JP2001264356A - Monitoring system - Google Patents

Monitoring system

Info

Publication number
JP2001264356A
JP2001264356A JP2000081679A JP2000081679A JP2001264356A JP 2001264356 A JP2001264356 A JP 2001264356A JP 2000081679 A JP2000081679 A JP 2000081679A JP 2000081679 A JP2000081679 A JP 2000081679A JP 2001264356 A JP2001264356 A JP 2001264356A
Authority
JP
Japan
Prior art keywords
power
power supply
monitoring
switch
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000081679A
Other languages
Japanese (ja)
Other versions
JP3869616B2 (en
Inventor
Naohiro Takagamo
直大 高鴨
Toshiko Kimura
寿子 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Hitachi Industrial Equipment Nakajo Engineering Co Ltd
Original Assignee
Hitachi Ltd
Nakajo Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd, Nakajo Engineering Co Ltd filed Critical Hitachi Ltd
Priority to JP2000081679A priority Critical patent/JP3869616B2/en
Publication of JP2001264356A publication Critical patent/JP2001264356A/en
Application granted granted Critical
Publication of JP3869616B2 publication Critical patent/JP3869616B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

PROBLEM TO BE SOLVED: To transfer data by measuring/weighing electric quantities around a transformer using a power line carriage technology, and to assure information at a switcher wherein a power must be supplied from a post stage of a switching mechanism. SOLUTION: A CPU of a switcher 5 is provided with a backup power source while power source monitoring devices 7 and 8 are provided to a high-voltage side and low-voltage side of a transformer 2, respectively, for measuring/ weighing electric quantities around the transformer while power-source monitoring devices are cascaded for communication with power line carriage.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、配電用変電所の系
統の各種電気量の計測・計量あるいは、機器状態を監視
し、これらの情報を上位装置に伝送し、上位装置は所定
の処理を行う監視システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to the measurement and measurement of various quantities of electricity in a distribution substation system or the monitoring of equipment status, transmission of such information to a higher-level device, and the higher-level device performs predetermined processing. Related to monitoring systems.

【0002】[0002]

【従来の技術】配電用変電所の受配電監視システムで
は、系統内に多くの計測用センサやメータ類を用いて電
気諸量を計測・計量あるいはオン・オフ情報などの監視
または制御を行うと共に計測・計量結果、監視情報結果
さらに制御結果などを記録・保存することにより情報管
理を行っている。
2. Description of the Related Art In a power distribution monitoring system for a distribution substation, various measurement sensors and meters are used in a system to measure and measure various electric quantities and to monitor or control on / off information and the like. Information management is performed by recording and storing measurement / weighing results, monitoring information results, and control results.

【0003】図7は、従来の配電用変電所の受配電監視
システムの一例を示す。1は受配電系統の受電側幹線、
2は変圧器、3は配電側の幹線、4は配電側母線、5は
開閉器、6は負荷である。受配電系統の受電側幹線1に
は、電流信号を取り込むためのセンサで変流器(CTセ
ンサ)20および電圧信号を取り込む為のセンサで変成
器(VTセンサ)21が設けられて、電源監視装置11
に接続される。電源監視装置11には通信部を備える。
なお、22は電流計である。各負荷6の開閉器5では、
負荷の電気量を計測・計量するとともに、通信部を備え
る。通信線13を設けて、上記各通信部をカスケード接
続して、それぞれの計測結果を上位装置10へ伝送す
る。なお、14は信号変換器である。このように、同一
構内ではあっても、遠隔部所に設置された電気量の計測
や回路の開閉状態を検知する電源監視装置11および開
閉器5が多数設置され通信線13で上位装置10と結ば
れ監視システムを構成している。また、開閉器5は、た
とえば、過電流に対応して回路を自動遮断する機能をも
備えるものとされる。
FIG. 7 shows an example of a conventional power distribution monitoring system for a distribution substation. 1 is the power receiving side main line of the power receiving and distribution system,
2 is a transformer, 3 is a main line on the distribution side, 4 is a distribution side bus, 5 is a switch, and 6 is a load. The power receiving side main line 1 of the power receiving and distribution system is provided with a current transformer (CT sensor) 20 as a sensor for capturing a current signal and a transformer (VT sensor) 21 as a sensor for capturing a voltage signal. Device 11
Connected to. The power supply monitoring device 11 includes a communication unit.
In addition, 22 is an ammeter. In the switch 5 of each load 6,
It measures and measures the amount of electricity of the load and has a communication unit. A communication line 13 is provided to cascade-connect each of the above communication units, and each measurement result is transmitted to the host device 10. In addition, 14 is a signal converter. As described above, even in the same premises, the power supply monitoring device 11 and the switch 5 are installed in a remote location and measure the amount of electricity and detect the open / closed state of the circuit. It is connected and forms a monitoring system. Further, the switch 5 has a function of automatically shutting off a circuit in response to an overcurrent, for example.

【0004】このような監視システムにおいては、構成
する各装置、機器、などを接続するための配線が多くな
り、施工性が悪く不経済となる問題がある。
[0004] In such a monitoring system, there is a problem that the number of wirings for connecting the constituent devices, devices, and the like increases, and the workability is poor and uneconomical.

【0005】近年ではこの主の問題を解決するための提
案がなされており、例えば、特開平05−174693
号公報、特開平8−226940号公報はセンサとデー
タ伝送回路を内蔵し、通信線で上位装置に情報伝達し配
線数を低減している。
In recent years, proposals have been made to solve this main problem. For example, Japanese Patent Application Laid-Open No. 05-174693 has been proposed.
In Japanese Patent Application Laid-Open No. Hei 8-226940, a sensor and a data transmission circuit are incorporated, and information is transmitted to a host device via a communication line to reduce the number of wirings.

【0006】また、前記のような通信線を無くするため
に配電線を利用し電力線搬送技術を用いてさらに配線工
数を低減する方法があるが、このような電力線搬送技術
を用いると、配電系統内の変圧器で通信信号が阻害ある
いは遮断される問題があり、これを解決する公知例とし
て、特開昭62−35724号公報、特開平1−276
933号公報などが提案され、変圧器間をバイパスさせ
る装置により解決している。
Further, there is a method for further reducing the number of wiring steps by using a power distribution line to eliminate the communication line as described above and using a power line transportation technique. There is a problem that a communication signal is obstructed or cut off by a transformer in the inside, and as known examples of solving this problem, Japanese Patent Application Laid-Open Nos. 62-35724 and 1-276.
No. 933 has been proposed and solved by a device for bypassing between transformers.

【0007】また、特開昭62−104231号公報
は、バイパスさせる装置(子局)が端末装置を監視する
機能を有している例である。
Japanese Patent Laid-Open Publication No. Sho 62-104231 is an example in which a bypass device (slave station) has a function of monitoring a terminal device.

【0008】[0008]

【発明が解決しようとする課題】上記電力線搬送技術を
用いた例は、いずれも変圧器の部分での通信信号をバイ
パスさせるものであって、変圧器まわりの諸電気量を計
測・計量するにはさらに端末装置を設置しなければなら
ず、不経済であると言う問題点がある。
In each of the examples using the power line carrier technique, the communication signal at the transformer is bypassed, and various electric quantities around the transformer are measured and measured. Has to be provided with a terminal device, which is uneconomical.

【0009】また、開閉器に於いては伝送部など電子回
路を有すると電源供給が必須であるが、開閉器の性質、
即ち開閉機構部の後段で過電流などが発生した場合遮断
することを考慮すると、開閉機構部の後段から電源供給
しなければならないため、遮断された後は通信ができ
ず、直前の通信情報が途切れる、あるいは誤った情報に
なると言う問題点がある。本発明はこれらを解決するこ
とにある。
In addition, when a switch has an electronic circuit such as a transmission unit, power supply is indispensable.
That is, in consideration of shutting off when an overcurrent occurs at the subsequent stage of the opening / closing mechanism, power must be supplied from the stage subsequent to the opening / closing mechanism. There is a problem that the information is interrupted or incorrect. The present invention is to solve these problems.

【0010】[0010]

【課題を解決するための手段】本発明では、各機器間の
信号伝送は電力線搬送による通信により行うとともに、
各機器には必要な処理プログラムを持つCPUと必要な
メモリーを備えた小型の計算機を配置して、各機器に要
求される信号はこの計算機により統括的に処理するもの
とする。さらに、電源遮断があっても短時間は信号授受
ができるように、計算機には電路から電源を供給するた
めの電源部を備えるものとした。
According to the present invention, signal transmission between devices is carried out by power line communication.
A small computer equipped with a CPU having a necessary processing program and a necessary memory is arranged in each device, and signals required for each device are collectively processed by the computer. Further, the computer is provided with a power supply unit for supplying power from a power line so that signals can be transmitted and received for a short time even if power is shut off.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施形態を図1〜
図6により説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG.
This will be described with reference to FIG.

【0012】図1は本発明の実施例に係る監視システム
の構成図を示す。1は受配電系統の受電側幹線、2は変
圧器、3は配電側の幹線、4は配電側母線、5は後述す
るところの本発明に係わる開閉器である。6は負荷であ
り開閉器5を通して設けられる配電線に接続される負荷
を模式的に示す。7,8は電源監視装置であり、それぞ
れ負荷側および電源側に設けられている。10は上位装
置であり、必要な処理プログラムを持つ汎用パソコンが
使用される。9は信号変換器であり、後述するように、
電源監視装置7,8および各開閉器5からの信号を上位
装置10に伝え、あるいは逆に、上位装置10からの信
号を電源監視装置7,8および各開閉器5に伝えるため
に設けられる。前記汎用パソコン10は、通信としてR
S−232Cが一般的であり、上記信号変換器9とはR
S232Cケーブルで結ばれる。
FIG. 1 shows a configuration diagram of a monitoring system according to an embodiment of the present invention. 1 is a power receiving side main line of a power distribution system, 2 is a transformer, 3 is a power distribution side main line, 4 is a power distribution side bus, and 5 is a switch according to the present invention, which will be described later. Reference numeral 6 denotes a load, which schematically shows a load connected to a distribution line provided through the switch 5. Reference numerals 7 and 8 denote power supply monitoring devices provided on the load side and the power supply side, respectively. Reference numeral 10 denotes a host device, which uses a general-purpose personal computer having a necessary processing program. 9 is a signal converter, as described later,
It is provided to transmit a signal from the power monitoring devices 7 and 8 and each switch 5 to the host device 10, or conversely, to transmit a signal from the host device 10 to the power monitoring devices 7 and 8 and each switch 5. The general-purpose personal computer 10 communicates with R
S-232C is common, and the signal converter 9 is R
The connection is made with an S232C cable.

【0013】7−1、8−1は電流信号を取り込むため
のセンサで変流器(CTセンサ)、7−2、8−2は電
圧信号を取り込む為のセンサで変成器(VTセンサ)で
あり、それぞれ電源監視装置7,8が設けられた負荷側
および電源側の電流、電圧信号を電源監視装置7,8に
導入するために設けられる。7−11は電力線搬送信号
を注入及び抽出するための搬送部であり、後述するよう
に、負荷側と電源側とを信号で結合するために設けれ
る。
Reference numerals 7-1 and 8-1 denote current transformers (CT sensors) for capturing current signals, and reference numerals 7-2 and 8-2 denote transformers (VT sensors) for capturing voltage signals. The power supply monitoring devices 7 and 8 are provided to introduce current and voltage signals on the load side and the power supply side provided with the power supply monitoring devices 7 and 8 to the power supply monitoring devices 7 and 8, respectively. Reference numeral 7-11 denotes a carrier unit for injecting and extracting a power line carrier signal, and is provided for coupling a load side and a power supply side by a signal, as described later.

【0014】図2は、本発明の実施例の開閉器5の具体
的な構成の一例を示すブロック図である。5−2は受電
側即ち母線4から分岐する各支線に接続するための端子
台、5−3は負荷側の端子台である。5−1は開閉制御
部、5−100は開閉機構部である。5−101は複数
のCTセンサ、5−102は電流信号を整流する整流回
路部、5−103は過電流を検出するとともに開閉制御
部5−1内に必要な電源を供給する電流・電源回路、5
−104は所定の過電流を検出したとき開閉機構部5−
100を瞬時引き外しするための引外し装置を駆動する
瞬時引き外し回路部、5−105は引外し装置、5−1
06は前記所定の過電流よりは小さいが予め設定された
過電流を越えた電流が検出されたとき所定の時限特性に
より開閉機構部5−100を引き外しするための引外し
装置を駆動する限時引き外し回路部、5−107は限時
特性を設定する限時特性設定部、5−108は過電流な
どが発生時に外部に知らせるための警報表示部である。
さらに、5−4は計測用の複数のVTセンサ、5−5は
計測用の複数のCTセンサ、5−6は電源回路部であ
る。5−7は電流・電圧計測回路部であり、上記CTセ
ンサ5−5からの電流信号、上記変成器5−4からの電
圧信号をもとに電流・電圧を計測する。5−15は開閉
器監視装置である。5−8は必要な処理プログラムを持
つCPU部であり、開閉器監視装置5−15の中心機能
を持つものであり、以下のような機能を持つ。上記電流
・電圧計測回路部5−7の計測した値から電力・電力量
の演算、前記警報表示部5−108の出力する信号の取
り込み、前記瞬時引き外し回路部5−104および前記
限時引き外し回路部5−107の出力した信号の取り込
み、後述する電力線搬送信号を内部電子回路に適した信
号に変える送受信部5−12との信号の交換、限時特性
設定部5−107への信号の付与、等である。CPU部
5−8は記憶部5−20を備え、電力および電力量等の
必要なデータを保存することができるものとされる。ま
た、CPU部5−8は、電源回路5−6より必要な電源
が供給される。電源回路5−6はスーパコンデンサ5−
9を備え、開閉機構部5−100が遮断された時、内部
電源をバックアップできるものとされている。バックア
ップする時間は少なくとも電源断直前の通信情報と通信
障害が発生したときの再送情報と電源断情報を上位装置
10と通信できる時間があればよい。当然のことなが
ら、各開閉器のCPU部5−8には、固有アドレスが設
定されており、このアドレスを使用して上位装置10と
各開閉器のCPU部5−8とが通信する。なお、この固
有アドレスの設定は、上位装置10から行うことができ
るものであるとともに、必要なら、開閉器5に設けられ
た設定部5−21によって現場でも行うことができる。
この設定部5−21を設けたときは、限時特性設定部5
−107の設定も現場で行うことが可能となる。
FIG. 2 is a block diagram showing an example of a specific configuration of the switch 5 according to the embodiment of the present invention. Reference numeral 5-2 denotes a terminal block for connection to the power receiving side, that is, each branch line branched from the bus 4, and reference numeral 5-3 denotes a load side terminal block. 5-1 is an opening / closing control unit, and 5-100 is an opening / closing mechanism unit. 5-101 is a plurality of CT sensors, 5-102 is a rectifier circuit for rectifying a current signal, 5-103 is a current / power supply circuit for detecting overcurrent and supplying necessary power to the switching control unit 5-1. , 5
Reference numeral -104 denotes an opening / closing mechanism unit 5 when a predetermined overcurrent is detected.
An instantaneous trip circuit for driving a tripping device for instantaneously tripping 100; 5-105, a tripping device;
Reference numeral 06 denotes a time limit for driving a trip device for tripping the opening / closing mechanism unit 5-100 by a predetermined time characteristic when a current smaller than the predetermined overcurrent but exceeding a preset overcurrent is detected. A trip circuit unit, 5-107 is a time limit characteristic setting unit for setting a time limit characteristic, and 5-108 is an alarm display unit for notifying outside when an overcurrent or the like occurs.
Furthermore, 5-4 is a plurality of VT sensors for measurement, 5-5 is a plurality of CT sensors for measurement, and 5-6 is a power supply circuit unit. Reference numeral 5-7 denotes a current / voltage measurement circuit for measuring current / voltage based on the current signal from the CT sensor 5-5 and the voltage signal from the transformer 5-4. 5-15 is a switch monitoring device. Reference numeral 5-8 denotes a CPU unit having a necessary processing program, which has a central function of the switch monitoring device 5-15, and has the following functions. Calculation of electric power and electric energy from the value measured by the current / voltage measurement circuit section 5-7, capture of a signal output from the alarm display section 5-108, the instantaneous trip circuit section 5-104 and the timed trip Taking in the signal output from the circuit unit 5-107, exchanging a signal with the transmission / reception unit 5-12 that converts a power line carrier signal described later into a signal suitable for the internal electronic circuit, and giving a signal to the time limit characteristic setting unit 5-107 , Etc. The CPU unit 5-8 includes a storage unit 5-20, and can store necessary data such as electric power and electric energy. The CPU unit 5-8 is supplied with necessary power from a power supply circuit 5-6. The power supply circuit 5-6 has a super capacitor 5-
9 so that the internal power supply can be backed up when the opening / closing mechanism 5-100 is shut off. The backup time only needs to be at least as long as the communication information immediately before the power interruption and the retransmission information and the power interruption information when a communication failure occurs can be communicated with the host device 10. Naturally, a unique address is set in the CPU section 5-8 of each switch, and the host apparatus 10 and the CPU section 5-8 of each switch communicate using this address. The setting of the unique address can be performed from the host device 10 and, if necessary, can also be performed on site by the setting unit 5-21 provided in the switch 5.
When the setting unit 5-21 is provided, the time-limit characteristic setting unit 5
The setting of -107 can also be performed on site.

【0015】受電側の端子台5−2の直後に搬送部5−
13が設けられが、この搬送部5−13は前記開閉機構
部5−100よりも端子台5−2の側に設けられる。し
たがって、開閉機構部5−100が断となっても負荷側
の電源監視装置7と通信は行える。搬送部5−13は送
受信部5−12と結合されている。送受信部5−12で
は電力線搬送信号をCPU部に適した信号に変えてCP
U部に導入し、あるいは、CPU部の信号を電力線搬送
信号に適した信号に変換して搬送部5−13に送り出
す。
Immediately after the terminal block 5-2 on the power receiving side, the transport section 5-
The transport unit 5-13 is provided closer to the terminal block 5-2 than the opening / closing mechanism unit 5-100. Therefore, even if the opening / closing mechanism section 5-100 is disconnected, communication with the power supply monitoring device 7 on the load side can be performed. The transport section 5-13 is connected to the transmission / reception section 5-12. The transmission / reception unit 5-12 converts the power line carrier signal into a signal suitable for the CPU unit and
The signal is introduced into the U section, or the signal of the CPU section is converted into a signal suitable for the power line carrier signal and sent to the carrier section 5-13.

【0016】尚、本実施例では、CTセンサ5−101
を所定の過電流領域での特性を良いものとし、CTセン
サ5−5を負荷の定格電流以下の領域での特性を良いも
のとした。こうすることにより、開閉制御部5−1によ
る保護動作を高精度に行い、負荷の計測を高精度に行う
ものとすることができる。
In this embodiment, the CT sensor 5-101 is used.
Have a good characteristic in a predetermined overcurrent region, and the CT sensor 5-5 has a good characteristic in a region below the rated current of the load. By doing so, the protection operation by the switching control unit 5-1 can be performed with high accuracy, and the load measurement can be performed with high accuracy.

【0017】図3は本発明の実施例の負荷側の電源監視
装置7の具体的な構成と幹線1,3および変圧器2との
接続関係の一例を示すブロック図である。
FIG. 3 is a block diagram showing a specific configuration of the load-side power supply monitoring device 7 according to the embodiment of the present invention and an example of a connection relationship between the trunk lines 1, 3 and the transformer 2.

【0018】7は電源監視装置本体、7−1はCTセン
サ、7−2はVTセンサ、7−3は電源部、7−4は上
記CTセンサ、VTセンサからの信号から電流・電圧を
計測する電流・電圧計測部、7−5はCPU部、7−6
は記憶部、7−7は設定部、7−9は幹線1側の送受信
部、7−11は幹線1側で電力線搬送信号を注入及び抽
出するための搬送部、7−12は負荷側の幹線3の送受
信部、7−14は負荷側の幹線3側で電力線搬送信号を
注入及び抽出するための搬送部、7−15はスーパコン
デンサで遮断器7−16、7−17が遮断された時、内
部電源をバックアップするためのものである。なお、図
1では、遮断器7−16、7−17は表示しなかった
が、一般には、変圧器自体の内部事故から変圧器を保護
するために、図示しない変圧器の保護継電器が設けられ
ることが行われ、これが働いたときは、遮断器7−1
6、7−17は遮断される。
Reference numeral 7 denotes a power supply monitoring device main body, 7-1 denotes a CT sensor, 7-2 denotes a VT sensor, 7-3 denotes a power supply unit, and 7-4 measures current and voltage from signals from the CT sensor and VT sensor. Current / voltage measurement unit, 7-5 is a CPU unit, 7-6
Is a storage unit, 7-7 is a setting unit, 7-9 is a transmission / reception unit on the main line 1, 7-11 is a transmission unit for injecting and extracting a power line carrier signal on the main line 1, and 7-12 is a load unit on the load side. The transmission / reception unit of the trunk line 3, 7-14 is a carrier unit for injecting and extracting a power line carrier signal on the trunk line 3 side of the load side, and 7-15 is a super capacitor, and the circuit breakers 7-16 and 7-17 are shut off. Sometimes, this is to back up the internal power supply. The figure
In FIG. 1, the circuit breakers 7-16 and 7-17 are not displayed, but in general, a protection relay for the transformer (not shown) is provided to protect the transformer from an internal accident of the transformer itself. When this worked, the breaker 7-1
6, 7-17 are shut off.

【0019】図3に示す電源監視装置7の各構成ブロッ
クの機能は、変圧器2の負荷側での電流・電圧を計測
し、開閉器5と同じように、CPU部7−5にデータを
渡す点では、図2に示すものと本質的に変わるものでは
ない。しかし、電源監視装置7は幹線1、変圧器3およ
び負荷側の幹線3にまたがって設けられ、幹線1側から
の信号を開閉器5に転送し、開閉器5側からの信号を幹
線1側に転送する機能を持つ点において開閉器5と本質
的に異なる。搬送部7−11,7−14に接続された送
受信部7−9,7−12はその為に設けられる。図の実
施例では、送受信部7−9,7−12の受信した信号
は、一旦、CPU部7−5に送られて信号内容を判断さ
れた後、あらためて送出されるものとして示したが、送
受信部7−9,7−12を一体化して、幹線1側および
負荷側の幹線3の信号を受信に応じて、相互に転送する
ものとしながら、CPU部7−5で、転送されている信
号に対する必要な処理をするものとしても良い。もっと
も、こうすると、幹線1側および負荷側の幹線3の信号
とが、同時に送受信部に到達して信号の衝突を起こす可
能性があるから、幹線1側および負荷側の幹線3の信号
のそれぞれを受信するレジスタは独立させた方が良い。
そして、そのときはCPU部7−5が、その状況を判定
して、必要な転送の制御をすれば良い。
The function of each component block of the power supply monitoring device 7 shown in FIG. 3 is to measure the current and voltage on the load side of the transformer 2 and to send data to the CPU unit 7-5 in the same manner as the switch 5. The passing point is not essentially different from that shown in FIG. However, the power supply monitoring device 7 is provided across the main line 1, the transformer 3, and the main line 3 on the load side, transfers a signal from the main line 1 to the switch 5, and transmits a signal from the switch 5 to the main line 1. Is essentially different from the switch 5 in that it has a function of transferring the data to the switch 5. Transmission / reception units 7-9 and 7-12 connected to the conveyance units 7-1 and 7-14 are provided for that purpose. In the illustrated embodiment, the signals received by the transmission / reception units 7-9 and 7-12 are temporarily sent to the CPU unit 7-5 to determine the signal content, and are then sent out again. The transmission / reception units 7-9 and 7-12 are integrated, and the signals on the main line 1 and the main line 3 on the load side are transferred to each other in response to reception, while being transferred by the CPU unit 7-5. Necessary processing for the signal may be performed. However, in this case, there is a possibility that the signals of the trunk line 1 and the load side of the trunk line 3 may simultaneously reach the transmission / reception unit and cause a signal collision. It is better to make the register for receiving the data independent.
Then, at that time, the CPU section 7-5 may determine the situation and perform necessary transfer control.

【0020】図1に示す電源監視装置8は、上記電源監
視装置7と本質的に同じであるが、幹線1側と上位装置
10とを結ぶ機能を持つ必要がある。したがって、信号
変換器9に結合できる搬送部7−11を持つようにする
工夫が必要である。このため、幹線1側に接続された搬
送部7−14を備えるとともに、搬送部7−11を上位
装置10の交流電源である電源線に設ける。そして、信
号変換器9に搬送部、送受信部を内蔵させて、信号変換
器9をこの電源線に接続することによって信号の授受を
行うのが簡便である。
The power supply monitoring device 8 shown in FIG. 1 is essentially the same as the power supply monitoring device 7, but needs to have a function of connecting the main line 1 to the host device 10. Therefore, a contrivance is required to have the transport unit 7-11 that can be coupled to the signal converter 9. For this purpose, a transport unit 7-14 connected to the trunk line 1 is provided, and the transport unit 7-11 is provided on a power supply line that is an AC power supply of the host device 10. Then, it is convenient to transmit and receive signals by incorporating the carrier unit and the transmission / reception unit in the signal converter 9 and connecting the signal converter 9 to this power supply line.

【0021】ここで監視システムの動作を図4〜図6に
より説明する。以下の説明では、予め、各開閉器5およ
び電源監視装置7,8にアドレスが設定されているもの
として説明する。システムが初期状態にあるなら、各開
閉器5および電源監視装置7,8の設定部を利用して設
定するか、それぞれが持つCPU部の設定機能を利用し
て上位装置10から設定すれば良い。
The operation of the monitoring system will now be described with reference to FIGS. In the following description, it is assumed that addresses are set in advance for each switch 5 and power supply monitoring devices 7 and 8. If the system is in the initial state, the setting may be performed using the setting unit of each switch 5 and the power monitoring devices 7 and 8, or may be performed from the host device 10 using the setting function of the CPU unit of each. .

【0022】図4は、開閉器5のアドレス03の計測・
計量データを取得する場合の情報の流れを示すものであ
る。まず、上位装置10はデータを要求(コマンド)す
る。この際、アドレス03を含めたデータの要求コマン
ドを発行する。すなわち、データの要求と、アドレス0
3に向けられた要求であることを意味するコマンドであ
る。このコマンドは図に太線で示すように、全ての電源
監視装置7,8と各開閉器5に伝えられる。このコマン
ドを受けた電源監視装置7,8と各開閉器5では、コマ
ンドに含まれたアドレスが自身のアドレスかどうかをチ
ェックし、自身のアドレスならば計測・計量値を応答デ
ータ(レスポンス)として上位装置10に返す。この様
子を図5に示す。
FIG. 4 shows the measurement and measurement of the address 03 of the switch 5.
It shows the flow of information when acquiring weighing data. First, the host device 10 requests (commands) data. At this time, a data request command including the address 03 is issued. That is, a request for data and address 0
This is a command indicating that the request is directed to No.3. This command is transmitted to all power supply monitoring devices 7 and 8 and each switch 5 as shown by the thick line in the figure. The power monitoring devices 7 and 8 and each switch 5 receiving this command check whether the address included in the command is their own address. If the address is their own, the measured / weighed value is used as response data (response). Return it to the host device 10. This is shown in FIG.

【0023】次に電源監視装置7の計測・計量データを
取得する場合を考える。電源監視装置7は固有アドレス
が02のためコマンドにO2を含めてコマンドを発行し
全機器に伝えられる。この流れは前記図4と同様であ
る。電源監視装置7は、コマンドに含まれたアドレスが
自身の固有アドレスと一致するため、計測・計量データ
をレスポンスとして上位装置10に返す。この様子を図
6に示す。
Next, the case where the measurement / weighing data of the power supply monitoring device 7 is acquired will be considered. Since the unique address is 02, the power supply monitoring device 7 issues a command including O2 in the command and transmits the command to all devices. This flow is the same as in FIG. Since the address included in the command matches its own unique address, the power supply monitoring device 7 returns the measurement / weighing data to the host device 10 as a response. This is shown in FIG.

【0024】ここで応答データ(レスポンス)について
考えると、上記説明では計測・計量データについて説明
したが、開閉器5の接点(開閉機構部5−100)のO
N/OFF情報や、開閉制御部5−1で取得出来る情
報、例えば過電流に至る経過値、そして過電流値等もレ
スポンスとして上位に送ることができる。
Here, considering the response data (response), the measurement / weighing data has been described in the above description. However, the O of the contact (opening / closing mechanism section 5-100) of the switch 5 is described.
The N / OFF information and the information that can be obtained by the opening / closing control unit 5-1 such as the elapsed value leading to the overcurrent and the overcurrent value can also be sent to the higher order as a response.

【0025】また、電源監視装置7等では、変圧器の温
度なども測定すればレスポンスとして上位装置10に送
ることが可能である。
In the power supply monitoring device 7 and the like, if the temperature of the transformer is measured, it can be sent to the host device 10 as a response.

【0026】[0026]

【発明の効果】本発明では、幹線回路が遮断機を介して
切り離される場合でも、電力線搬送技術により上位装置
10と電源監視装置7,8と各開閉器5との信号の連係
が切れることが無いから、システムの監視に万全を期す
ことができる。また、各機器間を通信線で結ぶ必要がな
いので施工が極めて簡単になる等、監視システムを経済
的に構築することができる。
According to the present invention, even when the main circuit is disconnected via the circuit breaker, the signal link between the host device 10, the power monitoring devices 7, 8 and the switches 5 can be cut off by the power line carrier technology. Since there is no such system, it is possible to ensure system monitoring. In addition, since there is no need to connect each device with a communication line, construction is extremely simplified, and a monitoring system can be economically constructed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例に係る監視システムの構成を示
す図。
FIG. 1 is a diagram showing a configuration of a monitoring system according to an embodiment of the present invention.

【図2】本発明の実施例の開閉器の具体的な構成の一例
を示すブロック図。
FIG. 2 is a block diagram showing an example of a specific configuration of the switch according to the embodiment of the present invention.

【図3】本発明の実施例の負荷側の電源監視装置の具体
的な構成と幹線および変圧器との接続関係の一例を示す
ブロック図。
FIG. 3 is a block diagram showing an example of a specific configuration of a load-side power supply monitoring device according to an embodiment of the present invention and an example of a connection relationship between a trunk line and a transformer.

【図4】開閉器のアドレス03の計測・計量データを取
得する場合の情報の流れを示す図。
FIG. 4 is a view showing a flow of information when acquiring measurement / weighing data at a switch address 03;

【図5】図4の応答データの流れを示す図。FIG. 5 is a diagram showing a flow of response data in FIG. 4;

【図6】電源監視装置の応答データの流れを示す図。FIG. 6 is a diagram showing a flow of response data of the power supply monitoring device.

【図7】従来技術を説明するための監視システム構成
図。
FIG. 7 is a configuration diagram of a monitoring system for explaining a conventional technique.

【符号の説明】[Explanation of symbols]

1:幹線、2:変圧器、3:負荷側の幹線、4:配電
線、5:開閉器、5−1:開閉制御部、5−2:端子
台、5−3:端子台、5−4:VTセンサ、5−5:C
Tセンサ、5−6:電源回路、5−7:電流・電圧計測
回路部、5−8:CPU部、5−12:送受信部、5−
13:搬送部、5−15:開閉器監視装置、5−20:
記憶部、5−21:設定部、7,8:電源監視装置、7
−3:電源部、7−4:電流・電圧計測部、7−5:C
PU部、7−6:記憶部、7−7:設定部、7−9:送
受信部、7−11,7−14:搬送部、7−12:送受
信部、7−16,7−17:遮断器、10:上位装置。
1: trunk line, 2: transformer, 3: load side trunk line, 4: distribution line, 5: switch, 5-1: switching control section, 5-2: terminal block, 5-3: terminal block, 5- 4: VT sensor, 5-5: C
T sensor, 5-6: power supply circuit, 5-7: current / voltage measurement circuit section, 5-8: CPU section, 5-12: transmission / reception section, 5-
13: transport unit, 5-15: switch monitoring device, 5-20:
Storage unit, 5-21: setting unit, 7, 8: power supply monitoring device, 7
-3: power supply unit, 7-4: current / voltage measurement unit, 7-5: C
PU section, 7-6: storage section, 7-7: setting section, 7-9: transmission / reception section, 7-1, 7-14: transport section, 7-12: transmission / reception section, 7-16, 7-17: Circuit breaker, 10: host device.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 木村 寿子 新潟県北蒲原郡中条町大字富岡46番地1 株式会社中条エンジニアリング内 Fターム(参考) 5G064 AA09 AC01 AC09 CA08 CB08 DA01  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Hisako Kimura 46-1 Tomioka, Nakajo-cho, Kitakanbara-gun, Niigata F-term in Nakajo Engineering Co., Ltd. (reference) 5G064 AA09 AC01 AC09 CA08 CB08 DA01

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】受電側幹線と、変圧器と、配電側の幹線
と、配電側母線および配電側母線に接続された開閉器よ
りなる受配電系統の監視システムであって、前記受電側
幹線に設けられた第1の電源監視装置、前記配電側の幹
線に設けられた第2の電源監視装置、前記開閉器に設け
られた開閉器監視装置およびこれらの各監視装置を統括
するための上位装置を備え、各監視装置は被監視対象か
らの電流信号および電圧信号を取り込んで所定の演算を
行うとともに、必要な処理プログラムを持つCPU部を
有し、前記開閉器監視装置のCPU部で処理された信号
は第2の電源監視装置のCPU部および第1の電源監視
装置のCPU部を介して、各監視装置が設けられている
場所の電路を通信路とする電力線搬送により通信が可能
とされたことを特徴とする監視システム。
1. A monitoring system for a power distribution system, comprising: a power receiving side main line, a transformer, a power distribution side main line, a power distribution side bus, and a switch connected to the power distribution side bus. A first power supply monitoring device provided, a second power supply monitoring device provided on the main line on the power distribution side, a switch monitoring device provided on the switch, and a higher-level device for controlling each of these monitoring devices Each monitoring device receives a current signal and a voltage signal from the monitored object, performs a predetermined calculation, has a CPU unit having a necessary processing program, and is processed by the CPU unit of the switch monitoring device. The signals thus transmitted can be communicated via the CPU section of the second power supply monitoring apparatus and the CPU section of the first power supply monitoring apparatus by power line transport using the electric path of the place where each monitoring apparatus is provided as a communication path. Features Monitoring system for.
【請求項2】前記第2の電源監視装置のCPU部による
搬送信号の授受は前記変圧器の遮断器の外側で電力線搬
送により行われる請求項1記載の監視システム。
2. The monitoring system according to claim 1, wherein the transmission and reception of the carrier signal by the CPU of the second power supply monitoring device is performed by power line carrier outside the circuit breaker of the transformer.
【請求項3】前記各監視装置のCPU部に対する駆動電
源は、電路が開状態で電源供給断となった時、少なくと
も電源断直前の通信情報と、通信障害が発生した時の再
送情報と、電源断情報を上位装置に通知するために必要
な短時間必要な電力を供給できるものである請求項1記
載の監視システム。
3. The driving power supply for the CPU section of each of the monitoring devices includes at least communication information immediately before the power supply is cut off when power is cut off with an electric circuit open, retransmission information when a communication failure occurs, and 2. The monitoring system according to claim 1, wherein the monitoring system is capable of supplying power required for a short period of time to notify power-off information to a host device.
JP2000081679A 2000-03-17 2000-03-17 Monitoring system Expired - Fee Related JP3869616B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000081679A JP3869616B2 (en) 2000-03-17 2000-03-17 Monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000081679A JP3869616B2 (en) 2000-03-17 2000-03-17 Monitoring system

Publications (2)

Publication Number Publication Date
JP2001264356A true JP2001264356A (en) 2001-09-26
JP3869616B2 JP3869616B2 (en) 2007-01-17

Family

ID=18598587

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000081679A Expired - Fee Related JP3869616B2 (en) 2000-03-17 2000-03-17 Monitoring system

Country Status (1)

Country Link
JP (1) JP3869616B2 (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006004112A1 (en) * 2004-07-05 2006-01-12 Ip Power Systems Corp. Power consumption measuring device and power control system
WO2009099082A1 (en) * 2008-02-06 2009-08-13 Mitsubishi Electric Corporation Power measuring system, measuring apparatus, load terminal, and device control system
CN102064611A (en) * 2011-01-06 2011-05-18 国电南瑞科技股份有限公司 Transformer substation sequentialization control system with visualization and interactivity
JP2011172259A (en) * 2000-12-28 2011-09-01 Ambient Corp Data communication network and communication method
CN102412624A (en) * 2011-11-08 2012-04-11 湖北省电力公司电力试验研究院 Virtual monitoring method for transformer substation sequence control
JP2012078356A (en) * 2010-09-30 2012-04-19 Nhn Business Platform Corp Removable measurement apparatus
CN102468688A (en) * 2010-11-17 2012-05-23 南京四方亿能电力自动化有限公司 Economical operation automatic control system and method of distribution transformer
CN102570601A (en) * 2011-11-09 2012-07-11 南方电网科学研究院有限责任公司 Transformer substation control cabin technology
JP2013055819A (en) * 2011-09-05 2013-03-21 Sumitomo Electric Ind Ltd Power generation control system and power conditioner
JP2013068578A (en) * 2011-09-26 2013-04-18 Sumitomo Electric Ind Ltd Electric energy measurement system and watt-hour meter
JP2013117484A (en) * 2011-12-05 2013-06-13 Panasonic Corp Power measurement system
JP2013121307A (en) * 2011-12-09 2013-06-17 Ihi Compressor & Machinery Co Ltd Power monitoring system
CN103488154A (en) * 2013-10-09 2014-01-01 国家电网公司 Remote comprehensive monitoring system for transformer substation operating environment and linkage control method thereof
CN103499965A (en) * 2013-10-18 2014-01-08 国家电网公司 Intelligent assisting monitoring system for substation internet of things
CN103747212A (en) * 2014-01-04 2014-04-23 国网四川省电力公司信息通信公司 Realization method of transformer substation video monitoring system integrating motive power environment monitoring data
CN104076833A (en) * 2014-07-04 2014-10-01 国家电网公司 Intelligent switch station water level monitoring and automatic drainage method
CN104407637A (en) * 2014-12-19 2015-03-11 中煤科工集团重庆研究院有限公司 Automatic water level monitoring system for mining
CN104407634A (en) * 2014-11-25 2015-03-11 国家电网公司 Water level monitoring system for transformer substation cable interlayer
JP2016096442A (en) * 2014-11-14 2016-05-26 三菱電機株式会社 Plant communication device
CN106532935A (en) * 2016-11-03 2017-03-22 重庆电力高等专科学校 Method and system used for carrying out intelligent substation secondary system fault diagnosis

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104320629A (en) * 2014-11-05 2015-01-28 国家电网公司 Cable branch box monitoring system

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011172259A (en) * 2000-12-28 2011-09-01 Ambient Corp Data communication network and communication method
US7502698B2 (en) 2004-07-05 2009-03-10 Ip Power Systems Corporation Power consumption measuring device and power control system
WO2006004112A1 (en) * 2004-07-05 2006-01-12 Ip Power Systems Corp. Power consumption measuring device and power control system
JP5235908B2 (en) * 2008-02-06 2013-07-10 三菱電機株式会社 Power measurement system, equipment control system
WO2009099082A1 (en) * 2008-02-06 2009-08-13 Mitsubishi Electric Corporation Power measuring system, measuring apparatus, load terminal, and device control system
AU2009211720B2 (en) * 2008-02-06 2012-08-23 Mitsubishi Electric Corporation Power measuring system, measuring apparatus, load terminal, and device control system
US8476895B2 (en) 2008-02-06 2013-07-02 Mitsubishi Electric Corporation Power measuring system, measuring apparatus, load terminal, and device control system
JP2012078356A (en) * 2010-09-30 2012-04-19 Nhn Business Platform Corp Removable measurement apparatus
CN102468688A (en) * 2010-11-17 2012-05-23 南京四方亿能电力自动化有限公司 Economical operation automatic control system and method of distribution transformer
CN102064611A (en) * 2011-01-06 2011-05-18 国电南瑞科技股份有限公司 Transformer substation sequentialization control system with visualization and interactivity
JP2013055819A (en) * 2011-09-05 2013-03-21 Sumitomo Electric Ind Ltd Power generation control system and power conditioner
JP2013068578A (en) * 2011-09-26 2013-04-18 Sumitomo Electric Ind Ltd Electric energy measurement system and watt-hour meter
CN102412624A (en) * 2011-11-08 2012-04-11 湖北省电力公司电力试验研究院 Virtual monitoring method for transformer substation sequence control
WO2013067745A1 (en) * 2011-11-09 2013-05-16 南方电网科学研究院有限公司 Substation control center technology
CN102570601A (en) * 2011-11-09 2012-07-11 南方电网科学研究院有限责任公司 Transformer substation control cabin technology
JP2013117484A (en) * 2011-12-05 2013-06-13 Panasonic Corp Power measurement system
JP2013121307A (en) * 2011-12-09 2013-06-17 Ihi Compressor & Machinery Co Ltd Power monitoring system
CN103488154A (en) * 2013-10-09 2014-01-01 国家电网公司 Remote comprehensive monitoring system for transformer substation operating environment and linkage control method thereof
CN103499965A (en) * 2013-10-18 2014-01-08 国家电网公司 Intelligent assisting monitoring system for substation internet of things
CN103747212A (en) * 2014-01-04 2014-04-23 国网四川省电力公司信息通信公司 Realization method of transformer substation video monitoring system integrating motive power environment monitoring data
CN104076833A (en) * 2014-07-04 2014-10-01 国家电网公司 Intelligent switch station water level monitoring and automatic drainage method
JP2016096442A (en) * 2014-11-14 2016-05-26 三菱電機株式会社 Plant communication device
CN104407634A (en) * 2014-11-25 2015-03-11 国家电网公司 Water level monitoring system for transformer substation cable interlayer
CN104407637A (en) * 2014-12-19 2015-03-11 中煤科工集团重庆研究院有限公司 Automatic water level monitoring system for mining
CN106532935A (en) * 2016-11-03 2017-03-22 重庆电力高等专科学校 Method and system used for carrying out intelligent substation secondary system fault diagnosis
CN106532935B (en) * 2016-11-03 2019-04-23 重庆电力高等专科学校 For carrying out the method and its system of secondary system of intelligent substation fault diagnosis

Also Published As

Publication number Publication date
JP3869616B2 (en) 2007-01-17

Similar Documents

Publication Publication Date Title
JP2001264356A (en) Monitoring system
US6892145B2 (en) Method and system for conditionally triggered system data capture
EP3001535B1 (en) Protection control system for process bus, merging unit, and computation device
US11112815B1 (en) Fault isolation and restoration scheme
CN112751412B (en) Communication power supply system
KR20230002072U (en) Monitoring device for circuit breaker status of distribution panel
CN110535243A (en) A kind of intelligent comprehensive protection supervisory equipment
US8493866B2 (en) Redundant computers and computer communication networks in a high-voltage power transmission system
JPH0638407A (en) Generator for uninterruptible change-over
CN209642306U (en) A kind of two-way self-shield three-phase motor intelligent controller
JP2005318697A (en) Digital protection and control system
CN207475174U (en) A kind of coincidence brake control device of breaker
JP2503961B2 (en) Loop line protection device
JP3023913B2 (en) Ring protection relay
JP3221342B2 (en) Automatic distribution line switchgear
JP3141807B2 (en) Automatic distribution line switchgear
JPH0644887A (en) Breaker for wiring
JP2827464B2 (en) Trip test equipment for ring system protection equipment
JPS63287322A (en) Relay for detecting ground fault section in distribution line
JPH03251031A (en) Fault zone detector
JP2855650B2 (en) Ring protection relay
JPH0520976B2 (en)
JPS58119725A (en) Non-utility substation facility protecting and relaying system
JPS62173933A (en) Spot network distribution system
JPH0245420B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040116

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20040116

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050930

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051220

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060210

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061003

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061013

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091020

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101020

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111020

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121020

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121020

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131020

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees