JP2001003519A - Roof tile - Google Patents

Roof tile

Info

Publication number
JP2001003519A
JP2001003519A JP11173525A JP17352599A JP2001003519A JP 2001003519 A JP2001003519 A JP 2001003519A JP 11173525 A JP11173525 A JP 11173525A JP 17352599 A JP17352599 A JP 17352599A JP 2001003519 A JP2001003519 A JP 2001003519A
Authority
JP
Japan
Prior art keywords
tile
roof
head
engaging projection
engaging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11173525A
Other languages
Japanese (ja)
Inventor
Kazuhide Ukekawa
和英 請川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP11173525A priority Critical patent/JP2001003519A/en
Publication of JP2001003519A publication Critical patent/JP2001003519A/en
Pending legal-status Critical Current

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

PROBLEM TO BE SOLVED: To secure the reinforcement of the batter side head part of a tile by forming a first engaging projection projected upward on the surface near the tail part of the tile body and a second engaging projection projected downward on the rear face near the head part respectively and locking the first engaging projection of a lower side tile and the second engaging projection of an upper side tile. SOLUTION: A first engaging projection 2 projected upward on the surface near the tail part 11 of the batter side 13 of a tile body is provided, and a second engaging projection 3 projected downward on the rear face near the head part 12 is provided. The second engaging projection 3 on the rear face near the head part 12 of an upper side tile Y2 is locked downward to the first engaging projection 2 on the surface near the tail part 11 of the lower side tile Y1 of the two upper and lower tiles set continuously in the inclined direction of a roof. Since the tail part 11 of the lower side tile Y1 is firmly fixed on a roof plate by a nail 9, and furthermore the head part 11 of the upper side tile Y2 can be firmly held by engaging both the engaging projections 2, 3. Thus, even when force lifting the side of the head part 12 of the upper side tile Y2 is acted by strong wind or the like, each tile can be maintained in a stable state.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本願発明は、屋根瓦に関し、
特に瓦本体の一側部に桟部を設けた桟瓦に関するもので
ある。
TECHNICAL FIELD The present invention relates to a roof tile,
In particular, the present invention relates to a cross tile having a cross section on one side of a tile main body.

【0002】[0002]

【従来の技術】図6には、従来の一般的な屋根瓦(桟
瓦)Xを示しているが、この屋根瓦Xは、瓦本体1の尻
部11側に釘穴4を設けている。又、瓦本体1の一側部
には山形に屈曲した桟部13が形成されている。尚、符
号14,15は、対角線上の両角部に設けた位置決め用
の切込部である。
2. Description of the Related Art FIG. 6 shows a conventional general roof tile (cross tile) X. The roof tile X is provided with a nail hole 4 on a bottom portion 11 side of a tile body 1. On one side of the tile body 1, a crosspiece 13 bent in a mountain shape is formed. Reference numerals 14 and 15 are notches for positioning provided at both corners on a diagonal line.

【0003】そして、図6の屋根瓦Xは、図7に示すよ
うに、屋根の野地板7上に一部を重合させながら葺いて
いく。尚、屋根瓦Xは、屋根の下側から順次上方に向け
て葺いていくが、そのとき尻部11の裏面に設けた引掛
け爪5を野地板7上の桟木8に係止し、且つ釘穴4(図
6)を通して釘9を桟木8に打ち込んで瓦本体1の尻部
11側を固定する。又、屋根傾斜方向に並べられる各屋
根瓦X,X・・は、その下側瓦の尻部11上面に上側瓦
の頭部12を載せた状態で葺いていく。
As shown in FIG. 7, the roof tile X shown in FIG. 6 is laid while being partially overlapped on a roof base plate 7. The roof tiles X are sequentially roofed upward from the lower side of the roof. At that time, the hooking claws 5 provided on the back surface of the buttocks 11 are engaged with the piers 8 on the field board 7, and The nail 9 is driven into the crosspiece 8 through the nail hole 4 (FIG. 6) to fix the buttocks 11 side of the tile body 1. Each of the roof tiles X, X,... Arranged in the roof tilt direction is roofed with the head 12 of the upper tile placed on the upper surface of the buttocks 11 of the lower tile.

