JP2002091763A - Development approval support system and storage medium - Google Patents

Development approval support system and storage medium

Info

Publication number
JP2002091763A
JP2002091763A JP2000281977A JP2000281977A JP2002091763A JP 2002091763 A JP2002091763 A JP 2002091763A JP 2000281977 A JP2000281977 A JP 2000281977A JP 2000281977 A JP2000281977 A JP 2000281977A JP 2002091763 A JP2002091763 A JP 2002091763A
Authority
JP
Japan
Prior art keywords
data
development plan
change
standard
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000281977A
Other languages
Japanese (ja)
Inventor
Shinya Sugiyama
晋也 杉山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2000281977A priority Critical patent/JP2002091763A/en
Publication of JP2002091763A publication Critical patent/JP2002091763A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To automatically extract and output a process to be a problem. SOLUTION: A person in charge of development or the like previously prepares the development schedule data by processes of a project or standard development schedule data by processes of a standard project related to the project and respectively preserves the data in correspondent databases 2 and 3. In such a state, an examining/approving person extracts the process to be a problem from the size relation of the development schedule data by processes by a process extracting means 5b in a schedule problem extracting processing main body part 5, finds out the development schedule data to become the problem from the development schedule data of the extracted process and the standard development schedule data of the same process stored in the database 3 by an analyzing means 5c later and displays these data on an output device 6 and a state, in which the approving person or the like can check each problem process, is created.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、製品やソフトウエ
アの開発計画の妥当性をチェックする開発承認支援シス
テム及び記憶媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a development approval support system and a storage medium for checking the validity of a product or software development plan.

【0002】[0002]

【従来の技術】従来、製品やソフトウエア(以下、製品
と総称する)を開発する場合、その製品の開発進捗状況
を自動的に管理するシステムは既に知られている。
2. Description of the Related Art Conventionally, when a product or software (hereinafter collectively referred to as a product) is developed, a system for automatically managing the development progress of the product is already known.

【0003】この管理システムは、開発すべき製品につ
いて複数の開発作業工程に分け、予め各開発作業工程に
関する標準計画情報を登録し、各作業担当者から開発作
業工程ごとの開発作業状況の実績データを受け取ると、
その実績データと該当各開発作業工程の標準計画情報と
を比較し、作業進捗状況を把握し、適宜な作業指示を各
作業担当者に通知する構成である。
This management system divides a product to be developed into a plurality of development work processes, pre-registers standard plan information on each development work process, and records actual development work status data for each development work process from each worker. When you receive
The actual data is compared with the standard plan information of the corresponding development work process, the work progress is grasped, and an appropriate work instruction is notified to each worker.

【0004】このような管理システムは、単に製品実現
の進捗状況を確認するのものであり、当該製品開発にお
ける各工程の妥当性を判断するものではない。
[0004] Such a management system merely confirms the progress of product realization, and does not judge the validity of each process in the product development.

【0005】[0005]

【発明が解決しようとする課題】そこで、近年、製品の
開発計画の作成を支援し、期間、工数、目標品質指標を
自動算出するシステムが開発されている。
Accordingly, in recent years, a system has been developed which supports the creation of a product development plan and automatically calculates a period, man-hours, and a target quality index.

【0006】しかしながら、以上のようなシステムは、
製品開発に対する期間、工数、目標品質指標を自動算出
できるが、実際の製品開発のプロジェクトでは、特異条
件が多いことから、自動算出された結果からプロジェク
ト計画が立てられないケースが多い。この場合には、そ
の元となる期間、工数、目標品質指標等のツールないし
計算式等に関し、責任のある管理者に対し、その都度説
明しなければならず、非常に煩雑である。
However, such a system is
Although the period, man-hours, and target quality index for product development can be automatically calculated, in actual product development projects, there are many peculiar conditions, and in many cases, a project plan cannot be made from the automatically calculated results. In this case, it is necessary to explain to the responsible manager about the period, man-hours, target quality index, and other tools or calculation formulas each time, which is very complicated.

【0007】また、管理者は、一般に複数のプロジェク
トを抱えている場合が多いが、個別のプロジェクトとそ
のプロジェクトの標準との差異を分析するには当該プロ
ジェクト開発担当者から詳細な状況を聞き取りながら必
要な変更を指示しなければならず、負担がかかり過ぎる
問題がある。特に、納期延長等のごとき開発計画の変更
は、それなりに納得する理由が必要であり、詳細な調査
ないし再検討を余儀なくされ、過度の負担がかかる。ま
た、開発計画の変更は、詳細な調査ないし再検討が必要
なだけでなく、初期の開発計画を立てることよりも難し
いことから、作業の途中で度々計画を変更するケースが
多発し、その度に検討を要する問題がある。
In general, the manager generally has a plurality of projects. To analyze the difference between an individual project and the standard of the project, the manager listens to a detailed situation from the project developer. There is a problem that the necessary change must be indicated and the burden is excessively increased. In particular, a change in the development plan, such as an extension of the delivery date, requires a reason to be convinced, necessitating a detailed investigation or reexamination, and an excessive burden is imposed. In addition, changes in the development plan require not only detailed investigation or reexamination, but also more difficult than making an initial development plan.Therefore, in many cases, the plan is frequently changed during the work. There is a problem that needs to be considered.

【0008】さらに、過去のノウハウをもとに適切な判
断決定を下し得る管理者が多く存在するが、そのノウハ
ウが共有化されず、そこには当然各管理者間における判
断差が生ずる問題もある。
Further, there are many managers who can make an appropriate decision based on past know-how, but the know-how is not shared, which naturally causes a judgment difference between the managers. There is also.

【0009】本発明は上記事情に鑑みてなされたもの
で、問題となる工程自動的に洗出して承認者に指示を仰
ぐことが可能な開発承認支援システムを提供することに
ある。
The present invention has been made in view of the above circumstances, and it is an object of the present invention to provide a development approval support system capable of automatically identifying a problematic process and asking an approver for instructions.

【0010】また、本発明の他の目的は、問題となる工
程を自動的に洗い出す処理を行うプログラムを記憶した
記憶媒体を提供することにある。
It is another object of the present invention to provide a storage medium storing a program for performing a process for automatically identifying a process in question.

【0011】[0011]

【課題を解決するための手段】上記課題を解決するため
に、本発明に係わる開発承認支援システムは、開発担当
者において作成されるプロジェクトの工程別開発計画デ
ータが記憶される開発計画データ記憶手段と、前記プロ
ジェクトに関連する標準プロジェクトの工程別標準開発
計画データが記憶される標準開発計画データ記憶手段
と、承認者の入力指示に基づいて前記工程別開発計画デ
ータの中から問題となる工程を洗い出す工程洗出し手段
と、この工程洗出し手段により洗い出された工程の開発
計画データと前記標準開発計画データ記憶手段に記憶さ
れる同一の工程の標準開発計画データとから問題となる
開発計画データを見つけ出す分析手段とを備えた構成で
ある。
In order to solve the above-mentioned problems, a development approval support system according to the present invention is a development plan data storage means for storing process-specific development plan data of a project created by a developer. A standard development plan data storage means for storing standard development plan data for each process of a standard project related to the project, and a process which becomes a problem from among the development plan data for each process based on an input instruction of an approver. Development plan data which is problematic from the process washing means to be washed out, and the development plan data of the process washed out by the process washing means and the standard development plan data of the same process stored in the standard development plan data storage means. And analysis means for finding out.

【0012】本発明は、以上のような構成とすることに
より、予め担当者等によりプロジェクトの工程別開発計
画データの他、このプロジェクトに関連する標準プロジ
ェクトの工程別標準開発計画データを作成した後、承認
者から入力指示を受けたとき、工程洗出し手段が工程別
に開発計画データの大小関係から問題となる工程を取り
出し、さらに同一の工程の標準開発計画データと比較し
ながら問題となる開発計画データを見つけ出すので、問
題となる工程の標準開発計画データを自動的に洗い出し
て出力でき、開発担当者の説明を受けることなく承認者
が迅速に計画の妥当性をチェックすることが可能とな
る。
According to the present invention, with the above-described configuration, a person in charge prepares standard development plan data for each process of a standard project related to this project in addition to development data for each process of the project in advance. When an input instruction is received from the approver, the process identification means extracts the problematic process from the size relationship of the development plan data for each process, and compares it with the standard development plan data of the same process. Since the data is found, the standard development plan data of the process in question can be automatically extracted and output, and the approver can quickly check the validity of the plan without receiving the explanation from the development staff.

【0013】本発明に係わる開発承認支援システムは、
開発担当者において作成されるプロジェクトの変更理由
付き工程別開発計画変更データが記憶される開発計画変
更データ記憶手段と、前記プロジェクトに関連する標準
プロジェクトの工程別標準開発計画変更データが記憶さ
れる標準開発計画変更データ記憶手段と、承認者の入力
指示を受け、前記変更理由をもとに問題とされる工程の
開発計画変更データと前記標準開発計画変更データ記憶
手段に記憶される同一工程の前記標準開発計画変更デー
タとから最も大きい問題工程の変更データを洗い出す現
状工程変更データ洗出し手段と、次以降の工程の開発計
画変更データと前記標準開発計画変更データ記憶手段に
記憶される同一工程の前記標準開発計画変更データとか
ら最も大きい問題工程の変更データを洗い出す次工程順
変更データ洗出し手段と、少なくとも前記洗出し手段に
より洗い出された工程別変更データを出力する問題デー
タ出力手段とを備えた構成である。
The development approval support system according to the present invention comprises:
A development plan change data storage means for storing process-specific development plan change data with a reason for change of a project created by a developer, and a standard for storing process-specific standard development plan change data of a standard project related to the project A development plan change data storage unit, receiving the input instruction of the approver, and developing plan change data of the process considered as a problem based on the reason for the change and the same process stored in the standard development plan change data storage unit; Current process change data identification means for identifying the largest problem process change data from the standard development plan change data, and the same process stored in the development plan change data and the standard development plan change data storage means for the next and subsequent processes. The next process order change data that identifies the largest problem process change data from the standard development plan change data Stage and a configuration in which an issue data output means for outputting a step basis change data washed out by at least the washout means.

【0014】本発明は、以上のような構成とすることに
より、例えば初期開発計画等のもとに変更されたプロジ
ェクトの変更理由付き工程別開発計画変更データ及びこ
のプロジェクトに関連する標準プロジェクトの工程別標
準開発計画変更データが存在するとき、承認者から入力
指示を受けたとき、現状工程変更データ洗出し手段が変
更理由のもとに問題とされる工程の開発計画変更データ
とこの工程に対応する標準開発計画変更データとから最
も大きい問題工程の変更データを洗出し、同様に次工程
についても同様に問題工程の変更データを洗出し、これ
ら洗い出された工程別の変更データを出力するので、各
工程の問題変更データが即座に観察でき、しかも工程全
体にわたってもれなく問題点を認識可能である。
According to the present invention having the above-described configuration, for example, a development plan change data for each process with a reason for change of a project changed based on an initial development plan and the like, and a process of a standard project related to this project. When there is another standard development plan change data, and when an input instruction is received from the approver, the current process change data identification means responds to the development plan change data of the process that is a problem based on the change reason and this process The change data of the largest problem process is extracted from the standard development plan change data, and the change data of the problem process is similarly identified for the next process, and the changed data for each process is output. In addition, the problem change data of each process can be immediately observed, and the problem can be recognized throughout the entire process.

【0015】なお、以上述べた2つの開発承認支援シス
テムの構成を組み合わせるようにすれば、初期開発計画
の問題工程と変更後の問題工程を容易に把握でき、両者
の作用効果を奏することが可能である。
By combining the two development approval support systems described above, the problem process of the initial development plan and the problem process after the change can be easily grasped, and both functions and effects can be achieved. It is.

【0016】また、本発明に係わる別の開発承認支援シ
ステムは、複数の過去プロジェクトの工程別開発計画実
績データが記憶される実績データ記憶手段と、各プロジ
ェクトの変更理由付き工程別開発計画変更データが記憶
される開発計画変更データ記憶手段と、この開発計画変
更データ記憶手段に記憶される各プロジェクトの工程別
開発計画変更データに付される変更理由の変更回数に応
じた変更理由の順にソートし出力する変更理由別ソート
手段と、この変更理由別ソート手段でソートされた変更
理由の1つを指定し、この指定された変更理由により変
更された前記各プロジェクトの工程別開発計画実績デー
タ及び工程別開発計画変更データのうち、いずれか一方
または両方のデータを用いて工程別開発計画実績データ
の平均値を算出する平均値算出手段と、この平均値算出
手段によって算出された変更理由別及び工程別の計画平
均値データを出力する理由別平均値出力手段とを備えた
構成である。
Further, another development approval support system according to the present invention comprises: a result data storage means for storing process-specific development plan result data of a plurality of past projects; Is sorted in the order of the change reason according to the number of changes of the change reason added to the development plan change data for each process of each project stored in the development plan change data storage means. A sort means for each change reason to be output and one of the change reasons sorted by the sort means for each change reason are designated, and the development plan result data and the process for each process of each project changed by the designated change reason Calculate the average value of process-specific development plan data using one or both of the development plan change data. An average value calculation means, a configuration in which a by reason average value output means for outputting the average value planned average value data by the calculated modified by reason and processes by calculating means.

【0017】本発明は、以上のような構成とすることに
より、変更理由別ソート手段が各プロジェクトの変更理
由付き工程別開発計画変更データから変更理由の変更回
数に応じた変更理由の順にソートして表示した後、その
1つの変更理由を指定すると、平均値算出手段は、変更
された前記各プロジェクトの工程別開発計画実績データ
及び工程別開発計画変更データのうち、少なくとも工程
別開発計画実績データの平均値を算出し、変更理由別及
び工程別の計画平均値データに表示するので、承認者は
そのデータを見ながら標準の開発計画データを作成可能
であり、問題の発生しやすい工程の標準開発計画の作成
精度を高めることが可能である。
According to the present invention, with the above-described structure, the sorting means for each reason for change sorts the development plan change data for each project with the reason for change for each project in the order of the reason for change according to the number of times of change of the reason for change. When the one reason for the change is designated after the display, the average value calculating means outputs at least the process-specific development plan result data of the changed project-specific development plan result data and the process-specific development plan change data of each of the changed projects. The average value is calculated and displayed on the planned average data for each reason for change and each process, so that the approver can create standard development plan data while looking at the data, and the standard for process that is likely to cause problems can be created. It is possible to increase the accuracy of creating a development plan.

【0018】[0018]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照して説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0019】(第1の実施の形態)図1は本発明に係わ
る開発承認支援システムの一実施の形態を示す構成図で
ある。
(First Embodiment) FIG. 1 is a block diagram showing one embodiment of a development approval support system according to the present invention.

【0020】このシステムは、ソフトウエアを含む製品
の開発計画を作成するために必要な初期開発計画データ
を入力するキーボード,マウスのごときポインティング
デバイスなどの入力装置1と、この入力装置1から入力
される初期開発計画データを記憶する開発計画データベ
ース2と、標準開発計画データベース3と、作成される
初期開発計画に対する問題抽出用プログラムを記憶する
記憶媒体4と、この記憶媒体4に記憶される問題抽出用
プログラムに従って開発計画データベース2に記憶され
ている作成済み開発計画の問題抽出処理を実行する例え
ばCPUで構成される計画問題抽出処理本体部5と、出
力装置6とによって構成されている。
This system includes an input device 1 such as a keyboard and a pointing device such as a mouse for inputting initial development plan data necessary for creating a development plan of a product including software, and an input device 1 for inputting data from the input device 1. A development plan database 2 for storing initial development plan data, a standard development plan database 3, a storage medium 4 for storing a problem extracting program for the created initial development plan, and a problem extraction stored in the storage medium 4. It is composed of a plan problem extraction processing main unit 5 configured by, for example, a CPU that executes a problem extraction process of a created development plan stored in the development plan database 2 according to a program for use, and an output device 6.

【0021】前記開発計画データベース2は、図2に示
すように各工程開発担当者等によって入力装置1から入
力される初期開発計画データ,例えば開発プロジェクト
の概要説明や工程・計画値等のデータが所定のフォーマ
ットに従って記憶するものであって、そのうち開発プロ
ジェクトの概要説明は承認を与える管理者が初期開発計
画のプロジェクトの内容を即座に理解可能な程度に記述
する部分であり、その他必要に応じて例えばそのプロジ
ェクトの特長を付加記述することも考えられる。一方、
工程・計画値については、工程の項目を横軸、計画値の
項目を縦軸とする表形式により作成する。工程の項目と
しては、例えば設計、製造、テスト等が挙げられ、その
他必要な項目を付加することも可能である。計画値の項
目には、例えば投入コスト、品質指標、生産指標等が挙
げられ、同様にその他必要な項目があれば、その必要項
目も付加することが可能である。
As shown in FIG. 2, the development plan database 2 stores initial development plan data input from the input device 1 by each process developer or the like, for example, data such as a brief description of the development project and process / plan values. It is stored in a predetermined format, and the outline description of the development project is a part that describes the contents of the project of the initial development plan to the administrator who gives approval so that it can be understood immediately, and other necessary For example, it is conceivable to additionally describe the features of the project. on the other hand,
The process / plan value is created in a table format with the process item as the horizontal axis and the plan value item as the vertical axis. The items of the process include, for example, design, manufacturing, test, and the like, and other necessary items can be added. The items of the plan value include, for example, input costs, quality indices, and production indices. Similarly, if there are other necessary items, the necessary items can also be added.

【0022】なお、本実施の形態では、初期開発計画デ
ータの工程・計画値キーとして、投入コストが用いられ
る。
In this embodiment, the input cost is used as a process / plan value key of the initial development plan data.

【0023】前記標準開発計画データベース3は、予め
過去の関連プロジェクトの開発計画実行結果データや熟
練者,管理者による過去の知識、経験に基づいて作成さ
れるものであって、図2に示すごとく工程項目単位ご
と、つまり<設計>、<製造>、<テスト>ごとに工程
・計画値のキーとなる標準となる投入コストと標準とな
る品質指標や生産指標がペアとなるように記述され、標
準開発計画データとして作成されている。なお、図面上
では、開発計画データベース2と標準開発計画データベ
ース3がそれぞれ独立した状態で設けられているが、例
えば同一のデータベースにエリア分けし、それぞれ対応
するエリアに初期開発計画データ及び標準開発計画デー
タを格納する構成であってもよい。
The standard development plan database 3 is prepared in advance based on the development plan execution result data of past related projects and the past knowledge and experience of experts and managers, and as shown in FIG. For each process item unit, that is, for <design>, <manufacturing>, and <test>, the standard input cost, which is the key of the process / plan value, and the standard quality index and production index are described as a pair, Created as standard development plan data. In the drawing, the development plan database 2 and the standard development plan database 3 are provided independently of each other. For example, the areas are divided into the same database, and the initial development plan data and the standard development plan data are stored in the corresponding areas. A configuration for storing data may be used.

【0024】前記記憶媒体4は、一般的には磁気ディス
クが用いられるが、それ以外にも例えば磁気テープ、C
D−ROM、DVD−ROM、フロッピー(登録商標)
ディスク、MO、CD−R、メモリカードなどが用いら
れ、その具体的なプログラムの処理フローは後記する。
As the storage medium 4, a magnetic disk is generally used.
D-ROM, DVD-ROM, floppy (registered trademark)
A disc, MO, CD-R, memory card, or the like is used, and the specific program processing flow will be described later.

【0025】前記計画問題抽出処理本体部5は、記憶媒
体4に記憶される問題抽出用プログラムを読み取って次
のような処理手段ないし機能を実現するものであって、
具体的には、入力装置1から入力される初期開発計画デ
ータである開発プロジェクトの概要説明及び工程・計画
値等のデータを受けると、開発計画データベース2の予
め定める所定のフォーマットに基づくエリアに順次記憶
していく初期開発計画作成手段5a、この初期開発計画
作成手段5aによって作成された開発計画データベース
2の初期開発計画のうち、工程・計画値のキーとなる投
入コストの中から最も大きい投入コストの工程を洗い出
す工程洗出し手段5b、この工程洗出し手段5bによっ
て洗い出された工程の指標と前記標準開発計画データベ
ース3に記憶される同一工程の指標とを比較し、最も異
なる指標を見つけ出す工程計画値分析手段5cおよびこ
の工程計画値分析手段5cの分析結果に基づき、最も異
なる指標と開発計画データベース2の当該指標に関連す
るデータとを読み出して出力装置6に表示する分析結果
出力手段5d等からなっている。
The planning problem extraction processing main unit 5 reads the problem extraction program stored in the storage medium 4 and implements the following processing means and functions.
Specifically, upon receiving data of the development project summary description and process / plan values, which are initial development plan data input from the input device 1, the development plan database 2 sequentially enters areas based on a predetermined format. The initial development plan creating means 5a to be stored, and among the initial development plans of the development plan database 2 created by the initial development plan creating means 5a, the largest input cost among the input costs which are the key of the process / plan values. A step washing means 5b for washing out the step, a step of comparing the index of the step washed out by the step washing means 5b with the index of the same step stored in the standard development plan database 3, and finding the most different index Based on the plan value analysis means 5c and the analysis results of the process plan value analysis means 5c, the most different indices and development plans Reads the data related to the index of the database 2 are made of the analysis result output unit 5d for displaying on the output device 6.

【0026】次に、以上のようなシステムの動作ないし
記憶媒体4に記憶されるプログラムの処理手順につい
て、図3を参照して説明する。
Next, the operation of the above system or the processing procedure of the program stored in the storage medium 4 will be described with reference to FIG.

【0027】本システムによる初期開発計画の問題洗出
しに先立ち、熟練者,管理者により工程項目単位である
<設計>、<製造>、<テスト>、…ごとに工程・計画
値のキーとなる投入コストに対しペアとなる品質指標や
生産指標等の標準値を標準開発計画データベース3に設
定することにより、標準開発計画のデータベースを作成
する。また、開発担当者が必要事項を標準開発計画デー
タベース3に設定し、管理者の承認を得る形式で標準開
発計画データベース3を作成してもよい。
Prior to the problem identification of the initial development plan by the present system, the key of the process / plan value for each <design>, <manufacturing>, <test>,. A standard development plan database is created by setting standard values such as a quality index and a production index that are paired with the input cost in the standard development plan database 3. Alternatively, the development staff may set necessary items in the standard development plan database 3 and create the standard development plan database 3 in a format that obtains the approval of the administrator.

【0028】以上の状態において、システムの動作が開
始すると、記録媒体4に記憶される問題抽出用プログラ
ムを読み取り、図3に示す一連の処理手段ないし機能を
実現する。すなわち、CPUで構成される計画問題抽出
処理本体部5は、問題抽出用プログラムに基づいて、図
示しないバッファメモリなどに不必要なデータが格納さ
れていればそのデータを削除し、プログラムの処理上必
要なデータがあればそのデータを読み出してバッファメ
モリなどに保存する初期化処理を実施する(S1)。
In the above state, when the operation of the system is started, a problem extracting program stored in the recording medium 4 is read, and a series of processing means and functions shown in FIG. 3 are realized. That is, based on the problem extracting program, the planning problem extracting process main unit 5 configured by the CPU deletes unnecessary data stored in a buffer memory or the like (not shown) or the like, and executes the processing of the program. If there is necessary data, an initialization process for reading the data and storing it in a buffer memory or the like is performed (S1).

【0029】しかる後、初期開発計画作成手段5aは、
入力装置1から初期開発計画データが入力されているか
否かを判断し、入力有りと判断されたとき、例えば入力
順序または各識別コードのもとに初期開発計画データを
判断し、所定のエリアに開発プロジェクトの概要説明を
記述し、さらに表形式化された工程の各項目と計画値の
各項目との交差エリアに必要なデータを順次書き込んで
いくことにより、図2に示すような開発計画データベー
スを作成する(S2〜S4:初期開発計画作成機能)。
Thereafter, the initial development plan creating means 5a
It is determined whether or not the initial development plan data is input from the input device 1, and when it is determined that there is an input, the initial development plan data is determined based on, for example, an input order or each identification code, and is determined in a predetermined area. The development plan database as shown in FIG. 2 is written by describing the outline of the development project and sequentially writing necessary data in the intersection area between each item of the tabulated process and each item of the plan value. Is created (S2 to S4: initial development plan creation function).

【0030】因みに、初期開発計画は、製品開発に際
し、設計工程では、10人月(例えば設計期間3ヶ月間
に10人要する)投入コスト計画値、設計試験(ウォー
クスルー:WT)4時間,指標件数100件等の品質指
標計画値、200ページの生産指標計画値等からなる計
画を作成し、また製造工程では、15人月の投入コスト
計画値、製造試験数200件の場合には不具合20件等
の品質指標計画値、800ステップの生産指標計画値か
らなる計画を作成し、テスト工程においても同様の要領
で作成する。
Incidentally, in the initial development plan, in the product development, in the design process, an input cost plan value of 10 man months (for example, 10 people are required for a design period of 3 months), a design test (walk-through: WT) 4 hours, an index A plan consisting of a quality index plan value of 100 cases, etc., a production index plan value of 200 pages, etc. is created. In the manufacturing process, an input cost plan value of 15 man-months, and if the number of production tests is 200, a defect 20 A plan including a quality index plan value of an item and a production index plan value of 800 steps is created, and is created in a similar manner in a test process.

【0031】以上のようにして初期開発計画を作成した
後、工程洗出し手段5bを実行する。この工程洗出し手
段5bは、問題抽出のための工程・計画値キーの入力有
無を判断する。本実施の形態では、投入コストがキーと
なっている。ここで、工程・計画値キーが入力されたと
判断したとき、投入コストに対応する各工程の大小関係
等について比較し、各工程の中で投入コストの一番大き
い工程を洗い出すか、或いは投入コストの大きい順番の
工程名またはそれに類する識別データをバッファメモリ
等に保存する(S5,S6:工程洗出し機能)。ここで
は、投入コストの各工程の中で一番大きい工程は、15
人月を要する製造工程を洗い出すことができる。
After the initial development plan is created as described above, the process cleaning means 5b is executed. The process identification means 5b determines whether or not a process / plan value key for problem extraction has been input. In the present embodiment, the input cost is the key. Here, when it is determined that the process / plan value key has been input, the magnitude relation of each process corresponding to the input cost is compared, and the process having the largest input cost among the processes is identified or the input cost is determined. Is stored in a buffer memory or the like (S5, S6: process identification function). Here, the largest step among the steps of the input cost is 15
Manufacturing processes that require man-hours can be identified.

【0032】さらに、計画問題抽出処理本体部5は工程
計画値分析手段5cを実行する。この工程計画値分析手
段5cは、ステップS6において一番大きい工程の洗出
しにより製造工程を取り出したので、この初期開発計画
の製造工程に関する品質指標,生産指標と標準開発計画
データベース3に記憶される既に標準値とされている製
造工程の品質指標,生産指標とをそれぞれ比較し、最も
異なる指標が何れの指標であるかを分析する(S7:工
程計画値分析機能)。ここでは、初期開発計画における
製造工程に対応する品質指標の200件と標準開発計画
の<製造>に対応する品質指標の2000件との間に差
が最も大きいことから、その標準開発計画の標準品質指
標と差分とを洗い出し、バッファメモリ7などに保存す
る。
Further, the planning problem extraction processing main unit 5 executes a process plan value analyzing means 5c. Since the process plan value analysis means 5c extracts the manufacturing process by washing out the largest process in step S6, it is stored in the quality index, the production index, and the standard development plan database 3 relating to the manufacturing process in the initial development plan. The quality index and the production index of the manufacturing process, which have already been set as standard values, are compared with each other, and which index is the most different is analyzed (S7: process plan value analysis function). Here, since the difference between the 200 quality indices corresponding to the manufacturing process in the initial development plan and the 2000 quality indices corresponding to <manufacture> in the standard development plan is the largest, the standard The quality index and the difference are identified and stored in the buffer memory 7 or the like.

【0033】引き続き、計画問題抽出処理本体部5は分
析結果出力手段5dを実行する。この分析結果出力手段
5dでは、ステップS7において標準品質指標を取り出
した後、開発計画データベース2から該当プロジェクト
の概要説明、初期開発計画における製造工程の投入コス
ト,品質指標,生産指標およびバッファメモリに格納さ
れている標準品質指標、差分等を読み出し、出力装置6
に表示する(S8:分析結果出力機能)。なお、このと
き、標準開発計画の製造工程全部のデータを表示しても
よい。
Subsequently, the planning problem extraction processing main unit 5 executes the analysis result output means 5d. In the analysis result output means 5d, after extracting the standard quality index in step S7, the outline description of the project concerned from the development plan database 2, the input cost of the manufacturing process in the initial development plan, the quality index, the production index and the buffer memory are stored. Read out the standard quality index, the difference, etc.
(S8: analysis result output function). At this time, data of all the manufacturing processes in the standard development plan may be displayed.

【0034】以上のようにして投入コストの最も大きい
製造工程データと標準開発計画の該当製造工程の中で最
も指標差の大きい指標を取り出し出力装置6に表示する
ので、調査/承認を与える管理者はその表示される投入
コストの最も大きい製造工程データが標準開発計画や過
去の経験,知識等に基づいて妥当か否かを判断し、変更
を必要とする場合にはやり直し或いは変更値を開発担当
者等に通知するとか、開発計画データベース2の該当個
所を変更するとか、或いは別途開発計画変更データベー
ス(後記する図5参照)に変更された開発計画を格納す
る。
As described above, the manufacturing process data with the largest input cost and the index having the largest index difference among the corresponding manufacturing processes in the standard development plan are taken out and displayed on the output device 6, so that the administrator who gives investigation / approval is given. Determines whether the displayed manufacturing process data with the largest input cost is appropriate based on the standard development plan, past experience, knowledge, etc., and if a change is required, redo or change the value. The changed development plan is stored in the development plan database 2 (see FIG. 5 described later).

【0035】なお、以上のように一連の処理を実行した
後、次に投入コストの大きい工程について同様に問題洗
出しを行う必要があるか否かを判断し(S9)、必要有
りの場合にはステップS6に戻り、次に大きい工程を取
り出し、同様の処理を繰り返し実行する(S6〜S
8)。
After executing a series of processes as described above, it is determined whether or not it is necessary to perform problem identification for a process having the next largest input cost (S9). Returns to step S6, takes out the next largest process, and repeatedly executes the same processing (S6 to S6).
8).

【0036】従って、以上のような実施の形態によれ
ば、調査/承認を与える管理者等が投入コストを工程・
計画値キーとして入力指示することにより、投入コスト
の最も大きい初期開発計画の工程を洗出し、引き続き、
初期開発計画の工程に対応する標準開発計画の該当工程
の中で何れの標準指標との間で差分が大きいかを判断
し、出力装置6に表示するので、その表示結果から前述
するように製造時の試験数が極端に少ないことが容易に
把握でき、またプロジェクトの概要説明も同時に表示さ
れるので、開発担当者等が各問題工程の開発計画データ
についてわざわざ゛説明することなく容易にプロジェク
トの内容を把握でき、開発担当者に適切な助言ないし指
示を与えることが可能となる。
Therefore, according to the above-described embodiment, the administrator or the like who gives the investigation / approval can reduce the input cost by the process / process.
By inputting as a plan value key, the process of the initial development plan with the highest input cost is identified,
It is determined which of the standard indices in the corresponding process of the standard development plan corresponding to the process of the initial development plan has a large difference, and the result is displayed on the output device 6. It is easy to grasp that the number of tests at the time is extremely small, and a summary of the project is also displayed at the same time, so that the development staff etc. can easily understand the project without having to explain the development plan data for each problem process. The contents can be grasped, and appropriate advice or instructions can be given to the developers.

【0037】また、本システムは、過去の経験値等のノ
ウハウをもとに標準開発計画データベース3に標準開発
計画を保存するので、初期開発計画の特徴を容易に洗出
しでき、しかもそれぞれ異なるノウハウをもつ管理者ご
との判断の質に差が出るような問題もなくなり、開発計
画の均質化を図ることができる。さらに、人間系の判断
に頼らずにもっとも不合理な初期開発計画の工程を自動
的に洗い出し、標準開発計画の該当工程とともに出力す
るので、迅速に妥当性の検証を行うことが可能であり、
現実的なレビューが可能となる。
Further, since the present system stores a standard development plan in the standard development plan database 3 based on know-how such as past experience values, the features of the initial development plan can be easily identified, and different know-hows can be obtained. There is no problem that the quality of the judgment of each manager having a difference is made, and the development plan can be homogenized. Furthermore, the most irrational process of the initial development plan is automatically identified without relying on human judgment, and output together with the corresponding process of the standard development plan, so that the validity can be quickly verified.
Realistic reviews are possible.

【0038】なお、一般的には、開発担当者等において
初期開発計画を作成した後、直ちに調査/承認を与える
管理者等が問題抽出処理を実施することは希であって、
初期開発計画を作成した後、比較的早い適宜な時間帯に
問題抽出処理を実施する場合が多い。従って、記憶媒体
4には、ステップS5から動作が開始するようなプログ
ラムを記憶しておけば、管理者等による承認等の処理が
円滑に行うことができる。
In general, it is rare for a manager or the like who immediately gives an investigation / approval to execute a problem extraction process immediately after the initial development plan is created by a developer or the like.
After the initial development plan is created, the problem extraction process is often performed at an appropriate time period relatively early. Therefore, if a program that starts the operation from step S5 is stored in the storage medium 4, processing such as approval by an administrator or the like can be performed smoothly.

【0039】また、上記実施の形態では、工程・計画値
のキーに投入コストを使用したが、この投入コストに代
えて品質指標,生産指標その他の項目を用いてもよい。
In the above embodiment, the input cost is used as the key of the process / plan value. However, a quality index, a production index, and other items may be used instead of the input cost.

【0040】(第2の実施の形態)図4は本発明に係わ
る開発承認支援システムの他の実施形態を示す構成図で
ある。なお、同図において図1と同一部分には同一符号
を付し、その部分の詳しい説明は省略する。
(Second Embodiment) FIG. 4 is a block diagram showing another embodiment of the development approval support system according to the present invention. In the figure, the same parts as those in FIG. 1 are denoted by the same reference numerals, and detailed description of those parts will be omitted.

【0041】この実施の形態は、例えばノウハウに基づ
く開発計画変更に伴う開発計画変更データの工程別の問
題洗出しを行う例である。
This embodiment is an example in which a problem is identified for each process in development plan change data accompanying a development plan change based on know-how.

【0042】このシステムは、具体的には、入力装置
1、出力装置6の他、新たに開発計画変更データベース
11、標準開発計画変更データベース12、開発計画変
更に伴う各工程の問題抽出用プログラムを記憶する記憶
媒体13およびこの記憶媒体4に記憶される問題抽出用
プログラムに従って各工程の問題抽出処理を実行する例
えばCPUで構成された計画変更問題抽出処理本体部1
4が設けられている。
Specifically, this system includes, in addition to the input device 1 and the output device 6, a new development plan change database 11, a standard development plan change database 12, and a program for extracting problems in each process accompanying the development plan change. A plan change problem extraction processing main unit 1 configured by, for example, a CPU that executes a problem extraction process of each process according to a storage medium 13 for storing and a problem extraction program stored in the storage medium 4.
4 are provided.

【0043】前記開発計画変更データベース11は、図
5に示すように入力装置1から入力される開発計画変更
データを所定のフォーマットに従って記憶するものであ
って、開発計画変更データには、例えば(1)計画変更
理由、(2)現状工程、(3)修正後の工程計画値など
が挙げられる。
As shown in FIG. 5, the development plan change database 11 stores development plan change data input from the input device 1 in a predetermined format. ) Plan change reason, (2) Current process, (3) Process plan value after correction, and the like.

【0044】(1)計画変更理由としては、予め予想さ
れる複数の変更理由を記述しておき、その中の該当する
変更理由のスペースにマークを付するとか、或いは変更
理由を直接文章にて記述する場合がある。(2)現状工
程とは、実際に図1ないし図3に示す処理によって問題
抽出された工程等であって、例えば「製造工程」とか
「製造中」などの記述が現状工程に相当する。また、
(3)修正後の工程計画値とは、図2に示す開発計画デ
ータベース2の工程計画値をもとに変更を施した工程計
画値であって、開発計画データベース2とは別に変更専
用の開発計画変更データベース11の該当工程・計画値
エリアに作成される。
(1) As the plan change reason, a plurality of expected change reasons are described in advance, and a space for the corresponding change reason is put in the space, or the change reason is directly described in a sentence. May be described. (2) The current process is a process or the like actually extracted by the processing shown in FIGS. 1 to 3, and a description such as “manufacturing process” or “under manufacturing” corresponds to the current process. Also,
(3) The modified process plan values are process plan values changed based on the process plan values in the development plan database 2 shown in FIG. It is created in the corresponding process / plan value area of the plan change database 11.

【0045】前記標準開発計画変更データベース12
は、予め過去の知識,経験のもとに、多少問題を抱えな
がら図1、図2の標準開発計画データベース3が作成さ
れることから、図3の問題抽出処理過程または当該標準
開発計画のもとにプログラムを含む製品の開発が行われ
た結果、不具合が生じたり、最適な結果が得られないと
か、その他種々の要求を達成する必要から、ノウハウと
して標準開発計画の変更に特化したデータベースであっ
て、図1,図2と同様に各工程単位,つまり<設計>、
<製造>、<テスト>ごとに標準となる投入コストと同
じく標準となる品質指標,生産指標,その他の指標とが
ペアの形で作成される。
The standard development plan change database 12
Since the standard development plan database 3 of FIGS. 1 and 2 is created with some problems based on past knowledge and experience in advance, the problem extraction process shown in FIG. As a result of the development of products including programs, problems occur, optimal results cannot be obtained, and various other requirements must be met, so a database specialized in changing standard development plans as know-how As in FIGS. 1 and 2, each process unit, that is, <design>,
For each of <manufacturing> and <test>, a standard quality index, a production index, and other indexes as well as standard input costs are created in pairs.

【0046】前記記憶媒体13は、図1に示す記憶媒体
4と同様のものが使用され、その具体的な一連の問題抽
出用プログラムは後記する。
The storage medium 13 is the same as the storage medium 4 shown in FIG. 1, and a specific series of problem extracting programs will be described later.

【0047】前記計画変更問題抽出処理本体部14は、
記憶媒体13に記憶される問題抽出用プログラムを読み
取って次のような処理手段ないし機能を実現するもので
あり、入力装置1から入力される開発計画変更データ,
例えば計画変更理由、現状工程、変更後の工程・計画値
等のデータを受けると、開発計画変更データベース11
の予め定める所定のフォーマットのエリアに順次記憶し
ていく開発計画変更データベース作成手段14a、現状
工程の投入コストに相当するデータベース11,12相
互の指標の中から最も差分の大きい指標を洗出す現状工
程指標洗出し手段14b、次以降の工程の有無を判断し
ながら同様に差分の大きい指標を順次洗い出す次工程順
指標洗出し手段14cおよび前記洗出し手段14b,1
4cにより洗い出された問題指標その他所要のデータを
出力装置6に出力する問題指標出力手段14dとが設け
られている。
The plan change problem extraction processing main unit 14
By reading the problem extraction program stored in the storage medium 13, the following processing means or functions are realized, and the development plan change data input from the input device 1,
For example, upon receiving data such as a plan change reason, a current process, and a process / plan value after the change, the development plan change database 11
A development plan change database creating means 14a for sequentially storing in the area of a predetermined format which is predetermined the database 11 and 12 corresponding to the input cost of the current process. The index washing means 14b, the next-step order index washing means 14c, and the washing means 14b, 1 which sequentially wash the indices having a large difference while judging the presence or absence of the next and subsequent steps.
A problem index output unit 14d for outputting the problem index identified by 4c and other necessary data to the output device 6 is provided.

【0048】次に、以上のようなシステムの動作ないし
記憶媒体13に記憶されるプログラムの処理手順につい
て、図6を参照して説明する。
Next, the operation of the above system or the processing procedure of the program stored in the storage medium 13 will be described with reference to FIG.

【0049】本システムによる開発計画データデータベ
ース11の計画変更問題洗出しに先立ち、第1の実施の
形態で説明するごとく、予め標準開発計画変更データを
標準開発計画変更データベース12に設定し、標準開発
計画変更データベースを作成する。
Prior to identifying a plan change problem in the development plan data database 11 by this system, as described in the first embodiment, standard development plan change data is set in the standard development plan change database 12 in advance, and standard development Create a plan change database.

【0050】以上の状態において、システムの動作が開
始すると、記録媒体13に記憶される問題抽出用プログ
ラムを読み取り、図6に示す一連の処理手段ないし機能
を実現する。すなわち、CPUで構成される計画変更問
題抽出処理本体部14は、問題抽出用プログラムに基づ
いて初期化処理を実施した後(S11)、開発計画変更
データベース作成手段14aを実行する。
In the above state, when the operation of the system starts, the program for problem extraction stored in the recording medium 13 is read, and a series of processing means and functions shown in FIG. 6 are realized. That is, the plan change problem extraction processing main unit 14 configured by the CPU executes the initialization process based on the problem extraction program (S11), and then executes the development plan change database creating means 14a.

【0051】この開発計画変更データベース作成手段1
4aは、入力装置1から開発計画変更データが入力され
ているか否かを判断し、入力有りと判断されたとき、例
えば入力順序または各識別コードのもとに開発計変更デ
ータを判断し、所定のエリアに計画変更理由、現状工程
をマーキングまたは記述し、さらに表形式化された工程
の各項目と計画値の各項目との交差エリアに必要なデー
タを順次書き込んでいくことにより、図5に示すような
開発計画変更データベース11を作成する(S12〜S
14:開発計画変更データベース作成機能)。
This development plan change database creating means 1
4a determines whether or not development plan change data is input from the input device 1, and when it is determined that there is an input, for example, determines the development plan change data based on the input order or each identification code, and By marking or describing the reason for changing the plan and the current process in the area indicated by, and sequentially writing necessary data in the intersection area between each item of the tabulated process and each item of the planned value, FIG. Create the development plan change database 11 as shown (S12-S
14: Development plan change database creation function).

【0052】以上のようにして開発計画変更データベー
スを作成した後、現状工程指標洗出し手段14bを実行
する。この現状工程順指標洗出し手段14bは、現状工
程を参照し、当該現状工程である製造工程の投入コスト
(20人月)に関する品質指標/生産指標と、標準開発
計画変更データベース12に既に標準変更値として保存
されている製造工程の20人月に相当する品質指標/生
産指標とを比較し、その差分がもっとも大きい指標を洗
い出す(S16)。因みに、両データベース11,12
の投入コストの等しい20人月では、一方のデータベー
ス11の品質指標では試験数200件、他方のデータベ
ース12の品質指標では試験数2000件であり、差分
の最も大きい問題指標が品質指標の試験数となる。
After the development plan change database is created as described above, the current process index identification means 14b is executed. The current process order index identification means 14b refers to the current process and changes the quality index / production index relating to the input cost (20 man months) of the manufacturing process, which is the current process, and the standard development plan change database 12 to the standard. The quality index / production index corresponding to 20 man-months of the manufacturing process stored as the value is compared, and the index having the largest difference is identified (S16). By the way, both databases 11, 12
In the case of 20 man-months with the same input cost, the number of tests in the quality index of one database 11 is 200 and the number of tests in the quality index of the other database 12 is 2000, and the problem index having the largest difference is the number of tests of the quality index. Becomes

【0053】引き続き、次工程順指標洗出し手段14c
を実行する。この次工程順指標洗出し手段14cは、現
状工程における問題指標の洗出し後、次工程が存在する
か否かを判断し(S17)、存在する場合にはステップ
S16に移行し、同様の処理を繰り返すことにより、工
程別の問題となる開発計画指標を洗い出す(S16,S
17:次工程順指標洗出し機能)。因みに、製造工程の
次工程としては<テスト>工程であり、両者を比較する
と、修正された一方のステップ数が50、他方のステッ
プ数が100であることから、テスト工程における差分
の最も大きい問題指標が生産指標の修正ステップ数とな
る。
Subsequently, the next process order index washing means 14c
Execute The next step order index identification means 14c determines whether or not the next step is present after the identification of the problem index in the current step (S17), and if so, proceeds to step S16 and performs the same processing. Is repeated to identify development plan indicators that are problematic for each process (S16, S16)
17: next process order index washing function). By the way, the <test> process is the next process after the manufacturing process. When both processes are compared, the number of modified steps is 50 and the number of the other steps is 100. The index is the number of correction steps of the production index.

【0054】以上のように各工程の問題指標が洗い出す
と、開発計画変更データベース11の例えば計画変更理
由、現状工程とともに工程順の問題指標を順次出力装置
6に表示するか、或いは各工程の問題指標を順次図示し
ないバッファメモリ等に格納した後、次以降の全工程の
洗出し完了後、開発計画変更データベース11の例えば
計画変更理由、現状工程を読み出し、バッファメモリ等
に格納されている各工程の問題指標とともに出力装置6
に表示する(S18,S19:問題指標出力機能)。
When the problem index of each process is identified as described above, the problem index in the order of the process is sequentially displayed on the output device 6 together with the reason for the plan change and the current process in the development plan change database 11, or the problem of each process is changed. After the indices are sequentially stored in a buffer memory or the like (not shown), after all the subsequent processes have been identified, for example, the plan change reason and the current process in the development plan change database 11 are read out, and each process stored in the buffer memory or the like is read out. Output device 6 with the problem index of
(S18, S19: problem index output function).

【0055】従って、以上のような実施の形態によれ
ば、変更された開発計画及び標準開発計画に基づき、現
状工程から順次次工程に品質指標/生産指標等について
両者を比較し、差分の大きい指標を洗出し、計画変更理
由、現状工程とともに出力するので、例えば調査/承認
を行う管理者は、以上の出力内容から例えば現状工程で
ある製造段階では変更された開発計画の中の試験数が少
ないとか、次工程のテスト段階では修正されたステップ
数の見積りが甘いことが容易に把握でき、開発担当者に
適切な指示を出すことができる。
Therefore, according to the above-described embodiment, based on the changed development plan and the standard development plan, the quality index / production index and the like are sequentially compared from the current process to the next process, and the difference is large. Since the indicators are identified and output together with the plan change reason and the current process, for example, the administrator who conducts investigation / approval, based on the above output contents, can determine, for example, the number of tests in the development plan that has been changed at the manufacturing stage, which is the current process. In the test stage of the next process, it is easy to grasp that the estimated number of corrected steps is poor, and it is possible to give appropriate instructions to the developer.

