JP2002203006A - System for confirming number of knockdown production parts - Google Patents

System for confirming number of knockdown production parts

Info

Publication number
JP2002203006A
JP2002203006A JP2000402715A JP2000402715A JP2002203006A JP 2002203006 A JP2002203006 A JP 2002203006A JP 2000402715 A JP2000402715 A JP 2000402715A JP 2000402715 A JP2000402715 A JP 2000402715A JP 2002203006 A JP2002203006 A JP 2002203006A
Authority
JP
Japan
Prior art keywords
parts
shipping
department
assembly
manufacturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000402715A
Other languages
Japanese (ja)
Inventor
Fumio Iijima
文夫 飯嶋
Kenji Tokutome
謙治 徳留
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honda Motor Co Ltd
Original Assignee
Honda Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co Ltd filed Critical Honda Motor Co Ltd
Priority to JP2000402715A priority Critical patent/JP2002203006A/en
Publication of JP2002203006A publication Critical patent/JP2002203006A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide a system for confirming shipment number of knockdown production parts to be actually shipped accurately by forming a reading table for data of the numbers of parts being shipped to an assemble department located at an assemble site from a shipping department of the knockdown production when missing parts are claimed by the assemble production department at the assemble site. SOLUTION: The system stores the parts that are transported 22 to a shipping department 11 within containers (a sack, a case, and the likes) that accommodate the pre-determined number of the parts, counts the number of the parts that are accommodated within the containers, and records the number of the parts accommodated on an actual data database 19 as recording data. Therefore, the system can easily confirm the data when a person who may concern needs to know the data.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ノックダウン生産
用部品の出荷数確認システムに関し、特に、自動車のノ
ックダウン生産を国内・海外を問わず遠隔地で行なわせ
る場合に、ノックダウン生産組立地の組立製造部門への
組立用部品の出荷数をカウントして記憶し、後で確認で
きるノックダウン生産用部品の出荷数確認システムに関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for confirming the number of shipped knockdown production parts, and more particularly to a knockdown production assembly site when a knockdown production of a vehicle is performed at a remote place regardless of domestic or overseas. The present invention relates to a system for checking the number of shipments of knockdown production parts, which counts and stores the number of shipments of assembly parts to an assembly manufacturing department of the company, and can confirm the number later.

【0002】[0002]

【従来の技術】一般に、先進各国の自動車メーカでは、
製造コスト削減、世界市場の重要性などの理由から自動
車生産がグローバル化したため、多数の国で自動車のノ
ックダウン生産を行なうことが多くなった。ノックダウ
ン生産において、自動車メーカは、海外のノックダウン
組立地において必要な部品を、国内の出荷部門に発注
し、国内の出荷部門でその発注内容に基づいて部品の出
荷予定を一括して管理している。
2. Description of the Related Art Generally, automobile manufacturers in advanced countries
Due to the globalization of car production due to reduced manufacturing costs and the importance of the global market, knockdown production of cars has increased in many countries. In knockdown production, automakers place orders for parts required at knockdown assembly sites overseas in the domestic shipping department, and collectively manage the parts shipping schedule based on the order in the domestic shipping department. ing.

【0003】ノックダウン生産においては、組立地に出
荷する各種の部品を自社の製造事業部または自社もしく
は他社の部品メーカ(以下「部品製造部門」という)に
製造させて、組立地への出荷予定に間に合うように出荷
部門へ搬入しておく。このとき個々の部品は、遠隔地の
部品製造部門から散発的に搬入される。出荷部門は、組
立地が発注した全ての部品が揃うまでは出荷できないの
で、散発的に搬入された部品を所定の部品倉庫に置いて
おかなければならない。大量のノックダウン組立用部品
を長期間倉庫に置いておく場合には、倉庫スペース、在
庫管理の人件費などがかかり、結果としてノックダウン
生産用組立部品の供給コストを上昇させてしまう。そこ
で、様々な部品を各部品製造部門に発注した場合でも、
各部品の組立地への出荷予定に合せて、部品製造部門か
ら出荷部門へ搬入させることを可能にした部品の搬入指
示システムが知られている。
In knockdown production, various parts to be shipped to an assembly site are manufactured by the company's own manufacturing division or a part manufacturer of the company or another company (hereinafter referred to as the "parts manufacturing department"), and are scheduled to be shipped to the assembly site. And bring it to the shipping department in time. At this time, individual parts are sporadically carried in from a remote parts manufacturing department. Since the shipping department cannot ship until all parts ordered by the assembly site are completed, the parts sporadically delivered must be kept in a predetermined parts warehouse. When a large number of knockdown assembly parts are stored in a warehouse for a long period of time, warehouse space, labor costs for inventory management, etc. are required, and as a result, supply costs of knockdown production assembly parts are increased. Therefore, even if you order various parts from each part manufacturing department,
2. Description of the Related Art There is known a component loading instruction system that enables components to be transported from a component manufacturing department to a shipping department in accordance with a shipping schedule of each component to an assembly place.

【0004】図11は、従来の部品の搬入指示システム
を説明する図である。この部品の搬入指示システム10
0は、特開平11−96213号公報に開示された組立
部品の搬入指示システムである。このシステムでは、完
成品の売れ情報データ128に基づいて、各種マスタフ
ァイル130,132からの部品を仕分ける型単位の集
約(S132)、各部品製造部門などの生産能力と照合
する振出上下限チェック(S134)、部品の仕上り日
と搬入日とを調整する稼働日差による補正処理(S13
6)、各部品の実際の納期計算(S138)を行なう。
FIG. 11 is a diagram for explaining a conventional component loading instruction system. Loading instruction system 10 for this part
Reference numeral 0 denotes an assembly component carry-in instruction system disclosed in Japanese Patent Application Laid-Open No. 11-96213. In this system, based on the sales information data 128 of the finished product, aggregation of die units for sorting parts from the various master files 130 and 132 (S132), and upper and lower limit check of the withdrawal for collating with the production capacity of each part manufacturing department (S132) S134), a correction process based on the working day difference for adjusting the finish date and the carry-in date of the component (S13)
6) The actual delivery date of each part is calculated (S138).

【0005】この部品の搬入指示システム100では、
前述した各処理(S132〜S138)によって決定し
た発注量をかんばん振出データ144にまとめている。
また、過去の発注実績に基づく内示データ122と、各
部品の包装場所の稼働日に合せた搬入日と、前述したか
んばん振出データ144とを各部品製造部門に送信して
いる。各製造事業部門では、翌月の発注数量を内示デー
タ122から予測して生産計画の予定を立てている。
[0005] In this part loading instruction system 100,
The order amount determined by each of the above-described processes (S132 to S138) is summarized in the kanban stake data 144.
In addition, the secret data 122 based on past order results, the carry-in date adjusted to the operating day of the packaging location of each component, and the above-described kanban dispense data 144 are transmitted to each component manufacturing department. Each manufacturing business unit makes a production plan schedule by predicting the order quantity for the next month from the secret data 122.

【0006】図12は、従来の部品の出荷予定を管理す
る出荷管理システムを説明する図である。この出荷管理
システム200は、特許第2531180号公報に開示
された部品の出荷予定を管理する出荷管理システムであ
る。この出荷管理システム200において、組立地の組
立製造部門のホストコンピュータ211は、必要な部品
206の出荷要求を出荷部門のホストコンピュータ20
1に注文する。この出荷要求が部品の出荷部門のホスト
コンピュータ201に受注されると、この出荷要求につ
いてのバーコードをバーコードプリンタ202によって
出荷指示書203にプリントアウトさせる。
FIG. 12 is a view for explaining a conventional shipping management system for managing a shipping schedule of parts. This shipment management system 200 is a shipment management system that manages a shipping schedule of components disclosed in Japanese Patent No. 2531180. In this shipment management system 200, the host computer 211 of the assembly / manufacturing department at the assembly site sends a shipment request for necessary parts 206 to the host computer 20 of the shipping department.
Order 1 When this shipping request is received by the host computer 201 of the parts shipping department, the barcode for this shipping request is printed out on the shipping instruction 203 by the barcode printer 202.

【0007】この出荷指示書203は部品倉庫の管理部
門に送られ、作業員が、パーソナルコンピュータ205
へバーコードリーダ204によって出荷情報を入力する
とともに、出荷情報の各表示項目を見ながら該当する部
品206を棚から取り出す。続いて、取り出した部品2
06に付してあるバーコード207をバーコードリーダ
204で読み取らせてパーソナルコンピュータ205に
入力する。これにより、全ての部品206を出荷情報と
照合しながら所定の梱包容器208に収納でき、また、
その梱包容器208に出荷指示書203を添付して組立
地の組立製造部門へ向けて出荷できる。
[0007] The shipping instruction 203 is sent to the management department of the parts warehouse, and the worker sends the instruction to the personal computer 205.
The shipping information is input by the barcode reader 204 and the corresponding part 206 is taken out from the shelf while looking at each display item of the shipping information. Next, the removed part 2
The barcode 207 attached to the reference numeral 06 is read by the barcode reader 204 and input to the personal computer 205. As a result, all the parts 206 can be stored in the predetermined packaging container 208 while collating with the shipping information.
The shipping instruction sheet 203 can be attached to the packing container 208 and shipped to the assembly / manufacturing department at the assembly site.

【0008】組立地の組立製造部門では、入荷した梱包
容器208から各部品206を取り出しながら、前述し
たホストコンピュータ211のハンディターミナル21
0と別のバーコードリーダ209とにより、部品206
に付してあるバーコード207を読みとって、すでに注
文した部品206が確かに入荷したことを確認する。こ
のとき確認した部品206の部品情報は、ホストコンピ
ュータ211を介して再び出荷部門のホストコンピュー
タ201に伝送される。このシステムによれば、組立地
の組立製造部門から出荷部門への出荷要求、出荷部門で
の梱包、組立地の組立製造部門への部品の出荷、組立地
の組立製造部門での部品の確認、確認した部品の情報の
出荷部門への送信まで一元的に情報管理できる。
[0008] The assembling / manufacturing section of the assembling site takes out each part 206 from the received packing container 208 while taking out the parts 206 from the handy terminal 21 of the host computer 211.
0 and another barcode reader 209, the component 206
Is read to confirm that the parts 206 already ordered have arrived. The part information of the part 206 confirmed at this time is transmitted again to the host computer 201 of the shipping department via the host computer 211. According to this system, a shipment request from the assembly manufacturing department at the assembly site to the shipping department, packing at the shipping department, shipping of parts to the assembly manufacturing department at the assembly site, confirmation of parts at the assembly manufacturing department at the assembly site, Information can be centrally managed until the information of the confirmed parts is sent to the shipping department.

【0009】[0009]

【発明が解決しようとする課題】しかし、上述した後者
の従来のシステムでは、組立地の組立製造部門からの発
注のデータの中に、出荷日等とともに出荷数に関するデ
ータは計画として残っているが、出荷部門において実際
に包装され出荷された部品数に関するデータは実績とし
て、どこにも残っていない。このため、部品数の確認
は、組立地の組立製造部門からの発注のデータ、また
は、出荷部門において実際に部品を包装するときに用い
る包装に係る計画のデータと対応させて確認を取ること
によってしかできない。従って、組立地の組立製造部門
での部品数の確認においては、当該組立製造部門の出し
た発注のデータにある部品数と、当該組立製造部門に届
いた部品数とをつき合わせて、部品の確認を行ってい
る。
However, in the latter conventional system described above, data relating to the number of shipments together with the shipping date etc. remains in the order data from the assembly / manufacturing department at the assembly site as a plan. However, no data remains on the actual number of parts packaged and shipped in the shipping department. For this reason, the number of parts should be confirmed by associating with the data of the order from the assembly / manufacturing department at the assembly site, or the data of the plan related to the packaging used when actually packing the parts in the shipping department. I can only do it. Therefore, when confirming the number of parts in the assembly / manufacturing section at the assembly site, the number of parts in the order data issued by the assembly / manufacturing section is compared with the number of parts delivered to the assembly / manufacturing section to determine the number of parts. Checking.

【0010】さらに上述した従来のシステムにおいて
は、組立地の組立製造部門において部品が足りない場合
に、実際に包装し出荷した部品数に関するデータが実績
として残っていないので、国内の出荷部門側でも、海外
の組立地の組立製造部門側でも、実際に包装し出荷した
部品数に関しては確認することができないのが現状であ
る。このため、組立地の組立製造部門において部品の不
足が起こった場合、この不足分の部品が、組立地での紛
失・盗難等によるものなのか、それとも出荷部門からの
出荷時に最初から不足していたものなのかを確認するこ
とができなかった。そのため、出荷部門は、組立地の組
立製造部門から要求された不足分の部品数を確認するこ
ともなく、組立地の組立製造部門からの要求が正しいも
のであると信じて、組立地の組立製造部門に送ってい
た。この際、出荷部門が不足分の部品と出荷に係る全て
の費用を払っていた。
Further, in the above-mentioned conventional system, when there is a shortage of parts in the assembly / manufacturing department at the assembly site, data regarding the number of parts actually packaged and shipped is not recorded as a result, so that even the domestic shipping department side. At present, even the assembly / manufacturing departments of overseas assembly sites cannot confirm the number of parts actually packaged and shipped. Therefore, if there is a shortage of parts in the assembly / manufacturing department at the assembly site, whether the shortage is due to loss or theft at the assembly site, or if there is a shortage at the time of shipment from the shipping department. Could not be confirmed. Therefore, the shipping department does not check the number of parts for the shortage requested by the assembly / manufacturing section of the assembly site, and believes that the request from the assembly / manufacturing section of the assembly site is correct, and Had been sent to the manufacturing department. At this time, the shipping department paid for the shortage of parts and all costs related to shipping.

【0011】上記のごとく海外等組立地の組立製造部門
において部品の不足が起こった場合、国内の出荷部門が
実際に出荷した部品数を確認できるシステムが望まれて
いる。つまり、出荷部門での出荷する部品の包装時に、
実際に入れ物に入れて包装した部品数をカウントして記
録し、この記録したデータを必要なときに確認ができる
ように整理しておくことによって、組立地での紛失・盗
難等による不足に対して指摘をし、不正の可能性をなく
し、不足分の部品を売るようにできることが望まれてい
る。上記の理由により、出荷部門から組立地の組立製造
部門に出荷される部品の出荷数を正しく記録に残し、そ
の後に関係者が必要とするときには容易に確認できるシ
ステムが要求されている。
As described above, when a shortage of parts occurs in an assembly manufacturing department in an assembly place such as an overseas location, there is a demand for a system capable of confirming the number of parts actually shipped by a domestic shipping department. In other words, when packaging parts to be shipped in the shipping department,
By counting and recording the number of parts actually packed in containers and organizing the recorded data so that it can be checked when necessary, shortage due to loss or theft at the assembly site can be avoided. It is desirable to be able to eliminate the possibility of fraud and to sell the missing parts. For the above reasons, there is a demand for a system which correctly records the number of parts to be shipped from the shipping department to the assembly manufacturing department at the assembly site, and which can be easily checked by the related parties when necessary.

【0012】本発明の目的は、前述した課題を解決する
ため、ノックダウン生産の出荷部門において、組立地の
組立製造部門へ出荷される部品に係る個数データを閲覧
テーブルとして形成し、組立地の組立製造部門から部品
の不足クレーム等のクレームがあった場合に、正確に、
かつ迅速に実際に出荷した部品数を確認できるノックダ
ウン生産用部品の出荷数確認システムを提供することに
ある。
An object of the present invention is to solve the above-mentioned problem by forming, in a knockdown production shipping department, quantity data relating to parts to be shipped to an assembly manufacturing department at an assembly site as a viewing table, If there is a complaint such as a shortage of parts from the assembly manufacturing department,
Another object of the present invention is to provide a knockdown production parts shipment number confirmation system capable of quickly confirming the number of parts actually shipped.

【0013】[0013]

【課題を解決するための手段】本発明に係るノックダウ
ン生産用部品の出荷数確認システムは、上記目的を達成
するために、次のように構成される。
A system for confirming the number of shipped knockdown production parts according to the present invention is configured as follows to achieve the above object.

【0014】本発明に係る第1のノックダウン生産用部
品の出荷数確認システム(請求項1に対応)は、ノック
ダウン組立地の組立製造部門から出荷部門に対する製品
組立に必要な各種の部品の発注に応じて、出荷部門が部
品の製造・搬入の計画を立てて各種の部品のそれぞれの
部品製造部門に部品製造の指示を出し、かつ部品製造部
門から計画数の部品の搬入を受け、さらに出荷部門が、
搬入された部品を所定数量で収納する入れ物に入れ、さ
らに複数の入れ物を外装ケースに入れて組立製造部門に
向けて出荷するノックダウン生産システムに関するシス
テムである。出荷部門では、出荷数を確認するため、発
注部品の包装の際に出荷する部品数をカウントし記憶し
て、記録としてデータを残す。このため、出荷部門は、
所定数量の部品を入れ物に入れる時に入れ物の重量を測
定する重量測定部と、重量測定部で測定された入れ物の
重量に基づいて入れ物内の部品の個数を算出する個数演
算手段と、個数演算手段で算出された個数のデータを記
憶する記憶部を備える。上記の構成により、関係者は記
憶部に記憶された部品の個数のデータによって、出荷部
門での部品の出荷数を確認することが可能になる。
A first system for confirming the number of shipments of knockdown production parts according to the present invention (corresponding to claim 1) is a system for assembling various parts necessary for assembling products from an assembly manufacturing department at a knockdown assembly site to a shipping department. In accordance with the order, the shipping department makes a plan for the manufacture and delivery of parts, issues instructions to manufacture the parts for each of the various parts, and receives the planned number of parts from the parts manufacturing department. The shipping department
This is a system related to a knockdown production system in which a carried part is put in a container for storing a predetermined number of containers, and a plurality of containers are put in an outer case and shipped to an assembly and manufacturing department. The shipping department counts and stores the number of parts shipped at the time of packaging the ordered parts in order to confirm the number of shipments, and records the data as a record. For this reason, the shipping department
A weight measuring unit that measures the weight of the container when a predetermined number of parts are put into the container; a number calculating unit that calculates the number of components in the container based on the weight of the container measured by the weight measuring unit; And a storage unit for storing the data of the number calculated in the step (a). According to the above configuration, the related person can confirm the number of parts shipped in the shipping department based on the data on the number of parts stored in the storage unit.

【0015】本発明に係る第2のノックダウン生産用部
品の出荷数確認システム(請求項2に対応)は、上記の
構成において、好ましくは、記憶部に記憶される入れ物
内の部品に係る個数のデータは、個数算出日、個数算出
時刻、部品を特定する番号と関連して記憶され、閲覧テ
ーブルとして形成されることを特徴とする。上記の構成
によれば、個数のデータを個数算出日、個数算出時刻、
部品を特定する番号と関連させて記憶させ、閲覧テーブ
ルとして形成させたので、正確かつ迅速に、出荷数の確
認をとることが可能になる。
In the second system for confirming the number of shipped knockdown production parts according to the present invention (corresponding to claim 2), in the above configuration, preferably, the number relating to the parts in the container stored in the storage unit. Are stored in association with the number calculation date, the number calculation time, and the number specifying the part, and are formed as a browsing table. According to the above configuration, the data of the number is calculated as the number calculation date, the number calculation time,
Since the parts are stored in association with the numbers for specifying the parts and formed as a browsing table, it is possible to check the number of shipments accurately and quickly.

【0016】本発明に係る第3のノックダウン生産用部
品の出荷数確認システム(請求項3に対応)は、上記の
構成において、好ましくは、記憶部に記憶される入れ物
内の部品に係る個数のデータは、ノックダウン組立地の
組立製造部門から発注された部品の発注内容との対応関
係を有するように記憶されていることを特徴とする。個
数のデータをノックダウン組立地の組立製造部門から発
注された部品の発注内容との対応関係を有するように記
憶させたので、関係者は不足クレーム等のクレームが来
たときに容易にかつ迅速に確認をとることが可能とな
る。
The third system for confirming the number of shipped knockdown production parts according to the present invention (corresponding to claim 3) is preferably configured such that the number of parts related to the parts in the container stored in the storage unit is configured as described above. Is stored so as to have a correspondence relationship with the contents of the order of the parts ordered from the assembly manufacturing department at the knockdown assembly site. Since the data of the quantity is stored so as to have a correspondence with the order contents of the parts ordered from the assembly manufacturing department of the knockdown assembly site, the concerned parties can easily and quickly receive a complaint such as a shortage complaint. Can be confirmed.

【0017】本発明に係る第4のノックダウン生産用部
品の出荷数確認システム(請求項4に対応)は、上記の
構成において、さらに、記憶部は出荷部門に設けられた
ホストコンピュータに付設されたデータベースとして構
成され、ホストコンピュータは組立製造部門の端末装置
とネットワークで接続され、組立製造部門は、端末装置
およびネットワークを介してホストコンピュータにアク
セスして、発注した部品の出荷部門における出荷数を、
データベースに記憶される個数のデータから取得するこ
とを特徴とする。上記の構成によれば、組立製造部門に
おいて部品の不足があった場合、組立製造部門は出荷部
門に対し電話、FAX、Eメールで問い合わせることな
く、不足した発注部品が実際に包装されたかどうかの確
認が取れる。
According to a fourth aspect of the present invention, there is provided a system for confirming the number of shipped knockdown production parts (corresponding to claim 4), wherein the storage unit is provided in a host computer provided in the shipping department. The host computer is connected to the terminal device of the assembly / manufacturing section via a network, and the assembly / manufacturing section accesses the host computer via the terminal device and the network to determine the number of ordered parts shipped by the shipping section. ,
It is obtained from the number of data stored in the database. According to the above configuration, if there is a shortage of parts in the assembly / manufacturing section, the assembly / manufacturing section does not contact the shipping section by telephone, facsimile, or e-mail, and determines whether or not the missing ordered parts are actually packed. Confirmation can be taken.

【0018】本発明に係る第5のノックダウン生産用部
品の出荷数確認システム(請求項5に対応)は、上記の
構成を前提として、好ましくは、ノックダウン組立地の
組立製造部門は海外に存し、出荷部門は国内に存するこ
とを特徴とする。
The fifth system for confirming the number of shipped knockdown production parts according to the present invention (corresponding to claim 5) is based on the above-mentioned configuration, and preferably, the assembly / manufacturing department of the knockdown assembly site is overseas. And the shipping department is located domestically.

【0019】[0019]

【発明の実施の形態】以下に、本発明に好適な実施形態
を添付図面に基づいて説明する。
Preferred embodiments of the present invention will be described below with reference to the accompanying drawings.

【0020】図1〜図9を参照にして本発明の第1実施
形態を説明する。図1は、本実施形態のノックダウン生
産用部品の出荷数確認システムの全体概念図である。図
1によれば、本実施形態のノックダウン生産用部品の出
荷数確認システムは、例えば海外に存するノックダウン
組立地の組立製造部門10からの製品組立に必要な各種
の部品の発注10Aに応じて、国内に存する出荷部門1
1が発注部品の包装・出荷の計画と製造・搬入の計画を
立てて、各種の部品を製造する複数の部品製造部門12
A,12B,12Cに発注部品の製造・搬入の指示21
を出し、かつ各部品製造部門12A,12B,12Cか
ら計画数の発注部品の搬入22を受け、出荷部門11に
搬入された部品を所定数量で収納する入れ物(袋体、箱
体、その他の容器)に入れ(個装)、この入れ物に収納
した部品数をカウントして記録し、さらに、複数の入れ
物を外装ケースに入れて、組立製造部門10に向けて出
荷11Aを行うシステムである。なお、組立地の組立製
造部門10と出荷部門11は、複数存していてもよい。
組立製造部門10から出荷部門11へ発注10Aがなさ
れ、出荷部門11ではこの発注10Aに基づき、包装・
出荷計画、製造・搬入計画を立てる。複数の部品製造部
門12A,12B,12Cの各々で製造された部品は、
個々に、出荷部門11へ搬入される。出荷部門11で
は、発注部品が計画通り搬入されると、発注部品を包装
し組立製造部門10へ出荷する。
A first embodiment of the present invention will be described with reference to FIGS. FIG. 1 is an overall conceptual diagram of a system for confirming the number of shipped knockdown production parts according to the present embodiment. According to FIG. 1, the system for confirming the number of shipped knockdown production parts according to the present embodiment responds to, for example, an order 10A of various parts required for product assembly from an assembly manufacturing department 10 of a knockdown assembly site located overseas. And the domestic shipping department 1
1 is a plurality of parts manufacturing departments 12 for manufacturing various parts by planning packaging / shipping and manufacturing / delivery of ordered parts.
Instruct A, 12B, 12C to manufacture and carry in ordered parts 21
And a container (bag, box, or other container) that receives the planned number of ordered parts delivered 22 from the respective parts manufacturing departments 12A, 12B, and 12C and stores the parts delivered to the shipping department 11 in a predetermined quantity. ) (Individual packaging), counts and records the number of parts stored in the container, and furthermore, puts a plurality of containers in an outer case and performs shipping 11A to the assembly / manufacturing section 10. It should be noted that there may be a plurality of assembling / manufacturing departments 10 and shipping departments 11 at the assembly site.
An order 10A is made from the assembly / manufacturing section 10 to the shipping section 11, and the shipping section 11 performs packaging / packaging based on the order 10A.
Make a shipping plan and a production / delivery plan. Parts manufactured in each of the plurality of parts manufacturing departments 12A, 12B, 12C are:
Individually, they are carried into the shipping department 11. When the ordered parts are carried in as planned, the shipping department 11 wraps the ordered parts and ships them to the assembly manufacturing department 10.

【0021】図2は、本実施形態に係るノックダウン生
産用部品の出荷数確認システムにおける部品の出荷11
Aまでの手順のフロー図である。以下、この手順フロー
図に従って、組立製造部門からの製品組立に必要な各種
の部品の発注10Aから、組立製造部門への部品の出荷
11Aまでを説明する。
FIG. 2 is a schematic diagram showing the shipment of parts 11 in the system for confirming the number of shipped knockdown production parts according to this embodiment.
It is a flowchart of the procedure to A. Hereinafter, from the order flow 10A of various parts necessary for product assembly from the assembly and manufacturing department to the shipment of parts 11A to the assembly and manufacturing department from the assembly and manufacturing department will be described with reference to this procedure flow chart.

【0022】海外に存するノックダウン組立地の組立製
造部門10は、製品組立に必要な各種の部品(または部
品群)を国内に存する出荷部門11へ発注10Aする
(P100)。出荷部門11では、組立製造部門10か
らの各種の部品の発注10Aに基づき包装・出荷計画と
製造・搬入計画を立案する(P101)。出荷部門11
は、立案された発注部品の製造・搬入計画を、発注部品
ごとの部品製造部門12A,12B,12Cに送り、製
造・搬入の指示21を行う(P102)。部品製造部門
12A,12B,12Cでは、それぞれ、製造・搬入計
画に従って部品を製造し、出荷部門11に部品を搬入2
2する(P103)。出荷部門11では、部品製造部門
12から部品の搬入22を受け、包装・出荷計画の包装
に係る計画に従って部品を入れ物に入れると同時に、入
れ物に入れた部品をカウントし、カウントした部品数を
記憶部に記憶し、記録としてデータを残す(P10
4)。出荷部門11は、包装・出荷計画の出荷11Aに
係る計画に基づき、包装した各種の発注部品を組立製造
部門10へ出荷する(P105)。
The assembly / manufacturing section 10 of the knockdown assembly site located overseas places an order 10A for various parts (or parts group) required for product assembly to the shipping section 11 located in Japan (P100). The shipping department 11 drafts a packaging / shipping plan and a manufacturing / delivery plan based on an order 10A for various parts from the assembly / manufacturing department 10 (P101). Shipping department 11
Sends the planned production / delivery plan of the ordered parts to the parts manufacturing departments 12A, 12B, and 12C for each ordered part, and issues a production / delivery instruction 21 (P102). In the parts manufacturing departments 12A, 12B, and 12C, the parts are manufactured according to the manufacturing and delivery plan, and the parts are delivered to the shipping department 11 respectively.
2 (P103). In the shipping department 11, the parts are received 22 from the parts manufacturing department 12, and the parts are put into the container according to the packaging plan of the packaging / shipping plan. At the same time, the number of the parts put in the container is counted and the counted number of parts is stored. Section and leave the data as a record (P10
4). The shipping section 11 ships various packed order parts to the assembly / manufacturing section 10 based on the plan related to the shipment 11A in the packaging / shipping plan (P105).

【0023】図3は、本実施形態に係るノックダウン生
産用部品の出荷数確認システムにおける包装・出荷計画
と製造・搬入計画の立案に関するシステム概念図であ
る。以下、この図に従って、包装・出荷計画の立案と製
造・搬入計画の立案を説明する。この説明は、図2に示
した手順P101の詳細な説明に相当する。
FIG. 3 is a conceptual diagram of a system for planning a packaging / shipping plan and a manufacturing / loading plan in the system for confirming the number of shipped knockdown production parts according to the present embodiment. In the following, the drafting of the packaging / shipping plan and the drafting of the manufacturing / delivery plan will be described with reference to this figure. This description corresponds to the detailed description of the procedure P101 shown in FIG.

【0024】海外に存するノックダウン組立地の組立製
造部門10からの発注10Aのデータは、例えばオンラ
イン等の電気通信回線を経由して、国内のオーダデータ
ベース13に入り、ここに格納される。包装・出荷計画
立案システム14では、オーダデータベース13に格納
された発注10Aのデータに基づいて包装・出荷計画を
立案する。この包装・出荷計画には、海外の組立製造部
門10からの各種部品の発注10Aを特定する番号と、
国内での発注部品の包装を特定する番号とを対応させて
記憶している、出荷11Aに係る計画および出荷部門1
1での発注部品の包装に係る計画が含まれる。また、包
装・出荷計画立案システム14では、組立製造部門10
によって発注された各種の部品について、当該組立製造
部門10へ出荷する出荷日、および出荷11Aを行える
ように、搬入22された発注部品を小分けして所定数ご
とに所定の入れ物に入れる包装日が定められる。この包
装・出荷計画の情報は、包装・出荷計画データベース1
5に格納・保存されると同時に、製造・搬入計画立案シ
ステム16に送られる。
The data of the order 10A from the assembling / manufacturing section 10 of the knockdown assembly site located abroad enters the domestic order database 13 via, for example, a telecommunication line such as online, and is stored therein. The packaging / shipping planning system 14 drafts a packaging / shipping plan based on the data of the order 10A stored in the order database 13. This packaging / shipping plan includes a number that specifies the order 10A of various parts from the overseas assembly and manufacturing department 10,
The planning and shipping department 1 relating to the shipping 11A, which stores therein the numbers identifying the packaging of the ordered parts in Japan in association with each other.
1 includes a plan related to packaging of ordered parts. In the packaging / shipping planning system 14, the assembly manufacturing section 10
With respect to the various parts ordered by the manufacturer, the shipping date for shipping to the assembly and manufacturing department 10 and the packing date for subdividing the ordered parts carried in 22 into predetermined containers by predetermined numbers so as to perform the shipping 11A are set. Determined. This packaging / shipping plan information is stored in the packaging / shipping plan database 1
5 and is sent to the production / loading planning system 16 at the same time.

【0025】製造・搬入計画立案システム16では、上
記包装・出荷計画で定められた包装日および出荷日に間
に合うように、部品製造部門12A,12B,12Cか
ら出荷部門11への部品の搬入日を決め、製造・搬入計
画を立案する。ここで、製造・搬入計画が立案されると
きには、部品とその部品を製造する部品製造部門12
A,12B,12Cとを対応させて記憶しているパーツ
リストデータベース17と、部品製造部門12A,12
B,12Cの搬入22に関する情報が記憶されている搬
入情報データベース18とが参照される。製造・搬入計
画立案システム16によって立案された製造・搬入計画
は、部品製造部門12A,12B,12Cに送られる。
In the production / delivery planning system 16, the delivery date of parts from the parts manufacturing departments 12 A, 12 B, 12 C to the shipping department 11 is determined in time for the packaging date and shipping date specified in the packaging / shipping plan. Decide and make a production / delivery plan. Here, when a manufacturing / delivery plan is drafted, the parts and the parts manufacturing department 12 for manufacturing the parts are prepared.
A, a parts list database 17 storing the parts A, 12B and 12C in association with each other, and the parts manufacturing departments 12A and 12C.
Reference is made to the carry-in information database 18 in which information on the carry-in 22 of B and 12C is stored. The manufacturing / loading plan created by the manufacturing / loading planning system 16 is sent to the parts manufacturing departments 12A, 12B, 12C.

【0026】図4は、包装・出荷計画データベース15
に記憶される包装・出荷計画の出荷に係る計画の一例を
示す。包装・出荷計画の出荷11Aに係る計画の内容に
は、「ノックダウン・オーダ・ロットNo.」、「パッキ
ング・ロットNo.」、「オーダ機種」、「UNIT
数」、「出荷日」、その他運送に関する情報等がある。
「ノックダウン・オーダ・ロットNo.」とは、海外の組
立製造部門10からの発注10Aに付されている番号
(発注を特定する番号)であり、「パッキング・ロット
No.」とは、国内の出荷部門11での包装に係る入れ物
(代表的にはポリ袋などの袋体、その他箱体。さらに外
装ケース、コンテナ等を含む)に付される番号(入れ物
を特定する番号)である。
FIG. 4 shows a packaging / shipping plan database 15.
1 shows an example of a plan relating to shipping of a packaging / shipping plan stored in a storage device. The contents of the plan related to the shipment 11A of the packaging / shipping plan include “knockdown order lot No.”, “packing lot No.”, “order model”, “UNIT”.
"Number", "shipping date", and other information related to transportation.
The “knockdown order lot No.” is a number (number specifying the order) assigned to the order 10A from the overseas assembly / manufacturing section 10, and the “packing lot”
"No." refers to a number (container for a container (typically, a bag such as a plastic bag, other boxes, including an outer case, a container, etc.)) related to packaging in the shipping department 11 in Japan. (Specifying number).

【0027】例えば、海外の組立製造部門10からノッ
クダウン・オーダ・ロットNo.「ABC1」が付された
発注10Aを受けると、国内の出荷部門11はその発注
10Aに応じて、パッキング・ロット・No.「○△×0
1」を付した包装・出荷計画を立案する。同様に、別の
組立製造部門10からノックダウン・オーダ・ロットN
o.「ABD1」が付された発注10Aを受けると、国内
の出荷部門11はその発注10Aに応じて、出荷部門1
1側で管理しやすいようにパッキング・ロット・No.
「○△×04」等が付された包装・出荷計画を立案す
る。なお図4でオーダ機種、UNIT数、出荷日の各欄
の記入は省略されている。
For example, when receiving the order 10A with the knockdown order lot No. "ABC1" from the overseas assembly / manufacturing department 10, the domestic shipping department 11 responds to the order 10A with the packing lot. No. "○ △ × 0
1) Make a packaging and shipping plan. Similarly, knockdown order lot N from another assembly manufacturing department 10
o. Upon receiving the order 10A with “ABD1”, the domestic shipping department 11 responds to the order 10A, and
Packing lot No. for easy management on one side
Develop a packaging and shipping plan with “○ △ × 04” etc. In FIG. 4, the columns of the order model, the number of UNITs, and the date of shipment are not shown.

【0028】図5は、本実施形態に係るノックダウン生
産用部品の出荷数確認システムにおいて、部品製造部門
12A,12B,12Cで製造された各発注部品の出荷
部門11への搬入22が完了し、その発注部品を所定の
入れ物に所定数入れ包装するときに、包装される部品の
個数をカウントし、カウントした部品数を記憶する部分
に関するフロー図である。以下、この図に従ってカウン
トした部品数の記憶に関する説明をする。この説明は、
図2に示した手順P104の詳細な説明に相当する。
FIG. 5 shows that in the system for confirming the number of parts shipped for knockdown production according to this embodiment, the delivery 22 of each ordered part manufactured by the parts manufacturing departments 12A, 12B and 12C to the shipping department 11 is completed. FIG. 10 is a flow chart of a part for counting the number of parts to be packed and storing the counted number of parts when a predetermined number of the ordered parts are put into a predetermined container for packaging. Hereinafter, storage of the counted number of components will be described with reference to FIG. This explanation
This corresponds to the detailed description of the procedure P104 shown in FIG.

【0029】包装・出荷計画データベース15には、前
述した通り包装・出荷計画立案システム14により立案
された包装・出荷計画が格納されている。この包装・出
荷計画データベース15から、当日に包装すべき部品の
計画を抽出する(P201)。発注10Aを受けた各種
の部品(または部品群)に対応して、その部品の単位重
量が表されている重量管理表が重量管理データベースよ
り読み出される(P202)。包装作業を行う担当者
は、パソコン端末の表示装置の画面上に表示される包装
に係る計画を見て、入れ物に収納すべき部品と部品数を
確認し、かつ部品を入れ物に収納し、入れ物全体の総重
量を量る(P203)。入れ物全体の総重量をその部品
の単位重量で割ることによって、入れ物に入れた部品の
数がカウントされる(P204)。包装に係る計画の表
通りの個数の部品を入れ物の中へ入れたら、入れ物に封
をして、「日付」、「時刻」、「部品名」、「部品N
o.」、「総重量」、「単位重量」、「個数」、「担当
者」等のデータを「パッキング・ロットNo.」と対応付
けて、実績データベース19に実績データとして記憶す
る。
The packaging / shipping plan database 15 stores the packaging / shipping plan created by the packaging / shipping planning system 14 as described above. From the packing / shipping plan database 15, a plan of parts to be packed on the day is extracted (P201). A weight management table indicating the unit weight of each part (or group of parts) corresponding to the order 10A is read from the weight management database (P202). The person in charge of the packaging works looks at the packaging plan displayed on the screen of the display device of the personal computer terminal, checks the parts to be stored in the container and the number of parts, stores the parts in the container, The total weight is weighed (P203). The total number of parts in the container is counted by dividing the total weight of the entire container by the unit weight of the part (P204). After putting the number of parts as shown in the plan related to packaging into the container, seal the container and set the date, time, part name, and part N.
o. ”,“ total weight ”,“ unit weight ”,“ number ”,“ person in charge ”, etc. are stored in the result database 19 as result data in association with the“ packing lot No. ”.

【0030】手順P201における「当日に包装すべき
部品の計画」とは、包装・出荷計画立案システム14に
より立案された包装に係る計画であり、包装・出荷計画
データベース15に保存されている計画である。この包
装に係る計画は、包装担当者に対して部品名、部品数を
指示するものである。手順P202,P203,P20
4は、好ましくは、重量測定器(重量計)と個数演算手
段とを含んで成る計数装置により行う。手順P202に
おける重量管理データベースには、部品とその部品の単
位重量とが対応して記憶されている。このため、担当者
が部品をカウントするには、部品を入れた入れ物を計数
装置にかければよい。計数装置は、部品の入った入れ物
全体の総重量をその部品の単位重量で割り、部品のカウ
ントを行う。計数装置によってカウントされた部品の個
数は、「日付」、「時刻」、「部品名」、「部品N
o.」、「総重量」、「単位重量」、「担当者」等のデー
タとともに、「パッキング・ロットNo.」と対応付け
て、計数装置とオンラインで接続されている実績データ
ベース19に、実績データとして記憶される。上記にお
いて、計数装置は重量測定器を備えたパソコン(CP
U)であり、個数演算手段はパソコンに演算機能として
実現されている。
The "plan of parts to be packed on the day" in the procedure P201 is a plan relating to the packaging prepared by the packaging / shipping planning system 14, and is a plan stored in the packaging / shipping planning database 15. is there. The plan relating to the packaging is to instruct a packaging person in charge of a part name and the number of parts. Procedure P202, P203, P20
Step 4 is preferably performed by a counting device including a weight measuring device (weighing scale) and a number calculating means. In the weight management database in the procedure P202, parts and unit weights of the parts are stored in association with each other. For this reason, in order for the person in charge to count the parts, it is sufficient to apply a container containing the parts to the counting device. The counting device divides the total weight of the entire container including the part by the unit weight of the part to count the part. The number of parts counted by the counting device is “date”, “time”, “part name”, “part N”.
o., "gross weight", "unit weight", "person in charge", etc., and the results in the results database 19 connected online with the counting device in association with the "packing lot No." Stored as data. In the above, the counting device is a personal computer (CP
U), and the number calculation means is realized as a calculation function in a personal computer.

【0031】図6は、計数装置30を含む、出荷数を記
憶する部分のブロック図である。計数装置30は、個数
演算手段31と重量測定器32を含んで成り、担当者に
計画を表示させるための表示装置33と、キーボードや
ボタン入力部から成る入力装置34と、データをフロッ
ピー(登録商標)ディスク等の記憶媒体や紙に出力する
出力装置35と、送受信部36と、これらを機能させる
CPU37を備えている。この送受信部36は、実績デ
ータベース19を有する重量管理データベース38と、
包装・出荷計画データベース15とオンライン等の電気
通信回線を介してデータの送受信を行う。
FIG. 6 is a block diagram of a portion including the counting device 30 for storing the number of shipments. The counting device 30 includes a number calculating means 31 and a weight measuring device 32, a display device 33 for displaying a plan to a person in charge, an input device 34 including a keyboard and a button input section, and a floppy disk (registered). An output device 35 for outputting to a storage medium such as a trademark (trademark) disk or the like, a paper, a transmitting / receiving unit 36, and a CPU 37 for making these function. The transmission / reception unit 36 includes a weight management database 38 having the performance database 19,
Data is transmitted and received to and from the packaging / shipping plan database 15 via a telecommunication line such as online.

【0032】例えば、担当者乙が包装に係る計画にある
ネジXを包装する場合、乙は包装に係る計画の部品名
(この場合「ネジX」)と部品の数と、計数装置30の
表示装置33に表示される部品の単位重量とを確認す
る。確認後、ネジXを入れ物に入れ、この入れ物を計数
装置30の重量測定器32の上に置いてその個数をカウ
ントさせ、計数装置30に設けられたボタンを押して、
実際に行った作業を実績データとして、実績データベー
ス19に残す。この時、実績データベース19には、上
記したように、「日付」、「時刻」、「部品名」、「部
品No.」、「総重量」、「単位重量」、「個数」、「担
当者」、「パッキング・ロットNo.」等が記憶される。
なお実績データベース19は、前述の重量管理データベ
ース38の一部となる。また、実績データベース19の
データ内容は、出力装置35によって他の形式の記憶媒
体に必要に応じて保管され、あるいは紙に出力される。
For example, when the person in charge of packing the screws X in the plan relating to the packaging, the second person displays the name of the parts (in this case, “screw X”), the number of the parts, and the display of the counting device 30 in the plan relating to the packaging. The unit weight of the component displayed on the device 33 is confirmed. After the confirmation, the screw X is put in the container, and the container is placed on the weight measuring device 32 of the counting device 30 to count the number thereof, and the button provided on the counting device 30 is pressed,
The work actually performed is left in the result database 19 as result data. At this time, as described above, the result database 19 stores “date”, “time”, “part name”, “part number”, “gross weight”, “unit weight”, “quantity”, and “person in charge”. , "Packing lot No." and the like.
The performance database 19 is a part of the aforementioned weight management database 38. The data content of the performance database 19 is stored in a storage medium of another format by the output device 35 as needed, or is output on paper.

【0033】図7は、重量管理データベースの重量管理
表の一例である。重量管理表は、部品を包装する担当者
が部品の包装に係る計画の表に従って部品を入れ物に収
納し、カウントする際に、計数装置において必要となる
表である。重量管理表はパソコン端末装置の画面に表示
される。計数装置は、入れ物に入れた部品の総重量を対
応する部品の単位重量で割ることによって、部品の数を
カウントするため、各種の部品の単位重量を必要とす
る。重量管理表には、各種の「部品名」とその各々の部
品に対応して「部品No.」と「部品の単位重量」とが示
されている。担当者が、部品の包装に係る計画の表に従
って包装を行う際に、この重量管理表から、対応する部
品の単位重量が部品ごとに計数装置へ入力される。
FIG. 7 is an example of a weight management table of the weight management database. The weight management table is a table necessary for the counting device when the person in charge of packaging the parts stores the parts in the container and counts them according to the table of the plan relating to the packaging of the parts. The weight management table is displayed on the screen of the personal computer terminal device. The counting device requires unit weights of various parts in order to count the number of parts by dividing the total weight of the parts put in the container by the unit weight of the corresponding parts. The weight management table shows various “part names” and “part No.” and “unit weight of parts” corresponding to the respective parts. When a person in charge performs packaging according to a table of a plan for packaging parts, the unit weight of the corresponding parts is input to the counting device for each part from the weight management table.

【0034】例えば、包装に係る計画にネジXがある場
合、重量管理データベースの重量管理表から「ネジX」
の単位重量「19.07」グラムが部品No.「X111
1」をキーにして、計数装置に入力される。担当者は、
自分が包装しようとする部品の単位重量かどうかを確認
した後、部品を入れ物に収納し、部品を入れた入れ物を
計数装置にセットして、入れ物内の部品の個数のカウン
トを行う。このとき、計数装置は、入れ物に入れた部品
の総重量を、入力された単位重量で割って、入れ物の中
の部品の数をカウントする。
For example, when a screw X is included in the package plan, “Screw X” is obtained from the weight management table of the weight management database.
The unit weight of “19.07” grams is the part number “X111”.
Using the key "1" as a key, it is input to the counting device. The person in charge
After confirming whether or not the weight of the part to be packed is the unit weight, the part is stored in a container, the container containing the part is set in a counting device, and the number of parts in the container is counted. At this time, the counting device counts the number of parts in the container by dividing the total weight of the parts in the container by the input unit weight.

【0035】図8は、実績データベース19の実績デー
タの一例を示す。実績データは、部品を包装する担当者
が実際に、部品を入れ物に入れ、重量を計り、計数装置
によってカウントをした部品の「個数」、その部品をカ
ウントした「日付」と「時刻」、「部品名」、「部品N
o.」、入れ物の「総重量」、部品の「単位重量」、「担
当者」、「パッキング・ロットNo.」等から構成されて
いる。この実績データの「パッキング・ロットNo.」
は、図4の包装・出荷計画の「パッキング・ロットN
o.」と同じものである。
FIG. 8 shows an example of the result data in the result database 19. The actual data is based on the "number" of parts that were actually measured by the person in charge of packaging the parts, put them in a container, weighed them, and counted them with a counter, and the "date", "time", and " Part name '', `` Part N
o. ", the container's" gross weight ", the part's" unit weight ", the" person in charge ", the" packing lot number ", and the like. "Packing lot No."
Is “Packing Lot N” in the packaging and shipping plan of FIG.
o. ".

【0036】例えば、図5に示した手順に従って乙が作
業をすると、実績データとして、日付「11/10」の
時刻「14:25」にパッキング・ロットNo.「○△×
01」の部品名「ネジX」、部品No.「X1111」、
単位重量「19.07」グラムが個数「300」個、総
重量「5,730」グラムで担当者「乙」によって包装
されたというデータが残る。
For example, when the work is performed in accordance with the procedure shown in FIG. 5, the packing lot No. “○ △ ×” is obtained as the performance data at the time “14:25” on the date “11/10”.
01 ”, part number“ X1111 ”,
There remains data that the unit weight “19.07” gram is “300” pieces and the total weight “5,730” gram is packed by the person in charge “Otsu”.

【0037】図9は、本実施形態による出荷数確認シス
テムにおいて、組立製造部門10から部品不足のクレー
ムがきたときの対応の一例を示すフローチャート図であ
る。以下、部品不足クレームがきたときに、出荷部門1
1側で当該部品の出荷数を確認するフローチャート図に
従って説明をする。
FIG. 9 is a flow chart showing an example of how the system for confirming the number of shipments according to the present embodiment corresponds to a case in which a complaint for a shortage of parts comes from the assembly and manufacturing department 10. Hereafter, when a component shortage complaint comes, the shipping department 1
A description will be given with reference to a flowchart in which the number of shipments of the part is checked on the first side.

【0038】海外に存するノックダウン生産組立地の組
立製造部門10から国内に存する出荷部門11へ、「ノ
ックダウン・オーダ・ロットNo.」と「部品No.」と「部
品数」から成る部品不足クレームがくる(P301)。
組立製造部門10からきた部品不足クレームの「ノック
ダウン・オーダ・ロットNo.」をキーとして、この「ノ
ックダウン・オーダ・ロットNo.」に係る「パッキング
・ロットNo.」を、包装・出荷計画データベース15か
ら検索する(P302)。検索された「パッキング・ロ
ットNo.」に係る実績データを実績データベース19か
ら抽出する(P303)。抽出された実績データの中か
ら、部品不足クレームがきた部品を「部品No.」をキー
として抽出する(P304)。
A part shortage consisting of "knockdown order lot No.", "part No." and "number of parts" is transferred from the assembly manufacturing department 10 of the knockdown production assembly site overseas to the shipping department 11 existing in Japan. A complaint comes (P301).
Using the “knockdown order lot No.” of the parts shortage complaint from the assembly manufacturing department 10 as a key, the “packing lot No.” related to this “knockdown order lot No.” is packaged and shipped. Search from the database 15 (P302). The result data relating to the retrieved “packing lot No.” is extracted from the result database 19 (P303). From the extracted performance data, a part with a parts shortage complaint is extracted using “part No.” as a key (P304).

【0039】例えば、組立製造部門10から出荷部門1
1へ、ノックダウン・オーダ・ロットNo.「ABC1」
の部品No.「X1111」が部品数「10」個足りない
という部品不足クレームがきたとする。この場合、まず
包装・出荷計画データベース14から、このノックダウ
ン・オーダ・ロットNo.「ABC1」をキーとして、こ
のノックダウン・オーダ・ロットNo.「ABC1」に係
るパッキング・ロット・No.である「○△×01」を検
索する。次に実績データベース19より、このパッキン
グ・ロットNo.「○△×01」に係る実績データを抽出
する。この抽出された実績データの中から、部品不足ク
レームに係る部品を、部品No.「X1111」をキーと
して抽出し、実際の包装状況を確認する。図8を参照す
ると、ここでは、部品No.「X1111」が日付「11
/10」の時刻「14:25」に担当者「乙」によって
個数「300」個、日付「11/10」の時刻「14:
26」に担当者「甲」によって個数「300」個、日付
「11/10」の時刻「14:29」に担当者「乙」に
よって個数「300」個包装された、というように確認
することができる。このとき、包装・出荷計画の包装に
係る計画と実績データとをつき合わせて、確認すること
も可能である。
For example, from the assembly / manufacturing section 10 to the shipping section 1
To 1, knockdown order lot No. "ABC1"
Suppose that a part shortage complaint has been made that the part number "X1111" is insufficient for "10" parts. In this case, first, from the packaging / shipping plan database 14, using the knockdown order lot number "ABC1" as a key, the packing lot number related to the knockdown order lot number "ABC1". Search for “○ △ × 01”. Next, the result data relating to the packing lot No. “△ Δ × 01” is extracted from the result database 19. From the extracted performance data, the part related to the parts shortage claim is extracted using the part number “X1111” as a key, and the actual packaging status is confirmed. Referring to FIG. 8, here, the part No. “X1111” has the date “11”.
At the time “14:25” on “/ 10”, the person in charge “Otsu” received “300” pieces and the date “11/10” at the time “14:25”.
26, "300" pieces were packed by the person in charge "A", and "300" pieces were packed by the person in charge "Otsu" at the time "14:29" on the date "11/10". Can be. At this time, it is also possible to check the packaging and shipping plan relating to the packaging and the actual data in association with each other.

【0040】図10は、本発明の第2実施形態に係るノ
ックダウン生産用部品の出荷数確認システムの全体図で
ある。海外に存する組立地の組立製造部門10には端末
装置40が設けられ、この端末装置40は、国内に存す
る出荷部門11のホストコンピュータ42とネットワー
ク41を介して接続されている。出荷部門11のホスト
コンピュータ42は、実績データベース19と接続され
ている。このため、出荷部門11においてだけでなく、
海外に存する組立製造部門10においてもネットワーク
41を介して、ホストコンピュータ42に接続されてい
る実績データベース19を検索することができる。海外
に存する組立製造部門10において、部品の不足が起こ
った場合、出荷部門11に電話、FAX、Eメールで問
い合わせることなく、不足した発注部品が実際に注文通
りに包装・出荷されているかどうかの確認が迅速に取れ
る。
FIG. 10 is an overall view of a system for confirming the number of shipped knockdown production parts according to a second embodiment of the present invention. A terminal device 40 is provided in the assembly / manufacturing section 10 of an overseas assembly site. The terminal apparatus 40 is connected to a host computer 42 of the shipping section 11 located in Japan via a network 41. The host computer 42 of the shipping department 11 is connected to the performance database 19. For this reason, not only in the shipping department 11,
Even in the assembly / manufacturing section 10 existing overseas, the results database 19 connected to the host computer 42 can be searched through the network 41. In the event that a shortage of parts occurs in the assembly and manufacturing department 10 existing overseas, without inquiring the shipping department 11 by telephone, facsimile or e-mail, it is possible to determine whether or not the missing ordered parts are actually packaged and shipped as ordered. Confirmation can be taken quickly.

【0041】[0041]

【発明の効果】以上の説明で明らかなように本発明によ
れば、ノックダウン生産用部品を組立地に出荷する出荷
部門において、組立地の組立製造部門へ出荷される発注
部品の数を実績データとして残すようにしたため、組立
地の組立製造部門から発注部品の不足クレーム等のクレ
ームがあった場合に、正確に、かつ迅速に実際に出荷し
た出荷数を確認できる。また、担当者と第三者がリアル
タイムで、部品重量のばらつき度などのデータを活用す
ることができ、データの確認をすることができる。
As is apparent from the above description, according to the present invention, the number of ordered parts to be shipped to the assembly / manufacturing department at the assembly site is actually measured in the shipping department for shipping knockdown production parts to the assembly site. Since the data is left as data, when there is a complaint such as a complaint of a shortage of ordered parts from the assembling / manufacturing department of the assembling place, it is possible to accurately and promptly confirm the number of actual shipments. In addition, the person in charge and the third party can utilize data such as the degree of variation in component weight in real time, and can confirm the data.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1実施形態のノックダウン生産用部
品の出荷数確認システムの全体概念図である。
FIG. 1 is an overall conceptual diagram of a system for confirming the number of shipped knockdown production parts according to a first embodiment of the present invention.

【図2】本発明に係るノックダウン生産用部品の出荷数
確認システムにおける部品の出荷までの手順フロー図で
ある。
FIG. 2 is a flow chart showing a procedure up to shipment of parts in a system for confirming the number of shipped knockdown production parts according to the present invention.

【図3】本発明に係るノックダウン生産用部品の出荷数
確認システムにおける包装・出荷計画と製造・搬入計画
の立案に関するシステム概念図である。
FIG. 3 is a system conceptual diagram relating to planning of a packaging and shipping plan and a manufacturing and carrying-in plan in a system for confirming the number of shipped knockdown production parts according to the present invention.

【図4】包装計画データベースに記憶される包装・出荷
計画の出荷に係る計画の一例を示す図である。
FIG. 4 is a diagram showing an example of a plan related to shipping of a packing / shipping plan stored in a packing plan database.

【図5】本発明に係るノックダウン生産用部品の出荷数
確認システムにおいて包装される部品をカウントし、カ
ウントした部品数を記憶する部分に関するフロー図であ
る。
FIG. 5 is a flowchart showing a part for counting the number of parts to be packaged and storing the counted number of parts in the system for checking the number of shipped knockdown production parts according to the present invention.

【図6】 本発明に係るノックダウン生産用部品の出荷
数確認システムにおける記憶する部分の計数器を含むブ
ロック図である。
FIG. 6 is a block diagram including a counter of a storage part in the system for confirming the number of shipped knockdown production parts according to the present invention.

【図7】重量管理データベースの重量管理表の一例を示
す図である。
FIG. 7 is a diagram showing an example of a weight management table of a weight management database.

【図8】実績データベースの実績データの一例を示す図
である。
FIG. 8 is a diagram illustrating an example of performance data in a performance database.

【図9】本実施形態において、組立製造部門から部品不
足のクレームがきたときの対応の一例を示すフローチャ
ート図である。
FIG. 9 is a flowchart illustrating an example of a process performed when a component shortage complaint is received from the assembly / manufacturing section in the embodiment.

【図10】本発明に係る第2実施形態のノックダウン生
産用部品の出荷数確認システムの全体図である。
FIG. 10 is an overall view of a system for confirming the number of shipped knockdown production parts according to a second embodiment of the present invention.

【図11】従来の部品の搬入指示システムの概念図であ
る。
FIG. 11 is a conceptual diagram of a conventional component carry-in instruction system.

【図12】従来の部品の出荷予定を管理する出荷管理方
法の概念図である。
FIG. 12 is a conceptual diagram of a conventional shipping management method for managing a shipping schedule of parts.

【符号の説明】[Explanation of symbols]

10 組立製造部門 11 出荷部門 12A,12B,12C 部品製造部門 13 オーダデータベース 14 包装・出荷計画立案システム 15 包装・出荷計画データベース 16 製造・搬入計画立案システム 17 パーツリストデータベース 18 搬入情報データベース 19 実績データベース 30 計数装置 31 個数演算手段 32 重量測定器 38 重量管理データベース 40 端末装置 41 ネットワーク 42 ホストコンピュータ Reference Signs List 10 Assembly / manufacturing section 11 Shipping section 12A, 12B, 12C Parts manufacturing section 13 Order database 14 Packaging / shipping planning system 15 Packaging / shipping planning database 16 Manufacturing / loading planning system 17 Parts list database 18 Import information database 19 Performance database 30 Counting device 31 Number calculation means 32 Weight measuring device 38 Weight management database 40 Terminal device 41 Network 42 Host computer

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 ノックダウン組立地の組立製造部門から
出荷部門に対する製品組立に必要な各種の部品の発注に
応じて、前記出荷部門は前記部品の製造・搬入の計画を
立てて各種の前記部品のそれぞれの部品製造部門に部品
製造の指示を出し、かつ前記部品製造部門から計画数の
前記部品の搬入を受け、さらに前記出荷部門は、搬入さ
れた前記部品を所定数量で収納する入れ物に入れ、さら
に複数の前記入れ物を外装ケースに入れて前記組立製造
部門に向けて出荷するノックダウン生産システムにおい
て、 所定数量の前記部品を前記入れ物に入れる時に前記入れ
物の重量を測定する重量測定部と、 前記重量測定部で測定された前記入れ物の前記重量に基
づいて前記入れ物内の前記部品の個数を算出する個数演
算手段と、 前記個数演算手段で算出された前記個数のデータを記憶
する記憶部を備え、 前記記憶部に記憶される前記部品の前記個数のデータに
よって前記出荷部門での前記部品の出荷数を確認するよ
うにしたことを特徴とするノックダウン生産用部品の出
荷数確認システム。
1. In accordance with an order for various parts required for product assembly from an assembly manufacturing department at a knockdown assembly site to a shipping department, the shipping department makes a plan for manufacturing and carrying in the parts and prepares various types of the parts. Issue a part manufacturing instruction to each of the parts manufacturing departments, and receive a planned number of the parts from the parts manufacturing department, and further, the shipping department places the carried-in parts in a container for storing the parts in a predetermined quantity. A knockdown production system for placing a plurality of the containers in an outer case and shipping to the assembling / manufacturing section; a weight measuring unit for measuring a weight of the container when a predetermined number of the parts are put in the container; A number calculating means for calculating the number of the parts in the container based on the weight of the container measured by the weight measuring unit; A storage unit for storing the issued data of the number, wherein the number of the parts shipped in the shipping department is confirmed by the data of the number of the parts stored in the storage unit. Confirmation system for knockdown production parts shipments.
【請求項2】 前記記憶部に記憶される前記入れ物内の
前記部品に係る前記個数のデータは、個数算出日、個数
算出時刻、前記部品を特定する番号と関連して記憶さ
れ、閲覧テーブルとして形成されることを特徴とする請
求項1記載のノックダウン生産用部品の出荷数確認シス
テム。
2. The number data relating to the part in the container stored in the storage unit is stored in association with a number calculation date, a number calculation time, and a number specifying the part, and is stored as a browsing table. The system for confirming the number of shipments of knockdown production parts according to claim 1, wherein the system is formed.
【請求項3】 前記記憶部に記憶される前記入れ物内の
前記部品に係る前記個数のデータは、前記ノックダウン
組立地の前記組立製造部門から発注された前記部品の発
注内容との対応関係を有するように記憶されていること
を特徴とする請求項1記載のノックダウン生産用部品の
出荷数確認システム。
3. The data of the number of the parts in the container stored in the storage unit indicates a correspondence relationship with an order content of the parts ordered from the assembly and manufacturing department of the knockdown assembly site. 2. The system according to claim 1, wherein the number of shipments of knockdown production parts is stored.
【請求項4】 前記記憶部は前記出荷部門に設けられた
ホストコンピュータに付設されたデータベースとして構
成され、前記ホストコンピュータは前記組立製造部門の
端末装置とネットワークで接続され、前記組立製造部門
は、前記端末装置および前記ネットワークを介して前記
ホストコンピュータにアクセスして、発注した前記部品
の前記出荷部門における出荷数を、前記データベースに
記憶される前記個数のデータから取得することを特徴と
する請求項1記載のノックダウン生産用部品の出荷数確
認システム。
4. The storage unit is configured as a database attached to a host computer provided in the shipping department, wherein the host computer is connected to a terminal device of the assembly manufacturing department via a network, The method according to claim 1, wherein the host computer is accessed via the terminal device and the network, and a shipment number of the ordered parts in the shipping department is acquired from the data of the number stored in the database. 1. A system for confirming the number of shipped knockdown production parts according to 1.
【請求項5】 前記ノックダウン組立地の前記組立製造
部門は海外に存し、前記出荷部門は国内に存することを
特徴とする請求項1〜4のいずれか1項に記載のノック
ダウン生産用部品の出荷数確認システム。
5. The knockdown production apparatus according to claim 1, wherein the assembly production section of the knockdown assembly site is located overseas and the shipping section is located in Japan. A system for checking the number of parts shipped.
JP2000402715A 2000-12-28 2000-12-28 System for confirming number of knockdown production parts Pending JP2002203006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000402715A JP2002203006A (en) 2000-12-28 2000-12-28 System for confirming number of knockdown production parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000402715A JP2002203006A (en) 2000-12-28 2000-12-28 System for confirming number of knockdown production parts

Publications (1)

Publication Number Publication Date
JP2002203006A true JP2002203006A (en) 2002-07-19

Family

ID=18866957

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000402715A Pending JP2002203006A (en) 2000-12-28 2000-12-28 System for confirming number of knockdown production parts

Country Status (1)

Country Link
JP (1) JP2002203006A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007148598A (en) * 2005-11-25 2007-06-14 Hitachi Ltd Information processor
JP2009051601A (en) * 2007-08-24 2009-03-12 Nikken Lease Kogyo Kk Management system of carrier in carrying system using carrier

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007148598A (en) * 2005-11-25 2007-06-14 Hitachi Ltd Information processor
JP4710568B2 (en) * 2005-11-25 2011-06-29 株式会社日立製作所 Information processing device
JP2009051601A (en) * 2007-08-24 2009-03-12 Nikken Lease Kogyo Kk Management system of carrier in carrying system using carrier

Similar Documents

Publication Publication Date Title
CN107358383B (en) Logistics freight system
US9105003B2 (en) Freight tracking and control system
US7536321B2 (en) Estimated time of arrival (ETA) systems and methods
US8190497B2 (en) Handheld scanner device with display location database
US20050102203A1 (en) Order-handling inventory management system and method
US20020087438A1 (en) Order assembly production system and method
US7267270B2 (en) Goods tracking system and method
EP2366166A1 (en) Systems and methods for processing requests for proposals and managing inventory
US20040267677A1 (en) Packing and shipping management system and packing and shipping management method
US20030009398A1 (en) Computer system for goods management in a stock company
JP3479881B2 (en) Strategic Alliance Information Management System
US20100200657A1 (en) Display fixture build and mapping system and method and related product sales information system and method
TW202137086A (en) Computer-implemented systems and computer-implemented methods for quality control of worker behavior
JP2002063440A (en) Order issuing apparatus, order issuing system, method for issuing order, order issuing program and computer readable recording medium having order issuing program recorded thereon
JP2002203006A (en) System for confirming number of knockdown production parts
JP2003084821A (en) Article manufacturing apparatus and method containing blend treatment in manufacturing process
CN107274127B (en) Hierarchical freight management system
US20050060243A1 (en) Method for managing tools in a power plant service environment
CN115204602A (en) Material packaging processing method and device and storage medium
JP3902161B2 (en) International consolidated logistics system
CA2414212A1 (en) Repair parts ordering management system
CN113205347A (en) Anti-counterfeiting traceability management system applied to cold chain refrigeration house
JP5228634B2 (en) Trade support processing system, trade support processing method, and trade support processing program
JP3866206B2 (en) Kit parts production support device and program
CN115564357A (en) Part supply system management platform

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070313

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070511

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080507