the kansashi streaks 16 protruding horizontally or left and right, it can be used as a gripping part or a locking part at the time of construction or transportation, and is excellent in handling properties. (E) Since the J-shaped hook part 15 is provided, the kansashi locking bars 13 and 14 can be securely and easily attached to the pile head reinforcing bar unit 1.
It can be arranged at 0 and is excellent in workability and durability. (F) Since the bottom fixing bars 17 are provided, the pile head reinforcing bar unit 10 can be easily assembled at the time of manufacturing, can be manufactured with a small amount of labor, and can be produced at low cost. (G) Since it has the ready-mixed concrete receiving portion 19, the construction of the pile head reinforcing bar unit 10 can be performed at a low cost by using a minimum necessary amount of ready-mixed concrete. (H) Since the ready-mixed concrete receiving portion 19 is detachably attached to the lower end portion of the main bar 11 using the screw engaging portion 18, it can be detached at the time of transportation or the like, and is excellent in handleability and workability.

【0018】(実施の形態2)図5は実施の形態2の杭
頭補強筋ユニットを示す平面図であり、図6は実施の形
態2の杭頭補強筋ユニットの正面図である。図5及び図
6において、20は実施の形態2における杭頭補強筋ユ
ニット、21は異形鉄筋等の棒状鋼材を螺旋状にして主
筋11の外周囲に巻き回されると共にその下端部を中心
側に向けて折り曲げて水平折り曲げ部21aを形成した
フープ筋、22は主筋11の長さ方向に伸延して中心軸
部に配置されカンザシ筋16の中間部とフープ筋21下
端の水平折り曲げ部21aとがそれぞれ上部及び下部で
溶接して固定されるカンザシ係止筋である。なお、図
5、図6において前記実施の形態1と同様の機能を有す
るものについて、同一の符号を付してその詳しい説明を
省略している。フープ筋21の上端側は溶接されること
なくステンレス線材やスチール線材等の結束手段を用い
て主筋11に結束されると共に、必要に応じてカンザシ
筋16に結束手段または溶接手段を介して固定されてい
る。またフープ筋21の中間部及び下端側は溶接手段又
は結束手段を適宜用いて主筋11に固定もしくは支持さ
れている。カンザシ係止筋22は、フープ筋21の上端
に近接して配置されたカンザシ筋16の中間部に嵌合し
て溶接固定されるJ字状のフック部15を上部先端に有
すると共に、その下端側がフープ筋21の下端部の水平
折り曲げ部21aに当接して、この当接部が溶接手段又
は結束手段で固定されている。なお、フープ筋21の下
端側は主筋11に当接して、ここを溶接手段や結束手段
により固定している。また、カンザシ係止筋22下端側
の固定された当接部のさらに下方には螺子部が形成さ
れ、生コンクリート受部19が取付けられるようになっ
ている。
(Embodiment 2) FIG. 5 is a plan view showing a pile head reinforcing bar unit of Embodiment 2, and FIG. 6 is a front view of the pile head reinforcing bar unit of Embodiment 2. 5 and 6, reference numeral 20 denotes a pile head reinforcing bar unit according to the second embodiment, and reference numeral 21 denotes a spiral shape of a bar-shaped steel material such as a deformed reinforcing bar, which is wound around the outer periphery of the main bar 11, and whose lower end is located on the center side. The hoop, 22 which is bent toward and forms a horizontal bent portion 21a, extends in the longitudinal direction of the main bar 11 and is disposed on the center axis portion, and is disposed at the center portion of the kansashi bar 16 and the horizontal bent portion 21a at the lower end of the hoop bar 21. Are kansashi retaining bars that are fixed by welding at the upper and lower portions, respectively. 5 and 6, those having the same functions as those in the first embodiment are denoted by the same reference numerals, and detailed description thereof is omitted. The upper end side of the hoop bar 21 is bound to the main bar 11 using a binding unit such as a stainless steel wire or a steel wire without being welded, and is fixed to the kansashi bar 16 via a binding unit or a welding unit as necessary. ing. The middle and lower ends of the hoops 21 are fixed or supported to the main bars 11 by appropriately using welding means or bundling means. The kansashi locking streaks 22 have a J-shaped hook portion 15 at an upper end, which is fitted and welded and fixed to an intermediate portion of the kansashi streaks 16 arranged close to the upper end of the hoop streaks 21, and has a lower end thereof. The side contacts the horizontal bent portion 21a at the lower end of the hoop streak 21, and this contact portion is fixed by welding means or binding means. In addition, the lower end side of the hoop streaks 21 abuts on the main streaks 11 and is fixed by welding means or binding means. Further, a screw portion is formed further below the fixed contact portion on the lower end side of the kansashi engaging streaks 22, so that the ready-mixed concrete receiving portion 19 is attached.

【0019】実施の形態2の杭頭補強筋ユニット20は
以上のように構成されるので、実施の形態1の杭頭補強
筋ユニットの作用に加えて以下の作用を有する。 (a)カンザシ係止筋22が杭頭補強筋ユニット20の
中心軸上に配置されるので、実施の形態1のように複数
のカンザシ係止筋を配置する必要がなく、簡単かつ経済
的に杭頭補強筋ユニット20を製造することができる。 (b)フープ筋21に対してその中心軸にカンザシ係止
筋22を配置してバランスよくカンザシ筋16を固定保
持でき、剪断力が大きくかかる柱部や壁部の基部におけ
る耐久性に優れた杭頭補強筋ユニット20を提供でき
る。 (c)カンザシ係止筋22が杭頭補強筋ユニット20の
内部の中心位置に収納されるので、余分な出っ張り部分
がなく、ハンドリングが容易にでき、施工性に優れてい
る。 (d)実施の形態1の底部固定筋17を省略できるの
で、杭頭補強筋ユニット20における部品数を削減し
て、低コストで生産を行うことができ、経済性に優れ
る。
Since the pile head reinforcing bar unit 20 of the second embodiment is configured as described above, it has the following operation in addition to the operation of the pile head reinforcing bar unit of the first embodiment. (A) Since the buckle locking bar 22 is arranged on the central axis of the pile head reinforcing bar unit 20, there is no need to arrange a plurality of buckle locking bars as in the first embodiment, and it is simple and economical. The pile head reinforcement unit 20 can be manufactured. (B) The hoop streaks 16 are fixed to the hoop streaks 21 at the center axis thereof, and the kansashi streaks 16 can be fixed and held in a well-balanced manner. The pile head reinforcement unit 20 can be provided. (C) Since the buckle locking bar 22 is housed at the center position inside the pile head reinforcing bar unit 20, there is no extra protruding portion, handling is easy, and workability is excellent. (D) Since the bottom fixing bars 17 of the first embodiment can be omitted, the number of components in the pile head reinforcing bar unit 20 can be reduced, production can be performed at low cost, and economic efficiency is excellent.

【0020】(実施の形態3)図7は実施の形態3の杭
頭補強筋ユニットを示す平面図であり、図8は実施の形
態2の杭頭補強筋ユニットの正面図である。図7及び図
8において、30は実施の形態3における杭頭補強筋ユ
ニット、31は棒状鋼材を主筋11の外周囲に巻き回し
て形成された螺旋状のフープ筋、32は全体をU字状に
曲げて形成しフープ筋31の内周の両側に接して配置さ
れてカンザシ筋16が上部で嵌合、溶接されて配置され
るカンザシ係止筋である。なお、図7、図8において前
記実施の形態1と同様の機能を有するものについて、同
一の符号を付してその詳しい説明を省略している。カン
ザシ係止筋32はその上部側の両端に、カンザシ筋16
の中間部分に嵌合して溶接固定されるJ字状のフック部
15を有している。また、U字状に形成されたカンザシ
係止筋32の中間部及び下部側が主筋11に当接して、
この当接部が溶接手段又は結束手段で固定されている。
さらに、カンザシ係止筋32のU字状に形成された下端
部には螺子部が形成され、生コンクリート受部19が取
付けられるようになっている。なお、カンザシ係止筋3
2を複数組み合わせて全体を篭形に構成して主筋11の
取付けを容易に行うようにすることもできる。フープ筋
31の上端部側は結束手段を用いて主筋11に結束さ
れ、その中間部及び下端部側は溶接手段又は結束手段に
より主筋11に固定されている。なお、必要に応じて、
フープ筋31の上端部側とカンザシ筋16とを溶接手段
又は結束手段を介して固定してもよい。
(Embodiment 3) FIG. 7 is a plan view showing a pile head reinforcing bar unit of Embodiment 3, and FIG. 8 is a front view of the pile head reinforcing bar unit of Embodiment 2. 7 and 8, reference numeral 30 denotes a pile head reinforcing bar unit in the third embodiment, 31 denotes a spiral hoop bar formed by winding a bar-shaped steel material around the outer periphery of the main bar 11, and 32 denotes a U-shape as a whole. This is a buckle locking bar that is formed by being bent to be in contact with both sides of the inner circumference of the hoop bar 31 and is fitted and welded to the buckle bar 16 at the upper part. 7 and 8, components having the same functions as those in the first embodiment are denoted by the same reference numerals, and detailed description thereof is omitted. The kansashi locking bar 32 is provided at both upper ends thereof with the kansashi bar 16.
And has a J-shaped hook portion 15 which is fitted and welded and fixed to an intermediate portion of the. Also, the middle part and the lower part of the U-shaped kansashi locking bar 32 contact the main bar 11,
This contact portion is fixed by welding means or binding means.
Further, a screw portion is formed at the lower end portion of the U-shaped locking bar 32 formed in a U-shape, and the ready-mixed concrete receiving portion 19 is attached thereto. In addition, kansashi locking bar 3
The main bars 11 can be easily mounted by combining a plurality of the two to form a cage shape as a whole. The upper end side of the hoop streak 31 is bound to the main streak 11 using a binding unit, and the middle and lower end sides thereof are fixed to the main streak 11 by a welding unit or a binding unit. If necessary,
The upper end side of the hoop streaks 31 and the kansashi streaks 16 may be fixed via welding means or binding means.

【0021】実施の形態3の杭頭補強筋ユニット30は
以上のように構成されるので、実施の形態1、2の杭頭
補強筋ユニットの作用に加えて以下の作用を有する。 (a)カンザシ係止筋32を杭頭補強筋ユニットのフー
プ筋31の両側にバランスよく固定保持でき、周囲の配
置構成により剪断力が大きくかかる柱部や壁部の基部に
おける耐久性に優れた杭頭補強筋ユニット30を提供で
きる。 (b)底部固定筋を省略でき経済性に優れると共に、U
字状のカンザシ係止筋32を複数組み合わせて全体を篭
型に形成した場合には、主筋11の取付けを容易に行う
ことができ、施工性に優れる。
Since the pile head reinforcing bar unit 30 of the third embodiment is configured as described above, the following functions are provided in addition to the functions of the pile head reinforcing bar units of the first and second embodiments. (A) The Kansashi locking bar 32 can be fixedly held on both sides of the hoop bar 31 of the pile head reinforcing bar unit in a well-balanced manner, and has excellent durability at the base of the column or wall where a large shearing force is applied due to the surrounding arrangement. The pile head reinforcement unit 30 can be provided. (B) It is possible to omit the bottom fixing streaks, and it is economical.
In the case where the whole is formed in a cage shape by combining a plurality of the L-shaped kansashi engaging streaks 32, the main streaks 11 can be easily attached, and the workability is excellent.

【0022】[0022]

【発明の効果】請求項1に記載の杭頭補強筋ユニットに
よれば、以下の効果が得られる。 (1)特に剪断力が大きくかかる柱部や壁部の基部にお
いて、この部分に対応する位置のフープ筋の上端部が主
筋に固定されることなく、結束手段により支持されてい
るので、この主筋の部分の強度劣化がなく機械的強度を
維持できる。 (2)フープ筋の上端部が主筋に溶接部を介して固定さ
れていず、温度変化に伴う主筋の伸縮や生コンクリート
の充填等に際しての振動に対して動き得る自由度を有し
ているので残留応力等が緩和され、構造体としての柔軟
性に優れると共に、構造物の信頼性に優れる。 (3)主筋とフープ筋との当接部の全てを溶接固定する
必要がないので、現場の状況に応じて微妙な位置調整を
容易に行うことができ、施工作業の効率化が図れる。 (4)コンクリートを杭頭補強筋ユニットに流し込んで
これを硬化させて形成される構造物の柱部や壁部におい
て、補強の必要箇所をフープ筋を用いて補強するので、
材料の無駄がなくしかも基礎の耐久性を効果的に向上で
きる。 (5)主筋の長さ方向の中間位置で水平に突出して、前
記構造物の基礎部の上端位置に係止されるカンザシ筋を
有するので、杭頭補強筋ユニットの下部をパイル等の基
礎部に挿入して、カンザシ筋をパイルの上端に係止させ
て設計位置への位置決めを確実に行うことができ、施工
の際の作業性と信頼性に優れている。 (6)水平又は左右に突出したカンザシ筋を有するの
で、これを施工や運搬の際の把持部や係止部としても利
用することができ、ハンドリング性に優れる。
According to the pile head reinforcing bar unit of the first aspect, the following effects can be obtained. (1) In particular, at the base of a column or a wall to which a large shearing force is applied, the upper end of the hoop at a position corresponding to this portion is supported by the binding means without being fixed to the main, so that this main is used. The mechanical strength can be maintained without the strength deterioration of the portion. (2) Since the upper end of the hoop streak is not fixed to the main streak via a welded portion, the hoop streak has a degree of freedom to move with respect to vibration caused by expansion and contraction of the main streak due to a temperature change and filling of ready-mixed concrete. Residual stress and the like are relieved, and the flexibility of the structure is excellent, and the reliability of the structure is excellent. (3) Since it is not necessary to weld and fix all the contact portions between the main reinforcement and the hoop reinforcement, fine adjustment of the position can be easily performed according to the situation at the site, and the efficiency of the construction work can be improved. (4) Since concrete is poured into the pile head reinforcement unit and hardened, the necessary portions of the pillars and walls of the structure are reinforced using hoop bars.
There is no waste of material, and the durability of the foundation can be effectively improved. (5) Since there is a kansashi bar which projects horizontally at an intermediate position in the length direction of the main bar and is locked at the upper end position of the base portion of the structure, the lower portion of the pile head reinforcing bar unit is connected to the base portion such as a pile. And secures the kansashi streaks to the upper end of the pile to ensure the positioning at the design position, and is excellent in workability and reliability during construction. (6) Since it has kansuji streaks protruding horizontally or left and right, it can be used as a gripping part or a locking part at the time of construction or transportation, and is excellent in handling properties.

【0023】請求項2に記載の発明によれば、請求項1
の効果の他、以下の効果が得られる。 (1)カンザシ筋が主筋に結束手段を介して結合され、
カンザシ筋がカンザシ係止筋の上端部に溶接手段を介し
て結合されているので、施工時や施工後における振動等
で過大な応力が主筋に直接的に加わることがなく、しか
も溶接の際の熱による強度劣化を効果的に防止できる。 (2)カンザシ筋が主筋に溶接されていないので、施工
時におけるカンザシ筋の位置調整を容易に行うことがで
きる。
According to the invention described in claim 2, according to claim 1
In addition to the effects described above, the following effects can be obtained. (1) The scorpion muscle is connected to the main muscle via a tying means,
Since the kansashi bar is connected to the upper end of the kansashi locking bar via welding means, excessive stress is not directly applied to the main bar due to vibrations during construction or after construction, and furthermore, during welding, The strength deterioration due to heat can be effectively prevented. (2) Since the kansushi bars are not welded to the main bars, the position of the kansashi bars can be easily adjusted during construction.

【0024】請求項3に記載の発明によれば、請求項1
又は2の効果の他、以下の効果が得られる。 (1)カンザシ係止筋の下部がフープ筋の下端部や主筋
の下端側に連結されるので、主筋に対して水平方向に配
置される水平横行筋等の係止部材を用いることなく、安
定にカンザシ係止筋を固定して保持させることができ
る。 (2)専用の係止部材を省略して部品数を減らすことが
でき、生産性や経済性に優れる。
According to the invention described in claim 3, according to claim 1
The following effects can be obtained in addition to the effects of the second or the second effects. (1) Since the lower part of the Kansashi locking bar is connected to the lower end of the hoop bar or the lower side of the main bar, it is stable without using a locking member such as a horizontal transverse bar disposed horizontally with respect to the main bar. Can fix and hold the kansashi locking bar. (2) The number of parts can be reduced by omitting a dedicated locking member, which is excellent in productivity and economy.

【0025】請求項4に記載の発明によれば、請求項1
乃至3の内いずれか1項の効果の他、以下の効果が得ら
れる。 (1)J字状に湾曲したフック部を有するので、カンザ
シ係止筋を確実かつ簡単に杭頭補強筋ユニット上に配置
することができ、施工性に優れている。 (2)フック部を設けることにより、ここに固定される
フープ筋との接合強度を高めることができ、構造体とし
ての機械的強度を高めて、杭頭補強筋ユニットが適用さ
れる構造物の耐久性をさらに向上させることができる。
According to the invention of claim 4, according to claim 1,
The following effects can be obtained in addition to the effects of any one of the above items 3 to 3. (1) Since it has a hook portion curved in a J-shape, it is possible to securely and easily arrange the kansashi locking bar on the pile head reinforcing bar unit, which is excellent in workability. (2) By providing the hook portion, it is possible to increase the bonding strength with the hoop reinforce fixed here, to enhance the mechanical strength of the structure, and to improve the structure to which the pile head reinforcement unit is applied. The durability can be further improved.

【0026】請求項5に記載の発明によれば、請求項至
1乃至4の内いずれか1項の効果の他、以下の効果が得
られる。 (1)底部固定筋により主筋やフープ筋等を予め集合さ
せた状態で保持することができるので、杭頭補強筋ユニ
ット製造時における組立てを容易に行え、少ない労力で
製造でき、低コストでの生産を行うことができる。 (2)杭頭補強筋ユニットの構造体としての強度を高め
ることにより、この耐久性をさらに向上できる。 (3)外周囲を拡径させて形成された生コンクリート受
部を有しているので、特別に充填材等をパイル内に予め
充填するような施工時の準備作業や生コンクリートの過
剰な充填を省略して、構造物の柱部や壁部を補強する杭
頭補強筋ユニットを低コストで設定できる。 (4)生コンクリート受部を主筋の下端部に螺子部等を
用いて着脱自在に取付けることもできるので、運搬時に
嵩張るようなことがなく、ハンドリング性や施行性に優
れる。
According to the invention set forth in claim 5, the following effects can be obtained in addition to the effects of any one of claims 1 to 4. (1) Since the main reinforcement and the hoop reinforcement can be held in a pre-assembled state by the bottom fixing bar, the assembly at the time of manufacturing the pile head reinforcement unit can be easily performed, the production can be performed with less labor, and the cost can be reduced. Production can be done. (2) By increasing the strength of the pile head reinforcement unit as a structure, the durability can be further improved. (3) Since it has a ready-mixed concrete receiving part formed by enlarging the outer periphery, it is necessary to perform preparatory work during construction, such as pre-filling a filler, etc. in the pile in advance, or excessive filling of ready-mixed concrete. Can be omitted, and a pile head reinforcement unit that reinforces a column or a wall of a structure can be set at low cost. (4) Since the ready-mixed concrete receiving portion can be detachably attached to the lower end of the main bar using a screw portion or the like, it does not become bulky during transportation, and is excellent in handleability and workability.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施の形態1の杭頭補強筋ユニットの平面図FIG. 1 is a plan view of a pile head reinforcing bar unit according to a first embodiment.

【図2】実施の形態1の杭頭補強筋ユニットの正面図FIG. 2 is a front view of a pile head reinforcing bar unit according to the first embodiment.

【図3】実施の形態1の杭頭補強筋ユニットの設置施工
前の状態を示す部分断面図
FIG. 3 is a partial cross-sectional view showing a state before installation of the pile head reinforcing bar unit according to the first embodiment.

【図4】実施の形態1の杭頭補強筋ユニットの設置施工
後の状態を示す部分断面図
FIG. 4 is a partial cross-sectional view showing a state after installation of the pile head reinforcing bar unit according to the first embodiment.

【図5】実施の形態2の杭頭補強筋ユニットの平面図FIG. 5 is a plan view of a pile head reinforcing bar unit according to the second embodiment.

【図6】実施の形態2の杭頭補強筋ユニットの正面図FIG. 6 is a front view of a pile head reinforcing bar unit according to the second embodiment.

【図7】実施の形態3の杭頭補強筋ユニットの平面図FIG. 7 is a plan view of a pile head reinforcing bar unit according to the third embodiment.

【図8】実施の形態3の杭頭補強筋ユニットの正面図FIG. 8 is a front view of a pile head reinforcing bar unit according to the third embodiment.

【図9】従来例の杭頭補強筋ユニットの設置施工前の状
態を示す部分断面図
FIG. 9 is a partial cross-sectional view showing a state before installation of a conventional pile head reinforcement unit.

【図10】従来例の杭頭補強筋ユニットの設置施工後の
状態を示す部分断面図
FIG. 10 is a partial cross-sectional view showing a state after installation of a conventional pile head reinforcement unit.

【符号の説明】[Explanation of symbols]

10 実施の形態1の杭頭補強筋ユニット 11 主筋 12 フープ筋 13 カンザシ係止筋 14 カンザシ係止筋 15 フック部 16 カンザシ筋 17 底部固定筋 18 螺子係合部 19 生コンクリート受部 19a 地盤 19b パイル 19c コンクリート 20 実施の形態2の杭頭補強筋ユニット 21 フープ筋 21a 水平折り曲げ部 22 カンザシ係止筋 30 実施の形態3の杭頭補強筋ユニット 31 フープ筋 32 カンザシ係止筋 50 従来例の杭頭補強筋ユニット 51 主筋 52 フープ筋 53 生コンクリート受部 54 パイル 55 カンザシ筋 56 コンクリート X 溶接部(溶接手段) Y 結束部(結束手段) 10 Pile Head Reinforcing Bar Unit of First Embodiment 11 Main Bar 12 Hoop Bar 13 Kansashi Bar 14 Kansaba Bar 15 Hook 16 Kansashi Bar 17 Bottom Fixing Bar 18 Screw Engaging Unit 19 Fresh Concrete Receiving Unit 19a Ground 19b Pile 19c Concrete 20 Pile Head Reinforcement Unit of Embodiment 2 21 Hoop Reinforcement 21a Horizontal Bend 22 Kansashi Reinforcement 30 Pile Head Reinforcement Unit of Third Embodiment 31 Hoop Reinforcement 32 Kansashi Reinforcement 50 Conventional Pile Head Reinforcing bar unit 51 Main bar 52 Hoop bar 53 Fresh concrete receiving part 54 Pile 55 Kansashi bar 56 Concrete X Welded part (welding means) Y Bundled part (bundling means)

───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 2D041 AA02 BA05 BA17 BA37 BA56 DB02 DB03 2D046 CA02 CA04  ──────────────────────────────────────────────────続 き Continued on the front page F term (reference) 2D041 AA02 BA05 BA17 BA37 BA56 DB02 DB03 2D046 CA02 CA04

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】下部が構造物の基礎部にコンクリートを介
して埋設され、その上部が前記構造物の柱部や壁部の内
部に配置される長尺状に形成された杭頭補強筋ユニット
であって、 (a)上下方向に互いに平行して複数配置される略棒状
の主筋と、 (b)前記基礎部に埋設される前記主筋の周囲に沿って
巻き回されて、その上端部が前記主筋の上部に結束手段
を介して結束され下端部が前記主筋の下端側で固定され
る螺旋状のフープ筋と、 (c)前記フープ筋の上端部に近接して前記主筋に略直
交して配置されたカンザシ筋と、 (d)前記主筋の長さ方向と平行して配置され、その上
部が前記カンザシ筋に固定された略棒状のカンザシ係止
筋と、を有することを特徴とする杭頭補強筋ユニット。
An elongated pile head reinforcing unit having a lower portion embedded in a foundation portion of a structure via concrete and an upper portion disposed inside a column portion or a wall portion of the structure. (A) a plurality of substantially bar-shaped main bars arranged in parallel with each other in the vertical direction; and (b) wound around the main bars buried in the base portion, and an upper end portion thereof is wound. A spiral hoop muscle bound at the upper part of the main muscle through a tying means and having a lower end fixed at the lower end side of the main muscle; and (c) substantially perpendicular to the main muscle near the upper end of the hoop muscle. And (d) a substantially bar-shaped kansashi anchoring muscle arranged parallel to the length direction of the main muscle and having an upper portion fixed to the kansima muscle. Pile head reinforcement unit.
【請求項2】前記カンザシ筋が前記主筋に結束手段を介
して結合され、前記カンザシ筋が前記カンザシ係止筋の
上端部に溶接手段を介して結合されていることを特徴と
する請求項1に記載の杭頭補強筋ユニット。
2. The kansashi muscle is connected to the main muscle via a tying means, and the kansashi muscle is connected to an upper end of the kansashi locking muscle via a welding means. The pile head reinforcing bar unit according to 4.
【請求項3】前記カンザシ係止筋の下部が前記フープ筋
の下端部や前記主筋の下端側に連結されることを特徴と
する請求項1又は2に記載の杭頭補強筋ユニット。
3. The pile head reinforcing bar unit according to claim 1, wherein a lower portion of the buckle bar is connected to a lower end of the hoop bar or a lower end of the main bar.
【請求項4】前記カンザシ係止筋の端部には、J字状に
湾曲して形成されたフック部が設けられていることを特
徴とする請求項1乃至3の内いずれか1項に記載の杭頭
補強筋ユニット。
4. The hook according to claim 1, wherein a hook portion curved in a J-shape is provided at an end of the buckle locking bar. The pile head reinforcement unit as described.
【請求項5】前記主筋の下端部を集合させて固定する底
部固定筋と、前記主筋の底部側に、前記複数の主筋で形
成される外周囲を拡径させて形成された生コンクリート
受部とを有することを特徴とする請求項至1乃至4の内
いずれか1項に記載の杭頭補強筋ユニット。
5. A bottom fixing bar for collecting and fixing the lower ends of the main bars, and a ready-mixed concrete receiving portion formed on the bottom side of the main bars by expanding an outer periphery formed by the plurality of main bars. The pile head reinforcing bar unit according to any one of claims 1 to 4, comprising:
JP2001013731A 2001-01-22 2001-01-22 Pile head reinforcement unit Expired - Lifetime JP4345951B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001013731A JP4345951B2 (en) 2001-01-22 2001-01-22 Pile head reinforcement unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001013731A JP4345951B2 (en) 2001-01-22 2001-01-22 Pile head reinforcement unit

Publications (2)

Publication Number Publication Date
JP2002212960A true JP2002212960A (en) 2002-07-31
JP4345951B2 JP4345951B2 (en) 2009-10-14

Family

ID=18880546

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001013731A Expired - Lifetime JP4345951B2 (en) 2001-01-22 2001-01-22 Pile head reinforcement unit

Country Status (1)

Country Link
JP (1) JP4345951B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100480018B1 (en) * 2002-12-11 2005-03-31 (주) 대호바콘텍 Head cover for concrete pile and construction method of pile foundation structure using that
JP2008111256A (en) * 2006-10-30 2008-05-15 Shimizu Corp Joint structure and construction method for pile head part
JP2009013652A (en) * 2007-07-04 2009-01-22 Taiyo:Kk Pile head reinforcing bar, and construction method of concrete foundation using the pile head reinforcing bar
JP2009275377A (en) * 2008-05-13 2009-11-26 Ikuo Suzuki Steel pipe pile foundation structure
JP2016191290A (en) * 2015-03-31 2016-11-10 旭化成建材株式会社 Pile head joint member and pile head joint structure using the same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100480018B1 (en) * 2002-12-11 2005-03-31 (주) 대호바콘텍 Head cover for concrete pile and construction method of pile foundation structure using that
JP2008111256A (en) * 2006-10-30 2008-05-15 Shimizu Corp Joint structure and construction method for pile head part
JP2009013652A (en) * 2007-07-04 2009-01-22 Taiyo:Kk Pile head reinforcing bar, and construction method of concrete foundation using the pile head reinforcing bar
JP2009275377A (en) * 2008-05-13 2009-11-26 Ikuo Suzuki Steel pipe pile foundation structure
JP2016191290A (en) * 2015-03-31 2016-11-10 旭化成建材株式会社 Pile head joint member and pile head joint structure using the same

Also Published As

Publication number Publication date
JP4345951B2 (en) 2009-10-14

Similar Documents

Publication Publication Date Title
JP2019199710A (en) Joint structure for precast composite floor slab in direction perpendicular to bridge axis and construction method for same
JP2002212960A (en) Pile head reinforcement unit
JP2003027418A (en) Concrete structure and method for constructing the same
JP2019206876A (en) Joint structure of column and beam, and construction method of joint structure of column and beam
JP2000064305A (en) Foundation structure of steel tower and construction thereof
JP7194531B2 (en) Seismic isolation upper foundation structure and manufacturing method thereof, footing structure, and seismic isolation foundation construction method
JPH05311747A (en) Pole-beam structure
JP2003293521A (en) Double reinforcement structure of reinforced concrete foundation
JP4841446B2 (en) Construction method for steel beam columns with RC beam ends
JP6261860B2 (en) Reinforcing bar anchoring structure
JP3841209B2 (en) Joint structure of structural steel
JP3659918B2 (en) Floor slab structural material
JP4318787B2 (en) Construction method of foundation structure
JP3156467U (en) Pile head reinforcement unit
JPH0420457B2 (en)
JPH08319695A (en) Underground beam reinforcement assembly and underground beam construction method
JPH04120343A (en) Semi-prefabricated concrete reinforcement of mild steel bars for pillar hoop and reinforcement arranging method
JP2001123525A (en) Half-precast beam
JP2538528B2 (en) Slope stabilization method
JPH04143350A (en) Semi-prefabricated reinforcement for beam stirrup and arranging method of beam reinforcement therewith
JP2003239402A (en) Joint structure between column and beam and joint method between column and beam
JPH11131692A (en) Unit joint bar
JP6850578B2 (en) Structure
JP2001193283A (en) Bar arrangement method in concrete structure, bar arrangement construction, and continuous hoops
JP2022136695A (en) Construction method of columnar improvement body with core material and columnar improvement body with core material

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090226

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090414

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090709

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090709

R150 Certificate of patent or registration of utility model

Ref document number: 4345951

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120724

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120724

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130724

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term