JP2001348876A - Earth retaining structure with insertion replaceable/ planting box - Google Patents

Earth retaining structure with insertion replaceable/ planting box

Info

Publication number
JP2001348876A
JP2001348876A JP2000207544A JP2000207544A JP2001348876A JP 2001348876 A JP2001348876 A JP 2001348876A JP 2000207544 A JP2000207544 A JP 2000207544A JP 2000207544 A JP2000207544 A JP 2000207544A JP 2001348876 A JP2001348876 A JP 2001348876A
Authority
JP
Japan
Prior art keywords
planting
soil
net
basin
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000207544A
Other languages
Japanese (ja)
Inventor
Heihachi Hayashi
平八 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2000207544A priority Critical patent/JP2001348876A/en
Publication of JP2001348876A publication Critical patent/JP2001348876A/en
Pending legal-status Critical Current

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Retaining Walls (AREA)
  • Cultivation Of Plants (AREA)

Abstract

PROBLEM TO BE SOLVED: To solve the problem of plants being apt to wither in the shade particularly in a high altitude cold district due to the insufficient supply of water and the insufficient transfer of round heat in a planting block with a planting part provided in a concrete block. SOLUTION: A method of providing a wall body with an opening and installing insertable or replaceable planting boxes therein is adopted. A net of large area is installed at the bottom face of each planting box. The root elongation of a plant stops since the bottom face is exposed to light, but the growth of a round part continues while limiting a root area. The bottom face net part of the planting box inserted in the opening is dark being covered with back face soil but starts growing again when nutritious water is supplied. The subsequent growth is extremely smooth, so that the plants do not wither even in the shade in the high altitude cold district.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は機能、経済が万能と
いうことに対する反省の1つとして開発によって緑が失
われつつある昨今、むき出しになったコンクリート面を
少しでも癒そうとする数々の貴重な試みを更に高能率に
成就させんが為の緑化技術に関するものである。また植
栽のみならず野菜等の栽培にも応用できるものである。
BACKGROUND OF THE INVENTION The present invention is one of the reflections on the versatility of function and economy, and in recent years green is being lost due to the development, and in recent years, there are a number of valuable precious stones that attempt to heal bare concrete surfaces. The present invention relates to greening technology for achieving higher efficiency in attempts. It can be applied not only to planting but also to cultivation of vegetables and the like.

【0002】[0002]

【従来の技術】切土、盛土をとわず機能やコストを優先
させるならばコンクリートを構造上安全な構造に設置打
設すればよい。現在のところコンクリートにかわる別の
材料や方法はないようである。やむを得ずコンクリート
面に空間部をつくりここに植栽土を入れサツキ等の低木
を植えている場合が多い。
2. Description of the Related Art If priority is given to function and cost without cutting and embankment, concrete may be installed and cast into a structurally safe structure. At present, there seems to be no alternative material or method for concrete. In many cases, it is necessary to create a space on the concrete surface, put planting soil here, and plant shrubs such as satsuki.

【0003】[0003]

【発明が解決しようとする課題】1. コンクリートの
空間部に植栽する方法でプレキャストコンクリートブロ
ックを組み立てたものや現場打設のコンクリート枠内に
植栽した場合の実施結果を観ると枯れてしまっているも
のが多々ある。特に高冷地の日陰が悪く、また最も良い
条件と思われる各種の植栽した擁壁のカタログの写真で
さえも1部欠けているものがある。この原因として考え
られるものとして次のようなことがある。 1.1 水分の供給が十分でない。水分の蒸散面積すな
わち日光に晒されている植栽物及び土の面積に対して水
分を供給可能な背面土と接しいる接触面積が蒸散面積の
1/2以下である。表面から供給される雨水や結露水で
は不十分の場合が多い。 1.2 根が深く根ずいていないのに葉が広い面積で日
光や風に晒されている。岩の間やコンクリートや舗装の
目地にさえ生育している植物や雑草は実の段階からそこ
で生育しているから常に根と葉のバランスが保たれ段々
に成長してきている。 1.3 実の段階からコンクリートの空間部に植栽土を
入れ播種し水分と養分を供給すればよいが構造物が出来
てから数年コンクリートと土のままでは景観上も好まし
くなく、養水分を供給する費用も嵩むので実用的でな
い。天候との関係もあり水分の供給が多すぎると土砂が
流出し少なすぎると風に舞う。 1.4 地熱が伝わらない。1.1の項と同様に接触面
積が少ないから例えば気温が−10度Cになると、根を
取り巻く土も−10度C近くになり根の先端部分も含め
てすべてがこの様になると植物は枯れてしまう。
[Problems to be Solved by the Invention] There are many cases where precast concrete blocks are assembled by a method of planting in a concrete space, and when the planting results are planted in a concrete frame cast on site, they have withered. Especially in the cold regions, the shade is poor, and even some of the photographs in the catalogs of the various planted retaining walls which seem to be in the best condition are missing one copy. Possible causes include the following. 1.1 Insufficient water supply. The transpiration area of water, that is, the area of the plant and the soil exposed to sunlight, the contact area in contact with the back soil capable of supplying water is 1 / or less of the transpiration area. Rainwater or dew water supplied from the surface is often insufficient. 1.2 The leaves are exposed to sunlight and wind over a large area even though the roots are not deeply rooted. Plants and weeds that grow between the rocks and even at the joints of concrete and pavement grow there from the fruit stage, so that the roots and leaves are kept in balance and are growing gradually. 1.3 From the actual stage, planting soil is put into the concrete space and seeding is sufficient to supply water and nutrients. However, it is not desirable from the viewpoint of the landscape if concrete and soil remain for several years after the structure is formed, It is not practical because the cost of supplying the lipstick increases. Due to the weather, if the water supply is too high, earth and sand will flow out, and if it is too low, the wind will blow. 1.4 Geothermal is not transmitted. As in section 1.1, the contact area is small. For example, when the temperature reaches -10 ° C, the soil surrounding the roots becomes close to -10 ° C. Will wither.

