JP2002206345A - Protective cover of adjustment jig for reinstallation of steel frame and adjustment jig - Google Patents

Protective cover of adjustment jig for reinstallation of steel frame and adjustment jig

Info

Publication number
JP2002206345A
JP2002206345A JP2001000941A JP2001000941A JP2002206345A JP 2002206345 A JP2002206345 A JP 2002206345A JP 2001000941 A JP2001000941 A JP 2001000941A JP 2001000941 A JP2001000941 A JP 2001000941A JP 2002206345 A JP2002206345 A JP 2002206345A
Authority
JP
Japan
Prior art keywords
jig
steel column
erection piece
protective cover
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001000941A
Other languages
Japanese (ja)
Other versions
JP3641655B2 (en
Inventor
Yasuo Wada
保雄 和田
Takaaki Shibamoto
高明 芝本
Shuji Ota
修二 太田
Masato Fujisawa
正人 藤澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elephant Chain Block Co Ltd
Daisho Sangyo Co Ltd
Original Assignee
Elephant Chain Block Co Ltd
Daisho Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elephant Chain Block Co Ltd, Daisho Sangyo Co Ltd filed Critical Elephant Chain Block Co Ltd
Priority to JP2001000941A priority Critical patent/JP3641655B2/en
Publication of JP2002206345A publication Critical patent/JP2002206345A/en
Application granted granted Critical
Publication of JP3641655B2 publication Critical patent/JP3641655B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a protective cover of an adjustment jig for reinstallation of a steel frame, and an adjustment jig for reinstallation of the steel frame capable of providing enhanced durability to the adjustment jig and ease of maintenance by preventing, using a simple arrangement, sputters from adhering to a jig body during the welding of the upper end of a lower steel column to the lower end of an upper steel column, for avoiding a decrease in the strength of the adjustment jig. SOLUTION: The protective cover 101 is attached to the jig 21 so as to intervene between a welded potion 100 and the jig 21, the welded portion 100 being located between the lower steel column 23 and the upper steel column 25.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、下側の鉄骨柱に上
側の鉄骨柱を接合するために用いられる鉄骨建入直し調
整治具の防護カバー、および、その防護カバーを備えて
いる鉄骨建入直し調整治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a protective cover for a jig for refitting a steel frame used for joining an upper steel column to a lower steel column, and a steel frame provided with the protective cover. Refitting adjustment jig.

【0002】[0002]

【従来の技術】従来より、建設現場において、下側の鉄
骨柱に上側の鉄骨柱を接合する時には、まず、クレーン
によって上側の鉄骨柱を吊り上げて、下側の鉄骨柱の上
方に配置した後、治具を用いて、これら下側の鉄骨柱と
上側の鉄骨柱とを連結させた後、その下側の鉄骨柱の上
端部と上側の鉄骨柱の下端部とを溶接によって、接合す
るようにしている。
2. Description of the Related Art Conventionally, when joining an upper steel column to a lower steel column at a construction site, first, the upper steel column is lifted by a crane and then placed above the lower steel column. After connecting the lower steel column and the upper steel column using a jig, the upper end of the lower steel column and the lower end of the upper steel column are joined by welding. I have to.

【0003】このような鉄骨建入直しに用いられる調整
治具としては、たとえば、特開平11−303404号
公報や特開平11−303406号公報に記載されるも
のが知られている。すなわち、たとえば、図18ないし
図20に示すように、この治具1は、その上端部に下側
エレクションピース3が取り付けられている下側の鉄骨
柱2と、その下端部に上側エレクションピース5が取り
付けられている上側の鉄骨柱4とを接合するために用い
られるものであって、環状の略長方形状をなし、その長
さ方向中央にスリット部6が形成されている。また、こ
の治具1は、その上部に、上側エレクションピース5を
水平方向に押圧するための上側水平押圧ボルト7と、そ
の下部に、下側エレクションピース3を水平方向に押圧
するための下側水平押圧ボルト8および下側エレクショ
ンピース3を固定するための下側固定ボルト9と、その
上側水平押圧ボルト7と下側水平押圧ボルト8との間
に、ジャッキ装置10とを備えている。なお、ジャッキ
装置10は、図20に示すように、ねじ部材11、カム
12、座板13および支持板15を備えており、ねじ部
材11の締め込みによって、カム12を揺動させて、カ
ム12の前端部で座板13を上方向に押圧し、これによ
って、上側エレクションピース5を上方向に押圧して適
正位置で支持するものである。
[0003] As an adjusting jig used for rebuilding such a steel frame, for example, those described in JP-A-11-303404 and JP-A-11-303406 are known. That is, as shown in FIGS. 18 to 20, for example, this jig 1 has a lower steel column 2 to which a lower erection piece 3 is attached at its upper end, and an upper erection piece 5 at its lower end. This is used to join the upper steel column 4 to which is attached, and has an annular substantially rectangular shape, and a slit portion 6 is formed at the center in the length direction. The jig 1 has an upper horizontal pressing bolt 7 for pressing the upper erection piece 5 in a horizontal direction on an upper portion thereof, and a lower side for pressing the lower erection piece 3 in a horizontal direction on a lower portion thereof. A lower fixing bolt 9 for fixing the horizontal pressing bolt 8 and the lower erection piece 3 and a jack device 10 are provided between the upper horizontal pressing bolt 7 and the lower horizontal pressing bolt 8. As shown in FIG. 20, the jack device 10 includes a screw member 11, a cam 12, a seat plate 13, and a support plate 15. The front plate 12 presses the seat plate 13 upward, thereby pressing the upper erection piece 5 upward and supporting it at an appropriate position.

【0004】そして、このような治具1を用いて、下側
の鉄骨柱2に上側の鉄骨柱4を接合するには、まず、図
18に示すように、上側エレクションピース5に治具1
のスリット部6を挿入するとともに、そのスリット部6
の上端側を、上側エレクションピース5の遊端側の上端
部に突出状に取り付けられているストッパ14によって
係止させ、次いで、この上側の鉄骨柱4を、クレーンに
よって吊り上げて、下側の鉄骨柱2の上方に、上側エレ
クションピース5と下側エレクションピース3とが対向
するように配置した後、治具1を振り子状に揺動させ
て、下側エレクションピース3に治具1のスリット部6
を挿入する。その後、図19に示す状態において、上側
水平押圧ボルト7を締め付けて、治具1と上側エレクシ
ョンピース5を連結固定した後、各下側水平押圧ボルト
8をそれぞれ締め付けることにより、上側の鉄骨柱4
を、下側の鉄骨柱2に対して水平方向に移動させて、そ
の水平方向の姿勢を修正するとともに、ジャッキ装置1
0によって、上側エレクションピース5を押圧して適正
位置で支持することにより、上側の鉄骨柱4の鉛直方向
の姿勢を修正する。これによって、下側の鉄骨柱2に上
側の鉄骨柱4が良好な姿勢で連結される。その後、クレ
ーンの吊り具を上側の鉄骨柱4から取り外して、下側の
鉄骨柱2の上端部と上側の鉄骨柱4の下端部とを溶接す
ることによって、これら下側の鉄骨柱2と上側の鉄骨柱
4とを接合する。
[0004] In order to join the upper steel column 4 to the lower steel column 2 using such a jig 1, first, as shown in FIG.
Is inserted, and the slit 6
Of the upper erection piece 5 is stopped by a stopper 14 protrudingly attached to the upper end of the free end side of the upper erection piece 5, and then the upper steel column 4 is lifted by a crane, and the lower steel frame 4 is lifted. After the upper erection piece 5 and the lower erection piece 3 are arranged above the column 2 so as to face each other, the jig 1 is swung like a pendulum, and the lower erection piece 3 is slit into the slit portion of the jig 1. 6
Insert Thereafter, in the state shown in FIG. 19, the upper horizontal pressing bolt 7 is tightened to connect and fix the jig 1 and the upper erection piece 5, and then each lower horizontal pressing bolt 8 is tightened, whereby the upper steel column 4 is tightened.
Is moved in the horizontal direction with respect to the lower steel column 2 to correct its horizontal position, and the jack device 1
0 corrects the vertical posture of the upper steel column 4 by pressing and supporting the upper erection piece 5 at an appropriate position. Thus, the upper steel column 4 is connected to the lower steel column 2 in a favorable posture. After that, the lifting tool of the crane is removed from the upper steel column 4 and the upper end of the lower steel column 2 and the lower end of the upper steel column 4 are welded to each other, so that the lower steel column 2 and the upper column are welded. With the steel column 4 of the above.

【0005】[0005]

【発明が解決しようとする課題】しかし、このように、
上側の鉄骨柱と下側の鉄骨柱とを治具によって姿勢を保
持して、下側の鉄骨柱の上端部と上側の鉄骨柱の下端部
とを溶接によって接合する場合には、その溶接時に飛散
するスパッタが治具に付着して、治具が黒く変色した
り、または、穴が開いたり、あるいは、部分的に焼きな
ましされたりするので、治具の本体有する強度を保証で
きなくなるおそれがある。そのため、このような治具で
は、耐久性の向上を図りにくく、また、メンテナンスに
時間がかかったり、さらには、再使用の可否の判断がむ
つかしく、安定した品質での使用が困難であるという不
具合を有する。
However, as described above,
If the upper steel column and the lower steel column are held in position by a jig and the upper end of the lower steel column and the lower end of the upper steel column are joined by welding, The scattered spatter adheres to the jig, and the jig turns black or has holes or is partially annealed, so that the strength of the jig body may not be guaranteed. . Therefore, it is difficult to improve the durability of such a jig, it takes time for maintenance, and it is difficult to judge whether or not it can be reused, and it is difficult to use the jig with stable quality. Having.

【0006】本発明は、このような不具合に鑑みなされ
たものであり、その目的とするところは、簡易な構成に
より、下側の鉄骨柱の上端部と上側の鉄骨柱の下端部と
を溶接によって接合する時に飛散するスパッタが、治具
本体に付着することを防止して、鉄骨建入直し調整治具
の強度低下を回避し、それによって、鉄骨建入直し調整
治具の耐久性の向上およびメンテナンスの容易化を図る
ことができ、鉄骨建入直し調整治具を安定した品質で使
用することができる、鉄骨建入直し調整治具の防護カバ
ー、および、その防護カバーを備えている鉄骨建入直し
調整治具を提供することにある。
The present invention has been made in view of such a problem, and an object thereof is to weld a lower end of a lower steel column and a lower end of an upper steel column with a simple configuration. Prevents the spatter that is scattered when joining by the jig from adhering to the jig body and avoids a decrease in the strength of the steel frame refitting adjustment jig, thereby improving the durability of the steel frame refitting adjustment jig And a protective cover for the steel frame re-installation adjustment jig, which can facilitate maintenance and can use the steel frame re-installation adjustment jig with stable quality, and a steel frame having the protective cover. An object of the present invention is to provide a re-installation adjustment jig.

