JP2002080113A - Method for delivering member, method for management, managing system, and managing server, and recording medium having recorded managing program - Google Patents

Method for delivering member, method for management, managing system, and managing server, and recording medium having recorded managing program

Info

Publication number
JP2002080113A
JP2002080113A JP2000266496A JP2000266496A JP2002080113A JP 2002080113 A JP2002080113 A JP 2002080113A JP 2000266496 A JP2000266496 A JP 2000266496A JP 2000266496 A JP2000266496 A JP 2000266496A JP 2002080113 A JP2002080113 A JP 2002080113A
Authority
JP
Japan
Prior art keywords
distribution base
delivery
base
specific
supplier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000266496A
Other languages
Japanese (ja)
Inventor
Junji Fujita
純司 藤田
Keiji Uchiyama
恵詞 内山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Corp
Original Assignee
Asahi Kasei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Corp filed Critical Asahi Kasei Corp
Priority to JP2000266496A priority Critical patent/JP2002080113A/en
Publication of JP2002080113A publication Critical patent/JP2002080113A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for delivering a member capable of delivering a member to a construction site in time to the starting of construction using the member. SOLUTION: The method for delivering the member comprises a step where the member is dispatched from a member feed source to a physical distribution base situated near construction site, a step wherein the member is temporarily stored at the physical distribution base, and a step wherein the member temporarily stored at the physical distribution base is delivered when it is needed for construction.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば住宅等の施
工に必要な部材を部材供給元から施工現場へ配送する部
材配送方法に関し、さらに、そのような部材配送を管理
するための部材配送管理方法、部材配送管理システム、
部材配送管理サーバ、及び、部材配送管理プログラムを
記録した記録媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a member delivery method for delivering a member required for construction, such as a house, from a member supplier to a construction site, and furthermore, a member delivery management for managing such member delivery. Method, component delivery management system,
The present invention relates to a member delivery management server and a recording medium storing a member delivery management program.

【0002】[0002]

【従来の技術】例えば、住宅施工現場においては、多く
の職種に分れた多くの職人が分担して施工を行う。従
来、施工に必要な部材は、配送業者によって部材メーカ
から施工現場に配送されていた。ここで、配送業者は、
配送効率を考慮して、いくつかの部材をまとめて施工現
場に配送していた。
2. Description of the Related Art For example, at a house construction site, many craftsmen, who are divided into many job types, carry out construction in a shared manner. Conventionally, members required for construction have been delivered from a member maker to a construction site by a delivery company. Here, the delivery company
In consideration of the delivery efficiency, several members were delivered together to the construction site.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、そのよ
うにいくつかの部材をまとめて施工現場に配送していた
のでは、それぞれの部材をタイミング良く施工現場に配
送することは困難であった。
However, if several members are collectively delivered to the construction site as described above, it is difficult to deliver each member to the construction site in a timely manner.

【0004】部材がその部材を用いる工程の開始予定時
よりも早く施工現場に配送された場合には、その部材は
施工現場において在庫となり、部材が使用されるまでの
間、施工現場において部材を管理しなければならなかっ
た。その結果、施工現場の狭い作業スペースがさらに狭
くなってしまうという問題が生じていた。また、施工現
場で保管されている部材が他の作業の妨害となる場合に
は、その都度部材を施工現場内で移動させる必要が生じ
るので無駄な作業が発生し、施工スケジュールの遅延を
招くと共に、コストの上昇を招いていた。さらに、移動
させる部材や他の部材に傷を付けてしまうおそれもあっ
た。
[0004] If a member is delivered to the construction site earlier than the scheduled start of the process using the member, the member is stocked at the construction site, and the member is stored at the construction site until the member is used. Had to manage. As a result, there has been a problem that the narrow work space of the construction site is further reduced. In addition, when a member stored at the construction site interferes with other work, it is necessary to move the member within the construction site each time, so wasteful work occurs, and a delay in the construction schedule is caused. , Which led to higher costs. Further, there is a possibility that a member to be moved or another member may be damaged.

【0005】また、前述のような傷をつけぬ様にすべく
部材に、部材供給元にて段ボール、緩衝パッキン、布な
どでカバーをすることも行われている。そして、実際に
施工する時にカバーを取り外すため、そのカバーは施工
現場でのゴミとなり、産業廃棄物を増加させていた。
[0005] Further, in order to prevent the above-mentioned damage, the member is covered with a cardboard, cushioning packing, cloth or the like at the member supply source. Then, since the cover is removed at the time of actual construction, the cover becomes garbage at the construction site and increases industrial waste.

【0006】一方、部材がその部材を用いる工程の開始
予定時よりも遅く施工現場に配送された場合には、その
工程に従事する職人の作業が止まってしまうこととな
り、やはり施工スケジュールの遅延を招くと共に、コス
トの上昇を招いていた。ここで、その工程に必要な部材
が施工現場にないということを確実に判断できれば、他
の作業を先に行うこともできる。
On the other hand, if the member is delivered to the construction site later than the scheduled start of the process using the member, the work of the craftsman who engages in the process stops, which also delays the construction schedule. In addition, the cost was increased. Here, if it can be reliably determined that there are no members necessary for the process at the construction site, other operations can be performed first.

【0007】しかし、施工現場には、全体の作業の管理
を行う者は通常存在しないので、各職人がその工程に必
要な部材が施工現場にあるか否かを判断することは困難
である。従って、部材が見当たらない場合には、その部
材を探す作業を行わなければならず、結果としてその部
材が無いことが明らかになる場合も多い。このような場
合には、施工現場において無駄な作業時間が発生し、施
工スケジュールの遅延を招くと共に、コストの上昇を招
いていた。
However, since there is usually no person who manages the entire work at the construction site, it is difficult for each craftsman to determine whether or not the members required for the process are present at the construction site. Therefore, when a member is not found, an operation of searching for the member must be performed, and as a result, it is often clear that the member is not present. In such a case, useless work time is generated at the construction site, which causes a delay in the construction schedule and an increase in cost.

【0008】また、部材メーカや建材店から施工現場に
部材が届いたときに、必ずしもその部材に関与する職人
や現場監督がその部材を受け取るとは限らないし、施工
現場においては、部材の受領を確認するシステムがな
い。そのため、施工現場における部材の受領の確認が曖
昧になりがちであった。
When a member arrives at a construction site from a member manufacturer or a building material store, a craftsman or a site supervisor involved in the member does not always receive the member. There is no system to check. Therefore, the confirmation of the receipt of the member at the construction site tends to be ambiguous.