【0004】[0004]

【発明が解決しようとする課題】ところで、図6及び図
7に示す従来の屋根瓦Xでは、尻部11側は桟木8に釘
9で固定しているが、頭部12側は下側瓦の尻部11上
に単に載せられているだけである。尚、屋根板上に葺か
れた各瓦において、桟部13とは反対側の側縁は、右側
の瓦で押さえられるが、桟側の頭部12は、何ら固定手
段が施されていない。
By the way, in the conventional roof tile X shown in FIGS. 6 and 7, the butt portion 11 side is fixed to the pier 8 with the nail 9 while the head 12 side is the lower tile. Is merely placed on the buttocks 11. In each of the tiles laid on the shingle, the side edge opposite to the beam 13 is pressed by the right tile, but the head 12 on the beam is not provided with any fixing means.

【0005】従って、従来の屋根瓦Xを使用したもので
は、台風時等の強風が屋根瓦Xの頭部12側から吹き込
むと、該頭部12側(特に桟側頭部)が浮き上がり易く
なり、該屋根瓦が位置ずれしたり捲れたりするという問
題が発生するおそれがある。尚、屋根瓦の頭部12側
は、雨水が流れる場所であるので釘止めによる固定がで
きない。
Therefore, in the case of using the conventional roof tile X, when a strong wind such as a typhoon blows from the head 12 side of the roof tile X, the head 12 side (particularly, the head on the side of the pier) is easily lifted. This may cause a problem that the roof tile is displaced or turned up. Note that the roof tile head 12 side cannot be fixed by nailing because it is a place where rainwater flows.

【0006】本願発明は、上記従来の問題点に鑑み、瓦
の桟側頭部を有効に補強し得るようにした屋根瓦を提供
することを目的としている。
SUMMARY OF THE INVENTION [0006] In view of the above-mentioned conventional problems, an object of the present invention is to provide a roof tile which can effectively reinforce the side of the roof of the tile.

【0007】[0007]

【課題を解決するための手段】本願発明は、上記課題を
解決するための手段として次の構成を有している。本願
発明は、屋根瓦(例えば桟瓦と称している屋根瓦)を対
象にしている。尚、この種の屋根瓦には、瓦本体の尻部
側に釘穴を設けている。
The present invention has the following structure as means for solving the above-mentioned problems. The present invention is directed to roof tiles (for example, roof tiles called cross tiles). In this type of roof tile, a nail hole is provided on the bottom side of the tile body.

【0008】そして、本願の屋根瓦は、瓦本体の桟部に
おいて、瓦本体の尻部寄り表面に上向きに突出する第1
係合突起と、瓦本体の頭部寄り裏面に下向きに突出する
第2係合突起とをそれぞれ形成している。
In the roof tile of the present invention, a first portion protrudes upward from a surface near a bottom portion of the tile body at a cross section of the tile body.
An engagement protrusion and a second engagement protrusion protruding downward are formed on the back surface near the head of the tile body.

【0009】又、上記第1係合突起と第2係合突起は、
屋根の傾斜方向に連続して設置される上下2つの瓦にお
いて、下側瓦の尻部寄り表面にある第1係合突起に対し
て上側瓦の頭部寄り裏面にある第2係合突起が下方から
係止されるように構成している。即ち、屋根傾斜方向に
連続して設置される瓦は、下側瓦の尻側上面に上側瓦の
頭側が載せられるが、そのとき上下各側の係合突起が相
互に係合し得るようにしている。尚、各屋根瓦は、尻部
側の釘穴を通して屋根(桟木)に釘を打ち込んで固定し
ておく。
Further, the first engagement projection and the second engagement projection are
In two upper and lower tiles that are installed continuously in the inclination direction of the roof, a second engagement projection on the back surface near the head of the upper tile is opposed to a first engagement projection on the surface near the bottom of the lower tile. It is configured to be locked from below. That is, the roof tiles that are installed continuously in the roof inclination direction are such that the head side of the upper tile is placed on the upper side of the bottom side of the lower tile, and at this time, the upper and lower engagement protrusions can be engaged with each other. ing. In addition, each roof tile is nailed into a roof (pier) through a nail hole on the side of the butt and fixed.

【0010】第1係合突起と第2係合突起との係合構造
としては、両係合突起の係合部を相互に面接合する傾斜
係合面としたものを採用できる。そして、その両傾斜係
合面を係合させた状態では、下側瓦の尻部に対して上側
瓦の頭部(特に桟側頭部)がそのまま上方に浮き上がら
ないようにしている。尚、下側瓦の尻部は、釘打ちによ
って屋根板上に強固に固定されるので、両係合突起を係
合させることにより上側瓦の桟側頭部も強固に保持され
る。従って、例えば台風時の強風により上側瓦の頭部側
を浮き上げようとする力が働いても、各瓦を安定状態に
維持させることができる。
As the engagement structure between the first engagement protrusion and the second engagement protrusion, a structure in which the engagement portions of the two engagement protrusions are formed as inclined engagement surfaces that are surface-joined to each other can be adopted. When the two inclined engagement surfaces are engaged with each other, the head of the upper tile (particularly, the head on the beam side) is prevented from floating upward as it is with respect to the buttocks of the lower tile. Since the bottom of the lower tile is firmly fixed on the roof plate by nailing, the head of the upper tile is firmly held by engaging the two engaging projections. Therefore, for example, even if a strong wind during a typhoon exerts a force to lift the head side of the upper tile, each tile can be maintained in a stable state.

【0011】[0011]

【発明の実施の形態】以下、図1〜図5を参照して本願
の実施形態を説明すると、図1は本願実施形態の屋根瓦
を表面側から見たものであり、図2はその屋根瓦を裏面
側から見たものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. 1 to 5. FIG. 1 is a view of a roof tile according to an embodiment of the present invention as viewed from the front side, and FIG. The roof tile is viewed from the back side.

【0012】図1及び図2に示す実施形態の屋根瓦Y
は、粘土を材料にして略長方形で断面〜状に成形した桟
瓦が採用されている。即ち、この屋根瓦Yには、瓦本体
1の一側部に山形に屈曲した桟部13が形成されてい
る。瓦本体1の尻部11寄りには、釘穴4が形成されて
いる。尚、この釘穴4は1つでも2つでもよい。又、瓦
本体1の尻部11裏面には、屋根板の桟木8(図3〜図
5)に引っ掛ける引掛け爪5,5が下向きに形成されて
いる。
The roof tile Y of the embodiment shown in FIGS.
Has adopted a cross tile having a substantially rectangular cross section and a shape made of clay. That is, in the roof tile Y, a crosspiece 13 bent in a mountain shape is formed on one side of the tile body 1. A nail hole 4 is formed near the bottom 11 of the tile body 1. The number of the nail holes 4 may be one or two. In addition, hook claws 5, 5 for hooking on the pier 8 (FIGS. 3 to 5) of the roof slab are formed on the back surface of the buttocks 11 of the tile body 1 in a downward direction.

【0013】又、この瓦本体1には、桟部13側の尻部
11角部と、反桟部側の頭部12角部にそれぞれ位置決
め用の切込部14,15が形成されている。
The roof body 1 has cutouts 14 and 15 for positioning at the 11 corners of the buttocks 13 side and the 12 corners of the head at the opposite side of the cross section. .

【0014】瓦本体1の表面1aには、図1に示すよう
に、尻部11側の端縁と桟部13の反対側端縁とに跨が
って連続する水返し突条16がされている。又、瓦本体
1の裏面1bにも、図2に示すように、頭部12側の端
縁と桟部13側の端縁とに跨がって連続する水返し突条
17が形成されている。尚、この各水返し突条16,1
7は、例えば6〜7mm程度の高さを有している。
As shown in FIG. 1, on the surface 1a of the tile main body 1, there are formed water return protrusions 16 extending over the edge on the side of the buttocks 11 and the edge on the opposite side of the crosspiece 13. ing. As shown in FIG. 2, a continuous water return ridge 17 is also formed on the back surface 1 b of the tile main body 1 so as to extend over the edge on the head 12 side and the edge on the crosspiece 13 side. I have. In addition, each of the water return ridges 16, 1
7 has a height of, for example, about 6 to 7 mm.

【0015】又、瓦本体1には、その桟部(山形部分)
13において、尻部11寄り表面に上向きに突出する第
1係合突起2と、頭部12寄り裏面に下向きに突出する
第2係合突起3とをそれぞれ形成している。
The tile body 1 has a crosspiece (a chevron).
In FIG. 13, a first engagement protrusion 2 protruding upward on the surface near the buttocks 11 and a second engagement protrusion 3 protruding downward on the back surface near the head 12 are respectively formed.

【0016】尻部11寄り表面側の第1係合突起2は、
図1に示すように尻部11側の水返し突条16に連続し
て形成している。又、この第1係合突起2には、瓦中央
部側に出っ張るような傾斜係合面を有している。尚、こ
の第1係合突起2は、水返し突条16に連続させずに独
立して形成してもよい。他方、頭部12寄り裏面側の第
2係合突起3は、図2に示すように桟側端縁側に出っ張
るような傾斜係合面を有している。尚、この第1及び第
2の各係合突起2,3の突出高さは、瓦本体1の表裏各
面1a,1bに形成している各水返し突条16,17の
高さとほぼ同程度である。
The first engagement projection 2 on the surface side near the buttocks 11 is
As shown in FIG. 1, it is formed continuously with the water return protrusion 16 on the side of the butt portion 11. The first engagement projection 2 has an inclined engagement surface protruding toward the center of the roof tile. Note that the first engagement projection 2 may be formed independently without being continuous with the water return protrusion 16. On the other hand, the second engagement projection 3 on the back surface side near the head 12 has an inclined engagement surface protruding toward the end of the beam side as shown in FIG. The height of the first and second engaging projections 2 and 3 is substantially the same as the height of each of the water return protrusions 16 and 17 formed on the front and back surfaces 1a and 1b of the tile body 1. It is about.

【0017】そして、この第1係合突起2と第2係合突
起3は、図3〜図5に示すように、屋根の傾斜方向に連
続して設置される上下2つの瓦(例えば符号Y1,Y2
各瓦)において、下側瓦Y1の尻部11寄り表面にある
第1係合突起2に対して上側瓦Y2の頭部12寄り裏面
にある第2係合突起3が下方から係止されるように構成
している。即ち、屋根傾斜方向に連続して設置される瓦
は、その下側瓦Y1の尻側11上面に上側瓦Y2の頭側1
2が載せられるが、そのとき上下各瓦の係合突起2,3
の傾斜係合面が相互に係合し得るようにしている。尚、
上下の瓦を重合させたときに、表裏各面の水返し突条1
6,17により下側瓦Y1の瓦本体上面と上側瓦Y2の瓦
本体下面との間の隙間ができ、該隙間部分で第1係合突
起2と第2係合突起3とが係合している。
As shown in FIGS. 3 to 5, the first engagement projection 2 and the second engagement projection 3 are provided with two roof tiles (for example, a symbol Y) which are continuously installed in the inclination direction of the roof. 1, Y in each tile) of 2, the second engaging projection 3 in the head 12 toward the back surface of the upper tile Y 2 with respect to the first engaging protrusion 2 in the buttocks 11 toward the surface of the lower tile Y 1 Are locked from below. In other words, tiles, cranial first upper tiles Y 2 in the trailing 11 upper surface of the lower tile Y 1 installed consecutively in the roof slope direction
2 are placed, and at that time, the engagement protrusions 2, 3
Are designed to engage with each other. still,
When the upper and lower roof tiles are superimposed, water return ridges 1 on each side
6,17 by a gap between the lower tile Y 1 of the tile main body top and the tile main body lower surface of the upper tile Y 2, the first engaging protrusion 2 in the clearance portion second engaging projection 3 Togakakari I agree.

【0018】この実施形態の屋根瓦Yは、図3〜図5に
示すように葺かれるが、各屋根瓦Y,Y・・は、屋根の
下側(軒先側)から順次上方に向けて葺いていく。その
とき、瓦本体尻部11の裏面に設けた引掛け爪5を野地
板7上の桟木8に係止し、且つ釘穴4を通して釘9を桟
木8に打ち込んで瓦本体1の尻部11側を固定する。そ
して、その既設の下側瓦Y1の上に次の瓦Y2を重ねると
きに、下側瓦Y1側の尻部寄り表面にある第1係合突起
2に上側瓦Y2の頭部寄り裏面にある第2係合突起3を
係合させ、その係合状態で該上側瓦Y2の釘穴4に釘9
を打ち込む。尚、瓦葺き作業は、屋根の軒先側から順次
上方に向けて葺いていくが、傾斜方向の縦列ごと左側か
ら右方向に葺いていく場合と、軒先と平行な横列ごとに
下段側から上段側に葺いていく場合とがある。
The roof tiles Y of this embodiment are laid as shown in FIGS. 3 to 5, and each of the roof tiles Y, Y,. Go on. At this time, the hooking claw 5 provided on the back surface of the roof part 11 of the tile main body is engaged with the pier 8 on the base plate 7, and the nail 9 is driven into the pier 8 through the nail hole 4, so that the butt part 11 of the tile main body 1 is formed. Fix the side. Then, when superimposing the next tile Y 2 over the existing lower tile Y 1, the head of the upper tiles Y 2 in the first engaging projection 2 at the bottom tile Y 1 side hip portion near the surface of the a second engagement protrusion 3 on the deviation backside engaged, nail in its engaged state to the nail hole 4 of the upper tile Y 2 9
Type. In the roofing work, roofing is performed sequentially from the eaves side of the roof upwards.When the roof is roofed from left to right for each column in the inclination direction, or from the lower side to the upper side for each row parallel to the eaves. There are times when it roofs.

