JP2001200636A - Stairs construction method and device therefor - Google Patents

Stairs construction method and device therefor

Info

Publication number
JP2001200636A
JP2001200636A JP2000011606A JP2000011606A JP2001200636A JP 2001200636 A JP2001200636 A JP 2001200636A JP 2000011606 A JP2000011606 A JP 2000011606A JP 2000011606 A JP2000011606 A JP 2000011606A JP 2001200636 A JP2001200636 A JP 2001200636A
Authority
JP
Japan
Prior art keywords
stairs
concrete
corridor
inspection
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000011606A
Other languages
Japanese (ja)
Other versions
JP3773734B2 (en
Inventor
Minoru Shimozaka
実 下坂
Tsutomu Kitagawa
勉 北川
Toru Yamazaki
徹 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Gifu Industry Co Ltd
Original Assignee
Kajima Corp
Gifu Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Gifu Industry Co Ltd filed Critical Kajima Corp
Priority to JP2000011606A priority Critical patent/JP3773734B2/en
Publication of JP2001200636A publication Critical patent/JP2001200636A/en
Application granted granted Critical
Publication of JP3773734B2 publication Critical patent/JP3773734B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To construct a high grade stairs to be arranged in a connecting tunnel or an inspection gallery in a short time. SOLUTION: After forms for stairs 22 which are arranged in the connection tunnel 14 and the inspection galley 18 so as to rise, lower, and move freely and are provided with a lid body 24 capable of being opened and closed upward and freely are arranged across a predetermined distance between the connection tunnel 14 and a floor surface 40 of the inspection galley 18, concrete 52 is placed between the floor surface 40 and the forms for stairs 22 by opening the lid body 24 as required, then the concrete 52 is cured and hardened, and the forms for stairs 22 are removed to construct the stairs 20 in the connection tunnel 14 and the inspection gallery 18.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、隣接する各トンネ
ル間に配設された緊急避難用、点検用の連絡トンネルま
たはダム内部に配設された点検用の監査廊内に配設され
る階段を構築する方法および装置に関するものである。
なお、本明細書中、「打設」とは、養生硬化させていな
い泥状のコンクリートを型枠とトンネル内壁面(本発明
においては連絡トンネルまたは監査廊の床面)との間に
充填させることをいう。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a staircase provided in a communication tunnel for emergency evacuation and inspection provided between adjacent tunnels or an inspection corridor for inspection provided inside a dam. And a method and apparatus for constructing.
In the present specification, “placement” refers to filling mud-like concrete, which has not been cured and hardened, between a formwork and a tunnel inner wall surface (in the present invention, a communication tunnel or a floor of an inspection corridor). That means.

【0002】[0002]

【従来の技術】従来、隣接する各トンネル間に配設され
た災害時に人々が緊急避難するため、あるいはトンネル
内部を点検するための連絡トンネル内に配設される階段
(図7(イ)参照)、またはダム内部に配設された内部
を点検するための監査廊内に配設される階段(図7
(ロ)参照)の構築は、図8に示すように、階段に対応
する木製枠を現場にて製作し、この木製枠を連絡トンネ
ルまたは監査廊の傾斜した床面に組立、配設させ、この
木製枠により仕切られた各区画内にコンクリートを打設
し、コンクリートの養生硬化後、各木製枠を脱型させる
ことにより行う方法が採用されてきた。
2. Description of the Related Art Conventionally, steps provided in a communication tunnel for evacuating people in the event of a disaster placed between adjacent tunnels or for inspecting the inside of the tunnel (see FIG. 7A). ) Or stairs installed in the audit corridor for inspecting the inside of the dam (Fig. 7
(See (b)), as shown in Fig. 8, a wooden frame corresponding to the stairs is manufactured on site, and this wooden frame is assembled and arranged on the inclined floor of the communication tunnel or the audit corridor. A method has been adopted in which concrete is poured into each section partitioned by the wooden frame, and after curing and hardening of the concrete, each wooden frame is removed from the mold.

【0003】また、連絡トンネルまたは監査廊の傾斜し
た床面に、粘性のあるコンクリートを打設するため、打
設コンクリート上面も傾斜し、水平とならないことが常
であり、このため打設コンクリート上面を水平に均すた
めのコテ仕上げ作業を作業者が強いられてきた。
Further, in order to cast viscous concrete on the inclined floor surface of a communication tunnel or an inspection corridor, the upper surface of the cast concrete is usually inclined and does not become horizontal. Workers have been forced to perform ironing work to level the surface horizontally.

【0004】なお、図7および図8中、12は隣接した
各トンネル、14は連絡トンネル、16はダム、18は
監査廊、20は階段、40は連絡トンネル14または監
査廊18のコンクリート打設された床面、52はコンク
リート、60は木製枠、62はコンクリート供給管を示
す。
In FIGS. 7 and 8, reference numeral 12 denotes each adjacent tunnel, reference numeral 14 denotes a connecting tunnel, reference numeral 16 denotes a dam, reference numeral 18 denotes an inspection corridor, reference numeral 20 denotes a staircase, and reference numeral 40 denotes a concrete casting of the connecting tunnel 14 or the inspection corridor 18. 52 indicates concrete, 60 indicates a wooden frame, and 62 indicates a concrete supply pipe.

【0005】[0005]

【発明が解決しようとする課題】従来、隣接した各トン
ネル間に配設された連絡トンネルまたはダム内部に配設
された監査廊内に配設される階段の構築は、図8に示す
ように、現場にてその都度木製枠を製作し、組立、配
設、脱型させるため、木製枠の製作、組立、脱型作業が
非常に面倒であり、工期が大幅に遅延することが問題と
なっていた。
Conventionally, as shown in FIG. 8, the construction of a staircase provided in a communication tunnel provided between adjacent tunnels or an audit corridor provided in a dam is as shown in FIG. The production, assembly and dismantling of the wooden frame is very troublesome because the wooden frame is manufactured and assembled, disassembled, and removed from the site each time, and the construction period is greatly delayed. I was

【0006】また、構築する階段全長に応じて木製枠の
組立、脱型作業回数が左右され、階段全長が長い場合に
は極めて作業性が良くないことが問題となっていた。
Further, the number of times of assembling and removing the wooden frame is determined according to the total length of the stairs to be constructed. When the total length of the stairs is long, workability is extremely poor.

【0007】また、木製枠により仕切られた各区画内に
打設されるコンクリート上面は、コンクリートの有する
粘性、木製枠を配設する床面の傾斜のため、傾斜し、水
平とならないことが常であり、このため打設コンクリー
ト上面を水平に均すためのコテ仕上げ作業が必要不可欠
となり、熟練した作業者でもコンクリート上面を水平に
均すことが困難であり、経験が浅い作業者が行う場合に
は常に不均一となり易く、構築する階段の質が著しく低
下することが問題となっていた。
Further, the upper surface of concrete cast in each section partitioned by a wooden frame is always inclined and does not become horizontal due to the viscosity of concrete and the inclination of the floor on which the wooden frame is disposed. Therefore, ironing work to level the cast concrete surface horizontally is indispensable, and it is difficult for even a skilled worker to level the concrete surface horizontally, and when inexperienced workers perform it. However, there is always a problem that the quality of the stairs to be built is remarkably deteriorated.

【0008】また、打設硬化後のコンクリートの強度、
耐久性を向上させるため、振動具によりコンクリートを
振動させる必要があるが、木製枠により外周が全て囲ま
れるため、木製枠内に打設されたコンクリートを振動具
により振動させ難いことが問題となっていた。
Further, the strength of concrete after casting and hardening,
In order to improve durability, it is necessary to vibrate the concrete with a vibrator, but since the entire outer periphery is surrounded by the wooden frame, it is difficult to vibrate the concrete poured into the wooden frame with the vibrator. I was

【0009】本発明は、このような欠点に鑑み、連絡ト
ンネルまたは監査廊内に配設される階段を、短期間で、
高品質に構築することができる方法およびその装置を提
供することを目的とするものである。
The present invention has been made in view of the above drawbacks, and has been developed in a short period of time to provide a staircase provided in a communication tunnel or an audit corridor.
It is an object of the present invention to provide a method and a device capable of being constructed with high quality.

【0010】[0010]

【課題を解決するための手段】本発明は、隣接する各ト
ンネル間に配設された緊急避難用、点検用の連絡トンネ
ルまたはダム内部に配設された点検用の監査廊内に配設
される階段を構築する方法および装置において、連絡ト
ンネルまたは監査廊内に昇降、移動自在に配設され、か
つ上方に開閉自在の蓋体を備えた階段用型枠を、連絡ト
ンネルまたは監査廊の床面との間に所定距離を隔てて配
設させた後、必要に応じて蓋体を開放させながら、連絡
トンネルまたは監査廊の床面と階段用型枠との間にコン
クリートを打設した後、コンクリートを養生硬化させ、
階段用型枠を脱型させることにより、連絡トンネルまた
は監査廊内に階段を構築することを特徴とするものであ
る。
According to the present invention, there is provided an emergency evacuation / inspection communication tunnel provided between adjacent tunnels or an inspection audit corridor provided inside a dam. A method and apparatus for constructing a staircase, comprising: a stair form having a lid capable of being lifted, lowered and moved freely in a communication tunnel or an audit corridor and having an openable and closable upper part, and a floor of the communication tunnel or the audit corridor. After placing the concrete at a predetermined distance from the surface and then placing concrete between the floor of the connecting tunnel or audit corridor and the formwork for the stairs while opening the lid as necessary Curing and hardening the concrete,
The method is characterized in that a staircase is constructed in a communication tunnel or an inspection corridor by removing a stair form.

【0011】[0011]

【発明の実施の形態】本発明に係る階段構築装置は、図
7(イ)に示す隣接した各トンネル12間に配設された
緊急避難用、検査用の連絡トンネル14、または図7
(ロ)に示すダム16内部に配設された検査用の監査廊
18内に配設される階段20を構築することを主目的と
し、図1〜図6に示すように、以下の構成からなるもの
である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A staircase construction apparatus according to the present invention uses a communication tunnel 14 for emergency evacuation and inspection provided between adjacent tunnels 12 shown in FIG.
The main purpose is to construct a staircase 20 arranged in an inspection corridor 18 for inspection arranged inside the dam 16 shown in (b), and as shown in FIGS. It becomes.

【0012】構築する階段20の形状に対応する階段用
型枠22の上面に開閉自在の蓋体24が複数配設されて
いる。
A plurality of openable and closable lids 24 are provided on the upper surface of a staircase formwork 22 corresponding to the shape of the staircase 20 to be constructed.

【0013】本例において、蓋体24は打設コンクリー
トの階段用型枠22内への打設(充填)効率を向上させ
るべく打設コンクリートに浮力を付与するために開放し
て使用され、または開放してコンクリートの打設口とし
て使用され、あるいは打設コンクリートの打設状況を確
認するために使用されるものであり、階段用型枠22の
各階段部に複数個ずつ配設されている(図1、図2およ
び図6参照)。
In this embodiment, the lid 24 is used open to impart buoyancy to the cast concrete in order to improve the casting (filling) efficiency of the cast concrete into the staircase formwork 22, or It is used as a concrete pouring mouth when opened, or used to check the state of pouring concrete. A plurality of stairs are provided at each step of the formwork 22 for stairs. (See FIGS. 1, 2 and 6).

【0014】階段用型枠22の幅方向の両側に、連絡ト
ンネル14または監査廊18内で発生する水分を排水さ
せるための排水溝25を構築するための排水溝用型枠2
6が着脱自在に装着されている。
A drain groove form 2 for constructing a drain groove 25 for draining water generated in the communication tunnel 14 or the inspection corridor 18 on both sides in the width direction of the stair form 22.
6 is detachably mounted.

【0015】階段用型枠22に、昇降手段28および移
動手段30が、着脱自在にそれぞれ配備されている。
An elevating means 28 and a moving means 30 are provided on the stair form 22 in a detachable manner.

【0016】本例において、昇降手段28は、連絡トン
ネル14または監査廊18の内壁面32と階段用型枠2
2との間に着脱自在に装着されたチェーンブロックであ
る。
In this embodiment, the elevating means 28 is connected to the inner wall 32 of the communication tunnel 14 or the inspection corridor 18 and the stair form 2.
2 is a chain block detachably attached to the chain block 2.

【0017】また、移動手段30は、昇降手段28であ
るチェーンブロックに吊設されたトロリー34と、この
トロリー34に係合して移動する移動レール36と、こ
の移動レール36を階段用型枠22と共に移動させる、
階段用型枠22の移動方向の先端部位に設置された巻揚
機構38と、により構成されている。
The moving means 30 includes a trolley 34 suspended from a chain block serving as the elevating means 28, a moving rail 36 which moves by engaging with the trolley 34, and a staircase formwork. Move with 22,
And a hoisting mechanism 38 installed at the leading end of the staircase form 22 in the moving direction.

【0018】さらに、詳述すると、階段用型枠22を移
動させる際、まず移動手段30である移動レール36と
トロリー34を、昇降手段28であるチェーンブロック
により下降させ、次いで移動レール36と階段用型枠2
2とを止着させ、次いで昇降手段28により上昇させた
後、移動レール36を階段用型枠22と共に、巻揚機構
38により移動方向(上方)に移動させる。
More specifically, when the stair form 22 is moved, first, the moving rail 36 as the moving means 30 and the trolley 34 are lowered by the chain block as the elevating means 28, and then the moving rail 36 and the stairs are moved. Formwork 2
After moving the moving rail 36 together with the stair form 22, the moving rail 36 is moved in the moving direction (upward) by the hoisting mechanism 38.

【0019】なお、図中40は連絡トンネル14または
監査廊18のコンクリート打設された床面、42は階段
用型枠22の床面40への固定ボルト、44は階段用型
枠22の調整用棒ジャッキ、46はブラケット、48は
排水溝用型枠26の止着具、50は矢板、52はコンク
リートを示す。
In the drawings, reference numeral 40 denotes a concrete-cast floor of the communication tunnel 14 or the inspection corridor 18, reference numeral 42 denotes a bolt for fixing the stair form 22 to the floor 40, and reference numeral 44 denotes an adjustment of the stair form 22. Reference numeral 46 denotes a bracket, reference numeral 46 denotes a bracket, reference numeral 48 denotes a fastener for the drainage form 26, reference numeral 50 denotes a sheet pile, and reference numeral 52 denotes concrete.

【0020】本装置を使用して隣接する各トンネル12
間に配設された緊急避難用、点検用の連絡トンネル14
またはダム16内部に配設された点検用の監査廊18内
に配設される階段20を構築する方法を以下に詳述す
る。
Using the present device, each adjacent tunnel 12
Emergency evacuation and inspection contact tunnel 14 located between
Alternatively, a method of constructing the stairs 20 provided in the inspection corridor 18 for inspection provided inside the dam 16 will be described in detail below.

【0021】まず、連絡トンネル14または監査廊18
内の所定個所に階段用型枠22を移動させる。
First, the communication tunnel 14 or the audit corridor 18
The stair form 22 is moved to a predetermined place in the inside.

【0022】この際、まず移動手段30である移動レー
ル36とトロリー34を、昇降手段28であるチェーン
ブロックにより下降させ、次いで移動レール36と階段
用型枠22とを止着させ、次いで昇降手段28により上
昇させた後、移動レール36を階段用型枠22と共に、
巻揚機構38により移動方向に移動させる。
At this time, first, the moving rail 36 and the trolley 34 as the moving means 30 are lowered by the chain block as the elevating means 28, and then the moving rail 36 and the stair form 22 are fixed. After being raised by 28, the moving rail 36 is moved together with the formwork 22 for stairs,
It is moved in the moving direction by the hoisting mechanism 38.

【0023】次に、階段用型枠22を、連絡トンネル1
4または監査廊18のコンクリート打設された傾斜した
床面40との間に、構築する階段20に対応する距離を
隔てて配置させた後、この階段用型枠22を固定ボルト
42により床面40に固定する。
Next, the stair form 22 is connected to the connecting tunnel 1.
4 or the concrete floor of the inspection corridor 18 is placed at a distance corresponding to the stairs 20 to be built, and then the stair form 22 is fixed to the floor surface with fixing bolts 42. Fix to 40.

【0024】この際、階段用型枠22と移動手段30で
ある移動レール36との止着を解除する。
At this time, the fastening between the stair form 22 and the moving rail 36 as the moving means 30 is released.

【0025】次に、階段用型枠22の幅方向の両側に、
排水溝用型枠26を配設させる。
Next, on both sides of the stair form 22 in the width direction,
The drainage formwork 26 is provided.

【0026】次に、この排水溝用型枠26、階段用型枠
22と、連絡トンネル14または監査廊18の内壁面3
2、床面40と、の間を矢板50、妻板等を介して被覆
(妻止め)する。
Next, the drainage groove formwork 26, the staircase formwork 22 and the inner wall 3 of the communication tunnel 14 or the inspection corridor 18 will be described.
2. The space between the floor surface 40 and the floor surface 40 is covered with a sheet pile 50, a wife board, or the like (a wife stop).

【0027】また、階段用型枠22の下側縁(図1にお
いて下側)は、既構築階段上面と重合させる。
The lower edge (the lower side in FIG. 1) of the staircase formwork 22 is overlapped with the upper surface of the already built staircase.

【0028】この際、構築する階段20の強度を向上さ
せるため、階段用型枠22と連絡トンネル14または監
査廊18の床面40との間に、鉄筋等の補強材(図示
略)を、配設させることが望ましい。
At this time, in order to improve the strength of the stairs 20 to be constructed, a reinforcing material such as a reinforcing bar (not shown) is provided between the stair form 22 and the floor surface 40 of the communication tunnel 14 or the inspection corridor 18. It is desirable to arrange them.

【0029】次に、階段用型枠22の上方側(図1にお
いて上側)および階段用型枠22の蓋体24を開放させ
た開口部からコンクリート52を、階段用型枠22と連
絡トンネル14または監査廊18の床面40との間全域
に打設する。
Next, concrete 52 is removed from the upper side (upper side in FIG. 1) of the stair form 22 and the opening of the stair form 22 with the cover 24 opened. Alternatively, it is cast in the entire area between the floor 40 and the inspection corridor 18.

【0030】この際、打設されるコンクリート上面が、
コンクリート52の有する粘性、床面40の傾斜のた
め、傾斜し、水平とならないことが常であるが、所要個
所の蓋体24を開放させておくことにより、打設コンク
リート52に浮力を付与し、打設コンクリート52の上
面位置を図2の二点鎖線で示す傾斜位置Xから点線で示
す水平位置Yまで上昇させ、構築する階段20をより高
品質(精密なもの)とすることができる。
At this time, the concrete upper surface to be cast is
Due to the viscosity of the concrete 52 and the inclination of the floor surface 40, it is usual that the concrete 52 is inclined and does not become horizontal. However, by leaving the lid 24 at a required position open, buoyancy is given to the cast concrete 52. Then, the upper surface position of the cast concrete 52 is raised from the inclined position X shown by the two-dot chain line in FIG. 2 to the horizontal position Y shown by the dotted line, so that the stairs 20 to be built can be made higher quality (precision).

【0031】また、コンクリート打設量に応じて、振動
具(図示略)を、開放させた蓋体24の開口部から挿入
し、打設コンクリートを振動させ、締固めることによ
り、養生硬化後のコンクリート(階段)の強度、耐久性
を向上させることができる。
In addition, a vibrating tool (not shown) is inserted from the opened opening of the lid 24 according to the amount of concrete to be poured, and the poured concrete is vibrated and compacted to cure the concrete after curing. The strength and durability of concrete (stairs) can be improved.

【0032】次に、打設コンクリートの養生硬化後、階
段用型枠22と床面40との固定、階段用型枠22と排
水溝用型枠26との固定、を解除した後、両型枠22,
26を脱型する。
Next, after curing of the poured concrete, the fixing of the stair form 22 and the floor surface 40 and the fixing of the stair form 22 and the drain form 26 are released. Frame 22,
26 is demolded.

【0033】この両型枠22,26の脱型により、排水
溝25を備えた階段20が構築される。
By removing the molds 22 and 26, the stairs 20 having the drain grooves 25 are constructed.

【0034】次に、昇降手段28により移動手段30で
あるトロリー34、移動レール36を下降させ、移動レ
ール36と階段用型枠22とを止着し、巻揚機構38に
より階段用型枠22を移動レール36と共に移動させ、
階段用型枠22を次工程位置に移動させる。
Next, the trolley 34 as the moving means 30 and the moving rail 36 are moved down by the elevating means 28, and the moving rail 36 and the stair form 22 are fixed to each other. With the moving rail 36,
The stair form 22 is moved to the next process position.

【0035】この際、昇降手段28であるチェーンブロ
ックおよび移動手段30であるトロリー34は、階段用
型枠22の1回移動長さに対応する間隔、つまり階段用
型枠22の全長の2倍の間隔、に所定数ずつ配設させ、
階段用型枠22を移動させた後、階段用型枠22により
既階段構築個所のチェーンブロックおよびトロリー34
を順次移動させて使用することにより、チェーンブロッ
クおよびトロリー34の使用数を減少させ、コストを激
減させることが可能となる。
At this time, the chain block as the elevating means 28 and the trolley 34 as the moving means 30 have an interval corresponding to the length of one movement of the stair form 22, that is, twice the total length of the stair form 22. At predetermined intervals,
After moving the staircase formwork 22, the staircase formwork 22 uses the chain block and the trolley 34 at the place where the stairs have been constructed.
Are sequentially moved and used, the number of chain blocks and trolleys 34 used can be reduced, and costs can be drastically reduced.

【0036】このように、本発明の方法および装置によ
り、従来のように現場にて木製枠を製作、組立、脱型さ
せる必要がなく、1個の階段用型枠22を連続使用して
構築することができるため、作業性に優れ、工期を大幅
に短縮することができる。
As described above, according to the method and the apparatus of the present invention, it is not necessary to manufacture, assemble, and remove a wooden frame on site as in the related art, and a single stair form 22 is continuously used. Therefore, the workability is excellent, and the construction period can be greatly reduced.

【0037】また、階段用型枠22と連絡トンネル14
または監査廊18の床面40との間にコンクリート52
を打設する際、必要に応じて階段用型枠22に開閉自在
に配設された蓋体24を開放させることにより、打設コ
ンクリート52に浮力を付与し、打設コンクリート52
の上面位置を水平位置Yまで確実に上昇させ、構築する
階段20をより高品質(精密なもの)とすることができ
る。
The stair form 22 and the connecting tunnel 14
Or concrete 52 between the floor 40 of the inspection corridor 18
At the time of placing, the buoyancy is imparted to the cast concrete 52 by opening the lid 24 which is freely openable and closable on the staircase formwork 22 as necessary.
Is reliably raised to the horizontal position Y, and the stairs 20 to be constructed can be made higher in quality (precision).

【0038】なお、本例において、連絡トンネル14ま
たは監査廊18は略半円形のトンネル構造体であるが、
円形のものでもよく、他の形状のものでもよい。
In this embodiment, the communication tunnel 14 or the inspection corridor 18 is a substantially semicircular tunnel structure.
It may be circular or another shape.

【0039】また、階段用型枠22の幅方向の両側には
排水溝用型枠26を配設させ、階段20の構築と共に、
階段20の両側に排水溝25を構築させるものである
が、排水溝を構築しない場合には排水溝用型枠26を省
略することは自明である。
Further, drainage formwork 26 is provided on both sides of the step formwork 22 in the width direction.
Although drain grooves 25 are constructed on both sides of the stairs 20, it is obvious that the drain groove formwork 26 is omitted when the drain grooves are not constructed.

【0040】また、階段用型枠22の昇降手段28はチ
ェーンブロックであるが、昇降自在の機構であれば、他
の機構を採用することは自由である。
Although the elevating means 28 of the staircase formwork 22 is a chain block, any other mechanism can be freely used as long as the mechanism is capable of elevating and lowering.

【0041】また、階段用型枠22の移動手段30はト
ロリー34、移動レール36および巻揚機構38により
構成されているが、移動自在の機構であれば、他の機構
を採用することは自由である。
The moving means 30 of the staircase formwork 22 comprises a trolley 34, a moving rail 36 and a hoisting mechanism 38, but any other mechanism can be freely used as long as it is movable. It is.

【0042】また、本発明に係る方法および装置により
構築される階段20は、連絡トンネル14または監査廊
18内に配設されるものであるが、山等の傾斜した斜面
に配設される階段をも構築できることは自明である。
The stairs 20 constructed by the method and the apparatus according to the present invention are provided in the communication tunnel 14 or the inspection corridor 18, but are provided on an inclined slope such as a mountain. It is obvious that can also be constructed.

【0043】[0043]

【発明の効果】本発明に係る階段構築方法およびその装
置によれば、連絡トンネルまたは監査廊内に昇降、移動
自在に配設され、かつ上方に開閉自在の蓋体を備えた階
段用型枠を、連絡トンネルまたは監査廊の床面との間に
所定距離を隔てて配置固定させた後、必要に応じて蓋体
を開放させながら、床面と階段用型枠との間にコンクリ
ートを打設した後、コンクリートを養生硬化させ、階段
用型枠を脱型させることにより、階段を構築するため、
従来のように現場にて木製枠を製作、組立、脱型する必
要がなく、1個の階段用型枠を連続使用して構築するこ
とができ、作業性に優れ、工期を大幅に短縮することが
できる。
According to the method and the apparatus for constructing a staircase according to the present invention, a form for a staircase which is disposed so as to be able to ascend, descend, and move freely in a communication tunnel or an inspection corridor, and has a lid which can be opened and closed upward. Is fixed at a predetermined distance from the floor of the communication tunnel or audit corridor, and concrete is struck between the floor and the formwork for the stairs while opening the lid as necessary. After setting, the concrete is cured and hardened, and the stairs are built off by removing the formwork.
There is no need to manufacture, assemble, and remove a wooden frame on site as in the past, and it is possible to build a single staircase form continuously, and it is excellent in workability and greatly shortens the construction period. be able to.

【0044】また、コンクリートを打設する際、必要に
応じて階段用型枠に開閉自在に配設された蓋体を開放さ
せることにより、打設コンクリートに浮力を付与し、打
設コンクリートの上面位置を水平位置まで確実に上昇さ
せ、作業者によるコテ仕上げ作業をする必要もなく、構
築する階段をより高品質(精密なもの)とすることがで
きる。
When the concrete is poured, buoyancy is imparted to the cast concrete by opening the lid which can be freely opened and closed on the stair formwork as required, so that the upper surface of the cast concrete can be obtained. The position can be reliably raised to a horizontal position, and the stairs to be constructed can be of higher quality (precision) without the need for the operator to perform ironing work.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る階段構築装置の側面図。FIG. 1 is a side view of a stair building apparatus according to the present invention.

【図2】図1のA部拡大側面図。FIG. 2 is an enlarged side view of a portion A in FIG.

【図3】本発明に係る階段構築装置の正面図。FIG. 3 is a front view of the stair building apparatus according to the present invention.

【図4】図3のB部拡大正面図。FIG. 4 is an enlarged front view of a portion B in FIG. 3;

【図5】階段用型枠移動時の要部拡大正面図。FIG. 5 is an enlarged front view of a main part when the stair form is moved.

【図6】階段用型枠の要部拡大平面図であり、中央から
左側部分は蓋体開放状態を示し、中央から右側部分は蓋
体閉塞状態を示す。
FIG. 6 is an enlarged plan view of a main part of the stair form, in which a left part from the center shows a cover opened state, and a right part from the center shows a lid closed state.

【図7】(イ)は連絡トンネルを示す正面図、(ロ)は
監査廊を示す正面図。
7A is a front view showing a communication tunnel, and FIG. 7B is a front view showing an inspection corridor.

【図8】従来の階段構築状態を示す側面図。FIG. 8 is a side view showing a conventional staircase construction state.

【符号の説明】[Explanation of symbols]

12 トンネル 14 連絡トンネル 16 ダム 18 監査廊 20 階段 22 階段用型枠 24 蓋体 28 昇降手段 30 移動手段 40 床面(連絡トンネル14または監査廊18の) 52 コンクリート DESCRIPTION OF SYMBOLS 12 Tunnel 14 Communication tunnel 16 Dam 18 Audit hall 20 Stairs 22 Formwork for stairs 24 Lid 28 Elevating means 30 Transportation means 40 Floor surface (of communication tunnel 14 or audit hall 18) 52 Concrete

───────────────────────────────────────────────────── フロントページの続き (72)発明者 北川 勉 岐阜県本巣郡真正町十四条144番地 岐阜 工業株式会社内 (72)発明者 山崎 徹 岐阜県本巣郡真正町十四条144番地 岐阜 工業株式会社内 Fターム(参考) 2D055 CA08 DA01  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Tsutomu Kitagawa 144, 14-14, Masamasa, Motosu-gun, Gifu Gifu Kogyo Co., Ltd. Co., Ltd. F term (reference) 2D055 CA08 DA01

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 隣接する各トンネル(12)間に配設された
緊急避難用、点検用の連絡トンネル(14)またはダム(16)
内部に配設された点検用の監査廊(18)内に配設される階
段(20)を構築する方法において、連絡トンネル(14)また
は監査廊(18)内に昇降、移動自在に配設され、かつ上方
に開閉自在の蓋体(24)を備えた階段用型枠(22)を、連絡
トンネル(14)または監査廊(18)の床面(40)との間に所定
距離を隔てて配設させた後、必要に応じて蓋体(24)を開
放させながら、連絡トンネル(14)または監査廊(18)の床
面(40)と階段用型枠(22)との間にコンクリート(52)を打
設した後、コンクリート(52)を養生硬化させ、階段用型
枠(22)を脱型させることにより、連絡トンネル(14)また
は監査廊(18)内に階段(20)を構築することを特徴とする
階段構築方法。
1. A communication tunnel (14) or a dam (16) for emergency evacuation and inspection disposed between adjacent tunnels (12).
In the method of constructing the stairs (20) to be installed in the inspection corridor (18) for inspection, it is installed in the communication tunnel (14) or the audit corridor (18) so as to be able to move up and down and move freely. A stair form (22) provided with a lid (24) that can be opened and closed at the top and at a predetermined distance from the connecting tunnel (14) or the floor (40) of the audit corridor (18). After opening the lid (24) if necessary, the floor (40) of the connecting tunnel (14) or the audit corridor (18) and the formwork for stairs (22) are opened. After placing the concrete (52), the concrete (52) is cured and hardened, and the stair form (22) is removed from the stairs (20) in the communication tunnel (14) or the audit corridor (18). A stair building method, comprising:
【請求項2】 隣接する各トンネル(12)間に配設された
緊急避難用、点検用の連絡トンネル(14)またはダム(16)
内部に配設された点検用の監査廊(18)内に配設される階
段(20)を構築する装置において、上方に開閉自在の蓋体
(24)を備えた階段用型枠(22)が、連絡トンネル(14)また
は監査廊(18)内に昇降、移動自在に配設されており、階
段用型枠(22)を連絡トンネル(14)または監査廊(18)の床
面(40)との間に所定距離を隔てて配設させた後、必要に
応じて蓋体(24)を開放させながら、連絡トンネル(14)ま
たは監査廊(18)の床面(40)と階段用型枠(22)との間にコ
ンクリート(52)を打設した後、コンクリート(52)を養生
硬化させ、階段用型枠(22)を脱型させることにより、連
絡トンネル(14)または監査廊(18)内に階段(20)を構築す
ることを特徴とする階段構築装置。
2. A tunnel (14) or a dam (16) for emergency evacuation and inspection disposed between adjacent tunnels (12).
In a device that constructs a staircase (20) installed in an inspection corridor (18) installed inside, a lid that can be opened and closed upwards
A staircase formwork (22) equipped with a staircase formwork (22) is provided in the communication tunnel (14) or the inspection corridor (18) so as to be able to move up and down and move freely. 14) or the floor (40) of the audit corridor (18), with a predetermined distance between them, then open the lid (24) as necessary, and open the communication tunnel (14) or audit. After placing concrete (52) between the floor (40) of the corridor (18) and the formwork for stairs (22), the concrete (52) is cured and hardened, and the formwork for stairs (22) is removed. A staircase construction device characterized by constructing a staircase (20) in a communication tunnel (14) or an audit corridor (18) by molding.
JP2000011606A 2000-01-20 2000-01-20 Staircase construction method and apparatus Expired - Fee Related JP3773734B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000011606A JP3773734B2 (en) 2000-01-20 2000-01-20 Staircase construction method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000011606A JP3773734B2 (en) 2000-01-20 2000-01-20 Staircase construction method and apparatus

Publications (2)

Publication Number Publication Date
JP2001200636A true JP2001200636A (en) 2001-07-27
JP3773734B2 JP3773734B2 (en) 2006-05-10

Family

ID=18539450

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000011606A Expired - Fee Related JP3773734B2 (en) 2000-01-20 2000-01-20 Staircase construction method and apparatus

Country Status (1)

Country Link
JP (1) JP3773734B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003074298A (en) * 2001-09-06 2003-03-12 Teito Rapid Transit Authority Steel form for step wise tunnel side way, and construction method of step wise tunnel side way
JP2014214578A (en) * 2013-04-30 2014-11-17 鹿島建設株式会社 Movable type form device for inspection gallery of dam, and construction method of inspection gallery of dam
CN114165055A (en) * 2021-12-15 2022-03-11 山东长泰建设集团工程有限公司 Cast-in-place stair concrete pouring and tamping process

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101522022B1 (en) * 2014-03-24 2015-05-21 주식회사 다원종합건축사사무소 Mold for kick plate with anchor bolt for handrail and stairway construction method using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003074298A (en) * 2001-09-06 2003-03-12 Teito Rapid Transit Authority Steel form for step wise tunnel side way, and construction method of step wise tunnel side way
JP4562329B2 (en) * 2001-09-06 2010-10-13 東京地下鉄株式会社 Steel formwork for stepped tunnel sideways and construction method for stepped tunnel sideways
JP2014214578A (en) * 2013-04-30 2014-11-17 鹿島建設株式会社 Movable type form device for inspection gallery of dam, and construction method of inspection gallery of dam
CN114165055A (en) * 2021-12-15 2022-03-11 山东长泰建设集团工程有限公司 Cast-in-place stair concrete pouring and tamping process

Also Published As

Publication number Publication date
JP3773734B2 (en) 2006-05-10

Similar Documents

Publication Publication Date Title
US3275719A (en) Method of building in situ construction using sequential molding techniques
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
KR100833527B1 (en) Non-cementation concrete forming structure of capsule type or cave type underground structure
JP6966853B2 (en) How to place concrete on an inclined surface and mobile formwork equipment
CN106113230A (en) For the prefabricated non-type of bench, template system and construction method thereof can be had enough to meet the need
JP2001200636A (en) Stairs construction method and device therefor
JP4052918B2 (en) Outer formwork for tunnel gate and tunnel tunnel construction method using this
CN108286333B (en) Floor slab formwork system and building method of house building
CN106965302A (en) A kind of prefabricated stringer type stairway and its particular manufacturing craft and construction method
JPH06272380A (en) Concrete placement method and placement chute in inverted lining method
JPH0860825A (en) Construction method of staircase
JP2001193382A (en) Constructing method for shaft having wall with varied thickness
JP2699819B2 (en) Construction method of precast reinforced concrete foundation block
JP5608060B2 (en) Housing construction method and formwork for following housing
CN215291442U (en) Support frame system for reinforcing narrow space template
JP2647012B2 (en) Stair plate, method of manufacturing the same, and formwork device
CN212471900U (en) Special mould for prefabricated laminated elevator shaft
CN211590623U (en) Vertical casting hollow beam template
JP2657390B2 (en) Construction method of inclined concrete structure
JP4562329B2 (en) Steel formwork for stepped tunnel sideways and construction method for stepped tunnel sideways
JPS5953981B2 (en) Formwork method and its equipment
JP4119315B2 (en) Construction method of independent foundation
JPH08105240A (en) Mold frame of tower concrete structure and its construction method
JP2005264600A (en) Manufacturing method for precast-concrete staircase constituting body
KR200243718Y1 (en) Mold device for second lining wall operation of vertical tunnel

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050617

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050712

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050912

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060131

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060215

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees