JP2001165137A - Method of fitting beam-jointing bolt in rectangular steel column - Google Patents
Method of fitting beam-jointing bolt in rectangular steel columnInfo
- Publication number
- JP2001165137A JP2001165137A JP35385999A JP35385999A JP2001165137A JP 2001165137 A JP2001165137 A JP 2001165137A JP 35385999 A JP35385999 A JP 35385999A JP 35385999 A JP35385999 A JP 35385999A JP 2001165137 A JP2001165137 A JP 2001165137A
- Authority
- JP
- Japan
- Prior art keywords
- bolt
- hole
- mounting
- screw
- rectangular steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は5階建て程度までの
長尺な角形鋼管柱にH形鋼等の梁を接合する場合に取付
けるボルトが、角形鋼管柱の外部からその内壁に誘導さ
れて配置出来る角形鋼管柱に於ける梁接合用ボルトの取
付方法に関する。BACKGROUND OF THE INVENTION The present invention relates to a bolt for connecting a beam such as an H-beam to a long rectangular steel pipe column having a length of up to about 5 stories, which is guided from the outside of the rectangular steel pipe column to its inner wall. The present invention relates to a method of mounting beam connecting bolts on a square steel pipe column that can be arranged.
【0002】[0002]
【従来の技術】従来、角形鋼管柱とH形鋼等の梁との接
合は、角形鋼管柱の内部に手が入らないため、殆ど溶接
工法が採用されているが、溶接工法は手間が掛るばかり
でなく、溶接作業者の技能によって梁の溶接部の品質や
強度にバラツキが生じていた。また溶接工法では角形鋼
管柱を一度切断し、梁を接合した後、角形鋼管柱を溶接
で接合するため、角形鋼管柱の品質の確保にも問題があ
ると共に組立精度が要求されるため、寸法がしっかり決
まるまで仕事が出来なかった。このため、図5に示すよ
うな角形鋼管柱(1)とH形鋼等の梁(9)との接合に
ボルト工法が採用された接合構造のものも多くなってい
るが、これは短く切断された角形鋼管柱(1)の端部か
ら内部に手を入れてボルト(2)を配置させると共に接
合金物(6)を固定し、且つH形鋼等の梁(9)をボル
ト(2)で角形鋼管柱(1)に取付けたボルト工法であ
る一方、一度切断した角形鋼管柱(1)を溶接で再度接
合するためその品質の確保に問題があると共に長尺の角
形鋼管柱(1)の途中位置にH形鋼等の梁(9)を取付
けることは不可能であった。2. Description of the Related Art Conventionally, welding of a square steel pipe column to a beam such as an H-section steel beam is hardly performed because the inside of the square steel pipe column is inaccessible, but the welding method is troublesome. Not only that, the quality and strength of the welded portion of the beam varied due to the skill of the welding operator. In addition, in the welding method, the square steel pipe column is cut once, the beam is joined, and then the square steel pipe column is welded.Therefore, there is a problem in securing the quality of the square steel pipe column and assembly accuracy is required. I couldn't do the job until the decision was made. For this reason, as shown in FIG. 5, there are many joint structures using a bolt construction method for joining a square steel pipe column (1) and a beam (9) such as an H-section steel, etc. Reach the inside from the end of the square steel pipe column (1), place the bolt (2), fix the joint hardware (6), and attach the beam (9) such as H-section steel to the bolt (2). The method is a bolt method in which the rectangular steel pipe column (1) is attached to the rectangular steel pipe column (1). On the other hand, the rectangular steel pipe column (1), which has been cut once, is joined again by welding. It was not possible to attach a beam (9) such as an H-section steel at an intermediate position of.
【0003】近年に於いては長尺な角形鋼管柱(1)の
任意の位置でもH形鋼等の梁(9)を容易にボルト工法
が行えるように、特殊な梁接合用補強金物を長尺な角形
鋼管柱(1)の内部に取付ける工法などが種々提案され
ている。本発明者においても実用新案登録番号第301
8179号で「建築用角形鋼管柱と梁の接合用取付部
材」を提案したところである(図4参照)。更に長尺な
角形鋼管柱(1)の任意の位置でもH形鋼等の梁(9)
を外側から容易にボルト工法が行えるための実用新案登
録番号第3018180号で「建築用角形鋼管柱と梁な
どの接合用取付ボルト」を提案したところである。[0003] In recent years, a special reinforcing metal for beam joining has been used to easily bolt a beam (9) such as an H-beam at an arbitrary position of a long rectangular steel tubular column (1). Various construction methods have been proposed for mounting the inside of a long rectangular steel tube column (1). The present inventor also has utility model registration number 301.
No. 8179 proposes a "mounting member for connecting a rectangular steel tubular column and a beam for building" (see FIG. 4). Furthermore, a beam (9) of H-section steel or the like can be provided at any position of the long rectangular steel tube column (1)
Has been proposed in Japanese Utility Model Registration No. 3018180 for easily performing the bolting method from the outside.