【0004】2.植栽物に大きいものは使用できない。
これは水分の供給が少なく根の活着が悪いからである。
灌水パイプを使用する方法もあるが費用が嵩む。
[0004] 2. Large plants cannot be used.
This is because the supply of water is small and the root survival is poor.
There is a method using irrigation pipe, but it is expensive.

【0005】3.一度根の着いたものは別の種類の木や
別の色の花の咲くものに変えるのは困難である。これは
根と同時にそのまわりの土砂が取り出され空洞部が生じ
空洞部を埋めるには背面土を上の方から掘って充填し直
さなければならないからである
[0005] 3. Once rooted, it is difficult to turn it into another kind of tree or a flower of another color. This is because the earth and sand around it is taken out at the same time as the root, and a cavity is created, and in order to fill the cavity, the back soil must be dug from the top and refilled

【0006】[0006]

【課題を解決するための手段】本発明は上記の課題を解
決するために行ったものであり壁体に開口部を設けここ
に挿入または差しかえ自由な植栽桝を設置する方法とし
た。植栽桝の底面は開口とし植栽桝本体の底は無い構造
である。底に別にネットを設ける場合(請求項1,2)
と設け無い場合(請求項3)がある。植栽桝底面ネット
1のネットの目の大きさは1×1cm乃至2×2cm程
度のもので材料は合成樹脂や鉄などである。目の大きさ
は植栽物の根のためには大きい方がよいが土が漏れ落ち
ると良くないので目が大き過ぎる場合は生分解シートや
水分を吸うと弱くなる紙を敷く。生分解とは土中のバク
テリアにより水と二酸化炭素に分解することである。壁
体の開口部の背面側は開口のままの場合(請求項1)と
ネットを用いる場合(請求項2,3)がある。ネットの
形状や材料は植栽桝の底面に使用するものと同じとす
る。強度は背面土砂の土圧があるため植栽桝底面ネット
1より強くする。壁体の背面には背面植栽土を厚さで2
0乃至30cm程詰める。この背面植栽土は良質の山又
は畑の土に2年位した落ち葉とモミガラと若干の肥料を
混ぜたものに小径の砂利や砕石を混ぜたものを使用す
る。通気性と給排水性と保水力と保肥力が必要とされ
る。また植栽桝底面ネットまたは背面土ネットを使用し
この背面植栽土の流出を防ぐ。更にこの背面に掘削した
残土などの良質のものを充填し良く転圧する。この背面
土と前記背面植栽土を良く転圧しておかないと工事が終
わってから三ヶ月乃至六ヶ月後に土砂が急に背面内で落
下し滑り現象が生じ植栽物の根が切断され植栽物が一時
的に弱るから特に念入りに施工する。背後の法面や山な
どに降る雨が程良く浸透し給排水が円滑に行われれば植
栽物の生育は極めて順調になる。
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and has a method of providing an opening in a wall and installing a freely insertable or replaceable planting pit therein. The bottom of the planting basin has an opening with no bottom of the planting basin itself. When a separate net is provided at the bottom (Claims 1 and 2)
(Claim 3). The size of the net of the planting basin bottom net 1 is about 1 × 1 cm to 2 × 2 cm, and the material is synthetic resin, iron, or the like. The size of the eyes should be large for the roots of the plant, but it is not good if the soil leaks. If the eyes are too large, lay a biodegradable sheet or a paper that becomes weak when moisture is absorbed. Biodegradation is the decomposition of water and carbon dioxide by bacteria in the soil. There are a case where the back side of the opening of the wall is left open (claim 1) and a case where a net is used (claims 2 and 3). The shape and material of the net are the same as those used for the bottom of the planting basin. The strength is made stronger than the net 1 of the planting basin because of the earth pressure of the back soil. On the back of the wall, the back planting soil is 2
Pack 0-30cm. For the back planting soil, use a mixture of fallen leaves, peach grass, and some fertilizer mixed with small diameter gravel or crushed stone, which is about two years old, on high-quality mountain or field soil. Ventilation, water supply and drainage, water retention and fertilization are required. In addition, use the bottom net of the planting basin or the back soil net to prevent the back planting soil from flowing out. Further, high-quality materials such as excavated soil are filled on the back surface and compacted well. If this back soil and the back planting soil are not compacted well, three to six months after the construction is completed, the earth and sand will suddenly fall in the back and cause a slip phenomenon, and the roots of the plant will be cut and planted. The construction is especially careful because the plant is temporarily weak. If rain falling on the slopes and mountains behind penetrates properly and the water supply and drainage is performed smoothly, the growth of the plant will be extremely smooth.