【0007】[0007]

【課題を解決するための手段】上記の目的を達成するた
め、請求項1に記載の発明は、下側の鉄骨柱に上側の鉄
骨柱を接合するために用いられる鉄骨建入直し調整治具
を防護するために、前記下側の鉄骨柱と前記上側の鉄骨
柱との間の溶接部分と、前記鉄骨建入直し調整治具との
間に介在されるように設けられる鉄骨建入直し調整治具
の防護カバーを特徴としている。
In order to achieve the above object, an invention according to claim 1 is a jig for adjusting a steel frame re-installation used for joining an upper steel column to a lower steel column. In order to protect the steel column, the steel column re-installation adjustment provided so as to be interposed between the welded portion between the lower steel column and the upper steel column and the steel frame re-installation adjustment jig. It features a protective cover for the jig.

【0008】このような構成によると、下側の鉄骨柱に
上側の鉄骨柱を接合する時には、その下側の鉄骨柱と上
側の鉄骨柱との間の溶接部分と、鉄骨建入直し調整治具
との間に、防護カバーが介在されるので、その溶接時に
飛散するスパッタが鉄骨建入直し調整治具に付着するこ
とを有効に防止することができる。そのため、鉄骨建入
直し調整治具の強度低下を回避することができ、それに
よって、鉄骨建入直し調整治具の耐久性の向上およびメ
ンテナンスの容易化を図ることができ、鉄骨建入直し調
整治具を安定した品質で使用することができる。
[0008] According to such a configuration, when the upper steel column is joined to the lower steel column, a welding portion between the lower steel column and the upper steel column, and a steel frame re-installation adjustment jig. Since the protective cover is interposed between the jig and the jig, it is possible to effectively prevent spatter scattered at the time of welding from being attached to the steel-frame refitting adjustment jig. Therefore, it is possible to avoid a reduction in the strength of the steel frame re-installation adjustment jig, thereby improving the durability of the steel frame re-installation adjustment jig and facilitating maintenance, and improving the steel frame re-installation adjustment. The jig can be used with stable quality.

【0009】また、請求項2に記載の発明は、請求項1
に記載の発明において、前記鉄骨建入直し調整治具は、
エレクションピースが取り付けられている下側の鉄骨柱
に、エレクションピースが取り付けられている上側の鉄
骨柱を接合するために用いられ、治具本体と、前記下側
の鉄骨柱のエレクションピースに取付可能な第1取付
部、および、前記上側の鉄骨柱のエレクションピースに
取付可能な第2取付部とを備え、前記防護カバーは、少
なくとも前記第1取付部と前記第2取付部との間に配置
され、前記治具本体に取り付けられていることを特徴と
している。
The invention described in claim 2 is the first invention.
In the invention described in the above, the steel frame refitting adjustment jig,
Used to join the upper steel column to which the erection piece is attached to the lower steel column to which the erection piece is attached, and can be attached to the jig body and the erection piece of the lower steel column. A first attachment portion, and a second attachment portion attachable to the erection piece of the upper steel column, wherein the protective cover is disposed at least between the first attachment portion and the second attachment portion. And is attached to the jig body.

【0010】このような構成によると、第1取付部を下
側の鉄骨柱のエレクションピースに取り付けるととも
に、第2取付部を上側の鉄骨柱のエレクションピースに
取り付ければ、この鉄骨建入直し調整治具により、下側
の鉄骨柱と上側の鉄骨柱とを確実に連結して溶接するこ
とができる。しかも、その溶接時には、防護カバーが、
少なくとも第1取付部と第2取付部との間に配置されて
いるので、その溶接時に飛散するスパッタが、治具本体
に付着することを確実に防止することができる。そのた
め、鉄骨建入直し調整治具の強度低下を、より確実に回
避することができる。
According to such a configuration, if the first attachment portion is attached to the erection piece of the lower steel column and the second attachment portion is attached to the erection piece of the upper steel column, the steel frame re-installation adjustment repair can be performed. With the tool, the lower steel column and the upper steel column can be reliably connected and welded. Moreover, at the time of welding, the protective cover
Since it is arranged at least between the first mounting portion and the second mounting portion, it is possible to reliably prevent spatters scattered at the time of welding from attaching to the jig main body. For this reason, a reduction in the strength of the steel frame re-installation adjustment jig can be more reliably avoided.

【0011】また、請求項3に記載の発明は、請求項2
に記載の発明において、前記防護カバーは、前記下側の
鉄骨柱のエレクションピースと前記上側の鉄骨柱のエレ
クションピースとの間の溶接部分に対向される防護壁部
と、治具本体に取り付ける取付部とを備えていることを
特徴としている。
The invention described in claim 3 is the same as the claim 2
In the invention described in the above, the protective cover is provided with a protective wall portion facing a welded portion between the erection piece of the lower steel column and the erection piece of the upper steel column, and an attachment attached to the jig body. And a part.

【0012】このような構成によると、溶接時に飛散す
るスパッタを、防護壁部によって確実に防護することが
できるとともに、取付部によって防護カバーを確実に治
具本体に取り付けることができる。そのため、より確実
に、鉄骨建入直し調整治具の強度低下を回避することが
できる。
According to such a configuration, spatters scattered during welding can be reliably protected by the protective wall portion, and the protective cover can be securely mounted to the jig body by the mounting portion. Therefore, it is possible to more reliably avoid a decrease in the strength of the steel frame re-installation adjustment jig.

【0013】また、請求項4に記載の発明は、請求項3
に記載の発明において、前記防護壁部には、前記下側の
鉄骨柱のエレクションピースを挿通するための下側切欠
部と、前記上側の鉄骨柱のエレクションピースを挿通す
るための上側切欠部とが形成されていることを特徴とし
ている。
The invention described in claim 4 is the same as the claim 3.
In the invention described in the above, the protective wall portion, a lower notch portion for inserting the erection piece of the lower steel column, and an upper notch portion for inserting the erection piece of the upper steel column. Is formed.

【0014】このような構成によると、下側の鉄骨柱の
エレクションピースと上側の鉄骨柱のエレクションピー
スとを鉄骨建入直し調整治具によって連結した状態にお
いては、防護壁部の下側切欠部に、下側の鉄骨柱のエレ
クションピースが挿通されるとともに、防護壁部の上側
切欠部に、上側の鉄骨柱のエレクションピースが挿通さ
れる状態となる。そのため、この防護壁部では、下側の
鉄骨柱のエレクションピースよりも下方の治具本体を覆
うことができるとともに、上側の鉄骨柱のエレクション
ピースよりも上方を覆うことができるので、より広く鉄
骨建入直し調整治具を覆って、溶接時に飛散するスパッ
タが治具本体に付着することを、より一層有効に防止す
ることができる。そのため、鉄骨建入直し調整治具の強
度低下を、より一層、回避することができる。
According to such a configuration, in a state where the erection piece of the lower steel column and the erection piece of the upper steel column are connected by the steel frame re-installation adjustment jig, the lower notch of the protection wall is provided. Then, the erection piece of the lower steel column is inserted, and the erection piece of the upper steel column is inserted into the upper cutout of the protective wall. Therefore, the protective wall portion can cover the jig body below the erection piece of the lower steel column and can also cover the jig body above the erection piece of the upper steel column, so that the steel frame can be wider. It is possible to more effectively prevent the spatter scattered at the time of welding from adhering to the jig main body by covering the refitting adjustment jig. For this reason, a reduction in the strength of the steel frame re-installation adjustment jig can be further avoided.

【0015】また、防護壁部の下側切欠部に、下側の鉄
骨柱のエレクションピースが挿通されるとともに、防護
壁部の上側切欠部に、上側の鉄骨柱のエレクションピー
スが挿通された状態では、それら下側の鉄骨柱のエレク
ションピースと上側の鉄骨柱のエレクションピースとに
よって、防護カバーのがたつきなどが規制されるので、
確実に位置決めされた状態で、溶接時に飛散するスパッ
タを確実に防護することができる。
Also, an erection piece of the lower steel column is inserted into the lower notch of the protection wall, and an erection piece of the upper steel column is inserted into the upper notch of the protection wall. Then, the rattling of the protective cover is regulated by the erection piece of the lower steel column and the erection piece of the upper steel column,
In a state where it is securely positioned, spatters scattered during welding can be reliably protected.

【0016】また、請求項5に記載の発明は、請求項2
ないし4のいずれかに記載の発明において、前記防護カ
バーは、前記治具本体に着脱自在に取り付けられること
を特徴としている。
The invention described in claim 5 is the same as the claim 2.
In the invention described in any one of (4) to (4), the protective cover is detachably attached to the jig body.

【0017】このような構成によると、防護カバーが、
治具本体に対して着脱自在に取り付けられるので、溶接
時に飛散するスパッタの付着により防護カバーが損傷し
ても、その防護カバーのみを交換すれば、再び、良好に
使用することができる。したがって、簡易なメンテナン
スにより、かつ、低コストで、長期にわたって、鉄骨建
入直し調整治具を良好に使用することができる。
According to such a configuration, the protective cover is
Since the protective cover is detachably attached to the jig main body, even if the protective cover is damaged due to the attachment of spatter scattered during welding, it can be used again satisfactorily only by replacing the protective cover. Therefore, the steel frame re-installation adjustment jig can be favorably used for a long time with simple maintenance at low cost.

【0018】また、請求項6に記載の発明は、鉄骨建入
直し調整治具であって、請求項1ないし5のいずれかに
記載の鉄骨建入直し調整治具の防護カバーを備えている
ことを特徴としている。
According to a sixth aspect of the present invention, there is provided a steel frame re-installation adjusting jig, comprising a protective cover for the steel frame re-installation adjusting jig according to any one of the first to fifth aspects. It is characterized by:

【0019】このような構成によると、防護カバーによ
って、溶接時に飛散するスパッタが鉄骨建入直し調整治
具に付着することが有効に防止されるので、鉄骨建入直
し調整治具の強度低下を回避することができ、それによ
って、鉄骨建入直し調整治具の耐久性の向上およびメン
テナンスの容易化を図ることができ、鉄骨建入直し調整
治具を安定した品質で使用することができる。
According to this configuration, the protective cover effectively prevents spatters scattered at the time of welding from adhering to the steel-frame rebuilding adjustment jig. Thus, the durability of the steel frame refitting adjustment jig can be improved and maintenance can be facilitated, so that the steel frame refitting adjusting jig can be used with stable quality.

【0020】[0020]

【発明の実施の形態】図1は、本発明の鉄骨建入直し調
整治具の一実施形態としての治具を示す斜視図、図2
は、その正面図、図3は、その背面図、図4は、その左
側面図、図5は、その右側面図、図6は、図2における
A−A線断面図である。まず、これら図2ないし図6を
参照して、本発明の防護カバーが取り付けられる治具の
一実施形態について詳細に説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a perspective view showing a jig as one embodiment of a steel frame re-installation adjusting jig according to the present invention, and FIG.
3 is a front view thereof, FIG. 3 is a rear view thereof, FIG. 4 is a left side view thereof, FIG. 5 is a right side view thereof, and FIG. 6 is a sectional view taken along line AA in FIG. First, an embodiment of a jig to which the protective cover of the present invention is attached will be described in detail with reference to FIGS.