【0004】[0004]
【発明が解決しようとする課題】しかしながら前記梁接
合用補強金物を長尺な角形鋼管柱(1)の内部に取付け
る工法や実用新案登録番号第3018179号の接合用
取付部材を用いる場合には、それらを長尺な角形鋼管柱
(1)の内部に取付ける際に、穴を正確に合致させてボ
ルト(2)を通すことが難しく、又、前記接合用取付部
材の取付け位置を正確にセットすることが面倒で手間が
掛り、特に角形鋼管柱(1)の板厚が異なりその内径が
異なると使用できなくなる等の問題点があった。更に本
発明者が提案した角形鋼管柱(1)の外側から容易にボ
ルト工法が行えるための接合用取付ボルトを用いると、
その構造が複雑であるので、部品単価が高くなるのが欠
点であった。However, in the case of using a method of attaching the reinforcing metal for beam joining to the inside of a long rectangular steel tubular column (1) or using a joining attachment member of Utility Model Registration No. 3018179, When attaching them to the inside of a long rectangular steel pipe column (1), it is difficult to pass the bolts (2) by aligning the holes exactly, and the mounting position of the joint mounting member is set accurately. This is troublesome and troublesome. In particular, there is a problem that the rectangular steel tube column (1) cannot be used if the plate thickness is different and the inner diameter is different. Furthermore, when using the mounting bolts for joining that enables the bolting method to be easily performed from the outside of the square steel tubular column (1) proposed by the present inventors,
The disadvantage is that the unit cost is high because the structure is complicated.
【0005】本発明は閉鎖断面を有する角形鋼管柱の任
意の位置で且つその内壁へ直接に取付けることが出来る
と共に接合金具の穴にも容易に取付けることが可能な角
形鋼管柱に於ける梁接合用ボルトの取付方法を提供する
ことを目的とする。SUMMARY OF THE INVENTION The present invention relates to a beam joint in a square steel tube column which can be directly attached to an arbitrary position of a square steel tube column having a closed cross section and the inner wall thereof, and which can be easily installed in a hole of a joint fitting. It is an object of the present invention to provide a method for mounting a bolt for use.
【0006】[0006]
【課題を解決するための手段】上記問題点を解決するた
めに本発明は成されたものであり、つまり、任意の位置
に梁接合用ボルトの取付穴を穿設した従来のボルト工法
で用いる長尺な角形鋼管柱に、前記取付穴の近くにボル
ト挿通用の挿入穴を穿設し、ボルトの先端を支持するた
めの支持部と、前記挿入穴と取付穴間を誘導させるワイ
ヤーなどの導入部とから成るボルトチャックを用い、該
ボルトチャックにボルトの先端を支持させ、それを挿入
穴に挿通させて対向面又は横面の取付穴に向ってボルト
を誘導して各取付穴からボルトのネジ部を引出して突出
させ、そのネジ部に合せて補強鋼鈑や接合金物を配置さ
せると共に前記ネジ部にワッシャとナットを取付けて固
定し、前記角形鋼管柱の内壁にボルトが直接に取付けら
れる角形鋼管柱に於ける梁接合用ボルトの取付方法とす
る。尚、前記ボルトのネジ部を引出して突出させた際
に、ネジ部の基部に仮止具を取付け、全ての取付穴にボ
ルトを突出させて仮止具で仮止めした後、補強鋼鈑や接
合金物を配置すると共に各ネジ部にワッシャとナットを
取付け、その後、仮止具を全て取外し、更にナットを締
めて仮締めする梁接合用ボルトの取付方法としても良
い。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems. That is, the present invention is applied to a conventional bolt construction method in which a mounting hole for a beam connecting bolt is formed at an arbitrary position. In a long rectangular steel pipe column, an insertion hole for bolt insertion is drilled near the mounting hole, a supporting portion for supporting the tip of the bolt, a wire for guiding between the insertion hole and the mounting hole, and the like. Using a bolt chuck composed of an introduction part, the bolt chuck supports the tip of the bolt, inserts it through the insertion hole, guides the bolt toward the mounting hole on the facing surface or the lateral surface, and bolts from each mounting hole. Pull out and protrude the screw part, place a reinforcing steel plate and joining hardware in accordance with the screw part, attach a washer and a nut to the screw part, fix it, and directly attach a bolt to the inner wall of the square steel pipe column Square pillars It takes the method of mounting Beam Connection bolt. When the screw portion of the bolt is pulled out and protruded, a temporary fixing tool is attached to the base of the screw portion, and the bolt is protruded from all the mounting holes and temporarily fixed with the temporary fixing device. A method of attaching beam joining bolts may be used in which the joining hardware is arranged, a washer and a nut are attached to each screw portion, all the temporary fixing tools are removed, and the nut is further tightened and temporarily fastened.