【0019】この実施形態の屋根瓦Yを使用したもので
は、屋根傾斜方向に連続する各瓦(例えば符号Y1
2)において、上側瓦Y2の頭部12寄り裏面にある第
2係合突起3が下側瓦Y1の尻部11寄り表面にある第
1係合突起2に係合しているので、下側瓦Y1の尻部1
1に対して上側瓦Y2の頭部12(特に桟側頭部)がそ
のまま上方に浮き上がることがない。又、下側瓦Y1
尻部11は釘9で屋根板上に強固に固定されているの
で、両係合突起2,3を係合させることにより上側瓦Y
2の頭部12も強固に保持される。従って、例えば台風
時の強風により上側瓦Y2の頭部12側を浮き上げよう
とする力が働いても、各瓦を安定状態に維持させること
ができる。
In the case where the roof tile Y of this embodiment is used, each tile (for example, reference characters Y 1 , Y 1 ,
In Y 2 ), the second engagement protrusion 3 on the back surface near the head 12 of the upper tile Y 2 is engaged with the first engagement protrusion 2 on the surface near the buttocks 11 of the lower tile Y 1 . , buttocks 1 of the lower tile Y 1
It is never directly lifted over the head 12 of the upper tile Y 2 (especially桟側head) with respect to 1. In addition, since the hip portion 11 of the lower tile Y 1 is firmly fixed on the roof plate with nails 9, upper roof tile by engaging the engaging projections 2,3 Y
The second head 12 is also firmly held. Thus, for example, even if force acts that try float 12 side head of the upper tile Y 2 by strong winds during a typhoon, it is possible to keep each tile in a stable state.

【0020】[0020]

【発明の効果】本願発明の効果を説明すると、本願の屋
根瓦は、瓦本体1の桟部13において、尻部寄り表面に
上向きに突出する第1係合突起2と、頭部寄り裏面に下
向きに突出する第2係合突起3とをそれぞれ形成し、屋
根の傾斜方向に連続して設置される上下2つの瓦におい
て、下側瓦Y1の尻部寄り表面にある第1係合突起2に
対して上側瓦Y2の頭部寄り裏面にある第2係合突起3
が下方から係止されるように構成している。
The effect of the present invention will be described. The roof tile according to the present invention comprises a first engaging projection 2 projecting upward on a surface near a butt portion and a rear surface near a head portion on a cross section 13 of the tile body 1. and a second engaging projection 3 protruding downward are respectively formed in upper and lower two tiles to be installed consecutively in the direction of inclination of the roof, the first engaging protrusion on the buttocks toward the surface of the lower tile Y 1 the second engagement protrusion in the head toward the back surface of the upper tile Y 2 against 2 3
Are locked from below.

【0021】そして、本願の屋根瓦を使用して屋根上を
葺けば、屋根の傾斜方向に連続する各瓦において、上側
瓦Y2の桟側頭部が下側瓦Y1の尻部11(釘打ちにより
強固に固定されている)に対して各係合突起2,3の係
合により保持されるようになり、従来補強が難しかった
瓦の桟側頭部を強固に保持することができる。従って、
台風時等に強風が瓦の頭部12部分に吹き付けても、該
瓦の頭側が浮き上がることがなく、安定状態を維持でき
るという効果がある。
[0021] Then, if dandruff on the roof using application of roof tiles, each tile that is continuous with the inclined direction of the roof, the upper tile桟側head of Y 2 is lower tiles Y 1 of the buttocks 11 (Fixed firmly by nailing) by the engagement of each of the engaging projections 2 and 3, which makes it possible to firmly hold the roof side of the roof of the tile which was difficult to reinforce conventionally. it can. Therefore,
Even if a strong wind blows to the head 12 of the tile during a typhoon or the like, there is an effect that the head side of the tile does not rise and a stable state can be maintained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本願実施形態の屋根瓦を表面から見た斜視図で
ある。
FIG. 1 is a perspective view of a roof tile according to an embodiment of the present application as viewed from the surface.

【図2】図1の屋根瓦を裏面から見た斜視図である。FIG. 2 is a perspective view of the roof tile of FIG. 1 as viewed from the back.

【図3】図1の屋根瓦の使用状態を示す斜視図である。FIG. 3 is a perspective view showing a use state of the roof tile of FIG. 1;

【図4】図3のIV−IV線相当の断面図である。FIG. 4 is a sectional view corresponding to the line IV-IV in FIG. 3;

【図5】図3のV−V線相当の断面図である。FIG. 5 is a cross-sectional view corresponding to line VV in FIG. 3;

【図6】従来の屋根瓦の斜視図である。FIG. 6 is a perspective view of a conventional roof tile.

【図7】図6の屋根瓦の使用状態を示す断面図である。FIG. 7 is a cross-sectional view illustrating a use state of the roof tile of FIG. 6;

【符号の説明】[Explanation of symbols]

1は瓦本体、2は第1係合突起、3は第2係合突起、4
は釘穴、11は瓦本体の尻部、12は瓦本体の頭部、1
3は瓦本体の桟部である。
1 is a roof tile body, 2 is a first engagement projection, 3 is a second engagement projection, 4
Is a nail hole, 11 is a butt of the tile body, 12 is a head of the tile body, 1
3 is a crosspiece of the tile body.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 瓦本体(1)の桟部(13)において、
瓦本体の尻部(11)寄り表面に上向きに突出する第1
係合突起(2)と、瓦本体の頭部(12)寄り裏面に下
向きに突出する第2係合突起(3)とをそれぞれ形成す
るとともに、 前記第1係合突起(2)と前記第2係合突起(3)は、
屋根の傾斜方向に連続して設置される上下2つの瓦(Y
1,Y2)において、下側瓦(Y1)の尻部寄り表面(1
a)にある第1係合突起(2)に対して上側瓦(Y2
の頭部寄り裏面(1b)にある第2係合突起(3)が下
方から係止されるように構成した、 ことを特徴とする屋根瓦。
1. A cross section (13) of a tile body (1),
The first projecting upward on the surface near the bottom (11) of the tile body
An engagement projection (2) and a second engagement projection (3) projecting downward on the back surface near the head (12) of the roof tile body, respectively, and the first engagement projection (2) and the second engagement projection are formed. 2 engagement projection (3)
The two upper and lower roof tiles (Y
1 , Y 2 ), the surface (1) of the lower tile (Y 1 ) near the buttocks
The upper roof tile (Y 2 ) with respect to the first engagement projection (2) in a)
The roof tiles are characterized in that the second engaging projections (3) on the rear surface (1b) near the head are locked from below.
JP11173525A 1999-06-21 1999-06-21 Roof tile Pending JP2001003519A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11173525A JP2001003519A (en) 1999-06-21 1999-06-21 Roof tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11173525A JP2001003519A (en) 1999-06-21 1999-06-21 Roof tile

Publications (1)

Publication Number Publication Date
JP2001003519A true JP2001003519A (en) 2001-01-09

Family

ID=15962150

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11173525A Pending JP2001003519A (en) 1999-06-21 1999-06-21 Roof tile

Country Status (1)

Country Link
JP (1) JP2001003519A (en)

Similar Documents

Publication Publication Date Title
US4372090A (en) Structure for roofing tile
JP2001003519A (en) Roof tile
JP2003278320A (en) Roof tile
JP2604642Y2 (en) Roofing structure
JP2934181B2 (en) Seismic and wind resistant roofing method using stable pieces
JPH0699986B2 (en) Roof tile roofing method and tile timber used for this
JP2875648B2 (en) Tile roof structure
JP2581534Y2 (en) Roof mounting structure
JP2502279Y2 (en) Roof tile and its fixed structure
JP4144861B2 (en) Roof tile construction method
JPS585773Y2 (en) tiling equipment
JPH11310996A (en) Pantile
JP2600278Y2 (en) tile
JP2549740Y2 (en) Flat tile roofing structure
JP2003278318A (en) Roof tile
JP2004143709A (en) Roof tile and roofing method therefor
JPH04132118U (en) flat tiles
JP3911639B1 (en) Vertical shaft construction method
JP2004232247A (en) Roof tile, batten, and roof tile mounting structure
JP2611856B2 (en) Construction method of ridge part on tiled roof
JP3549791B2 (en) Roof tile lift prevention device
JP3115863B2 (en) tile
JP3038023B2 (en) Roof panel and its mounting structure
JPH09324497A (en) Pantile
JP2547296Y2 (en) Flat tile roofing structure