【0009】さらに、施工現場における施工は、一般的
に月曜日から土曜日の朝から夕方まで行われ、天候によ
り不規則に休業となる。一方、部材工場は、月曜日から
金曜日の9時から18時まで稼動し、土曜日、日曜日及
び祝日は規則的に休業となる。従って、例えば、部材工
場で夕方完成した部材をその日に出荷しても、その日の
夜には施工現場に届けることはできない。このような場
合には、その日の夕方完成した部材を翌日の朝の便で発
送し、施工現場への到着は翌日の午後になることが多
い。そのため、その部材を用いる職人の作業が止まって
しまうことになる。
Further, construction at the construction site is generally performed from Monday to Saturday from morning to evening, and is closed irregularly due to weather. On the other hand, the member factory operates from 9:00 to 18:00 from Monday to Friday, and is regularly closed on Saturday, Sunday and public holidays. Therefore, for example, even if a member completed in the evening at the member factory is shipped that day, it cannot be delivered to the construction site that night. In such a case, the components completed in the evening on that day are sent out by a flight in the morning of the next day, and arrival at the construction site is often in the afternoon of the next day. Therefore, the work of the craftsman using the member is stopped.

【0010】そこで、上記の点に鑑み、本発明は、部材
をその部材を用いる工程の開始に合わせて(JIT:Just
In Time)施工現場に配送することができる部材配送方
法を提供することを目的とする。さらに、本発明は、そ
のような部材配送を管理するための部材配送管理方法、
部材配送管理システム、部材配送管理サーバ、部材配送
管理プログラムを記録した記録媒体を提供することを目
的とする。
[0010] In view of the above, the present invention relates to a method in which a member is set at the start of a process using the member (JIT: Just).
In Time) An object of the present invention is to provide a member delivery method that can be delivered to a construction site. Further, the present invention provides a member delivery management method for managing such member delivery,
It is an object of the present invention to provide a member delivery management system, a member delivery management server, and a recording medium on which a member delivery management program is recorded.

【0011】[0011]

【課題を解決するための手段】以上の課題を解決するた
め、本発明の第1の観点に係る部材配送方法は、施工現
場の近傍或は施工業者が車或いは歩いて(以下単に車と
表示する)で容易に立寄れる場所に所在する物流拠点に
部材供給元から部材を発送するステップと、物流拠点に
部材を一時保管するステップと、物流拠点に一時保管さ
れた部材を施工に必要なときに引き渡すステップとを具
備する部材配送方法である。
In order to solve the above-mentioned problems, a member delivery method according to a first aspect of the present invention provides a member delivery method in the vicinity of a construction site or by a construction company walking or walking (hereinafter simply referred to as a car). ), Sending parts from the material supplier to the logistics base located at a place where it can be easily dropped off, temporarily storing the materials at the logistics base, and when the parts temporarily stored at the logistics base are required for construction. And a step of delivering the material to a member.

【0012】また、本発明の第2の観点に係る部材配送
方法は、部材供給元に設置された第1の装置及び施工現
場の近傍或は施工業者が車で容易に立寄れる場所に所在
する物流拠点に設置された第2の装置と管理地点に設置
された第3の装置との間で通信することにより部材の配
送を行う方法であって、部材を部材供給元から特定の物
流拠点に発送するように指示する情報を第3の装置から
第1の装置に送信するステップと、部材を部材供給元か
ら特定の物流拠点に発送するステップと、特定の物流拠
点において部材を受領した旨を通知する情報を第2の装
置から第3の装置に送信するステップと、特定の物流拠
点に部材を一時保管するステップと、特定の物流拠点に
一時保管された部材を、施工に必要なときに引き渡すス
テップとを具備する部材配送方法である。
The member delivery method according to the second aspect of the present invention is located near the first apparatus installed at the member supply source and the construction site or at a place where the construction company can easily drop in by car. A method of delivering a member by communicating between a second device installed at a distribution base and a third device installed at a management point, wherein the member is transferred from a member supplier to a specific distribution base. Sending information instructing to send from the third device to the first device, sending the member from the member supplier to a specific distribution base, and indicating that the member has been received at the specific distribution base. Transmitting the information to be notified from the second device to the third device, temporarily storing the members at a specific logistics base, and transferring the members temporarily stored at the specific logistics base when necessary for construction. Handing over And is a member shipping method.

【0013】さらに、本発明に係る部材配送管理方法
は、部材供給元に設置された第1の装置及び施工現場の
近傍或は施工業者が車で容易に立寄れる場所に所在する
物流拠点に設置された第2の装置と通信することにより
部材の配送を管理する方法であって、部材を部材供給元
から特定の物流拠点に発送するように指示する情報を第
1の装置に送信するステップと、特定の物流拠点におい
て部材を受領した旨を通知する情報を第2の装置から受
信して記録するステップと、特定の物流拠点において部
材を引き渡した旨を通知する情報を第2の装置から受信
して記録するステップとを具備する部材配送管理方法で
ある。
Further, the member delivery management method according to the present invention provides a method for installing a member at a logistics base located near a first device installed at a member supplier and near a construction site or at a place where a contractor can easily drop in by car. A method for managing the delivery of a member by communicating with the second device, wherein the information is transmitted to the first device to instruct the first device to ship the member from a member supplier to a specific distribution base. Receiving and recording information notifying that a member has been received at a specific distribution base from the second device, and receiving information notifying that the member has been delivered at the specific distribution base from the second device And recording.

【0014】また、本発明に係る部材配送管理システム
は、管理地点に設置された装置と部材供給元に設置され
た装置及び物流拠点に設置された装置との間で通信を行
うことにより部材の配送を管理するシステムであって、
管理地点に設置された装置から、部材を特定の物流拠点
に発送するように指示する情報を部材供給元に設置され
た装置に送信するサーバと、特定の物流拠点に設置され
た装置から、特定の物流拠点が部材を受領した旨、及
び、特定の物流拠点において部材を引き渡した旨を通知
する情報をサーバに送信する端末とを具備する部材配送
管理システムである。
In addition, the member delivery management system according to the present invention communicates between the device installed at the management point, the device installed at the material supply source, and the device installed at the distribution base, so that the member is managed. A delivery management system,
From a device installed at the management point, a server that transmits information instructing to send out parts to a specific logistics base to a device installed at the material supply source, and from a device installed at a specific logistics base, And a terminal for transmitting information notifying that the distribution base has received the component and that the component has been delivered at the specific distribution base to the server.