【0021】図1ないし図6において、この治具21
は、互いに対向する金属製の2つの第1ベースプレート
29および第2ベースプレート30を備えている。これ
ら第1ベースプレート29および第2ベースプレート3
0の中央部は、上下方向に延び、その第1ベースプレー
ト29および第2ベースプレート30の間には、金属製
の補強プレート85が架設され、溶接によりまたは一体
として、第1ベースプレート29および第2ベースプレ
ート30のそれぞれに取り付けられている。
1 to 6, the jig 21
Has two first base plates 29 and second base plates 30 made of metal and facing each other. These first base plate 29 and second base plate 3
A central portion of the first base plate 29 extends vertically, and a reinforcing plate 85 made of metal is provided between the first base plate 29 and the second base plate 30. The first base plate 29 and the second base plate are welded or integrally formed. 30 are attached to each.

【0022】また、これら第1ベースプレート29およ
び第2ベースプレート30の中央部から連続する各下端
部には、側方に向かって略矩形状に膨出する下側方膨出
部31および32と、下方に向かって略半円状に膨出す
る下方膨出部33および34とが形成されており、互い
に対向する各下側方膨出部31および32の遊端部に
は、金属製の下側支持板39が架設され、溶接によりま
たは一体として、各下側方膨出部31および32の遊端
部に取り付けられている。
The lower end portions 31 and 32, which bulge in a substantially rectangular shape toward the side, are provided at the lower end portions of the first base plate 29 and the second base plate 30 which are continuous from the center. Lower swelling portions 33 and 34 swelling downward in a substantially semicircular shape are formed, and the free ends of the lower swelling portions 31 and 32 facing each other have metal lower portions. A side support plate 39 is erected and attached to the free ends of each of the lower bulges 31 and 32 by welding or as one piece.

【0023】また、これら第1ベースプレート29およ
び第2ベースプレート30の中央部から連続する各上端
部には、下側方膨出部31および32と同じ側の側方に
向かって略矩形状に膨出する上側方膨出部35および3
6と、上方に向かって略テーパ状に膨出する上方膨出部
37および38とが形成されている。互いに対向する各
上側方膨出部35および36の遊端部には、金属製の上
側支持板40が架設され、溶接によりまたは一体とし
て、各上側方膨出部35および36の遊端部に取り付け
られている。また、互いに対向する各上方膨出部37お
よび38の遊端部には、金属製の上面支持板45が架設
され、溶接によりまたは一体として、各上方膨出部37
および38の遊端部の遊端部に取り付けられている。
The upper end portions of the first base plate 29 and the second base plate 30 which are continuous from the central portion are expanded in a substantially rectangular shape toward the same side as the lower swelling portions 31 and 32. Projecting upper bulging portions 35 and 3
6 and upper bulging portions 37 and 38 bulging upward in a substantially tapered shape. At the free ends of the upper bulges 35 and 36 facing each other, a metal upper support plate 40 is erected, and is welded or integrally formed with the free ends of the upper bulges 35 and 36. Installed. At the free ends of the upper bulges 37 and 38 facing each other, a metal upper surface support plate 45 is provided, and the upper bulges 37 are welded or integrally formed.
And 38 are attached to the free ends of the free ends.

【0024】そして、この治具21では、第1ベースプ
レート29および第2ベースプレート30の中央部が治
具本体22とされ、その下端部が、下側の鉄骨柱23の
下側エレクションピース24に取付可能な第1取付部2
7とされ、また、その上端部が、上側の鉄骨柱25の上
側エレクションピース26に取付可能な第2取付部28
とされている。
In the jig 21, the center of the first base plate 29 and the second base plate 30 is a jig body 22, and the lower end thereof is attached to the lower erection piece 24 of the lower steel column 23. Possible first mounting part 2
7, and a second mounting portion 28 whose upper end is mountable on the upper erection piece 26 of the upper steel column 25.
It has been.

【0025】なお、図3に示すように、第2取付部28
における第1ベースプレート29および第2ベースプレ
ート30の間は、第1取付部27における第1ベースプ
レート29および第2ベースプレート30の間よりも幅
広に形成されており、これによって、後述するように、
下側エレクションピース24に対する第1取付部27の
確実な取り付けを図るとともに、上側エレクションピー
ス26に対する第1押圧ボルト57および58の水平方
向の押圧による位置調整を容易にしている。
As shown in FIG. 3, the second mounting portion 28
Between the first base plate 29 and the second base plate 30 is formed wider than the space between the first base plate 29 and the second base plate 30 in the first mounting portion 27. As a result, as described later,
The first mounting portion 27 is securely mounted to the lower erection piece 24, and the position adjustment of the first pressing bolts 57 and 58 to the upper erection piece 26 by horizontal pressing is facilitated.

【0026】また、第1ベースプレート29および第2
ベースプレート30は、各下側方膨出部31および3
2、各下方膨出部33および34、各上側方膨出部35
および36の各端縁部においては、角がない湾曲形状と
して形成されており、応力集中による破損のおそれを回
避して、その剛性が高められている。
The first base plate 29 and the second base plate 29
The base plate 30 is provided with each of the lower bulges 31 and 3
2, each lower bulge 33 and 34, each upper bulge 35
Each of the end portions of the and 36 is formed as a curved shape having no corners, and the rigidity thereof is increased while avoiding the possibility of breakage due to stress concentration.

【0027】第1取付部27においては、図3に示すよ
うに、各下方膨出部33および34に、下側固定ボルト
41を螺着させるためのねじ孔42および43がそれぞ
れ形成されるとともに、一方の下側方膨出部31には、
下側第1押圧ボルト44を螺着させるためのねじ孔46
が形成されている。また、一方の下側方膨出部31の上
端側であって、第1取付部27と治具本体22との境界
近傍にも、下側第2押圧ボルト48を螺着させるための
ねじ孔50が形成されている。さらに、下側支持板39
には、下側第3押圧ボルト52を螺着させるためのねじ
孔53が形成されている。
In the first mounting portion 27, as shown in FIG. 3, screw holes 42 and 43 for screwing the lower fixing bolt 41 are formed in the lower bulging portions 33 and 34, respectively. , On one of the lower bulging portions 31,
Screw hole 46 for screwing the lower first pressing bolt 44
Are formed. A screw hole for screwing the lower second pressing bolt 48 also at the upper end side of the one lower bulging portion 31 and near the boundary between the first mounting portion 27 and the jig main body 22. 50 are formed. Further, the lower support plate 39
Is formed with a screw hole 53 into which the lower third pressing bolt 52 is screwed.

【0028】そして、いずれか一方の下方膨出部33お
よび34のねじ孔42および43から、他方の下方膨出
部33および34のねじ孔42および43に向けて、下
側固定ボルト41が螺着可能とされている。また、一方
の下側方膨出部31のねじ孔46には、下側第1押圧ボ
ルト44が螺着可能とされており、また、一方の下側方
膨出部31の上端側のねじ孔50にも、下側第2押圧ボ
ルト48が螺着可能とされている。さらに、下側支持板
39のねじ孔53には、下側第3押圧ボルト52が、下
側第1押圧ボルト44および下側第2押圧ボルト48と
直交する方向から螺着可能とされている。
The lower fixing bolt 41 is screwed from the screw holes 42 and 43 of one of the lower bulges 33 and 34 to the screw holes 42 and 43 of the other lower bulges 33 and 34. It is possible to wear. Further, the lower first pressing bolt 44 can be screwed into the screw hole 46 of the one lower bulging portion 31, and the screw on the upper end side of the one lower bulging portion 31 is screwed. The lower second pressing bolt 48 can also be screwed into the hole 50. Further, the lower third pressing bolt 52 can be screwed into the screw hole 53 of the lower supporting plate 39 from a direction orthogonal to the lower first pressing bolt 44 and the lower second pressing bolt 48. .

【0029】また、第2取付部28においては、各上方
膨出部37および38の基端部に、上側固定ボルト54
を螺着させるためのねじ孔55および56がそれぞれ形
成されるとともに、各上側方膨出部35および36の基
端部には、2つの上側第1押圧ボルト57および58を
それぞれ螺着させるためのねじ孔59および60がそれ
ぞれ形成されている。また、上側支持板40には、上側
第2押圧ボルト61を螺着させるためのねじ孔62が形
成されている。さらに、上面支持板45にも、上側第3
押圧ボルト86を螺着させるためのねじ孔87が形成さ
れている。
In the second mounting portion 28, upper fixing bolts 54 are provided at the base ends of the upper bulging portions 37 and 38, respectively.
Screw holes 55 and 56 are formed respectively for screwing the upper side bulging portions 35 and 36, and two upper first pressing bolts 57 and 58 are screwed into the base ends of the upper bulging portions 35 and 36, respectively. Screw holes 59 and 60 are formed respectively. The upper support plate 40 has a screw hole 62 for screwing the upper second pressing bolt 61. Further, the upper surface support plate 45 also has an upper third
A screw hole 87 for screwing the pressing bolt 86 is formed.

【0030】そして、いずれか一方の上方膨出部37お
よび38のねじ孔55および56から、他方の上方膨出
部37および38のねじ孔55および56に向けて、上
側固定ボルト54が螺着可能とされている。また、各上
側方膨出部35および36のねじ孔59および60に
は、2つの上側第1押圧ボルト57および58が、それ
ぞれ対向方向から螺着可能とされており、また、上側支
持板40のねじ孔62には、上側第2押圧ボルト61
が、上側第1押圧ボルト57および58と直交する方向
から螺着可能とされており、さらに、上面支持板45の
ねじ孔87にも、上側第3押圧ボルト86が、上側第2
押圧ボルト61と直交する方向から螺着可能とされてい
る。
An upper fixing bolt 54 is screwed from the screw holes 55 and 56 of one of the upper bulging portions 37 and 38 to the screw holes 55 and 56 of the other upper bulging portions 37 and 38. It is possible. Further, two upper first pressing bolts 57 and 58 can be screwed into the screw holes 59 and 60 of each of the upper bulging portions 35 and 36 from opposite directions, respectively. The upper second pressing bolt 61
Can be screwed from a direction orthogonal to the upper first pressing bolts 57 and 58. Further, the upper third pressing bolt 86 is also screwed into the screw hole 87 of the upper surface support plate 45.
The screw can be screwed from a direction perpendicular to the pressing bolt 61.

【0031】また、この治具21には、第1取付部27
と第2取付部28との間に、上側エレクションピース2
6の下端部を上方に向けて押圧可能なジャッキ装置66
が設けられている。
The jig 21 has a first mounting portion 27.
Between the upper erection piece 2 and the second mounting portion 28.
Jack device 66 capable of pressing the lower end portion 6 upward.
Is provided.

【0032】このジャッキ装置66は、図6にも示すよ
うに、本体67、プランジャ部材68、ピストン部材6
9、受け部材70およびばね71などを備えている。
As shown in FIG. 6, the jack device 66 includes a main body 67, a plunger member 68, and a piston member 6.
9, a receiving member 70, a spring 71, and the like.

