JP2002169857A - Portable telephone, building site construction management system, recording medium with program for portable telephone recorded, and recording medium with building site construction management program recorded - Google Patents

Portable telephone, building site construction management system, recording medium with program for portable telephone recorded, and recording medium with building site construction management program recorded

Info

Publication number
JP2002169857A
JP2002169857A JP2000369052A JP2000369052A JP2002169857A JP 2002169857 A JP2002169857 A JP 2002169857A JP 2000369052 A JP2000369052 A JP 2000369052A JP 2000369052 A JP2000369052 A JP 2000369052A JP 2002169857 A JP2002169857 A JP 2002169857A
Authority
JP
Japan
Prior art keywords
construction
house
site
work
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000369052A
Other languages
Japanese (ja)
Inventor
Kazuhiro Inoue
和弘 井上
Yoshifumi Koda
芳文 幸田
Shinichi Sakiyama
眞一 崎山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2000369052A priority Critical patent/JP2002169857A/en
Publication of JP2002169857A publication Critical patent/JP2002169857A/en
Pending legal-status Critical Current

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a system which manages the progress conditions of construction in building sites by residences and subdivided construction units and provides management contents to persons concerned who want the data. SOLUTION: In this building site construction management system, a portable telephone 1 is provided with an input operation part 37 which inputs a construction item of each of units constituting a residence and respective workers who are in charge of these construction items, at the time of entrance to a building site, during presence in the side, and at the time of leaving the site and a control part 29 which uses 'i mode' services to transmit selected contents to a management server 7. The management server 8 is provided with a transmission/ reception part 11 which receives transmission contents from the portable telephone 1 and a residence-classified database 23 where reception contents of the transmission/reception part 11 are stored.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は携帯電話機、建築現
場工事管理システムに関し、特に、建築現場での工事の
進捗状況をリアルタイムに管理することができる携帯電
話機、建築現場工事管理システム、携帯電話機用プログ
ラムを記録した記録媒体及び建築現場工事管理プログラ
ムを記録した記録媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mobile phone and a construction site construction management system, and more particularly, to a mobile phone, a construction site construction management system, and a mobile phone capable of managing the progress of construction at a construction site in real time. The present invention relates to a recording medium recording a program and a recording medium recording a construction site construction management program.

【0002】[0002]

【従来の技術】建築現場では、基礎工事から始まり据付
け工事、木工工事、クロス工事、電気工事、水道工事、
ガス工事、内装設備等の各種工事が行われる。これらの
工事は、必ずしも順番に行われる訳ではなく、作業の進
み具合によって複数の工事が重複して行われる場合もあ
ることから、これらの工事の進捗管理が作業効率の向上
を図るうえでの重要な課題となっている。また、建築現
場には、工事に携わる多数の現場作業者が入邸及び退邸
することから、現場作業者の管理も重要である。
2. Description of the Related Art At a construction site, starting from foundation work, installation work, woodworking work, cross work, electric work, water works,
Various works such as gas works and interior equipment will be performed. These works are not necessarily performed in order, and multiple works may be performed repeatedly depending on the progress of the work.Therefore, the progress management of these works is a key to improving work efficiency. It is an important issue. In addition, since a large number of field workers involved in construction work enter and leave the building site, management of the field workers is also important.

【0003】本発明に関連する公知技術として、特開平
07−229294号公報、及び特開平07−2292
95号公報には、建築現場作業管理システムが開示され
ている。このシステムは、建築現場に配置され、バーコ
ードリーダを有する端末機と、該端末機と電話回線によ
り接続され、該端末機からの作業情報を管理するホスト
コンピュータとにより構成される。ここで、現場作業者
は、各個人に固有に付与された識別番号(バーコード)が
印刷された個人カードを所持しており、また、建築現場
には、各作業項目に固有に付与されたバーコードが印刷
された作業ブックが配置されている。
[0003] Japanese Patent Application Laid-Open Nos. 07-229294 and 07-22992 disclose known techniques related to the present invention.
No. 95 discloses a construction site work management system. This system includes a terminal provided at a building site and having a barcode reader, and a host computer connected to the terminal via a telephone line and managing work information from the terminal. Here, the site worker has a personal card on which an identification number (bar code) uniquely assigned to each individual is printed, and the construction site is uniquely assigned to each work item. A workbook on which a barcode is printed is placed.

【0004】現場作業者は、端末機のバーコードリーダ
により個人カードのバーコードを読み取り、つぎに、作
業ブックの所定の作業項目に対応するバーコードをバー
コードリーダにより読み取る。バーコードリーダにより
読み取られたバーコード情報は電話回線を介してホスト
コンピュータに送信される。これにより、ホストコンピ
ュータには、邸別の工事進捗情報がリアルタイムに管理
される。
[0004] The field worker reads the barcode of the personal card with the barcode reader of the terminal, and then reads the barcode corresponding to a predetermined work item of the workbook with the barcode reader. The barcode information read by the barcode reader is transmitted to a host computer via a telephone line. As a result, the host computer manages the construction progress information for each house in real time.

【0005】[0005]

【発明が解決しようとする課題】上記公知技術では、作
業者個人が所持する個人カード、及び作業現場に配置さ
れる作業ブックのバーコードを読み取るために、バーコ
ードリーダを有する端末機(電話機)を特別に設ける必
要があり、設置時の導入費及び電話代等の運営費の負担
が大きい。また、各作業者は、各邸での入邸及び退邸時
において個人カードを所持している必要があるため、こ
れらを作業中に紛失する可能性がある。
According to the above-mentioned prior art, a terminal (telephone) having a bar code reader for reading a personal card carried by an individual worker and a bar code of a work book arranged at a work site. It is necessary to provide a special service, which imposes a large burden on installation costs and operating expenses such as telephone charges. In addition, since each worker needs to have a personal card when entering and leaving the house, there is a possibility that they may be lost during the work.

【0006】また、上記公知技術は、端末機からホスト
コンピュータへ一方向にデータ転送するものであり、逆
にホストコンピュータの管理情報を端末機が現状把握等
の目的で利用するための機能を有していない。さらに、
ユニット工法が普及してきている。この工法は、邸を細
分化(ユニット化)することにより、部材、加工法及び
アフターサービスに至るまで顧客満足度を向上すること
を目的とした工法である。この工法によるユニット住宅
の現場工事での進捗状況の管理についても、住宅開発か
ら入居後のメンテナンスまでの一部として、一般住宅の
ものと比べてより充実されることが望まれる。
In addition, the above-mentioned known technique is for transferring data in one direction from a terminal to a host computer, and has a function for the terminal to use the management information of the host computer for the purpose of grasping the current state. I haven't. further,
The unit construction method is spreading. This method is a method for improving customer satisfaction by subdivision (unitization) of the house to members, processing methods and after-sales service. It is desired that the progress of the unit construction on site construction by this method be managed as part of the process from house development to maintenance after moving in as compared to that of ordinary houses.

【0007】本発明の目的は、コストパフォーマンスを
考慮してバーコードリーダに代わる操作性の高いインタ
フェースを構築し、建築現場での工事の進捗状況を管理
することができる携帯電話機、建築現場工事管理システ
ム、携帯電話機用プログラムを記録した記録媒体及び建
築現場工事管理プログラムを記録した記録媒体を提供す
ることにある。
SUMMARY OF THE INVENTION An object of the present invention is to provide a portable telephone capable of constructing a highly operable interface in place of a bar code reader in consideration of cost performance and managing the progress of construction at a construction site, and construction site construction management. It is an object of the present invention to provide a system, a recording medium recording a program for a mobile phone, and a recording medium recording a construction site construction management program.

【0008】[0008]

【課題を解決するための手段】本発明の携帯電話機は、
建築現場への入邸時、入邸中又は退邸時に、邸の工事項
目及び該工事を行う職方を指定する指定手段と、通信回
線を介して該指定手段による指定内容を管理サーバに送
信する制御手段と、を備えるものである。また、前記通
信回線は、iモードサービスにより提供される電話回線
を含む。文字情報サービスとして注目されている携帯電
話網を利用することで、コストパフォーマンスの高い進
捗状況の管理をすることができる。
A portable telephone according to the present invention comprises:
When entering, leaving, or leaving a building site, a designating means for designating a construction item of a house and a technician performing the construction, and the contents specified by the designating means are transmitted to a management server via a communication line. Control means for performing the operation. Further, the communication line includes a telephone line provided by an i-mode service. By using the mobile phone network, which has been attracting attention as a text information service, it is possible to manage progress with high cost performance.

【0009】他の観点において本発明は、コンピュータ
を、上記携帯電話機として機能させるためのプログラム
を記録したコンピュータ読み取り可能な記録媒体であ
る。本発明の建築現場工事管理システムは、建築現場へ
の入邸時、入邸中又は退邸時に、邸の工事項目及び該工
事を行う職方に関するデータを通信回線を介して受信す
る受信手段と、該受信手段による受信内容を記憶する記
憶手段と、を備えるものである。
[0009] In another aspect, the present invention is a computer-readable recording medium in which a program for causing a computer to function as the portable telephone is recorded. The building site construction management system according to the present invention includes a receiving unit for receiving, via a communication line, data relating to the construction items of the house and the occupants performing the work when entering, leaving, or leaving the building site. And storage means for storing the contents received by the receiving means.

【0010】また、前記通信回線は、iモードサービス
により提供される電話回線を含む。文字情報サービスと
して注目されている携帯電話網を利用することで、コス
トパフォーマンスの高い進捗状況の管理をすることがで
きる。他の観点において本発明は、コンピュータを、上
記建築現場工事管理システムとして機能させるためのプ
ログラムを記録したコンピュータ読み取り可能な記録媒
体である。
[0010] The communication line includes a telephone line provided by an i-mode service. By using the mobile phone network, which has been attracting attention as a text information service, it is possible to manage progress with high cost performance. In another aspect, the present invention is a computer-readable recording medium recording a program for causing a computer to function as the above-mentioned construction site construction management system.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施の形態を添付
図面と対応して詳細に説明する。図1は、本発明の実施
の形態による建築現場工事管理システムの構成を示すブ
ロック図である。
Embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 is a block diagram showing a configuration of a construction site construction management system according to an embodiment of the present invention.

【0012】はじめに、本建築現場工事管理システム
は、インターネット等の通信回線を利用して、建築現場
の管理者等と管理部門との間で現場工事の進捗状況に関
するデータのやり取りを行うものである。特に、本実施
の形態によるシステムは、NTTドコモ社により提供さ
れる文字情報サービス“iモード”を利用して、現場管
理者が所持する携帯電話機から邸別の入邸時、入邸中及
び退邸時に、電気、水道工事等の工事項目及び該工事を
行う職方(作業者)に関する情報等を管理部門に報告す
ることで、現場工事の進捗状況をリアルタイムに管理す
ると共に、該管理内容を現場管理者及び建築メーカ担当
者等から照会可能にする。
First, the construction site construction management system uses a communication line such as the Internet to exchange data on the progress of site construction between a construction site manager or the like and the management department. . In particular, the system according to the present embodiment uses a text information service “i-mode” provided by NTT DoCoMo, and uses a mobile phone owned by a site manager to enter, enter, and exit a house. At the time of residence, information on construction items such as electricity and water works and information on workers (workers) performing the construction are reported to the management department, so that the progress of site construction can be managed in real time, and the management contents can be managed. Inquiry from site managers and building maker staff is possible.

【0013】図1に示す建築現場作業管理システムは、
携帯電話機1、照会端末3、インターネット5及び管理
サーバ7により実現される。携帯電話機1は、建築現場
等で現場管理者等により操作され、インターネット5を
介して、邸毎の現場工事の進捗状況に関するデータを管
理サーバ7との間でやり取りする。
The construction site work management system shown in FIG.
It is realized by the mobile phone 1, the inquiry terminal 3, the Internet 5, and the management server 7. The mobile phone 1 is operated by a site manager or the like at a building site or the like, and exchanges data relating to the progress of site construction for each house with the management server 7 via the Internet 5.

【0014】特に、本実施の形態では、携帯電話機1
は、“iモード”サービスの契約端末であり、“iモー
ド”サービスを利用して、邸別の入邸時、入邸中及び退
邸時に、工事項目、該工事を行う職方に関するデータを
管理サーバ7に送信すると共に、送信(入力)内容を確
認し、管理サーバ7に格納されている管理内容の一部
(例えば工事計画)を受信して表示する。
Particularly, in the present embodiment, the portable telephone 1
Is a contract terminal of the “i-mode” service, and uses the “i-mode” service to store construction items and data relating to the occupants performing the construction when entering, entering, and leaving the house. While transmitting to the management server 7, the transmission (input) content is confirmed, and a part of the management content (for example, a construction plan) stored in the management server 7 is received and displayed.

【0015】照会端末3は、建築メーカの営業所等に配
置され、工事・工程担当者等により操作される。照会端
末3は、管理サーバ7に格納されている管理内容(図4
〜図6参照)、携帯電話機1から入力された邸別の現場
工事の進捗状況を照会する。管理サーバ7は、インター
ネット5を介して、携帯電話機1から送信される邸別の
現場工事の進捗状況に関するデータを管理すると共に、
要求に応じて該管理内容を照会端末3、携帯電話機1に
送信する。
The inquiry terminal 3 is arranged at a sales office of a building maker or the like, and is operated by a person in charge of construction / process. The inquiry terminal 3 manages the management contents stored in the management server 7 (FIG. 4).
To FIG. 6), and inquires about the progress of site construction by house input from the mobile phone 1. The management server 7 manages data relating to the progress of site construction by house transmitted from the mobile phone 1 via the Internet 5,
The management content is transmitted to the inquiry terminal 3 and the mobile phone 1 in response to the request.

【0016】図1において、携帯電話機1とインターネ
ット5との間には、プロバイダ機能を提供するNTTド
コモ社の電話回線であるパケット通信網(図示せず)が
設けられており、そこには“iモード”サービス用サー
バ(図示せず)が配置されている。このサーバ及びイン
ターネット5を介して、携帯電話機1は管理サーバ7に
アクセスする。また、照会端末3は、社内LAN又は専
用線(図示せず)等に接続されており、これらの通信回
線及びインターネット5を介して管理サーバ7にアクセ
スする。
In FIG. 1, a packet communication network (not shown), which is a telephone line of NTT DoCoMo, which provides a provider function, is provided between the portable telephone 1 and the Internet 5. An i-mode "service server (not shown) is provided. The mobile phone 1 accesses the management server 7 via this server and the Internet 5. The inquiry terminal 3 is connected to an in-house LAN or a dedicated line (not shown), and accesses the management server 7 via these communication lines and the Internet 5.

【0017】図2は、本実施の形態による携帯電話機1
の詳細構成を示すブロック図である。携帯電話機1は、
制御部29、送信/受信部31、RAM33、ROM3
5、入力操作部37及び表示部39により構成される。
制御部29は、CPUであり、携帯電話機1全体の動作
を制御する。具体的には、“iモード”サービスを利用
した通信制御、入力操作部37の操作に応じた表示制御
等を行う。
FIG. 2 shows a portable telephone 1 according to the present embodiment.
FIG. 3 is a block diagram showing a detailed configuration of the embodiment. The mobile phone 1
Control unit 29, transmission / reception unit 31, RAM33, ROM3
5, an input operation unit 37 and a display unit 39.
The control unit 29 is a CPU, and controls the operation of the entire mobile phone 1. Specifically, communication control using the “i-mode” service, display control according to the operation of the input operation unit 37, and the like are performed.

【0018】送信/受信部31は、制御部29の指示に
基づいて送受信処理を行う。具体的には、邸別の入邸
時、入邸中及び退邸時に選択される工事項目、該工事を
行う職方等に関するデータの送信処理、及び管理サーバ
7からの管理内容を受信する。RAM33は、携帯電話
機1の処理に必要なデータを一時的に格納する。具体的
には、管理サーバ7に現場工事の進捗状況を報告するた
めの表示データ(図3参照)を一時的に格納する。RO
M35は、上記表示データ及び携帯電話機1の処理プロ
グラム等を固定的に格納する。
The transmission / reception unit 31 performs transmission / reception processing based on an instruction from the control unit 29. More specifically, it receives a construction item selected at the time of entering, entering and leaving the house, data transmission processing relating to a clerk who performs the construction, and receives management contents from the management server 7. The RAM 33 temporarily stores data required for processing of the mobile phone 1. Specifically, display data (see FIG. 3) for reporting the progress of the site construction is temporarily stored in the management server 7. RO
M35 stores the display data, the processing program of the mobile phone 1, and the like in a fixed manner.

【0019】入力操作部37は、入力ボタン等であり、
管理サーバ7に現場工事の進捗状況として報告すべき項
目の入力及び選択等を行う。具体的には、業者コード及
びパスワードの入力(図3(a)参照)、入邸、退邸、
進捗、及び確認等の端末操作に関する業務の選択(図3
(b)参照)、邸の選択(図3(c)参照)、工事項目
の選択(図3(d)参照)、工事を行う職方の選択(図
3(e)参照)等を行う。表示部39は、制御部29からの
指示に基づいて上記現場工事の進捗状況を報告するため
の表示データを表示する。
The input operation unit 37 is an input button or the like.
The user inputs and selects items to be reported to the management server 7 as the progress of the site construction. Specifically, input of a trader code and a password (see FIG. 3A), entering a house, leaving a house,
Selection of tasks related to terminal operation such as progress and confirmation (Fig. 3
(See (b)), house selection (see FIG. 3 (c)), construction item selection (see FIG. 3 (d)), and a clerk who performs construction (see FIG.
3 (e)). The display unit 39 displays display data for reporting the progress of the site construction based on an instruction from the control unit 29.

【0020】つぎに、管理サーバ7(図1参照)の詳細
構成について説明する。管理サーバ7は、制御部9、送
信/受信部11、RAM13、ROM15、入力操作部
17、表示部19、情報コードデータベース(以下、D
Bと呼ぶ)21、邸別DB23、及びCD−ROMドラ
イブ25により構成される。制御部9はCPUであり、
管理サーバ7全体の動作を制御する。特に、送信/受信
部11に対する通信制御、業者コード及びパスワード受
信時の業者認証、情報コードDB21、邸別DB23へ
のデータ書き込み及び読み出し処理、邸別DB23に記
憶される管理内容の編集処理、及び表示部19に対する
表示制御等を行う。
Next, a detailed configuration of the management server 7 (see FIG. 1) will be described. The management server 7 includes a control unit 9, a transmission / reception unit 11, a RAM 13, a ROM 15, an input operation unit 17, a display unit 19, and an information code database (hereinafter referred to as D).
B) 21, a house-specific DB 23, and a CD-ROM drive 25. The control unit 9 is a CPU,
The operation of the entire management server 7 is controlled. In particular, communication control for the transmission / reception unit 11, vendor authentication at the time of receiving a vendor code and a password, information code DB21, data write / read processing to the house-specific DB23, editing processing of management contents stored in the house-specific DB23, and The display control for the display unit 19 is performed.

【0021】送信/受信部11は、制御部9の指示に基
づいて、携帯電話機1等との間でデータの送信及び受信
処理を行う。具体的には、邸別の入邸時、入邸中及び退
邸時に、工事項目及び該工事を行う職方に関するデータ
の受信処理、及び携帯電話機1からの確認要求時に邸別
DB23に記憶されている管理内容を送信する。
The transmission / reception unit 11 transmits and receives data to and from the mobile phone 1 or the like based on an instruction from the control unit 9. Specifically, at the time of entering, entering, and leaving the house, the work item and the data relating to the workman performing the work are received and stored in the house-by-house DB 23 at the time of a confirmation request from the mobile phone 1. Send the management contents that have been.

【0022】RAM13は、管理サーバ7の処理に必要
なデータを一時的に格納する。ROM15は、管理サー
バ7の処理プログラム等を固定的に格納する。入力操作
部17は、キーボード、マウス等であり、情報コードD
B21、邸別DB23の内容の更新又は編集時等に操作
される。表示部19は、LCD等であり上記DBの更新
又は編集時等に制御部9からのコードデータをその都度
表示用データに変換して表示処理を行う。
The RAM 13 temporarily stores data necessary for the processing of the management server 7. The ROM 15 fixedly stores a processing program of the management server 7 and the like. The input operation unit 17 is a keyboard, a mouse, and the like.
B21 is operated when the contents of the house-specific DB 23 are updated or edited. The display unit 19 is an LCD or the like, and performs display processing by converting code data from the control unit 9 into display data each time the DB is updated or edited.

【0023】情報コードDB21及び邸別DB23は、
光磁気ディスクライブラリ装置等の大容量の記憶装置で
ある。図1では、各DBは各記憶装置に個別に格納され
るように示しているが、これらのDBが1台の記憶装置
に設けられていてもよい。情報コードDB21は、業者
毎の業者コード及びパスワード、職方の名前及び該職方
毎に割当てられた作業者コード、並びに工事名及び工事
毎に割当てられた工事コードを格納する。
The information code DB 21 and the house-specific DB 23
This is a large-capacity storage device such as a magneto-optical disk library device. Although FIG. 1 shows that each DB is stored individually in each storage device, these DBs may be provided in one storage device. The information code DB 21 stores a trader code and a password for each trader, a name of a workman, a worker code assigned to the workman, a work name and a work code assigned to each work.

【0024】邸別DB23は、現場工事の進捗状況に関
する邸別のファイル(工事進捗状況詳細一覧表、図4参
照)、及び該邸別ファイルに対応し、建築現場の職方の
入退邸を管理する入退邸実績ファイル(図5参照)を格
納する。CD−ROMドライブ25は、制御部9からの
指示に基づいて、CD−ROM27に格納されているプ
ログラム等を読み出してRAM13等に書き込む。
The house-by-house DB 23 corresponds to a house-by-house file relating to the progress of site construction (see a detailed list of construction progress, see FIG. 4), and the house-by-house file, and stores the house entrance / exit of the builder. The managed entry / exit record file (see FIG. 5) is stored. The CD-ROM drive 25 reads a program or the like stored in the CD-ROM 27 and writes the program or the like in the RAM 13 or the like based on an instruction from the control unit 9.

【0025】図4は、邸別ファイルを例示する図であ
る。この邸別ファイルは、カレンダー欄51、施工から
完成までの各工事の予定が示される予定欄52、該予定
欄52に示された各種工事の予定に対する工事実績が示
される実績欄53により構成されている。カレンダー欄
51は、その上段が月、中段と下段とが日を表してお
り、月日は同欄の左から右へと経過する。図4の例で
は、同欄の左端は8月30日、右端は10月8日となっ
ている。予定欄52には、このカレンダー欄51に対応
させて工事予定が記憶され、これに対応する実績が実績
欄53に順次記憶される。
FIG. 4 is a diagram exemplifying a house-by-house file. This house-specific file is composed of a calendar column 51, a schedule column 52 showing the schedule of each construction from construction to completion, and a performance column 53 showing the construction results for the various construction schedules shown in the schedule column 52. ing. In the calendar column 51, the upper row represents the month, the middle row and the lower row represent the day, and the date passes from left to right in the column. In the example of FIG. 4, the left end of the column is August 30 and the right end is October 8. The schedule column 52 stores the construction schedule in association with the calendar column 51, and the corresponding results are sequentially stored in the result column 53.

【0026】つぎに、本実施の形態による建築現場作業
管理システムの動作について説明する。はじめに、邸別
DB23の邸別ファイルには、カレンダー欄51のみが
記憶されている。この状態において、オペレータは、予
め作成された該当邸の建築計画表に従い、入力操作部1
7より各工事の予定日を入力する。図4の予定欄52に
は、このようにして入力された各工事の予定日が記憶さ
れている。
Next, the operation of the construction site work management system according to this embodiment will be described. First, in the house-specific file of the house-specific DB 23, only the calendar column 51 is stored. In this state, the operator operates the input operation unit 1 in accordance with the building plan table of the corresponding house created in advance.
Enter the scheduled date of each construction from 7. The schedule column 52 of FIG. 4 stores the schedule dates of each construction input in this manner.

【0027】予定欄52に示されている各記号に関し
て、記号“C”は基礎のナマコン立ち上がり工事、記号
“キ”は基礎工事、“S”は据付け工事、“D”は大工
工事をそれぞれ示し、“<”は各工事の完了予定日、
“>”は各工事の開始予定日を示している。たとえば、
“<キ”は基礎工事の完了予定日、“D>”は大工工事
の開始予定日を示している。
Regarding the symbols shown in the schedule column 52, the symbol "C" indicates the foundation work of the Namakon, the symbol "K" indicates the foundation work, "S" indicates the installation work, and "D" indicates the carpentry work. , “<” Is the scheduled completion date of each construction,
“>” Indicates the scheduled start date of each construction. For example,
“<G” indicates the scheduled completion date of the foundation work, and “D>” indicates the scheduled start date of the carpentry work.

【0028】このようにして予定日が記憶された後、上
述した携帯電話機1から送信されたデータが記憶され
る。具体的には、基礎のナマコン立ち上げ工事日である
8月30日以降、予定欄52に記入された工事予定に従
って、各工事を担当する業者の作業者が建築現場に入邸
し、担当する工事を行い退邸する。
After the scheduled date is stored in this way, the data transmitted from the mobile phone 1 is stored. Specifically, after August 30, which is the foundation Namakon start-up construction date, according to the construction schedule entered in the schedule column 52, a worker of a contractor in charge of each construction enters the building site and takes charge of it. Completes construction and leaves.

【0029】図3(a)は、携帯電話機1のiモード用
ログイン画面を例示する図である。現場管理者等の携帯
電話機1の利用者は、このログイン画面で、入邸する業
者の業者コード及びパスワードを入力し、ボタン“確
定”を押す。この業者コードとパスワードは、インター
ネット5を介して管理サーバ7に受信される。管理サー
バ7は、受信した業者コード及びパスワードと、情報コ
ードDB21に格納されている業者コード及びパスワー
ドとから認証を行う。ここで、管理サーバ7は、受信し
た業者コード及びパスワードの対が情報コードDB21
に格納されている場合に、携帯電話機1に対して入力要
求を送信する。携帯電話機1は、管理サーバ7からの入
力要求に応答してiモード処理メニューを表示する。
FIG. 3A is a diagram exemplifying an i-mode login screen of the mobile phone 1. A user of the mobile phone 1, such as a site manager, inputs the trader code and password of the trader who enters the house on this login screen, and presses the button "OK". The company code and the password are received by the management server 7 via the Internet 5. The management server 7 performs authentication based on the received trader code and password and the trader code and password stored in the information code DB 21. Here, the management server 7 stores the pair of the received trader code and password in the information code DB 21.
, An input request is sent to the mobile phone 1. The mobile phone 1 displays an i-mode processing menu in response to an input request from the management server 7.

【0030】図3(b)は、iモード処理メニュー画面
を例示する図である。このメニュー画面は、図3(a)
で入力された業者コードの業者が行う業務を選択する画
面である。業務の選択として(1)入邸、(2)退邸、
(3)進捗、及び(4)確認、を示すボタンが設けられ
ている。ここで、ボタン“(1)入邸”を押すと、入邸
業務が選択された旨が管理サーバ7に送信され、入邸す
る邸の選択を促す画面が表示される。
FIG. 3B is a diagram illustrating an i-mode processing menu screen. This menu screen is shown in FIG.
Is a screen for selecting a task performed by the trader of the trader code input in step (1). As business choices, (1) move in, (2) leave,
Buttons indicating (3) progress and (4) confirmation are provided. Here, when the button "(1) Entering a house" is pressed, the fact that the entering operation has been selected is transmitted to the management server 7, and a screen prompting selection of the house to enter is displayed.

【0031】図3(c)は、邸選択・検索画面を例示す
る図である。この選択画面は、図3(a)で入力された
業者コードの業者が入邸する邸を選択する画面である。
下から、所定の邸をカナ検索するボックス、該カナ検索
により該当する邸の一覧を表示するボックス、最近検索
された邸の一覧を表示するボックスが設けられている。
FIG. 3C is a diagram showing an example of a house selection / search screen. This selection screen is a screen for selecting the house where the trader of the trader code entered in FIG.
From below, there are provided a box for searching for a predetermined house, a box for displaying a list of houses corresponding to the kana search, and a box for displaying a list of houses searched recently.

【0032】邸を選択する場合には、まずカナ検索によ
り邸の始めの1文字を選択する。たとえば、田中邸であ
れば“タ”を選択する。これにより、選択された1文字
に該当する邸の一覧が上のボックスに表示され、該一覧
から所定の邸を選択し、ボタン“確定”を押す。また、
最近検索された邸の一覧から所定の邸を選択し、ボタン
“確定”を押すこともできる。ここで、ボタン“送信”
を押すと、所定の邸が選択された旨が管理サーバ7に送
信され、作業の選択を促す画面が表示される。
When selecting a house, first, the first character of the house is selected by kana search. For example, "Ta" is selected for Tanaka's residence. As a result, a list of houses corresponding to the selected one character is displayed in the upper box, a predetermined house is selected from the list, and the button "confirm" is pressed. Also,
It is also possible to select a predetermined house from a list of recently searched houses and press the button "OK". Here, the button "Send"
When is pressed, the fact that the predetermined house has been selected is transmitted to the management server 7, and a screen prompting the selection of the work is displayed.

【0033】図3(d)は、作業(工事)選択画面を例
示する図である。この選択画面は、図3(a)で入力さ
れた業種コードの業者が行う工事を選択する画面であ
り、電気工事、水道工事、据付け工事等の工事一覧を表
示するボックスが設けられている。ここで、この一覧か
ら所定の工事を選択し、ボタン“確定”を押すことによ
り、所定の工事が選択された旨が管理サーバ7に送信さ
れ、職方の選択を促す画面が表示される。
FIG. 3D is a diagram showing an example of a work (construction) selection screen. This selection screen is a screen for selecting works performed by the trader of the type of business code input in FIG. 3A, and includes a box for displaying a list of works such as electric works, water works, and installation works. Here, by selecting a predetermined construction from this list and pressing a button "confirm", the fact that the predetermined construction has been selected is transmitted to the management server 7, and a screen for prompting the selection of the workman is displayed.

【0034】図3(e)は、職方を選択する画面を例示
する図である。この選択画面は、図3(d)で選択され
た工事を行う職方を選択する画面であり、職方の名前を
一覧表示するボックスが設けられている。ここで、この
一覧から所定の職方を選択し、ボタン“確定”を押すこ
とにより、所定の職方が選択された旨が作業者コードと
して管理サーバ7に送信され、入邸業務の確認を促す画
面が表示される。図3(f)は、業務の確認画面を例示
する図である。この確認画面は、入邸業務における入力
内容を確認する画面であり、図3(a)〜図3(e)で
の入力内容を表示するボックスが設けられており、利用
者はスクロールする等して入力内容を確認する。ここ
で、ボタン“確定”を押すことにより、内容確認が完了
した旨が管理サーバ7に送信され、入邸業務終了を示す
画面が表示される。
FIG. 3 (e) is a diagram showing an example of a screen for selecting a work style. This selection screen is a screen for selecting the workman who performs the construction selected in FIG. 3D, and is provided with a box for displaying a list of workman names. Here, by selecting a predetermined clerk from this list and pressing the button "confirm", the fact that the predetermined clerk has been selected is transmitted to the management server 7 as an operator code, and confirmation of the resident operation is confirmed. A prompt is displayed. FIG. 3F is a diagram illustrating a business confirmation screen. This confirmation screen is a screen for confirming the input contents in the house entry business, and is provided with a box for displaying the input contents in FIGS. 3 (a) to 3 (e). To confirm the input. Here, when the button "Confirm" is pressed, the fact that the content confirmation has been completed is transmitted to the management server 7, and a screen indicating the end of the house entry operation is displayed.

【0035】図3(g)は、業務終了画面を例示する図
である。この終了画面には、ボタン“メニュー”が設け
られている。ボタン“メニュー”を押すと図3(b)の
iモード処理メニューが表示され、引き続いて図3
(a)で入力した業者コードの業者に関して退邸、進捗
等の業務を選択できる。また、図3(b)〜図3(f)
の画面におけるボタン“戻る”を押すと直前の画面が表
示され、また、ボタン“先頭”を押すと図3(a)の画
面が表示される。
FIG. 3 (g) is a diagram showing an example of the work end screen. The end screen is provided with a button “menu”. When the button “menu” is pressed, the i-mode processing menu shown in FIG. 3B is displayed.
With respect to the trader of the trader code entered in (a), the work such as leaving the house, progress, etc. can be selected. 3 (b) to 3 (f).
When the button "return" on the screen of FIG. 3 is pressed, the screen immediately before is displayed, and when the button "head" is pressed, the screen of FIG. 3A is displayed.

【0036】以上、図3(a)〜図3(g)の操作に連
動して、管理サーバ7の邸別DB23に格納されている
邸別ファイルには、入邸業務に関するデータ(邸、工
事、職方)がカレンダー欄51、予定欄52及び実績欄
53に記憶される。ここでは、図3(a)〜図3(g)
を用いて入邸業務に関して説明したが、退邸業務に関し
ても同様な操作により、管理サーバ7と連動する。
As described above, in conjunction with the operations shown in FIGS. 3A to 3G, the house-specific file stored in the house-specific DB 23 of the management server 7 includes data (movement, construction, , Workman) are stored in the calendar column 51, the schedule column 52, and the results column 53. Here, FIGS. 3 (a) to 3 (g)
Has been described with reference to, but the same applies to the leaving operation, which is linked to the management server 7.

【0037】この場合、図3(a)のログイン画面で退
邸業務を行う業者の業者コード及びパスワードを入力
し、図3(b)のメニュー画面でボタン“(2)退邸”
を選択する。続いて、図3(c)の選択画面で退邸する
邸を選択し、図3(d)の選択画面で工事を選択する。
最後に図3(e)の選択画面で職方を選択する。上記携
帯電話機1の操作に連動して、邸別DB23に格納され
ている邸別ファイル(図4参照)には、現場工事の進捗
状況を示すデータがカレンダー欄51、予定欄52及び
実績欄53の所定の欄に記憶される。
In this case, on the login screen shown in FIG. 3A, a trader code and a password of a trader who performs the leaving work are input, and a button "(2) leaving house" is displayed on the menu screen shown in FIG. 3B.
Select Subsequently, the house to be retired is selected on the selection screen of FIG. 3C, and the construction is selected on the selection screen of FIG. 3D.
Finally, a job style is selected on the selection screen shown in FIG. In conjunction with the operation of the mobile phone 1, in the house-specific file (see FIG. 4) stored in the house-specific DB 23, data indicating the progress of the site construction is stored in the calendar column 51, the schedule column 52, and the results column 53. Is stored in a predetermined column.

【0038】実績欄53は実績欄53a〜53eからな
り、現場工事の実績が記憶されている。ここで、実績欄
53に記入されている各記号について説明する。たとえ
ば、9月1日の実績欄53aについて見ると、上段の記
号“キ3”は、9月1日に基礎工事に3人が入邸したこ
とを示し、中段の記号“#C”は、基礎のナマコン立ち
上がり部打設が完了したことを示し、下段の記号
“[3”は、型枠を3日後に外すことを示している。ま
た、9月3日の実績欄53aについて見ると、中段の記
号“[]”は、2日後に型枠を外したことを示している。
The performance column 53 is composed of performance columns 53a to 53e, and stores the results of site construction. Here, each symbol entered in the performance column 53 will be described. For example, looking at the results column 53a on September 1, the upper symbol “ki 3” indicates that three people entered the foundation work on September 1, and the middle symbol “#C” is The mark "[3" at the bottom indicates that the formwork is to be removed three days later. Looking at the results column 53a on September 3, the middle symbol "[]" indicates that the mold was removed two days later.

【0039】また、9月7日の実績欄53aについて見
ると、中段の記号“完”は、上段の記号“キ3”で示さ
れるように、3人入邸した基礎工事がその日で完了した
ことを示している。すなわち、この記号“完”と予定欄
52の基礎完了予定日を示す記号“<キ”とが同じ日で
一致していることから、基礎工事が予定通り完了したこ
とが示される。なお、その他の記号については、“M”
は監督の入邸、“W”は水道工事、“ヤ”は屋根の工
事、“G”はガス工事、“E”は電気工事、“T”は畳
の工事、“S”は据付け工事、“ユ”は風呂釜の工事を
それぞれ示している。
In addition, looking at the results column 53a on September 7, the symbol “complete” in the middle row is indicated by the symbol “ki3” in the upper row, and the foundation work for three people was completed on that day. It is shown that. That is, since the symbol "complete" and the symbol "<" indicating the scheduled completion date of the foundation in the schedule column 52 coincide on the same day, it indicates that the foundation work has been completed as scheduled. For other symbols, "M"
"W" is waterworks, "Y" is roof work, "G" is gas work, "E" is electric work, "T" is tatami work, "S" is installation work, “Yu” indicates the construction of the bath kettle.

【0040】また、9月20日の実績欄53aについて
見ると、中段の記号“+1”は、上段の記号“ヤ2”で
示される屋根の工事があと1日で終わるという予定報告
を示しており、この工事の完了が9月21日の実績欄5
3dの中段に記号“完”として示されている。実績欄5
3dの上段の“ヤ1”より、この日も屋根工事に現場作
業者が一人入邸したことを示している。また、10月3
日の実績欄53bについて見ると、中段の記号“☆”は
可能を意味し、この場合には、上段の記号“T”で示さ
れる畳の寸法取りが可能であることを示している。
Looking at the results column 53a on September 20, the symbol “+1” in the middle indicates a schedule report that the construction of the roof indicated by the symbol “Y2” in the upper will be completed in one day. The completion of this construction was 5
The symbol “complete” is shown in the middle of 3d. Result column 5
"Ya1" in the upper section of 3d shows that one site worker had entered the roof construction again on this day. Also, October 3
Looking at the day performance column 53b, the symbol “☆” in the middle row indicates that it is possible. In this case, it indicates that the tatami indicated by the symbol “T” in the upper row can be dimensioned.

【0041】図5は、入退邸実績ファイルを例示する図
である。このファイルは、図4の邸別ファイルと関連付
けて記憶されており、建築現場に入退邸した各工事の作
業者の実績を管理する。図5の例では、建築現場に入退
邸した作業者の1日の実績を示している。具体的には、
左欄61には、職方毎に付与された作業者コードと作業
者名(図5では、記号“△”にて図示)とが記憶され、
中央欄62には、入邸及び退邸時刻、並びに通算時間が
記憶され、右欄63には、作業名及び作業コードが2桁
でそれぞれ記憶されている。
FIG. 5 is a diagram showing an example of the entry / exit record file. This file is stored in association with the house-by-house file of FIG. 4, and manages the results of the workers who have entered and left the building site. In the example of FIG. 5, the result of one day of the worker who moved in and out of the building site is shown. In particular,
The left column 61 stores a worker code and a worker name (indicated by a symbol “△” in FIG. 5) assigned to each occupant,
The center column 62 stores the entry and exit times and the total time, and the right column 63 stores the work name and the work code in two digits.

【0042】また、左欄61の下段64には、右欄63
の内容に加えてその進捗状況を示すコードが2桁で記憶
されている。ただし、図には、その横に職種と進捗状況
とが文字により記憶されている。管理サーバ7の制御部
9は、表示部19を制御して図4及び図5の管理内容を
表示すると共に、入力操作部17からの編集指示に基づ
いてこれらの管理内容を編集して表示部19に表示させ
る。
The lower column 64 of the left column 61 includes a right column 63.
In addition to the contents, a code indicating the progress is stored in two digits. However, in the figure, the occupation type and the progress status are stored by characters next to it. The control unit 9 of the management server 7 controls the display unit 19 to display the management contents of FIGS. 4 and 5, and edits these management contents based on the editing instruction from the input operation unit 17 to display the management contents. 19 is displayed.

【0043】図6は、邸別工事進捗状況一覧表を例示す
る図である。各邸の上段に示されている日付は、原則と
してその工事の着工日を示し、下段に示されている日付
は、その工事の完了日を示す。また、上段に示されてい
る日付のうち、下段が空白となっている工事(クロス、
木仕、清掃等の欄)に示されている日付は、全てその工
事の着工予定日を示している。
FIG. 6 is a diagram exemplifying a house-based construction progress list. The date shown at the top of each house indicates, in principle, the construction start date of the construction, and the date shown at the bottom shows the completion date of the construction. In addition, of the dates shown in the upper row, constructions in which the lower row is blank (cross,
All the dates shown in the columns of “wood finishing, cleaning, etc.” indicate the scheduled start dates of the construction.

【0044】下段に記号“●”又は“○”が示されてい
る工事の上段の日付は着工実績日を示しており、その下
段の記号“●”は今日現在入邸した実績(すなわち、今
日現在その工事の現場作業者が入邸したこと)を示して
いる。また、下段の記号“○”は、今日は入邸していな
いが過去に入邸した実績があることを示している。
The date in the upper part of the construction in which the symbol “●” or “O” is shown in the lower part indicates the actual construction start date. The construction site worker has now entered the house.) The symbol “O” in the lower row indicates that the user has not moved in today but has moved in the past.

【0045】各記号“○”、“●”の横に付されている
数字は、入邸回数を示している。たとえば、邸名欄71
の木工欄では、木工工事で9月26日に現場作業者が入
邸し、今日現在入邸中で通算して12日現場で作業して
いることを示している。記号“★”は、その上段の予定
日に対して何日遅れているかを示す。この記号“★”の
横に付された数字は、通算の遅れている日数を示してい
る。たとえば、邸名欄71のクロス欄で見ると、10月
7日の予定日を含めて2日作業が遅れていることを示し
ている。
The numbers next to the symbols “記号” and “●” indicate the number of times of residence. For example, house name field 71
The woodwork column indicates that a worker at a site for woodworking entered the house on September 26, and is currently working at the site on the 12th. The symbol “★” indicates how many days behind the scheduled date at the top. The number next to the symbol “★” indicates the number of days that have been delayed. For example, looking at the cross column of the house name column 71, it indicates that work is delayed by two days including the scheduled date of October 7.

【0046】記号“☆”は、その上段の予定日に対して
もう既に入邸できる状態になったことを示す。記号
“☆”の横に付された数字は、入邸可能時からの経過日
数を示している。たとえば邸名欄72の木仕欄で見る
と、10月12日の予定日に対して既に入邸可能であっ
て、その報告が10月8日(報告のあった日を含むこと
から1日は当日を示す)にあったことを示している。な
お、設仕欄(電気、水道、ガス、釜の設備仕様欄)73
については、その上段に記入されている日付は器具取り
付け完了予定日を示している。
The symbol "*" indicates that the house can be already entered on the upper scheduled date. The number next to the symbol “☆” indicates the number of days that have passed since the house was available. For example, looking at the wooden column of the house name column 72, it is already possible to enter the house on the scheduled date of October 12, and the report is October 8 (one day from the date of the report. Indicates that day). It should be noted that the specification column (electricity, water, gas, kettle equipment specification column) 73
For, the date entered in the upper row indicates the expected date of completion of instrument installation.

【0047】図7は、業者別工事工程表を例示する図で
ある。各邸欄81,82,83には、その邸の施工主の
住所、氏名、現場監督の氏名、設計者の氏名、入邸した
各工事担当者(現場作業者)の氏名、及び建物の概要
(床面積、ユニット数等)が記載されている。
FIG. 7 is a diagram exemplifying a work schedule for each contractor. In each house column 81, 82, 83, the address, name, name of the site supervisor, name of the designer, name of each construction worker (site worker) who entered the house, and the outline of the building are shown in the house. (Floor area, number of units, etc.).

【0048】各邸欄81,82,83にはその上段にカ
レンダー欄91が設けられており、1,2,3の各文字
は各々10日、20日、30日を示している。また、こ
のカレンダー欄のすぐ下の中段92に示されている記号
は、その邸の予定計画であって、記号“S”は据付け工
事、記号“ヤ”は屋根工事、記号“ク”はクロス貼り、
記号“D”は大工工事、記号“シ”は大工仕上げ、記号
“セ”は設備仕上げ、記号“ソ”は掃除、記号“M”は
監督検査、記号“Y”は社内検査をそれぞれ示してい
る。
In each of the house columns 81, 82, and 83, a calendar column 91 is provided in the upper row, and characters 1, 2, and 3 indicate 10, 20, and 30 days, respectively. The symbol shown in the middle section 92 immediately below the calendar column is the plan of the house, the symbol “S” is installation work, the symbol “Y” is roof work, and the symbol “C” is cross Paste,
The symbol "D" indicates carpentry construction, the symbol "S" indicates carpentry finishing, the symbol "C" indicates equipment finishing, the symbol "S" indicates cleaning, the symbol "M" indicates supervision inspection, and the symbol "Y" indicates internal inspection. I have.

【0049】下段93には、中段92に示された予定計
画に対する工事実績が示されており、ここに示されてい
る記号の意味は、図4の予定欄52及び実績欄53に記
入されている記号の意味と同じである。図7の表から、
次のようなことが分かる。たとえば、邸欄81の建築現
場に木工工事として入邸したC氏、D氏は、3月26日
に木工工事を完了し、2日あいてから3月28日に邸欄
83の建築現場に木工工事として入邸したことが分か
る。
The lower section 93 shows the construction results for the scheduled plan shown in the middle section 92, and the meanings of the symbols shown here are entered in the schedule column 52 and the result column 53 of FIG. Has the same meaning as the symbol. From the table in FIG.
You can see the following. For example, Mr. C and Mr. D who entered the building site of the house section 81 as carpentry work completed the woodwork on March 26, and entered the building site of the house section 83 on March 28 after two days. You can see that he entered the house as a woodworker.

【0050】このように、図7に示す表及び図5に示す
実績レポート等から、現場作業者の建築現場への入退邸
の実績や時刻、及び仕事の進捗状況等が的確に把握でき
る。そのため、現場作業者を効率良く管理することがで
きる。また、管理サーバ7の制御部9は、携帯電話機1
のボタン“進捗”又は“確認”(図3(b)参照)等が
押された場合に、これら図4〜図7に例示した管理内容
を携帯電話機1に送信する。これにより、管理サーバ7
側で現場工事の進捗状況を一元管理するだけでなく、携
帯電話機1を所持する現場管理者、又は照会端末3を利
用する建築メーカ担当者に情報提供できる。
As described above, from the table shown in FIG. 7 and the performance report shown in FIG. 5, it is possible to accurately grasp the performance and time of the worker entering and leaving the building site, the progress of the work, and the like. Therefore, field workers can be managed efficiently. Also, the control unit 9 of the management server 7
When the button “progress” or “confirm” (see FIG. 3B) is pressed, the management contents illustrated in FIGS. 4 to 7 are transmitted to the mobile phone 1. Thereby, the management server 7
In addition to centrally managing the progress of the site construction, the site can provide information to a site manager who owns the mobile phone 1 or a building maker who uses the inquiry terminal 3.

【0051】以上、この発明の実施の形態を図面を参照
して詳述してきたが、具体的な構成はこれらの実施の形
態に限られるものではなく、この発明の要旨を逸脱しな
い範囲の設計の変更等があってもよい。たとえば、上記
実施の形態では、携帯電話機1は、邸別の建築現場の進
捗状況を送信し、該進捗状況を管理サーバ7で管理する
構成としている。他の形態として、邸を細分化して、邸
を構成する1階、2階毎、あるいは部屋、部位毎、もし
くはユニット別に各工事の進捗状況を送信することで、
該進捗状況を管理する構成としてもよい。
Although the embodiments of the present invention have been described in detail with reference to the drawings, the specific configuration is not limited to these embodiments, and a design within a range not departing from the gist of the present invention is provided. May be changed. For example, in the above embodiment, the mobile phone 1 is configured to transmit the progress of the building site of each house and manage the progress with the management server 7. As another form, the house is subdivided, and the progress of each construction is transmitted by the first floor, the second floor, the room, the site, or the unit constituting the house,
The progress may be managed.

【0052】この場合、携帯電話機1の表示画面とし
て、図3(c)の邸の選択画面と図3(d)の作業選択
画面との間に、リビング、バスルーム等のユニットを選
択する画面が表示される。入邸時、入邸中及び退邸時の
操作として、はじめに、所定の邸を選択した後、ユニッ
トを選択する。つぎに、選択されたユニット別の工事項
目(図3(d)参照)及び該工事を行う職方(図3
(e)参照)に関するデータが各々一覧表示され、所定
の工事項目及び職方が選択される。
In this case, as a display screen of the mobile phone 1, a screen for selecting a unit such as a living room or a bathroom is provided between the house selection screen of FIG. 3C and the work selection screen of FIG. 3D. Is displayed. At the time of entering, entering and leaving the house, first, a predetermined house is selected and then a unit is selected. Next, the construction item for each selected unit (see FIG. 3D) and the workman who performs the construction (FIG. 3
(E) is displayed in a list, and a predetermined construction item and a work style are selected.

【0053】上記実施の形態及び他の形態では、携帯電
話機1の操作において、工事項目及び該工事を行う職方
は、ボタン“確定”を押すことで選択されるが、携帯電
話機1の表示画面に直接文字入力するか、携帯電話機1
と文字入力端末(図示せず)とを電気的又は電磁的に接
続して該端末の表示画面に文字入力する等してもよい。
いずれにしても、携帯電話機1は、建築現場の入邸時、
入邸中又は退邸時に、邸を構成するユニット毎の工事項
目及び該工事を行う職方を指定し、インターネット5を
介して該指定内容を管理サーバ7に送信する機能を有し
ていればよい。このため、上記携帯電話機1は狭義の携
帯電話でもよいしPHSでもよい。
In the above embodiment and other embodiments, in the operation of the mobile phone 1, the construction item and the technician who performs the construction are selected by pressing the button "OK". Enter text directly into the
And a character input terminal (not shown) may be electrically or electromagnetically connected to input characters on a display screen of the terminal.
In any case, when the mobile phone 1 enters the building site,
At the time of entering or leaving the house, if it has a function of designating the construction item for each unit constituting the house and the clerk who performs the construction, and transmitting the designated contents to the management server 7 via the Internet 5 Good. Therefore, the mobile phone 1 may be a mobile phone in a narrow sense or a PHS.

【0054】同様に、管理サーバ7は、入邸時、入邸中
及び退邸時に、ユニット毎の工事項目及び該工事を行う
職方に関するデータを受信し、該受信内容を作業履歴と
して記憶する機能を有していればよい。また、上記実施
の形態では、携帯電話機1は、“iモード”サービスを
利用して邸別の建築現場の進捗状況を管理サーバ7に送
信しているが、“iモード”サービスに限定されず、
“Ezweb”、“Ezアクセス”等の文字情報サービ
スを利用して実現するものであってもよい。なお、本発
明の建築現場工事管理システムは、本建築現場工事管理
システムを機能させるためのプログラムでも実現され
る。このプログラムは、コンピュータで読み取り可能な
記録媒体に格納されている。
Similarly, the management server 7 receives the work items for each unit and data on the occupants performing the work at the time of entering, entering and leaving the house, and stores the received contents as a work history. What is necessary is just to have a function. Further, in the above embodiment, the mobile phone 1 transmits the progress of the building site for each residence to the management server 7 using the “i-mode” service, but is not limited to the “i-mode” service. ,
It may be realized using character information services such as “Ezweb” and “Ez access”. The construction site construction management system of the present invention is also realized by a program for causing the construction site construction management system to function. This program is stored in a computer-readable recording medium.

【0055】本システムの動作を実行するプログラムを
記録した記録媒体は、図1に示される携帯電話機1のR
OM35、管理サーバ7のROM15そのものであって
もよいし、また、外部記憶装置としてCD−ROMドラ
イブ25等のプログラム読み取り装置が設けられ、そこ
に記録媒体を挿入することで読み取り可能なCD−RO
M27等であってもよい。また、上記記録媒体は、磁気
テープ、カセットテープ、フロッピー(登録商標)ディ
スク、ハードディスク、MO/MD/DVD等、又は半
導体メモリであってもよい。
The recording medium on which the program for executing the operation of the present system is recorded is the same as that of the portable telephone 1 shown in FIG.
The OM 35 may be the ROM 15 of the management server 7 itself, or a program reading device such as a CD-ROM drive 25 is provided as an external storage device, and a CD-RO readable by inserting a recording medium into the program reading device.
M27 or the like. Further, the recording medium may be a magnetic tape, a cassette tape, a floppy (registered trademark) disk, a hard disk, an MO / MD / DVD, or the like, or a semiconductor memory.

【0056】[0056]

【発明の効果】本発明によれば、建築現場での工事の進
捗状況を邸別、さらには細分した工事単位毎に管理する
ことができ、また、必要に応じて管理内容を関係者に提
供することができる。
According to the present invention, the progress of construction work at a building site can be managed for each house and for each subdivided construction unit, and the management contents can be provided to relevant persons as needed. can do.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態による建築現場工事管理シ
ステムの構成を示すブロック図である。
FIG. 1 is a block diagram showing a configuration of a construction site construction management system according to an embodiment of the present invention.

【図2】本発明の実施の形態による携帯電話機の詳細構
成を示すブロック図である。
FIG. 2 is a block diagram showing a detailed configuration of the mobile phone according to the embodiment of the present invention.

【図3】本発明の実施の形態による携帯電話機の表示画
面を例示する図である。図3(a)は、iモード用ログ
イン画面を例示する図である。図3(b)は、iモード
処理メニュー画面を例示する図である。図3(c)は、
邸選択・検索画面を例示する図である。図3(d)は、
工事選択画面を例示する図である。図3(e)は、職方
を選択する画面を例示する図である。図3(f)は、業
務の確認画面を例示する図である。図3(g)は、業務
終了画面を例示する図である。
FIG. 3 is a diagram illustrating a display screen of the mobile phone according to the embodiment of the present invention. FIG. 3A is a diagram exemplifying an i-mode login screen. FIG. 3B is a diagram illustrating an i-mode processing menu screen. FIG. 3 (c)
It is a figure which illustrates a house selection / search screen. FIG. 3 (d)
It is a figure which illustrates a construction selection screen. FIG. 3E is a diagram exemplifying a screen for selecting a work style. FIG. 3F is a diagram illustrating a business confirmation screen. FIG. 3G is a diagram exemplifying a work end screen.

【図4】邸別のファイル(工事進捗状況詳細一覧表)を
例示する図である。
FIG. 4 is a diagram exemplifying a file (a detailed list of construction progress) for each house.

【図5】入退邸実績ファイルを例示する図である。FIG. 5 is a diagram illustrating an example of an entry / exit record file.

【図6】邸別工事進捗状況一覧表を例示する図である。FIG. 6 is a diagram exemplifying a work progress list for each house.

【図7】業者別工事工程表を例示する図である。FIG. 7 is a diagram illustrating an example of a work schedule by company;

【符号の説明】[Explanation of symbols]

1 携帯電話機 3 照会端末 5 インターネット 7 管理サーバ 9,29 制御部 11,31 送信/受信部 13,33 RAM 15,35 ROM 17,37 入力操作部 19,39 表示部 21 情報コードデータベース 23 邸別データベース 25 CD−ROMドライブ 27 CD−ROM DESCRIPTION OF SYMBOLS 1 Mobile telephone 3 Inquiry terminal 5 Internet 7 Management server 9, 29 Control part 11, 31 Transmission / reception part 13, 33 RAM 15, 35 ROM 17, 37 Input operation part 19, 39 Display part 21 Information code database 23 House-specific database 25 CD-ROM drive 27 CD-ROM

───────────────────────────────────────────────────── フロントページの続き (72)発明者 崎山 眞一 大阪府豊中市新千里東町1−4−1 大阪 セキスイハイム株式会社内 Fターム(参考) 5K067 AA41 BB04 BB21 EE02 EE16 GG01 HH05 HH21 KK00  ────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Shinichi Sakiyama 1-4-1 Shinsenrihigashicho, Toyonaka-shi, Osaka F-term (reference) in Sekisui Heim Co., Ltd. 5K067 AA41 BB04 BB21 EE02 EE16 GG01 HH05 HH21 KK00

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 建築現場への入邸時、入邸中又は退邸時
に、邸の工事項目及び該工事を行う職方を指定する指定
手段と、通信回線を介して該指定手段による指定内容を
管理サーバに送信する制御手段と、を備えることを特徴
とする携帯電話機。
1. A designating means for designating a construction item of a house and a technician performing the construction when entering, leaving, or leaving a building site, and contents specified by the designating means via a communication line. And a control unit for transmitting the information to the management server.
【請求項2】 前記通信回線は、iモードサービスによ
り提供される電話回線を含むことを特徴とする請求項1
記載の携帯電話機。
2. The communication line according to claim 1, wherein the communication line includes a telephone line provided by an i-mode service.
The described mobile phone.
【請求項3】 建築現場への入邸時、入邸中又は退邸時
に、邸の工事項目及び該工事を行う職方に関するデータ
を通信回線を介して受信する受信手段と、該受信手段に
よる受信内容を記憶する記憶手段と、を備えることを特
徴とする建築現場工事管理システム。
3. Receiving means for receiving, via a communication line, a construction item of a house and data on a clerk who performs the work when entering, leaving, or leaving the building site, and the receiving means. A construction site construction management system, comprising: storage means for storing received contents.
【請求項4】 前記通信回線は、iモードサービスによ
り提供される電話回線を含むことを特徴とする請求項3
記載の建築現場工事管理システム。
4. The communication line according to claim 3, wherein the communication line includes a telephone line provided by an i-mode service.
The construction site construction management system described.
【請求項5】 コンピュータを、請求項1又は2記載の
携帯電話機として機能させるためのプログラムを記録し
たことを特徴とするコンピュータ読み取り可能な記録媒
体。
5. A computer-readable recording medium on which a program for causing a computer to function as the mobile phone according to claim 1 or 2 is recorded.
【請求項6】 コンピュータを、請求項3又は4記載の
建築現場工事管理システムとして機能させるためのプロ
グラムを記録したことを特徴とするコンピュータ読み取
り可能な記録媒体。
6. A computer-readable recording medium on which a program for causing a computer to function as the construction site construction management system according to claim 3 or 4 is recorded.
JP2000369052A 2000-12-04 2000-12-04 Portable telephone, building site construction management system, recording medium with program for portable telephone recorded, and recording medium with building site construction management program recorded Pending JP2002169857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000369052A JP2002169857A (en) 2000-12-04 2000-12-04 Portable telephone, building site construction management system, recording medium with program for portable telephone recorded, and recording medium with building site construction management program recorded

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000369052A JP2002169857A (en) 2000-12-04 2000-12-04 Portable telephone, building site construction management system, recording medium with program for portable telephone recorded, and recording medium with building site construction management program recorded

Publications (1)

Publication Number Publication Date
JP2002169857A true JP2002169857A (en) 2002-06-14

Family

ID=18839151

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000369052A Pending JP2002169857A (en) 2000-12-04 2000-12-04 Portable telephone, building site construction management system, recording medium with program for portable telephone recorded, and recording medium with building site construction management program recorded

Country Status (1)

Country Link
JP (1) JP2002169857A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017182313A (en) * 2016-03-29 2017-10-05 前田建設工業株式会社 Step management device, step management method and step management program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017182313A (en) * 2016-03-29 2017-10-05 前田建設工業株式会社 Step management device, step management method and step management program

Similar Documents

Publication Publication Date Title
CN101676869A (en) System and method for adding context to the creation and revision of artifacts
CN107391134A (en) A kind of General Mobile application interactive interface automatically generates and dynamic mapping method and apparatus
JP6062086B1 (en) Business support system
JP3974922B2 (en) Vehicle repair work management device, vehicle repair work management method, vehicle repair work management program, computer-readable recording medium, and stored device
JP5010665B2 (en) Sales support system
JP6918362B2 (en) Working system, working program and working method
JP4929467B2 (en) Needs information collection system, needs information collection server, needs information collection method and program
JP7391344B1 (en) Business management devices, methods, and programs
WO2006075714A1 (en) Attendant managing method, and attendant managing system
JP2002169857A (en) Portable telephone, building site construction management system, recording medium with program for portable telephone recorded, and recording medium with building site construction management program recorded
JP2004178000A (en) Reservation system, reservation device, reservation method and reservation program
JP2008123469A (en) Management system of object management information, person management information and real estate information
JP4503067B2 (en) Name identification system, name identification method, name identification program and recording medium thereof
JP2001357114A (en) Building information managing method, managing device, and system
JP4010495B2 (en) Facility management business support system
JP6199366B2 (en) License integration system, management apparatus, and license integration method
JP7246626B1 (en) Property search system and property search method
JP2003122813A (en) Field control system
JP2002269327A (en) System and program for supporting business development
JP4959542B2 (en) Customer information association system, customer information association method, customer information association program, and recording medium therefor
JPH07229294A (en) Construction-site operation control system
JP2002180665A (en) Process control system for house construction
JP2002183417A (en) Business support device, business support system, and storage medium storing business support program
JP5525959B2 (en) Housing specification confirmation support system
JP2002073742A (en) Progress control device for building work, and method of preparing progress control chart

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060207

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060410

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060704

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060904

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20061031

A912 Removal of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20061124