Field control system

Info

Publication number
JP2003122813A
JP2003122813A JP2001313235A JP2001313235A JP2003122813A JP 2003122813 A JP2003122813 A JP 2003122813A JP 2001313235 A JP2001313235 A JP 2001313235A JP 2001313235 A JP2001313235 A JP 2001313235A JP 2003122813 A JP2003122813 A JP 2003122813A
Authority
JP
Japan
Prior art keywords
data
work
site
computer system
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001313235A
Other languages
Japanese (ja)
Inventor
Hiroshi Umemori
浩 梅森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2001313235A priority Critical patent/JP2003122813A/en
Publication of JP2003122813A publication Critical patent/JP2003122813A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To enable a field controller to control the process progress status of detached house construction even in a place distant from a work field. SOLUTION: In order to control the process progress status of a plurality of work fields 3-1 to 3-3 of detached house construction, a server 12 is provided in a main contractor company 10, and an information terminal is provided at each of the work fields 3-1-3-3. The process control table data and worker individual information data of the respective work fields 3-1-3-3 are previously stored in the server 12. In the server 12, working man-hour data H3 of the corresponding work field is originated from the data sent from each information terminal, and the corresponding process control table data is updated on the basis of the working man-hour data H3. A field controller 2 accesses the server 12 to be able to acquire the working man-hour data H3 and the updated process control table data.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、戸建住宅を建設す
る作業現場を管理するための現場管理システムに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a site management system for managing a work site where a detached house is constructed.

【0002】[0002]

【従来の技術】例えば建設会社が複数の戸建住宅を建設
するに際して、現場管理者が各地に点在する複数の建設
現場を掛け持ちで管理する場合、従来では、現場管理者
が自動車、公共の交通機関などの移動手段により担当し
ている複数の建設現場を毎日巡回し、各建設現場におけ
る作業員の入退場状況、その日の作業状況、及び工程進
捗状況などの現場状況を把握し、次工程作業のための作
業員の手配、工程の管理を含む建設現場の管理を行って
いる。
2. Description of the Related Art For example, when a construction company constructs a plurality of detached houses and the site manager manages a plurality of construction sites scattered in various places, conventionally, the site manager has to use a car or a public house. Daily visits to multiple construction sites that are in charge by means of transportation such as transportation, grasp the on-site status of workers entering and leaving each construction site, work status on that day, and process progress status, and then proceed to the next step. It manages the construction site including the arrangement of workers for work and process management.

【0003】また、現場管理者が担当している全ての建
設現場を1日で巡回できない場合には、現場管理者は巡
回できない建設現場で作業している作業者に電話等の適
宜の手段によって連絡し、作業者から現場状況の説明を
受けて建設現場の管理を行っている。
When it is impossible to visit all the construction sites under the control of the site manager in one day, the site manager uses an appropriate means such as a telephone to call a worker working on the construction site that cannot be visited. The construction site is managed by contacting them and receiving explanations from the workers about the site situation.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、現場管
理者が管理している複数の建設現場を巡回するという従
来の現場管理方法にあっては、それらの建設現場が各々
離れている場合、移動に時間がかかるため現場管理者が
現場管理を行うための時間が短くなってしまう。したが
って、現場管理者によって綿密な現場管理を行うことが
できず工事の遅延を引き起こす虞があり、工事が遅延す
るとこれに伴いコストが上昇してしまうという問題点を
有している。また、現場管理者は、各々の建設現場を巡
回したときにそれぞれの建設現場の進捗状況をそこでは
じめて把握するため、リアルタイムに工程管理すること
ができず、結局各建設現場にいる作業員に工程管理をま
かせがちになってしまうという別の問題点を有してい
る。
However, in the conventional site management method of visiting a plurality of construction sites managed by the site manager, if the construction sites are distant from each other, it is difficult to move. Since it takes time, the time required for the site manager to perform site management becomes short. Therefore, the on-site manager may not be able to perform detailed on-site management, which may cause a delay in the construction. If the construction is delayed, the cost will increase accordingly. In addition, the site manager cannot grasp the progress status of each construction site for the first time when he visits each construction site, so he cannot manage the process in real time, and eventually the workers at each construction site can It has another problem that it tends to be left to management.

【0005】また、電話等の手段によって現場管理者が
各建設現場にいる作業員と連絡するという方法の場合に
は、例えば建設現場にいる作業員の携帯電話がつながら
ない、又は現場管理者が電話をかけたときに作業員がそ
のときの作業状況によって会話できない等の理由によ
り、現場管理者が現場状況を把握できない場合が多々生
じる。このため、現場管理者が電話連絡により現場を管
理しようとする場合にも、充分な管理が行えないという
問題点を有している。
Further, in the case of a method in which the site manager contacts the workers at each construction site by means of telephone or the like, for example, the mobile phone of the worker at the construction site cannot be connected, or the site manager makes a phone call. In many cases, the site manager may not be able to grasp the site situation due to reasons such as the fact that the worker cannot have a conversation depending on the work situation at that time. Therefore, even if the site manager tries to manage the site by telephone contact, there is a problem that sufficient management cannot be performed.

【0006】本発明の目的は、従来技術における上述の
問題点を解決することができる現場管理システムを提供
することにある。
An object of the present invention is to provide a site management system which can solve the above-mentioned problems in the prior art.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するた
め、請求項1の発明によれば、現場管理者の管理下にあ
る戸建住宅の建設のための複数の作業現場のそれぞれに
おける各種管理を行うための現場管理システムであっ
て、サーバ機能及び通信ネットワーク上で供給される情
報を検索、収集して表示する機能を有するコンピュータ
システムを設けると共に、前記複数の作業現場のそれぞ
れに、作業員カード情報読取装置を含み該作業員カード
情報読取装置によって読み取られた情報を前記コンピュ
ータシステムに送るための情報端末装置を設け、前記コ
ンピュータシステムには前記複数の作業現場の各工程を
管理するために必要な工程管理データ及び前記複数の作
業現場で作業する作業員の個人情報データを予め格納し
ておき、前記コンピュータシステムにおいて、前記情報
端末装置から送られてきた作業員の入退場に関するデー
タから対応する作業現場の実働データが作成されると共
に前記実働データに基づいて対応する工程管理データが
更新され、前記現場管理者が、前記作業現場の工程進捗
状況を把握又は確認するため前記通信ネットワークを介
して前記コンピュータシステムにアクセスして前記実働
データ及び更新された工程管理データとを入手しうるよ
うにしたことを特徴とする現場管理システムが提案され
る。
In order to solve the above problems, according to the invention of claim 1, various managements at each of a plurality of work sites for construction of a detached house under the control of a site manager. And a computer system having a server function and a function of searching, collecting, and displaying information supplied on a communication network, and a worker at each of the plurality of work sites. An information terminal device including a card information reading device for sending information read by the worker card information reading device to the computer system is provided, and the computer system is for managing each step of the plurality of work sites. Necessary process control data and personal information data of workers who work at the plurality of work sites are stored in advance, and In the data system, the actual work data of the corresponding work site is created from the data relating to the entry and exit of the worker sent from the information terminal device, and the corresponding process control data is updated based on the actual work data, and the work site management is performed. A person can access the computer system via the communication network to obtain or confirm the actual work data and the updated process control data in order to grasp or confirm the process progress status of the work site. A site management system is proposed.

【0008】請求項2の発明によれば、請求項1の発明
において、前記作業員のそれぞれが所有する作業員カー
ドに格納されている作業員の識別のための識別データが
前記作業員カード情報読取装置により読み取られ、前記
情報端末装置から前記作業現場への作業員の入退場に関
するデータを前記通信ネットワークを介して前記コンピ
ュータシステムに送り、前記コンピュータシステムにお
いて前記複数の作業現場のそれぞれにおける作業員の出
退勤を一元的に管理できるようにした現場管理システム
が提案される。
According to the invention of claim 2, in the invention of claim 1, the identification data for identifying the worker stored in the worker card owned by each of the workers is the worker card information. Data read from the information terminal device and related to the entry and exit of a worker from the information terminal device to the work site is sent to the computer system via the communication network, and the worker at each of the plurality of work sites in the computer system. A field management system is proposed that can manage the attendance and departure of employees.

【0009】請求項3の発明によれば、請求項1又は2
の発明において、前記通信ネットワークを介して供給さ
れる情報を検索、収集し、表示する機能付きの携帯端末
装置をさらに有し、前記携帯端末装置によって前記コン
ピュータシステムに蓄積されている所要のデータをダウ
ンロードすることができるようになっている現場管理シ
ステムが提案される。
According to the invention of claim 3, claim 1 or 2
In the invention of claim 1, further comprising a mobile terminal device having a function of searching, collecting, and displaying information supplied via the communication network, the required data being stored in the computer system by the mobile terminal device. A site management system is proposed that can be downloaded.

【0010】請求項4の発明によれば、請求項1、2又
は3の発明において、前記携帯端末装置を用いて前記コ
ンピュータシステムに蓄積されている前記作業現場に対
応する前記工程管理データと前記実働データとに基づ
き、前記作業現場に対応する前記工程管理データを更新
することができる現場管理システムが提案される。
According to the invention of claim 4, in the invention of claim 1, 2 or 3, the process management data corresponding to the work site stored in the computer system using the portable terminal device and the process management data are stored. A site management system is proposed that can update the process management data corresponding to the work site based on actual work data.

【0011】請求項5の発明によれば、請求項1、2、
3又は4の発明において、前記情報端末装置が資材情報
読取装置をさらに備えており、前記作業現場に納入され
る資材に添付される資材情報フラグに付されている資材
の識別のための識別データを前記資材情報読取装置によ
り読み取って前記作業現場への納品状況に関するデータ
として前記通信ネットワークを介して前記コンピュータ
システムに送り、前記コンピュータシステムにおいて前
記作業現場における資材納品に関するデータを蓄積し、
一元的に管理できるようにした現場管理システムが提案
される。
According to the invention of claim 5, claims 1, 2 and
In the invention of 3 or 4, the information terminal device further includes a material information reading device, and identification data for identifying the material attached to the material information flag attached to the material delivered to the work site. Is read by the material information reading device and sent to the computer system via the communication network as data relating to the delivery status to the work site, and the computer system stores data relating to material delivery at the work site,
A site management system that can be managed centrally is proposed.

【0012】請求項6の発明によれば、請求項1、2、
3、4又は5の発明において、前記携帯端末装置から前
記コンピュータシステムに前記作業現場における作業員
の手配や資材の納入等の指示のためのデータを送ること
ができると共に、前記コンピュータシステムには前記指
示の内容が蓄積されるようになっている現場管理システ
ムが提案される。
According to the invention of claim 6, claims 1, 2 and
In the third, fourth, or fifth invention, data for instructing arrangements of workers or delivery of materials at the work site can be sent from the portable terminal device to the computer system, and the computer system can store the data. A site management system is proposed in which the contents of instructions are accumulated.

【0013】請求項7の発明によれば、請求項1、2、
3、4、5又は6の発明において、前記携帯端末装置か
ら前記コンピュータシステムに前記作業現場における完
了工事種目や納品済資材等についての支払い指示のため
のデータを送ることができると共に、前記コンピュータ
システムには前記支払い指示の内容が蓄積されるように
なっている現場管理システムが提案される。
According to the invention of claim 7, claims 1, 2,
In the third, fourth, fifth, or sixth invention, the portable terminal device can send data to the computer system for paying an instruction regarding a completed work item or a delivered material at the work site, and the computer system. Proposes a site management system in which the contents of the payment instruction are accumulated.

【0014】[0014]

【発明の実施の形態】以下、図面を参照して本発明の実
施の形態の一例につき詳細に説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An example of an embodiment of the present invention will be described in detail below with reference to the drawings.

【0015】図1は、本発明の方法による現場管理シス
テムの実施の形態の一例を示すシステム構成図である。
図1において、10は建設会社である元請会社、3−
1、3−2、3−3は元請会社10による戸建住宅の建
設が行われている作業現場であり、3つの作業現場3−
1、3−2、3−3は現場管理者2によって現場管理さ
れている。そして、現場管理者2が1人で複数の作業現
場3−1、3−2、3−3を効率的に管理することがで
きるようにするため、本発明による現場管理システム1
が構築されている。
FIG. 1 is a system configuration diagram showing an example of an embodiment of a site management system according to the method of the present invention.
In FIG. 1, 10 is a main contractor, which is a construction company, 3-
1, 3-2, 3-3 are work sites where the subcontractor 10 is constructing a detached house, and three work sites 3-
1, 3-2, 3-3 are on-site managed by the on-site manager 2. In order to enable the site manager 2 to efficiently manage a plurality of work sites 3-1, 3-2, 3-3 by one person, the site management system 1 according to the present invention.
Is being built.

【0016】現場管理システム1は、現場管理者2が、
管理すべき3つの作業現場3−1、3−2、3−3を毎
日巡回するなどして作業現場に出向くことなく、それぞ
れの現場において各種作業のために働くその日の作業員
の実働人工数及び工事の進捗状況を任意の場所から携帯
端末装置等を用いて把握し、いつどこにいても現場管理
者2が作業現場3−1、3−2、3−3の工程管理や作
業員の手配等の現場管理を行うことができるようにする
ためのシステムである。
In the on-site management system 1, the on-site manager 2
The actual man-hours of the workers of the day who work for various work at each work site without going to the work site by visiting the three work sites 3-1, 3-2, 3-3 to be managed every day. Also, the progress status of the construction can be grasped from any place using a mobile terminal device, etc., and the site manager 2 can manage the process of the work sites 3-1, 3-2, 3-3 and arrange the workers no matter where they are. It is a system to enable on-site management such as.

【0017】なお、ここでは、元請会社10によって3
つの作業現場3−1、3−2、3−3のそれぞれに戸建
住宅が建設され、3つの作業現場3−1、3−2、3−
3は1人の現場管理者2によって管理される例が示され
ているが、作業現場の箇所数は3箇所に限定されず、例
えばさらに多くてもよい。また、現場管理者2は1人に
限定されず、作業現場が多数あり、複数の現場管理者に
よって各作業現場を手分けして管理する場合にも本発明
を適用できる。
It should be noted that here, the main contracting company 10
Detached houses are constructed at each of the three work sites 3-1, 3-2, 3-3, and the three work sites 3-1, 3-2, 3-
Although 3 shows the example managed by one site manager 2, the number of sites at the work site is not limited to 3 and may be more, for example. Further, the number of the site managers 2 is not limited to one, and there are many work sites, and the present invention can be applied to the case where each site is managed separately by a plurality of site managers.

【0018】元請会社10内には、複数の作業現場3−
1、3−2、3−3を管理するために必要な各作業現場
の工程管理表データ、工事予算書データ及び各作業現場
で働く作業員の作業員個人情報データ等の基本データが
登録されているサーバ11が設けられている。工程管理
表データは、物件名データA1、期間データA2、日に
ちデータA3、作業予定人工数データA4を含んでお
り、工事予算書データは物品名データB1、納入会社名
データB2、納入会社識別コードB3を含んでいる。作
業員個人情報データは、作業員が所属している協力会社
名データC1、作業員の作業業種データC2、氏名デー
タC3、作業員識別コードC4を含んで成っている。
Within the prime contractor 10, a plurality of work sites 3-
Basic data such as process control sheet data of each work site, construction budget data, and worker personal information data of workers who work at each work site are registered in order to manage 1, 3-2, 3-3. A server 11 is provided. The process control table data includes property name data A1, period data A2, date data A3, work schedule artificial number data A4, and construction budget data is article name data B1, delivery company name data B2, delivery company identification code. B3 is included. The worker personal information data includes the cooperating company name data C1 to which the worker belongs, the worker's work industry data C2, the name data C3, and the worker identification code C4.

【0019】元請会社10は、また、サーバ11に社内
ネットワークNTを介して接続されているコンピュータ
12を備えており、これにより元請会社10内には企業
内の情報共有等に活用するためのシステム形態であるイ
ントラネットが形成されている。コンピュータ12は、
サーバ11に各作業現場の工程管理表データと各作業員
の作業員個人情報データ等を書き込むために使用される
ものであり、中央演算処理装置(CPU)12Aとキー
ボード、マウス等から成るインタフェース12Bとを備
えて成っている。元請会社10では、コンピュータ12
を社内ネットワークNTを介してサーバ11に接続する
ことができ、サーバ11に登録されている作業現場3−
1、3−2、3−3に関する各種データをコンピュータ
12において読み出し、修正することができる構成とな
っている。コンピュータ12の数は1つに限定されず複
数台であってもよい。
The subcontractor 10 is also provided with a computer 12 connected to the server 11 via an in-house network NT, so that the subcontractor 10 can utilize it for information sharing within the company. Intranet which is a system form of is formed. Computer 12
It is used for writing process control table data of each work site and worker personal information data of each worker in the server 11, and an interface 12B including a central processing unit (CPU) 12A and a keyboard, a mouse and the like. It is made up of and. In the prime contractor 10, the computer 12
Can be connected to the server 11 via the in-house network NT, and the work site 3 registered in the server 11
Various data relating to 1, 3-2, and 3-3 can be read and corrected by the computer 12. The number of computers 12 is not limited to one and may be plural.

【0020】各作業現場3−1、3−2、3−3には、
それぞれの現場に設置されている図示しない仮設分電盤
内に、各作業現場の作業員及び資材の現場入退場データ
等をサーバ11に送信することができる情報端末装置3
−11、3−21、3−31がそれぞれ設けれている。
At each work site 3-1, 3-2, 3-3,
An information terminal device 3 capable of transmitting on-site entry / exit data of workers and materials at each work site to the server 11 in a temporary distribution board (not shown) installed at each site.
-11, 3-21, and 3-31 are provided, respectively.

【0021】図2を参照して情報端末装置3−11につ
いて説明する。情報端末装置3−11には作業員が入退
場時にその入退場を入力するために使用するIDカード
の記録内容を読み取るための作業員カード読取装置3
1、資材の納入時に納入会社が納品したことを入力する
のに使用することができるバーコード用のバーコードリ
ーダ32、作業現場3−1における作業の進捗状況等現
場に関する情報を作業員が直接キー入力するためのキー
ボード33が設けられている。バーコードリーダ32は
限定されるものではなく、RFID、二次元コードな
ど、他の情報媒体を読みとるものでも良い。
The information terminal device 3-11 will be described with reference to FIG. The information terminal device 3-11 is a worker card reading device 3 for reading the recorded contents of an ID card used by a worker to enter the entrance / exit when entering / exiting.
1. The barcode reader 32 for barcodes that can be used by the delivery company to input that it has been delivered at the time of delivery of materials, the worker directly provides information about the work site such as the work progress status at the work site 3-1. A keyboard 33 for key input is provided. The barcode reader 32 is not limited, and may be another information medium such as an RFID or a two-dimensional code that can be read.

【0022】作業員カード読取装置31は、予めサーバ
11に登録されている各作業員のそれぞれに配布されて
いるIDカード内に書き込まれている作業員識別コード
C4を読み出し、読み出された作業員識別コードC4は
時刻データD1と共に情報処理装置34の制御部34A
に入力される構成となっている。ここで、作業員カード
読取装置31は、IDカードを読み出したときに自動的
に該IDカードを読み出した時刻を示す時刻データD1
を作成するよう構成されている。また、資材の納入会社
にも同様のIDカードが配布されており、そのIDカー
ド内には、納入会社識別コードB3が書き込まれてい
る。作業員カード読取装置31は納入会社識別コードB
3も読み出し、作業員カード読取装置31に読み出され
た納入会社識別コードB3は情報処理装置34の制御部
34Aに入力される。
The worker card reader 31 reads the worker identification code C4 written in the ID card distributed to each worker registered in advance in the server 11 and reads the read work. The member identification code C4 is the time data D1 and the control unit 34A of the information processing device 34.
It is configured to be input to. Here, the worker card reading device 31 automatically reads the ID card, the time data D1 indicating the time when the ID card is read.
Is configured to create. A similar ID card is distributed to the material delivery company, and the delivery company identification code B3 is written in the ID card. The worker card reader 31 is a delivery company identification code B
3 is also read, and the delivery company identification code B3 read by the worker card reading device 31 is input to the control unit 34A of the information processing device 34.

【0023】バーコードリーダ32は、納入されてきた
資材に予め貼られているバーコードシールに表示され納
品物を識別することができる納品物識別バーコード情報
を読み取るためのものであり、読み取られた納品物識別
データE1は、日付データE2及び作業員カード読取装
置31で読み出された納入会社識別コードB3と共に情
報処理装置34の制御部34Aに送られる。ここで、バ
ーコードリーダ32は、納品物識別バーコード情報を読
み取ったときに該該納品物識別バーコード情報を読み取
った日付を示す日付データE2を自動的に作成するよう
構成されている。
The bar code reader 32 is for reading the delivery item identification bar code information which is displayed on the bar code label affixed to the delivered material and which can identify the delivery item. The delivered item identification data E1 is sent to the control unit 34A of the information processing device 34 together with the date data E2 and the delivery company identification code B3 read by the worker card reading device 31. Here, the barcode reader 32 is configured to automatically create date data E2 indicating the date when the delivery identification barcode information is read when the delivery identification barcode information is read.

【0024】また、バーコードリーダ32は、工事項目
の作業が完了した際、協力会社が元請会社10から工事
を依頼されたときに受け取っている作業発注書に表示さ
れている工事項目等を示すバーコード表示の情報を読み
取るためのものでもあり、読み取られた該情報は完了デ
ータE3として日付データE2と共に制御部34Aに送
られる。
When the work of the construction item is completed, the bar code reader 32 displays the construction item etc. displayed on the work order received when the subcontractor is requested by the prime contractor 10 to perform the construction. It is also for reading the information of the bar code display shown, and the read information is sent to the control section 34A as the completion data E3 together with the date data E2.

【0025】キーボード33を用い、作業員及び又は現
場管理者2は、その日の作業の進み具合等の現場情報を
キー操作により入力することができ、入力された現場情
報を示す現場データF1は日付データF2と共に制御部
34Aに入力される構成となっている。日付データF2
は、現場データF1がキーボード33により入力された
ときにキーボード33において自動的に作成されるもの
である。
Using the keyboard 33, the worker and / or the site manager 2 can enter site information such as the progress of the work of the day by key operation, and the site data F1 showing the entered site information is the date. The data F2 is input to the control unit 34A. Date data F2
Is automatically created by the keyboard 33 when the site data F1 is input by the keyboard 33.

【0026】上述の如くして制御部34Aに入力された
各データに基づき、制御部34Aでは以下の処理が行わ
れる。作業員識別コードC4及び時刻データD1から、
作業員識別コードC4に対応する作業員が時刻データD
1の示す時刻に作業現場に入場したことを示す現場入場
データG1が作成され、同日において2度目に入力され
た作業員識別コードC4及び時刻データD1から、作業
員識別コードC4に対応する作業員が時刻データD1の
示す時刻に作業現場から退場したことを示す現場退場デ
ータG2が作成される。納入会社識別コードB3と納品
物識別データE1と日付データE2とから、納入会社識
別コードB3に対応する納入会社により納品物識別デー
タE1に対応する納品物が日付データE2の示す日にち
に作業現場に納入されたことを示す納品物の現場入場デ
ータG3が作成される。また、現場データF1と日付デ
ータF2とから、日付データF2の示す日にちの作業現
場の状況を示す現場情報データG4が作成され、完了デ
ータE3と日付データE2とから、完了データE3に含
まれる工事項目の作業が日付データE2の示す日にちに
完了したことを示す作業完了データG5が作成される。
Based on each data input to the control unit 34A as described above, the control unit 34A performs the following processing. From the worker identification code C4 and the time data D1,
The worker corresponding to the worker identification code C4 indicates the time data D
The site entrance data G1 indicating that the worker has entered the work site at the time indicated by 1 is created, and the worker corresponding to the worker identification code C4 from the worker identification code C4 and the time data D1 input the second time on the same day. Field leaving data G2 indicating that the player has left the work site at the time indicated by the time data D1. From the delivery company identification code B3, the delivery item identification data E1, and the date data E2, the delivery company corresponding to the delivery company identification code B3 delivers the delivery item corresponding to the delivery item identification data E1 to the work site on the date indicated by the date data E2. On-site entrance data G3 of the delivered product indicating that the product has been delivered is created. Further, from the site data F1 and the date data F2, the site information data G4 indicating the situation of the work site on the date indicated by the date data F2 is created, and from the completion data E3 and the date data E2, the work included in the completion data E3. Work completion data G5 indicating that the work of the item is completed on the date indicated by the date data E2 is created.

【0027】作成された各データG1〜G5は、情報処
理装置34の通信部34Bから電話会社4を経由して元
請会社10に送られ、サーバ11に蓄積されるようにな
っている。以上、作業現場3−1の仮設分電盤内に設け
られている情報端末装置3−11について説明したが、
他の作業現場3−2、3−3にそれぞれ設けられている
情報端末装置3−21、3−31も図2に示したのと同
様に構成されているので、情報端末装置3−21、3−
31についての詳しい説明を省略する。
Each of the created data G1 to G5 is sent from the communication section 34B of the information processing device 34 to the prime contractor 10 via the telephone company 4, and is stored in the server 11. The information terminal device 3-11 provided in the temporary distribution board of the work site 3-1 has been described above.
Since the information terminal devices 3-21 and 3-31 respectively provided in the other work sites 3-2 and 3-3 are also configured in the same manner as shown in FIG. 2, the information terminal device 3-21, 3-
A detailed description of 31 will be omitted.

【0028】図1に戻ると、サーバ11は電話会社4と
通信ケーブル41を介して接続されており、電話会社4
と各作業現場3−1、3−2、3−3に設置された情報
端末装置3−11、3−21、3−31とは通信ネット
ワークを介して接続される構成となっている。
Returning to FIG. 1, the server 11 is connected to the telephone company 4 via the communication cable 41.
And the information terminal devices 3-11, 3-21 and 3-31 installed at the respective work sites 3-1, 3-2 and 3-3 are connected via a communication network.

【0029】サーバ11は、各情報端末装置3−11、
3−21、3−31から送られてきた現場入場データG
1とサーバ内に登録されている作業員個人情報データに
含まれる作業員識別コードC4とを照合することによ
り、どの作業員が出勤しているかを示す出勤作業者デー
タH1と、出勤作業者データH1の数量から何人出勤し
ているかを示す現場入場者数データH2とを作成する。
The server 11 includes the information terminal devices 3-11,
Site admission data G sent from 3-21, 3-31
1 and the worker identification code C4 included in the worker personal information data registered in the server, the attended worker data H1 indicating which worker is at work and the attended worker data The number H2 of the number of visitors to the work site, which indicates how many people are working, is created from the quantity of H1.

【0030】また、サーバ11は、サーバ内に登録され
ている作業員個人情報データに含まれる作業員識別コー
ドC4、現場入場データG1及び現場退場データG2を
照合して演算することにより、その日に何人の作業員が
1日分の作業を行ったかを示す実働人工数データH3を
算出し、算出した実働人工数データH3を工事管理表デ
ータ内の実働人工数を表示する所定の欄に入力する。
Further, the server 11 collates and calculates the worker identification code C4, the site entrance data G1 and the site exit data G2 included in the worker personal information data registered in the server, thereby calculating that day. Calculate the actual work number data H3 that indicates how many workers have worked for one day, and enter the calculated actual work number data H3 in the predetermined column that displays the actual work number in the construction management table data. .

【0031】さらに、サーバ11は、実働人工数データ
H3の累積数とサーバ11内に登録されている工程管理
表データに含まれる作業予定人工数データA4の累積数
とを比較しその差の値により現在の各作業現場の進捗状
況を判断し、判断結果に基づいて工程管理表データを更
新する。またサーバ11は、納品物の現場入場データG
3をサーバ11内に登録されている工事予算書データ内
の所定の位置に入力して蓄積し、現場情報データG4及
び作業完了データG5を工事管理表データの所定の位置
に入力して蓄積する等の処理を行う。
Further, the server 11 compares the cumulative number of the actual artificial number data H3 with the cumulative number of the work scheduled artificial number data A4 included in the process control table data registered in the server 11, and the difference value thereof. The current progress status of each work site is determined by, and the process control table data is updated based on the determination result. In addition, the server 11 uses the site entrance data G of the delivered product.
3 is input and accumulated at a predetermined position in the construction budget document data registered in the server 11, and site information data G4 and work completion data G5 is inputted and accumulated at a predetermined position of the construction management table data. Etc. are processed.

【0032】次に、サーバ11は、通信ケーブル51を
介して電話会社5に接続されており、電話会社5と現場
管理者2の携帯端末装置である携帯電話21とは通信ネ
ットワークを介して接続される構成となっている。
Next, the server 11 is connected to the telephone company 5 via a communication cable 51, and the telephone company 5 and the mobile phone 21 which is a mobile terminal device of the site manager 2 are connected via a communication network. It is configured to be.

【0033】サーバ11は、情報端末装置3−11、3
−21、3−31から受け取った納品物の現場入場デー
タG3、及び情報端末装置3−11、3−21、3−3
1から受け取った各種データから作成した現場入場者数
データH2、実働人工数データH3を含む更新された工
程管理表データ等を現場管理者2の携帯電話21に供給
するほか、サーバ11は、現場管理者2の携帯電話21
から工程管理に関する工程管理指示データI1及び工事
費用支払いに関する決済指示データI2、次の工事項目
に必要な作業や納品の依頼指示を行うための作業依頼デ
ータI3、納品依頼データI4等のデータを収集するこ
とができるように構成されている。
The server 11 includes information terminal devices 3-11 and 3
-21, 3-31, field entrance data G3 of the delivered goods, and information terminal devices 3-11, 3-21, 3-3
In addition to supplying the updated process control table data including the site visitor number data H2 and the actual work artificial number data H3 created from the various data received from 1 to the mobile phone 21 of the site administrator 2, the server 11 Mobile phone 21 of administrator 2
Collects data such as process control instruction data I1 regarding process control and settlement instruction data I2 regarding payment of construction costs, work request data I3 for performing a work and delivery request instruction necessary for the next construction item, and delivery request data I4. Is configured to be able to.

【0034】サーバ11では、現場管理者2の携帯電話
21から受け取った決済指示データI2に応答して支払
い指示データH4が作成され、また、作業依頼データI
3に基づいて作業発注書データH5が作成され、納品依
頼データI4に基づいて資材発注書データH6が作成さ
れる。
In the server 11, payment instruction data H4 is created in response to the payment instruction data I2 received from the mobile phone 21 of the site manager 2, and the work request data I
The work order form data H5 is created based on 3, and the material order form data H6 is created based on the delivery request data I4.

【0035】元請会社10に設けられているサーバ11
内に予め登録される工程管理表データについて説明す
る。
A server 11 provided in the prime contractor company 10.
The process control table data registered in advance will be described.

【0036】工程を管理するための工事工程表は2種類
ある。1つは各作業現場毎の物件別工程表である。この
物件別工程表は、仮設工事(看板、仮囲い)、仮設工事
(足場)、防腐・防蟻処理工事、基礎工事、水道設備工
事、・・・というように、工事の着工から竣工、その後
の施主確認に至るまで、一連の戸建住宅建設の工事工程
において工事業種毎に工事項目が作成され、工事項目毎
にその工事を行う協力会社の業者名と作業予定日、及び
その作業予定日に作業を行う作業員の予定人数とが表示
されたものである。もう1つは各工事項目毎、且つ協力
会社毎に作成された工程管理表である。この工程管理表
をデータ化した工程管理表データがサーバ11内に登録
されている。
There are two types of construction process schedules for managing the process. One is a work schedule for each work site. This property-specific process chart shows that temporary work (signboards, temporary enclosures), temporary work (scaffolding), antiseptic / termite treatment work, foundation work, water supply work, ... Up to the confirmation of the owner, a construction item is created for each construction industry in the construction process of a series of detached house construction, and the name of the contractor of the subcontractor performing the construction work and the planned work date, and the planned work date The planned number of workers who will perform the work is displayed. The other is a process management table created for each construction item and each subcontractor. The process control table data obtained by converting the process control table into data is registered in the server 11.

【0037】図3には、各工事項目毎の工程管理表のう
ち、基礎工事の工程管理表の一例が示されている。図3
には協力会社である「A社」が行う基礎工事の作業の工
程管理表が示されており、「A社」が作業を行う作業現
場3−1、3−2、3−3にそれぞれ建設される物件
「A邸」、「B邸」、「C邸」のそれぞれの基礎工事の
作業予定とその作業予定に対する作業実施状況とがわか
るように構成されている。
FIG. 3 shows an example of the basic construction process control table among the process control tables for each construction item. Figure 3
Shows the process control chart of the work of the foundation work performed by the cooperating company "A company", which is constructed at the work sites 3-1, 3-2, 3-3 where "A company" works, respectively. It is configured so that the work schedules of the basic works of the properties “A House”, “B House”, and “C House” and the work implementation statuses for the work schedules can be understood.

【0038】工程管理表は、期間中の日付が横軸に1日
1ますで用意されているカレンダー表示形態となってい
る。工程管理表の左の欄内には、「A社」が請け負って
いる物件名データA1である「A邸」が表示されてお
り、さらにこの物件名データA1には、「予定」と「実
働」という項目が用意されている。
The process control table has a calendar display format in which the dates in the period are set to 1 on the horizontal axis. In the left column of the process control table, “A House”, which is the property name data A1 under contract by “A company”, is displayed. Furthermore, in this property name data A1, “plan” and “actual work” are displayed. Item is prepared.

【0039】「予定」項目の行には予め各日付に対応す
るます内にその日の作業予定人工数データA4が入力さ
れて表示されており、「実働」項目の行の各日付に対応
するます内には、工事開始後、それぞれの日付において
作業員が実際に作業に来てIDカードを各作業現場の作
業員カード読取装置に読み込ませることにより既述の如
く作成された現場入場者数データH2が入力され、表示
されるようになっている。
In the line of the "plan" item, the work schedule artificial number data A4 of the day is entered and displayed in advance corresponding to each date, and corresponds to each date of the line of the "actual work" item. After the start of construction, the worker actually came to the work on each date, and the ID card was read by the worker card reader at each work site. H2 is input and displayed.

【0040】次にサーバ11が現場退場データG2を受
け取ると、上述のごとくして算出されたその日の実働人
工数データH3が、それまで現場入場者数データH2が
入力されていた「実働」項目のます内にあらためて現場
入場者数データH2に代えて入力される。そしてサーバ
11により、実働人工数の累積数が予定人工数の累積数
と同じ数値になった日にちまで、実働人工数欄が黒く塗
りつぶされているように表示され、黒く塗りつぶされて
いるように表示された工事予定日までの作業が完了して
いることが表示されるようになっている。
Next, when the server 11 receives the field exit data G2, the actual work artificial number data H3 of the day calculated as described above and the "actual work" item in which the field visitor number data H2 has been input until then. It is input again in place of the data H2 of the number of visitors in the field. Then, by the server 11, until the date when the cumulative number of actual artificial numbers reaches the same value as the cumulative number of planned artificial numbers, the actual artificial number column is displayed in black and is displayed in black. It is displayed that the work up to the scheduled construction date has been completed.

【0041】「A邸」の欄の下方には、同様にして「A
社」が請け負っている物件である「B邸」、「C邸」に
ついての欄が用意されている。全物件の項目の下方には
「人工集計」の項目が設けられており、「人工集計」の
詳細項目として「予定」、「実働」、「−」が
用意されている。
Below the "A House" column, "A
There are columns for "B House" and "C House" that are properties under the contract of "Company". Below the items for all properties, there is an "artificial aggregation" item, and "plan", "actual work", and "-" are prepared as detailed items for "artificial aggregation".

【0042】「予定」項目は、期間中の各日にちにお
ける「A社」に所属している作業員の全作業予定人工数
を予め表示するためのものであり、「実働」は、工事
開始後に実際に出勤した「A社」に所属している全作業
員人工数が毎日入力され該全作業員人工数を表示するた
めの項目である。「−」の項目は、作業予定人工数
と実働人工数とを比較するためのものである。
The "plan" item is for displaying in advance the total number of man-hours scheduled to be worked by the workers belonging to "Company A" on each day of the period, and "actual work" is after the start of construction. This is an item for inputting every day the total number of artificial workers belonging to “Company A” who actually went to work and displaying the total number of artificial workers. The item "-" is for comparing the planned artificial number with the actual working number.

【0043】工程管理表は上述の如く構成されているの
で、現場管理者2が携帯電話21を用いサーバ11にア
クセスし、サーバ11内の工程管理表データを読み出せ
ば、携帯電話21の図示しない表示部に図3に示す工程
管理表が表示され、それぞれの作業現場3−1、3−
2、3−3に直接出掛けたり、作業現場3−1、3−
2、3−3で作業している作業員に電話等の通信設備を
用いて連絡をとることを行うことなく、その日の作業員
入場者数を示す現場入場者数データH2を知ることがで
きる。さらに、現場管理者2はサーバ11内の工程管理
表を携帯電話21に表示させることにより、工程管理表
に示されている工事項目の作業に対する実働人工数の累
積数を確認することができるため、各作業現場での工事
の進捗状況を把握し、各作業現場の工程管理を行うこと
ができる。
Since the process management table is constructed as described above, if the site manager 2 accesses the server 11 using the mobile phone 21 and reads the process management table data in the server 11, the mobile phone 21 is illustrated. The process control table shown in FIG. 3 is displayed on the display unit, and the respective work sites 3-1 and 3-
Directly go to 2, 3-3, work site 3-1, 3
It is possible to know the site visitor number data H2 indicating the number of worker visitors on that day without contacting the workers who are working in 2-3 by using communication equipment such as a telephone. . Further, since the site manager 2 can display the process management table in the server 11 on the mobile phone 21, it is possible to confirm the cumulative number of actual artificial numbers for the work of the construction item shown in the process management table. , It is possible to grasp the progress status of the construction at each work site and manage the process at each work site.

【0044】また、工程管理表は協力会社毎に作成され
ているため、例えば「A社」の「A邸」における工程に
変更が生じた場合、現場管理者2の携帯電話21及び元
請会社10のコンピュータ12を用いてサーバ11内に
登録されている図3に示された工程管理表を参照するこ
とにより、「A社」が作業を請け負っている他の物件の
工程についても考慮しながら「A邸」の工程を調整する
ことができるようになっている。なお、図3に示した工
程管理表の「予定」項目行のうち、人工数を示す数値が
表示されていない欄は、対応する作業現場における養生
日又は調整日を示すものである。
Further, since the process management table is prepared for each subcontractor, when the process in the "A residence" of "A company" changes, for example, the mobile phone 21 of the site manager 2 and the prime contractor company. By referring to the process management table shown in FIG. 3 which is registered in the server 11 using the computer 12 of 10, while considering the processes of other properties under which the “Company A” is undertaking the work. The process of "A House" can be adjusted. In the “plan” item row of the process control table shown in FIG. 3, the column in which the numerical value indicating the artificial number is not displayed indicates the curing date or the adjustment date at the corresponding work site.

【0045】以上、基礎工事においてA社が作業を行う
工程管理表について説明したが、他の工事項目において
他の協力会社の工程管理表も同様に構成されているた
め、他の工事項目の他の協力会社の工程管理表について
の詳しい説明は省略する。
The process control chart for company A to perform work in the basic construction has been described above, but the process control charts of other subcontractors are also configured in the same manner in other work items. Detailed explanation of the process control table of the subcontractor is omitted.

【0046】次に、図4から図6を参照し、現場管理者
2が現場管理システム1を使用して作業現場3−1を管
理するためのサーバ11内に格納されている現場管理プ
ログラム60について説明する。
Next, referring to FIGS. 4 to 6, a site management program 60 stored in the server 11 for the site manager 2 to manage the work site 3-1 by using the site management system 1. Will be described.

【0047】まず最初に、工事が開始される前、ステッ
プS1において、元請会社10に所属している社員がイ
ンタフェース12Bを用いて作業現場3−1の建設工事
に関する基本データを入力し、入力された基本データが
サーバ11内に登録される。
First, before the construction is started, in step S1, an employee who belongs to the prime contractor 10 inputs basic data concerning the construction work of the work site 3-1 by using the interface 12B and inputs it. The obtained basic data is registered in the server 11.

【0048】サーバ11に基本データが登録されると、
サーバ11は、現場管理者2が現場管理システム1を用
いて携帯電話21によりサーバ11内の所望のデータに
アクセスして作業現場3−1の現場管理を行うことがで
きる状態となる。なお、工事途中で作業員の追加や変更
が生じた場合には、作業員の追加、変更が生じた協力会
社から元請会社10に対して届出を行い、元請会社10
においてコンピュータ12を用いてサーバ11内の作業
員個人情報データの修正を行うことにより、作業員個人
情報データの更新を行うことができるようになってい
る。
When basic data is registered in the server 11,
The server 11 is in a state in which the site manager 2 can use the site management system 1 to access desired data in the server 11 using the mobile phone 21 and perform site management of the work site 3-1. In addition, when a worker is added or changed in the middle of construction, the subcontractor in which the worker is added or changed notifies the prime contractor 10 to notify the prime contractor 10
In (1), the worker personal information data in the server 11 is corrected by using the computer 12, so that the worker personal information data can be updated.

【0049】次にステップS2に入り、サーバ11で
は、毎朝、作業現場3−1において現在作業されている
工事項目が何であるかを確認し、本日作業される予定の
工事項目を把握する処理が行われる。
Next, in step S2, the server 11 confirms, every morning, what the construction item currently being worked at the work site 3-1 is, and grasps the construction item to be worked today. Done.

【0050】次にステップS3に入り、作業員が作業現
場3−1に到着し元請会社10から渡されているIDカ
ードを情報端末装置3−11の作業員カード読取装置3
1に読み込ませると、IDカードを読み込ませた作業員
の現場入場データG1が電話会社4を経由してサーバ1
1に入力される。サーバ11では、受け取った現場入場
データG1の数量に基づき現場入場者数データH2が作
成され、現場入場者数データH2が工程管理表データ中
の対応する日にちの「実働」欄に入力される。
Next, in step S3, the worker arrives at the work site 3-1 and the ID card passed from the prime contractor 10 is used to read the worker card reading device 3 of the information terminal device 3-11.
When it is read by 1, the site entrance data G1 of the worker who has read the ID card is transferred to the server 1 via the telephone company 4.
Input to 1. In the server 11, the site visitor number data H2 is created based on the received quantity of the site visitor data G1, and the site visitor number data H2 is input to the “actual work” column of the corresponding date in the process control table data.

【0051】また、資材が作業現場3−1に納入された
とき、納入に来た者が所持しているIDカードを作業員
カード読取装置31に読み込ませると共に納品物に貼ら
れているバーコードシールに表示されているバーコード
をバーコードリーダ32に読み取らせると、納品物の現
場入場データG3がサーバ11内の工事予算書データに
含まれる納品物データB1と納入会社名データB2と照
合され、工事予算書データ内の所定の場所に入力され
る。
When the material is delivered to the work site 3-1, the ID card possessed by the person who has delivered the work is read by the worker card reader 31 and the bar code attached to the delivered product. When the bar code displayed on the sticker is read by the bar code reader 32, the site entrance data G3 of the delivered product is collated with the delivered product data B1 and the delivery company name data B2 included in the construction budget data in the server 11. , Is entered in a predetermined place in the construction budget data.

【0052】次にステップS4に入り、作業員がその日
の作業を終え、作業現場3−1から帰る際に各自のID
カードを作業員カード読取装置31に読み取らせると、
IDカードを読み込ませた作業員の現場退場データG2
がサーバ11に送られる。サーバ11では、ステップS
3において受け取った現場入場データG1と今ステップ
において受け取った現場退場データG2とに基づき、そ
の日の作業現場3−1における実働人工数データH3が
算出される。算出された実働人工数データH3は、ステ
ップS3において現場入場者数データH2が入力された
「実働」欄に、現場入場者数データH2に代えてあらた
めて入力され、工程管理表データが更新される。
Next, in step S4, when the worker finishes the work of the day and returns from the work site 3-1, his / her own ID
When the worker card reader 31 reads the card,
Field exit data G2 of the worker who read the ID card
Is sent to the server 11. In the server 11, step S
Based on the site entrance data G1 received in step 3 and the site exit data G2 received in the current step, the actual work artificial number data H3 at the work site 3-1 on that day is calculated. The calculated actual work artificial number data H3 is newly input in place of the on-site attendance data H2 in the “actual work” column to which the on-site attendance data H2 was input in step S3, and the process control sheet data is updated. .

【0053】このように、作業員の現場入場者数データ
H2、実働人工数データH3及び納品物の現場入場デー
タG3がサーバ11内の対応する工程管理表データ若し
くは工事予算書データに入力されて蓄積されるため、現
場管理者2は、直接作業現場3−1に出向くことなく、
携帯電話21を用いてサーバ11内の所要のデータにア
クセスするだけで、作業現場3−1に現在の出勤してい
る作業員数や現在作業が行われている工事項目の現在ま
での実働人工数の累積数、納品物が届いているかどうか
等の現場状況を把握することができる。
As described above, the data H2 of the number of people who enter the site of the workers, the data H3 of the number of actual working man-hours, and the site entrance data G3 of the delivered products are input to the corresponding process control table data or construction budget data in the server 11. Since it is accumulated, the site manager 2 does not go to the work site 3-1 directly,
Only by accessing the required data in the server 11 using the mobile phone 21, the number of workers currently working at the work site 3-1 and the actual number of actual work items up to the present of the work item currently being worked on It is possible to grasp the on-site situation such as the cumulative number of items and whether or not the delivered items have arrived.

【0054】次にステップS5に入り、サーバ11で
は、工程管理表データにおいて作業予定人工数データA
4と実働人工数データH3とを比較し、その人工数の差
により工事作業が予定した通りに進んだか否かを判断す
る処理が行われる。
Next, in step S5, the server 11 calculates the artificial work number data A in the process control table data.
4 is compared with the actual work artificial number data H3, and a process is performed to determine whether or not the construction work has proceeded as planned due to the difference in the artificial number.

【0055】ステップS6に入り、ここでは、サーバ1
1において、ステップS5での処理結果により、実働人
工数データH3の数量が作業予定人工数データA4の数
量よりも少なく、現在の工事の進捗状況が予め登録され
ている工程管理表と比べて遅れていると判断された場合
には、実働人工数データH3が作業予定人工数A4と等
しくなるよう、現在管理している工事項目の作業期間を
延ばす、又は該工事項目の以後の各作業日の作業予定人
工数A4を増加させるなどして工程管理表を更新する処
理が行われる。
Step S6 is entered, in this case, the server 1
1, the number of the actual work artificial number data H3 is smaller than the number of the work planned artificial number data A4 due to the processing result in step S5, and the progress of the current construction is delayed compared with the pre-registered process control table. If it is determined that the actual work number H3 is equal to the planned work number A4, the work period of the currently managed construction item is extended or each work day after the construction item is calculated. A process of updating the process control table is performed by, for example, increasing the planned work artificial number A4.

【0056】実働人工数データH3の数量が作業予定人
工数データA4の数量よりも多く、サーバ11において
現在の工事の進捗状況が対応する工事項目の工程管理表
と比べて進んでいると判断された場合には、実働人工数
データH3が作業予定人工数A4と等しくなるよう、現
在管理している工事項目の作業期間を短くする、又は該
工事項目の以後の各作業日の作業予定人工数A4を減少
させるなどして工程管理表を更新する処理が行われる。
このように、各工事項目の工程管理表データが自動的に
補正され、また、同じ協力会社が請け負っている複数の
物件の工程が変更になった場合にも他の物件の工程を考
慮しながら工程を調整することができるため、現場管理
者2は手間をかけずに工程管理を行うことができ、以後
の作業に対して作業員の手配及び資材の納入等のための
予定を立てやすくすることができる。
It is determined that the quantity of the actual work artificial number data H3 is larger than that of the work scheduled artificial number data A4, and the progress status of the current construction in the server 11 is ahead of the corresponding work item process control table. In this case, the work period of the currently managed construction item is shortened so that the actual work number data H3 becomes equal to the planned work number A4, or the planned work number of each work day after the construction item. A process of updating the process control table by reducing A4 is performed.
In this way, the process control sheet data for each construction item is automatically corrected, and even when the processes of multiple properties under contract by the same subcontractor are changed, the processes of other properties are considered. Since the process can be adjusted, the site manager 2 can manage the process without much trouble, and facilitates the scheduling of the worker's arrangement and delivery of materials for the subsequent work. be able to.

【0057】次にステップS7に入り、ここでは、サー
バ11において、本日の日付が現在作業現場3−1にお
いて作業されている工事項目の工事完了予定日となった
か否かが判別される。本日の日にちが現在作業現場3−
1において作業されている工事項目の工事完了予定日と
なっていない場合には、ステップS7の判別結果はNO
となり、ステップS2に戻り、サーバ11が次の日に再
び同じ工事項目を管理するのに備えるよう構成されてい
る。本日の日付が今まで作業現場3−1において作業さ
れていた工事項目の工事完了予定日となった場合には、
ステップS7の判別結果はYESとなり、ステップS8
に進む。
Next, in step S7, the server 11 determines whether or not today's date is the scheduled construction completion date of the construction item currently being worked at the work site 3-1. Today is today's worksite 3-
When the scheduled construction completion date of the construction item being worked on in 1 is not reached, the determination result of step S7 is NO.
Then, the process returns to step S2, and the server 11 is prepared to manage the same construction item again on the next day. If today's date is the planned construction completion date for the construction item that was being worked at work site 3-1 until now,
The determination result of step S7 is YES, and step S8
Proceed to.

【0058】ステップS8では、作業現場3−1におい
て、今まで作業していた工事項目の作業が終了したと
き、その工事項目の作業を行っていた作業員が、工事を
依頼されたときに受け取っている作業発注書に表示され
ているバーコードをバーコードリーダ32に読み取らせ
ると、今まで作業現場3−1で作業されていた工事項目
の作業が本日完了したことを示す作業完了データG5が
サーバ11に送られ、作業完了データG5がサーバ11
内の工程管理表データの所定の位置に入力される。
In step S8, at the work site 3-1, when the work of the construction item that has been worked up to now is completed, the worker who was working on the construction item receives it when the construction work is requested. When the bar code displayed on the work order form is read by the bar code reader 32, the work completion data G5 indicating that the work of the construction item that has been worked at the work site 3-1 up to now is completed today. The work completion data G5 sent to the server 11 is sent to the server 11.
It is input to a predetermined position of the process control table data in the.

【0059】なお、本実施例では、バーコードリーダ3
2にバーコードを読み取らせることにより作業完了デー
タG5をサーバ11に送るようにしているが、キーボー
ド33を用いてキー操作することにより作業完了データ
G5をサーバ11に送るようにしてもよい。
In this embodiment, the bar code reader 3 is used.
Although the work completion data G5 is sent to the server 11 by scanning the bar code at 2, the work completion data G5 may be sent to the server 11 by performing a key operation using the keyboard 33.

【0060】次にステップS9に入り、現場管理者2が
携帯電話21を用いてサーバ11にアクセスし、ステッ
プS8においてサーバ11に登録されている工程管理表
データ内に入力された工事項目の作業完了データG5を
確認し、その作業完了を承認するための操作を携帯電話
21に行うと、作業完了承認データI5が携帯電話21
からサーバ11に送られ、サーバ11に蓄積される。
Next, in step S9, the site manager 2 accesses the server 11 using the mobile phone 21, and the work of the construction item input in the process control table data registered in the server 11 in step S8. When the completion data G5 is confirmed and the operation for approving the completion of the work is performed on the mobile phone 21, the work completion approval data I5 is displayed on the mobile phone 21.
Sent from the server to the server 11 and stored in the server 11.

【0061】次にステップS10に入り、現場管理者2
が、ステップS9において作業完了を承認した工事項目
について元請会社10からその工事項目の作業を行った
協力会社に対して支払いするよう決済の指示を行うため
携帯電話21に所要の操作を行うと、決済指示データI
2が携帯電話21からサーバ11に送られ、サーバ11
に蓄積される。ステップS11では、サーバ11が、受
け取った決済指示データI2に応答し、サーバ11と社
内ネットワークNTを介して接続され元請会社10内の
決算箇所に設けられている図示しないコンピュータに完
了工事項目に対する支払いを指示する支払い指示データ
H4を送信する。
Next, in step S10, the site manager 2
However, when the required operation is performed on the mobile phone 21 in order to instruct the subcontractor who has worked on the construction item to pay the construction item for which the work completion is approved in step S9, , Payment instruction data I
2 is sent from the mobile phone 21 to the server 11, and the server 11
Accumulated in. In step S11, the server 11 responds to the received settlement instruction data I2, and connects the server 11 via the in-house network NT to a computer (not shown) provided at the settlement site in the prime contractor 10 for the completed construction item. The payment instruction data H4 for instructing payment is transmitted.

【0062】次に、ステップS12では、作業現場3−
1で作業されている工事項目が全て完了し、「A邸」の
建設工事の全工程が完了したか否かが判別される。「A
邸」の建設工事に関する全工程がすべて完了し、残って
いる工事項目がない場合にはステップS12の判別結果
はYESとなり、工事終了となり「A邸」の建設工事に
関する現場管理プログラム60が終了する。「A邸」の
建設工事が完了しておらず作業現場3−1における工事
項目が残っている場合には、ステップS12の判別結果
はNOとなり、ステップS13に入る。
Next, in step S12, the work site 3-
It is determined whether or not all the construction items being worked on in 1 have been completed and all the steps of the construction work of "A House" have been completed. "A
When all the steps relating to the construction work of the "house" have been completed and there are no remaining construction items, the determination result in step S12 is YES, the construction ends, and the site management program 60 regarding the construction work of the "house A" ends. . When the construction work of the "A residence" is not completed and the construction items at the work site 3-1 remain, the determination result of step S12 is NO and the process goes to step S13.

【0063】ステップS13では、現場管理者2が次の
工事項目の作業を行う協力会社に作業依頼を行うため、
携帯電話21若しくは元請会社10内のコンピュータ1
2に備えられているインタフェース12Bを用いて所要
の操作を行うことにより作業依頼を入力すると、次の工
事項目の作業依頼データI3がサーバ11に送られ、サ
ーバ11に蓄積される。ステップS14では、ステップ
S13と同様に、現場管理者2が次の工事項目の作業を
行う際に必要な資材を作業現場3−1に納入するよう、
該当資材の納品会社に対して納品を依頼するため、携帯
電話21若しくは元請会社10内のコンピュータ12を
構成しているインタフェース12Bを用いて所要の操作
を行うことにより納品依頼を行うと、納品依頼データI
4がサーバ11に送られ、サーバ11に蓄積される。
In step S13, the site manager 2 makes a work request to a subcontractor who works on the next construction item.
Mobile phone 21 or computer 1 in the prime contractor 10
When a work request is input by performing a required operation using the interface 12B provided in 2, the work request data I3 of the next construction item is sent to the server 11 and stored in the server 11. In step S14, as in step S13, the site manager 2 delivers the necessary materials to the work site 3-1 when performing the work of the next construction item,
In order to request delivery of the relevant material from the delivery company, the delivery request is made by performing the required operation using the mobile phone 21 or the interface 12B configuring the computer 12 in the prime contractor 10. Request data I
4 is sent to the server 11 and stored in the server 11.

【0064】ステップS15では、サーバ11におい
て、蓄積されている作業依頼データI3に基づき次の工
事項目の作業のための作業発注書データH5が作成さ
れ、図示しないプリンタからプリントアウトされた作業
発注書を現場管理者2又は元請会社10に所属している
社員が次の工事項目の作業を行う協力会社に図示しない
ファクシミリ装置を用いてファクシミリ送信することに
より作業を発注することができるようになっている。同
様に、サーバ11に蓄積されている納品依頼データI4
に基づき資材発注書データH6が作成され、図示しない
プリンタからプリントアウトされた資材発注書を現場管
理者2又は元請会社10に所属している社員が該当資材
の納品会社にファクシミリ装置を用いてファクシミリ送
信することにより資材の納品を発注することができるよ
うになっている。
In step S15, the server 11 creates work order data H5 for the work of the next construction item based on the stored work request data I3, and the work order data printed out from the printer (not shown). A worker who belongs to the site manager 2 or the prime contractor 10 can order the work by sending a facsimile to a subcontractor who carries out the work of the next construction item using a facsimile device (not shown). ing. Similarly, the delivery request data I4 accumulated in the server 11
The material purchase order data H6 is created based on the above, and the material purchase order printed out from the printer (not shown) is used by the site manager 2 or the employee who belongs to the prime contractor 10 by using the facsimile device to the delivery company of the corresponding material. It is possible to order the delivery of materials by sending them by facsimile.

【0065】なお、作業発注書データH5は、図示しな
いインターネットを介してサーバ11から次の工事項目
の作業を行う協力会社に設けられているコンピュータに
データ送信して作業発注を行うようにしてもよい。同様
に、資材発注書データH6についても、図示しないイン
ターネットを介してサーバ11から次の工事項目の作業
で使用する資材の納品会社に設けられているコンピュー
タにデータ送信して資材納品の依頼を行うようにしても
よい。
The work order data H5 may be transmitted from the server 11 via the Internet (not shown) to a computer provided in a subcontractor who works on the next construction item to place a work order. Good. Similarly, the material purchase order data H6 is also transmitted from the server 11 via the Internet (not shown) to a computer provided in a company that delivers the materials used in the work of the next construction item to request the delivery of the materials. You may do it.

【0066】ステップS15が終了すると、ステップS
2に戻り、サーバ11では作業現場3−1での次の工事
項目の管理を行うよう構成されている。
When step S15 ends, step S15
Returning to step 2, the server 11 is configured to manage the next construction item at the work site 3-1.

【0067】以上、現場管理システム1を用いて作業現
場3−1を管理する場合について説明したが、他の作業
現場3−2、3−3についても同様であり、これら複数
の作業現場を同時に管理する場合も同様であるため、こ
こでの詳しい説明は省略する。
Although the case where the work site 3-1 is managed by using the site management system 1 has been described above, the same applies to the other work sites 3-2 and 3-3, and these work sites are simultaneously operated. Since the same applies to management, detailed description is omitted here.

【0068】現場管理システム1は以上のように構成さ
れているので、各作業現場3−1、3−2、3−3に通
信設備を有する情報端末装置3−11、3−21、3−
31を設け、情報端末装置3−11、3−21、3−3
1から各作業現場3−1、3−2、3−3に関する現場
入場データG1、現場退場データG2、納品物の現場入
場データG3等が元請会社10のサーバ11内に送信さ
れ、サーバ11では、受け取った現場入場データG1、
現場退場データG2に基づく現場入場者数データH2、
実働人工数データH3を工程管理表データに組み込み、
工程管理表データを更新し、納品物の現場入場データG
3を工事予算書データの所定の位置に組み込まれる。し
たがって、現場管理者2が携帯電話21を用いて元請会
社10のサーバ11にアクセスして所要のデータを参照
するだけで、自分の担当している作業現場3−1、3−
2、3−3に関する作業員の現場入場者数データH2、
実働人工数データH3、納品物の現場入場データG3等
を確認することができるため、現場管理者2は各作業現
場に直接出向いて巡回することなく、いつどこからでも
現場状況を詳細に把握することができ、充分な現場管理
を行うことができる。さらに、現場管理者2は、リアル
タイムに各作業現場の進捗状況を確認することができる
ので、各作業現場の工程や人工の変更への対処を容易に
行うことができる。
Since the on-site management system 1 is configured as described above, the information terminal devices 3-11, 3-21, 3- having communication facilities at the respective work sites 3-1, 3-2, 3-3.
31 is provided, and the information terminal devices 3-11, 3-21, 3-3
1, the site entrance data G1, the site exit data G2, the site entrance data G3 of the delivered product, etc. regarding each work site 3-1, 3-2, 3-3 are transmitted to the server 11 of the prime contractor 10, and the server 11 Then, the received site entrance data G1,
Data H2 on the number of visitors to the field based on the field exit data G2,
Incorporating the actual artificial number data H3 into the process control table data,
Update the process control table data, and the field entrance data G of the delivered product
3 is incorporated at a predetermined position in the construction budget data. Therefore, the site manager 2 simply accesses the server 11 of the prime contractor 10 by using the mobile phone 21 and refers to the required data, and the work sites 3-1 and 3 which he is in charge of.
Data H2 on the number of site visitors of workers concerning 2, 3 and 3,
Since it is possible to confirm the actual work man-hour data H3, the site entrance data G3 of the delivered goods, etc., the site manager 2 can grasp the site situation in detail from anytime and anywhere without directly visiting each work site and patrolling. It is possible to perform sufficient site management. Further, since the site manager 2 can confirm the progress status of each work site in real time, it is possible to easily deal with the process or artificial change of each work site.

【0069】また、現場管理者2は携帯電話21を用い
て工事の進捗状況に応じて次の工事項目に必要な作業依
頼指示や納品依頼指示を行うことができるので、手間を
かけずタイミングを逃さずに作業員や資材の手配を行う
ことができ、工期の遅延を防止することができる。
Further, since the site manager 2 can use the mobile phone 21 to give a work request instruction or a delivery request instruction necessary for the next construction item according to the progress status of the construction, the timing can be saved without trouble. Workers and materials can be arranged without missing them, and delays in the construction period can be prevented.

【0070】さらに、各作業現場に作業にきた各協力会
社毎の作業員の全人工数がサーバ11に蓄積されるた
め、支払い対象工事において作業した作業員人工数を協
力会社毎に簡単に把握することができるので費用計上に
手間がかからず、現場管理者2及び又は元請会社10の
決済箇所に所属している社員の支払いに関する作業負担
を軽減させることができる。また、現場管理者2は携帯
電話21を操作することによりサーバ11を用いて支払
い業務を進めることができるため、現場管理者2から協
力会社に対する月末等の定期的なペーパーによる請求書
処理業務を省略することができ、建設工事に関わる業務
を削減することができる。
Furthermore, since the total number of workers of each subcontractor who has come to work at each work site is accumulated in the server 11, the number of workers who have worked in the work to be paid is easily grasped for each subcontractor. Since it is possible to do so, it is possible to reduce costs, and it is possible to reduce the work load related to payment of the site manager 2 and / or the employees who belong to the settlement location of the prime contractor 10. Further, since the site manager 2 can proceed with the payment work by using the server 11 by operating the mobile phone 21, the site manager 2 can perform the bill processing work by the site manager 2 on a regular paper basis such as the end of the month. It can be omitted, and the work related to the construction work can be reduced.

【0071】[0071]

【発明の効果】本発明によれば、上述の如く、現場管理
者が管理する各作業現場に通信設備を有する情報端末装
置を設け、情報端末装置から各作業現場における作業員
の現場入退場情報、納品物の現場入場情報、作業員の現
場入退場情報に基づく実働人工情報が元請会社のサーバ
内の対応するデータ内に蓄積されるようにし、現場管理
者が携帯端末装置を用いて元請会社のサーバ内の所望の
データにアクセスするだけで自分の担当している作業現
場における作業員の現場入場人数、資材の現場入場状
況、全実働人工数等を確認することができるようにした
ため、現場管理者は自分の管理している複数の作業現場
に直接出向いて巡回することなく各作業現場の工事進捗
状況を把握することができ、各作業現場の工程管理を行
うことができる。
According to the present invention, as described above, an information terminal device having a communication facility is provided at each work site managed by a site manager, and the site entry / exit information of the worker at each work site is provided from the information terminal device. , The actual site artificial information based on the on-site entry information of the deliverables and the on-site entry / exit information of workers is stored in the corresponding data in the server of the contractor, and the on-site manager uses the mobile terminal device to send the original data. By making it possible to confirm the number of workers entering the site, the situation of materials entering the site, the total number of actual working manpower, etc., only by accessing the desired data in the server of the contractor. The site manager can grasp the construction progress status of each work site without directly visiting the plurality of work sites managed by him / her, and can manage the process of each work site.

【0072】さらに、現場管理者は携帯端末装置を用い
て次の工事項目に必要な作業依頼指示や納品依頼指示を
工事の進捗状況に応じて行うことができるので、手間を
かけずにタイミングを逃すことなく作業員や資材の手配
を行うことができ、現場作業を滞らせることがないため
工期の遅延を防止することができる。また、協力会社か
ら各作業現場に実際に作業にきた作業員の全人工数が協
力会社毎にサーバに蓄積されるので、元請会社が協力会
社に対して工事費用の支払いを行う際、支払い対象工事
において作業した作業員人工数を協力会社毎に簡単に把
握することができ、したがって、費用計算に手間がかか
らず、現場管理者及び又は元請会社の決済箇所に所属し
ている社員の作業負担を減少させることができる。
Further, since the site manager can use the portable terminal device to give the work request instruction and the delivery request instruction necessary for the next construction item according to the progress status of the construction, the timing can be set without any trouble. Workers and materials can be arranged without missing, and on-site work is not delayed, so delays in the construction period can be prevented. In addition, the total number of workers who actually came to work from the subcontractor at each work site is stored in the server for each subcontractor, so when the prime contractor pays the subcontractor for the construction cost It is possible to easily grasp the artificial number of workers who worked in the target construction for each subcontractor, so it does not take time to calculate the cost, and the site manager and / or the employee who belongs to the settlement site of the prime contractor Can reduce the work load.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による現場管理システムの実施の形態の
一例を示すシステム構成図。
FIG. 1 is a system configuration diagram showing an example of an embodiment of a site management system according to the present invention.

【図2】図1に示した情報端末装置のシステム構成図。FIG. 2 is a system configuration diagram of the information terminal device shown in FIG.

【図3】各工事項目毎の工程管理表のうちの一例として
基礎工事の工程管理表について説明するための説明図。
FIG. 3 is an explanatory diagram for explaining a process control table for foundation work as an example of a process control table for each work item.

【図4】本発明の現場管理システムを使用して作業現場
を管理するための現場管理プログラムを説明するための
一部フローチャート。
FIG. 4 is a partial flowchart for explaining a site management program for managing a work site using the site management system of the present invention.

【図5】本発明の現場管理システムを使用して作業現場
を管理するための現場管理プログラムを説明するための
一部フローチャート。
FIG. 5 is a partial flowchart for explaining a site management program for managing a work site using the site management system of the present invention.

【図6】本発明の現場管理システムを使用して作業現場
を管理するための現場管理プログラムを説明するための
一部フローチャート。
FIG. 6 is a partial flowchart for explaining a site management program for managing a work site using the site management system of the present invention.

【符号の説明】[Explanation of symbols]

1 現場管理システム 2 現場管理者 3−1、3−2、3−3 作業現場 3−11、3−21、3−31 情報端末装置 31 作業員カード読取装置 32 バーコードリーダ 33 キーボード 34 情報処理装置 4、5 電話会社 10 元請会社 11 サーバ 12 コンピュータ 21 携帯電話 60 現場管理プログラム 1 Site management system 2 Site manager 3-1, 3-2, 3-3 Work site 3-11, 3-21, 3-31 Information terminal device 31 Worker card reader 32 barcode reader 33 keyboard 34 Information processing equipment 4,5 telephone company 10 prime contractor 11 servers 12 computers 21 mobile phone 60 On-site management program

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 現場管理者の管理下にある戸建住宅の建
設のための複数の作業現場のそれぞれにおける各種管理
を行うための現場管理システムであって、 サーバ機能及び通信ネットワーク上で供給される情報を
検索、収集して表示する機能を有するコンピュータシス
テムを設けると共に、前記複数の作業現場のそれぞれ
に、作業員カード情報読取装置を含み該作業員カード情
報読取装置によって読み取られた情報を前記コンピュー
タシステムに送るための情報端末装置を設け、前記コン
ピュータシステムには前記複数の作業現場の各工程を管
理するために必要な工程管理データ及び前記複数の作業
現場で作業する作業員の個人情報データを予め格納して
おき、前記コンピュータシステムにおいて、前記情報端
末装置から送られてきた作業員の入退場に関するデータ
から対応する作業現場の実働データが作成されると共に
前記実働データに基づいて対応する工程管理データが更
新され、前記現場管理者が、前記作業現場の工程進捗状
況を把握又は確認するため前記通信ネットワークを介し
て前記コンピュータシステムにアクセスして前記実働デ
ータ及び更新された工程管理データとを入手しうるよう
にしたことを特徴とする現場管理システム。
1. A site management system for performing various kinds of management at each of a plurality of work sites for construction of a detached house under the control of a site manager, which is supplied on a server function and a communication network. A computer system having a function of retrieving, collecting and displaying the information to be read, and including a worker card information reading device at each of the plurality of work sites, and reading the information read by the worker card information reading device. An information terminal device for sending to a computer system is provided, and the computer system has process management data necessary for managing each process of the plurality of work sites and personal information data of workers who work at the plurality of work sites. Is stored in advance, and in the computer system, the worker's information sent from the information terminal device is stored. In order to confirm or confirm the progress status of the process at the work site, the actual work data of the corresponding work site is created from the data related to exit and the corresponding process control data is updated based on the work data. A site management system, characterized in that it is possible to access the computer system via the communication network to obtain the working data and the updated process management data.
【請求項2】 前記作業員のそれぞれが所有する作業員
カードに格納されている作業員の識別のための識別デー
タが前記作業員カード情報読取装置により読み取られ、
前記情報端末装置から前記作業現場への作業員の入退場
に関するデータを前記通信ネットワークを介して前記コ
ンピュータシステムに送り、前記コンピュータシステム
において前記複数の作業現場のそれぞれにおける作業員
の出退勤を一元的に管理できるようにした請求項1記載
の現場管理システム。
2. Identification data for identifying a worker, which is stored in a worker card owned by each of the workers, is read by the worker card information reading device,
Data relating to the entry and exit of workers from the information terminal device to the work site is sent to the computer system via the communication network, and the attendance of workers at each of the plurality of work sites in the computer system is unified. The on-site management system according to claim 1, which can be managed.
【請求項3】 前記通信ネットワークを介して供給され
る情報を検索、収集し、表示する機能付きの携帯端末装
置をさらに有し、前記携帯端末装置によって前記コンピ
ュータシステムに蓄積されている所要のデータをダウン
ロードすることができるようになっている請求項1又は
2記載の現場管理システム。
3. The mobile terminal device having a function of searching, collecting, and displaying information supplied via the communication network, the required data being stored in the computer system by the mobile terminal device. The site management system according to claim 1 or 2, which is capable of being downloaded.
【請求項4】 前記携帯端末装置を用いて前記コンピュ
ータシステムに蓄積されている前記作業現場に対応する
前記工程管理データと前記実働データとに基づき、前記
作業現場に対応する前記工程管理データを更新すること
ができる請求項1、2又は3記載の現場管理システム。
4. The process management data corresponding to the work site is updated based on the process management data corresponding to the work site and the actual work data stored in the computer system using the mobile terminal device. The on-site management system according to claim 1, 2 or 3, which can be performed.
【請求項5】 前記情報端末装置が資材情報読取装置を
さらに備えており、前記作業現場に納入される資材に添
付される資材情報フラグに付されている資材の識別のた
めの識別データを前記資材情報読取装置により読み取っ
て前記作業現場への納品状況に関するデータとして前記
通信ネットワークを介して前記コンピュータシステムに
送り、前記コンピュータシステムにおいて前記作業現場
における資材納品に関するデータを蓄積し、一元的に管
理できるようにした請求項1、2、3又は4記載の現場
管理システム。
5. The information terminal device further includes a material information reading device, and the identification data for identifying the material attached to the material information flag attached to the material delivered to the work site is described above. It can be read by a material information reading device and sent to the computer system via the communication network as data on the delivery status to the work site, and the computer system can accumulate data on the material delivery at the work site and manage it centrally. The site management system according to claim 1, 2, 3, or 4.
【請求項6】 前記携帯端末装置から前記コンピュータ
システムに前記作業現場における作業員の手配や資材の
納入等の指示のためのデータを送ることができると共
に、前記コンピュータシステムには前記指示の内容が蓄
積されるようになっている請求項1、2、3、4又は5
記載の現場管理システム。
6. The portable terminal device can send data to the computer system for instructing arrangements of workers and delivery of materials at the work site, and the computer system stores the contents of the instructions. Claims 1, 2, 3, 4 or 5 for accumulating
Site management system described.
【請求項7】 前記携帯端末装置から前記コンピュータ
システムに前記作業現場における完了工事種目や納品済
資材等についての支払い指示のためのデータを送ること
ができると共に、前記コンピュータシステムには前記支
払い指示の内容が蓄積されるようになっている請求項
1、2、3、4、5又は6記載の現場管理システム。
7. The portable terminal device can send data to the computer system for a payment instruction for a completed work item or a delivered material at the work site, and the computer system stores the payment instruction data. The site management system according to claim 1, 2, 3, 4, 5, or 6, wherein contents are accumulated.
JP2001313235A 2001-10-10 2001-10-10 Field control system Pending JP2003122813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001313235A JP2003122813A (en) 2001-10-10 2001-10-10 Field control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001313235A JP2003122813A (en) 2001-10-10 2001-10-10 Field control system

Publications (1)

Publication Number Publication Date
JP2003122813A true JP2003122813A (en) 2003-04-25

Family

ID=19131747

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001313235A Pending JP2003122813A (en) 2001-10-10 2001-10-10 Field control system

Country Status (1)

Country Link
JP (1) JP2003122813A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006033920A (en) * 2004-07-12 2006-02-02 Tempearl Ind Co Ltd Mounting plate
JP2010231410A (en) * 2009-03-26 2010-10-14 Sumitomo Mitsui Construction Co Ltd Labor management system
JP4850973B1 (en) * 2010-09-14 2012-01-11 ギアヌーヴ株式会社 Construction site labor management system and server
JP2015195451A (en) * 2014-03-31 2015-11-05 株式会社フジタ communication system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006033920A (en) * 2004-07-12 2006-02-02 Tempearl Ind Co Ltd Mounting plate
JP4574254B2 (en) * 2004-07-12 2010-11-04 テンパール工業株式会社 Mounting plate
JP2010231410A (en) * 2009-03-26 2010-10-14 Sumitomo Mitsui Construction Co Ltd Labor management system
JP4850973B1 (en) * 2010-09-14 2012-01-11 ギアヌーヴ株式会社 Construction site labor management system and server
JP2015195451A (en) * 2014-03-31 2015-11-05 株式会社フジタ communication system

Similar Documents

Publication Publication Date Title
US9165334B2 (en) Pet and people care management system
US7634598B2 (en) Dynamic total asset management system (TAMS) and method for managing building facility services
JP3122710U (en) Real estate management system
CN110178150A (en) Dock management system, reservation management server, ship-handling person's terminal and dock manager terminal
KR20180023177A (en) Method for providing unified delivery processing service with outsourcing management
KR20060073555A (en) The method and system for outsourcing administration on web-server and employees qualification periodically performed by customer for advancements and compensations
US20170286890A1 (en) Method for Arranging and Managing Employment Contracts
JP4520087B2 (en) System for managing or notifying the results of communication with customers
JP2002024947A (en) Pos register store management system
JP2003122813A (en) Field control system
JP2001216428A (en) Centralized management system for labor safety information
JP2022167771A (en) Management apparatus and program for staffing service
JP2004054655A (en) Schedule management system, program and recording medium
KR100959617B1 (en) Electric Display Board System Based on Web Browser
JP2010205229A (en) Care result management support system, care result management method,and computer program
JP4614598B2 (en) Rental system and method
WO2006106587A1 (en) Procurement preparation system and procurement preparation method
JP2003076824A (en) Cleaning work management system
JP2006163514A (en) Personnel selection support system and program applied thereto
JP4010495B2 (en) Facility management business support system
JP7330764B2 (en) Recruitment management and work performance management system for part-time workers
JPH10187859A (en) Business processing method, system and device, and storage medium storing business processing program
KR102381334B1 (en) Medical Service Providing Method Using Online
JP6618500B2 (en) Order processing apparatus and order processing method
JP2005275688A (en) Cloth production plan management system