【0033】本体67は、互いに対向する下側方膨出部
31および32の上方に配置され、略U字状のホルダ部
材72を介して取り付けられている。すなわち、ホルダ
部材72の両端部には、ボルト挿通孔が形成されるとと
もに、第1ベースプレート29および第2ベースプレー
ト30における治具本体22には、螺着孔がそれぞれ形
成されており、ホルダ部材72が本体67の周りを保持
した状態で、各固定ボルト96が、ホルダ部材72の両
端部に形成される各ボルト挿通孔を介して、治具本体2
2の螺着孔に螺着されることにより、ジャッキ装置66
が治具21に取り付けられている。
The main body 67 is disposed above the lower bulging portions 31 and 32 facing each other, and is attached via a substantially U-shaped holder member 72. That is, bolt insertion holes are formed at both ends of the holder member 72, and screw holes are formed in the jig body 22 of the first base plate 29 and the second base plate 30, respectively. Is held around the main body 67, each fixing bolt 96 is inserted into the jig main body 2 through each bolt insertion hole formed at both ends of the holder member 72.
The jack device 66 is screwed into the second screw hole.
Is attached to the jig 21.

【0034】また、この本体67は、略L字円筒形状を
なし、ピストン部材69が収容されるピストン筒部73
と、そのピストン筒部73から側方に延び、プランジャ
部材68が収容されるプランジャ筒部74とが一体に形
成されており、ピストン筒部73内とプランジャ筒部7
4内とは、連通路95によって連通されている。
The main body 67 has a substantially L-shaped cylindrical shape, and has a piston cylindrical portion 73 in which the piston member 69 is accommodated.
And a plunger cylinder 74 extending laterally from the piston cylinder 73 and accommodating the plunger member 68 are integrally formed, and the inside of the piston cylinder 73 and the plunger cylinder 7 are formed.
The inside of 4 is communicated with a communication passage 95.

【0035】プランジャ部材68は、軸方向に沿ってね
じ山が形成されるプランジャ軸89と、そのプランジャ
軸89の一端に設けられるボルト90と、その他端に設
けられるプランジャ91からなり、プランジャ91がシ
ールされた状態でプランジャ筒部74内に挿入されると
ともに、プランジャ軸89が、プランジャ筒部74の遊
端部に設けられているシールナット88に螺進および螺
退可能に螺着されている。
The plunger member 68 includes a plunger shaft 89 having a thread formed in the axial direction, a bolt 90 provided at one end of the plunger shaft 89, and a plunger 91 provided at the other end. While being inserted into the plunger cylinder 74 in a sealed state, the plunger shaft 89 is screwed to a seal nut 88 provided at the free end of the plunger cylinder 74 so as to be able to advance and retreat. .

【0036】また、ピストン部材69は、大径部92と
小径軸部93とが一体に形成されており、大径部92が
シールされるとともに、小径軸部93のまわりにばね7
1が配置された状態で、ピストン筒部73内に収容さ
れ、その状態において、ピストン筒部73の上端に、小
径軸部93を進退自在に挿通する上蓋94が取り付けら
れている。なお、小径軸部93の上端には、円板状に形
成される断面略コ字状の受け部材70が取り付けられて
おり、この受け部材70が、上側エレクションピース2
6の下端部を受けるように配置されている。
The piston member 69 has a large-diameter portion 92 and a small-diameter shaft portion 93 integrally formed. The large-diameter portion 92 is sealed, and the spring 7 surrounds the small-diameter shaft portion 93.
1 is accommodated in the piston cylinder 73, and in this state, an upper lid 94 is attached to the upper end of the piston cylinder 73 so that the small-diameter shaft 93 can be inserted and retracted. At the upper end of the small-diameter shaft portion 93, a receiving member 70 formed in a disk shape and having a substantially U-shaped cross section is attached.
6 are arranged to receive the lower end thereof.

【0037】そして、プランジャ筒部74内および連通
路95内にオイルを充填して、図14に示すように、レ
ンチ78によってボルト90をプランジャ軸89の螺進
方向に回動させれば、油圧により、ピストン部材69が
上昇して、受け部材70が上方向に移動し、一方、レン
チ78によってボルト90をプランジャ軸89の螺退方
向に回動させれば、ばね74の付勢力により、ピストン
部材69が降下して、受け部材70が下方向に移動され
る。そのため、このジャッキ装置66では、ボルト90
を、レンチ78によって正逆方向に回転させることによ
って、上側エレクションピース26の持ち上げ、また
は、持ち下げを行なうことができ、これによって、上側
エレクションピース26を適正位置で支持することがで
きる。
Then, oil is filled in the plunger cylinder 74 and the communication passage 95, and the bolt 90 is rotated in the screwing direction of the plunger shaft 89 by the wrench 78 as shown in FIG. As a result, the piston member 69 rises, and the receiving member 70 moves upward. On the other hand, if the bolt 90 is rotated in the retreating direction of the plunger shaft 89 by the wrench 78, the piston 74 is biased by the urging force of the spring 74. The member 69 descends, and the receiving member 70 is moved downward. Therefore, in this jack device 66, the bolt 90
By rotating the upper erection piece 26 in the forward and reverse directions with the wrench 78, the upper erection piece 26 can be lifted or lowered, thereby supporting the upper erection piece 26 at an appropriate position.

【0038】そして、本実施形態では、このような治具
21を、下側の鉄骨柱23と上側の鉄骨柱25との溶接
時に飛散するスパッタから防護するための、防護カバー
101が設けられている。
In the present embodiment, a protective cover 101 is provided to protect such a jig 21 from spatter scattered when welding the lower steel column 23 and the upper steel column 25. I have.

【0039】図7は防護カバーの斜視図、図8はその正
面図、図9はその右側面図、図10はその平面図であ
る。次に、図7ないし図10、および、後述する図11
ないし図15を参照して、防護カバー101について説
明する。
FIG. 7 is a perspective view of the protective cover, FIG. 8 is its front view, FIG. 9 is its right side view, and FIG. 10 is its plan view. Next, FIGS. 7 to 10 and FIGS.
The protective cover 101 will be described with reference to FIGS.

【0040】図7ないし図10において、この防護カバ
ー101は、断面コ字状の金属板材から形成されてお
り、略矩形状の防護壁部102と、その防護壁部102
の幅方向両端から屈曲形成される取付部としての取付板
部103とを備えている。防護壁部102は、図15に
も示すように、その下端部に、下側の鉄骨柱23のエレ
クションピース24を挿通するための下側切欠部104
が、下側に向かって略矩形状に開口形成されるととも
に、その上端部に、上側の鉄骨柱25のエレクションピ
ース26を挿通するための下側切欠部105が、上側に
向かって矩形状に開口形成されている。
7 to 10, the protective cover 101 is made of a metal plate having a U-shaped cross section, and has a substantially rectangular protective wall 102 and a protective wall 102.
And a mounting plate portion 103 as a mounting portion bent from both ends in the width direction. As shown in FIG. 15, the protective wall portion 102 has a lower notch 104 at the lower end thereof for inserting the erection piece 24 of the lower steel column 23.
Is formed in a substantially rectangular shape toward the lower side, and a lower notch portion 105 for inserting the erection piece 26 of the upper steel column 25 at the upper end thereof has a rectangular shape toward the upper side. An opening is formed.

【0041】また、取付板部103は、防護壁部102
と一体形成され、防護壁部102の幅方向両端部から、
略直交方向に互いに対向するように延び、その基端部か
ら遊端部に向かって先細状となるような側面視略三角形
状として形成されており、その先端部には、治具本体2
2に取り付けるための取付孔106が穿孔されている。
Further, the mounting plate portion 103 is
From the both ends in the width direction of the protective wall portion 102,
It is formed in a substantially triangular shape in a side view so as to extend in a direction substantially orthogonal to each other and taper from its base end toward the free end.
2, a mounting hole 106 is provided.

【0042】そして、この防護カバー101は、図14
に示すように、防護壁部102が、下側の鉄骨柱23の
エレクションピース24と上側の鉄骨柱25のエレクシ
ョンピース26との間の溶接部分100に対向するよう
な状態で、防護壁部102および両取付板部103によ
って治具本体22を囲むように配置して、取付板部10
3の取付孔106を、治具本体22の螺着孔に対向させ
て、ホルダ部材72とともに、各固定ボルト96の挿通
固定によって、治具本体22に着脱自在に取り付けるよ
うにされている。
Then, the protective cover 101 is provided as shown in FIG.
As shown in FIG. 5, the protection wall portion 102 faces the welded portion 100 between the erection piece 24 of the lower steel column 23 and the erection piece 26 of the upper steel column 25, and The jig main body 22 is arranged so as to surround the jig main body 22 by the two mounting plate portions 103, and the mounting plate portion 10
The third mounting hole 106 faces the screw hole of the jig main body 22, and is detachably mounted to the jig main body 22 by inserting and fixing the fixing bolts 96 together with the holder member 72.

【0043】図11は、治具を上側エレクションピース
に連結した状態を示す正面図、図12は、治具を上側エ
レクションピースに連結した状態を示す側面図、図13
は、治具を、上側エレクションピースおよび下側エレク
ションピースに連結した状態を示す正面図、図14は、
ジャッキ装置の使用状態を示す要部斜視図、図15は、
上側の鉄骨柱と下側の鉄骨柱とを溶接する状態を示す要
部斜視図である。
FIG. 11 is a front view showing a state in which the jig is connected to the upper erection piece. FIG. 12 is a side view showing a state in which the jig is connected to the upper erection piece.
Is a front view showing a state in which the jig is connected to the upper erection piece and the lower erection piece, FIG.
FIG. 15 is a perspective view of a main part showing a use state of the jack device.
It is a principal part perspective view which shows the state which welds an upper steel column and a lower steel column.

【0044】次に、これら図11ないし図15を参照し
て、このような防護カバー101が取り付けられた治具
21を用いて、下側の鉄骨柱23の上に、上側の鉄骨柱
25を接合する方法について説明する。下側の鉄骨柱2
3は、既にその下端部が他の鉄骨柱に接合された状態に
ある鉄骨柱であって、たとえば、図13ないし図15に
示すように、その断面形状が略4角形状をなし、その上
端部および下端部において、外周面の各辺の中央部に、
4つの略矩形板状の下側エレクションピース24が、こ
の下側の鉄骨柱23の周方向に対する直交方向におい
て、それぞれ溶接固定されている。また、各下側エレク
ションピース24の中央部には、図12に示すように、
クレーンの吊り具(図示せず)を挿通するために用いら
れる挿通孔83が、厚さ方向を貫通するようにして、そ
れぞれ形成されている。
Next, referring to FIGS. 11 to 15, the jig 21 to which the protective cover 101 is attached is used to mount the upper steel column 25 on the lower steel column 23. The joining method will be described. Lower steel column 2
Reference numeral 3 denotes a steel column having a lower end portion already joined to another steel column, for example, as shown in FIG. 13 to FIG. In the part and the lower end, at the center of each side of the outer peripheral surface,
The four substantially rectangular plate-shaped lower erection pieces 24 are respectively welded and fixed in the direction perpendicular to the circumferential direction of the lower steel column 23. Also, as shown in FIG. 12, at the center of each lower erection piece 24,
Insertion holes 83 used to insert a hanging tool (not shown) of the crane are formed so as to penetrate in the thickness direction.