【0015】また、本発明に係る部材配送管理サーバ
は、部材供給元に設置された第1の装置及び施工現場の
近傍或は施工業者が車で容易に立寄れる場所に所在する
物流拠点に設置された第2の装置と通信を行うことによ
り部材の配送を管理するサーバであって、部材を部材供
給元から特定の物流拠点に発送するように指示する発注
情報を第1の装置に送信すると共に、特定の物流拠点が
部材を受領した旨を通知する受領情報、及び、特定の物
流拠点において部材を引き渡した旨を通知する引渡情報
を第2の装置から受信する第1の手段と、第1の手段が
受信した受領情報及び引渡情報を記録する第2の手段と
を具備する部材配送管理サーバである。
Further, the member delivery management server according to the present invention is installed at a logistics base located near the first device installed at the member supplier and near the construction site or at a place where the contractor can easily drop in by car. A server that manages the delivery of members by communicating with the second device, and sends order information to the first device to instruct the first member to ship the members from a member supplier to a specific distribution base. A first means for receiving, from the second device, receipt information notifying that the specific logistics base has received the member, and transfer information notifying that the specific logistics base has transferred the member, A second means for recording the received information and the delivery information received by the first means.

【0016】さらに、本発明に係る部材配送管理プログ
ラムを記録した記録媒体は、部材供給元に設置された第
1の装置及び施工現場の近傍に所在する物流拠点に設置
された第2の装置と通信を行うことにより部材の配送を
管理するためにCPUで読み取り可能な記録媒体であっ
て、部材供給元が特定の物流拠点に部材を発送するよう
に指示する情報を第1の装置に送信する手順と、特定の
物流拠点が部材を受領した旨を通知する情報を第2の装
置から受信して記録する手順と、特定の物流拠点におい
て部材を引き渡した旨を通知する情報を第2の装置から
受信して記録する手順とをCPUに実行させる部材配送
管理プログラムを記録した記録媒体である。
Further, the recording medium recording the member delivery management program according to the present invention includes a first device installed at a member supplier and a second device installed at a distribution base located near a construction site. A recording medium readable by the CPU for managing delivery of members by performing communication, wherein the member supplier sends information to the first apparatus to instruct the first device to ship members to a specific distribution base. A procedure for receiving and recording, from the second device, information notifying that the specific logistics base has received the member, and transmitting the information notifying that the member has been delivered at the specific physical distribution base to the second device. And a recording medium for recording a member delivery management program for causing the CPU to execute the procedure of receiving and recording from the server.

【0017】前述の本発明によれば、施工現場の近傍或
は施工業者が車で容易に立寄れる場所に所在する物流拠
点に部材供給元から部材を配送し、物流拠点に部材を一
時保管し、物流拠点に一時保管された部材を施工に必要
なときに引き渡すことにより、その部材を用いる工程の
開始に合わせて部材を施工現場に配送することができ
る。これにより、施工スケジュールの遅延を防止した
り、コストの上昇を防止することが可能となる。また、
管理地点に設置されたサーバを操作することにより、部
材の発送・受領・引渡しを確認できる特徴を有してい
る。
According to the present invention described above, the members are delivered from the material supply source to the distribution base located near the construction site or at a place where the contractor can easily drop in by car, and the members are temporarily stored in the distribution base. By handing over the members temporarily stored at the distribution base when necessary for construction, the members can be delivered to the construction site at the start of the process using the members. This makes it possible to prevent delays in the construction schedule and prevent an increase in cost. Also,
By operating the server installed at the management point, it has the feature that the sending, receiving, and delivery of members can be confirmed.

【0018】[0018]

【発明の実施の形態】以下、図面に基づいて本発明の実
施の形態について説明する。図1は、本発明の実施形態
に係る部材配送方法を実施するためのシステムを示す説
明図、図2は本発明に係る部材配送方法を示すフローチ
ャートである。本実施形態においては、住宅施工現場に
部材を配送する場合について説明する。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an explanatory diagram showing a system for implementing a member delivery method according to an embodiment of the present invention, and FIG. 2 is a flowchart showing a member delivery method according to the present invention. In the present embodiment, a case where a member is delivered to a house construction site will be described.

【0019】図1に示すように、このシステムは、ネッ
トワーク10にそれぞれ接続された生産拠点端末20
と、物流拠点端末1〜1nと、サーバ30とを含んでい
る。ネットワーク10は、公衆回線網やインターネット
等を含む既存の通信ネットワークである。生産拠点端末
20は、住宅の建設に使用するための部材を生産する工
場等に設置され、部材の発注データの受信や、部材の発
送データの送信等を行う。
As shown in FIG. 1, this system includes a production base terminal 20 connected to a network 10.
, Distribution base terminals 1 to 1n, and a server 30. The network 10 is an existing communication network including a public line network, the Internet, and the like. The production base terminal 20 is installed in a factory or the like that produces members for use in building a house, and performs reception of order data of members, transmission of shipping data of members, and the like.

【0020】物流拠点端末1〜1nは、例えば毎日24
時間営業するコンビニエンスストアやガソリンスタンド
等にそれぞれ設置され、部材の受領データの送信や、部
材の引き渡しデータの送信等を行う。部材の配送を管理
するための管理地点である住宅建設会社等のオフィス等
に設置されたサーバ30は、CPUを含む管理端末31
と、部材配送管理プログラムや各種データを記録するた
めの記録媒体32を有しており、部材の発注データの送
信や、部材の配送データの受信等の部材配送管理を行
う。記録媒体32としては、フロッピー(登録商標)デ
ィスク、ハードディスク、MO、MT、RAM、CDR
OM、DVDROM等が該当する。
The distribution base terminals 1 to 1n are, for example, 24
It is installed in a convenience store, gas station, etc., which is open for hours, and performs transmission of data received from members and transmission of delivery data of members. A server 30 installed in an office or the like of a home construction company or the like, which is a management point for managing the delivery of members, includes a management terminal 31 including a CPU.
And a recording medium 32 for recording a member delivery management program and various data, and performs member delivery management such as transmission of member order data and reception of member delivery data. As the recording medium 32, a floppy (registered trademark) disk, hard disk, MO, MT, RAM, CDR
OM, DVDROM, etc. correspond.

【0021】前記実施例に於ては、物流拠点端末1〜1
nを設置する場所として、コンビニエンスストアとガソ
リンスタンドを例示したが、これ等の外に1日に比較的
長時間に渡って営業している(例えば朝9時から夕方8
時頃迄営業している)倉庫業者、貸倉庫業者等の専業
者、或はホームセンター、建材店、DIY店等の兼業者
にも物流拠点端末1〜1nを設置することが可能であ
る。しかし、以後の具体的実施例は、コンビニエンスス
トアとガソリンスタンドとを使用する例について説明す
る。
In the above embodiment, the distribution base terminals 1 to 1
Although the convenience store and the gas station are illustrated as places where the n is set up, the store is open for a relatively long time a day (for example, from 9 am to 8 pm in the evening).
It is possible to install the distribution base terminals 1 to 1n also in a specialized company such as a warehouse company, a rental warehouse company, or a combined company such as a home center, a building material store, and a DIY store. However, in the following specific embodiments, an example in which a convenience store and a gas station are used will be described.

【0022】次に、本実施形態に係る部材配送方法につ
いて、図1及び図2を参照しながら説明する。まず、サ
ーバ30の作業者は、必要な部材の品番や、その部材の
配送先等を含む発注データをサーバ30に入力する。サ
ーバ30は、入力された発注データを、ネットワーク1
0を介して生産拠点端末20に送信する(ステップS3
01)。生産拠点端末20は、この発注データを受信す
る(ステップS201)。工場では、この発注データに
基づいて部材の生産を開始する。
Next, a member delivery method according to this embodiment will be described with reference to FIGS. First, an operator of the server 30 inputs order data including a part number of a necessary component, a delivery destination of the component, and the like to the server 30. The server 30 transmits the input order data to the network 1
0 to the production base terminal 20 (step S3).
01). The production base terminal 20 receives the order data (step S201). At the factory, the production of components is started based on the order data.

【0023】工場で部材の生産が完了して配送すべき部
材がいくつか集まると、工場の作業者は、配送業者を手
配して、発注データによって指示された配送先にそれぞ
れの部材を発送する(ステップS202)。部材の発送
が完了すると、工場の作業者は、部材の発送が完了した
旨を通知するための発送完了通知データを生産拠点端末
20に入力する。生産拠点端末20は、この発送完了通
知データをサーバ30に送信する(ステップS20
3)。一方、サーバ30は、部材の発送完了通知データ
を受信して記録する(ステップS302)。
When the production of components is completed at the factory and some components to be delivered are collected, the factory worker arranges a delivery company and sends each component to the delivery destination specified by the order data. (Step S202). When the dispatch of the members is completed, the worker of the factory inputs the dispatch completion notification data for notifying that the dispatch of the members has been completed to the production base terminal 20. The production base terminal 20 transmits this shipping completion notification data to the server 30 (step S20).
3). On the other hand, the server 30 receives and records the delivery completion notification data of the member (step S302).

【0024】工場から発送された部材は、発注データに
よって指示されたコンビニエンスストアやガソリンスタ
ンド等の物流拠点に配送され、そこで受領される(ステ
ップS101)。物流拠点の従業員は、受領した部材の
梱包等に付された品番を示すバーコードをバーコードリ
ーダによって読み取ることにより、部材の品番データを
物流拠点に設置されている物流拠点端末1に入力する。
物流拠点端末1は、部材の品番データや、部材を受領し
た時刻を示す時刻データ等を含む受領データをサーバ3
0に送信する(ステップS102)。一方、サーバ30
は、受領データを受信して記録する(ステップS30
3)。
The members dispatched from the factory are delivered to a distribution base such as a convenience store or a gas station specified by the order data, and received there (step S101). The employee of the distribution base reads the bar code indicating the part number attached to the packing or the like of the received member with a bar code reader, and inputs the part number data of the member to the distribution base terminal 1 installed at the distribution base. .
The logistics base terminal 1 transmits the receipt data including the product number data of the member and the time data indicating the time at which the member was received to the server 3.
0 (step S102). On the other hand, the server 30
Receives and records the received data (step S30).
3).

【0025】施工担当者がコンビニエンスストア等の物
流拠点へ部材を受取りに行くと、物流拠点の従業員は、
部材の品番データ、部材の受取人を示すデータ等を物流
拠点端末1に入力する。物流拠点端末1は、部材の品番
データや、部材の受取人を示すデータや、部材の引き渡
し時刻を示す時刻データ等を含む引渡データをサーバ3
0に送信する(ステップS104)。一方、サーバ30
は、引渡データを受信して記録する(ステップS30
4)。
When the construction worker goes to a logistics base such as a convenience store to receive the materials, the employees of the logistics base
The part number data of the member, data indicating the recipient of the member, and the like are input to the distribution base terminal 1. The distribution base terminal 1 transmits the delivery data including the product number data of the component, data indicating the recipient of the component, time data indicating the delivery time of the component, and the like to the server 3.
0 (step S104). On the other hand, the server 30
Receives and records the delivery data (step S30).
4).

【0026】このように、本実施形態においては、部材
を工場から施工現場40〜40nの最寄りのコンビニエ
ンスストアやガソリンスタンド等の物流拠点に配送し、
施工担当者が物流拠点へ部材を受取りに行くことによ
り、工程の進行状況に合わせて部材を施工現場40〜4
0nに配送することができる。尚、部材供給元は、工場
に限らず輸入業者等でもかまわない。また、物流拠点
は、前述のようにコンビニエンスストアやガソリンスタ
ンド以外の店舗等であっても良く、24時間営業でなく
ても良いが、出来るだけ早朝から営業したり深夜まで営
業することが望ましい。
As described above, in the present embodiment, the members are delivered from the factory to the logistics base such as a convenience store or a gas station near the construction site 40 to 40n.
The construction worker goes to the logistics base to receive the members, so that the members can be installed at the construction sites 40 to 4 according to the progress of the process.
0n. Note that the material supply source is not limited to the factory and may be an importer or the like. The distribution base may be a store other than a convenience store or a gas station as described above, and may not be open for 24 hours. However, it is desirable that the logistics base be open as early as possible or open until midnight.