【0007】植栽桝の中には良質の植栽土を容れ植栽物
を植える。植栽物を植える工程は圃場で行って良く管理
し十分な大きさになるまで生育させる場合(請求項1,
2)と植栽桝を開口部に挿入後あとから植栽土を入れ現
地で植える場合(請求項3)がある。ネットの網目から
植栽物の根が出ることは日常植木鉢の底穴から底穴が暗
い場合に根が出るのと同じである。特に植栽物を大きく
育てる場合根も沢山出て移動するときに根が切られて植
栽物が弱るから仮置台を設け底面にも光を当てるように
する。根は光に直接当たることを嫌うから根は出ない。
圃場で十分な大きさ生育した植栽物を植栽桝ごと完成し
た壁体の近くに運搬し、吊金具用穴に吊金具又はチェー
ンを挿入しクレーンで吊って壁体の開口部に挿入する。
別の方法としてバケット型のゴンドラを鉄材で作りこれ
に載せて開口部付近に移動し滑り込ませて挿入する方法
もある。
[0007] A high quality planting soil is contained in a planting basin to plant a plant. The step of planting a plant is performed in a field and is well managed, and is grown until the plant grows to a sufficient size.
2) There is a case where planting soil is inserted and planted on site after the planting pit is inserted into the opening (claim 3). The root of a plant coming out of the net mesh is the same as that of a daily pot when the bottom hole is dark. In particular, when growing a large plant, when a large number of roots move out and move, the root is cut and the plant is weakened. Therefore, a temporary table is provided and the bottom surface is also illuminated. Roots do not come out because they dislike direct exposure to light.
The plant that has grown to a sufficient size in the field is transported together with the planting pit near the completed wall, and a hanging bracket or a chain is inserted into the hole for the hanging bracket, and then suspended by a crane and inserted into the opening of the wall. .
As another method, there is a method in which a bucket-type gondola is made of an iron material, placed on the iron-made gondola, moved near the opening, and slid into the gondola.

【0008】[0008]

【発明の実施の形態】実施の形態は構成要素から考える
と大きく分けて4つある。壁体Aはプレキャスト鉄筋コ
ンクリートブロック(以下コンクリートブロックとす
る)を目地コンクリートやモルタル(以下目地モルタル
とする)で以下の図面に示すように結合して開口部Bを
作る。ただし壁面の形が正面からみて長方形でなく異形
のときはこの部分だけ現場打設のコンクリートを用い
る。植栽桝Cの材質は鉄筋コンクリートの他合成樹脂や
この再生材また木材や木材と合成樹脂の混合物等次々に
新しいものが開発されているからこれらを適宜使用す
る。植栽桝Cの形状は図面のようにバケット型であり底
にはネットのある場合と無い場合がある。この中に植栽
桝内植栽土2を入れ植栽物を育ててから植栽桝Cをクレ
ーン等で吊り上げて開口部Bに挿入するのが基本であ
る。植栽桝Cの底の背面側には良質の背面植栽土Dを用
いる。以下図面と共にほぼ施工の順番で説明する。
BEST MODE FOR CARRYING OUT THE INVENTION There are roughly four embodiments according to the components. The wall A is formed by joining a precast reinforced concrete block (hereinafter referred to as a concrete block) with joint concrete or mortar (hereinafter referred to as joint mortar) as shown in the following drawings. However, when the shape of the wall is irregular rather than rectangular when viewed from the front, use concrete cast in place only for this part. As the material of the planting basin C, synthetic resins and recycled materials other than reinforced concrete, wood and a mixture of wood and synthetic resin are being developed one after another. The shape of the planting basin C is a bucket type as shown in the drawing, and may or may not have a net at the bottom. It is basically that the planting soil is put into the planting basin 2 to grow the plant, and then the planting basin C is lifted up by a crane or the like and inserted into the opening B. A high-quality back planting soil D is used on the back side of the bottom of the planting basin C. The description will be made in the order of construction with the drawings.