【0045】また、上側の鉄骨柱25は、これから、そ
の下端部を下側の鉄骨柱23の上端部に接合しようとす
る鉄骨柱であって、たとえば、図13ないし図15に示
すように、その断面形状が略4角形状をなし、その上端
部および下端部において、外周面の各辺の中央部に、4
つの略矩形板状の上側エレクションピース26が、この
上側の鉄骨柱25の周方向に対する直交方向において、
それぞれ溶接固定されている。また、各上側エレクショ
ンピース24の中央部には、図11に示すように、クレ
ーンの吊り具(図示せず)を挿通するために用いられる
挿通孔84が、厚さ方向を貫通するようにして、それぞ
れ形成されている。
The upper steel column 25 is a steel column whose lower end is to be joined to the upper end of the lower steel column 23. For example, as shown in FIGS. Its cross-sectional shape is substantially quadrangular, and at its upper and lower ends, 4
Two substantially rectangular plate-shaped upper erection pieces 26 are arranged in a direction orthogonal to the circumferential direction of the upper steel column 25.
Each is fixed by welding. In addition, as shown in FIG. 11, an insertion hole 84 used to insert a hanging tool (not shown) of the crane is formed in the center of each upper erection piece 24 so as to penetrate in the thickness direction. , Respectively.

【0046】そして、この方法では、まず、上側の鉄骨
柱25の下端部に設けられている4つの上側エレクショ
ンピース26のそれぞれに、4つの治具21をそれぞれ
連結する。各治具21を各上側エレクションピース26
に連結するには、まず、図11および図12に示すよう
に、治具21の第2取付部28における各上方膨出部3
7および38の間に上側エレクションピース26を挿入
して挟んだ後、この上側エレクションピース26の挿通
孔84と、各上方膨出部37および38のねじ孔55お
よび56とを位置合わせして、上側固定ボルト54を、
各上方膨出部37および38のねじ孔55および56の
いずれか一方から、上側エレクションピース26の挿通
孔84を介して、他方の上方膨出部37および38のね
じ孔55および56に挿通して、その他方の上方膨出部
37および38のねじ孔55および56に、この上側固
定ボルト54の螺着部を螺着させる。これによって、こ
の治具21を、上側エレクションピース26に確実に連
結する。
In this method, first, the four jigs 21 are respectively connected to the four upper erection pieces 26 provided at the lower end of the upper steel column 25. Each jig 21 is connected to each upper erection piece 26
First, as shown in FIGS. 11 and 12, each of the upper bulging portions 3 in the second mounting portion 28 of the jig 21 is connected.
After inserting and sandwiching the upper erection piece 26 between 7 and 38, the insertion hole 84 of the upper erection piece 26 is aligned with the screw holes 55 and 56 of the upper bulging portions 37 and 38, respectively. The upper fixing bolt 54 is
One of the screw holes 55 and 56 of each of the upper bulging portions 37 and 38 is inserted into the screw holes 55 and 56 of the other upper bulging portions 37 and 38 through the insertion hole 84 of the upper erection piece 26. Then, the screw portion of the upper fixing bolt 54 is screwed into the screw holes 55 and 56 of the other upper bulging portions 37 and 38. Thereby, the jig 21 is securely connected to the upper erection piece 26.

【0047】その後、各上側方膨出部35および36の
ねじ孔59および60に、各上側第1押圧ボルト57お
よび58を螺着させて、上側エレクションピース26の
表面および裏面を、適宜、その上側エレクションピース
26の厚さ方向に押圧するとともに、上側支持板40の
ねじ孔62に、上側第2押圧ボルト61を螺着させて、
上側エレクションピース26の側面を、適宜、その上側
エレクションピース26の遊端側の側端部から基部側の
側端部に向けて押圧することにより、上側の鉄骨柱25
に対する治具21の連結姿勢を調整する。より具体的に
は、クレーンよって吊り上げられた状態において、この
治具21の各下方膨出部33および34の間に、上側エ
レクションピース24が円滑に挿入されるように、治具
21の連結姿勢を調整する。そうすれば、この治具21
を下側の鉄骨柱23と連結する時に、各下方膨出部33
および34の間において、良好な姿勢で円滑に上側エレ
クションピース24を受け入れることができるので、効
率的な作業を行なうことができる。
Thereafter, the upper first pressing bolts 57 and 58 are screwed into the screw holes 59 and 60 of the upper bulging portions 35 and 36, and the front and back surfaces of the upper erection piece 26 are appropriately adjusted. While pressing in the thickness direction of the upper erection piece 26, the upper second pressing bolt 61 is screwed into the screw hole 62 of the upper support plate 40,
By appropriately pressing the side surface of the upper erection piece 26 from the free end side end of the upper erection piece 26 toward the base side end, the upper steel column 25
Of the connecting position of the jig 21 with respect to. More specifically, the connection posture of the jig 21 so that the upper erection piece 24 is smoothly inserted between the lower bulging portions 33 and 34 of the jig 21 in a state of being lifted by the crane. To adjust. Then, this jig 21
When connecting to the lower steel column 23, each of the lower bulges 33
Since the upper erection piece 24 can be smoothly received in a good posture between the position and the position 34, efficient work can be performed.

【0048】そして、このようにして、上側の鉄骨柱2
5に対する治具21の連結姿勢が調整された後に、この
上側の鉄骨柱25をクレーンによって吊り上げて、下側
の鉄骨柱23の上方において、各上側エレクションピー
ス26と各下側エレクションピース24とが対向するよ
うに配置する。この上側の鉄骨柱25のクレーンによる
吊り上げは、公知の方法で行なうことができ、たとえ
ば、上側の鉄骨柱25の上端部に設けられる各上側エレ
クションピース26の挿通孔84に、吊り具を挿入して
吊り上げればよい。
Then, in this way, the upper steel column 2
After the connection posture of the jig 21 with respect to 5 is adjusted, the upper steel column 25 is lifted by a crane, and the upper erection pieces 26 and the lower erection pieces 24 are moved above the lower steel column 23. They are arranged so as to face each other. The lifting of the upper steel column 25 by a crane can be performed by a known method. For example, a lifting tool is inserted into the insertion hole 84 of each upper erection piece 26 provided at the upper end of the upper steel column 25. Just lift it.

【0049】そして、下側の鉄骨柱23の上端部に設け
られている4つの下側エレクションピース24のそれぞ
れに、4つの治具21をそれぞれ連結する。各治具21
を各下側エレクションピース24に連結するには、ま
ず、図11および図12に示すように、クレーンによっ
て上側の鉄骨柱25を徐々に下げ、治具21の第1取付
部27における各下方膨出部33および34の間に下側
エレクションピース24を挿入して挟むようにする。
Then, the four jigs 21 are connected to the four lower erection pieces 24 provided at the upper end of the lower steel column 23, respectively. Each jig 21
In order to connect the upper steel column 25 to the lower erection pieces 24, first, as shown in FIG. 11 and FIG. The lower erection piece 24 is inserted and sandwiched between the projections 33 and 34.

【0050】次いで、図13および図14に示すよう
に、下側エレクションピース24の挿通孔83と、各下
方膨出部33および34のねじ孔42および43とを位
置合わせして、下側固定ボルト41を、各下方膨出部3
3および34のねじ孔42および43のいずれか一方か
ら、下側エレクションピース24の挿通孔83を介し
て、他方の下方膨出部33および34のねじ孔42およ
び43に挿通して、その他方の下方膨出部33および3
4のねじ孔42および43に、この下側固定ボルト41
の螺着部64を螺着させる。これによって、この治具2
1を、下側エレクションピース24に確実に連結する。
Next, as shown in FIGS. 13 and 14, the insertion hole 83 of the lower erection piece 24 and the screw holes 42 and 43 of each of the lower bulging portions 33 and 34 are aligned, and the lower fixing portion is fixed. The bolt 41 is attached to each of the lower bulging portions 3.
3 and 34, through one of the screw holes 42 and 43 of the lower erection piece 24, into the screw holes 42 and 43 of the other lower bulges 33 and 34, and through the other. Downward bulges 33 and 3
4 and the lower fixing bolt 41
Is screwed. Thereby, this jig 2
1 is securely connected to the lower erection piece 24.

【0051】次いで、下側の鉄骨柱23に対する上側の
鉄骨柱25の姿勢を水平方向において修正し、両者の目
地合わせを行なう。上側の鉄骨柱25における水平方向
の修正は、たとえば、次のようにして行なうことができ
る。すなわち、図13に示すように、まず、一方の下側
方膨出部31のねじ孔46に、下側第1押圧ボルト44
を螺着させて、下側エレクションピース24を、他方の
下側方膨出部32に向けて押圧するとともに、下側方膨
出部31の上端側のねじ孔50にも、下側第2押圧ボル
ト48を螺着させて、下側エレクションピース24を、
他方の下側方膨出部32に向けて押圧し、さらに、下側
支持板39のねじ孔53に、下側第3押圧ボルト52を
螺着させて、下側エレクションピース24の側面を、そ
の下側エレクションピース24の遊端側の側端部から基
部側の側端部に向けて押圧することにより、第1取付部
27をしっかりと下側エレクションピース24に固定す
る。
Next, the posture of the upper steel column 25 with respect to the lower steel column 23 is corrected in the horizontal direction, and the joints of the two are performed. The horizontal correction of the upper steel column 25 can be performed, for example, as follows. That is, as shown in FIG. 13, first, the lower first pressing bolt 44 is inserted into the screw hole 46 of one of the lower bulging portions 31.
, And presses the lower erection piece 24 toward the other lower bulging portion 32, and also inserts the lower second erection piece 24 into the screw hole 50 on the upper end side of the lower bulging portion 31. By screwing the pressing bolt 48, the lower erection piece 24 is
The lower erected piece 24 is pressed against the other lower bulging portion 32, and further, the lower third pressing bolt 52 is screwed into the screw hole 53 of the lower support plate 39, so that the side surface of the lower erection piece 24 is The first mounting portion 27 is firmly fixed to the lower erection piece 24 by pressing the lower erection piece 24 from the free end side end to the base side end.