【0027】前述の施工現場40〜40nの最寄りの物
流拠点は、必ずしも施工現場40〜40nから歩いて行
けるような近い場所に限らず、施工業者(職人)が自宅
から施工現場40〜40nに行く途中で車で立寄ること
が出来る場所等の、所謂施工業者が車で容易に立寄れる
場所であれば良い。
The logistics base closest to the above-mentioned construction sites 40 to 40n is not necessarily limited to a nearby place that can be walked from the construction sites 40 to 40n, and a construction company (craftsman) goes to the construction sites 40 to 40n from home. Any place that can be easily visited by a so-called construction company by car, such as a place that can be visited by car on the way, may be used.

【0028】次に、本実施形態に係る部材配送方法の第
1の実施例について説明する。2000年7月18日1
4時、施工現場において、外装担当者のFさんは、金物
A(品番コード:AX290321AQ)が不足してい
ることを発見した。Fさんは、早速、金物工場Xに連絡
して、コンビニエンスストアY店(物流拠点コード:C
VS−14)に配送するように依頼した。
Next, a first example of the member delivery method according to this embodiment will be described. July 18, 2000 1
At 4 o'clock at the construction site, Mr. F, an exterior worker, discovered that hardware A (part number code: AX290321AQ) was insufficient. Mr. F immediately contacts the hardware factory X, and enters the convenience store Y store (distribution base code: C
VS-14).

【0029】金物工場Xでは、金物Aを生産できるか否
かの調査を行った後、在庫の半完成品を加工し、200
0年7月18日16時12分に金物Aの加工を完了し
た。その後、金物工場Xは、配送業者に依頼して、金物
Aをその他の部材と共に発送した。配送業者のトラック
は、金物Aをその他の部材と混載し、いくつかの物流拠
点を回った際、コンビニエンスストアY店に金物Aを配
送した。
At the hardware factory X, after investigating whether or not the hardware A can be produced, semi-finished products in stock are processed and 200
At 16:12 on July 18, 2005, the processing of metal A was completed. After that, the hardware factory X requested the delivery company to send the hardware A together with other members. The truck of the delivery company mixed the hardware A with other components, and delivered the hardware A to the convenience store Y when traveling around several distribution bases.

【0030】コンビニエンスストアY店の従業員は、金
物Aの梱包に付されたバーコードをバーコードリーダに
よって読み取ることにより、金物Aの品番コードAX2
90321AQをコンビニエンスストアY店に設置され
ている物流拠点端末1に入力した。物流拠点端末1は、
金物Aの品番コードAX290321AQと、受領場所
である物流拠点コードCVS−14と、金物Aを受領し
た時刻を示す時刻データ等を含む受領データを住宅建設
会社に設置されたサーバ30に送信し、サーバ30は、
この受領データを受信して記録した。
The employee of the convenience store Y stores reads the bar code attached to the package of the hardware A with a bar code reader, thereby obtaining the product code AX2 of the hardware A.
90321AQ was input to the distribution base terminal 1 installed in the convenience store Y store. Distribution base terminal 1
The part number code AX290321AQ of the hardware A, the distribution base code CVS-14 which is the receiving place, and the reception data including the time data indicating the time of receiving the hardware A are transmitted to the server 30 installed in the housing construction company. 30 is
This receipt data was received and recorded.

【0031】2000年7月19日の早朝、外装担当者
のFさんは、コンビニエンスストアY店に立ち寄り、金
物Aを受け取ると共に、ジュース、パン、煙草を購入し
た。コンビニエンスストアY店の従業員は、Fさんの工
事店コードBJ2413Xを物流拠点端末1に入力し、
金物Aの梱包に付されたバーコードをバーコードリーダ
によって読み取った。物流拠点端末1は、金物Aの品番
コードAX290321AQと、工事店コードBJ24
13Xと、Fさんが金物Aを受領した時刻を示す時刻デ
ータ等を含む引渡データを住宅建設会社に設置されたサ
ーバ30へ送信し、サーバ30は、この引渡データを受
信して記録した。
In the early morning of July 19, 2000, Mr. F, an exteriorist, stopped at convenience store Y, received hardware A, and purchased juice, bread, and cigarettes. The employee of the convenience store Y store inputs the construction store code BJ2413X of F into the distribution base terminal 1,
The barcode attached to the package of the hardware A was read by a barcode reader. The distribution base terminal 1 has a part number code AX290321AQ of hardware A and a construction shop code BJ24.
13X and the delivery data including time data indicating the time at which Mr. F received the hardware A was transmitted to the server 30 installed in the housing construction company, and the server 30 received and recorded the delivery data.

【0032】このように、本実施形態に係る部材の配送
管理システムにより、外装担当者のFさんは、2000
年7月19日の早朝に金物Aを受領することができたの
で、同日の朝から施工作業を行うことができた。一方、
従来の配送システムによれば、金物工場Xからの金物A
の発送は2000年7月19日の9時以降となり、施工
現場40への金物Aの到着は同日昼頃となるため、Fさ
んは同日午前中に施工作業を行うことが出来ず、無駄が
発生することになる。また、本実施例によれば、Fさん
は、金物Aを受領すると共にジュース等を購入したた
め、コンビニエンスストアY店の売上を向上することが
できた。
As described above, according to the member delivery management system according to the present embodiment, Mr. F, who is in charge of exterior,
The hardware A could be received in the early morning of July 19, and construction work could be performed from the same morning. on the other hand,
According to the conventional delivery system, the hardware A from the hardware factory X
Is shipped after 9:00 on July 19, 2000, and the arrival of hardware A to the construction site 40 is around noon on the same day, so Mr. F cannot perform the construction work in the morning of the same day, and waste Will happen. Further, according to the present embodiment, since Mr. F received the hardware A and purchased the juice and the like, the sales at the convenience store Y could be improved.

【0033】次に、本実施形態に係る部材配送方法の第
2の実施例について説明する。2000年7月30日よ
りBさん邸の和室を作る計画に従い、床間材、床柱、及
びなげしからなる和室造作材が同日に施工現場(Bさん
邸)40nに到着するように手配が完了していた。
Next, a description will be given of a second embodiment of the member delivery method according to the present embodiment. In accordance with the plan to build a Japanese-style room of Mr. B's house from July 30, 2000, arrangements were completed for the Japanese-style building material consisting of flooring, floor pillars and sashimi to arrive at the construction site (Mr. B's house) 40n on the same day. I was

【0034】しかし、2000年7月29日、建築作業
者のMさんから施工管理者のG主任に、別の施工現場4
0nの作業が遅れているため2000年8月1日まで手
が離せないという連絡があった。
However, on July 29, 2000, Mr. M, a construction worker, gave a chief of construction manager G another construction site 4.
I was told that I could not release my hand until August 1st, 2000 because the work on 0n was delayed.

【0035】施工管理者のG主任は、和室造作材を施工
現場(Bさん邸)40nの最寄りのガソリンスタンドS
店に配送するように和室造作材メーカーDに連絡した。
和室造作材メーカーDは、当初の配送予定日である20
00年7月29日に、和室造作材をガソリンスタンドS
店に配送した。また、施工管理者のG主任は、和室造作
材はガソリンスタンドS店に保管されているので作業に
とりかかる2000年8月2日に引取りに行くように、
建築作業者のMさんに連絡した。
The chief G of the construction manager supplies Japanese-style building materials to the nearest gas station S at the construction site (Mr. B's house) 40n.
I contacted a Japanese-style building material maker D to deliver it to the store.
The Japanese-style building material maker D has an initial scheduled delivery date of 20
On July 29, 2000, Japanese-style building materials were supplied to gas station S.
Delivered to the store. In addition, G chief of the construction manager said that Japanese-style building materials are stored at the gas station S shop, so go to work on August 2, 2000 to start the work.
Contacted Mr. M, a construction worker.

【0036】このように、本実施形態に係る部材配送方
法により、和室造作材は2000年7月29日から同年
8月2日迄の間ガソリンスタンドS店に保管されるた
め、和室造作材を施工現場(Bさん邸)40nに保管す
る必要がなく、和室造作材が施工現場(Bさん邸)40
nにおける他の作業の邪魔になることもない。また、和
室造作材がガソリンスタンドS店に保管されるため、ガ
ソリンスタンドS店で梱包を解いて、梱包材を和室造作
材メーカーDへ持ち帰れば、施工現場40nで発生する
産業廃棄物を減らすことができる。
As described above, according to the member delivery method according to the present embodiment, the Japanese-style building material is stored in the gas station S from July 29, 2000 to August 2, 2000. There is no need to store at the construction site (Mr. B's house) 40n.
n does not interfere with other operations. Also, since Japanese-style building materials are stored at the gas station S store, unpacking at the gas station S store and returning the packing materials to the Japanese-style building material maker D will reduce the industrial waste generated at the construction site 40n. Can be.

【0037】前記実施例に於ては、施工現場40〜40
nに配送される部材として、金物Aと和室造作材とを例
示したが、建物の部材としては「大物」として、コンク
リート原材料、鉄骨、ALC板、屋根材等の建物の基本
部材及び躯体部材がある。また、「中物」としては、造
作材、風呂・台所機器、サッシ、戸扉等の内外装材、設
備機器及び建具材がある。さらに、「小物」としては、
金物、照明器具等の装飾部材及び小型機器がある。
In the above embodiment, the construction sites 40 to 40
n, the hardware A and the Japanese-style building materials are exemplified as the members to be delivered to the n. However, the basic members and the frame members of the building such as concrete raw materials, steel frames, ALC plates, roofing materials, etc. is there. Further, the “medium products” include interior and exterior materials such as building materials, bath / kitchen equipment, sashes, doors, etc., equipment and fittings. Furthermore, as "accessories",
There are decorative members such as hardware and lighting fixtures, and small devices.

【0038】本発明の対象とする部材は、一般的に前記
「中物」及び「小物」であるが、これ等の部材を取扱う
物流拠点となる業者が、倉庫業、貸倉庫業、ホームセン
ター、建材店である場合には、「大物」を部材として取
扱うことが出来る。また、コンビニエンスストアやガソ
リンスタンドであっても、敷地内或は近くに倉庫等の収
納スペースを有する店は「大物」の部材を取扱うことが
可能である。
The components to be covered by the present invention are generally the above-mentioned "medium products" and "small items". In the case of a building material store, "big goods" can be handled as members. Further, even in a convenience store or a gas station, a store having a storage space such as a warehouse in or near the site can handle members of "big items".

【0039】[0039]

【発明の効果】以上述べた様に、本発明によれば、施工
現場の近傍或は施工業者が車で容易に立寄れる場所に所
在する物流拠点に部材供給元から部材を配送し、物流拠
点において部材を一時保管し、物流拠点において一時保
管された部材を施工に必要なときに引き渡すことによ
り、その部材を用いる工程の開始に合わせて部材を施工
現場に配送することができる等の効果を有している。
As described above, according to the present invention, a member is delivered from a member supplier to a logistics base located near a construction site or a place where a contractor can easily drop in by car. By temporarily storing the components in the logistics base and delivering the temporarily stored components at the logistics base when necessary for construction, the components can be delivered to the construction site at the start of the process using the components. Have.

【0040】これにより、施工スケジュールの遅延を防
止したり、コストの上昇を防止することが可能となる。
また、管理地点に設置されたサーバを操作することによ
り、部材の発送・受領・引渡しを確認できる効果を有し
ている。さらに、物流拠点において部材の梱包を解いて
部材供給元に持ち帰ることにより、施工現場で発生する
産業廃棄物を減らすことができる等の多大な効果を有し
ている。
This makes it possible to prevent delays in the construction schedule and prevent an increase in cost.
Further, by operating the server installed at the management point, there is an effect that the sending, receiving, and delivery of members can be confirmed. Furthermore, by unpacking the components at the distribution base and bringing them back to the component supplier, there is a great effect that industrial waste generated at the construction site can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態に係る部材配送方法を実施す
るためのシステムを示す図である。
FIG. 1 is a diagram showing a system for performing a member delivery method according to an embodiment of the present invention.