【0009】まず土台を作るため地盤を堀り砕石等をい
れ転圧し基礎コンクリート5を作る。図1は側面図で1
部断面図を含む。図2は正面図、図3は背面図、図4は
平面図である。コンクリートブロック6の形状はコの字
形を90度右に回転した形であるが最上段は長方形にす
る。これを長方形コンクリートブロック6Bとする。コ
の字形のかわりにヨの字形を90度右に回転した形もあ
る。この場合の中心部のモルタル穴は目地用溝7または
目地溝10を2つ向かい合わせた空洞形とする。ヨの字
形の場合は積む時は互い違いに1/2ずつずらした千鳥
にする。開口部Bは開口のままにする場合と背面土ネッ
ト3を用いる場合がある。またコンクリートブロック6
が大型化した時は運搬や吊り上げ時の強度上から長方形
コンクリートブロック6Bにする必要がある。
First, the ground is dug to form a foundation, crushed stones and the like are put therein and compacted to produce a basic concrete 5. Figure 1 is a side view
Including a partial sectional view. 2 is a front view, FIG. 3 is a rear view, and FIG. 4 is a plan view. The shape of the concrete block 6 is a shape in which a U-shape is rotated to the right by 90 degrees, but the uppermost stage is a rectangle. This is referred to as a rectangular concrete block 6B. There is also a shape in which the Y shape is rotated 90 degrees to the right instead of the U shape. In this case, the mortar hole at the center is a hollow shape in which two joint grooves 7 or two joint grooves 10 face each other. In the case of the Y-shape, when loading, stagger the staggered stagger by 1/2. The opening B may be left open or the back soil net 3 may be used. Also concrete block 6
When the size is increased, it is necessary to make the rectangular concrete block 6B from the viewpoint of strength during transportation and lifting.

【0010】次にコンクリートブロック6をサポートで
背面から支えながら次々に適当な数、例えば縦横3個ク
レーンを使用し積む。このとき安全のため吊金具用穴1
1に吊金具またはチェーンを挿入して使用する。コンク
リートブロック6の目地用溝7が2つ向かいあい空洞部
8ができるから、ここに目地モルタル9を注入する。縦
鉄筋を入れてから目地モルタル9を充填したり、コンク
リートブロック6を作る時に横鉄筋をあらかじめ出して
置いてモルタル注入時に縦鉄筋を挿入して目地モルタル
9を充填すると更に強固になる。目地用溝の形状は目地
用溝7のような形のほか目地溝10のようにくさび形で
も良いが、この場合は強度はあるものの異常な外力が働
くと目地溝10の首の部分にひびわれが入るから一長一
短がある。
Next, the concrete blocks 6 are stacked one after another using a suitable number of crane, for example, three criss-crossers while supporting the concrete blocks 6 from behind. At this time, the hole 1 for the hanging bracket for safety
1 Insert and use a hanging bracket or chain. Since two joint grooves 7 of the concrete block 6 face each other to form a cavity 8, a joint mortar 9 is poured into the cavity. The joint mortar 9 is further strengthened by filling the joint mortar 9 after filling the joint mortar 9 after inserting the vertical reinforcing bar, or inserting and filling the joint reinforcing mortar at the time of pouring the mortar when the mortar is injected. The shape of the joint groove may be a shape like the joint groove 7 or a wedge shape like the joint groove 10, but in this case, the neck portion of the joint groove 10 is cracked when an abnormal external force is applied although the strength is strong. There are pros and cons from entering.

【0011】背面土ネット3は開口部Bの背面の背面植
栽土Dの流出を防ぐために用いる。図3及び図6の符号
3に示す形状である。道路や宅地などのコンクリート排
水桝の蓋に使用するUリット形のグレーチングの桝蓋に
類似である。目の大きさは1×1cm乃至2×2cm程
度のもので材料は鉄又は合成樹脂である。開口部Bに取
り付ける時は接合部にコンクリート用接着剤を塗り填め
込んで直ちに背面植栽土Dを入れて押さえる。更に背面
土4を入れ転圧する。
The back soil net 3 is used to prevent the back planting soil D behind the opening B from flowing out. This is the shape indicated by reference numeral 3 in FIGS. It is similar to the U-lit grating lid used for the lid of concrete drainage basins such as roads and residential lands. The size of the eyes is about 1 × 1 cm to 2 × 2 cm, and the material is iron or synthetic resin. When attaching to the opening B, the adhesive for concrete is applied to the joint, and the back planting soil D is immediately put in and pressed down. Further, the back soil 4 is put in and compacted.

【0012】植栽桝底面ネット1は図5及び図6の符号
1に示す形状である。取り付けの詳細は図6に示す。目
の大きさ、材質は背面土ネット3と同じである。取り付
けは接合部にコンクリート用接着剤を塗り填め込んで静
かに乾燥させる。埋め込みボルトを補助的に使用すると
更によい。植栽桝底面ネット1と植栽桝内植栽土2との
間に生分解シートや水に濡れると弱くなる紙を敷くこと
もある。これに就いては課題を解決するための手段で説
明したものと同じである。植栽桝には良質の植栽土を容
れる。植栽物を植えるのは圃場で行って良く管理し十分
な大きさになるまで生育させる場合はネットの網目から
植栽物の根が出るからこれを防ぐには仮置台13の上に
植栽桝を置いて底面にも光を当てる。
The planting net 1 has a shape indicated by reference numeral 1 in FIGS. Details of the mounting are shown in FIG. The size and material of the eyes are the same as the back soil net 3. For installation, apply concrete adhesive to the joints and dry gently. It is even better to use a stud bolt as an auxiliary. A biodegradable sheet or a paper that becomes weak when wet with water may be laid between the planting basin bottom net 1 and the planting soil in the planting basin. This is the same as that described in Means for Solving the Problems. The planting basin contains good quality planting soil. Planting the plant is done in the field and is well managed. If the plant is grown to a sufficient size, the root of the plant comes out from the net mesh. Place a basin and shine light on the bottom.

【0013】以上の各々の要素を組み合わせる場合まず
請求項1について説明する。この場合は開口部Bに先に
植栽桝Cを挿入し次に背面植栽土Dを入れて転圧する。
開口部Bに背面土ネット3を使用せずその分工費が安く
なる。請求項2はネットが植栽桝底面ネット1と背面土
ネット3の両方にあり、どちらを先に施工してもよい。
背面土ネット3を先に施工した方が植栽物Eの重機や土
砂による傷みが少ない。またこの場合は両方のネットを
特によく密着させる必要がある。請求項3は開口部Bに
先に背面土ネット3を挿入し背面植栽土Dを入れ転圧し
てから植栽桝Cを挿入する。請求項1及び請求項2では
植栽桝Cと植栽桝内植栽土2と植栽物Eを同時に挿入す
るが請求項3では、先に植栽桝Cを開口部Bに挿入し後
から植栽桝内植栽土2を入れ植栽物Eを植える。これに
より植栽桝底面ネット1が節約できる。以上3つの場合
のいずれも背面植栽土Dの背面に背面土4を入れ両方と
も良く転圧する。植栽桝Cの外側の両端の滑り止め突起
12は植栽桝Cが開口部Bの中に深く滑り込まない為の
ものである。
When combining the above elements, claim 1 will be described first. In this case, the planting basin C is inserted into the opening B first, and then the back planting soil D is put therein and the rolling is performed.
Since the back soil net 3 is not used for the opening B, the construction cost is reduced accordingly. In claim 2, the net is on both the planting basin bottom net 1 and the back soil net 3, and either one may be installed first.
If the back soil net 3 is constructed first, the damage of the plant E by heavy machinery and earth and sand is less. In this case, it is necessary to make both nets adhere particularly well. According to a third aspect, the back soil net 3 is inserted into the opening B first, the back planting soil D is put into the opening B, and then the planting basin C is inserted. In claims 1 and 2, the planting basin C, the planting soil 2 in the planting basin, and the plant E are inserted at the same time. In claim 3, the planting basin C is inserted into the opening B first. And planting soil E in the planting basin. Thereby, the planting net bottom 1 can be saved. In any of the above three cases, the back soil 4 is put on the back of the back planting soil D, and both are well compacted. The anti-slip projections 12 at both ends on the outer side of the planting basin C are for preventing the planting basin C from slipping deeply into the opening B.

【0014】以上は最初に植栽物Eを植える場合につい
てであるが様々な理由により最初と異なったものに取り
かえたい場合が生じる。この場合は請求項2のものを使
用するのが一番よい。請求項1は背面植栽土Dが流出し
これを復旧する労力が多大である。請求項3は取り除い
た後、最初に植えた時と同じ作業をするから工事期間が
請求項2より長くなる。いずれの場合も植栽桝Cを取り
除くとき植栽物Eの根を枯らす除草剤を葉に散布してか
ら行うと根の力が弱っているから作業が楽になる
The above description relates to the case where the plant E is planted first. However, there are cases where it is desired to replace the plant E with a plant different from the plant for various reasons. In this case, it is best to use the one of the second aspect. According to the first aspect, the back planting soil D flows out and requires a large amount of labor to recover the soil. In claim 3, after the removal, the same work as when planting first is performed, so that the construction period is longer than in claim 2. In any case, when removing the planting basin C, spraying the leaves with a herbicide that kills the roots of the plant E makes it easier to work because the roots are weakened.

【0015】[0015]

【発明の効果】この発明の挿入差しかえ植栽桝のある土
留め構造物は上述のように構成されているので、次のよ
うな効果を奏する。 1.植栽桝Cと植栽桝内植栽土2と植栽物Eをそのまま
同時に壁体の開口部に挿入する方法であるから根の活着
が極めてよい。 2.植栽桝Cの底面と背面植栽土Dとの接合面がコンク
リート等で遮られることが無くネットであり植栽物の根
が容易に伸長できまた接合面積も広いから養水分の供給
がよい。地熱も良く伝わり背面植栽土及び背面土の緩衝
作用により暑さ寒さに対して夏は地温を下げ冬は地温を
高める。 3.植栽桝Cの底面と背面植栽土Dとの接合面積が広い
から植栽物Eに大きいものが使用でき種類も多くのもの
が植栽可能になる。また植栽のみならずイチゴ等の野菜
の栽培もできる。特にランナーからの苗採りに適してい
る。 4.様々な場所でオープン初日から華やかな演出ができ
る。これは植栽物Eに大きいものや多種類のものが使用
でき、工事が短時間で施工できるからである。 5.単に植えるのみならず差しかえができるから四季折
々情緒ある花文字や絵柄の変化を大きな法面に描くとい
うようなことが夢ではなく現実のものとなる。
The earth retaining structure having the insertable replacement planting basin according to the present invention is constructed as described above, and has the following effects. 1. Since the planting basin C, the planting soil 2 in the planting basin, and the plant E are simultaneously inserted into the opening of the wall at the same time, the roots take root very well. 2. The joint surface between the bottom of the planting basin C and the rear planting soil D is a net without being interrupted by concrete or the like, the roots of the plant can be easily extended, and the joint area is large, so the supply of nutrient water is good. . The ground heat is also transmitted well, and the buffering effect of the back planting soil and the back soil reduces the ground temperature in summer and raises the ground temperature in winter against the heat and cold. 3. Since the joint area between the bottom surface of the planting basin C and the rear planting soil D is large, a large plant can be used as the plant E and many types can be planted. Not only planting, but also cultivation of vegetables such as strawberries. Especially suitable for collecting seedlings from runners. 4. Gorgeous productions can be performed in various places from the first day of opening. This is because large or many types of plant E can be used, and construction can be performed in a short time. 5. It is not a dream but a reality to draw a change of flower characters and patterns on a large slope from season to season because it can be replaced as well as planted.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の側面図で1部断面図を含む。FIG. 1 is a side view of the present invention, including a partial cross-sectional view.

【図2】この発明の正面図である。FIG. 2 is a front view of the present invention.

【図3】この発明の背面図である。FIG. 3 is a rear view of the present invention.

【図4】この発明のコンクリートブロック等の平面図で
ある。
FIG. 4 is a plan view of a concrete block and the like of the present invention.

【図5】植栽桝及び植栽桝底面ネットの斜視図である。FIG. 5 is a perspective view of a planting basin and a planting basin bottom net.

【図6】植栽桝底面ネット及び背面土ネットの詳細断面
図である。
FIG. 6 is a detailed cross-sectional view of a planting basin bottom net and a back soil net.

【図7】植栽桝1個と仮置台の図である。FIG. 7 is a diagram of one planting basin and a temporary storage table.

【符号の説明】[Explanation of symbols]

A 壁体 B 開口部 C 植栽桝 D 背
面植栽土 E 植栽物 1 植栽桝底面ネット 2 植栽桝内植栽土 3
背面土ネット 4 背面土 5 基礎コンクリート 6
コンクリートブロック 6B 長方形コンクリートブロック 7
目地用溝 8 空洞部 9 目地モルタル 10 目地溝 11
吊金具用穴 12 滑り止め突起 13 仮置台
A wall body B opening C planting basin D back planting soil E planting plant 1 planting basin bottom net 2 planting basin planting soil 3
Back soil net 4 Back soil 5 Foundation concrete 6
Concrete block 6B Rectangular concrete block 7
Joint groove 8 Cavity 9 Joint mortar 10 Joint groove 11
Hole for hanging bracket 12 Non-slip projection 13 Temporary stand

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) A01G 9/10 A01G 9/10 C E02D 29/02 311 E02D 29/02 311 Fターム(参考) 2B022 AB02 BA01 BA02 BA14 BA15 BB01 2B027 NC02 NC05 NC13 NC15 NC17 NC22 NC24 NC26 NC32 NC39 NC40 NC52 ND01 ND03 NE02 NE06 NE09 QA05 QB10 QB11 2D044 DA25 DB00 2D048 BA00 ──────────────────────────────────────────────────の Continued on the front page (51) Int.Cl. 7 Identification symbol FI Theme coat ゛ (Reference) A01G 9/10 A01G 9/10 C E02D 29/02 311 E02D 29/02 311 F term (reference) 2B022 AB02 BA01 BA02 BA14 BA15 BB01 2B027 NC02 NC05 NC13 NC15 NC17 NC22 NC24 NC26 NC32 NC39 NC40 NC52 ND01 ND03 NE02 NE06 NE09 QA05 QB10 QB11 2D044 DA25 DB00 2D048 BA00

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 壁体Aに開口部Bを設け開口部Bに挿入
自由または差しかえ自由な植栽桝Cを設置し植栽桝Cの
底面に、あらかじめ植栽桝底面ネット1を設けこの中に
植栽桝内植栽土2を容れ植栽桝底面ネット1の背面側に
背面植栽土Dを設け且つ植栽桝内植栽土2と背面植栽土
Dとを密着させた挿入差しかえ植栽桝のある土留め構造
物。
1. An opening B is formed in a wall A, a planting basin C which can be freely inserted or replaced in the opening B is provided, and a planting basin bottom net 1 is provided in advance on the bottom surface of the planting basin C. The planting soil in the planting basin 2 is contained therein, and the rear planting soil D is provided on the back side of the planting basin bottom net 1 and the planting soil in the planting basin 2 and the rear planting soil D are brought into close contact with each other. An earth retaining structure with a replacement planting basin.
【請求項2】 壁体Aに開口部Bを設け開口部Bの背面
側に背面土ネット3を設け開口部Bに挿入自由または差
しかえ自由な植栽桝Cを設置し植栽桝Cの底面にあらか
じめ植栽桝底面ネット1を設けこの中に植栽桝内植栽土
2を容れ背面土ネット3の背面側に背面植栽土Dを設け
且つ植栽桝内植栽土2と背面植栽土Dとを密着させた挿
入差しかえ植栽桝のある土留め構造物。
2. An opening B is provided in the wall A, a back soil net 3 is provided on the back side of the opening B, and a planting cell C which can be freely inserted or replaced in the opening B is installed. A planting basin bottom net 1 is provided on the bottom surface in advance, a planting basin soil 2 is contained therein, a rear planting soil D is provided on the back side of the rear soil net 3, and a planting basin soil 2 and a back surface. An earth retaining structure with an insertion replacement planting basin that closely adheres to the planting soil D.
【請求項3】 壁体Aに開口部Bを設け開口部Bの背面
側に背面土ネット3を設け開口部Bに挿入自由または差
しかえ自由な植栽桝Cを設置し植栽桝Cの底面にあらか
じめ植栽桝底面ネット等の物を用いること無く開口のま
まとし植栽桝Cと背面土ネット3により植栽桝状体を形
成し、この中に植栽桝内植栽土2を容れ背面土ネット3
の背面側に背面植栽土Dを設け且つ植栽桝内植栽土2と
背面植栽土Dとを密着させた挿入差しかえ植栽桝のある
土留め構造物。
3. An opening B is provided in the wall A, a back soil net 3 is provided on the back side of the opening B, and a planting box C which can be freely inserted or replaced in the opening B is installed. A planting basin body is formed by the planting basin C and the back soil net 3 without using an object such as a planting basin bottom net in advance on the bottom surface, and the planting soil in the planting basin 2 is formed therein. Bottom soil net 3
An earth retaining structure having an insertion replacement planting pit in which a rear planting soil D is provided on the rear side of the plant and the planting soil 2 and the rear planting soil D are adhered to each other.
【請求項4】 植栽桝Cに植栽桝内植栽土2を入れ植栽
物Eを圃場又は施工現場の近くで生育又は活着させた後
植栽桝Cと植栽桝内植栽土2と植栽物Eを一体に施工場
所に運搬し開口部Bに挿入または差しかえる請求項1ま
たは請求項2に記載する挿入差しかえ植栽桝のある土留
め構造物。
4. A planting basin C and a planting basin in the planting basin C after the planting soil 2 in the planting basin C is put in the planting basin C, and the plant E is grown or activated near a field or a construction site. The earth retaining structure having an insertion replacement planting basin according to claim 1 or 2, wherein the plant 2 and the plant E are integrally transported to a construction site and inserted or replaced in the opening B.
JP2000207544A 2000-06-05 2000-06-05 Earth retaining structure with insertion replaceable/ planting box Pending JP2001348876A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000207544A JP2001348876A (en) 2000-06-05 2000-06-05 Earth retaining structure with insertion replaceable/ planting box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000207544A JP2001348876A (en) 2000-06-05 2000-06-05 Earth retaining structure with insertion replaceable/ planting box

Publications (1)

Publication Number Publication Date
JP2001348876A true JP2001348876A (en) 2001-12-21

Family

ID=18704292

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000207544A Pending JP2001348876A (en) 2000-06-05 2000-06-05 Earth retaining structure with insertion replaceable/ planting box

Country Status (1)

Country Link
JP (1) JP2001348876A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005341905A (en) * 2003-06-26 2005-12-15 Shinichiro Hayashi Wall surface greening member and method for greening wall surface
KR100777386B1 (en) 2006-06-07 2007-11-29 김상수 Outer wall of a buikding with tree planting structure
CN110144931A (en) * 2019-05-28 2019-08-20 杭州悦为科技有限公司 A kind of construction method of the board-like Ecological Retaining Wall of novel pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005341905A (en) * 2003-06-26 2005-12-15 Shinichiro Hayashi Wall surface greening member and method for greening wall surface
KR100777386B1 (en) 2006-06-07 2007-11-29 김상수 Outer wall of a buikding with tree planting structure
CN110144931A (en) * 2019-05-28 2019-08-20 杭州悦为科技有限公司 A kind of construction method of the board-like Ecological Retaining Wall of novel pile

Similar Documents

Publication Publication Date Title
CN103931371B (en) A kind of biological control method of rock side-slope
CA2666659C (en) Slope planting structure
JP2004509616A (en) Modular rooftop greening system with pre-seeded panels
CN106358626A (en) Method and device for cultivating root growing upwards to transplant tree
CN113100010A (en) Mountain tree protection transplanting construction method
CN111887067B (en) Method for ecological restoration of artificial vegetation on high and steep rock slope
JP2001348876A (en) Earth retaining structure with insertion replaceable/ planting box
KR100518943B1 (en) A method of constructing gabion mattress with cylinder coir roll
KR100884017B1 (en) Method of Constructing Bank Walls with Recovering Natural Environment
KR20070012944A (en) Non woven fabric vegetation bag, slope structure and slope construction method using thereof
JPH10150862A (en) Vegetation protective cylinder and its method of use
KR101104956B1 (en) Vegetation block and manufacturing method thereof
KR20010046694A (en) Method for revegetation of a shotcrete construction area using tree-planting sandbags
KR100425923B1 (en) Method for greening wild ground
CN109526599A (en) Construction project damages massif ecological, environmental protective low cost restorative procedure
CN218831428U (en) Vine is cultivated and is built device of planting suitable for side slope ecological remediation
CN216018024U (en) Ecological protective structure of high steep rock slope
Yuhu Big Tree Transplanting Techniques in Urban Road Renovation: A Case Study of Big Tree Transplanting in Urban Road Renovation of Jinchang City, Gansu Province
RU2449087C2 (en) Slope protection structure
KR200307894Y1 (en) Embankment block
JP2004278180A (en) Method of seeding and planting slope, seeding and planting guard fence, and seeding and planting structure of slope
KR20190046562A (en) Constructing method of planting environment for eco-friendly rainwater storage
Koeser et al. Planting techniques
JP2761365B2 (en) Revetment block
CN111226676A (en) Roof greening process

Legal Events

Date Code Title Description
A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20061204

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061204

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070213

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20070220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070313

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070423

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070522