【0007】[0007]
【発明の実施の形態】図1は本発明方法の実施形態の工
法を示す図であり、先ず始めに図中の番号について説明
する。(1)は5階建て程度までの長尺な角形鋼管柱で
あり、該角形鋼管柱(1)の任意の位置には梁接合用ボ
ルト(2)の取付穴(11)が穿設されていると共にボル
ト挿通用の挿入穴(12)が穿設されている。前記取付穴
(11)はボルト(2)のネジ部(21)の外径よりも2mm
前後大きく穿設されており、前記挿入穴(12)はネジ径の
2.5倍〜3倍程度の大きさであり、ボルト(2)の頭
部が容易に入って挿通出来る大きさに穿設すれば良い。
尚、前記挿入穴(12)は前記取付穴(11)の対向面に穿設
するが、梁(9)の取付け状態によっては、必ずしも対
向面に穿設しなくても良く、この場合には、横面に穿設
された前記挿入穴(12)を利用する。又、前記ボルト
(2)としては、図1、図3(a)に示すトルシア形高
力ボルトを用いると良いが、図3(b)に示す一般の六
角ボルトを用いても良い。(3)はボルト(2)の先端
を支持する多数の爪と1つの輪とから成るチャック状の
支持部(31)と、該支持部(31)を一端に取付けると共に他
端を楕円状に折曲させたピアノ線材等の導入部(32)と
から構成したボルトチャックであり[図1(b),図3
(a)参照]、このボルトチャック(3)は挿入穴(12)
と取付穴(11)間を導入部(32)で誘導し、ボルト
(2)のネジ部(21)を取付穴(11)から引出して突出
させると共に角形鋼管柱(1)の内壁にボルト(2)の
頭部が配置されるための作業具である。又、図3(b)
のように1本の少し太めなピアノ線材等の端部を螺旋状
に形成し、そこにネジ部(21)を螺合させると共に他端
に円形状に折曲したボルトチャック(3)と成しても良
い。(4)は取外し可能な仮止具であり、該仮止具
(4)には、図1(d)に示す鋼線等が略C形に折曲さ
れて弾力性を有した仮止部(41)と、該仮止部(41)に
取付けた紐部(42)とがある。(5)はボルト(2)を
取付けるための穴(51)が穿設された補強鋼鈑であり、
角形鋼管柱(1)と後述する接合金物(6)との間に取
付けるが、接合状態によって使用しない場合もある。
(6)はボルト(2)を取付けるための穴(61)が穿設
された接合金物であり、該接合金物(6)としては、ス
プリットT型鋼を用いるが、他のものでも良い。(7)
はワッシャで、(8)はボルト(2)に螺合するナット
である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a view showing a method of an embodiment of the method of the present invention. First, the numbers in the drawing will be described. (1) is a long rectangular steel pipe column having a length of up to about 5 stories, and a mounting hole (11) for a beam connecting bolt (2) is formed in an arbitrary position of the rectangular steel pipe column (1). And an insertion hole (12) for bolt insertion. The mounting hole (11) is 2 mm larger than the outer diameter of the screw (21) of the bolt (2).
The insertion hole (12) is about 2.5 to 3 times the diameter of the screw, so that the head of the bolt (2) can be easily inserted and inserted. Just set it.
The insertion hole (12) is formed on the surface facing the mounting hole (11). However, depending on the mounting state of the beam (9), the insertion hole (12) may not necessarily be formed on the surface facing the mounting hole (11). The insertion hole (12) formed in the lateral surface is used. As the bolt (2), a torcia-type high-strength bolt shown in FIGS. 1 and 3A may be used, but a general hexagonal bolt shown in FIG. 3B may be used. (3) is a chuck-shaped support portion (31) composed of a number of claws and one ring for supporting the tip of the bolt (2), and the support portion (31) is attached to one end and the other end is made elliptical. FIG. 1 (b), FIG. 3 (b), a bolt chuck comprising a bent piano wire or the like introduction part (32).
(A)], and this bolt chuck (3) has an insertion hole (12).
And the mounting hole (11) are guided by the introduction portion (32), and the screw portion (21) of the bolt (2) is pulled out from the mounting hole (11) so as to protrude. This is a work tool for placing the head of 2). FIG. 3 (b)
The end of one slightly thicker piano wire or the like is formed in a spiral shape, and a screw portion (21) is screwed into the end and a bolt chuck (3) bent in a circular shape at the other end. You may. Reference numeral (4) denotes a removable temporary fixing tool. The temporary fixing tool (4) has a temporary fixing portion formed by bending a steel wire or the like shown in FIG. (41) and a cord (42) attached to the temporary fixing part (41). (5) is a reinforcing steel plate provided with a hole (51) for mounting a bolt (2),
It is mounted between the rectangular steel pipe column (1) and a metal fitting (6) to be described later, but it may not be used depending on the bonding state.
Reference numeral (6) denotes a metal joint having a hole (61) for mounting the bolt (2). As the metal joint (6), a split T-shaped steel is used, but another material may be used. (7)
Is a washer, and (8) is a nut screwed into the bolt (2).
【0008】次に本発明の取付方法について説明する。
予め取付穴(11)を穿設すると共に必要個数の挿入穴
(12)を穿設し、且つ取付穴(11)と挿入穴(12)の内
側のバリを除去した角形鋼管柱(1)を用意しておく
[図1(a)参照]。またボルト(2)及びそれを支持
するボルトチャック(3)を用意する[図1(b)参
照]。先ず始めにボルト(2)の先端を多数の爪の中に
入れてから輪を爪側に押し込むとボルト(2)が支持部
(31)で把持され、抜け落ちる心配がなくなる[図1
(c)参照]。尚、前記ボルト(2)の先端を支持する
場合には、図3(a)に示すボルトチャック(3)を使
用して、トルシア形高力ボルト(2)の先端部を把持さ
せる方法と、図3(b)に示すボルトチャック(3)を
使用して、トルシア形高力ボルト(2)や一般の六角ボ
ルト(2)のネジ部(21)と螺合してボルト(2)を支持
させる方法とがある。次にボルト(2)を挿入穴(12)
から挿入して取付穴(11)からネジ部(21)を突出させる
場合について説明する。先ずボルト(2)を支持したボ
ルトチャック(3)の導入部(32)を挿入穴(12)に差
込む。そして所定の取付穴(11)に目指して導入部(3
2)の先端を挿通させる。挿通して角形鋼管柱(1)の
外部に突出した導入部(32)を手で引張ると、図2に示
すようにボルト(2)が左側から挿入穴(12)を挿通し
て角形鋼管柱(1)の内部に入る。更にボルト(2)の
ネジ部(21)の先端が取付穴(11)に挿入されて右側へ
突出するのである[図1(d)参照]。この時、ボルト
(2)は挿入穴(12)から差込んで対向面或いは横面に
設けた取付穴(11)にボルトチャック(3)で簡単に配
置させることが出来る。また図1(a)に示す矢印のよ
うに任意の取付穴(11)にボルト(2)のネジ部(21)
を角形鋼管柱(1)の外部に突出させるのである。次に
ネジ部(21)が突出したらその基部に、鋼線等が略C形
に折曲された仮止部(41)を嵌め込むことにより、ボル
ト(2)が仮止めされる。その後は、輪を爪側から引き
戻せば支持部(31)はボルト(2)の先端から把持状態
が解除され、ボルトチャック(3)は外されるのであ
る。このようにボルト(2)を順次挿入穴(12)から挿
通させて取付穴(11)からネジ部(21)を引出して突出
させることにより、ボルト(2)は角形鋼管柱(1)の
内壁に直接配置させることが出来るのである(図2参
照)。角形鋼管柱(1)の取付穴(11)から突出された
ネジ部(21)の基部は仮止具(4)によって仮止めされ
ると共に各ボルト(2)のネジ部(21)から紐部(42)
が垂れ下げられた状態となる[図1(d)参照]。Next, the mounting method of the present invention will be described.
A square steel pipe column (1) in which a mounting hole (11) is drilled in advance, a required number of insertion holes (12) are drilled, and burrs inside the mounting hole (11) and the insertion hole (12) are removed. Prepare it [see FIG. 1 (a)]. Further, a bolt (2) and a bolt chuck (3) for supporting the bolt (2) are prepared [see FIG. 1 (b)]. First, when the tip of the bolt (2) is inserted into a large number of claws and the ring is pushed toward the claws, the bolt (2) is gripped by the support portion (31), and there is no fear of falling off [FIG.
(C)]. When the tip of the bolt (2) is supported, a method of gripping the tip of the torcia-type high-strength bolt (2) using a bolt chuck (3) shown in FIG. Using the bolt chuck (3) shown in FIG. 3 (b), the bolt (2) is supported by being screwed with the thread portion (21) of a torcia-type high-strength bolt (2) or a general hexagonal bolt (2). There is a way to make it. Next, insert the bolt (2) into the insertion hole (12).
From the mounting hole (11) to project the screw portion (21) from the mounting hole (11). First, the introduction portion (32) of the bolt chuck (3) supporting the bolt (2) is inserted into the insertion hole (12). Then, aiming at the specified mounting hole (11),
Insert the tip of 2). As shown in FIG. 2, the bolt (2) is inserted through the insertion hole (12) from the left side and the square steel pipe column is inserted by pulling the introduction portion (32) projecting to the outside of the square steel pipe column (1) by hand. Enter inside (1). Further, the tip of the screw portion (21) of the bolt (2) is inserted into the mounting hole (11) and protrudes rightward (see FIG. 1D). At this time, the bolt (2) is inserted from the insertion hole (12), and can be easily arranged with the bolt chuck (3) in the mounting hole (11) provided on the facing surface or the lateral surface. Also, as shown by an arrow in FIG. 1A, a screw (21) of a bolt (2) is inserted into an arbitrary mounting hole (11).
Is projected outside the rectangular steel tube column (1). Next, when the screw portion (21) protrudes, the bolt (2) is temporarily fixed by fitting a temporary fixing portion (41) formed by bending a steel wire or the like into a substantially C shape into the base thereof. Thereafter, when the wheel is pulled back from the claw side, the holding portion (31) is released from the gripping state of the bolt (2), and the bolt chuck (3) is removed. In this way, the bolt (2) is sequentially inserted through the insertion hole (12), and the screw portion (21) is pulled out from the mounting hole (11) so as to protrude. (See FIG. 2). The base of the screw part (21) protruding from the mounting hole (11) of the square steel tubular column (1) is temporarily fixed by a temporary fixing tool (4) and a string part from the screw part (21) of each bolt (2). (42)
Is suspended [see FIG. 1 (d)].
【0009】全ての取付穴(11)にボルト(2)が配置
された後は、穴加工された補強鋼板(5)、穴加工され
た接合金物(6)、ワッシャ(7)、ナット(8)を用
意する。先ず始めに各取付穴(11)から突出されたネジ
部(21)に、補強鋼板(5)の穴(51)を合せて、角形
鋼管柱(1)の表面に補強鋼板(5)を配置させる。次
に接合金物(6)の穴(61)をネジ部(21)に合せて補
強鋼板(5)の表面へ密着させて取付ける。そして突出
されたネジ部(21)にワッシャ(7)とナット(8)を
挿入してナット(8)を仮止めする。尚、この時、接合
状態によっては、前記接合金物(6)は補強鋼鈑(5)を
介在させずに直接取付ける場合もある。仮止め後、紐部
(42)を引張って仮止具(4)をボルト(2)から外
す。外してガタになった分だけナット(8)を締付けて
仮締めしておく[図1(e)参照]。次にH形鋼梁(9)
を接合する場合には、上下に取付けた接合金物(6)の
間にH形鋼梁(9)が入るようにナット(8)を弛める。
この時、仮締め状態でH形鋼梁(9)が入ればナット
(8)を弛めずにそのままでも良い。そしてH形鋼梁
(9)が所定位置に収まった時点で前記ナット(8)を締
込んで本締めすれば良い[図1(f)参照]。尚、前記
ボルト(2)を取付穴(11)に取付ける場合、始めに数
個のボルト(2)だけを取付け、次に補強鋼板(5)の
穴(51)と接合金物(6)の穴(61)に、ボルトチャッ
ク(3)が付けられたままネジ部(21)を挿入し、更に
ワッシャ(7)とナット(8)もボルトチャック(3)
を通過させる。そしてネジ部(21)にワッシャ(7)と
ナット(8)を取付けた後に、各穴ずれを確認してナッ
ト(8)を締込んで仮固定させる。その後、ボルトチャ
ック(3)を外す。次のボルト(2)を取付ける時は、
ネジ部(21)を取付穴(11),穴(51),穴(61)に一
気に差込んでボルト(2)を順次取付ける方法としても
良い(図2参照)。この時、ワッシャ(7)とナット
(8)を取付ける際に、ネジ部(21)を手で押えること
が出来れば、ボルトチャック(3)を外した後からワッ
シャ(7)とナット(8)を取付けても良い。After the bolts (2) have been placed in all the mounting holes (11), the reinforced steel plate (5) with holes, the metal joint (6) with holes, the washer (7), and the nut (8) are formed. ) Is prepared. First, align the hole (51) of the reinforcing steel plate (5) with the screw part (21) protruding from each mounting hole (11), and arrange the reinforcing steel plate (5) on the surface of the square steel tubular column (1). Let it. Next, the hole (61) of the metal joint (6) is fitted to the surface of the reinforcing steel plate (5) by fitting the hole (61) to the screw portion (21). Then, a washer (7) and a nut (8) are inserted into the protruding screw portion (21) to temporarily fix the nut (8). At this time, depending on the joining state, the joining hardware (6) may be directly attached without interposing the reinforcing steel plate (5). After the temporary fixing, the string part (42) is pulled to remove the temporary fixing tool (4) from the bolt (2). The nut (8) is tightened and temporarily tightened as much as it is removed and loose (see FIG. 1 (e)). Next, H beam (9)
In order to join the joints, the nut (8) is loosened so that the H-shaped steel beam (9) enters between the joint hardware (6) attached vertically.
At this time, if the H-shaped steel beam (9) enters in the temporarily tightened state, the nut (8) may be left as it is without loosening. And H-beam
When (9) is settled in the predetermined position, the nut (8) may be tightened and fully tightened (see FIG. 1 (f)). When mounting the bolts (2) in the mounting holes (11), first, only a few bolts (2) are mounted, and then the holes (51) of the reinforcing steel plate (5) and the holes of the joint hardware (6). Insert the screw (21) into the (61) with the bolt chuck (3) attached, and also wash the washer (7) and nut (8) with the bolt chuck (3).
Through. After attaching the washer (7) and the nut (8) to the screw portion (21), each hole is confirmed, and the nut (8) is tightened and temporarily fixed. Thereafter, the bolt chuck (3) is removed. When installing the next bolt (2)
It is also possible to insert the screw portion (21) into the mounting hole (11), the hole (51), and the hole (61) at a stretch and mount the bolt (2) sequentially (see FIG. 2). At this time, if the screw (21) can be pressed by hand when attaching the washer (7) and the nut (8), the washer (7) and the nut (8) are removed after the bolt chuck (3) is removed. May be attached.
【0010】[0010]
【発明の効果】本発明はこのように構成させたことによ
り、下記に記載する効果を有する。The present invention having the above-described structure has the following effects.
【0011】請求項1のように従来のボルト工法で用い
る長尺な角形鋼管柱(1)の任意の位置に梁接合用ボル
ト(2)の取付穴(11)が穿設されたものに、該取付穴
(11)の近くにボルト挿通用の挿入穴(12)を1個か2個
穿設させ、ボルト(2)の先端を支持するための支持部
(31)と、挿入穴(12)と取付穴(11)間を誘導させる導入
部(32)とから成るボルトチャック(3)を用い、該ボ
ルトチャック(3)にボルト(2)の先端を支持させ、
それを挿入穴(12)に挿通させて対向面又は横面の取付穴
(11)からボルト(2)の先端を引出して突出させ、そ
のネジ部(21)に合せて補強鋼鈑(5)や接合金物(6)
を配置させると共にネジ部(21)にワッシャ(7)とナ
ット(8)を取付けて固定し、角形鋼管柱(1)の内壁
にボルト(2)が直接に取付けられる梁接合用ボルトの
取付方法とすることにより、閉鎖断面を有する角形鋼管
柱(1)の任意位置の取付穴(11)であってもボルト
(2)を内部から外部へ突出させて取付けることが出来
ると共に接合金物(6)の穴(61)にも容易に取付ける
ことが可能なものとなる。また本発明方法を用いれば、
角形鋼管柱(1)などの組立工場に於いて、溶接技能や
組立技能がないパートタイマーの作業者であっても、組
立作業の内容が簡単であるので、角形鋼管柱(1)に補
強鋼鈑(5)や接合金物(6)をボルト(2)とナット
(8)で容易に取付けて固定することが出来る。従って、
ボルト工法が簡単に行えるため、従来の如き寸法がきっ
ちり決まらなくても、大まかに決まった時点から決定さ
れている箇所の加工を行うことができ、又、設計が決ま
らない箇所は、後から加工を行うことも容易なものとな
り、従来の加工取付方法と比較して組立工数が減少され
て工期短縮やコスト削減等の効果を高めるものとなる。
しかも、長尺な角形鋼管柱(1)の板厚が変化するもの
に対しても、本発明方法を用いれば、簡単に手間が掛ら
ずにボルト(2)を長尺な角形鋼管柱(1)の内部に取
付けることができ、穴ずれもなく、作業性が良好なもの
となる。According to a first aspect of the present invention, a long rectangular steel tube column (1) used in the conventional bolt method has a mounting hole (11) for a beam joining bolt (2) at an arbitrary position. One or two bolt insertion holes (12) for bolt insertion are provided near the mounting hole (11) to support the tip of the bolt (2).
(31) and a bolt chuck (3) comprising an insertion hole (32) for guiding between the insertion hole (12) and the mounting hole (11), and the tip of the bolt (2) is attached to the bolt chuck (3). To support,
It is inserted through the insertion hole (12), the tip of the bolt (2) is pulled out from the mounting hole (11) on the facing surface or the lateral surface and protruded, and the reinforcing steel plate (5) is fitted to the screw portion (21). And joining hardware (6)
And a washer (7) and a nut (8) are attached and fixed to the screw portion (21), and the bolt (2) is directly attached to the inner wall of the square steel tubular column (1). Accordingly, the bolt (2) can be attached to the rectangular steel pipe column (1) having a closed cross section by projecting the bolt (2) from the inside to the outside even in the mounting hole (11) at an arbitrary position. It can be easily attached to the hole (61). Also, if the method of the present invention is used,
Even in a part-timer who does not have welding or assembly skills in an assembly factory such as a rectangular steel column (1), the contents of the assembly work are simple. Plate (5) and metal fitting (6) are bolted (2) and nut
(8) It can be easily attached and fixed. Therefore,
Since the bolt method can be easily performed, it is possible to process the parts that are determined from the rough decision point even if the dimensions are not exactly determined as before, and the parts where the design is not determined are processed later. Can be easily performed, and the number of assembling steps is reduced as compared with the conventional processing and mounting method, so that effects such as shortening of a construction period and cost reduction are enhanced.
In addition, even if the plate thickness of the long rectangular steel tube column (1) changes, the method of the present invention can be used to easily and without any trouble, and the bolt (2) can be easily connected to the long rectangular steel tube column (1). It can be mounted inside 1), has no holes, and has good workability.
【0012】請求項2のようにボルト(2)の先端を取
付穴(11)から引出された基部に、取外し可能な仮止具
(4)を取付け、全ての取付穴(11)にボルト(2)を
予め取付けておくことが出来るので、補強鋼鈑(5) や
接合金物(6)の取付けが効率良く行え、コストダウン
が可能となる。又、補強鋼鈑(5)や接合金物(6)を取
付ける前であっても、仮止具(4)がネジ部(21)の基
部に取付けられているので、ボルト(2)が抜け落ちて
角形鋼管柱(1)の内部に落ちる心配がなく、移動する
ことも可能となる。A detachable temporary fixing tool (4) is attached to the base of the bolt (2) whose tip is pulled out from the mounting hole (11), and the bolt (2) is attached to all the mounting holes (11). Since 2) can be attached in advance, the reinforcing steel plate (5) and the joint hardware (6) can be attached efficiently, and the cost can be reduced. Further, even before the reinforcing steel plate (5) and the joint hardware (6) are attached, the bolt (2) comes off because the temporary fixing tool (4) is attached to the base of the screw portion (21). It is possible to move without having to worry about falling into the inside of the rectangular steel pipe column (1).
【0013】請求項3に示すようにボルト(2)として
トルシア形高力ボルトを用い、その先端を把持させて、
挿入穴(12)から各取付穴(11)に引出して突出させるこ
とにより、規定の締付トルクを確保した状態で締結作業
が可能となり、ナット(8)の弛みチェックが不要とな
ると共に角形鋼管柱(1)と梁(9)の接合強度の品質
が安定し、且つ接合施工のコストダウンに貢献出来るも
のとなる。According to a third aspect of the present invention, a torcia-type high-strength bolt is used as the bolt (2), and its tip is gripped.
By pulling out from the insertion hole (12) into each mounting hole (11) and making it protrude, fastening work can be performed with the specified tightening torque secured, and it is not necessary to check for looseness of the nut (8) and the square steel pipe The quality of the joining strength between the column (1) and the beam (9) is stabilized, and it is possible to contribute to the cost reduction of the joining work.
【0014】請求項4に示すようにボルト(2)のネジ
部(21)と螺合させて支持し、挿入穴(12)から各取付穴
(11)に引出して突出させることにより、取付穴(11)
にボルト(2)を誘導する際、ボルト(2)のネジ部
(21)が抜けて角形鋼管柱(1)の内部に落ちる心配が
殆どなく、確実にネジ部(21)を引出して突出させるこ
とが可能となる。According to a fourth aspect of the present invention, the bolt (2) is screwed and supported with the screw portion (21), and is pulled out from the insertion hole (12) into each of the mounting holes (11) so as to protrude. (11)
When the bolt (2) is guided to the square, there is almost no fear that the screw portion (21) of the bolt (2) will fall out and fall into the inside of the rectangular steel tube column (1), and the screw portion (21) will be reliably pulled out and projected. It becomes possible.
【図1】本発明方法の工程を示す説明図である。FIG. 1 is an explanatory view showing the steps of the method of the present invention.
【図2】本発明方法の実施形態の要部を示す説明図であ
る。FIG. 2 is an explanatory view showing a main part of an embodiment of the method of the present invention.
【図3】ボルトチャックでボルトの先端が支持された状
態を示す説明図である。FIG. 3 is an explanatory diagram showing a state in which a tip end of a bolt is supported by a bolt chuck.
【図4】従来方法による接合構造の要部を示す説明図で
ある。FIG. 4 is an explanatory view showing a main part of a joining structure according to a conventional method.
【図5】従来方法による別の接合構造の要部を示す説明
図である。FIG. 5 is an explanatory view showing a main part of another joining structure according to a conventional method.
1 角形鋼管柱 11 取付穴 12 挿入穴 2 ボルト 21 ネジ部 3 ボルトチャック 31 支持部 32 導入部 4 仮止具 5 補強鋼鈑 51 穴 6 接合金物 61 穴 7 ワッシャ 8 ナット DESCRIPTION OF SYMBOLS 1 Rectangular steel pipe column 11 Mounting hole 12 Insertion hole 2 Bolt 21 Screw part 3 Bolt chuck 31 Support part 32 Introducing part 4 Temporary fixing tool 5 Reinforcement steel plate 51 Hole 6 Joint metal 61 Hole 7 Washer 8 Nut
Claims (4)
梁接合用ボルト(2)の取付穴(11)を穿設すると共に
ボルト挿通用の挿入穴(12)を穿設し、該挿入穴(12)から
対向面又は横面に穿設された前記取付穴(11)に向って
前記ボルト(2)を誘導して各取付穴(11)から前記ボ
ルト(2)のネジ部(21)が突出され、そのネジ部(2
1)に補強鋼鈑(5) の穴(51)や接合金物(6)の穴
(61)を合致させて前記補強鋼鈑(5) や前記接合金物
(6)を配置すると共にワッシャ(7)とナット(8)を取
付けて固定する工程に於いて、前記ボルト(2)の先端
を支持するための支持部(31)と、前記挿入穴(12)と前記
取付穴(11)間を誘導させるワイヤーなどの導入部(3
2)とから成るボルトチャック(3)を用い、該ボルト
チャック(3)によって前記ボルト(2)全体を前記挿
入穴(12)に挿通させると共に前記ボルト(2)のネジ部
(21)を前記取付穴(11)から引出して突出させ、前記
角形鋼管柱(1)の内壁に前記ボルト(2)が直接に取
付けられることを特徴とする角形鋼管柱に於ける梁接合
用ボルトの取付方法。1. An installation hole (11) for a beam connecting bolt (2) and an insertion hole (12) for inserting a bolt are formed at an arbitrary position of a long rectangular steel tubular column (1). The bolt (2) is guided from the insertion hole (12) toward the mounting hole (11) drilled on the facing surface or the lateral surface, and the screw of the bolt (2) is inserted from each mounting hole (11). Part (21) is projected and its screw part (2
The hole (51) of the reinforcing steel plate (5) and the hole (61) of the metal joint (6) are aligned with 1), and the reinforcing steel plate (5) and the metal joint (6) are arranged and the washer (7) is arranged. ) And the nut (8) in the fixing step, a supporting portion (31) for supporting the tip of the bolt (2), and a space between the insertion hole (12) and the mounting hole (11). Introductory parts (3
2), the entirety of the bolt (2) is inserted into the insertion hole (12) by the bolt chuck (3), and the screw portion (21) of the bolt (2) is inserted into the bolt chuck (3). A method for mounting a beam joining bolt in a rectangular steel pipe column, wherein the bolt (2) is directly mounted on the inner wall of the rectangular steel pipe column (1) by being pulled out from the mounting hole (11) and projected.
取付穴(11)から引出された基部に、取外し可能な仮止
具(4)を取付け、且つ全ての前記取付穴(11)に前記
ボルト(2)のネジ部(21)を突出させて前記仮止具
(4)で仮止めした後、前記補強鋼鈑(5)や前記接合金
物(6)を配置すると共に各ネジ部(21)にワッシャ
(7)とナット(8)を取付け、その後、前記仮止具(4)
を全て取外し、更に前記ナット(8)を締めて仮締めする
請求項1記載の角形鋼管柱に於ける梁接合用ボルトの取
付方法。2. A removable temporary fixing device (4) is mounted on a base of the screw (21) of the bolt (2) drawn out from the mounting hole (11), and all the mounting holes (11) are removed. ), The screw portion (21) of the bolt (2) is projected and temporarily fixed with the temporary fixing tool (4). Then, the reinforcing steel plate (5) and the metal joint (6) are arranged and each screw is fixed. Washer for part (21)
(7) Attach the nut (8) and then the temporary fixing tool (4)
2. The method according to claim 1, wherein all of the bolts are removed, and the nut (8) is further tightened and temporarily tightened.
ボルトを用い、その先端を把持して、挿入穴(12)から各
取付穴(11)にネジ部(21)を引出して突出させる請求
項1又は2記載の角形鋼管柱に於ける梁接合用ボルトの
取付方法。3. A torsion-type high-strength bolt is used as the bolt (2), and its tip is gripped and a screw portion (21) is pulled out from an insertion hole (12) into each mounting hole (11) and projected. Item 3. A method for mounting a beam-joining bolt in a square steel tubular column according to item 1 or 2.
させて支持し、挿入穴(12)から各取付穴(11)にネジ部
(21)を引出して突出させる請求項1又は2記載の角形
鋼管柱に於ける梁接合用ボルトの取付方法。4. The screw (21) of the bolt (2) is screwed and supported, and the screw (21) is pulled out from the insertion hole (12) into each of the mounting holes (11) and projected. Or a method for mounting a beam-joining bolt in a square steel tubular column according to item 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35385999A JP2001165137A (en) | 1999-12-14 | 1999-12-14 | Method of fitting beam-jointing bolt in rectangular steel column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35385999A JP2001165137A (en) | 1999-12-14 | 1999-12-14 | Method of fitting beam-jointing bolt in rectangular steel column |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2001165137A true JP2001165137A (en) | 2001-06-19 |
Family
ID=18433716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP35385999A Pending JP2001165137A (en) | 1999-12-14 | 1999-12-14 | Method of fitting beam-jointing bolt in rectangular steel column |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2001165137A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010047943A (en) * | 2008-08-20 | 2010-03-04 | Ihi Corp | Method of joining steel structure |
CN102808451A (en) * | 2011-05-31 | 2012-12-05 | 谢英俊 | Light steel member, light steel member component, and joint method for quickly locating and fixing thereof |
JP2013224573A (en) * | 2012-03-22 | 2013-10-31 | Agata Denshi Kk | Fixture and fixing method |
CN107816131A (en) * | 2017-11-07 | 2018-03-20 | 北京工业大学 | It is a kind of can drawing-in wire double web H type frame structure of aluminum alloy |
CN113883143A (en) * | 2021-10-14 | 2022-01-04 | 西安鑫垚陶瓷复合材料有限公司 | Bolt installation method for near-closed space part |
-
1999
- 1999-12-14 JP JP35385999A patent/JP2001165137A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010047943A (en) * | 2008-08-20 | 2010-03-04 | Ihi Corp | Method of joining steel structure |
CN102808451A (en) * | 2011-05-31 | 2012-12-05 | 谢英俊 | Light steel member, light steel member component, and joint method for quickly locating and fixing thereof |
CN102808451B (en) * | 2011-05-31 | 2015-09-16 | 谢英俊 | Lightweight steel component, lightweight steel component assembly and quick position thereof and fixing joint method |
JP2013224573A (en) * | 2012-03-22 | 2013-10-31 | Agata Denshi Kk | Fixture and fixing method |
CN107816131A (en) * | 2017-11-07 | 2018-03-20 | 北京工业大学 | It is a kind of can drawing-in wire double web H type frame structure of aluminum alloy |
CN113883143A (en) * | 2021-10-14 | 2022-01-04 | 西安鑫垚陶瓷复合材料有限公司 | Bolt installation method for near-closed space part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2001165137A (en) | Method of fitting beam-jointing bolt in rectangular steel column | |
JP3068799B2 (en) | Scaffolding connection structure | |
JP2006046007A (en) | Joint member | |
CN111519893A (en) | Wall connecting piece structure of external scaffold and construction method thereof | |
JP2009299267A (en) | Structure and method for joining precast concrete structural members together | |
JP4755766B2 (en) | Pillar fixing device in wooden buildings | |
JP3114414U (en) | Wall tether fitting | |
JP3084153U (en) | Concrete column reinforcement mechanism | |
JP2000027429A (en) | Scaffold locking hardware | |
JP3859787B2 (en) | Column / column joining method and its rough assembly jig | |
JP2000291189A (en) | Continuous beam hole forming method and form for continuous beam hole | |
JP6692722B2 (en) | Sash mounting structure and sash mounting method | |
JP3307203B2 (en) | Bolt joining method for closed section column material | |
JPH07116781B2 (en) | External wall concrete panel installation method | |
JP3018180U (en) | Mounting bolts for joining rectangular steel pipe columns and beams for construction | |
JPS63312451A (en) | Method for mounting fixing jig of lightweight aerated concrete panel | |
JPH0417676Y2 (en) | ||
JPH01250540A (en) | Joint structure for steel work of closed cross section and other building part | |
JPH01260134A (en) | Structure of junction between closed section steel framed member and another steel framed member | |
JPH05340087A (en) | Wall tie bracket for fixing scaffold | |
JPH0542189Y2 (en) | ||
JPH0692673B2 (en) | Joint structure of closed-section column and beam main bar | |
JPH0217089Y2 (en) | ||
CN117552618A (en) | Detachable wall connecting piece and construction method thereof | |
KR200267855Y1 (en) | Crosslink unit |