JP2002138472A - Anchor foundation pile - Google Patents
Anchor foundation pileInfo
- Publication number
- JP2002138472A JP2002138472A JP2000334125A JP2000334125A JP2002138472A JP 2002138472 A JP2002138472 A JP 2002138472A JP 2000334125 A JP2000334125 A JP 2000334125A JP 2000334125 A JP2000334125 A JP 2000334125A JP 2002138472 A JP2002138472 A JP 2002138472A
- Authority
- JP
- Japan
- Prior art keywords
- pin
- anchor
- steel pipe
- foundation pile
- peripheral surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、建設現場における
軟弱地盤の補強として基礎に打ち込まれるアンカー基礎
杭に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an anchor foundation pile which is driven into a foundation as reinforcement of soft ground at a construction site.
【0002】[0002]
【従来の技術】従来、建設現場においては、軟弱地盤の
補強のため鋼管パイプを埋設して地盤の補強が行われて
いる。しかし、鋼管パイプは、軟弱地盤の補強を完全に
するためには、鋼管パイプの径を太くするか、鋼管パイ
プを長くするかの処置が必要であった為、製造経費や作
業時間が増大する等の問題が生じていた。2. Description of the Related Art Conventionally, at a construction site, a steel pipe is buried to reinforce a soft ground, thereby reinforcing the ground. However, in order to completely reinforce the soft ground, steel pipes require measures to increase the diameter of the steel pipes or lengthen the steel pipes, which increases production costs and work time. And other problems.
【0003】[0003]
【発明が解決しようとする課題】そこで、本発明は、鋼
管パイプの周面から半径方向外側に突出するアンカーピ
ンを設けることにより、軟弱地盤の補強を行うアンカー
基礎杭を提供することを目的とする。Accordingly, an object of the present invention is to provide an anchor foundation pile for reinforcing soft ground by providing an anchor pin projecting radially outward from the peripheral surface of a steel pipe. I do.
【0004】[0004]
【課題を解決するための手段】そのために、本発明のア
ンカー基礎杭は、鋼管パイプの周面から半径方向外側に
突出するアンカーピンを設けたものである。また、本発
明のアンカー基礎杭は、先端にキャップが溶接された鋼
管パイプと、該鋼管パイプの地中に埋設される周面に多
数個形成したピン穴と、該ピン穴に嵌合して鋼管パイプ
周面から半径方向外側に突出自在なアンカーピンと、該
アンカーピンを突出動作させるピン押出機構とからなる
ものである。For this purpose, the anchor foundation pile according to the present invention is provided with an anchor pin projecting radially outward from the peripheral surface of the steel pipe. In addition, the anchor foundation pile of the present invention has a steel pipe with a cap welded at the tip, a plurality of pin holes formed on a peripheral surface of the steel pipe buried in the ground, and fits into the pin hole. It comprises an anchor pin which can protrude radially outward from the peripheral surface of the steel pipe, and a pin pushing mechanism for causing the anchor pin to protrude.
【0005】[0005]
【実施例】以下、本発明の一実施例を図面に基づいて説
明する。本発明のアンカー基礎杭は、図1に示すよう
に、先端にキャップ1が溶接された鋼管パイプ2と、該
鋼管パイプ2の地中に埋設される周面に多数個形成した
ピン穴3と、該ピン穴3に嵌合して鋼管パイプ2周面か
ら半径方向外側に突出自在なアンカーピン4と、該アン
カーピン4を突出動作させるピン押出機構5とからな
る。An embodiment of the present invention will be described below with reference to the drawings. As shown in FIG. 1, the anchor foundation pile of the present invention includes a steel pipe 2 having a cap 1 welded to a tip thereof, and a plurality of pin holes 3 formed on a peripheral surface of the steel pipe 2 buried in the ground. An anchor pin 4 fitted in the pin hole 3 and capable of protruding radially outward from the peripheral surface of the steel pipe 2 and a pin pushing mechanism 5 for projecting the anchor pin 4.