【図2】本発明の実施形態に係る部材配送方法を示すフ
ローチャートである。
FIG. 2 is a flowchart illustrating a member delivery method according to the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1〜1n 物流拠点端末 10 ネットワーク 20 生産拠点端末 30 サーバ 31 管理端末 32 記録媒体 40〜40n 施工現場 1 to 1n Distribution base terminal 10 Network 20 Production base terminal 30 Server 31 Management terminal 32 Recording medium 40 to 40n Construction site

Claims (13)

【特許請求の範囲】[Claims] 【請求項1】 施工現場の近傍或は施工業者が容易に立
寄れる場所に所在する物流拠点に部材供給元から部材を
発送するステップと、 前記物流拠点に前記部材を一時保管するステップと、 前記物流拠点に一時保管された前記部材を、施工に必要
なときに引き渡すステップと、を具備する部材配送方
法。
A step of sending a member from a member supplier to a distribution base located near a construction site or a place where a contractor can easily drop in; a step of temporarily storing the member at the distribution base; Delivering the member temporarily stored at the distribution base when necessary for construction.
【請求項2】 部材供給元に設置された第1の装置と、
施工現場の近傍或は施工業者が容易に立寄れる場所に所
在する物流拠点に設置された第2の装置と、及び管理地
点に設置された第3の装置との間で通信することにより
部材の配送を行う方法であって、 前記部材を前記部材供給元から特定の物流拠点に発送す
るように指示する情報を前記第1の装置に送信するステ
ップと、 前記部材を前記部材供給元から前記特定の物流拠点に発
送するステップと、 前記特定の物流拠点において前記部材を受領した旨を通
知する情報を前記第2の装置から前記第3の装置に送信
するステップと、 前記特定の物流拠点に前記部材を一時保管するステップ
と、 前記特定の物流拠点に一時保管された前記部材を、施工
に必要なときに引き渡すステップと、を具備する部材配
送方法。
2. A first device installed at a member supplier,
By communicating between a second device installed at a distribution base located near the construction site or at a location where the contractor can easily drop in, and a third device installed at the management point, A method of performing delivery, comprising: transmitting, to the first device, information for instructing the member to be shipped from the member supplier to a specific distribution base; and identifying the member from the member supplier. Sending to the third device the information notifying that the member has been received at the specific logistics base; and transmitting the information to the third device from the second device. A member delivery method comprising: a step of temporarily storing members; and a step of delivering the members temporarily stored at the specific distribution base when necessary for construction.
【請求項3】 前記物流拠点が、前記部材を一時的に保
管し得る専業或は兼業の事業所であることを特徴とする
請求項1又は2記載の部材配送方法。
3. The member delivery method according to claim 1, wherein the distribution base is a dedicated or part-time business establishment capable of temporarily storing the members.
【請求項4】 前記物流拠点が、倉庫、貸倉庫、ホーム
センター、建材店、DIY店、コンビニエンスストア又
はガソリンスタンドであることを特徴とする請求項3記
載の部材配送方法。
4. The method according to claim 3, wherein the distribution base is a warehouse, a warehouse for rent, a home center, a building material store, a DIY store, a convenience store, or a gas station.
【請求項5】 前記物流拠点が、1日に比較的長時間に
渡って営業を行っていることを特徴とする請求項1〜4
のいずれか1項記載の部材配送方法。
5. The logistics base operates for a relatively long time in a day.
The member delivery method according to any one of the above items.
【請求項6】 部材供給元に設置された第1の装置及び
施工現場の近傍或は施工業者が容易に立寄れる場所に所
在する物流拠点に設置された第2の装置と通信すること
により部材の配送を管理する方法であって、 前記部材を前記部材供給元から特定の物流拠点に発送す
るように指示する情報を前記第1の装置に送信するステ
ップと、 前記特定の物流拠点において前記部材を受領した旨を通
知する情報を前記第2の装置から受信して記録するステ
ップと、 前記特定の物流拠点において前記部材を引き渡した旨を
通知する情報を前記第2の装置から受信して記録するス
テップと、を具備する部材配送管理方法。
6. A member by communicating with a first device installed at a member supplier and a second device installed at a logistics base near a construction site or at a place where a contractor can easily drop in. And transmitting information instructing the member to be sent from the member supplier to a specific logistics base to the first device; and controlling the member at the specific logistics base. Receiving from the second device and recording information notifying that the member has been received, and receiving and recording from the second device information notifying that the member has been delivered at the specific physical distribution base. And a member delivery management method.
【請求項7】 前記部材を前記部材供給元から前記特定
の物流拠点に発送した旨を通知する情報を前記第1の装
置から受信して記録するステップをさらに具備する請求
項6記載の部材配送管理方法。
7. The member delivery according to claim 6, further comprising the step of receiving from the first device and recording information notifying that the member has been sent from the member supplier to the specific distribution base. Management method.
【請求項8】 部材供給元に設置された装置との間で通
信を行うことにより部材の配送を管理するシステムであ
って、 管理地点に設置され、前記部材を特定の物流拠点に発送
するように指示する情報を前記部材供給元に設置された
装置に送信するサーバと、 前記特定の物流拠点に設置され、前記特定の物流拠点が
前記部材を受領した旨、及び、前記特定の物流拠点にお
いて前記部材を引き渡した旨を通知する情報を前記サー
バに送信する端末と、を具備する部材配送管理システ
ム。
8. A system for managing the delivery of a member by communicating with a device installed at a member supply source, wherein the system is installed at a management point and sends the member to a specific distribution base. A server that transmits information instructing to the device installed at the member supplier, installed at the specific distribution base, that the specific distribution base has received the member, and at the specific distribution base A terminal for transmitting information notifying that the member has been delivered to the server.
【請求項9】 前記物流拠点が、前記部材を一時的に保
管し得る専業或は兼業の事業所であることを特徴とする
請求項8記載の部材配送管理システム。
9. The member delivery management system according to claim 8, wherein said physical distribution base is a dedicated or part-time business establishment capable of temporarily storing said members.
【請求項10】 前記物流拠点が、倉庫、貸倉庫、ホー
ムセンター、建材店、DIY店、コンビニエンスストア
又はガソリンスタンドであることを特徴とする請求項9
記載の部材配送管理システム。
10. The logistics base is a warehouse, a rental warehouse, a home center, a building material store, a DIY store, a convenience store, or a gas station.
A member delivery management system as described in the above.
【請求項11】 前記物流拠点が、1日に比較的長時間
に渡って営業を行っていることを特徴とする請求項8〜
10のいずれか1項記載の部材配送管理システム。
11. The logistics base operates for a relatively long time in a day.
The member delivery management system according to claim 10.
【請求項12】 部材供給元に設置された第1の装置及
び施工現場の近傍或は施工業者が容易に立寄れる場所に
所在する物流拠点に設置された第2の装置と通信を行う
ことにより部材の配送を管理するサーバであって、 前記部材を前記部材供給元から特定の物流拠点に発送す
るように指示する発注情報を前記第1の装置に送信する
と共に、前記特定の物流拠点が前記部材を受領した旨を
通知する受領情報、及び、前記特定の物流拠点において
前記部材を引き渡した旨を通知する引渡情報を前記第2
の装置から受信する第1の手段と、 前記第1の手段が受信した受領情報及び引渡情報を記録
する第2の手段と、を具備する部材配送管理サーバ。
12. By communicating with a first device installed at a member supplier and a second device installed at a logistics base near a construction site or at a place where a contractor can easily drop in. A server that manages the delivery of members, wherein the server transmits order information to the first device to instruct the member to be shipped from the member supplier to a specific distribution base, and the specific distribution base is The receipt information notifying that the member has been received, and the delivery information notifying that the member has been delivered at the specific distribution base are stored in the second
A member delivery management server comprising: first means for receiving from the apparatus of (1); and second means for recording the reception information and the delivery information received by the first means.
【請求項13】 部材供給元に設置された第1の装置及
び施工現場の近傍或は施工業者が容易に立寄れる場所に
所在する物流拠点に設置された第2の装置と通信を行う
ことにより部材の配送を管理するためにCPUで読み取
り可能な記録媒体であって、 前記部材供給元が特定の物流拠点に前記部材を発送する
ように指示する情報を前記第1の装置に送信する手順
と、 前記特定の物流拠点が前記部材を受領した旨を通知する
情報を前記第2の装置から受信して記録する手順と、 前記特定の物流拠点において前記部材を引き渡した旨を
通知する情報を前記第2の装置から受信して記録する手
順と、を前記CPUに実行させるための部材配送管理プ
ログラムを記録した記録媒体。
13. By communicating with a first device installed at a member supply source and a second device installed at a logistics base near a construction site or at a place where a contractor can easily drop in. A recording medium readable by the CPU for managing the delivery of the member, wherein the member supplier sends information to the first apparatus to instruct the member to ship the member to a specific distribution base; A procedure for receiving and recording information notifying that the specific logistics base has received the member from the second device; and transmitting information notifying that the specific distribution base has delivered the member at the specific physical distribution base. A recording medium for recording a member delivery management program for causing the CPU to execute the procedure of receiving and recording from the second device.
JP2000266496A 2000-09-04 2000-09-04 Method for delivering member, method for management, managing system, and managing server, and recording medium having recorded managing program Pending JP2002080113A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000266496A JP2002080113A (en) 2000-09-04 2000-09-04 Method for delivering member, method for management, managing system, and managing server, and recording medium having recorded managing program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000266496A JP2002080113A (en) 2000-09-04 2000-09-04 Method for delivering member, method for management, managing system, and managing server, and recording medium having recorded managing program

Publications (1)

Publication Number Publication Date
JP2002080113A true JP2002080113A (en) 2002-03-19

Family

ID=18753570

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000266496A Pending JP2002080113A (en) 2000-09-04 2000-09-04 Method for delivering member, method for management, managing system, and managing server, and recording medium having recorded managing program

Country Status (1)

Country Link
JP (1) JP2002080113A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008158920A (en) * 2006-12-26 2008-07-10 Sumitomo Forestry Co Ltd Carrying-in management system of construction material to job site
CN109850465A (en) * 2018-11-30 2019-06-07 国家电网有限公司 A kind of mine material transportation scheduling system and method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001253516A (en) * 2000-03-14 2001-09-18 Sumitomo Corp Centralized control system for information about material and equipment

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001253516A (en) * 2000-03-14 2001-09-18 Sumitomo Corp Centralized control system for information about material and equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008158920A (en) * 2006-12-26 2008-07-10 Sumitomo Forestry Co Ltd Carrying-in management system of construction material to job site
CN109850465A (en) * 2018-11-30 2019-06-07 国家电网有限公司 A kind of mine material transportation scheduling system and method

Similar Documents

Publication Publication Date Title
Zhai et al. An Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong
CA2594639C (en) System and method of real-time homebuilding scheduling
CA2747928C (en) System, method, and computer program for manufacturing estimation production assembly and inventory management
US20030212614A1 (en) System and method for managing inventory
CN111401735A (en) Intelligent queuing method, device, equipment and storage medium for logistics vehicles
US20140019288A1 (en) Supply Chain Management System and Method
JP2003201015A (en) Shipping management system and shipping management program
KR20130058196A (en) Administration system of physical distribution using mobile
Zekavat et al. Holonic construction management: Unified framework for ICT-supported process control
KR20030047327A (en) Goods sending method available for realtime management using wireless telecommunication and system thereof
KR20100062848A (en) System and method for operating logistics
US20020133411A1 (en) Simplified order-placement and reception processing method and system
CN111401800B (en) Vehicle dispatching system suitable for ceramic industry
Brodskiy Improving transport and technological process to supply material resources for house construction
JP2002080113A (en) Method for delivering member, method for management, managing system, and managing server, and recording medium having recorded managing program
JP4520087B2 (en) System for managing or notifying the results of communication with customers
US20100312860A1 (en) Planning And Controlling Of Objects Transportation
JP2009193515A (en) Move business management system and management server
KR20090114241A (en) System for Analyzing a Resource Supplying Performance
JP2002024349A (en) System and method for supporting physical distribution business and recording medium having physical distribution business support program recorded thereon
JP4520070B2 (en) Standard type building materials transportation management system
Vaidyanathan Value of visibility and planning in an engineer-to-order environment
KR20020023986A (en) Wireless Mobile Supply Chain Management System
JP2001318966A (en) Method for controlling stock and production of cement of manufacturing plant of ready mixed concrete
Chung et al. An alert management system for concrete batching plant

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070903

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20080131

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100422

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100511

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100921