JP2002212948A - Foundation pile - Google Patents

Foundation pile

Info

Publication number
JP2002212948A
JP2002212948A JP2001012562A JP2001012562A JP2002212948A JP 2002212948 A JP2002212948 A JP 2002212948A JP 2001012562 A JP2001012562 A JP 2001012562A JP 2001012562 A JP2001012562 A JP 2001012562A JP 2002212948 A JP2002212948 A JP 2002212948A
Authority
JP
Japan
Prior art keywords
spiral
pipe
blade
foundation pile
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001012562A
Other languages
Japanese (ja)
Other versions
JP3874613B2 (en
Inventor
Noriyuki Arakawa
範行 荒川
Kotaro Kawamoto
公太郎 河本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP2001012562A priority Critical patent/JP3874613B2/en
Publication of JP2002212948A publication Critical patent/JP2002212948A/en
Application granted granted Critical
Publication of JP3874613B2 publication Critical patent/JP3874613B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a spiral blade at one end of a metal pipe for producing a foundation pile easier and further improving the driving performance. SOLUTION: A thicker meat portion of a metal pipe 1 where the thickness of meat is made larger at one end side 1a and the pipe end surface 2 is made to a spiral surface, from a spiral pipe end face 2 to a radial direction, the thick blade at the root portion 3a is extended and formed in one body by casting, and excavating blades 4...4 extruded in the axial direction are protruded as one body in the configuration.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、一端に螺旋状の
羽根が形成された鋳鉄製の基礎杭に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cast iron foundation pile having a spiral blade at one end.

【0002】[0002]

【従来の技術】先端に螺旋状の羽根を形成した金属製の
基礎杭として、例えば特公平02−62648号公報、
特開平9−324420号公報、特開平11−2698
75号公報に開示されたような基礎杭が知られている。
2. Description of the Related Art For example, Japanese Patent Publication No. 02-62648 discloses a metal foundation pile having a spiral blade at the tip.
JP-A-9-324420, JP-A-11-2698
A foundation pile as disclosed in Japanese Patent No. 75 is known.

【0003】[0003]

【発明が解決しようとする課題】上記のうち、特公平0
2−62648号公報に記載された「鋼管杭」は有底の
管端外周に螺旋状の羽根(螺旋翼)をつけ、底板に掘削
刃を前記鋼管の軸方向へ突設した鋼管杭であるが、螺旋
状の羽根や底板は金属管の管端に溶接により取り付けて
いたので、高価となる欠点があった。
Of the above, the Japanese Patent
The "steel pipe pile" described in 2-62648 is a steel pipe pile in which a spiral blade (spiral blade) is attached to the outer periphery of a bottomed pipe end, and a drilling blade is protruded from a bottom plate in the axial direction of the steel pipe. However, since the spiral blades and the bottom plate are attached to the end of the metal tube by welding, there is a disadvantage that the cost is high.

【0004】また、この公報記載の鋼管杭は有底である
ので底板が抵抗となって掘進が困難となる問題があっ
た。さらに、地中へと掘進していく際の前進力を発揮さ
せる螺旋状の羽根は、単板を螺旋状に加工し、これを一
定肉厚の鋼管などに溶接したものであるから、螺旋状の
羽根そのものの強度や、杭となる鋼管に対する取り付け
強度が十分でなく、基礎杭として地中に埋設された後、
螺旋状の羽根の荷重支持強度が十分でないといった問題
もあった。
Further, since the steel pipe pile described in this publication has a bottom, there is a problem that the bottom plate becomes a resistance and it becomes difficult to excavate. In addition, the spiral blades that exert the forward force when excavating into the ground are formed by processing a single plate into a spiral shape and welding it to a steel pipe with a certain thickness, so that the spiral blade The strength of the blade itself and the mounting strength to the steel pipe that becomes the pile are not enough, and after being buried underground as a foundation pile,
There is also a problem that the load supporting strength of the spiral blade is not sufficient.

【0005】また、特開平9−324420号公報に開
示された「ねじ込み式鋼管杭」は、螺旋状板を鋼管の先
端部の下面に溶接手段で取り付けたものであるから、溶
接に際して螺旋状板の仮止め作業が必要となって製造に
手間がかかり、その分高価となる欠点があった。
The "screw-in type steel pipe pile" disclosed in Japanese Patent Application Laid-Open No. 9-324420 is one in which a spiral plate is attached to the lower surface of the tip of a steel pipe by welding means. However, there is a drawback that the temporary fixing work is required, the production is troublesome, and the cost is high.

【0006】また、鋼管杭の先端に掘削刃がないので地
中へと掘進させるには螺旋条板のねじ進み力だけに頼ら
ざるを得ないので掘進効率が悪い問題があった。特開平
11−269875号公報に開示された「回転埋設開端
杭」は管状の杭先端が開口されているので、全二者のよ
うな掘進の困難性といった問題は少ないものの、螺旋状
の羽根は、鋼管端部外周に溶接により取り付けられてい
るので製造に手間がかかり、高価となる問題があった。
In addition, since there is no excavation blade at the tip of the steel pipe pile, excavation into the ground has to rely only on the screw advancing force of the spiral strip, so that the excavation efficiency is poor. The “rotating buried open-end pile” disclosed in Japanese Patent Application Laid-Open No. H11-269875 has a tubular pile tip with an open end, so that there are few problems such as difficulty of excavation like two people, but the spiral blade is In addition, since it is attached to the outer periphery of the end of the steel pipe by welding, there is a problem that the production is troublesome and expensive.

【0007】この発明は、上記問題を解消し、金属管の
一端に螺旋状の羽根を設けた基礎杭の製造を容易にし、
しかも掘進性能も改良することを課題としてなされたも
のである。
[0007] The present invention solves the above-mentioned problems and facilitates the production of a foundation pile having a spiral blade at one end of a metal tube,
Moreover, it was made to improve the excavation performance.

【0008】[0008]

【課題を解決するための手段】この発明の基礎杭は、一
端側の肉厚が厚くされた金属管の前記厚肉部の管端面が
螺旋状面とされ、該螺旋状管端面から半径方向へ、根元
部の肉厚の厚い螺旋形状の羽根が鋳造により一体に延出
形成され、かつ前記金属管の螺旋状管端面には軸方向へ
突出する掘削刃が一体に突設されてなるものである。
According to a first aspect of the present invention, there is provided a foundation pile having a helical surface at an end portion of a thickened metal tube having a helical surface. A spiral wing having a thick root portion is integrally formed by casting, and a digging blade projecting in the axial direction is integrally formed on an end surface of the helical pipe of the metal pipe. It is.

【0009】従って、この発明の基礎杭は、本体である
金属管とその先端部の螺旋形状の羽根が鋳造により一体
化されているため、管本体と螺旋状の羽根とが鋳造型で
一気に形成でき、製造が容易となる。また、管の一端側
と、径方向へ延出する螺旋状の羽根の根元部分とが共に
肉厚が厚くされているので、埋設された基礎杭を支える
螺旋条の羽根の支持強度が大きくなり、上部構造物に対
する支持力が大きい。
Therefore, in the foundation pile according to the present invention, since the metal pipe as the main body and the spiral blade at the tip end thereof are integrated by casting, the pipe main body and the spiral blade are formed at once in a casting mold. Can be manufactured. In addition, since both the one end side of the pipe and the root portion of the spiral blade extending in the radial direction are thickened, the supporting strength of the spiral strip blade supporting the embedded foundation pile is increased. And a large supporting force for the upper structure.

【0010】さらに掘進時、管端面の掘削刃で土砂が掘
削軟化されるので容易に掘進させることができ、また、
この掘削刃による掘進容易性により杭の鉛直性が良くな
るといった効果がある。
Further, at the time of excavation, the earth and sand is excavated and softened by the excavation blade on the pipe end surface, so that the excavation can be easily performed.
There is an effect that the verticality of the pile is improved by the ease of excavation by the excavation blade.

【0011】[0011]

【発明の実施の形態】次に、この発明の実施の形態を説
明する。図1はこの発明の実施の形態の基礎杭の一部破
断正面図、図2は図1の一部破断左側面図である。
Next, an embodiment of the present invention will be described. FIG. 1 is a partially broken front view of a foundation pile according to an embodiment of the present invention, and FIG. 2 is a partially broken left side view of FIG.

【0012】図1において1は杭本体を構成する金属管
を示し、例えば遠心力鋳造などにより製造された鋳鉄管
を示す。この金属管1の一端1aは図示のように通常の
直管部1bの肉厚tよりも肉厚Tが厚くされ、その肉厚
の厚い管壁部分1aの管端面2が図2にも示すように螺
旋状面とされ、さらにこの管端面2から半径方向へ延出
して根元部分3aの肉厚が径方向外側3bの肉厚より厚
くされた螺旋状の羽根3が鋳造により一体成形されてい
る。
In FIG. 1, reference numeral 1 denotes a metal tube constituting a pile body, for example, a cast iron tube manufactured by centrifugal casting or the like. As shown in the drawing, one end 1a of the metal tube 1 has a thickness T larger than the thickness t of the normal straight tube portion 1b, and the tube end surface 2 of the thick tube wall portion 1a is also shown in FIG. The spiral blade 3 is formed into a spiral surface, and further extends in a radial direction from the tube end surface 2 so that the thickness of the root portion 3a is greater than the thickness of the radially outer portion 3b. I have.

【0013】さらに、前記管端面2には前記金属管1の
軸方向へ延出して掘削刃4…4が一体的に突設されてい
る。なお、この掘削刃4…4は、螺旋状の羽根3と同
様、鋳造により金属管1に一体成形しても良いが、金属
管1の管端面2にブロック状の掘削刃4…4を溶接して
もよく、また、ブロック状の掘削刃の高さ分だけ管端面
2を螺旋状の羽根3より突出させて形成し、脱型後、掘
削刃4、4を切り出し加工しても良い。
Further, excavating blades 4 are integrally provided on the pipe end face 2 so as to extend in the axial direction of the metal pipe 1. The digging blades 4... May be formed integrally with the metal pipe 1 by casting, similarly to the spiral blades 3. However, the block-shaped digging blades 4. Alternatively, the pipe end face 2 may be formed so as to protrude from the spiral blade 3 by the height of the block-shaped excavating blade, and after the mold is removed, the excavating blades 4 and 4 may be cut out.

【0014】上記実施の形態において、一端1aの肉厚
部の肉厚Tは、通常の直管部1bの肉厚tよりも2倍〜
3倍の肉厚とされる。このような肉厚とすることにより
掘削時の過酷な使用条件や、埋設後の建造物の重量に耐
える強度とすることができる。
In the above embodiment, the thickness T of the thick portion at one end 1a is twice as large as the thickness t of the normal straight pipe portion 1b.
It is three times as thick. With such a thickness, it is possible to obtain a strength that can withstand the severe use conditions at the time of excavation and the weight of the building after burial.

【0015】また、螺旋条3の延出した直径Dは直管部
1の直径dに対して1.5〜2.5倍程度とされる。
1.5倍より小さいと、螺旋条による掘進力が十分に得
られず、また埋設後の地中での螺旋状の羽根3による支
持力も十分でなくなる。一方2.5倍より大きいと地中
での螺旋状の羽根3による支持力が増えるが、掘進抵抗
が大きくなり掘進が困難となる。
The extended diameter D of the spiral strip 3 is about 1.5 to 2.5 times the diameter d of the straight pipe portion 1.
If it is less than 1.5 times, the excavating power by the spiral strip cannot be sufficiently obtained, and the supporting force by the spiral blades 3 in the ground after burial becomes insufficient. On the other hand, if it is larger than 2.5 times, the supporting force of the spiral blade 3 in the ground increases, but the excavation resistance increases and it becomes difficult to excavate.

【0016】なお、上記数値範囲のうち螺旋条3の直径
Dは、直管部1bの1.9〜2.2倍程度が好ましい。
次にこの基礎杭の使用方法について説明する。
The diameter D of the spiral strip 3 in the above numerical range is preferably about 1.9 to 2.2 times the straight pipe section 1b.
Next, how to use the foundation pile will be described.

【0017】長さ約4メートル、直径約120mmで肉
厚が6mm、一端1aの肉厚Tが、長さ約140mmに
わたって16mmとされた直管1であって、厚肉部1b
の外周に根元部の最大肉厚hが16mmで、そこからテ
ーパ状に肉厚が薄くなり、直径194mmより外周は肉
厚9mmの一定肉厚とされた、外径250mmの螺旋状
の羽根3と、管端部に図1〜図3に示すように4個の掘
削刃4…4を鋳造成形した基礎杭1を用意した。
A straight pipe 1 having a length of about 4 meters, a diameter of about 120 mm, a thickness of 6 mm, and a thickness T at one end 1a of 16 mm over a length of about 140 mm, and a thick portion 1b
A spiral blade 3 having an outer diameter of 250 mm, having a maximum thickness h of 16 mm at the root portion on the outer periphery and tapered from there, and having a constant thickness of 9 mm from the outer diameter of 194 mm. In addition, a foundation pile 1 was prepared by casting four excavating blades 4... 4 at the pipe end as shown in FIGS.

【0018】この杭を地表に垂直に立て、回転させた。
杭1が軸周囲に回転駆動されると、管端面の掘削刃4、
4が地表を掘削し始め螺旋状の羽根3が地表に達する
と、地中に食い込みはじめ以後は地中へと掘進していっ
た。
The pile was set upright on the ground surface and rotated.
When the pile 1 is driven to rotate around the axis, the excavation blade 4 on the pipe end face,
When the spiral blades 3 reached the surface of the ground, the wings 4 began to dig into the ground and began to dig into the ground.

【0019】そのようにして軸周囲に回転力を付与し
て、杭を地中に掘進させたが、掘削刃4、4によって地
盤が掻き起こされて軟弱化し、掘進がスムーズに行われ
た。また、これに伴い、基礎杭1もほぼ垂直の状態で地
中へ掘進していった。
The pile was excavated in the ground by applying a rotational force around the shaft in this way. However, the ground was swept up by the excavation blades 4 and 4 to soften the ground, and the excavation was smoothly performed. Along with this, the foundation pile 1 also dug into the ground in a substantially vertical state.

【0020】地中埋設後の基礎杭は、先端の螺旋状の羽
根を地中に広げた状態で埋設されるので軟弱地盤でも十
分な支持強度を示した。
The foundation pile after being buried underground is buried in a state where the spiral blade at the tip is spread in the ground, so that it has sufficient supporting strength even on soft ground.

【0021】[0021]

【発明の効果】以上説明したように、この発明の基礎杭
は、本体である金属管とその先端部の螺旋形状の羽根が
鋳造により一体化されているため、管本体と螺旋状の羽
根とが鋳造型で一気に形成でき、製造が容易となる。ま
た、管の一端側の肉厚と、径方向へ延出する螺旋状の羽
根の根元部分の肉厚とが厚くされているので、埋設後、
建築物質量の加わる基礎杭を支える螺旋条の羽根の強度
が大きくなり地中埋設後の垂直方向の支持力が大きい。
同時に、上記以外の強度を必要としない部分は薄肉化で
きるので、基礎杭全体の質量を小さくすることができ
る。
As described above, in the foundation pile of the present invention, the metal pipe as the main body and the spiral blade at the tip end thereof are integrated by casting, so that the pipe main body and the spiral blade are integrated. Can be formed at once in a casting mold, which facilitates production. Also, since the wall thickness at one end side of the pipe and the root part of the spiral blade extending radially are thickened, after embedding,
The strength of the helical blade supporting the foundation pile to which the amount of building material is added increases, and the vertical bearing capacity after burial is buried.
At the same time, the parts that do not require strength other than those described above can be thinned, so that the mass of the entire foundation pile can be reduced.

【0022】さらに掘進時、管端面の掘削刃で土砂が掘
削軟化されるので容易に掘進させることができ、また、
この掘削刃による掘進容易性により杭の鉛直性も良くな
るといった効果がある。
Further, at the time of excavation, the earth and sand is excavated and softened by the excavation blade on the pipe end surface, so that the excavation can be easily performed.
There is an effect that the verticality of the pile is also improved by the ease of excavation by the excavation blade.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の実施の形態の基礎杭の一部破断正面
図である。
FIG. 1 is a partially cutaway front view of a foundation pile according to an embodiment of the present invention.

【図2】図1の左側面図である。FIG. 2 is a left side view of FIG.

【図3】図1の底面図である。FIG. 3 is a bottom view of FIG. 1;

【符号の説明】[Explanation of symbols]

1 金属管 1a 肉厚の厚い管壁部分 2 螺旋状の管端面 3 螺旋状の羽根 3a 螺旋状の羽根の根元部 4 掘削刃 DESCRIPTION OF SYMBOLS 1 Metal pipe 1a Thick wall part 2 Spiral pipe end surface 3 Spiral blade 3a Root part of spiral blade 4 Excavation blade

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】一端側の肉厚が厚くされた金属管の前記厚
肉部の管端面が螺旋状面とされ、該螺旋状管端面から半
径方向へ、根元部の肉厚の厚い螺旋形状の羽根が鋳造に
より一体に延出形成され、かつ前記金属管の螺旋状管端
面には軸方向へ突出する掘削刃が一体に突設されてなる
基礎杭。
1. A metal tube having a thicker wall at one end, wherein a tube end surface of the thicker portion is a spiral surface, and a thicker spiral shape at a root portion in a radial direction from the spiral tube end surface. A foundation pile, the blades of which are integrally extended by casting, and a drilling blade projecting in the axial direction is integrally provided on an end surface of the spiral tube of the metal tube.
JP2001012562A 2001-01-22 2001-01-22 Foundation pile Expired - Fee Related JP3874613B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001012562A JP3874613B2 (en) 2001-01-22 2001-01-22 Foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001012562A JP3874613B2 (en) 2001-01-22 2001-01-22 Foundation pile

Publications (2)

Publication Number Publication Date
JP2002212948A true JP2002212948A (en) 2002-07-31
JP3874613B2 JP3874613B2 (en) 2007-01-31

Family

ID=18879553

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001012562A Expired - Fee Related JP3874613B2 (en) 2001-01-22 2001-01-22 Foundation pile

Country Status (1)

Country Link
JP (1) JP3874613B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100453741C (en) * 2003-04-04 2009-01-21 株式会社奥特-塞特 Block-type steel pipe pile
CN102011395A (en) * 2010-11-12 2011-04-13 新兴河北工程技术有限公司 Piling tube
JP2021004502A (en) * 2019-06-26 2021-01-14 株式会社シグマベース Under-reamed steel pipe pile, and steel pipe with under-reamed portion
GB2605619A (en) * 2021-04-07 2022-10-12 Franki Foundations Uk Ltd Screw pile system
JP2022190512A (en) * 2021-06-14 2022-12-26 株式会社ガイアF1 Rotary penetration steel pipe pile with tip blade

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100453741C (en) * 2003-04-04 2009-01-21 株式会社奥特-塞特 Block-type steel pipe pile
CN102011395A (en) * 2010-11-12 2011-04-13 新兴河北工程技术有限公司 Piling tube
JP2021004502A (en) * 2019-06-26 2021-01-14 株式会社シグマベース Under-reamed steel pipe pile, and steel pipe with under-reamed portion
GB2605619A (en) * 2021-04-07 2022-10-12 Franki Foundations Uk Ltd Screw pile system
GB2605619B (en) * 2021-04-07 2023-06-14 Franki Foundations Uk Ltd Screw pile system
JP2022190512A (en) * 2021-06-14 2022-12-26 株式会社ガイアF1 Rotary penetration steel pipe pile with tip blade

Also Published As

Publication number Publication date
JP3874613B2 (en) 2007-01-31

Similar Documents

Publication Publication Date Title
JP5265500B2 (en) Pile digging method, foundation pile structure
JP2004270440A (en) Construction method for foundation pile, and prefabricated pile
JP2002212948A (en) Foundation pile
JPS6225612A (en) Pile
JP2001317049A (en) Pile with wing
JP2000291002A (en) Construction method for composite pile, steel pipe pile used for the method, and composite pile
JP3839461B1 (en) Steel pipe pole foundation and its foundation method
JP4189550B2 (en) Construction method of ready-made pile with spiral blade, casing for propulsion
JP2000170159A (en) Vaned screwing pile
JP2590157Y2 (en) Multi-wing conical steel pipe pile
JP4129836B2 (en) Construction method of foundation pile, ready-made pile with spiral wing
JP3661863B2 (en) Expanded bottom plate for rotating buried steel pipe pile, and method of attaching the expanded plate to the rotated buried steel pipe pile
JP2002105956A (en) Charging of mc type widening bottom pipe anchor into ground
JPH0561410B2 (en)
JP4314432B2 (en) Drilling tool for expanding diameter
JP4191451B2 (en) Advanced components for rotary press-fit steel piles and steel piles
JPH05311649A (en) Conical multi-blade steel tube friction pile and its burying method
JP2007132008A (en) Structure of jacking pile, and its burying method
JPH072677Y2 (en) Multi-blade steel pipe pile
JPH09302650A (en) Buried pile for foundation construction
JP2003155743A (en) Structure for attaching pile tip having longitudinal tooth and propeller-like tooth
JP2004143722A (en) Ground reinforcing pile burying method, and buried excavating claw device
JP3291692B2 (en) Rotary steel pipe pile manufacturing method
JP2002054135A (en) Composite structure
JP2003096770A (en) Soil cement composite pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040922

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060920

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060926

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061024

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3874613

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091102

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101102

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101102

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111102

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111102

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121102

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131102

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees