JP2001152447A JP33407299A JP33407299A JP2001152447A JP 2001152447 A JP2001152447 A JP 2001152447A JP 33407299 A JP33407299 A JP 33407299A JP 33407299 A JP33407299 A JP 33407299A JP 2001152447 A JP2001152447 A JP 2001152447A
Authority
JP
Japan
Prior art keywords
cage
reinforcing bar
stranded wire
steel
steel stranded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP33407299A
Other languages
Japanese (ja)
Inventor
Hajime Ouchi
一 大内
Mineo Sato
峰生 佐藤
Koichi Tanaka
浩一 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP33407299A priority Critical patent/JP2001152447A/en
Publication of JP2001152447A publication Critical patent/JP2001152447A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To prevent buckling and bending in the case of erection even in a cage having a large cross section and huge size, and to continuously conduct erection by continuously arranging a PC steel stranded wire, synchronized with erection speed. SOLUTION: In the erecting method, hoop reinforcements 11 are arranged at regular intervals among main reinforcements 1a, constituting the cage 1 and an intermediate reinforcement structure 12 as the precursor of the cage in which required sectional size is ensured is manufactured, and the intermediate reinforcement structure 12 is hung up and the PC steel stranded wires 10 are wound continuously on the outer circumferences of the main reinforcements 1a, erecting the structure 12 into an excavated pit 1 and synchronizing with the erection speed, and a hoop is manufactured.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、現場打の地中柱を
構成する鉄筋籠の建て込み方法及びこれに用いるPC鋼
より線の巻付け装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing a reinforcing rod cage constituting an underground pillar cast in place and a device for winding a PC steel strand used for the method.

【0002】[0002]

【従来の技術】壁基礎などに用いる現場打ちの地中柱を
構築する手順として、従来では一般に図6に示す方法が
採用されている。この方法では、まず(a)に示すよう
に、組立ヤードで所定長さ寸法の鉄筋籠1を組立て、次
いで(b)に示すように、クレーン車2を用いて組立て
られた鉄筋籠1を泥水で満たされた掘削孔3に建て込
む。
2. Description of the Related Art As a procedure for constructing a cast-in-place underground pillar used for a wall foundation or the like, a method shown in FIG. 6 has conventionally been generally employed. In this method, first, as shown in (a), a reinforcing cage 1 having a predetermined length is assembled in an assembly yard, and then, as shown in (b), the reinforcing cage 1 assembled by using a crane truck 2 is muddy. In the borehole 3 filled with.

【0003】また、大深度地中柱の場合には、以上の鉄
筋籠1の長さには限りがあるため、(c)に示すよう
に、先行して建て込まれた鉄筋籠1’の上端を掘削孔3
の頂部に設けられた固定治具4により固定した状態で、
新たに吊り込まれる後行の鉄筋籠1”の下端を溶接ある
いは機械的継手構造などにより接合し、接合後は固定治
具を外してさらに吊り込み作業を行うことを繰返し、所
定深度まで到達した後は、図示しないトレミー管などを
用いて掘削孔3内にコンクリートを打設し、泥水と置換
させることで、鉄筋コンクリート製の地中柱が完成す
る。
In the case of a deep underground pillar, since the length of the above-described reinforcing cage 1 is limited, as shown in FIG. Top hole 3
With the fixing jig 4 provided on the top of
The lower end of the rebar basket 1 ″ to be newly suspended is joined by welding or a mechanical joint structure, and after joining, the fixing jig is removed and the hanging operation is further repeated to reach a predetermined depth. Thereafter, concrete is poured into the excavation hole 3 using a tremy pipe (not shown) or the like, and is replaced with muddy water, whereby a reinforced concrete underground pillar is completed.

【0004】[0004]

【発明が解決しようとする課題】以上の構築方法におい
て、一般的な鉄筋籠1は、図4(a)にその断面を示す
ように、主鉄筋1aとその周囲を取巻く多数の帯筋1b
の組合わせからなるもので、その縦横断面B×Dが1m
未満の場合である場合には、主鉄筋と帯鉄筋のみで良い
が、1mを越えた大断面の場合には、中間帯鉄筋1cを
縦横に複数配して補強を行わなければならない。
In the above construction method, a general reinforcing bar cage 1 has a main reinforcing bar 1a and a large number of band bars 1b surrounding the main reinforcing bar 1a, as shown in FIG. 4 (a).
The vertical and horizontal cross section B × D is 1m
In the case of less than 10 mm, only the main reinforcing bar and the band reinforcing bar may be used, but in the case of a large cross section exceeding 1 m, reinforcement must be provided by arranging a plurality of intermediate band reinforcing bars 1 c vertically and horizontally.

【0005】このため製作される鉄筋籠1の自重が重く
なり、建て込み長さを十分に取ろうとすると、図5
(a)に示すように、吊り上げ時の立上げ荷重により、
主鉄筋が塑性変形を起し、挫屈、曲げなどを生じ易い。
従って、寸法制限するとともに、前述のごとく建て込み
作業を中断して鉄筋籠同士を縦に継いでいく作業を行わ
なければならず、作業能率の低下要因となっていた。
[0005] For this reason, the self-weight of the rebar basket 1 to be manufactured becomes heavy, and if it is attempted to take a sufficient length to be built, FIG.
As shown in (a), by the starting load at the time of lifting,
The main rebar is plastically deformed, and buckling and bending are likely to occur.
Therefore, it is necessary to limit the dimensions and to perform the work of vertically connecting the reinforcing bar cages by suspending the erection work as described above, which is a factor of lowering the work efficiency.

【0006】ところで、本発明者らは、PC鋼より線が
鉄筋の約5倍の強度があり、同一の断面寸法であって
も、帯筋1aに替えてPC鋼より線10を配筋すること
により、図4(b)に示すように、中間帯鉄筋1cを省
略できることに着目した。
By the way, the present inventors arrange the PC steel stranded wire 10 in place of the strip 1a even if the PC steel stranded wire has approximately five times the strength of the rebar and has the same sectional size. Thereby, as shown in FIG. 4B, attention was paid to the fact that the intermediate band reinforcing bar 1c can be omitted.

【0007】また、PC鋼より線10を配筋するにあた
っては、鉄筋建て込み時に吊り込み速度に同期して巻い
て行く方法を採用することにより、組立ヤードにおける
鉄筋籠製作時には図5(b)に示すように主筋1aの間
に所定離間間隔でたが筋11を配して、断面寸法のみを
確保した中間鉄筋構造物12とすることで、製作時にお
ける軽量化が達成でき、長大寸法としても吊り上げ時の
立上げ荷重が軽く、曲げモーメントが小さくなることに
着目した。
In arranging the PC stranded wire 10, a method of winding in synchronization with the hanging speed at the time of building the reinforcing bars is adopted. As shown in the figure, the reinforcing bars 11 are arranged at predetermined intervals between the main bars 1a, and the intermediate reinforcing bar structure 12 having only the cross-sectional dimensions is secured. Also, attention was paid to the fact that the starting load at the time of lifting was light and the bending moment was small.

【0008】本発明は、以上の着想に基づきなされたも
のであって、その目的は、大断面、かつ長大寸法の鉄筋
籠であっても、立上げ時に挫屈や曲げがなく、また、建
て込み速度に同期して連続的にPC鋼より線を配置する
ことで、連続的な建て込みがなされ、かつ中間帯鉄筋が
なくとも強度的にも十分な鉄筋籠の建て込み方法及びP
C鋼より線の巻付け装置を提供するものである。
The present invention has been made on the basis of the above-mentioned idea. The object of the present invention is to provide a steel cage having a large cross-section and a long dimension without buckling or bending at the time of starting up, and furthermore, the building is not erected. By arranging PC steel strands continuously in synchronization with the setting speed, continuous erection is performed, and a reinforcing cage basket with sufficient strength without intermediate band reinforcing bars and P
An object of the present invention is to provide an apparatus for winding a C steel strand.

【0009】[0009]

【課題を解決するための手段】以上の目的を達成するた
め、本発明方法は、鉄筋籠を構成する主筋の間に所定離
間間隔をおいてたが筋を配して、所要断面寸法を確保し
た鉄筋籠の前駆体である中間鉄筋構造物とし、次いで、
この中間鉄筋構造物を吊上げ、掘削孔内に建て込みつ
つ、この建て込み速度に同期して主筋外周に連続的にP
C鋼より線を捲回して帯筋とすることを特徴とする。従
って、本発明方法によれば、中間鉄筋構造物は軽量であ
り、十分に長大な寸法であっても、立上げ時に挫屈、曲
げがなく、また建て込み時において、鉄筋籠としての十
分な強度に仕上げられる。
In order to achieve the above-mentioned object, the method of the present invention secures a required cross-sectional dimension by arranging the reinforcing bars at predetermined intervals between the main reinforcing bars constituting the reinforcing bar cage. And an intermediate reinforced structure that is the precursor of the reinforced cage,
While this intermediate reinforcing structure is lifted and built in the excavation hole, P
It is characterized in that a C steel strand is wound to form a band. Therefore, according to the method of the present invention, the intermediate rebar structure is lightweight, does not buckle or bend at the time of start-up even if it has sufficiently large dimensions, and has a sufficient rebar basket at the time of erection. Finished with strength.

【0010】また、本発明の装置は、掘削孔周囲に架設
された周回軌条と、周回軌条上を移動する台車と、台車
上に旋回可能に配置されたターンテーブルと、ターンテ
ーブル上に回転可能に配置され、PC鋼より線をストッ
クするとともに、掘削孔内に吊り込まれる中間鉄筋構造
物外周に向けて繰出すドラムとを備えたことを特徴とす
る。従って、本発明装置にあっては、台車が周回移動す
る毎にPC鋼より線が、主筋外周に自動的かつ連続的に
巻付され、建て込み状態では高強度の帯筋を外周に配置
した鉄筋籠を構成する。
[0010] Further, the apparatus of the present invention comprises a orbiting rail erected around an excavation hole, a bogie moving on the orbital rail, a turntable rotatably arranged on the bogie, and a rotatable on the turntable. And a drum that stocks a PC steel strand and feeds it toward the outer periphery of the intermediate reinforcing structure suspended in the excavation hole. Therefore, in the apparatus of the present invention, each time the bogie moves around, the PC steel strand is automatically and continuously wound around the outer periphery of the main reinforcement, and a high-strength streak is disposed on the outer periphery in the built-in state. Construct a reinforced basket.

【0011】[0011]

【発明の実施の形態】以下、本発明の好ましい実施の形
態につき、添付図面を参照して詳細に説明する。図1,
2は本発明方法が適用されるPC鋼線の巻付け装置を示
すものである。なお、図において、従来と同一箇所につ
いては同一符号を付し、異なる箇所にのみ異なる符号を
用いて説明する。図において、所定縦横比で掘削され、
泥水が満たされた掘削孔3の周囲にあって、その地表部
には掘削孔3を包囲するようにして一対の周回軌条20
が架設されている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. Figure 1
Reference numeral 2 denotes a PC steel wire winding apparatus to which the method of the present invention is applied. In the drawings, the same parts as those in the related art are denoted by the same reference numerals, and only different parts will be described using different reference numerals. In the figure, excavation is performed at a predetermined aspect ratio,
A pair of orbiting rails 20 are provided around the drilling hole 3 filled with muddy water and surrounding the drilling hole 3 so as to surround the drilling hole 3.
Has been erected.

【0012】この周回軌条20上には、台車22が一方
向に移動可能に走行する。台車22は、その内部に配置
された図示しないモータ駆動によって車輪22aを回転
させて軌条20上を所定速度で一方向に周回するもの
で、台車22上には、ターンテーブル24が旋回可能に
配置され、さらにターンテーブル24上には、PC鋼よ
り線10をストックしたドラム28が配置され、コロ軸
受30などを介して転動可能とし、繰出したPC鋼より
線10を台車22の内側に立設されたワイヤーガイド3
2を通じて中間鉄筋構造物12の外周に巻付けるように
している。
A carriage 22 travels on the orbiting rail 20 so as to be movable in one direction. The bogie 22 rotates the wheels 22a by driving a motor (not shown) disposed therein to orbit around the rail 20 at a predetermined speed in one direction. Further, on the turntable 24, a drum 28 stocking the PC steel stranded wire 10 is arranged. The drum 28 can be rolled via a roller bearing 30 or the like, and the drawn PC steel stranded wire 10 is set inside the bogie 22. Established wire guide 3
2 and is wound around the outer periphery of the intermediate reinforcing bar structure 12.

【0013】従って、以上の巻付け装置を配置した鉄筋
の建て込み手順としては、図3(a)に示すように、組
付けヤードで、主筋1aの間に所定離間間隔でたが筋1
1を配して、断面寸法のみを確保した中間鉄筋構造物1
2を作り、次いでこれをクレーン車2で吊上げ、同図
(b)に示すように掘削孔3の直上に吊り込む。この状
態でPC鋼より線10の端部を中間鉄筋構造物12の主
筋1a上に固定する。
Accordingly, as shown in FIG. 3 (a), as a procedure for installing the rebar in which the above-mentioned winding device is disposed, the rebar 1 is provided at a predetermined interval between the main rebars 1a in the assembly yard.
1 is an intermediate reinforcing bar structure 1 in which only the cross-sectional dimensions are secured.
2 and then lifted by a crane truck 2 and suspended just above the excavation hole 3 as shown in FIG. In this state, the end of the PC steel strand 10 is fixed on the main reinforcing bar 1a of the intermediate reinforcing bar structure 12.

【0014】なお、組立状態からの吊上げ時には、前述
の図5(b)に示すように、曲げモーメントが小さく、
その分長大な中間鉄筋構造物に仕上げることができ、主
鉄筋の継手の手間が軽減できる。
At the time of lifting from the assembled state, the bending moment is small as shown in FIG.
The length of the intermediate rebar structure can be increased by that much, and the labor for connecting the main rebar can be reduced.

【0015】この状態でクレーン車2の吊ワイヤ2aの
下降動作に同期した速度で台車22を周回移動させるこ
とにより、PC鋼より線10はその建て込み及び周回の
同期速度に比例した巻付け間隔で主筋1aの外周に自動
的、かつ連続して巻付き、同図(c)に示すように、掘
削孔3内に投入された部分にはPC鋼より線からなる帯
鉄筋が配された鉄筋籠1として建て込まれることにな
る。この場合、ドラム28はターンテーブル24により
常時PC鋼より線の張力方向に向きを変えつつ、それ自
体が回転しつつPC鋼より線10を連続的に繰出す。ま
た、クレーン車2で吊り上げられた中間鉄筋構造物を油
圧ジャッキ等でゆっくり建て込める仮受装置により掘削
孔3に挿入してもよい。
In this state, by moving the bogie 22 around at a speed synchronized with the lowering operation of the hanging wire 2a of the crane truck 2, the PC steel strand 10 is wound with a winding interval proportional to the synchronous speed of the erection and the surrounding. And automatically and continuously wrapped around the outer periphery of the main reinforcing bar 1a. As shown in FIG. It will be built as basket 1. In this case, the drum 28 continuously turns the PC steel strand while rotating itself while constantly changing its direction in the tension direction of the PC strand by the turntable 24. Further, the intermediate reinforcing bar structure lifted by the crane truck 2 may be inserted into the excavation hole 3 by a temporary receiving device that can be slowly built with a hydraulic jack or the like.

【0016】なお、図示のごとく巻付け時において中間
鉄筋構造物12の主筋1aに対してPC鋼より線10を
クリップ等で固定するため1ないし2名の作業員が配さ
れる。
As shown in the drawing, one or two workers are arranged to fix the PC stranded wire 10 to the main reinforcing bar 1a of the intermediate reinforcing steel structure 12 with a clip or the like at the time of winding.

【0017】[0017]

【発明の効果】以上の説明により明らかなように、本発
明による鉄筋籠の建て込み方法によれば、大断面、かつ
長大寸法の鉄筋籠であっても、立上げ時に挫屈や曲げが
なく、また、建て込み速度に同期して連続的にPC鋼よ
り線を配置することで、連続的な建て込みがなされ、か
つ中間帯鉄筋がなくとも強度的にも十分なものとなる。
As is apparent from the above description, according to the method for installing a reinforcing rod cage according to the present invention, even when the reinforcing rod cage has a large cross section and a large size, it does not buckle or bend when starting up. In addition, by continuously arranging the PC steel strands in synchronization with the setting speed, the continuous setting is performed, and the strength is sufficient even without the intermediate band reinforcing bar.

【0018】また、本発明のPC鋼より線の巻付け装置
によれば、建て込み時において、自動的にPC鋼より線
の巻付けがなされ、作業を中断することがない。
Further, according to the apparatus for winding a PC steel stranded wire of the present invention, the winding of the PC steel stranded wire is automatically performed at the time of erection, so that the work is not interrupted.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明方法が適用されるPC鋼より線の巻付け
装置を示す平面図である。
FIG. 1 is a plan view showing an apparatus for winding a PC steel strand to which the method of the present invention is applied.

【図2】図1のA−A線断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】(a)〜(c)は同装置を用いた鉄筋籠の建て
込み手順を示す断面説明図である。
FIGS. 3 (a) to 3 (c) are cross-sectional explanatory views showing a procedure for installing a reinforcing cage using the same device.

【図4】(a)は従来の大断面鉄筋籠の断面図、(b)
は同一断面での本発明による鉄筋籠の断面図である。
FIG. 4 (a) is a cross-sectional view of a conventional large-section reinforced cage, and FIG.
1 is a cross-sectional view of a rebar basket according to the present invention in the same cross section.

【図5】(a)は従来の鉄筋籠のつり上げ時の不具合を
示す説明図、(b)は本発明の鉄筋籠の前駆体である中
間鉄筋構造物のつり上げ時の状態を示す説明図である。
FIG. 5 (a) is an explanatory view showing a problem at the time of lifting a conventional reinforcing cage, and FIG. 5 (b) is an explanatory view showing a state at the time of lifting an intermediate reinforcing structure which is a precursor of the reinforcing cage of the present invention. is there.

【図6】(a)〜(c)は従来の鉄筋籠の建て込み手順
を示す断面説明図である。
6 (a) to 6 (c) are cross-sectional explanatory views showing a conventional reinforcing cage insertion procedure.

【符号の説明】[Explanation of symbols]

1 鉄筋籠 1a 主筋 10 PC鋼より線 11 たが筋 12 中間鉄筋構造物 20 軌条 22 台車 28 ドラム DESCRIPTION OF SYMBOLS 1 Reinforcing bar 1a Main bar 10 PC strand 11 Steel bar 12 Intermediate reinforcing bar 20 Rail 22 Dolly 28 Drum

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田中 浩一 東京都清瀬市下清戸4丁目640番地 株式 会社大林組技術研究所内 Fターム(参考) 2D041 AA01 BA03 DA03 EB10 2E164 AA02 CA01 CA14 4E070 AA01 AB07 AC08 BA02 CA01 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Koichi Tanaka 4-640 Shimoseito, Kiyose-shi, Tokyo F-term in Obayashi Corporation Technical Research Institute Co., Ltd. (Reference) 2D041 AA01 BA03 DA03 EB10 2E164 AA02 CA01 CA14 4E070 AA01 AB07 AC08 BA02 CA01

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 鉄筋籠を構成する主筋の間に所定離間間
隔をおいてたが筋を配して、所要断面寸法を確保した鉄
筋籠の前駆体である中間鉄筋構造物とし、 次いで、この中間鉄筋構造物を吊上げ、掘削孔内に建て
込みつつ、この建て込み速度に同期して主筋外周に連続
的にPC鋼より線を捲回して帯筋とすることを特徴とす
る鉄筋籠の建て込み方法。
An intermediate reinforcing bar structure, which is a precursor of a reinforcing bar cage having a required cross-sectional dimension, is provided with a predetermined spacing between main bars constituting the reinforcing bar cage. Lifting an intermediate reinforcing bar structure and building it in a borehole, and continuously winding a PC steel stranded wire around the periphery of the main bar in synchronization with this build speed to form a reinforcing bar cage. Method.
【請求項2】 掘削孔周囲に架設された周回軌条と、周
回軌条上を移動する台車と、台車上に旋回可能に配置さ
れたターンテーブルと、ターンテーブル上に回転可能に
配置され、PC鋼より線をストックするとともに、掘削
孔内に吊り込まれる中間鉄筋構造物外周に向けて繰出す
ドラムとを備えたことを特徴とする鉄筋籠におけるPC
鋼より線の巻付け装置。
2. A revolving rail erected around a borehole, a truck moving on the revolving rail, a turntable rotatably arranged on the bogie, and a PC steel rotatably arranged on the turntable. And a drum for stocking the stranded wire and extending toward an outer periphery of the intermediate reinforcing structure suspended in the borehole.
Steel stranded wire winding device.
JP33407299A 1999-11-25 1999-11-25 Method of building cage and winder for pc steel stranded wire Pending JP2001152447A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33407299A JP2001152447A (en) 1999-11-25 1999-11-25 Method of building cage and winder for pc steel stranded wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33407299A JP2001152447A (en) 1999-11-25 1999-11-25 Method of building cage and winder for pc steel stranded wire

Publications (1)

Publication Number Publication Date
JP2001152447A true JP2001152447A (en) 2001-06-05

Family

ID=18273208

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33407299A Pending JP2001152447A (en) 1999-11-25 1999-11-25 Method of building cage and winder for pc steel stranded wire

Country Status (1)

Country Link
JP (1) JP2001152447A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777036A (en) * 2012-08-02 2012-11-14 中建三局第二建设工程有限责任公司 Air reverse mechanical joint construction method of super-long vertical reinforcement cage
CN109555111A (en) * 2018-12-29 2019-04-02 上海建工四建集团有限公司 NEW TYPE OF COMPOSITE ground-connecting-wall structure and construction method under a kind of low clearance
CN111424648A (en) * 2020-04-15 2020-07-17 中国二十二冶集团有限公司 Construction method for simultaneously hoisting steel column and cast-in-place pile reinforcement cage in reverse construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777036A (en) * 2012-08-02 2012-11-14 中建三局第二建设工程有限责任公司 Air reverse mechanical joint construction method of super-long vertical reinforcement cage
CN109555111A (en) * 2018-12-29 2019-04-02 上海建工四建集团有限公司 NEW TYPE OF COMPOSITE ground-connecting-wall structure and construction method under a kind of low clearance
CN111424648A (en) * 2020-04-15 2020-07-17 中国二十二冶集团有限公司 Construction method for simultaneously hoisting steel column and cast-in-place pile reinforcement cage in reverse construction

Similar Documents

Publication Publication Date Title
KR100694503B1 (en) Downward construction system and method for 1-way girder and slab of underground structure
CN112952661B (en) Installation structure and construction method for laying cable in narrow space
CN113445743B (en) Construction method for high-altitude overhanging ascending type concrete structure without jacking formwork
JP6554341B2 (en) Construction method of foundation pile
JP2009121108A (en) Reinforcement assembling method for high-rise structure reinforcing method, and reinforcement assembling jig for the same
JP2639361B2 (en) Construction method of steel pipe / concrete composite structure pier
JP2001152447A (en) Method of building cage and winder for pc steel stranded wire
JP2017186802A (en) Manufacturing method of tunnel lining reinforced cage and tunnel lining method
CN210684710U (en) Device for lowering concrete well pipe in pipe well
JP3013688B2 (en) Construction method of concrete structure
KR101267565B1 (en) Construction method of under-ground core part structure in top-down construction procedure
JP3518666B2 (en) Construction method of steel pipe / concrete composite structure pier
CN110552430B (en) Steel pipe column structure house
JP4325340B2 (en) How to build a reinforcing bar
CN208473293U (en) Narrow deformation joint easy-dismount template system
JP3538017B2 (en) Precast column unit and column construction method using it
JP2001055733A (en) Construction method for underground wall and underground wall structure thereof
JPH10137884A (en) Method for arranging rc structure
CN217756544U (en) Construction steel bar carrying device
CN219219037U (en) Urban comprehensive pipe rack deep foundation pit support
CN213661170U (en) Laying structure of cable in tunnel free layer
CN215402393U (en) Automatic take-up and pay-off device for building tower crane trolley
CN110042866A (en) The complete combined assembled inverse prefabricated middle plate in subway station of making transports mounting device and method
CN215439420U (en) Small-size overhead hoist is used in construction
CN210012530U (en) Portable two rope hoist device of prefabricated combination pipeline of hoist and mount

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040922

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050517

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050705

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050829

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051122

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060123

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060404