【0052】次いで、各上側第1押圧ボルト57および
58を適宜調整して締め付けて、上側エレクションピー
ス26をその厚さ方向に押圧することにより、上側の鉄
骨柱25の下側の鉄骨柱23に対する水平方向における
周方向の位置調整を行なう。すなわち、各上側第1押圧
ボルト57および58によって上側エレクションピース
26の表面および裏面を押圧すれば、上側の鉄骨柱25
は、その押圧力が作用する方向に移動されるので、互い
に対向する各上側第1押圧ボルト57および58を適宜
調整して締め付けることによって、上側の鉄骨柱25
を、その周方向における正逆方向に移動させることがで
き、これによって、水平方向における周方向の位置調整
を行なうことができる。
Then, the upper first pressing bolts 57 and 58 are appropriately adjusted and tightened, and the upper erection piece 26 is pressed in the thickness direction thereof, whereby the upper erection piece 26 is pressed against the lower steel column 23 on the lower side. The position adjustment in the circumferential direction in the horizontal direction is performed. That is, when the upper and lower surfaces of the upper erection piece 26 are pressed by the upper first pressing bolts 57 and 58, the upper steel column 25
Is moved in the direction in which the pressing force acts, so that the upper first pressing bolts 57 and 58 opposing each other are appropriately adjusted and tightened, whereby the upper steel column 25 is moved.
Can be moved in the forward and reverse directions in the circumferential direction, whereby the circumferential position adjustment in the horizontal direction can be performed.

【0053】また、このような、水平方向における周方
向の位置調整とともに、上側第2押圧ボルト61を適宜
調整して締め付けて、上側エレクションピース26の側
面を、その上側エレクションピース26の遊端側の側端
部から基部側の側端部に向けて押圧することにより、上
側の鉄骨柱25の下側の鉄骨柱23に対する水平方向に
おける周方向と直交する方向の位置調整を行なう。すな
わち、上側第2押圧ボルト61によって上側エレクショ
ンピース26の遊端側の側端部から基部側の側端部に向
けて押圧すれば、上側の鉄骨柱25は、その押圧力が作
用する方向に移動されるので、上側第2押圧ボルト61
を適宜調整して締め付けることによって、上側の鉄骨柱
25を、その周方向と直交する方向に移動させることが
でき、これによって、水平方向における周方向と直交す
る方向の位置調整を行なうことができる。
In addition to such adjustment of the circumferential position in the horizontal direction, the upper second pressing bolt 61 is appropriately adjusted and tightened so that the side surface of the upper erection piece 26 is moved to the free end side of the upper erection piece 26. By pressing from the side end to the side end on the base side, the position adjustment in the direction orthogonal to the horizontal circumferential direction with respect to the lower steel column 23 on the upper steel column 25 is performed. That is, if the upper second pressing bolt 61 is pressed from the free end side end of the upper erection piece 26 toward the base side end, the upper steel column 25 moves in the direction in which the pressing force acts. Since it is moved, the upper second pressing bolt 61
By appropriately adjusting and tightening, the upper steel column 25 can be moved in a direction perpendicular to the circumferential direction thereof, whereby the position can be adjusted in the horizontal direction perpendicular to the circumferential direction. .

【0054】このようにして、上側の鉄骨柱25におけ
る水平方向の修正を行なえば、上側の鉄骨柱25を、下
側の鉄骨柱23に、その水平方向における周方向および
その直交方向での姿勢を修正して連結することができる
ので、下側の鉄骨柱23に上側の鉄骨柱25を良好な姿
勢で接合することができる。
When the horizontal correction of the upper steel column 25 is performed in this manner, the upper steel column 25 is attached to the lower steel column 23 in the circumferential direction in the horizontal direction and in the vertical direction. Therefore, the upper steel column 25 can be joined to the lower steel column 23 in a favorable posture.

【0055】次いで、下側の鉄骨柱23に対する上側の
鉄骨柱25の姿勢を鉛直方向において修正する。上側の
鉄骨柱25における鉛直方向の修正は、上記したよう
に、図14において、ジャッキ装置66のボルト90
を、レンチ78によって正逆方向に回転させることによ
って、上側エレクションピース26の持ち上げ、また
は、持ち下げを行ない、これによって、上側エレクショ
ンピース26を適正位置で支持することにより行なうこ
とができる。このようにして、上側エレクションピース
26を、適正位置で支持すれば、上側の鉄骨柱25の下
側の鉄骨柱23に対する上下方向での傾きを修正するこ
とができるので、これによって、上側の鉄骨柱25の鉛
直方向の姿勢を確実に修正して、下側の鉄骨柱23に上
側の鉄骨柱25をより一層良好な姿勢で接合することが
できる。
Next, the posture of the upper steel column 25 with respect to the lower steel column 23 is corrected in the vertical direction. In the vertical direction of the upper steel column 25, as described above, the bolt 90 of the jack device 66 in FIG.
Can be lifted or lowered by rotating the upper erection piece 26 in the forward and reverse directions with a wrench 78, thereby supporting the upper erection piece 26 at an appropriate position. In this way, if the upper erection piece 26 is supported at an appropriate position, the inclination of the upper steel column 25 in the vertical direction with respect to the lower steel column 23 can be corrected. The posture of the column 25 in the vertical direction can be reliably corrected, and the upper steel column 25 can be joined to the lower steel column 23 in a more favorable posture.

【0056】さらに、このような水平方向および鉛直方
向の位置調整とともに、上側第3押圧ボルト86を適宜
調整して締め付けて、上側エレクションピース26の上
端部を、その上端側から下端側に向けて押圧すれば、上
側の鉄骨柱25を下側の鉄骨柱23に対して押圧するこ
とができる。そのため、上側の鉄骨柱25を、下側の鉄
骨柱23に対して密着させて連結することができ、下側
の鉄骨柱23に上側の鉄骨柱25を良好な姿勢で接合す
ることができる。
Further, in addition to such horizontal and vertical position adjustments, the upper third pressing bolt 86 is appropriately adjusted and tightened so that the upper end of the upper erection piece 26 is directed from the upper end to the lower end. When pressed, the upper steel column 25 can be pressed against the lower steel column 23. Therefore, the upper steel column 25 can be closely contacted and connected to the lower steel column 23, and the upper steel column 25 can be joined to the lower steel column 23 in a favorable posture.

【0057】なお、上記の説明においては、上側エレク
ションピース26の水平方向の位置調整を行なった後、
上側エレクションピース26の鉛直方向の位置調整を行
なうようにしたが、その順序はいずれが先でもよく、上
側エレクションピース26の鉛直方向の位置調整を行な
った後、上側エレクションピース26の水平方向の位置
調整を行なうようにしてもよく、さらには、これら水平
方向の位置調整と鉛直方向の位置調整とを並行して行な
ってもよい。
In the above description, after adjusting the position of the upper erection piece 26 in the horizontal direction,
The position of the upper erection piece 26 in the vertical direction is adjusted, but the order may be any order. After the position of the upper erection piece 26 is adjusted in the vertical direction, the position of the upper erection piece 26 in the horizontal direction is adjusted. The adjustment may be performed, and the horizontal position adjustment and the vertical position adjustment may be performed in parallel.

【0058】そして、このようにして、下側の鉄骨柱2
3に対する上側の鉄骨柱25の姿勢を修正した後に、下
側の鉄骨柱23の上端部と、上側の鉄骨柱25の下端部
とを溶接によって接合する。なお、この方法において
は、各治具21によって、上側の鉄骨注25と下側の鉄
骨柱23とが連結されていれば、その後、適宜の時点に
おいて、クレーンの吊り具を、上側の鉄骨柱25の上端
部に設けられる各上側エレクションピース26から取り
外すようにすればよい。
Then, in this manner, the lower steel column 2
After the posture of the upper steel column 25 with respect to 3 is corrected, the upper end of the lower steel column 23 and the lower end of the upper steel column 25 are joined by welding. In this method, if the upper steel frame note 25 and the lower steel frame column 23 are connected by each jig 21, then, at an appropriate point in time, the crane hanging tool is connected to the upper steel frame column. What is necessary is just to remove from each upper erection piece 26 provided in the upper end part of 25.

【0059】そして、この接合時においては、図15に
示すように、溶接時のスパッタが飛散するが、下側の鉄
骨柱23と上側の鉄骨柱25との間の溶接部分100
と、治具21との間には、防護カバー101の防護壁部
102が介在されるので、そのようなスパッタが、治具
21に付着することが有効に防止される。そのため、治
具21の強度低下を回避することができ、それによっ
て、治具21の耐久性の向上およびメンテナンスの容易
化を図ることができ、治具21を安定した品質で使用す
ることができる。より具体的には、防護カバー101の
防護壁部102が、第1取付部27と第2取付部28と
の間に配置されているので、その溶接時に飛散するスパ
ッタが、治具本体22に付着することが確実に防止され
ている。
At the time of this joining, spatters during welding are scattered as shown in FIG. 15, but a welding portion 100 between the lower steel column 23 and the upper steel column 25 is formed.
Since the protective wall portion 102 of the protective cover 101 is interposed between the jig 21 and the jig 21, such spatter is effectively prevented from adhering to the jig 21. Therefore, it is possible to avoid a decrease in the strength of the jig 21, thereby improving the durability of the jig 21 and facilitating maintenance, and using the jig 21 with stable quality. . More specifically, since the protective wall portion 102 of the protective cover 101 is disposed between the first mounting portion 27 and the second mounting portion 28, spatters scattered at the time of welding are generated on the jig main body 22. Adhesion is reliably prevented.

【0060】また、このような防護カバー101は、溶
接部分100に対向される防護壁部102と、治具本体
22に取り付ける取付板部103とを備えているので、
溶接時に飛散するスパッタを、防護壁部102によって
確実に防護することができるとともに、取付板部103
によって防護カバー101を確実に治具本体22に取り
付けることができる。そのため、より確実に、治具21
の強度低下を回避することができる。
Further, since such a protective cover 101 includes a protective wall portion 102 facing the welded portion 100 and a mounting plate portion 103 attached to the jig main body 22,
Spatter scattered during welding can be reliably protected by the protective wall portion 102, and the mounting plate portion 103
Accordingly, the protective cover 101 can be securely attached to the jig main body 22. Therefore, the jig 21 can be more reliably.
Can be avoided.

【0061】しかも、防護壁部102には、下側の鉄骨
柱23のエレクションピース24を挿通するための下側
切欠部104と、上側の鉄骨柱25のエレクションピー
ス26を挿通するための上側切欠部105とが形成され
ているので、この防護壁部102によって、下側の鉄骨
柱23のエレクションピース24よりも下方の治具本体
22を覆うことができるとともに、上側の鉄骨柱25の
エレクションピース26よりも上方を覆うことができ
る。そのため、より広く、治具本体22、さらには、第
1取付部27および第2取付部28を覆って、溶接時に
飛散するスパッタが治具本体22に付着することを、よ
り一層有効に防止することができる。また、防護壁部1
02の下側切欠部104に、下側の鉄骨柱23のエレク
ションピース24が挿通されるとともに、防護壁部10
2の上側切欠部105に、上側の鉄骨柱25のエレクシ
ョンピース26が挿通された状態では、それら下側の鉄
骨柱23のエレクションピース24と上側の鉄骨柱25
のエレクションピース26とによって、防護カバー10
1のがたつきなどが規制されるので、確実に位置決めさ
れた状態で、溶接時に飛散するスパッタから、治具本体
22を確実に防護することができる。
In addition, a lower cutout portion 104 for inserting the erection piece 24 of the lower steel column 23 and an upper cutout for inserting the erection piece 26 of the upper steel column 25 are formed in the protective wall portion 102. Since the protective wall portion 102 is formed, the jig body 22 below the erection piece 24 of the lower steel column 23 can be covered by the protective wall portion 102 and the erection piece of the upper steel column 25 can be covered. 26 can be covered. For this reason, the jig body 22 and the first and second attachment portions 27 and 28 are more widely covered, and spatter scattered during welding is more effectively prevented from adhering to the jig body 22. be able to. In addition, the protective wall 1
02, the erection piece 24 of the lower steel column 23 is inserted into the lower notch 104, and the protection wall 10
In a state where the erection piece 26 of the upper steel column 25 is inserted into the upper notch portion 105, the erection piece 24 of the lower steel column 23 and the upper steel column 25
Of the protective cover 10 by the erection piece 26 of FIG.
Since rattling or the like is regulated, the jig main body 22 can be reliably protected from spatter scattered at the time of welding in a state where it is securely positioned.

【0062】また、この防護カバー101は、各取付板
部103の取付孔106に各固定ボルト96を挿通する
ことによって、着脱自在に治具本体22に取り付けられ
ているので、溶接時に飛散するスパッタの付着により防
護カバー101が損傷しても、その防護カバー101の
みを交換すれば、再び、良好に使用することができる。
したがって、簡易なメンテナンスにより、かつ、低コス
トで、長期にわたって、治具21を良好に使用すること
ができる。
The protective cover 101 is removably attached to the jig body 22 by inserting the fixing bolts 96 into the mounting holes 106 of the mounting plate portions 103. Even if the protective cover 101 is damaged due to the adhesion, if the protective cover 101 alone is replaced, it can be used again satisfactorily.
Therefore, the jig 21 can be favorably used for a long period of time with simple maintenance and at low cost.

【0063】なお、以上の説明においては、下側の鉄骨
柱23および上側の鉄骨柱25は、その断面形状が略4
角形状をなし、その外周面の各辺の中央部に形成される
各下側エレクションピース24および各上側エレクショ
ンピース26のそれぞれに、各治具21を連結するよう
にしたが、下側の鉄骨柱23および上側の鉄骨柱25の
形状は、何ら限定されず、たとえば、断面多角形状、断
面円形状などであってもよく、また、各下側エレクショ
ンピース24および各上側エレクションピース26の数
も限定されず、さらには、各治具21を、各下側エレク
ションピース24および各上側エレクションピース26
に必ず対応させて連結する必要もない。
In the above description, the lower steel column 23 and the upper steel column 25 have a sectional shape of approximately 4 mm.
Each jig 21 is connected to each of the lower erection pieces 24 and the upper erection pieces 26 formed at the center of each side of the outer peripheral surface of each of the jigs 21. The shape of the column 23 and the upper steel column 25 is not limited at all, and may be, for example, a polygonal cross section, a circular cross section, or the like, and the number of each lower erection piece 24 and each upper erection piece 26 The jigs 21 are not limited to each other, and each jig 21 is
It is not necessary to always connect to correspond to.

【0064】なお、本発明の防護カバーは、以上に述べ
た治具21以外にも、鉄骨建入直し調整治具であれば、
何ら限定されることなく、広く適用することができる。
例えば、上記した、図18ないし図20に示す治具1に
ついても適用することができる。すなわち、治具1に適
用するカバー101は、たとえば、図17に示すよう
に、断面コ字状の金属板材から形成されており、略矩形
状の防護壁部102と、その防護壁部102の幅方向両
端から屈曲形成される取付部としての取付板部103と
を備えており、防護壁部102は、その下端部に、下側
の鉄骨柱2のエレクションピース3を挿通するための下
側切欠部104が、下側に向かって略矩形状に開口形成
されるとともに、その上端部に、上側の鉄骨柱4のエレ
クションピース5を挿通するための下側切欠部105
が、上側に向かって矩形状に開口形成されている。
The protective cover of the present invention is not limited to the above-described jig 21 but may be any other steel-frame re-adjustment jig.
It can be widely applied without any limitation.
For example, the above-described jig 1 shown in FIGS. 18 to 20 can also be applied. That is, the cover 101 applied to the jig 1 is formed of, for example, a metal plate having a U-shaped cross section, as shown in FIG. An attachment plate portion 103 is provided as an attachment portion bent from both ends in the width direction, and the protective wall portion 102 has a lower end for inserting the erection piece 3 of the lower steel column 2 into a lower end thereof. A notch 104 is formed in a substantially rectangular opening toward the lower side, and a lower notch 105 for inserting the erection piece 5 of the upper steel column 4 into the upper end thereof.
Are formed in a rectangular shape toward the upper side.

【0065】また、取付板部103は、防護壁部102
と一体形成され、防護壁部102の幅方向両端部から、
略直交方向に互いに対向するように延び、側面視略台形
状として形成されており、その先端下部には、治具本体
22に取り付けるための取付孔106が穿孔されてい
る。
Further, the mounting plate portion 103 is
From the both ends in the width direction of the protective wall portion 102,
It extends in a substantially orthogonal direction so as to face each other, and is formed in a substantially trapezoidal shape when viewed from the side. A mounting hole 106 for mounting to the jig main body 22 is drilled at the lower end of the tip.

【0066】そして、この防護カバー101は、たとえ
ば、図16に示すように、防護壁部102が、下側の鉄
骨柱2のエレクションピース3と上側の鉄骨柱4のエレ
クションピース5との間の溶接部分に対向するような状
態で、防護壁部102および両取付板部103によって
治具1を囲むように配置され、取付板部103の取付孔
106を、治具1の下側水平押圧ボルト8の螺着孔に対
向させて、その下側水平押圧ボルト8の挿通固定によっ
て、治具1に着脱自在に取り付けられている。
In this protective cover 101, as shown in FIG. 16, for example, the protective wall portion 102 is provided between the erection piece 3 of the lower steel column 2 and the erection piece 5 of the upper steel column 4. The jig 1 is arranged so as to surround the jig 1 by the protective wall portion 102 and the two attachment plate portions 103 in a state where the jig 1 is opposed to the welding portion. 8 is detachably attached to the jig 1 by inserting and fixing a lower horizontal pressing bolt 8 so as to face the screw hole 8.

【0067】[0067]

【発明の効果】以上述べたように、請求項1に記載の発
明によれば、鉄骨建入直し調整治具の耐久性の向上およ
びメンテナンスの容易化を図ることができ、鉄骨建入直
し調整治具を安定した品質で使用することができる。
As described above, according to the first aspect of the present invention, it is possible to improve the durability of the steel frame re-installation adjustment jig and to facilitate maintenance, and to adjust the steel frame re-installation adjustment. The jig can be used with stable quality.

【0068】請求項2に記載の発明によれば、溶接時に
飛散するスパッタが、治具本体に付着することを確実に
防止することができ、鉄骨建入直し調整治具の強度低下
を、より確実に回避することができる。
According to the second aspect of the present invention, it is possible to reliably prevent spatter scattered at the time of welding from adhering to the jig main body. It can be avoided reliably.

【0069】請求項3に記載の発明によれば、溶接時に
飛散するスパッタを、防護壁部によって確実に防護する
ことができるとともに、取付部によって防護カバーを確
実に治具本体に取り付けることができ、より確実に、鉄
骨建入直し調整治具の強度低下を回避することができ
る。
According to the third aspect of the invention, the spatter scattered during welding can be reliably protected by the protective wall portion, and the protective cover can be securely mounted to the jig body by the mounting portion. In addition, it is possible to more reliably avoid a reduction in the strength of the steel frame re-installation adjustment jig.

【0070】請求項4に記載の発明によれば、より広く
鉄骨建入直し調整治具を覆って、溶接時に飛散するスパ
ッタが治具本体に付着することを、より一層有効に防止
することができ、鉄骨建入直し調整治具の強度低下を、
より一層、回避することができる。また、下側の鉄骨柱
のエレクションピースと上側の鉄骨柱のエレクションピ
ースとによって、防護カバーのがたつきなどが規制され
るので、確実に位置決めされた状態で、溶接時に飛散す
るスパッタを確実に防護することができる。
According to the fourth aspect of the invention, it is possible to more effectively prevent the spatter scattered at the time of welding from adhering to the jig body by covering the steel frame re-installation adjusting jig more widely. Can reduce the strength of the steel frame refitting adjustment jig.
It can be further avoided. In addition, the erection piece of the lower steel column and the erection piece of the upper steel column regulate the backlash of the protective cover, etc. Can be protected.

【0071】請求項5に記載の発明によれば、簡易なメ
ンテナンスにより、かつ、低コストで、長期にわたっ
て、鉄骨建入直し調整治具を良好に使用することができ
る。
According to the fifth aspect of the present invention, the steel frame refitting adjustment jig can be favorably used for a long period of time at a low cost with a simple maintenance.

【0072】請求項6に記載の発明によれば、鉄骨建入
直し調整治具の耐久性の向上およびメンテナンスの容易
化を図ることができ、鉄骨建入直し調整治具を安定した
品質で使用することができる。
According to the sixth aspect of the present invention, it is possible to improve the durability of the steel frame re-installation adjusting jig and to facilitate maintenance, and to use the steel frame re-installing adjusting jig with stable quality. can do.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の鉄骨建入直し調整治具の一実施形態と
しての治具を示す斜視図である。
FIG. 1 is a perspective view showing a jig as one embodiment of a steel frame re-installation adjustment jig of the present invention.

【図2】図1の正面図である。FIG. 2 is a front view of FIG.

【図3】図1の背面図である。FIG. 3 is a rear view of FIG. 1;

【図4】図1の左側面図である。FIG. 4 is a left side view of FIG.

【図5】図1の右側面図である。FIG. 5 is a right side view of FIG. 1;

【図6】図2におけるA−A線断面図である。FIG. 6 is a sectional view taken along line AA in FIG. 2;

【図7】防護カバーの斜視図である。FIG. 7 is a perspective view of a protective cover.

【図8】防護カバーの正面図である。FIG. 8 is a front view of the protective cover.

【図9】防護カバーの右側面図である。FIG. 9 is a right side view of the protective cover.

【図10】防護カバーの平面図である。FIG. 10 is a plan view of a protective cover.

【図11】治具を上側エレクションピースに連結した状
態を示す正面図である。
FIG. 11 is a front view showing a state where a jig is connected to an upper erection piece.

【図12】治具を上側エレクションピースに連結した状
態を示す側面図である。
FIG. 12 is a side view showing a state where the jig is connected to the upper erection piece.

【図13】治具を上側エレクションピースおよび下側エ
レクションピースに連結した状態を示す正面図である。
FIG. 13 is a front view showing a state where a jig is connected to an upper erection piece and a lower erection piece.

【図14】ジャッキ装置の使用状態を示す要部斜視図で
ある。
FIG. 14 is a perspective view of a main part showing a use state of the jack device.

【図15】上側の鉄骨柱と下側の鉄骨柱とを溶接する状
態を示す要部斜視図である。
FIG. 15 is a perspective view of relevant parts showing a state where an upper steel column and a lower steel column are welded.

【図16】異なる実施形態の治具を上側エレクションピ
ースおよび下側エレクションピースに連結した状態を示
す正面図である。
FIG. 16 is a front view showing a state in which a jig according to a different embodiment is connected to an upper erection piece and a lower erection piece.

【図17】図16に示す治具の防護カバーの斜視図であ
る。
FIG. 17 is a perspective view of a protective cover of the jig shown in FIG.

【図18】従来の治具の使用状態を示す正面図である。FIG. 18 is a front view showing a use state of a conventional jig.

【図19】従来の治具の使用状態を示す正面図である。FIG. 19 is a front view showing a use state of a conventional jig.

【図20】従来の治具の使用状態を示す要部斜視図であ
る。
FIG. 20 is a perspective view of a main part showing a use state of a conventional jig.

【符号の説明】[Explanation of symbols]

21 治具 22 治具本体 23 下側の鉄骨柱 24 下側エレクションピース 25 上側の鉄骨柱 26 上側エレクションピース 27 第1取付部 28 第2取付部 100 溶接部分 101 防護カバー 102 防護壁部 103 取付板部 104 下側切欠部 105 上側切欠部 DESCRIPTION OF SYMBOLS 21 Jig 22 Jig main body 23 Lower steel column 24 Lower erection piece 25 Upper steel column 26 Upper erection piece 27 1st mounting part 28 2nd mounting part 100 Welding part 101 Protective cover 102 Protective wall part 103 Mounting plate Part 104 Lower notch 105 Upper notch

───────────────────────────────────────────────────── フロントページの続き (72)発明者 芝本 高明 大阪府大阪狭山市岩室2丁目180番地 象 印チェンブロック株式会社内 (72)発明者 太田 修二 大阪府大阪狭山市岩室2丁目180番地 象 印チェンブロック株式会社内 (72)発明者 藤澤 正人 大阪府枚方市楠葉美咲3丁目5番2号 大 商産業株式会社内 Fターム(参考) 2E125 AA02 AC14 CA90 EA33 EB12 2E174 AA01 BA03 DA08 DA12 DA38 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Takaaki Shibamoto, 2-180 Iwamuro, Izamuro, Osaka Sayama, Osaka Prefecture Inside of Inchi Chain Block Co., Ltd. (72) Shuji Ota 2-180 Iwamuro, Iwamuro, Osaka, Osaka In-Chain Block Co., Ltd. (72) Inventor Masato Fujisawa 3-5-2, Kusakiha Misaki, Hirakata-shi, Osaka F-term (reference) 2E125 AA02 AC14 CA90 EA33 EB12 2E174 AA01 BA03 DA08 DA12 DA38

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 下側の鉄骨柱に上側の鉄骨柱を接合する
ために用いられる鉄骨建入直し調整治具を防護するため
に、 前記下側の鉄骨柱と前記上側の鉄骨柱との間の溶接部分
と、前記鉄骨建入直し調整治具との間に介在されるよう
に設けられることを特徴とする、鉄骨建入直し調整治具
の防護カバー。
1. A method according to claim 1, wherein the lower steel column is connected to the upper steel column in order to protect a steel rebuilding adjustment jig used to join the upper steel column to the lower steel column. A protective cover for a steel-frame refitting adjustment jig, which is provided so as to be interposed between a welded portion of the steel frame and the steel-frame refitting adjustment jig.
【請求項2】 前記鉄骨建入直し調整治具は、エレクシ
ョンピースが取り付けられている下側の鉄骨柱に、エレ
クションピースが取り付けられている上側の鉄骨柱を接
合するために用いられ、 治具本体と、前記下側の鉄骨柱のエレクションピースに
取付可能な第1取付部、および、前記上側の鉄骨柱のエ
レクションピースに取付可能な第2取付部とを備え、 前記防護カバーは、少なくとも前記第1取付部と前記第
2取付部との間に配置され、前記治具本体に取り付けら
れていることを特徴とする、請求項1に記載の鉄骨建入
直し調整治具の防護カバー。
2. The jig for adjusting the re-establishment of a steel frame is used for joining an upper steel column to which an erection piece is attached to a lower steel column to which an erection piece is attached. A main body, a first attachment portion attachable to the erection piece of the lower steel column, and a second attachment portion attachable to the erection piece of the upper steel column, wherein the protective cover is at least The protective cover for a steel-frame refitting adjusting jig according to claim 1, wherein the protective jig is arranged between the first mounting portion and the second mounting portion, and is mounted on the jig main body.
【請求項3】 前記防護カバーは、前記下側の鉄骨柱の
エレクションピースと前記上側の鉄骨柱のエレクション
ピースとの間の溶接部分に対向される防護壁部と、前記
治具本体に取り付ける取付部とを備えていることを特徴
とする、請求項2に記載の鉄骨建入直し調整治具の防護
カバー。
3. The protective cover includes a protective wall portion facing a welded portion between the erection piece of the lower steel column and the erection piece of the upper steel column, and an attachment attached to the jig body. The protective cover of the steel frame re-installation adjustment jig according to claim 2, comprising a portion.
【請求項4】 前記防護壁部には、前記下側の鉄骨柱の
エレクションピースを挿通するための下側切欠部と、前
記上側の鉄骨柱のエレクションピースを挿通するための
上側切欠部とが形成されていることを特徴とする、請求
項3に記載の鉄骨建入直し調整治具の防護カバー。
4. A lower cutout for inserting the erection piece of the lower steel column and an upper cutout for inserting the erection piece of the upper steel column in the protective wall portion. The protective cover for a steel frame re-installation adjusting jig according to claim 3, wherein the protective cover is formed.
【請求項5】 前記防護カバーは、前記治具本体に着脱
自在に取り付けられることを特徴とする、請求項2ない
し4のいずれかに記載の鉄骨建入直し調整治具の防護カ
バー。
5. The protective cover according to claim 2, wherein the protective cover is detachably attached to the jig body.
【請求項6】 請求項1ないし5のいずれかに記載の鉄
骨建入直し調整治具の防護カバーを備えていることを特
徴とする、鉄骨建入直し調整治具。
6. A steel frame re-installation adjusting jig, comprising a protective cover for the steel frame re-installing adjusting jig according to any one of claims 1 to 5.
JP2001000941A 2001-01-09 2001-01-09 Steel cover re-adjustment adjustment jig protective cover and steel frame re-adjustment adjustment jig Expired - Fee Related JP3641655B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001000941A JP3641655B2 (en) 2001-01-09 2001-01-09 Steel cover re-adjustment adjustment jig protective cover and steel frame re-adjustment adjustment jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001000941A JP3641655B2 (en) 2001-01-09 2001-01-09 Steel cover re-adjustment adjustment jig protective cover and steel frame re-adjustment adjustment jig

Publications (2)

Publication Number Publication Date
JP2002206345A true JP2002206345A (en) 2002-07-26
JP3641655B2 JP3641655B2 (en) 2005-04-27

Family

ID=18869636

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001000941A Expired - Fee Related JP3641655B2 (en) 2001-01-09 2001-01-09 Steel cover re-adjustment adjustment jig protective cover and steel frame re-adjustment adjustment jig

Country Status (1)

Country Link
JP (1) JP3641655B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010270558A (en) * 2009-05-25 2010-12-02 Kayaba System Machinery Kk Distortion adjusting jig
JP2011001708A (en) * 2009-06-17 2011-01-06 Kayaba System Machinery Kk Connector
CN103624410A (en) * 2013-10-22 2014-03-12 中建钢构有限公司北京分公司 Method for welding large special-shaped multicavity steel structure
JP2014091966A (en) * 2012-11-05 2014-05-19 Taisei Corp Fire curing tool
KR101398443B1 (en) * 2012-11-28 2014-05-28 동아대학교 산학협력단 Weldment levelling device using electromagnet
CN110593408A (en) * 2019-10-23 2019-12-20 安徽跨宇钢结构网架工程有限公司 Auxiliary device for butt joint of H-shaped steel
CN111042552A (en) * 2019-12-26 2020-04-21 杜书影 Prefabricated post location leading truck of assembly type structure concrete

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010270558A (en) * 2009-05-25 2010-12-02 Kayaba System Machinery Kk Distortion adjusting jig
JP2011001708A (en) * 2009-06-17 2011-01-06 Kayaba System Machinery Kk Connector
JP2014091966A (en) * 2012-11-05 2014-05-19 Taisei Corp Fire curing tool
KR101398443B1 (en) * 2012-11-28 2014-05-28 동아대학교 산학협력단 Weldment levelling device using electromagnet
CN103624410A (en) * 2013-10-22 2014-03-12 中建钢构有限公司北京分公司 Method for welding large special-shaped multicavity steel structure
CN110593408A (en) * 2019-10-23 2019-12-20 安徽跨宇钢结构网架工程有限公司 Auxiliary device for butt joint of H-shaped steel
CN110593408B (en) * 2019-10-23 2020-10-09 安徽跨宇钢结构网架工程有限公司 Auxiliary device for butt joint of H-shaped steel
CN111042552A (en) * 2019-12-26 2020-04-21 杜书影 Prefabricated post location leading truck of assembly type structure concrete
CN111042552B (en) * 2019-12-26 2020-08-18 泰安市联强远大住宅工业有限公司 Prefabricated post location leading truck of assembly type structure concrete

Also Published As

Publication number Publication date
JP3641655B2 (en) 2005-04-27

Similar Documents

Publication Publication Date Title
US8484930B2 (en) Boxed frame member and method for manufacture
JP4231053B2 (en) Jig for assembling splice plate for connecting upper flange of H-shaped steel frame and assembling method using the same
US20070273179A1 (en) Joining Area for Attaching an Add-On Piece to a Vehicle Body
JP2002206345A (en) Protective cover of adjustment jig for reinstallation of steel frame and adjustment jig
CN100489305C (en) Piston pump
CN114402476A (en) Battery housing with a spacer
JP4237223B2 (en) Lining plate fastening bracket and fastening method of the lining plate
MXPA06010158A (en) Vehicle suspensions.
JPH11278069A (en) Fuel tank installation structure of lpg engine-mounted vehicle
JP3641654B2 (en) Steel frame adjustment jig
JP3619170B2 (en) Steel frame adjustment jig
KR20160073857A (en) Electrode unit for projection welder
CN101974987B (en) Automobile door lock installation structure
US6000720A (en) Tank mounting arrangement and method
JPH0431892Y2 (en)
JPH0532384Y2 (en)
JP3581685B2 (en) Steel frame rebuilding adjustment jig
CN211516453U (en) Bicycle lower tube laser cutting clamp
FR3070887B1 (en) SUPPORT FOR ELECTRIC SCREWDRIVER
CN215861233U (en) Nut box assembly
CN113830187A (en) Rear longitudinal beam assembly, welding method and automobile
JPH11303404A (en) Overturning preventive method and displacement correcting method of steel-framed column
KR100325933B1 (en) Sub frame mounting bracket of vehicle's frame
JP2002339572A (en) Jig for measurement and correction on plumbing to plumb for reinforcement
KR200354417Y1 (en) Bracket Mounting Zig

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040706

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040831

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041026

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20041122

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041122

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20041122

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees