JP2001220817A - Method of installing precast concrete member - Google Patents

Method of installing precast concrete member

Info

Publication number
JP2001220817A
JP2001220817A JP2000030674A JP2000030674A JP2001220817A JP 2001220817 A JP2001220817 A JP 2001220817A JP 2000030674 A JP2000030674 A JP 2000030674A JP 2000030674 A JP2000030674 A JP 2000030674A JP 2001220817 A JP2001220817 A JP 2001220817A
Authority
JP
Japan
Prior art keywords
precast concrete
concrete member
guide member
guide
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2000030674A
Other languages
Japanese (ja)
Inventor
Kazuo Mori
和夫 森
Kazuhiko Okumura
一彦 奥村
Makoto Ono
小野  誠
Takehiko Kitagawa
毅彦 北川
Haruhiko Amari
治彦 甘利
Takashi Matsui
崇 松井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Construction Co Ltd
Original Assignee
Sumitomo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Construction Co Ltd filed Critical Sumitomo Construction Co Ltd
Priority to JP2000030674A priority Critical patent/JP2001220817A/en
Publication of JP2001220817A publication Critical patent/JP2001220817A/en
Withdrawn legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To accurately install suspended precast concrete members at fixed positions when a structure is constructed by successively piling up a plurality of the precast concrete members to upper sections. SOLUTION: Guide members 31 are mounted at a plurality of positions along the upper edges of side faces in the previously installed lower-side precast concrete member 21a. The guide members are set up rotatably by bolts 35 while upper sections can be brought to an open state. The upper-side precast concrete member 21b is supported at an opening in the upper section of the suspended and previously installed lower-side precast concrete member, and the guide members 31 are rotated in the direction that the opened upper sections are closed and fixed temporarily. The upper-side precast concrete member is lowered on the lower-side precast concrete member along the guide members.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本願発明は、プレキャストコ
ンクリート部材を、上方に順次積み上げて構造物を構築
する場合における、プレキャストコンクリート部材の据
え付け方法に係り、特に簡単な作業でプレキャストコン
クリート部材を正確な位置に据え付けることができる方
法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing a precast concrete member in a case where a precast concrete member is sequentially stacked upward to construct a structure. To a method that can be installed in

【0002】[0002]

【従来の技術】橋脚等のコンクリートからなる柱状構造
物を構築するにあたり、高所作業の安全性を確保すると
ともに、省力化及び工期の短縮等の合理化が強く求めら
れている。このような要請により提案された方法の一つ
として、工場等において製作されたプレキャストコンク
リート部材を用いるものがある。これは、プレキャスト
コンクリート部材を工場等の条件の良好なところで製作
し、これを施工現場で順次組み立てて構造物を構築する
もので、プレキャストコンクリート部材のみで構造物の
主要部を形成するものの他、プレキャストコンクリート
部材を型枠として用い、プレキャストコンクリート部材
で囲まれた範囲内にコンクリートを現場で打設する方法
がある。
2. Description of the Related Art In constructing a columnar structure made of concrete such as a bridge pier, there is a strong demand for ensuring the safety of work at heights and at the same time rationalizing labor saving and shortening the construction period. As one of the methods proposed in response to such a request, there is a method using a precast concrete member manufactured in a factory or the like. This is to produce a precast concrete member in a good place such as a factory and assemble it sequentially at the construction site to build a structure, other than forming the main part of the structure with only the precast concrete member, There is a method in which a precast concrete member is used as a mold, and concrete is poured on site in a range surrounded by the precast concrete member.

【0003】このような方法では、工場等で製作された
プレキャストコンクリート部材を現場で短い時間内に組
み立てることができ、型枠の製作、鉄筋の組み立て、コ
ンクリートの打設、養生等の作業が大幅に削減されて施
工期間を短縮することができる。また、現場での作業量
が減少するので、柱状構造物を構築する際の高所作業が
少なくなり、安全性が向上する。
[0003] In such a method, precast concrete members manufactured in factories and the like can be assembled on site in a short period of time, and work such as formwork, assembling of rebar, placing of concrete, curing, and the like is greatly performed. And the construction period can be shortened. In addition, since the amount of work on site is reduced, work at heights when constructing a columnar structure is reduced, and safety is improved.

【0004】[0004]

【発明が解決しようとする課題】上記のように、プレキ
ャストコンクリート部材を用いて橋脚等の柱状構造物を
構築するには、プレキャストコンクリート部材をクレー
ン等で吊り上げ、基礎上又はすでに据え付けられた他の
プレキャストコンクリート部材の上に、位置を正確に合
わせて積み上げ、据え付けなければならない。しかしな
がら、吊り上げられたプレキャストコンクリート部材は
揺れ易く、所定の位置に正確に据え付けるのは容易では
ない。
As described above, in order to construct a columnar structure such as a bridge pier using a precast concrete member, the precast concrete member is lifted by a crane or the like, and is mounted on a foundation or other already installed. It must be stacked and installed on precast concrete members in precisely aligned positions. However, the lifted precast concrete member is liable to swing, and it is not easy to accurately install it at a predetermined position.

【0005】これに対し、接合されるプレキャストコン
クリート部材の双方に傾斜面を有する凸部又は凹部を設
けておき、これらを嵌め合わせるようにして、所定位置
に据え付ける方法がある。しかしながら、プレキャスト
コンクリート部材に凸部及び凹部を設けるには、プレキ
ャストコンクリート部材の製作に高い精度が要求され、
ぴったりと嵌め合わされる凸部及び凹部を形成するのに
多くの労力と費用を要することになる。
On the other hand, there is a method in which a convex portion or a concave portion having an inclined surface is provided on both of the precast concrete members to be joined, and these are fitted to each other to be installed at a predetermined position. However, in order to provide the convex and concave portions in the precast concrete member, high precision is required in the production of the precast concrete member,
A great deal of labor and expense is required to form the tightly fitting projections and depressions.

【0006】本発明は、上記のような事情に鑑みてなさ
れたものであり、その目的は簡易な部材を用いて吊り上
げられたプレキャストコンクリート部材を所定の位置に
正確に据え付ける方法を提供することである。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method for accurately mounting a precast concrete member lifted using a simple member at a predetermined position. is there.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
に、請求項1に係る発明は、 複数のプレキャストコン
クリート部材を上方に順次積み上げ、所定の位置に据え
付ける方法であって、既に据え付けられた下側プレキャ
ストコンクリート部材側面の上縁に沿った複数の位置又
は該下側プレキャストコンクリート部材の上に据え付け
られる上側プレキャストコンクリート部材の側面の下縁
に沿った複数の位置に、該上側又は下側プレキャストコ
ンクリート部材の側面より先端が外側に拡開するととも
に、該上側プレキャストコンクリート部材の下縁より下
方へ又は下側プレキャストコンクリート部材の上縁より
上方に突き出すように、部材位置を拘束するためのガイ
ド部材を取り付け、 前記上側プレキャストコンクリー
ト部材を吊り上げて既に据え付けた下側プレキャストコ
ンクリート部材の上方に隙間をあけて支持し、前記ガイ
ド部材を、前記プレキャストコンクリート部材の側面と
平行な位置に回動して先端部を、接合する他方のプレキ
ャストコンクリート部材に対向又は当接させて仮固定
し、 該ガイド部材に沿って、前記上側プレキャストコ
ンクリート部材を前記下側プレキャストコンクリート部
材上に降下させるプレキャストコンクリート部材の据え
付け方法を提供する。
Means for Solving the Problems In order to solve the above problems, the invention according to claim 1 is a method of sequentially stacking a plurality of precast concrete members upward and installing them at a predetermined position, and the method is already installed. The upper or lower precast at a plurality of locations along the upper edge of the side of the lower precast concrete member or at a plurality of locations along the lower edge of the side of the upper precast concrete member mounted on the lower precast concrete member. A guide member for constraining the position of the member so that the tip expands outward from the side surface of the concrete member and projects below the lower edge of the upper precast concrete member or above the upper edge of the lower precast concrete member. Attach and lift the upper precast concrete member The guide member is pivoted to a position parallel to the side surface of the precast concrete member, and the tip is connected to the other precast concrete member to be joined. Provided is a method of installing a precast concrete member in which the upper precast concrete member is lowered on the lower precast concrete member along the guide member and temporarily fixed to face or contact with each other.

【0008】上記ガイド部材の取り付けは、上側プレキ
ャストコンクリート部材を下側プレキャストコンクリー
ト部材の上方に隙間をあけて支持した後に行なってもよ
いし、請求項2に記載のように、異なる態様で取り付け
ておき、上側プレキャストコンクリート部材を下側プレ
キャストコンクリート部材上に吊支持下後に、上記の態
様に変化させてもよい。また、上側プレキャストコンク
リート部材を吊支持したときの下側プレキャストコンク
リート部材との隙間は、上側プレキャストコンクリート
部材が多少揺れても双方が接触しない程度で、ガイド部
材が双方のプレキャストコンクリート部材と対向できる
寸法とする。したがって、大きな寸法のガイド部材を用
いると、この隙間を大きくすることができるが、20c
m程度以下とするのが望ましい。
The guide member may be attached after the upper precast concrete member is supported above the lower precast concrete member with a gap therebetween, or may be attached in a different manner as described in claim 2. Alternatively, the upper precast concrete member may be changed to the above-mentioned mode after being suspended and supported on the lower precast concrete member. In addition, the gap between the upper precast concrete member and the lower precast concrete member when suspended and supported is such that the upper precast concrete member does not come into contact with each other even if the upper precast concrete member is slightly shaken, and the guide member can face both the precast concrete members. And Therefore, if a guide member having a large size is used, the gap can be increased.
m or less.

【0009】上記のようなプレキャストコンクリート部
材の据え付け方法では、上側プレキャストコンクリート
部材を吊り上げ、下側プレキャストコンクリート部材の
上方に隙間をあけて支持したときに、前後左右に揺れ易
い状態となっているが、一方のプレキャストコンクリー
ト部材に取り付けられたガイド部材を操作し、他方のプ
レキャストコンクリート部材に対向又は当接させて仮固
定することによって、揺れを抑止することができる。そ
して、このガイド部材に沿って上側プレキャストコンク
リート部材を降下させることによって、下側プレキャス
トコンクリート部材上の所定位置に据え付けることがで
きる。
In the above method for installing a precast concrete member, when the upper precast concrete member is lifted and supported with a gap above the lower precast concrete member, the precast concrete member is likely to swing back and forth and right and left. By operating the guide member attached to one of the precast concrete members and temporarily fixing the guide member so as to face or contact the other precast concrete member, the shaking can be suppressed. Then, by lowering the upper precast concrete member along the guide member, it can be installed at a predetermined position on the lower precast concrete member.

【0010】また、上記ガイド部材は、上側プレキャス
トコンクリート部材が下側プレキャストコンクリート部
材上に小さな隙間をあけて支持されている状態で、該上
側プレキャストコンクリート部材をガイドするので、部
材の寸法は小さなものでよく、さらにガイド部材が上側
プレキャストコンクリート部材を拘束する力も小さなも
のとなる。したがってガイド部材は簡易なものでよく、
着脱や回動の操作も容易となる。
Further, since the guide member guides the upper precast concrete member in a state where the upper precast concrete member is supported on the lower precast concrete member with a small gap, the size of the member is small. In addition, the force by which the guide member restrains the upper precast concrete member is small. Therefore, the guide member may be simple,
The operation of attaching and detaching and rotating becomes easy.

【0011】請求項2に係る発明は、請求項1に記載の
プレキャストコンクリート部材の据え付け方法におい
て、 前記ガイド部材は、該ガイド部材の取り付けられ
た側面に平行な面内での回動が可能に取り付け、 上側
プレキャストコンクリート部材に取り付けられたガイド
部材は、全体が該上側プレキャストコンクリート部材の
下縁より上方に、下側プレキャストコンクリート部材に
取り付けられたガイド部材は、全体が該下側プレキャス
トコンクリート部材の上縁より下方に、それぞれ位置す
るように設定しておき、 前記上側プレキャストコンク
リート部材を前記下側プレキャストコンクリート部材上
に吊支持した後、前記ガイド部材を側面と平行な面内で
回動し、先端部を接合する他方のプレキャストコンクリ
ート部材に対向又は当接させるものとする。
According to a second aspect of the present invention, in the method for installing a precast concrete member according to the first aspect, the guide member is rotatable in a plane parallel to a side surface to which the guide member is attached. The guide member attached to the upper precast concrete member is entirely above the lower edge of the upper precast concrete member, and the guide member attached to the lower precast concrete member is entirely of the lower precast concrete member. Below the upper edge, set so as to be located respectively, after hanging and supporting the upper precast concrete member on the lower precast concrete member, rotate the guide member in a plane parallel to the side surface, Facing or contacting the other precast concrete member joining the tip It is assumed that the cause.

【0012】この方法では、上側又は下側プレキャスト
コンクリート部材に取り付けられたガイド部材がプレキ
ャストコンクリート部材の接合面より突出していない状
態で、上側プレキャストコンクリート部材が下側プレキ
ャストコンクリート部材上方の近接する位置まで移動さ
れる。このとき、上側プレキャストコンクリート部材は
吊り支持されて揺れ易くなっているが、ガイド部材が接
合面より突出していないので、他方のプレキャストコン
クリート部材に接触して移動を妨げたり、プレキャスト
コンクリート部材又はガイド部材を破損するようなこと
が回避される。そして、上側プレキャストコンクリート
部材が下側プレキャストコンクリート部材との間に隙間
が生じる程度上方に支持されてから、ガイド部材を回動
し、上側プレキャストコンクリート部材の揺れを拘束
し、このガイド部材に沿って上側プレキャストコンクリ
ート部材を降下させることができる。
In this method, the upper precast concrete member is moved to a position above the lower precast concrete member in a state where the guide member attached to the upper or lower precast concrete member does not protrude from the joint surface of the precast concrete member. Be moved. At this time, the upper precast concrete member is suspended and supported to be easily shaken, but since the guide member does not protrude from the joint surface, the upper precast concrete member comes into contact with the other precast concrete member to hinder movement, or the precast concrete member or the guide member Is avoided. Then, after the upper precast concrete member is supported upward to the extent that a gap is formed between the upper precast concrete member and the lower precast concrete member, the guide member is rotated to restrain the swing of the upper precast concrete member, and along the guide member. The upper precast concrete member can be lowered.

【0013】請求項3に係る発明は、請求項1に記載の
プレキャストコンクリート部材の据え付け方法におい
て、 前記ガイド部材は、前記上側プレキャストコンク
リート部材を下側プレキャストコンクリート部材上に据
え付けた後、前記上側プレキャストコンクリート部材と
前記下側プレキャストコンクリート部材との双方にボル
トで締め付けて固定し、 その後に、前記上側プレキャ
ストコンクリート部材の上に、さらに他のプレキャスト
コンクリート部材を積み上げる工程に移るものとする。
According to a third aspect of the present invention, in the method for installing a precast concrete member according to the first aspect, the guide member is configured to install the upper precast concrete member on a lower precast concrete member and then to move the upper precast concrete member. The concrete member and the lower precast concrete member are both fastened and fixed by bolts, and thereafter, a process of stacking another precast concrete member on the upper precast concrete member is started.

【0014】この方法では、ガイド部材を用いて簡単に
上側プレキャストコンクリート部材と下側プレキャスト
コンクリート部材とを互い連結し、相対的な変位が生じ
ないように拘束することができる。したがって上側プレ
キャストコンクリート部材を据え付けた後の工程におい
て、上側プレキャストコンクリート部材に外力が作用し
ても据え付け位置がずれるような事態を防止することが
できる。特に、プレキャストコンクリート部材を型枠と
して用いる場合には、内側に打設するコンクリートの内
圧が偏って作用してもプレキャストコンクリート部材の
変位は上記ガイド部材によって拘束される。
According to this method, the upper precast concrete member and the lower precast concrete member can be easily connected to each other by using the guide member, and can be restrained so that relative displacement does not occur. Therefore, in the process after the upper precast concrete member is installed, it is possible to prevent a situation where the installation position is shifted even if an external force acts on the upper precast concrete member. In particular, when a precast concrete member is used as a formwork, the displacement of the precast concrete member is restricted by the guide member even if the internal pressure of the concrete cast inside acts unevenly.

【0015】[0015]

【発明の実施の形態】以下、本願に係る発明の実施の形
態を図に基づいて説明する。図1は、本願発明に係るプ
レキャストコンクリート部材の据え付け方法を用いて構
築される構造物の一例を示す概略斜視図である。この構
造物1は、プレストレストコンクリートの橋桁2を支持
する橋脚であり、地盤上に形成されたフーチング11
と、この上に立ち上げられた躯体部12と、躯体部の上
に形成された頭部13とを備えている。この橋脚のフー
チング11と頭部13とは場所打ちコンクリートで形成
されているが、躯体部12は、プレキャストコンクリー
トで形成された型枠ブロックを積み上げ、この内側に場
所打ちコンクリートを打設することによって形成されて
いる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a schematic perspective view showing an example of a structure constructed using the method for installing a precast concrete member according to the present invention. This structure 1 is a pier supporting a bridge girder 2 of prestressed concrete, and a footing 11 formed on the ground.
And a skeleton portion 12 raised thereon, and a head portion 13 formed on the skeleton portion. The footing 11 and the head 13 of this pier are made of cast-in-place concrete, but the skeleton 12 is formed by stacking form blocks formed of precast concrete and casting cast-in-place concrete inside the block. Is formed.

【0016】上記型枠ブロック21は、図2に示すよう
に、躯体部12の外側面部分を底のない箱状に形成した
部材であり、この型枠ブロック21内には、橋脚の横方
向鉄筋が埋め込まれている。また、橋脚には側面付近の
主鉄筋を拘束する中間拘束筋22が配置されるが、この
中間拘束筋22も上記型枠ブロック21と一体となるよ
うに組み込まれ、外側面部分のプレキャストコンクリー
トから内側に突出するように配置されている。なお、こ
の中間拘束筋22は、地震時のせん断耐力を維持するた
め、及び大きい曲げモーメントがくり返し作用したとき
に主鉄筋が外側へ膨らみ出すのを拘束するため配置され
るものである。
As shown in FIG. 2, the form block 21 is a member in which the outer surface portion of the frame 12 is formed in a box shape without a bottom. Reinforcing bars are embedded. Further, an intermediate restraining bar 22 for restraining the main reinforcing bar near the side surface is disposed on the pier, and the intermediate restraining bar 22 is also integrated with the formwork block 21 so that the precast concrete on the outer surface portion is used. It is arranged to protrude inward. The intermediate restraining bars 22 are arranged to maintain the shear strength in the event of an earthquake and to restrain the main reinforcing bar from bulging outward when a large bending moment repeatedly acts.

【0017】このような型枠ブロック21を用いた橋脚
の構築は次のように行われる。橋脚のフーチング11を
形成した後、躯体部12の主鉄筋24を配置するととも
に、図3に示すように工場で製作された型枠ブロック2
1をクレーン23で吊り上げ、図4に示すように、主鉄
筋24の外側を囲むように据え付ける。そして、この型
枠ブロック21の内側にコンクリートを打設し、主鉄筋
24を埋め込むとともに型枠ブロック21と一体とす
る。さらに、型枠ブロック21を積み上げ、この型枠ブ
ロック21内にコンクリートを打設することをくり返し
て橋脚の躯体部12を順次上方に立ち上げてゆく。
Construction of a pier using such a formwork block 21 is performed as follows. After the footing 11 of the pier is formed, the main reinforcing bars 24 of the frame 12 are arranged, and the formwork block 2 manufactured at the factory as shown in FIG.
1 is lifted by a crane 23 and installed so as to surround the outside of the main reinforcing bar 24 as shown in FIG. Then, concrete is cast inside the form block 21, the main reinforcing bars 24 are embedded, and the form is integrated with the form block 21. Further, the form blocks 21 are piled up, and the casting of concrete into the form blocks 21 is repeated, so that the frame portions 12 of the piers are sequentially raised upward.

【0018】上記型枠ブロック21を、既に据え付けら
れて内側にコンクリートが打設された他の型枠ブロック
の上に積み上げるように据え付ける工程は次のように行
われる。なお、この工程は本願に係る発明の一実施形態
である。
The step of installing the form block 21 so as to be stacked on another form block already installed and having concrete poured therein is carried out as follows. This step is one embodiment of the present invention.

【0019】図5(a)に示すように、型枠ブロック2
1は4つの側面を有しており、第1の側面21dとこれ
と平行な第3の側面21eとには、上部にガイド部材3
1aを取り付け、第2の側面21fとこれと平行な第4
面21gとには、下部にガイド部材31bを取り付けて
おく。そして、これらのガイド部材31は、プレキャス
トコンクリート部材21の上面より上方又は下面より下
方には突出しないように留め付けておく。
As shown in FIG. 5A, the form block 2
1 has four side surfaces, and a first side surface 21d and a third side surface 21e parallel thereto have a guide member 3
1a, the second side face 21f and the fourth side face
A guide member 31b is attached to the lower surface of the surface 21g. These guide members 31 are fastened so as not to protrude above the upper surface or below the lower surface of the precast concrete member 21.

【0020】ガイド部材31は、図6に示すように、断
面がL型の鋼材からなるもので、長さが350mm〜6
00mm程度で、両端付近にねじ孔32、33が設けら
れている。そして、図7に示すように、型枠ブロック2
1のコンクリート中に埋め込まれたアンカ−34にボル
ト35を螺合し、このボルト35によって取り付けられ
ている。
As shown in FIG. 6, the guide member 31 is made of an L-shaped steel material and has a length of 350 mm to 6 mm.
Approximately 00 mm, screw holes 32 and 33 are provided near both ends. Then, as shown in FIG.
A bolt 35 is screwed into an anchor 34 embedded in the concrete 1 and attached by the bolt 35.

【0021】上記のような型枠ブロック21bはクレー
ンによって吊り上げ、既に据え付けられた下側の型枠ブ
ロック21aの上方にゆっくりと降下させ、図8(b)
に示すように、下側の型枠ブロック21aの上面と上側
の型枠ブロック21bの下面との間隔が約5cm〜10
cm程度となる位置に支持する。そして、ガイド部材3
1を取り付け側面に沿って回動し、上下双方の型枠ブロ
ック21a、21bに対向させる。つまり、下側の型枠
ブロック21aに取り付けられているガイド部材31a
は、回動することによって上部を上側の型枠ブロック2
1bの側面に対向又は当接させ、上側の型枠ブロック2
1bに取り付けられているガイド部材31bは、下部を
下側の型枠ブロック21aの側面に対向又は当接させ
る。
The form block 21b as described above is lifted by a crane and slowly lowered above the lower form block 21a which has already been installed, as shown in FIG. 8 (b).
As shown in the figure, the distance between the upper surface of the lower mold block 21a and the lower surface of the upper mold block 21b is about 5 cm to 10 cm.
cm. And the guide member 3
1 is rotated along the mounting side surface so as to face both the upper and lower formwork blocks 21a and 21b. That is, the guide member 31a attached to the lower mold block 21a
Is rotated to rotate the upper part of the upper form block 2
1b so as to face or contact the side surface of the upper mold block 2
The lower part of the guide member 31b attached to 1b faces or contacts the side surface of the lower mold block 21a.

【0022】このとき、ガイド部材31は、図7に示す
ようにボルト35によって緩く取り付けられており、側
面に対しても回動可能となっている。このため、上側の
型枠ブロック21bと下側の型枠ブロック21aとの位
置が水平方向に多少ずれていても、ガイド部材31を側
面に沿って回動し、図8(b)に示すように、双方の型
枠ブロックに対向させることができる。
At this time, the guide member 31 is loosely attached by bolts 35 as shown in FIG. 7, and is also rotatable with respect to the side surface. For this reason, even if the positions of the upper mold block 21b and the lower mold block 21a are slightly displaced in the horizontal direction, the guide member 31 is rotated along the side surface, as shown in FIG. 8B. In addition, both mold blocks can be opposed.

【0023】上記のようにガイド部材31が上下双方の
型枠ブロック21a、21bと対向すると、取り付けて
いるボルト35を締め付け、ガイド部材31を取り付け
側面に対して回動させて、図8(c)に示すように、他
方の型枠ブロックに当接して、その位置を拘束する。そ
してこのガイド部材31に沿わせて、上側の型枠ブロッ
ク21bをゆっくりと降下させることにより、上側の型
枠ブロック21bは下側の型枠ブロック21a上に正確
に据え付けられる。
When the guide member 31 faces the upper and lower mold blocks 21a and 21b as described above, the attached bolts 35 are tightened, and the guide member 31 is rotated with respect to the mounting side surface, and as shown in FIG. As shown in ()), it abuts on the other form block and restricts its position. By slowly lowering the upper mold block 21b along the guide member 31, the upper mold block 21b is accurately installed on the lower mold block 21a.

【0024】なお、下側の型枠ブロック21aの上面に
は、接着剤として流動性を有するエポキシ樹脂の層が形
成されており、このエポキシ樹脂が双方の型枠ブロック
21a、21bに密着し、接合される。
An epoxy resin layer having fluidity as an adhesive is formed on the upper surface of the lower mold block 21a, and this epoxy resin adheres to both mold blocks 21a and 21b. Joined.

【0025】以上に説明したように実施の形態は、プレ
キャストコンクリート部材を型枠として用いるものであ
るが、プレキャストコンクリート部材のみによって構造
物の主要部分を構成する場合にも、本願に係る据え付け
方法を適用することができる。
As described above, in the embodiment, the precast concrete member is used as the formwork. However, even when the main part of the structure is constituted only by the precast concrete member, the installation method according to the present invention is used. Can be applied.

【0026】[0026]

【発明の効果】以上説明したように、本願発明に係るプ
レキャストコンクリート部材の据え付け方法では、プレ
キャストコンクリート部材に取り付けられた簡易なガイ
ド部材に沿って上側プレキャストコンクリート部材を下
側のプレキャストコンクリート部材上の正確な位置に据
え付けることができ、作業の効率を向上し、施工費用の
低減を図ることができる。
As described above, in the method for installing a precast concrete member according to the present invention, the upper precast concrete member is placed on the lower precast concrete member along the simple guide member attached to the precast concrete member. It can be installed at an accurate position, improving work efficiency and reducing construction costs.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本願発明に係るプレキャストコンクリート部材
の据え付け方法を適用して構築されるコンクリート構造
物の一例を示す概略斜視図である。
FIG. 1 is a schematic perspective view showing an example of a concrete structure constructed by applying a method for installing a precast concrete member according to the present invention.

【図2】図1に示すコンクリート構造物(橋脚)を構築
するために用いられる型枠ブロック(プレキャストコン
クリート部材)の概略斜視図である。
FIG. 2 is a schematic perspective view of a form block (precast concrete member) used for constructing the concrete structure (pier) shown in FIG.

【図3】図2に示す型枠ブロックを吊り下げ、積み上げ
るように据え付ける要領を示す概略図である。
FIG. 3 is a schematic view showing a manner in which the form block shown in FIG. 2 is suspended and stacked.

【図4】図1に示す橋脚を構築する要領を示す概略斜視
図である。
FIG. 4 is a schematic perspective view showing a procedure for constructing the pier shown in FIG. 1;

【図5】図2に示す型枠ブロックを吊り上げて、既に据
え付けられた他の型枠ブロック上に据え付ける方法を示
す概略図である。
FIG. 5 is a schematic view showing a method of lifting the form block shown in FIG. 2 and installing the form block on another form block already installed.

【図6】図5に示す方法で用いられるガイド部材の側面
図及び正面図である。
6A and 6B are a side view and a front view of a guide member used in the method shown in FIG.

【図7】図6に示すガイド部材を型枠ブロックに取り付
けた状態を示す概略断面図である。
FIG. 7 is a schematic sectional view showing a state where the guide member shown in FIG. 6 is attached to a form block.

【図8】型枠ブロックに取り付けられたガイド部材の機
能を示す概略図である。
FIG. 8 is a schematic diagram showing the function of a guide member attached to the form block.

【符号の説明】[Explanation of symbols]

1 コンクリート構造物(橋脚) 2 プレストレストコンクリートの橋桁 11 フーチング 12 躯体部 13 頭部 21 型枠ブロック 22 中間拘束筋 23 クレーン 24 主鉄筋 31 ガイド部材 32、33 ねじ孔 34 アンカー 35 ボルト DESCRIPTION OF SYMBOLS 1 Concrete structure (pier) 2 Prestressed concrete bridge girder 11 Footing 12 Body part 13 Head 21 Formwork block 22 Intermediate restraint bar 23 Crane 24 Main rebar 31 Guide member 32, 33 Screw hole 34 Anchor 35 Bolt

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小野 誠 東京都新宿区荒木町13番地の4 住友建設 株式会社内 (72)発明者 北川 毅彦 東京都新宿区荒木町13番地の4 住友建設 株式会社内 (72)発明者 甘利 治彦 東京都新宿区荒木町13番地の4 住友建設 株式会社内 (72)発明者 松井 崇 東京都台東区駒形1丁目3番16号 住友不 動産駒形ビル 住建コンクリート工業株式 会社内 Fターム(参考) 2D059 AA03 DD16 GG55  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Makoto Ono 13-13 Arakicho, Shinjuku-ku, Tokyo Sumitomo Construction Co., Ltd. (72) Inventor Takehiko Kitagawa 13-4 Arakicho, Shinjuku-ku, Tokyo Sumitomo Construction Co., Ltd. (72) Inventor Haruhiko Amari 13-4 Arakicho, Shinjuku-ku, Tokyo Sumitomo Construction Co., Ltd. (72) Inventor Takashi Matsui 1-3-16 Komagata, Taito-ku, Tokyo Sumitomo Real Estate Komagata Building Sumitomo Concrete Industry F-term in stock company (reference) 2D059 AA03 DD16 GG55

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 複数のプレキャストコンクリート部材
を上方に順次積み上げ、所定の位置に据え付ける方法で
あって、 既に据え付けられた下側プレキャストコンクリート部材
側面の上縁に沿った複数の位置又は該下側プレキャスト
コンクリート部材の上に据え付けられる上側プレキャス
トコンクリート部材の側面の下縁に沿った複数の位置
に、該上側又は下側プレキャストコンクリート部材の側
面より先端が外側に拡開するとともに、該上側プレキャ
ストコンクリート部材の下縁より下方へ又は下側プレキ
ャストコンクリート部材の上縁より上方に突き出すよう
に、部材位置を拘束するためのガイド部材を取り付け、 前記上側プレキャストコンクリート部材を吊り上げて既
に据え付けた下側プレキャストコンクリート部材の上方
に隙間をあけて支持し、 前記ガイド部材を、前記プレキャストコンクリート部材
の側面と平行な位置に回動して先端部を、接合する他方
のプレキャストコンクリート部材に対向又は当接させて
仮固定し、 該ガイド部材に沿って、前記上側プレキャストコンクリ
ート部材を前記下側プレキャストコンクリート部材上に
降下させることを特徴とするプレキャストコンクリート
部材の据え付け方法。
1. A method of sequentially stacking a plurality of precast concrete members upward and installing them at a predetermined position, wherein the plurality of precast concrete members are installed at a plurality of positions along an upper edge of a side surface of a lower precast concrete member already installed or the lower precast concrete member. At a plurality of positions along the lower edge of the side surface of the upper precast concrete member installed on the concrete member, the tip expands outward from the side surface of the upper or lower precast concrete member, and the upper precast concrete member has A guide member for restraining the position of the lower precast concrete member is attached so as to project below the lower edge or above the upper edge of the lower precast concrete member. Leave a gap upward Supporting the guide member, rotating the guide member to a position parallel to the side surface of the precast concrete member, and temporarily fixing the distal end portion to face or contact the other precast concrete member to be joined; And lowering the upper precast concrete member onto the lower precast concrete member.
【請求項2】 前記ガイド部材は、該ガイド部材の取
り付けられた側面に平行な面内での回動が可能に取り付
け、 上側プレキャストコンクリート部材に取り付けられたガ
イド部材は、全体が該上側プレキャストコンクリート部
材の下縁より上方に、下側プレキャストコンクリート部
材に取り付けられたガイド部材は、全体が該下側プレキ
ャストコンクリート部材の上縁より下方に、それぞれ位
置するように設定しておき、 前記上側プレキャストコンクリート部材を前記下側プレ
キャストコンクリート部材上に吊支持した後、前記ガイ
ド部材を側面と平行な面内で回動し、先端部を接合する
他方のプレキャストコンクリート部材に対向又は当接さ
せることを特徴とする請求項1に記載のプレキャストコ
ンクリート部材の据え付け方法。
2. The guide member attached to the upper precast concrete member is rotatable in a plane parallel to the side surface to which the guide member is attached. The guide member attached to the lower precast concrete member above the lower edge of the member is set so that the entire guide member is located below the upper edge of the lower precast concrete member. After suspending and supporting the member on the lower precast concrete member, the guide member is rotated in a plane parallel to the side surface, and is opposed to or abuts on the other precast concrete member joining the tip end. The method for installing a precast concrete member according to claim 1.
【請求項3】 前記ガイド部材は、前記上側プレキャ
ストコンクリート部材を下側プレキャストコンクリート
部材上に据え付けた後、前記上側プレキャストコンクリ
ート部材と前記下側プレキャストコンクリート部材との
双方にボルトで締め付けて固定し、 その後に、前記上側プレキャストコンクリート部材の上
に、さらに他のプレキャストコンクリート部材を積み上
げる工程に移ることを特徴とする請求項1に記載のプレ
キャストコンクリート部材の据え付け方法。
3. After the upper precast concrete member is installed on the lower precast concrete member, the guide member is fixed to both the upper precast concrete member and the lower precast concrete member by bolts. The method of claim 1, further comprising: stacking another precast concrete member on the upper precast concrete member.
JP2000030674A 2000-02-08 2000-02-08 Method of installing precast concrete member Withdrawn JP2001220817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000030674A JP2001220817A (en) 2000-02-08 2000-02-08 Method of installing precast concrete member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000030674A JP2001220817A (en) 2000-02-08 2000-02-08 Method of installing precast concrete member

Publications (1)

Publication Number Publication Date
JP2001220817A true JP2001220817A (en) 2001-08-17

Family

ID=18555658

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000030674A Withdrawn JP2001220817A (en) 2000-02-08 2000-02-08 Method of installing precast concrete member

Country Status (1)

Country Link
JP (1) JP2001220817A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101775365B1 (en) * 2016-02-26 2017-09-06 중산하이픽스 주식회사 Shim for horizontally adjusting wall panel
US11293069B2 (en) 2017-12-22 2022-04-05 Jfe Steel Corporation Method for oxygen-blowing refining of molten iron and top-blowing lance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101775365B1 (en) * 2016-02-26 2017-09-06 중산하이픽스 주식회사 Shim for horizontally adjusting wall panel
US11293069B2 (en) 2017-12-22 2022-04-05 Jfe Steel Corporation Method for oxygen-blowing refining of molten iron and top-blowing lance

Similar Documents

Publication Publication Date Title
US3968618A (en) Method of constructing a foldable building with beam roof and rigid frame
CN108222270B (en) Assembling construction building method of prefabricated building
KR100778252B1 (en) Fabrication-type slab bridge constructed by supporting H-girder to connection member inserted on matrix pile column and construction method thereof
JP2790986B2 (en) Bridge pier construction method and construction method
KR101482522B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
JP2994222B2 (en) Construction method of cast-in-place slab of precast concrete girder and its formwork
JP2742994B2 (en) Bridge pier reinforcement method
KR20090027052A (en) Precast concrete panel, construction method and structure of precast concrete panel using steel plate
JP2001220817A (en) Method of installing precast concrete member
CN110670717A (en) Prefabricated beam type balcony and connecting structure and construction method thereof
CN111074840A (en) Assembled beamless thick-plate high-pile wharf structure and construction method thereof
KR200422840Y1 (en) Fabrication-type slab bridge constructed by supporting H-girder to connection member inserted on matrix pile column
JP2003328369A (en) Precast concrete member, caisson construction method using the same, and tunnel construction method
JP3137448B2 (en) Construction method of concrete main tower
JP3466961B2 (en) Reinforcement method for existing load-bearing walls with openings
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
CN210976062U (en) Assembled frame construction combination system
JP2980567B2 (en) How to replace the bearing device
JP2003328320A (en) Construction method of precast capital part and bridge pier capital part
JP3039295B2 (en) Manufacturing method of prefabricated member of mixed structure
CN216239270U (en) Assembled rectangular opening component and connecting node of assembled rectangular opening component and superposed beam slab
CN216339000U (en) Novel there is not bent cap municipal administration bridge stake column type integral structure
JPH084196A (en) Panel for building
CN212926138U (en) Foundation device is assembled to prefabricated cross counterweight concrete tower crane
JP3171676B2 (en) Construction method of cast-in-place concrete horizontal member

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20070501