【0056】また、一般に抜けやすい次工程以降の各計
画見積りの問題点も明らかになり、調査/承認者が各工
程全般にわたって問題部分を容易に認識することができ
る。
In addition, the problems of each plan estimation after the next process, which are generally easy to escape, are also clarified, and the investigator / approver can easily recognize the problem portion over each process.

【0057】なお、一般的には、開発担当者等において
開発計画変更データベース11および標準開発計画変更
データベース12を作成した後、比較的早い適宜な時間
帯に工程問題抽出処理を実施する場合が多い。従って、
記憶媒体4には、ステップS15から動作が開始するよ
うなプログラムを記憶しておけば、管理者等による調査
/承認等の処理のみを円滑に行うことができる。
Incidentally, in general, after the development staff or the like creates the development plan change database 11 and the standard development plan change database 12, the process problem extraction processing is often performed at an appropriate time zone relatively early. . Therefore,
If a program that starts the operation from step S15 is stored in the storage medium 4, only processing such as investigation / approval by an administrator or the like can be performed smoothly.

【0058】また、この実施の形態は、開発計画及び標
準開発計画の変更のみについて各工程の問題点を洗い出
すようにしたが、図1と図4とを組み合わせて使用して
もよい。例えば開発計画データベース2、標準開発計画
データベース3と開発計画変更データベース11、標準
開発計画変更データベース12とを設け、CPUで構成
される問題抽出処理部5,14を1つとし、異なる記録
媒体4,13を選択的に用いることにより、初期開発計
画および変更された開発計画の承認等を容易に行うこと
ができる。
Further, in this embodiment, the problem of each process is identified only for the change of the development plan and the standard development plan. However, FIG. 1 and FIG. 4 may be used in combination. For example, a development plan database 2, a standard development plan database 3, a development plan change database 11, and a standard development plan change database 12 are provided. By selectively using 13, it is possible to easily approve the initial development plan and the changed development plan.

【0059】(第3の実施の形態)図7は本発明に係わ
る開発承認支援システムの他の実施形態を示す構成図で
ある。なお、同図において図1,図4と同一部分には同
一符号を付し、その部分の詳しい説明は省略する。
(Third Embodiment) FIG. 7 is a block diagram showing another embodiment of the development approval support system according to the present invention. In this figure, the same parts as those in FIGS. 1 and 4 are denoted by the same reference numerals, and detailed description of those parts will be omitted.

【0060】この実施の形態は、開発計画変更理由別の
各工程計画値(修正版)の標準値決定を支援するために
有効なデータを作成する例である。
This embodiment is an example in which effective data is created to support the standard value determination of each process plan value (modified version) for each development plan change reason.

【0061】このシステムは、入力装置1、開発計画変
更データベース11および出力装置6の他、開発計画実
績データベース21、ノウハウ抽出用プログラムを記憶
する記憶媒体22およびCPUで構成される計画変更ノ
ウハウ抽出処理本体部23が設けられている。
This system includes a development plan change database 11 and an output device 6, a development plan result database 21, a storage medium 22 for storing a know-how extracting program, and a CPU for planning change know-how extraction. A main body 23 is provided.

【0062】前記開発計画変更データベース11は、第
2の実施の形態で説明された内容に譲る。
The contents of the development plan change database 11 are the same as those described in the second embodiment.

【0063】前記開発計画実績データベース21は、各
プロジェクトの開発完了後のノウハウである各工程の実
績データが例えばデータベース2,11,12の何れか
のデータ配列構成をとるフォーマットによって作成され
ている。
The development plan result database 21 is created in a format in which the result data of each process, which is know-how after completion of the development of each project, has a data array configuration of any of the databases 2, 11, and 12, for example.

【0064】前記計画変更ノウハウ抽出処理本体部23
は、開発計画変更データベース11に保存される各プロ
ジェクトの開発計画変更データに存在する計画変更理由
別の変更回数を算出し、例えば変更回数の多い順に計画
変更理由を並べ替える変更理由別ソート手段23a、こ
の理由別ソート手段23aによって並べ替えられた計画
変更理由のうち1つの計画変更理由が指定されたとき、
開発計画変更データベース11から当該計画変更理由を
もつプロジェクト一覧の工程別開発計画変更データ及び
開発計画実績データベース21の当該プロジェクト一覧
の工程別開発計画実績データを取り出すデータ一覧取出
し手段23b、このデータ一覧取出し手段23bによっ
て取り出されたプロジェクト一覧の各工程別開発計画デ
ータ,実績データのうち、何れか一方または両方のデー
タを用いて、例えばデータベース12と同様なスキーマ
の形で工程別の平均値を算出する平均値算出手段23
c、この平均値算出手段23cにより算出される理由別
・工程別平均値を出力装置6に出力する理由別平均値出
力手段23dが設けられている。
The plan change know-how extraction processing main body 23
Calculates the number of changes for each plan change reason existing in the development plan change data of each project stored in the development plan change database 11, and sorts the plan change reasons in descending order of the number of changes, for example, the sort means 23a. When one of the plan change reasons rearranged by the reason sorting means 23a is designated,
Data list extracting means 23b for extracting the development plan change data for each process of the project list having the plan change reason from the development plan change database 11 and the development plan actual data for each process of the project list in the development plan actual database 21; Using one or both of the development plan data and actual data for each process in the project list extracted by the means 23b, an average value for each process is calculated in the form of a schema similar to the database 12, for example. Average value calculation means 23
c, a reason-specific average value output means 23d for outputting the average value for each reason / process calculated by the average value calculation means 23c to the output device 6 is provided.

【0065】次に、以上のようなシステムの動作ないし
記憶媒体22に記憶されるプログラムの処理手順につい
て、図8を参照して説明する。
Next, the operation of the above system or the processing procedure of the program stored in the storage medium 22 will be described with reference to FIG.

【0066】先ず、動作が開始すると、計画変更ノウハ
ウ抽出処理本体部23は、記憶媒体22からノウハウ抽
出用プログラムを読み取ってバッファメモリ26に記憶
した後、変更理由別ソート手段23aを実行する。この
変更理由別ソート手段23aは、入力装置1から変更理
由別ソートの入力指示有りかを判断し、指示有りの場合
には開発計画変更データベース11に保存される各プロ
ジェクトの開発計画変更データに付されている計画変更
理由別を計数し、計画変更の最も多い計画変更理由の順
番に並び替えて出力装置6に表示する(S21〜S2
3:変更理由別ソート機能)。
First, when the operation is started, the plan change know-how extraction processing main unit 23 reads the know-how extracting program from the storage medium 22 and stores it in the buffer memory 26, and then executes the sorting means 23a for each change reason. The sort-by-change reason sorting unit 23a determines whether there is an input instruction for sorting by change reason from the input device 1, and if there is an instruction, attaches to the development plan change data of each project stored in the development plan change database 11. The planned change reasons are counted, the plan change reasons having the largest plan change are rearranged and displayed on the output device 6 (S21 to S2).
3: Sorting function by change reason).

【0067】以上のようにして出力装置6に計画変更理
由を表示した後、データ一覧取出し手段23bは、入力
装置1から何れか1つの計画変更理由が指定されたか否
かを判断し、指定有りの場合には当該指定された変更理
由により変更された開発計画変更データベース11に記
憶される各プロジェクト一覧の工程別開発計画変更デー
タと開発計画実績データベース21に記憶される同一プ
ロジェクト一覧または関連プロジェクト一覧の工程別実
績データを順次読出し、バッファメモリ26に記憶する
(S24,S25:データ一覧取出し機能)。
After displaying the plan change reason on the output device 6 as described above, the data list extracting means 23b determines whether any one of the plan change reasons has been designated from the input device 1 and there is designation. In the case of, the development plan change data for each process of each project list stored in the development plan change database 11 changed for the designated reason for change and the same project list or the related project list stored in the development plan actual database 21 Are sequentially read and stored in the buffer memory 26 (S24, S25: data list retrieval function).

【0068】引き続き、計画変更ノウハウ抽出処理本体
部23は、平均値算出手段23cを実行する。この平均
値算出手段23cは、工程別開発計画変更データおよび
工程別実績データのうち、何れか一方または両方を用い
て、工程別の平均値を算出する(S26:平均値算出機
能)。このとき、何れか一方のデータの平均値を算出す
る場合、他方のデータの取出しは不要となる。
Subsequently, the plan change know-how extraction processing main body 23 executes the average value calculating means 23c. The average value calculation unit 23c calculates an average value for each process using one or both of the development plan change data for each process and the actual data for each process (S26: average value calculation function). At this time, when calculating the average value of any one of the data, it is not necessary to take out the other data.

【0069】しかる後、理由別平均値出力手段23d
は、各プロジェクトの理由別・工程別の平均値を例えば
図4に示す標準開発計画変更データベース12と同様の
スキーマの形で出力装置6に表示し(図9参照)、標準
開発計画変更データの決定等のために提供される(S2
7:理由別平均値出力機能)。
Thereafter, the average value output means 23d for each reason is provided.
Displays the average value of each project for each reason and process on the output device 6 in the form of, for example, the same schema as the standard development plan change database 12 shown in FIG. 4 (see FIG. 9). Provided for determination etc. (S2
7: Average value output function for each reason).

【0070】従って、以上のような実施の形態によれ
ば、過去プロジェクトの変更理由別・工程別のデータの
平均値を算出し出力装置6に表示するので、調査/承認
者において開発計画の再検討を行うときの負担を大幅に
低減させるとともに、問題の発生しやすい開発計画変更
に有効に利用でき、ノウハウによる精度の高い標準開発
計画変更データを作成できる。
Therefore, according to the above-described embodiment, the average value of the data for each change reason / process of the past project is calculated and displayed on the output device 6, so that the survey / approver can re-execute the development plan. This greatly reduces the burden of conducting a study, and can be effectively used for changes in development plans that are likely to cause problems, and can create highly accurate standard development plan change data based on know-how.

【0071】なお、本願発明は、上記実施の形態に限定
されるものでなく、その要旨を逸脱しない範囲で種々変
形して実施できる。また、各実施の形態は可能な限り組
み合わせて実施することが可能であり、その場合には組
み合わせによる効果が得られる。さらに、上記各実施の
形態には種々の上位,下位段階の発明が含まれており、
開示された複数の構成要素の適宜な組み合わせにより種
々の発明が抽出され得るものである。例えば問題点を解
決するための手段に記載される全構成要件から幾つかの
構成要件が省略されうることで発明が抽出された場合に
は、その抽出された発明を実施する場合には省略部分が
周知慣用技術で適宜補われるものである。
The present invention is not limited to the above embodiment, but can be variously modified and implemented without departing from the gist thereof. Further, the embodiments can be implemented in combination as much as possible, and in that case, the effect of the combination can be obtained. Furthermore, the above embodiments include various upper and lower stage inventions.
Various inventions can be extracted by appropriately combining a plurality of disclosed components. For example, if an invention is extracted because some constituent elements can be omitted from all the constituent elements described in Means for Solving the Problems, the omitted part may be omitted when implementing the extracted invention. Is appropriately supplemented by well-known conventional techniques.

【0072】[0072]

【発明の効果】以上説明したように本発明によれば、各
プロジェクト開発計画の問題となる工程等を自動的に洗
出して出力するので、調査/承認者が開発担当者等の説
明を受けることなく開発計画の問題を把握できる開発承
認支援システムを提供できる。
As described above, according to the present invention, the process or the like which is a problem in each project development plan is automatically identified and output, so that the investigator / approver receives the explanation from the developer. It is possible to provide a development approval support system that can grasp the problems of the development plan without any problem.

【0073】また、本発明は、問題となる工程等を自動
的に洗い出す処理を行うプログラムを記憶した記憶媒体
を提できる。
Further, the present invention can provide a storage medium storing a program for performing a process of automatically identifying a problematic step or the like.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る開発承認支援システムの一実施
の形態を示す構成図。
FIG. 1 is a configuration diagram showing an embodiment of a development approval support system according to the present invention.

【図2】 図1に示すシステムの具体的な構成を説明す
る図。
FIG. 2 is a view for explaining a specific configuration of the system shown in FIG. 1;

【図3】 図1に示す開発承認支援システムの動作説明
及び記憶媒体のプログラムによる処理を説明する図。
FIG. 3 is an exemplary view for explaining the operation of the development approval support system shown in FIG. 1 and processing by a program in a storage medium.

【図4】 本発明に係わる開発承認支援システムの他の
実施形態を示す構成図。
FIG. 4 is a configuration diagram showing another embodiment of the development approval support system according to the present invention.

【図5】 図4に示すシステムの具体的な構成を説明す
る図。
FIG. 5 is a view for explaining a specific configuration of the system shown in FIG. 4;

【図6】 図4に示す開発承認支援システムの動作説明
及び記憶媒体のプログラムによる処理を説明する図。
6 is an exemplary view for explaining the operation of the development approval support system shown in FIG. 4 and the processing by a program in a storage medium.

【図7】 本発明に係わる開発承認支援システムの他の
実施形態を示す構成図。
FIG. 7 is a configuration diagram showing another embodiment of the development approval support system according to the present invention.

【図8】 図7に示す開発承認支援システムの動作説明
及び記憶媒体のプログラムによる処理を説明する図。
8 is an exemplary view for explaining the operation of the development approval support system shown in FIG. 7 and processing by a program in a storage medium.

【図9】 本発明による処理結果の出力表示例図。FIG. 9 is an output display example of a processing result according to the present invention.

【符号の説明】[Explanation of symbols]

1…入力装置 2…開発計画データベース 3…標準開発計画データベース 4,13,22…記憶媒体 5…計画問題抽出処理本体部 6…出力装置 11…開発計画変更データベース 12…標準開発計画変更データベース 14…計画変更問題抽出処理本体部 21…開発計画実績データベース 23…計画変更ノウハウ抽出処理本体部 DESCRIPTION OF SYMBOLS 1 ... Input device 2 ... Development plan database 3 ... Standard development plan database 4, 13, 22 ... Storage medium 5 ... Planning problem extraction processing main part 6 ... Output device 11 ... Development plan change database 12 ... Standard development plan change database 14 ... Plan change problem extraction processing main body 21 ... Development plan results database 23 ... Plan change know-how extraction processing main body

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 開発担当者において作成されるプロジェ
クトの工程別開発計画データが記憶される開発計画デー
タ記憶手段と、 前記プロジェクトに関連する標準プロジェクトの工程別
標準開発計画データが記憶される標準開発計画データ記
憶手段と、 外部からの入力指示に基づいて前記工程別開発計画デー
タの中から問題となる工程を洗い出す工程洗出し手段
と、 この工程洗出し手段により洗い出された工程の開発計画
データと前記標準開発計画データ記憶手段に記憶される
同一の工程の標準開発計画データとから問題となる開発
計画データを見つけ出す分析手段とを備えたことを特徴
とする開発承認支援システム。
1. Development plan data storage means for storing project-specific development plan data of a project created by a developer, and standard development for storing process-specific standard development plan data of a standard project related to the project. Plan data storage means, process identification means for identifying a problematic process from the process-specific development plan data based on an externally input instruction, development plan data for the process identified by the process identification means A development approval support system comprising: analysis means for finding problematic development plan data from standard development plan data of the same process stored in the standard development plan data storage means.
【請求項2】 プロジェクトの工程別開発計画データ及
びこのプロジェクトに関連する標準プロジェクトの工程
別標準開発計画データが記憶されるメモリを有し、この
メモリのデータから問題開発計画データを抽出する問題
抽出用プログラムを記憶する記憶媒体であって、 前記問題抽出用プログラムは、 外部からの入力指示を受け、前記工程別開発計画データ
の大小関係から問題となる工程を洗い出す工程洗出し機
能と、この工程洗出し機能により洗い出された問題工程
のうち少なくとも最も大きい問題工程の開発計画データ
と同一工程の前記標準開発計画データとから最も異なる
開発計画データを見つけ出す工程計画値分析機能と、こ
の最も異なる開発計画データを含んで前記メモリから関
連データを読み出して出力する分析結果出力機能とを実
現するコンピュータ読み取り可能な記憶媒体。
2. A problem extraction method comprising: a memory for storing process-specific development plan data of a project and a process-specific standard development plan data of a standard project related to the project; and extracting problem development plan data from the data of the memory. A storage medium for storing an application program, wherein the problem extraction program receives an external input instruction, and identifies a problematic process based on the magnitude relation of the process-specific development plan data; A process plan value analysis function for finding out the most different development plan data from the development plan data of at least the largest problem process among the problem processes identified by the washing function and the standard development plan data of the same process; Analysis result output function for reading and outputting related data from the memory including plan data Computer readable storage medium to implement the.
【請求項3】 開発担当者において作成されるプロジェ
クトの変更理由付き工程別開発計画変更データが記憶さ
れる開発計画変更データ記憶手段と、 前記プロジェクトに関連する標準プロジェクトの工程別
標準開発計画変更データが記憶される標準開発計画変更
データ記憶手段と、 外部からの入力指示を受け、前記変更理由のもとに問題
とされる工程の開発計画変更データと前記標準開発計画
変更データ記憶手段に記憶される同一工程の前記標準開
発計画変更データとから最も大きい問題工程の変更デー
タを洗い出す現状工程変更データ洗出し手段と、 次以降の工程の開発計画変更データと前記標準開発計画
変更データ記憶手段に記憶される同一工程の前記標準開
発計画変更データとから最も大きい問題工程の変更デー
タを洗い出す次工程順変更データ洗出し手段と、 少なくとも前記洗出し手段により洗い出された工程別変
更データを出力する問題データ出力手段とを備えたこと
を特徴とする開発承認支援システム。
3. Development plan change data storage means for storing process-specific development plan change data with a reason for change of a project created by a developer, and standard development plan change data for each process of a standard project related to the project. Is stored in the standard development plan change data storage means and the standard development plan change data storage means for receiving the input instruction from the outside and receiving the input instruction from the outside, Current process change data identification means for identifying the largest problem process change data from the standard development plan change data of the same process, and storing the development plan change data for the next and subsequent processes and the standard development plan change data storage means Next process order to find out the change data of the largest problem process from the standard development plan change data of the same process A development approval support system comprising: a change data identification unit; and a problem data output unit that outputs at least the change data for each process identified by the identification unit.
【請求項4】 プロジェクトの変更理由付き工程別開発
計画変更データ及び当該プロジェクトに関連する標準プ
ロジェクトの工程別標準開発計画変更データが記憶され
るメモリを有し、このメモリのデータから問題工程の変
更データを抽出する問題抽出用プログラムを記憶する記
憶媒体であって、 前記問題抽出用プログラムは、 外部からの入力指示を受け、前記変更理由をもとに問題
とされる工程の開発計画変更データと前記標準開発計画
変更データ記憶手段に記憶される同一工程の前記標準開
発計画変更データとから最も大きい問題工程の変更デー
タを洗い出す現状工程変更データ洗出し機能と、次以降
の工程の開発計画変更データと前記標準開発計画変更デ
ータ記憶手段に記憶される同一工程の前記標準開発計画
変更データとから最も大きい問題工程の変更データを洗
い出す次工程順変更データ洗出し機能と、少なくとも前
記洗出し手段により洗い出された工程別変更データを出
力する問題データ出力機能とを実現するコンピュータ読
み取り可能な記憶媒体。
4. A memory for storing process-specific development plan change data with a reason for changing the project and process-specific standard development plan change data of a standard project related to the project. A storage medium for storing a problem extraction program for extracting data, wherein the problem extraction program receives an external input instruction, and develops a development plan change data of a process which is a problem based on the change reason. A current process change data identification function for extracting the largest problem process change data from the standard development plan change data of the same process stored in the standard development plan change data storage means, and a development plan change data for the next and subsequent processes And the standard development plan change data of the same process stored in the standard development plan change data storage means. And the next step order change data washout function washing out the change data have problems steps, computer-readable storage medium realizes the problem data output function of outputting a step basis change data washed out by at least the washout means.
【請求項5】 請求項1に記載する構成と、この構成の
中の前記分析手段に基づいて変更される前記プロジェク
トの変更理由付き工程別開発計画変更データ及び前記工
程別標準開発計画変更データをもつ請求項3に記載する
構成とを組み合わせたことを特徴とする開発承認支援シ
ステム。
5. The configuration according to claim 1, and the process-specific development plan change data and the process-specific standard development plan change data of the project that are changed based on the analysis means in the configuration. 4. A development approval support system, which is combined with the configuration according to claim 3.
【請求項6】 複数の過去プロジェクトの工程別開発計
画実績データが記憶される実績データ記憶手段と、 各プロジェクトの変更理由付き工程別開発計画変更デー
タが記憶される開発計画変更データ記憶手段と、 この開発計画変更データ記憶手段に記憶される各プロジ
ェクトの工程別開発計画変更データに付される変更理由
の変更回数に応じた変更理由の順にソートし出力する変
更理由別ソート手段と、 この変更理由別ソート手段でソートされた変更理由の1
つを指定し、この指定された変更理由により変更された
前記各プロジェクトの工程別開発計画実績データ及び工
程別開発計画変更データの何れか一方または両方の工程
別データの平均値を算出する平均値算出手段と、 この平均値算出手段によって算出された変更理由別及び
工程別の計画平均値データを出力する平均値出力手段と
を備えたことを特徴とする開発承認支援システム。
6. A result data storage means for storing process-specific development plan result data of a plurality of past projects, a development plan change data storage means for storing process-specific development plan change data with a change reason for each project, A sort means for each change reason for sorting and outputting in the order of change reasons in accordance with the number of times the change reason added to the process-specific development plan change data of each project stored in the development plan change data storage means; One of the reasons for change sorted by another sort means
Average value for calculating one or both of the process-specific development plan actual data and the process-specific development plan change data or the process-specific development plan change data of each of the projects changed for the specified reason. A development approval support system comprising: calculation means; and average value output means for outputting planned average value data for each change reason and each process calculated by the average value calculation means.
【請求項7】 過去の各プロジェクトの変更理由付きの
工程別開発計画変更データおよび過去の各プロジェクト
の開発計画実績データを記憶するメモリを有し、このメ
モリのデータから各工程のデータ平均値を求めるノウハ
ウ抽出用プログラムを記憶する記憶媒体であって、 前記ノウハウ抽出用プログラムは、 前記メモリに記憶される各プロジェクトの工程別開発計
画変更データに付される変更理由の変更回数に応じた変
更理由の順にソートし出力する変更理由別ソート機能
と、この変更理由別ソート機能でソートされた変更理由
の1つの指定を受けたとき、この指定された変更理由に
より変更された前記各プロジェクトの工程別開発計画実
績データ及び工程別開発計画変更データを読み出すデー
タ一覧取出し機能と、この計画変更データ取出し機能に
より取り出されたデータの何れか一方または両方の工程
別データの平均値を算出する平均値算出機能と、この平
均値算出機能によって算出された変更理由別及び工程別
の計画平均値データを出力する平均値出力機能とを実現
するコンピュータ読み取り可能な記録媒体。
7. A memory for storing process-specific development plan change data of each past project with a reason for change and development plan actual data of each past project, and averaging data of each process from the data in this memory. A storage medium storing a know-how extracting program to be sought, wherein the know-how extracting program is a change reason according to the number of changes of a change reason added to process-specific development plan change data of each project stored in the memory. Sort function for sorting and outputting in order of, and when one of the change reasons sorted by this sort function for change reason is specified, for each process of each project changed by this specified change reason A data list extraction function for reading out development plan actual data and development plan change data for each process And an average value calculation function for calculating an average value of data for one or both of the processes extracted by the function, and a planned average value data for each of the reasons for change and for each process calculated by the average value calculation function. A computer-readable recording medium that realizes an average output function.
JP2000281977A 2000-09-18 2000-09-18 Development approval support system and storage medium Pending JP2002091763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000281977A JP2002091763A (en) 2000-09-18 2000-09-18 Development approval support system and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000281977A JP2002091763A (en) 2000-09-18 2000-09-18 Development approval support system and storage medium

Publications (1)

Publication Number Publication Date
JP2002091763A true JP2002091763A (en) 2002-03-29

Family

ID=18766556

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000281977A Pending JP2002091763A (en) 2000-09-18 2000-09-18 Development approval support system and storage medium

Country Status (1)

Country Link
JP (1) JP2002091763A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004001645A1 (en) * 2002-06-19 2003-12-31 World Co., Ltd. Flow management system, flow management method, and information processing program operating on computer
JP2007249572A (en) * 2006-03-15 2007-09-27 Mitsubishi Electric Corp Project management support device, project management support method, and project management support program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0876992A (en) * 1994-09-07 1996-03-22 Toshiba Eng Co Ltd Device and method for evaluation and management of quality of software
JPH08329152A (en) * 1995-06-01 1996-12-13 Hitachi Ltd Method for managing system development system
JPH1166150A (en) * 1997-08-26 1999-03-09 Hitachi Ltd Risk evaluation system
JP2000181960A (en) * 1998-12-16 2000-06-30 Hitachi Ltd Information processing system
JP2000322252A (en) * 1999-05-13 2000-11-24 Mitsubishi Electric Corp Method and device for project management support and computer readable recording medium stored with program for execution of this method on computer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0876992A (en) * 1994-09-07 1996-03-22 Toshiba Eng Co Ltd Device and method for evaluation and management of quality of software
JPH08329152A (en) * 1995-06-01 1996-12-13 Hitachi Ltd Method for managing system development system
JPH1166150A (en) * 1997-08-26 1999-03-09 Hitachi Ltd Risk evaluation system
JP2000181960A (en) * 1998-12-16 2000-06-30 Hitachi Ltd Information processing system
JP2000322252A (en) * 1999-05-13 2000-11-24 Mitsubishi Electric Corp Method and device for project management support and computer readable recording medium stored with program for execution of this method on computer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004001645A1 (en) * 2002-06-19 2003-12-31 World Co., Ltd. Flow management system, flow management method, and information processing program operating on computer
JP2007249572A (en) * 2006-03-15 2007-09-27 Mitsubishi Electric Corp Project management support device, project management support method, and project management support program

Similar Documents

Publication Publication Date Title
Albliwi et al. Critical literature review on maturity models for business process excellence
JPH09504394A (en) System and method for defining a process structure for task execution
JPH03111969A (en) Method for supporting plan formation
JP2002123409A (en) Gui evaluating system, gui evaluating method therefor and recording medium with gui evaluation program recorded thereon
JP2007114819A (en) Business evaluation system
JP2001282965A (en) Team generation support device, team generation support method and recording medium
JP2002091763A (en) Development approval support system and storage medium
Liao et al. An integrated database and expert system for failure mechanism identification: Part II—the system and performance testing
JP2004185346A (en) Method and system for supporting project work
JPH0876992A (en) Device and method for evaluation and management of quality of software
JPH1153391A (en) Database access method
Waltz Group concept mapping
US7797294B2 (en) Method, system and program for testing accessibility in data processing system programs
US8306852B2 (en) System and method of managing change process
Kramer et al. Service identification--An explorative evaluation of recent methods
JP6978997B2 (en) Similar data search method, information retrieval device and program
JPH11282666A (en) Test specification preparing device and storage medium storing test specification preparing program
JPH1027099A (en) Method and device for program generation
JP2001265917A (en) System for supporting estimation evaluation
JP4325476B2 (en) Organization chart editing apparatus and program
Graeber How to select a clinical information system.
JP2007279931A (en) Intensive monitoring process specification support system and improvement process decision support system
JP4405187B2 (en) Dictionary evaluation program, system and method
Maukar et al. Developing a Business Intelligence Dashboard of Liquid Material at a Toy Manufacturing Company using a System Development Life Cycle (SDLC) Model
JP2749657B2 (en) Software quality simulator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070807

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100826

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101026

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110412