JP2000345712A - Hanging jig for external wall material - Google Patents

Hanging jig for external wall material

Info

Publication number
JP2000345712A
JP2000345712A JP11158149A JP15814999A JP2000345712A JP 2000345712 A JP2000345712 A JP 2000345712A JP 11158149 A JP11158149 A JP 11158149A JP 15814999 A JP15814999 A JP 15814999A JP 2000345712 A JP2000345712 A JP 2000345712A
Authority
JP
Japan
Prior art keywords
wall material
horizontal
vertical member
vertical
hanging jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11158149A
Other languages
Japanese (ja)
Inventor
Kaoru Hirai
薫 平井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP11158149A priority Critical patent/JP2000345712A/en
Publication of JP2000345712A publication Critical patent/JP2000345712A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To rapidly attach an external wall material and maximally reduce labor as a merit when using a self-rise and fall type outer periphery curing frame or the like. SOLUTION: This hanging jig is constituted of a horizontal member 1 to which a lifting machine such as a crane or the like is attached, a vertical member 7 extended from the other end of horizontal member, which can fit an external wall material 6. The vertical member 7 is swingably connected at the other end of the horizontal member 1 and the upper end of the vertical member 7 by a supporting bolt 4. Further, a horizontality-retaining mechanism 5 keeping the vertical member 7 horizontal against the horizontal member 1 is installed in the horizontal member 1 and the vertical member 7.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、PCa板等からな
る外壁材をクレーン等の揚重機(以下「クレーン」とい
う。)で吊り上げて、建設中の建物に取り付けるときに
使用する外壁材の吊り治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for suspending an external wall material used for lifting an external wall material made of a PCa plate or the like with a lifting machine such as a crane (hereinafter referred to as a "crane") and mounting it on a building under construction. About jigs.

【0002】[0002]

【従来の技術】高層ビル等の建築工事において、PCa
板等からなる外壁材をクレーンで吊り上げて建設中の建
物に取り付けるときには、吊り治具を介して外壁材をク
レーンで吊り上げている。吊り治具は、一端にクレーン
の吊りワイヤーや水平バランサー等を取り付け可能な水
平部材と、この水平部材の他端から垂下しており、外壁
材を取り付け可能な垂直部材とから構成されている。
2. Description of the Related Art In the construction work of high-rise buildings and the like, PCa
When an external wall material made of a board or the like is lifted by a crane and attached to a building under construction, the external wall material is lifted by a crane via a hanging jig. The hanging jig includes a horizontal member to which a hanging wire of a crane, a horizontal balancer, or the like can be attached at one end, and a vertical member that hangs from the other end of the horizontal member and can attach an outer wall material.

【0003】吊り治具を使用して、外壁材を建設中の建
物に取り付ける方法について説明すると、まず、トラッ
クの荷台に載置してある外壁材の一端を、吊り治具の垂
直部材に取り付ける。このとき、吊り治具の水平部材が
外壁材の上端の上側に位置し、垂直部材が外壁材の裏面
に位置するようにして取り付ける。そして、クレーンで
外壁材を吊り上げて、建設中の建物の所定の位置に取り
付ける。外壁材の取り付けが完了すると、外壁材と吊り
治具の垂直部材との連結を解除する。次に、吊り治具を
建物の外方、すなわち横方向に引き出す作業を行うが、
この状態のままでは、外壁材とその裏側にある吊り治具
の垂直部材とがぶつかって、建物の外方に引き出すこと
はできない。このため、クレーンにより吊り治具をいっ
たん吊り上げて、吊り治具の垂直部材の下端が外壁材の
上端よりも上方に位置するようにしてから、吊り治具を
建物の外部に引き出している。
A method of attaching an outer wall member to a building under construction using a hanging jig will be described. First, one end of the outer wall member placed on a truck bed is attached to a vertical member of the hanging jig. . At this time, the suspension jig is mounted such that the horizontal member is positioned above the upper end of the outer wall material and the vertical member is positioned on the back surface of the outer wall material. Then, the outer wall material is lifted by a crane and attached to a predetermined position of the building under construction. When the attachment of the outer wall material is completed, the connection between the outer wall material and the vertical member of the hanging jig is released. Next, work to pull the hanging jig out of the building, that is, in the horizontal direction,
In this state, the outer wall material collides with the vertical member of the hanging jig on the back side, and cannot be pulled out of the building. Therefore, the hanging jig is temporarily lifted by the crane so that the lower end of the vertical member of the hanging jig is positioned above the upper end of the outer wall material, and then the hanging jig is drawn out of the building.

【0004】これらの一連の作業を繰り返すことによ
り、外壁材を建設中の建物に取り付けている。
[0004] By repeating these series of operations, the outer wall material is attached to the building under construction.

【0005】[0005]

【発明が解決しようとする課題】しかし、前述した取り
付け方法では、建物に取り付けた外壁材のすぐ上方に、
自己昇降式の外周養生枠等の下端が位置している場合に
は、クレーンによって吊り治具を吊り上げようとして
も、吊り上げるだけの間隔はないため、吊り治具を建物
の外方に引き出すことができなかった。そして、この吊
り治具を建物の外方に引き出すことができない原因は、
吊り治具の垂直部材が水平部材に固定されたままになっ
ていることにある。
However, according to the above-described mounting method, just above the outer wall material mounted on the building,
If the lower end of the self-elevating outer curing frame is located, there is no space to lift the lifting jig using a crane, so the lifting jig may be pulled out of the building. could not. And the reason why this hanging jig cannot be pulled out of the building is
The vertical member of the hanging jig remains fixed to the horizontal member.

【0006】ここで自己昇降式外周養生枠について説明
すると、本願出願人が先に出願した例えば特開平10−
331431号公報に記載のものがあり、具体的には、
建設中の建物から資材が飛散するのを防止したり、作業
者が転落するのを防止等するため、建物の外周面に外周
面養生部材を配置して養生を行い、前記養生部材を外壁
の施工に伴って上昇または下降させることにより、上方
または下方の階の外周面を養生するものである。自己昇
降式外周養生枠によれば、クレーンにより養生部材を吊
り上げて、建設中の建物に取り付ける必要がないため、
労力を軽減することができ、迅速に建設中の建物の外周
面の養生を行うことができる。
Here, the self-elevating type outer peripheral curing frame will be described.
There is a thing described in 331431 gazette, specifically,
In order to prevent the materials from being scattered from the building under construction or to prevent the worker from falling down, etc., the outer peripheral surface curing member is arranged on the outer peripheral surface of the building to perform curing, and the curing member is attached to the outer wall. By raising or lowering during construction, the outer peripheral surface of the upper or lower floor is cured. According to the self-elevating outer peripheral curing frame, there is no need to lift the curing member with a crane and attach it to the building under construction.
The labor can be reduced, and the outer peripheral surface of the building under construction can be quickly cured.

【0007】自己昇降式外周養生枠を使用している場合
に、前述したように、吊り治具を建設中の建物の外方に
引き出すことができるようにするためには、外壁材の上
端と自己昇降式外周養生枠の下端との間隔を広げる必要
がある。しかし、この間隔を広げると、その間の建物の
外周面は養生されないため、安全面で問題が生じること
になる。このため、安全性を確保しつつ、クレーンによ
り吊り治具を吊り上げることができるようにするために
は、外壁材の上端と自己昇降式外周養生枠の下端との間
に、さらに外壁材を取り付ける等の何らかの養生を施さ
なければならず、自己昇降式外周養生枠のメリットであ
る労力の軽減を最大限に生かすことはできなかった。
When the self-elevating outer peripheral curing frame is used, as described above, in order to allow the hanging jig to be pulled out of the building under construction, the upper end of the outer wall material is required. It is necessary to increase the distance between the lower end of the self-elevating type outer peripheral curing frame. However, if this interval is widened, the outer peripheral surface of the building in the meantime will not be cured, and a problem will occur in terms of safety. Therefore, in order to ensure that the lifting jig can be lifted by the crane while ensuring safety, an outer wall material is further attached between the upper end of the outer wall material and the lower end of the self-elevating type outer peripheral curing frame. Therefore, it was not possible to make the most of the reduction in labor, which is an advantage of the self-elevating type outer peripheral curing frame.

【0008】そこで本発明の目的は、外壁材と吊り治具
の垂直部材との連結を解除した後に、クレーンにより吊
り治具を吊り上げるという工程を不要にすることによ
り、迅速に作業を行うことができるようにし、また、外
壁材の上端と自己昇降式外周養生枠等の下端との間隔を
広げなくても、吊り治具を建設中の建物の外方に引き出
すことができるようにすることにより、外壁材の上端と
自己昇降式外周養生枠等の下端との間にさらに何らかの
養生を施すことを不要とすることにある。
Therefore, an object of the present invention is to eliminate the step of lifting the hanging jig by a crane after disconnecting the connection between the outer wall material and the vertical member of the hanging jig, thereby enabling quick work. By allowing the hanging jig to be drawn out of the building under construction without increasing the distance between the upper end of the outer wall material and the lower end of the self-elevating outer peripheral curing frame, etc. Another object of the present invention is to eliminate the need for further curing between the upper end of the outer wall material and the lower end of the self-elevating outer peripheral curing frame.

【0009】[0009]

【課題を解決するための手段】前記目的を達成するた
め、本発明に係る外壁材の吊り治具は、一端にクレーン
等の揚重機を取り付ける水平部材と、この水平部材の他
端から垂下し、かつ外壁材を取り付け可能な垂直部材と
から構成される。前記水平部材の他端と前記垂直部材の
上端とは、支持軸により前記垂直部材が揺動自在に連結
されるとともに、前記水平部材と前記垂直部材には、前
記水平部材に対して前記垂直部材を水平に維持する水平
維持機構を設けてある。
In order to achieve the above object, a hanging jig for an outer wall material according to the present invention comprises a horizontal member for attaching a lifting machine such as a crane at one end, and a hanging member hanging from the other end of the horizontal member. And a vertical member to which an outer wall material can be attached. The other end of the horizontal member and the upper end of the vertical member are connected so that the vertical member can swing freely by a support shaft, and the horizontal member and the vertical member include the vertical member with respect to the horizontal member. There is provided a horizontal maintaining mechanism for maintaining the horizontal.

【0010】ここでクレーンと水平部材との間には、水
平バランサーが介在するものであってもよい。また、水
平部材及び垂直部材は、常にこれらの部材が水平または
垂直な状態になっていることを意味するのではなく、用
語の説明上、外壁材を吊っているときを基準として水平
または垂直と表現したものである。
[0010] Here, a horizontal balancer may be interposed between the crane and the horizontal member. In addition, the horizontal member and the vertical member do not always mean that these members are in a horizontal or vertical state. It is an expression.

【0011】本発明によれば、外壁材と吊り治具の垂直
部材との連結を解除した後、吊り治具を建物の外方に前
に、クレーンにより吊り治具を吊り上げるという工程が
不要となるため、迅速に作業を行うことができる。ま
た、外壁材の上端と自己昇降式外周養生枠等の下端との
間隔を広げなくても、吊り治具を建設中の建物の外方に
引き出すことができるため、外壁材の上端と自己昇降式
外周養生枠等の下端との間にさらに何らかの養生を施す
ことが不要となる。
According to the present invention, there is no need for a step of lifting the hanging jig by a crane before the hanging jig is moved outside the building after the connection between the outer wall material and the vertical member of the hanging jig is released. Therefore, work can be performed quickly. In addition, the hanging jig can be pulled out of the building under construction without increasing the distance between the upper end of the outer wall material and the lower end of the self-elevating outer peripheral curing frame. It is not necessary to provide any further curing between the lower end of the outer peripheral curing frame and the like.

【0012】[0012]

【発明の実施の形態】以下、本発明に係る外壁材の吊り
治具の実施の形態について、図面に基づいて説明する。
図1に示すように、本発明の吊り治具は、水平部材1
と、この水平部材の同図において右端から垂下している
垂直部材7とから構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a jig for suspending an outer wall material according to the present invention will be described below with reference to the drawings.
As shown in FIG. 1, the hanging jig of the present invention includes a horizontal member 1.
And a vertical member 7 hanging down from the right end of the horizontal member in FIG.

【0013】水平部材1の左端の両側面には、掛止板2
がボルト・ナット21及び溶接22によって固着してあ
る。掛止板2は、クレーンが吊っている水平バランサー
(図示せず)に、丸鋼で構成された連結部材(図示せ
ず)を介して連結される部分であり、その連結部材は掛
止孔2aに連結される。水平部材1の図1における左端
下部には、支持板3がボルト・ナット33及び溶接34
により固着され、支持板3の下面には、ブラケット35
がボルト・ナット33によって固着してある。ブラケッ
ト35の垂直な片には外側からボルト31が貫通螺合し
ており、このボルトの先端には押さえ部32が相対回転
可能に取り付けられており、ボルト31の回転により押
さえ部が外壁材6を外側から押さえるようにしてある。
On both sides of the left end of the horizontal member 1,
Are fixed by bolts and nuts 21 and welds 22. The hanging plate 2 is a portion connected to a horizontal balancer (not shown) suspended by a crane via a connecting member (not shown) made of round steel. 2a. At the lower left portion of the horizontal member 1 in FIG.
And a bracket 35 is attached to the lower surface of the support plate 3.
Are secured by bolts and nuts 33. A bolt 31 penetrates a vertical piece of the bracket 35 from the outside, and a holding portion 32 is attached to the tip of the bolt so as to be relatively rotatable. Is pressed from the outside.

【0014】水平部材1の右端近傍には、支持軸となる
支持用ボルト4によって垂直部材7の上端が枢着してあ
り、このボルトにはナット41が螺合している。水平部
材1と垂直部材7には固定用ボルト5が貫通し、ナット
51が螺合されており、これにより垂直部材は水平部材
に対して固定され、垂直状態を維持している。また、水
平部材1には、上向きにブラケット23が突設し、これ
に孔24が開設してあり、垂直部材7が支持用ボルト4
を中心として旋回して水平位置に至ったときに、ボルト
5が貫通していた垂直部材の孔が孔24に重なるように
なっている。そして、これらの孔にボルト等の棒状部材
を挿入することにより、垂直部材7の水平状態は維持さ
れる。このように、これらの孔と棒状部材とによって、
水平維持機構が構成されている。
In the vicinity of the right end of the horizontal member 1, the upper end of the vertical member 7 is pivotally mounted by a support bolt 4 serving as a support shaft, and a nut 41 is screwed to this bolt. A fixing bolt 5 penetrates the horizontal member 1 and the vertical member 7, and a nut 51 is screwed into the horizontal member 1 and the vertical member 7, whereby the vertical member is fixed to the horizontal member and maintains a vertical state. A bracket 23 protrudes upward from the horizontal member 1, and a hole 24 is formed in the bracket 23.
Is turned around to reach the horizontal position, the hole of the vertical member through which the bolt 5 has penetrated overlaps the hole 24. Then, by inserting a rod-like member such as a bolt into these holes, the horizontal state of the vertical member 7 is maintained. Thus, by these holes and the rod-shaped member,
A horizontal maintenance mechanism is configured.

【0015】さらに、垂直部材7には小孔71が開設さ
れ、垂直部材が上方に旋回したときに、これが孔24に
重なり、これらに棒状部材を挿入することにより、垂直
部材の上方への旋回状態が維持されるようになってい
る。垂直部材7は外壁材6を取り付けるものであり、こ
の垂直部材には外壁材を取り付け可能な取付板8が取り
付けてある。取付板8は、垂直部材7にボルト・ナット
81で固定される固定部82と、これと一体をなして外
壁材6を支持する支持部83とから構成されている。固
定部82は外壁材6の表面に対して直角となる板状をな
しており、支持部83は外壁材の表面に対して平行とな
る板状をなしている。
Further, a small hole 71 is opened in the vertical member 7, and when the vertical member turns upward, this overlaps with the hole 24, and by inserting a rod-shaped member into these holes, the vertical member turns upward. The state is maintained. The vertical member 7 is for attaching the outer wall material 6, and a mounting plate 8 to which the outer wall material can be attached is attached to the vertical member. The mounting plate 8 includes a fixing portion 82 fixed to the vertical member 7 with bolts and nuts 81, and a supporting portion 83 integrally formed with the fixing portion 82 and supporting the outer wall material 6. The fixing portion 82 has a plate shape perpendicular to the surface of the outer wall material 6, and the support portion 83 has a plate shape parallel to the surface of the outer wall material.

【0016】支持部83には、上下に長い長孔84が開
設してあり、これに外壁材6の裏面に突設された掛止軸
61を貫通させて、ナット62を螺合するようになって
いる。掛止軸61は、水平方向に複数突設され、支持部
83にも水平方向に複数の長孔84が開設してある。な
お、図中の9は、建物のスラブ上面に設けられた金具で
あり、91は、この金具に溶接された袋ナット92に螺
合しているボルトである。
A long hole 84 is formed in the support portion 83 in the vertical direction, and a nut 62 is screwed into the hole 84 through a hook shaft 61 provided on the back surface of the outer wall material 6. Has become. A plurality of hook shafts 61 are protruded in the horizontal direction, and a plurality of long holes 84 are also opened in the support portion 83 in the horizontal direction. 9 is a metal fitting provided on the upper surface of the slab of the building, and 91 is a bolt screwed to a cap nut 92 welded to the metal fitting.

【0017】次に、本発明を使用して、外壁材6を建設
中の建物に取り付ける手順について説明する。 1.吊り治具への外壁材の取り付け まず、水平部材1の一端から垂直部材7が垂下するよう
にして、支持用ボルト4と固定用ボルト5で両部材を固
定する。そして、垂直部材7を、トラックの荷台に載置
されている外壁材6の一端に取り付ける。具体的には、
取付板8に形成してある長孔84に、外壁材6の上端に
取り付けてある掛止軸61の先端を挿入し、この先端部
にナット62を螺合させる。そして、水平部材1に取り
付けてある支持部材31の押さえ部32で外壁材を押さ
え付けることにより、外壁材を支持する。
Next, a procedure for attaching the outer wall material 6 to a building under construction using the present invention will be described. 1. Attachment of the outer wall material to the hanging jig First, both members are fixed with the support bolt 4 and the fixing bolt 5 so that the vertical member 7 hangs down from one end of the horizontal member 1. Then, the vertical member 7 is attached to one end of the outer wall material 6 placed on the truck bed. In particular,
The distal end of the retaining shaft 61 attached to the upper end of the outer wall material 6 is inserted into the elongated hole 84 formed in the mounting plate 8, and the nut 62 is screwed into the distal end. Then, the outer wall material is supported by pressing the outer wall material with the pressing portion 32 of the support member 31 attached to the horizontal member 1.

【0018】これに前後して、水平部材1の右端に取り
付けてある掛止板2の掛止孔2aに図示しない連結部材
等を介してクレーンのワイヤロープ等を取り付ける。な
お、トラックの荷台の上に載置してある外壁材6に吊り
治具を取り付けるときは、水平部材1は垂直な状態にな
っており、垂直部材7は水平な状態になっている。 2.外壁材の建て起こし 次に、外壁材6をクレーンによって建て起こす作業を行
う。具体的には、クレーンによって外壁材6を吊り上げ
始めると、垂直部材7が取り付けてある方の一端から外
壁材は徐々に持ち上がる。そして、トラックの荷台から
外壁材6が完全に吊り上げられたとき、外壁材は垂直な
状態になり、この状態のまま、外壁材は建設中の建物の
所定の個所までさらに吊り上げられる。
Before or after this, a wire rope or the like of a crane is attached to a retaining hole 2a of a retaining plate 2 attached to the right end of the horizontal member 1 via a connecting member (not shown) or the like. When the hanging jig is attached to the outer wall material 6 placed on the truck bed, the horizontal member 1 is in a vertical state, and the vertical member 7 is in a horizontal state. 2. Next, the work of erecting the outer wall material 6 with a crane is performed. Specifically, when the outer wall material 6 is started to be lifted by the crane, the outer wall material is gradually lifted from one end to which the vertical member 7 is attached. Then, when the outer wall material 6 is completely lifted from the truck bed, the outer wall material is in a vertical state, and in this state, the outer wall material is further lifted to a predetermined place in the building under construction.

【0019】なお、外壁材6がクレーンによって吊り上
げられているとき、すなわち外壁材が垂直な状態になっ
ているときは、水平部材1は水平な状態になっており、
垂直部材7は垂直な状態になっている。 3.外壁材の建物への取り付け 次に、外壁材6を建物の所定の個所に取り付ける作業を
行う。具体的には、外壁材6を所定の高さまで吊り上げ
たら、外壁材を建物に寄せる。そして、ボルト91の上
に外壁材6の突出部を載置するほか、図示しないファス
ナーを用いて建物躯体に外壁材6を取り付ける。 4.外壁材からの吊り治具の取り外し 外壁材6を建物に取り付けたら、外壁材と垂直部材7と
の連結を解除する作業を行う。具体的には、垂直部材7
の上部右端に形成してある貫通孔に挿入してある固定用
ボルト5からナット51を取り外して、固定用ボルトを
貫通孔から引き抜く。併せて、掛止軸61の先端に取り
付けたナット62を取り外し、垂直部材7の下端を持ち
上げて、垂直部材が水平な状態になるまで垂直部材を図
面矢印方向に揺動させる。
When the outer wall material 6 is lifted by a crane, that is, when the outer wall material is in a vertical state, the horizontal member 1 is in a horizontal state.
The vertical member 7 is in a vertical state. 3. Attachment of outer wall material to building Next, an operation of attaching the outer wall material 6 to a predetermined location of the building is performed. Specifically, when the outer wall material 6 is lifted to a predetermined height, the outer wall material is brought to the building. Then, in addition to placing the protrusion of the outer wall material 6 on the bolt 91, the outer wall material 6 is attached to the building frame using a fastener (not shown). 4. Removal of the hanging jig from the outer wall material After the outer wall material 6 is attached to the building, a work of releasing the connection between the outer wall material and the vertical member 7 is performed. Specifically, the vertical member 7
The nut 51 is removed from the fixing bolt 5 inserted into the through hole formed at the upper right end of the, and the fixing bolt is pulled out from the through hole. At the same time, the nut 62 attached to the tip of the hook shaft 61 is removed, the lower end of the vertical member 7 is lifted, and the vertical member is swung in the direction of the arrow in the drawing until the vertical member becomes horizontal.

【0020】なお、掛止軸61の先端に取り付けたナッ
ト62を取り外してから、固定用ボルト5からナット5
1を取り外しても構わない。次に、水平部材1のブラケ
ット23に開設してある孔24と、この孔と重なるよう
にして位置している垂直部材7の上部右端に形成してあ
る貫通孔、すなわち固定用ボルト5が挿入してあった貫
通孔にボルト等を挿入して、垂直部材を水平に維持す
る。そして、この状態で、治具全体を建物の外方に押し
出す。垂直部材7は水平な状態になっており、垂直部材
と外壁材6とはぶつかることはないため、吊り治具のす
ぐ上方に位置している自己昇降式外周養生枠(図示せ
ず)の下端との間隔を広げなくても、垂直部材を建物の
外方に押し出すことができる。
After the nut 62 attached to the tip of the hook shaft 61 is removed, the nut 5 is removed from the fixing bolt 5.
1 may be removed. Next, a hole 24 formed in the bracket 23 of the horizontal member 1 and a through hole formed in the upper right end of the vertical member 7 positioned so as to overlap the hole, that is, the fixing bolt 5 are inserted. The vertical member is kept horizontal by inserting a bolt or the like into the through hole that has been made. Then, in this state, the entire jig is pushed out of the building. Since the vertical member 7 is in a horizontal state and does not collide with the outer wall material 6, the lower end of the self-elevating type outer peripheral curing frame (not shown) located immediately above the hanging jig is provided. The vertical members can be pushed out of the building without increasing the distance between the vertical members.

【0021】なお、垂直部材7の揺動を制止するのは、
固定用ボルト5を用いることに限られず、外壁材の上端
の上側と外壁材の裏面とに、L字状をした部材を取り付
けるようにしても構わない。
The vertical member 7 is prevented from swinging by
The present invention is not limited to the use of the fixing bolt 5, and an L-shaped member may be attached to the upper side of the upper end of the outer wall material and the back surface of the outer wall material.

【0022】[0022]

【発明の効果】以上説明したように本発明によれば、外
壁材と垂直部材との連結を解除した後に、クレーンによ
り吊り治具を吊り上げるという工程が不要となるため、
迅速に作業を行うことができる。また、外壁材の上端と
自己昇降式外周養生枠等の下端との間隔を広げなくて
も、吊り治具を建設中の建物の外方に引き出すことがで
きるため、外壁材の上端と自己昇降式外周養生枠等の下
端との間に、さらに何らかの養生を施すことが不要にな
る。
As described above, according to the present invention, the step of lifting the hanging jig by the crane after releasing the connection between the outer wall member and the vertical member is not required.
Work can be done quickly. In addition, the hanging jig can be pulled out of the building under construction without increasing the distance between the upper end of the outer wall material and the lower end of the self-elevating outer peripheral curing frame. It is not necessary to provide any further curing between the lower end of the outer peripheral curing frame and the like.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の使用状態を示す正面図である。FIG. 1 is a front view showing a use state of the present invention.

【符号の説明】[Explanation of symbols]

1 水平部材 7 垂直部材 4 支持用ボルト(支持軸) 5 固定用ボルト(水平維持機構) Reference Signs List 1 horizontal member 7 vertical member 4 support bolt (support shaft) 5 fixing bolt (horizontal maintenance mechanism)

フロントページの続き Fターム(参考) 2E002 FB02 JC02 JD04 MA01 NA01 NB06 PA04 RA00 RB03 XA03 XA18 2E174 AA03 BA01 CA03 CA12 CA34 CA38 DA14 DA67 3F004 AA08 AB08 AB12 AD01 EA27 LA07 Continued on the front page F term (reference) 2E002 FB02 JC02 JD04 MA01 NA01 NB06 PA04 RA00 RB03 XA03 XA18 2E174 AA03 BA01 CA03 CA12 CA34 CA38 DA14 DA67 3F004 AA08 AB08 AB12 AD01 EA27 LA07

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 一端にクレーン等の揚重機を取り付ける
水平部材と、この水平部材の他端から垂下し、かつ外壁
材を取り付け可能な垂直部材とから構成され、前記水平
部材の他端と前記垂直部材の上端とは、支持軸により前
記垂直部材が揺動自在に連結されるとともに、前記水平
部材と前記垂直部材には、前記水平部材に対して前記垂
直部材を水平に維持する水平維持機構を設けたことを特
徴とする外壁材の吊り治具。
1. A horizontal member for attaching a lifting machine such as a crane to one end, and a vertical member which is suspended from the other end of the horizontal member and to which an outer wall material can be attached, wherein the other end of the horizontal member and the horizontal member are provided. The upper end of the vertical member is pivotally connected to the vertical member by a support shaft, and the horizontal member and the vertical member have a horizontal maintaining mechanism for maintaining the vertical member horizontal with respect to the horizontal member. A jig for hanging an outer wall material, comprising:
JP11158149A 1999-06-04 1999-06-04 Hanging jig for external wall material Pending JP2000345712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11158149A JP2000345712A (en) 1999-06-04 1999-06-04 Hanging jig for external wall material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11158149A JP2000345712A (en) 1999-06-04 1999-06-04 Hanging jig for external wall material

Publications (1)

Publication Number Publication Date
JP2000345712A true JP2000345712A (en) 2000-12-12

Family

ID=15665342

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11158149A Pending JP2000345712A (en) 1999-06-04 1999-06-04 Hanging jig for external wall material

Country Status (1)

Country Link
JP (1) JP2000345712A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016023423A (en) * 2014-07-17 2016-02-08 大和ハウス工業株式会社 Exterior wall material hoisting jig
JP2016160050A (en) * 2015-03-03 2016-09-05 Jfe建材株式会社 Suspension metal fitting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016023423A (en) * 2014-07-17 2016-02-08 大和ハウス工業株式会社 Exterior wall material hoisting jig
JP2016160050A (en) * 2015-03-03 2016-09-05 Jfe建材株式会社 Suspension metal fitting

Similar Documents

Publication Publication Date Title
JP3321149B1 (en) Pipe lifting equipment
JP2000345712A (en) Hanging jig for external wall material
JPH0220354Y2 (en)
JPH08133661A (en) Concrete block lifting means
CN212450358U (en) Mechanical equipment that lifts by crane that construction was used
JPH092774A (en) Heavy object suspending device
JP3154940B2 (en) Auxiliary device for pulling in suspended loads
JP2000274080A (en) Wall member fitting method for building skeleton and wall member fitting traverser
JP3232447U (en) Antenna mounting base rod
JPH08303820A (en) Mounting metal for air conditioner outdoor machine
JP2000291261A (en) Boom for building steel tower
JP2007290410A (en) Device and method for installing automatic electric traction tensioner
JPH0585478B2 (en)
JPS6038160Y2 (en) Furnace lid mounting device
JP3122625B2 (en) Escalator curing method and curing panel
JP3018874U (en) Sash mounting device
JP2002128415A (en) Method and device for hoisting driving machine to height position in the vicinity of ceiling face in elevator shaft
JP2002060158A (en) Installation method for elevator
JP2001335258A (en) Method and device for adjusting elongation of main rope in elevator
JPH072549Y2 (en) Crane lifting equipment
JP3063880U (en) Scaffold unloader
JPH061582Y2 (en) Architectural version lifting equipment
JPS5844156Y2 (en) Counterweight attachment/detachment device
JPH0741746Y2 (en) Elevator installation device
JPH01111962A (en) Panel hanger and method of mounting panel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060317

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071122

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071211

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080408