【0006】前記鋼管パイプ2は、図2に示すように、
内部にピン押出機構5を収納できる管径で、先端に半球
キャップ1を溶接したものからなり、先端内部にピン押
出機構5を保持する固定ガイド6が溶接され、他方の上
方内部にストッパー7を溶接固定し、該ストッパー7上
にピン押出機構5を支持するガイドプレート8を載置す
る。さらに、前記固定ガイド6と前記ガイドプレート8
との間にピン押出機構5が収納され、ピン押出機構5が
収納される鋼管パイプ2の周面には多段に90°ずつ角
度をずらしたピン穴3が多数個形成される。なお、図2
の場合では、直径方向の2個所にピン穴3を設け、該ピ
ン穴3を多段に90°ずつ角度をずらしている。また、
ピン穴3を補強するために、ピン穴3の内径に補強リン
グ9を溶接することも可能である。[0006] As shown in FIG.
A hemispherical cap 1 is welded to the tip with a pipe diameter capable of accommodating the pin pushing mechanism 5 inside, a fixed guide 6 holding the pin pushing mechanism 5 is welded inside the tip, and a stopper 7 is placed inside the other upper part. A guide plate 8 supporting the pin pushing mechanism 5 is fixed on the stopper 7 by welding. Further, the fixed guide 6 and the guide plate 8
The pin push-out mechanism 5 is housed between the steel pipe and the steel pipe 2 in which the pin push-out mechanism 5 is housed. Note that FIG.
In the case of (1), the pin holes 3 are provided at two positions in the diameter direction, and the angles of the pin holes 3 are shifted by 90 ° in multiple stages. Also,
In order to reinforce the pin hole 3, a reinforcing ring 9 can be welded to the inner diameter of the pin hole 3.
【0007】前記アンカーピン4は、図3に示すよう
に、前記鋼管パイプ2内に格納される長さであって、先
端がピン穴3に係合し後端のフランジがピン押出機構5
に支持される適宜断面形状の棒状部材からなり、アンカ
ーピン4の断面形状に合わせて鋼管パイプ2のピン穴3
を形成する。鋼管パイプ2が地中に埋設される際に、前
記アンカーピン4は図3の実線の如く鋼管パイプ2内に
収納された状態でピン押出機構5に保持され、鋼管パイ
プ2の埋設完了後、ピン押出機構5の作動により半径方
向外側に押し出され、アンカーピン4に形成されたフラ
ンジが図3の点線の如くピン穴3周囲に当接することに
より停止され、その後ピン押出機構5は逆動作が行われ
て戻り、アンカーピン4はそのまま鋼管パイプ2周面か
ら突き出した状態に残留保持される。As shown in FIG. 3, the anchor pin 4 has a length to be stored in the steel pipe 2 and has a front end engaged with the pin hole 3 and a rear end flange connected to the pin pushing mechanism 5.
And a rod-like member having an appropriate cross-sectional shape supported by the steel pipe pipe 2 according to the cross-sectional shape of the anchor pin 4.
To form When the steel pipe 2 is buried in the ground, the anchor pin 4 is held by the pin pushing mechanism 5 in a state of being stored in the steel pipe 2 as shown by the solid line in FIG. The pin is pushed out in the radial direction by the operation of the pin pushing mechanism 5, and is stopped by the flange formed on the anchor pin 4 abutting around the pin hole 3 as shown by the dotted line in FIG. After being performed, the anchor pin 4 is retained and remains in a state of protruding from the peripheral surface of the steel pipe 2 as it is.
【0008】前記ピン押出機構5は、図2に示すよう
に、ジャッキ支持軸10と多数個のジャッキ11とから
なり、前記ジャッキ支持軸10は、ネジ式ジャッキ13
を支持するためにピン穴3に対向する個所にネジを形成
した回転自在の回転軸12となし、前記ジャッキ支持軸
10、すなわち回転軸12は前記鋼管パイプ2の中心を
通り、鋼管パイプ2の固定ガイド6とガイドプレート8
により回転自在に支持され、図3に示すように、該回転
軸12の鋼管パイプ2のピン穴3に対向する個所にネジ
を形成し、更に前記ジャッキ11は、該回転軸12のネ
ジに螺合するネジ式ジャッキ13を配置する。前記ネジ
式ジャッキ13は、図3に示すように、前記回転軸12
に螺合する上下の回転ブロック14と、該回転ブロック
14に旋回自在に支持され、前記回転軸12を挟んで左
右に設けられた第一リンク15、第二リンク16と、該
第一リンク15同士及び第二リンク16同士を連結して
アンカーピン4を保持する載置プレート17とからな
り、全体としてパンタグラフ機構を構成する。なお、前
記載置プレート17には、アンカーピン4が脱落しない
ようにアンカーピン4のフランジを保持する凹部を形成
するが、環状凸部とすることも可能である。したがっ
て、前記回転軸12を正回転又は逆回転することによ
り、回転ブロック14同士が接近又は離反することによ
って前記第一リンク15及び第二リンク16を拡開又は
閉鎖し、前記載置プレート17を鋼管パイプ2の半径方
向に前進又は後退させることが出来る。なお、実施例で
は、ピン押出機構5をネジ式ジャッキ13で説明したが
これに限らず、空気圧式又は油圧式ジャッキを用いて構
成することも可能である。その場合は、ジャッキ支持軸
10を回転自在の回転軸12としないで固定とし、ジャ
ッキ支持軸10のピン穴3の位置に空気圧式又は油圧式
ジャッキを固定し、該空気圧式又は油圧式ジャッキに空
気圧又は油圧パイプを連結して空気圧又は油圧により作
動させることが出来る。As shown in FIG. 2, the pin pushing mechanism 5 includes a jack supporting shaft 10 and a plurality of jacks 11.
And a rotatable rotary shaft 12 formed with a screw at a position facing the pin hole 3 to support the shaft. The jack support shaft 10, that is, the rotary shaft 12 passes through the center of the steel pipe 2. Fixed guide 6 and guide plate 8
As shown in FIG. 3, a screw is formed at a position of the rotating shaft 12 opposite to the pin hole 3 of the steel pipe 2, and the jack 11 is further screwed to the screw of the rotating shaft 12. The corresponding screw type jack 13 is arranged. As shown in FIG. 3, the screw type jack 13
An upper and lower rotary block 14 screwed to the first link 15, a first link 15 and a second link 16 rotatably supported by the rotary block 14 and provided on the left and right with the rotary shaft 12 interposed therebetween; And a mounting plate 17 for connecting the second links 16 to each other and holding the anchor pins 4, and constitutes a pantograph mechanism as a whole. The mounting plate 17 is provided with a concave portion for holding the flange of the anchor pin 4 so that the anchor pin 4 does not fall off, but may be formed as an annular convex portion. Therefore, by rotating the rotating shaft 12 forward or backward, the rotating blocks 14 approach or separate from each other to expand or close the first link 15 and the second link 16, and the mounting plate 17 The steel pipe 2 can be moved forward or backward in the radial direction. In the embodiment, the pin pushing mechanism 5 has been described as the screw type jack 13. However, the present invention is not limited to this, and it is also possible to use a pneumatic or hydraulic type jack. In this case, the jack support shaft 10 is fixed without being the rotatable rotary shaft 12, and a pneumatic or hydraulic jack is fixed at the position of the pin hole 3 of the jack support shaft 10, and the jack is connected to the pneumatic or hydraulic jack. It can be pneumatically or hydraulically operated by connecting pneumatic or hydraulic pipes.
【0009】次いで、本発明のアンカー基礎杭の施工方
法について述べると、鋼管パイプ2内にアンカーピン4
及びピン押出機構5を収納した後、軟弱地盤に在来工法
と同様にして鋼管パイプ2を杭打ち機により埋設させ
る。埋設終了後、ジャッキ支持軸10を正回転させる
と、ネジ式ジャッキ13自体もジャッキ支持軸10と一
体に回転しようとするが、アンカーピン4がストッパー
となって回転を阻止され、回転ブロック14がネジの作
用でネジ式ジャッキ13を伸長させてアンカーピン4を
半径方向外側に押し出し、ピン穴3からアンカーピン4
を地盤中に突出させる。この時、複数個のネジ式ジャッ
キ13は、ジャッキ支持軸10に一体に連結されている
ので、複数個のネジ式ジャッキ13が一斉に作動され
る。Next, a method of constructing the anchor foundation pile of the present invention will be described.
After the pin pushing mechanism 5 is stored, the steel pipe 2 is buried in the soft ground by a pile driver in the same manner as the conventional construction method. When the jack support shaft 10 is normally rotated after embedding, the screw type jack 13 itself also attempts to rotate integrally with the jack support shaft 10, but the anchor pin 4 acts as a stopper to prevent rotation, and the rotation block 14 is turned off. The screw type jack 13 is extended by the action of the screw to push the anchor pin 4 outward in the radial direction, and the anchor pin 4 is inserted through the pin hole 3.
Project into the ground. At this time, since the plurality of screw type jacks 13 are integrally connected to the jack support shaft 10, the plurality of screw type jacks 13 are simultaneously operated.
【0010】そして、アンカーピン4の突出が完了した
ならば、ジャッキ支持軸10を逆回転させてネジ式ジャ
ッキ13を短縮させてアンカーピン4を残し、載置プレ
ート17を半径方向内側に引き戻す。なお、逆回転の当
初は載置プレート17がアンカーピン4に係合している
のでネジ式ジャッキ13自体の回転が阻止されて引き戻
されるが、すぐに係合が外れてジャッキ支持軸10と一
体となってネジ式ジャッキ13は空転するので完全には
戻らない。引き戻しが完了した後、ジャッキ支持軸10
を鋼管パイプ2内から引き上げてネジ式ジャッキ13及
びガイドプレート8を取り出す。なお、鋼管パイプ2内
には、先端に固定ガイド6が残るのみで、その他の部材
は全て引き上げられ、次に準備中の鋼管パイプ2に利用
される。When the protrusion of the anchor pin 4 is completed, the jack support shaft 10 is rotated in the reverse direction to shorten the screw-type jack 13, leaving the anchor pin 4, and pulling the mounting plate 17 inward in the radial direction. At the beginning of the reverse rotation, since the mounting plate 17 is engaged with the anchor pin 4, the screw-type jack 13 itself is prevented from rotating and pulled back, but is immediately disengaged and integrated with the jack support shaft 10. As a result, the screw type jack 13 idles and does not return completely. After the retraction is completed, the jack support shaft 10
From the steel pipe 2 to take out the screw type jack 13 and the guide plate 8. In the steel pipe 2, only the fixed guide 6 remains at the tip, and all other members are pulled up and used for the steel pipe 2 that is being prepared.
【0011】[0011]
【効果】本発明のアンカー基礎杭は、鋼管パイプの周面
から半径方向外側に突出するアンカーピンを設けること
により、鋼管パイプの沈下又は引上げの抵抗となり軟弱
地盤の補強を行うことができる。また、鋼管パイプの埋
設後、アンカーピンを突出させるので、作業が容易であ
ると共に従来の如く管径の太いパイプや長いパイプを必
要としないので、工事費を安価にすることが出来る。The anchor foundation pile according to the present invention is provided with anchor pins protruding radially outward from the peripheral surface of the steel pipe, thereby providing resistance to sinking or pulling up of the steel pipe, thereby reinforcing soft ground. In addition, since the anchor pin is projected after the steel pipe is buried, the work is easy, and a pipe having a large diameter or a long pipe is not required unlike the related art, so that the construction cost can be reduced.
【図1】本発明のアンカー基礎杭の全体構成図である。FIG. 1 is an overall configuration diagram of an anchor foundation pile of the present invention.
【図2】本発明のアンカー基礎杭の縦断面図である。FIG. 2 is a longitudinal sectional view of the anchor foundation pile of the present invention.
【図3】本発明のアンカー基礎杭におけるパンダグラフ
ジャッキの説明図である。FIG. 3 is an explanatory view of a panda graph jack in the anchor foundation pile of the present invention.
1 キャップ 2 鋼管パイプ 3 ピン穴 4 アンカーピン 5 ピン押出機構 6 固定ガイド 7 ストッパー 8 ガイドプレート 9 補強リング 10 ジャッキ支持軸 11 ジャッキ 12 回転軸 13 ネジ式ジャッキ 14 回転ブロック 15 第一リンク 16 第二リンク 17 載置プレート DESCRIPTION OF SYMBOLS 1 Cap 2 Steel pipe 3 Pin hole 4 Anchor pin 5 Pin pushing mechanism 6 Fixed guide 7 Stopper 8 Guide plate 9 Reinforcement ring 10 Jack support shaft 11 Jack 12 Rotation shaft 13 Screw jack 14 Rotation block 15 First link 16 Second link 17 Mounting plate
Claims (2)
出するアンカーピンを設けたことを特徴とするアンカー
基礎杭。1. An anchor foundation pile comprising an anchor pin protruding radially outward from a peripheral surface of a steel pipe.
と、該鋼管パイプの地中に埋設される周面に多数個形成
したピン穴と、該ピン穴に嵌合して鋼管パイプ周面から
半径方向外側に突出自在なアンカーピンと、該アンカー
ピンを突出動作させるピン押出機構とからなることを特
徴とするアンカー基礎杭。2. A steel pipe with a cap welded to the tip, a plurality of pin holes formed in a peripheral surface buried in the ground of the steel pipe, An anchor foundation pile comprising an anchor pin that can protrude radially outward and a pin pushing mechanism that causes the anchor pin to protrude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000334125A JP2002138472A (en) | 2000-11-01 | 2000-11-01 | Anchor foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000334125A JP2002138472A (en) | 2000-11-01 | 2000-11-01 | Anchor foundation pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2002138472A true JP2002138472A (en) | 2002-05-14 |
Family
ID=18810101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000334125A Pending JP2002138472A (en) | 2000-11-01 | 2000-11-01 | Anchor foundation pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2002138472A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100558469B1 (en) | 2005-09-08 | 2006-03-10 | (주)한석엔지니어링 | The compressing permanent anchor |
CN103161153A (en) * | 2013-03-07 | 2013-06-19 | 郭财宝 | Powder injection stirring type anchor pile and construction method |
JP2017160726A (en) * | 2016-03-11 | 2017-09-14 | ケイコン株式会社 | Construction method of temporary fall prevention fence and temporary fall prevention fence |
CN110952541A (en) * | 2019-11-28 | 2020-04-03 | 成都四海岩土工程有限公司 | Construction method of large-diameter anti-floating anchor rod combining vibration immersed tube and high-pressure rotary spraying |
CN112502134A (en) * | 2020-11-26 | 2021-03-16 | 上海建工五建集团有限公司 | Reinforced steel pipe pile system and method |
CN113982189A (en) * | 2021-11-24 | 2022-01-28 | 郭旭 | Steel construction stand and steel construction system that takes precautions against earthquakes |
-
2000
- 2000-11-01 JP JP2000334125A patent/JP2002138472A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100558469B1 (en) | 2005-09-08 | 2006-03-10 | (주)한석엔지니어링 | The compressing permanent anchor |
CN103161153A (en) * | 2013-03-07 | 2013-06-19 | 郭财宝 | Powder injection stirring type anchor pile and construction method |
JP2017160726A (en) * | 2016-03-11 | 2017-09-14 | ケイコン株式会社 | Construction method of temporary fall prevention fence and temporary fall prevention fence |
CN110952541A (en) * | 2019-11-28 | 2020-04-03 | 成都四海岩土工程有限公司 | Construction method of large-diameter anti-floating anchor rod combining vibration immersed tube and high-pressure rotary spraying |
CN112502134A (en) * | 2020-11-26 | 2021-03-16 | 上海建工五建集团有限公司 | Reinforced steel pipe pile system and method |
CN113982189A (en) * | 2021-11-24 | 2022-01-28 | 郭旭 | Steel construction stand and steel construction system that takes precautions against earthquakes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2002138472A (en) | Anchor foundation pile | |
CN210002399U (en) | kinds of anchoring device | |
JP2003136328A (en) | Pipe cutting device | |
JP3174428B2 (en) | Rotary leader support for pile driver | |
JP2711236B2 (en) | Enlarged hole drilling head | |
JP4111905B2 (en) | Drilling propulsion device | |
JP3066071U (en) | Chuck for pipe propulsion device | |
JP7452860B2 (en) | Stretched steel pipe, steel pipe for ground reinforcement, and construction method using the same | |
JP2005061158A (en) | Pull-out device | |
JPS595111Y2 (en) | 2-stage enlargement bit | |
CN214245683U (en) | Pressure injection type concrete grouting pipeline | |
JP2003129472A (en) | Anchor foundation pile | |
JP2004324381A (en) | Erection method with enlarged diameter part of precast pile, and enlarging excavating rod used for the same | |
JPS6231518Y2 (en) | ||
JP3001797B2 (en) | Cone for rock bolt | |
JPH1025995A (en) | Tunnel excavator | |
JP2023132204A (en) | Ground reinforcement pipe and ground reinforcement method | |
KR20240138687A (en) | multipurpose anchor and construction method thereof) | |
JP3033892B2 (en) | Underground joining type different diameter shield excavator and its underground joining method | |
JPH0518175A (en) | Drilling device | |
KR20240138690A (en) | multipurpose anchor and construction method thereof) | |
JPH09256358A (en) | Non-earth-removing type rotary jacket pile | |
JP2006257675A (en) | Device and method for removing existing pile | |
JPH03119285A (en) | Propelling construction device | |
JPH108899A (en) | Structure reinforcing construction method and reinforcing column |