JP2000291372A - Concrete block for inner excavation type shaft construction method - Google Patents

Concrete block for inner excavation type shaft construction method

Info

Publication number
JP2000291372A
JP2000291372A JP11103480A JP10348099A JP2000291372A JP 2000291372 A JP2000291372 A JP 2000291372A JP 11103480 A JP11103480 A JP 11103480A JP 10348099 A JP10348099 A JP 10348099A JP 2000291372 A JP2000291372 A JP 2000291372A
Authority
JP
Japan
Prior art keywords
joint screw
joint
screw rod
concrete block
screw lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11103480A
Other languages
Japanese (ja)
Inventor
Takefumi Matsumura
武文 松村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chichibu Concrete Industry Co Ltd
Original Assignee
Chichibu Concrete Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chichibu Concrete Industry Co Ltd filed Critical Chichibu Concrete Industry Co Ltd
Priority to JP11103480A priority Critical patent/JP2000291372A/en
Publication of JP2000291372A publication Critical patent/JP2000291372A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a concrete block capable of shortening a time needed for integration of upper and lower concrete blocks with each other, assuring the positioning at the time of connection, preventing a play or displacement from occurring at connection positions, and facilitating the production of the concrete blocks. SOLUTION: Six box-shaped joint screw lever mounting fittings 7, guide pipes for knock pin, and an anchor bar 8 are fixed to the inside of a steel band 1 installed at the bottom end of a main body C at equal intervals, joint screw lever inserting holes 9 for the joint screw lever mounting fittings 7 are formed larger than a joint screw lever, a tapered recessed part 9a is provided in the upper part thereof, and a tapered washer 11 is fitted into the joint screw lever inserting hole 9 so as to form a joint tightened with nuts 12. Then, the joint A fixes six joint screw lever mounting nuts 2, two guide pipes for knock pin, and the anchor bar 8 on the inside of the steel band 1 installed at the upper end of the main body C at equal intervals, and screws the anchor screws 6 on the underside of the joint screw lever mounting nuts 2.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は回転圧入,揺動圧
入,素掘り圧入による中掘式立坑構築工法用コンクリー
トブロックの端部に取付けて使用する継手に関するもの
で、特に回転圧入,揺動圧入を行う場合に優れた効果を
発揮する継手が端部に取付られたコンクリートブロック
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint which is used by being attached to an end of a concrete block for a shaft construction method using a shaft by rotary press-fitting, rocking press-fitting, or plain excavation. The present invention relates to a concrete block attached to an end thereof, which exhibits an excellent effect when performing the above.

【0002】[0002]

【従来の技術】中掘式立坑構築工法用コンクリートブロ
ックを回転圧入又は揺動圧入によって沈下させる場合、
1.上下のコンクリートブロックの端部に設けた鋼製バ
ンド又は鋼製リングあるいは端板を溶接により連結する
方法,2.コンクリートブロックにアンカーナット(埋
込みナット)を埋め込み、緊結プレートにより連結する
方法,3.接着剤により連結する方法等によって一体に
し、回転圧入機又は揺動圧入機によって沈下させるよう
にしているが、各連結方法には次の問題がある。
2. Description of the Related Art When a concrete block for the construction of a shaft is constructed by rotary press-fitting or rocking press-fitting,
1. 1. A method in which steel bands or steel rings or end plates provided at the ends of the upper and lower concrete blocks are connected by welding. 2. A method of embedding an anchor nut (embedded nut) in a concrete block and connecting it with a binding plate, Although they are integrated by a method such as connecting with an adhesive and settled by a rotary press machine or an oscillating press machine, each connecting method has the following problems.

【0003】すなわち、前記1.の方法は溶接に時間を
要するという問題があり、2.の方法は回転又は揺動圧
入時に上下のコンクリートブロックに「ズレ」や「遊
び」が生じたり、プレートが圧入時の抵抗となるという
問題があり、3.の方法は接着剤が固化するまで時間を
要するという問題があった。
That is, 1. There is a problem that the method of (1) requires time for welding. The method of (2) has a problem that "displacement" or "play" occurs in the upper and lower concrete blocks at the time of rotation or rocking press-fitting, and the plate becomes a resistance at the time of press-fitting. The method has a problem that it takes time until the adhesive is solidified.

【0004】[0004]

【発明が解決しようとする課題】そこで本発明は、上下
のコンクリートブロックの一体化に要する時間の短縮,
連結時の位置合わせの確実化,連結箇所の「遊び」,
「ズレ」の防止及びコンクリートブロック製造の簡略化
を図ることができる継手を有するコンクリートブロック
を提供することを課題とするものである。
SUMMARY OF THE INVENTION Accordingly, the present invention has been made to reduce the time required for integrating upper and lower concrete blocks,
Ensuring alignment at the time of connection, "play" at the connection point,
It is an object of the present invention to provide a concrete block having a joint capable of preventing "displacement" and simplifying concrete block production.

【0005】[0005]

【課題を解決するための手段】本発明は上記課題を解決
するためになされたもので、請求項1記載の発明は、筒
状コンクリートブロックの下端部に装着する鋼製バンド
の内側に適数のボックス状継手ネジ杆取付金具,ノック
ピン用ガイドパイプ及びアンカーを適宜間隔で固定する
と共に、前記継手ネジ杆取付金具の継手ネジ杆挿入孔を
継手ネジ杆より一回り大きく設け、且つ締め付けナット
使用側にテーパー付凹部を設け、この継手ネジ杆挿入孔
にテーパー付座金を嵌め、ナットで締め付ける継手を構
成し、筒状コンクリートブロックの上端部に装着する鋼
製バンドの内側には適数の継手ネジ杆取付ナット,ノッ
クピン用ガイドパイプ及びアンカーを適宜間隔で固定す
ると共に、前記継手ネジ杆取付ナットのコンクリート埋
設側にアンカーネジを螺合した継手を構成したことを特
徴とする中掘式立坑構築工法用コンクリートブロックで
ある。
DISCLOSURE OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and the invention according to claim 1 is an invention in which a suitable number of steel bands are provided inside a steel band attached to the lower end of a tubular concrete block. The box-shaped joint screw rod mounting bracket, the guide pipe for the knock pin and the anchor are fixed at appropriate intervals, the joint screw rod insertion hole of the joint screw rod mounting bracket is provided one size larger than the joint screw rod, and the tightening nut is used. A tapered recess is provided in the joint, and a tapered washer is fitted in the joint screw rod insertion hole, and a joint tightened with a nut is formed. A steel band attached to the upper end of the tubular concrete block has an appropriate number of joint screws inside. The rod mounting nut, the knock pin guide pipe and the anchor are fixed at appropriate intervals, and the anchor screw is mounted on the concrete embedded side of the joint screw rod mounting nut. A concrete block for formula vertical shaft construction method dug in, characterized in that to constitute a screwed joints to.

【0006】請求項2記載の発明は、請求項1記載の発
明におけるテーパー付座金に替えて、テーパー付偏心座
金を用いるようにしたものである。
According to a second aspect of the present invention, a tapered eccentric washer is used in place of the tapered washer according to the first aspect of the present invention.

【0007】[0007]

【作用】遠心成形用型枠の両端に本発明にかゝる継手を
固定した鋼製バンドを配置し、コンクリートを型枠内に
注入して遠心成型することにより、両端に継手付の中掘
式立坑構築工法用コンクリートブロックが出来上がる。
[Function] A steel band having a joint according to the present invention fixed at both ends of a centrifugal mold is placed, and concrete is injected into the mold and centrifugally molded to form a digging with joints at both ends. The concrete block for the shaft construction method is completed.

【0008】完成された筒状コンクリートブロックは、
上部に他の筒状コンクリートブロックを接続する場合、
下位の筒状コンクリートブロックは継手ネジ杆取付ナッ
トを設けた側を上にし、上部に乗せる筒状コンクリート
ブロックは継手ネジ杆取付金具を設けた側を下にし、下
位の筒状コンクリートブロックの上端に取付られた継手
のノックピン用ガイドパイプにノックピンを入れると共
に、継手ネジ杆取付ナットに継手ネジ杆を螺合し、上部
に接続しようとする上位の筒状コンクリートブロックを
下位の筒状コンクリートブロックから上方に突出するノ
ックピンを上位の筒状コンクリートブロックのノックピ
ン用ガイドパイプに挿入すると同時に、継手ネジ杆取付
金具の継手ネジ杆挿入孔に前記継手ネジ杆を挿入し、止
水用ゴム製パッキンとテーパー付座金を介してナットで
継手ネジ杆を緊締することにより上下の筒状コンクリー
トブロックの軸心が一致し、確実に一体化し、回転圧入
機又は揺動圧入機を用いても上下のコンクリートブロッ
クの芯ブレが生じない回転が得られる。また、ノックピ
ンはネジ杆より長くすることにより、継手ネジ杆のネジ
部を傷付けない。
[0008] The completed tubular concrete block,
When connecting another tubular concrete block to the top,
The lower cylindrical concrete block has the side with the joint screw rod mounting nut facing up, and the upper cylindrical concrete block has the side with the joint screw rod mounting bracket facing down. Insert the knock pin into the guide pipe for the knock pin of the attached joint, screw the joint screw rod into the joint screw rod mounting nut, and move the upper cylindrical concrete block to be connected to the upper part from the lower cylindrical concrete block upward. At the same time as inserting the knock pin protruding into the guide pipe for the knock pin of the upper cylindrical concrete block, insert the joint screw rod into the joint screw rod insertion hole of the joint screw rod mounting bracket, and attach a rubber seal for waterproofing and a taper. The center of the upper and lower tubular concrete blocks is tightened by tightening the joint screw rod with a nut via a washer. Match, securely integrated, runout of the upper and lower concrete block also with a rotary press fit machine or rocking press fitting machine rotation does not occur is obtained. Further, by making the knock pin longer than the screw rod, the screw part of the joint screw rod is not damaged.

【0009】また、継手ネジ杆挿入孔は一廻り大きく設
けてあるので、上位の筒状コンクリートブロックを重ね
た場合、埋設の継手ネジ杆取付ナットの取付位置が所定
位置より多少ズレていても、継手ネジ杆挿入孔が通常の
丸孔の場合のように継手ネジ杆が挿入出来なくなるよう
なことがなく、テーパー付孔とテーパー付座金の効果で
緊締することにより継手ネジ杆挿入孔と継手ネジ杆がセ
ンタリングされ、緊締後は回転,揺動方向へのズレや遊
びは生じない。従って継手製作の製作精度の誤差にも容
易に対応できる。これらの本発明にかかる継手は鋼製バ
ンドに固定してあるため、型枠内に鋼製バンドをセット
するだけで継手を設けることができ、継手製作に係わる
コストを低減することが可能となる。
Further, since the joint screw rod insertion hole is provided so as to be slightly larger, even when the upper tubular concrete block is overlapped, even if the mounting position of the buried joint screw rod mounting nut is slightly displaced from a predetermined position, The joint screw rod insertion hole does not become impossible to insert the joint screw rod unlike the case of a normal round hole, and the joint screw rod insertion hole and the joint screw are tightened by the effect of the tapered hole and the tapered washer. The rod is centered, and after tightening, there is no displacement or play in the direction of rotation or swing. Therefore, it is possible to easily cope with an error in the manufacturing accuracy of the joint manufacturing. Since the joints according to the present invention are fixed to the steel band, the joint can be provided only by setting the steel band in the mold, and the cost for manufacturing the joint can be reduced. .

【0010】また、テーパー付偏心座金を用いることに
よってブロックの製作誤差を吸収させられる。
The use of the tapered eccentric washer makes it possible to absorb a manufacturing error of the block.

【0011】[0011]

【発明の実施の形態】以下本発明の実施例を図面に基づ
き説明すれば次の通りである。
Embodiments of the present invention will be described below with reference to the drawings.

【0012】図1は本発明にかゝる中掘式立坑構築工法
用コンクリートブロックの縦断面図で、A,Bは上下に
設けられた継手、Cは筒状コンクリートブロック本体で
ある。図2は継手Aの構造を示すコンクリートブロック
本体の上面図、図3は継手Bの構造を示すコンクリート
ブロック本体の下面図である。図4(a)は前記筒状コ
ンクリートブロック本体Cを重ねた時の接続部の継手
A,Bの拡大断面図、図4(b)はその内面図である。
FIG. 1 is a vertical cross-sectional view of a concrete block for a hollow shaft construction method according to the present invention, wherein A and B are joints provided vertically and C is a cylindrical concrete block main body. FIG. 2 is a top view of the concrete block main body showing the structure of the joint A, and FIG. 3 is a bottom view of the concrete block main body showing the structure of the joint B. FIG. 4A is an enlarged cross-sectional view of the joints A and B of the connecting portion when the cylindrical concrete block main body C is overlapped, and FIG. 4B is an inner view thereof.

【0013】継手Aは鋼製バンド1の内側に図2に示す
ような継手ネジ杆取付ナット2,2,2,2,2,2を
それぞれナット台3を介し、また図5に示すようなノッ
クピン用ガイドパイプ4,4をそれぞれ6箇と2箇づつ
等間隔に溶接で取付ると共に、図4に示すように継手ネ
ジ杆取付ナット2のネジ孔2aの上側に継手ネジ杆5
を、また下側にTフック付アンカーネジ6を取付る。
The joint A is provided with joint screw rod mounting nuts 2, 2, 2, 2, 2, 2 as shown in FIG. 2 through a nut base 3 inside the steel band 1, and as shown in FIG. The dowel pin guide pipes 4 and 4 are welded at equal intervals of 6 and 2 respectively, and a joint screw rod 5 is provided above the screw hole 2a of the joint screw rod mounting nut 2 as shown in FIG.
And an anchor screw 6 with a T-hook on the lower side.

【0014】継手Bは鋼製バンド1の内側に図3に示す
ようなボックス状継手ネジ杆取付金具7,7,7,7,
7,7と、図5に示すようなノックピン用ガイドパイプ
4,4をそれぞれ6箇と2箇づつ等間隔に溶接で取付け
ると共に、アンカー棒8を設けたもので、アンカー棒8
は各継手ネジ杆取付金具7,7,7,7,7,7の両側
に設けられている。
The joint B is provided inside a steel band 1 and has a box-shaped joint screw rod mounting bracket 7, 7, 7, 7, 7, as shown in FIG.
The guide rods 7 and 7 and the guide pipes 4 and 4 for knock pins as shown in FIG. 5 are welded at equal intervals of 6 and 2 respectively, and an anchor rod 8 is provided.
Are provided on both sides of each joint screw rod mounting bracket 7, 7, 7, 7, 7, 7.

【0015】また、各継手ネジ杆取付金具7にはそれぞ
れテーパー付凹部9aを設けた継手ネジ杆挿入孔9が図
4の(a)に示すように設けられている。そして、この
継手ネジ杆挿入孔9は継手ネジ杆5よりも一廻り大きく
設けられている。
Each joint screw rod mounting member 7 is provided with a joint screw rod insertion hole 9 having a tapered recess 9a as shown in FIG. 4 (a). The joint screw rod insertion hole 9 is provided one size larger than the joint screw rod 5.

【0016】従って、図4に示すようにコンクリートブ
ロックC,Cを接続するため、重ねたとき、止水用ゴム
製パッキン10とテーパー付座金11を継手ネジ杆挿入
孔9とナット12の間に設け、ナット12を緊締すると
テーパー付座金11とテーパー付凹部9aが係合するこ
とにより継手ネジ杆5がテーパー付継手ネジ杆挿入孔9
の中心にセンタリングされ完全に緊締することが出来
る。
Therefore, as shown in FIG. 4, in order to connect the concrete blocks C and C, when they are stacked, a rubber packing 10 for waterproofing and a tapered washer 11 are inserted between the joint screw rod insertion hole 9 and the nut 12. When the nut 12 is tightened, the tapered washer 11 engages with the tapered recess 9a, so that the joint screw rod 5 is inserted into the tapered joint screw rod insertion hole 9.
It is centered in the center and can be completely tightened.

【0017】また、本発明における継手は、図4に示す
継手ネジ杆5と図5に示すノックピン13によって連結
する方式を採っており、継手ネジ杆5は引っ張り応力又
は接触面の摩擦抵抗によるせん断応力に、またノックピ
ン13はせん断応力にそれぞれ対応し、何れもコンクリ
ートブロック内に埋め込まれているので、圧入時の抵抗
(障害)にはならないと同時に、回転圧入又は揺動圧入
しても上下のコンクリートブロックにズレを生じること
なく圧入させることができる。なお、図4,図5中、1
4は止水ゴムリングである。
Further, the joint according to the present invention employs a method in which the joint screw rod 5 shown in FIG. 4 and the knock pin 13 shown in FIG. 5 are connected, and the joint screw rod 5 is subjected to shearing force due to tensile stress or frictional resistance of the contact surface. The stress and the knock pin 13 correspond to the shearing stress, respectively. Since both of them are embedded in the concrete block, they do not become resistance (obstruction) at the time of press-fitting. The concrete block can be pressed into the concrete block without any displacement. 4 and 5, 1
4 is a waterproof rubber ring.

【0018】また、継手ネジ杆取付ナット2又は継手ネ
ジ杆取付金具7とノックピン用ガイドパイプ3を鋼製バ
ンド1に固定してあるため、型枠内に鋼製バンド1をセ
ットするだけで継手付コンクリートブロックを製造する
ことができるので、従来のように継手を型枠に取付ける
ためのアンカーナット(埋込みナット)の取付け、アン
カーナットを取り付ける継手ボルトの取外しの手間が必
要とせず生産性を向上することができる。
Also, since the joint screw rod mounting nut 2 or the joint screw rod mounting bracket 7 and the knock pin guide pipe 3 are fixed to the steel band 1, the joint can be set only by setting the steel band 1 in the formwork. Since it is possible to manufacture a concrete block with attached parts, it is not necessary to install anchor nuts (embedded nuts) to attach the joints to the formwork as in the past, and it is not necessary to remove the joint bolts to attach the anchor nuts. can do.

【0019】継手ネジ杆取付ナット2のネジ孔2aの下
側に取付けるアンカーネジは、図6に示すJフック付き
アンカーネジ6’でも良いし、アンカーの機能を持つ形
状ならこれら実施例に限られないことは勿論である。
The anchor screw to be attached to the lower side of the screw hole 2a of the joint screw rod mounting nut 2 may be an anchor screw 6 'with a J hook shown in FIG. 6, or is limited to these embodiments as long as it has a function of an anchor. Of course not.

【0020】図4で示した実施例では、テーパー付座金
11を用いたが、この種のコンクリートブロックは、そ
の製造上テーパ―座金によりセンタリング出来ない歪み
が生じるものもあり、その場合はテーパ―が浮いてしま
い完全に緊締することが出来ず緩みが生じてしまう。し
かし図7に示すテーパー付偏心座金11’を用いること
により、それに対応することができる。
In the embodiment shown in FIG. 4, a tapered washer 11 is used. However, in the case of this type of concrete block, a distortion that cannot be centered due to the tapered washer occurs due to its manufacture. Floats and cannot be completely tightened, causing looseness. However, the use of the tapered eccentric washer 11 'shown in FIG.

【0021】以上例示した実施例は、内側開口タイプの
ボックス状継手ネジ杆取付金具を用い、コンクリートブ
ロックの内側から継手ネジ杆を締める形式のものを示し
たが、外側開口タイプのボックス状継手ネジ杆取付金具
を用い、コンクリートブロックの外側から継手ネジ杆を
締める形式のものにも適用し得ることは勿論である。
In the embodiment exemplified above, the box-type joint screw rod fitting of the inside opening type is used, and the joint screw rod is tightened from the inside of the concrete block. Needless to say, the present invention can also be applied to a type in which a joint mounting rod is tightened from the outside of a concrete block using a rod mounting bracket.

【0022】[0022]

【発明の効果】以上のように、本発明にかゝる継手は、
構造が比較的簡単且つ型枠への組み付けが容易な継手付
コンクリートブロックの製造に適し、しかも、施工現場
での連結が容易でかつ、確実に行えるだけでなく、せん
断応力に対する結合力を要求される回転圧入,揺動圧入
に十分耐える継手を有したコンクリートブロックを提供
することができる。
As described above, the joint according to the present invention is
Suitable for the manufacture of concrete blocks with joints, whose structure is relatively simple and easy to assemble into the formwork. In addition to being easy and reliable to connect at the construction site, it is also required to have a bonding force against shear stress. The present invention can provide a concrete block having a joint sufficiently resistant to rotary press-fitting and swing press-fitting.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例の縦断面図。FIG. 1 is a longitudinal sectional view of an embodiment of the present invention.

【図2】本発明の実施例の継手Aの構造を示すコンクリ
ートブロック本体の上面図。
FIG. 2 is a top view of the concrete block main body showing the structure of the joint A according to the embodiment of the present invention.

【図3】本発明の実施例の継手Bの構造を示すコンクリ
ートブロック本体の下面図。
FIG. 3 is a bottom view of the concrete block main body showing the structure of the joint B according to the embodiment of the present invention.

【図4】本発明の実施例における継手ネジ杆取付金具の
詳細を示す拡大図で、(a)は縦断面図,(b)は内面
図。
FIGS. 4A and 4B are enlarged views showing details of a joint screw rod mounting bracket in the embodiment of the present invention, wherein FIG. 4A is a longitudinal sectional view and FIG.

【図5】本発明の実施例におけるノックピン用ガイドパ
イプの詳細を示す拡大図で、(a)は縦断面図,(b)
は外面図。
FIG. 5 is an enlarged view showing details of a guide pipe for a knock pin according to the embodiment of the present invention, where (a) is a longitudinal sectional view and (b).
Is an external view.

【図6】Jフック付きアンカーネジの側面図。FIG. 6 is a side view of an anchor screw with a J hook.

【図7】請求項2記載の発明の実施例を示す拡大縦断面
図。
FIG. 7 is an enlarged longitudinal sectional view showing an embodiment of the invention described in claim 2.

【符号の説明】[Explanation of symbols]

A 継手 B 継手 C コンクリートブロック本体 1 鋼製バンド 2 継手ネジ杆取付ナット 3 ナット台 4 ノックピン用ガイドパイプ 5 継手ネジ杆 6 Tフック付アンカーネジ 7 継手ネジ杆取付金具 8 アンカー棒 9 ネジ杆挿入孔 10 止水用ゴム製パッキン 11 テーパー付座金 12 ナット 13 ノックピン 14 止水ゴムリング A Joint B Joint C Concrete block main body 1 Steel band 2 Joint screw rod mounting nut 3 Nut base 4 Dowel pin guide pipe 5 Joint screw rod 6 T-hook anchor screw 7 Joint screw rod mounting bracket 8 Anchor rod 9 Screw rod insertion hole DESCRIPTION OF SYMBOLS 10 Rubber packing for waterproofing 11 Washer with taper 12 Nut 13 Dowel pin 14 Waterproof rubber ring

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 筒状コンクリートブロックの下端部に装
着する鋼製バンドの内側に適数のボックス状継手ネジ杆
取付金具,ノックピン用ガイドパイプ及びアンカーを適
宜間隔で固定すると共に、前記継手ネジ杆取付金具の継
手ネジ杆挿入孔を継手ネジ杆より一回り大きく設け、且
つ締め付けナット使用側にテーパー付凹部を設け、この
継手ネジ杆挿入孔にテーパー付座金を嵌め、ナットで締
め付ける継手を構成し、筒状コンクリートブロックの上
端部に装着する鋼製バンドの内側には適数の継手ネジ杆
取付ナット,ノックピン用ガイドパイプ及びアンカーを
適宜間隔で固定すると共に、前記継手ネジ杆取付ナット
のコンクリート埋設側にアンカーネジを螺合した継手を
構成したことを特徴とする中掘式立坑構築工法用コンク
リートブロック。
An appropriate number of box-shaped joint screw rod mounting brackets, knock pin guide pipes and anchors are fixed at appropriate intervals inside a steel band attached to a lower end portion of a cylindrical concrete block, and the joint screw rod is fixed. The joint screw rod insertion hole of the mounting bracket is provided one size larger than the joint screw rod, and a tapered recess is provided on the side where the tightening nut is used. On the inside of the steel band attached to the upper end of the tubular concrete block, an appropriate number of joint screw rod mounting nuts, guide pipes for knock pins and anchors are fixed at appropriate intervals, and the joint screw rod mounting nut is embedded in concrete. A concrete block for a construction method for a middle shaft shaft, comprising a joint having an anchor screw screwed on a side thereof.
【請求項2】 継手ネジ杆挿入孔のテーパー付凹部に嵌
める座金にテーパー付偏心座金を用いたことを特徴とす
る請求項1記載の中掘式立坑構築工法用コンクリートブ
ロック。
2. The concrete block according to claim 1, wherein an eccentric washer with a taper is used as a washer to be fitted into the tapered recess of the joint screw rod insertion hole.
JP11103480A 1999-04-12 1999-04-12 Concrete block for inner excavation type shaft construction method Pending JP2000291372A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11103480A JP2000291372A (en) 1999-04-12 1999-04-12 Concrete block for inner excavation type shaft construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11103480A JP2000291372A (en) 1999-04-12 1999-04-12 Concrete block for inner excavation type shaft construction method

Publications (1)

Publication Number Publication Date
JP2000291372A true JP2000291372A (en) 2000-10-17

Family

ID=14355185

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11103480A Pending JP2000291372A (en) 1999-04-12 1999-04-12 Concrete block for inner excavation type shaft construction method

Country Status (1)

Country Link
JP (1) JP2000291372A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007016446A (en) * 2005-07-06 2007-01-25 Shintoku Kogyo Kk Connection structure of concrete pile
JP2008138406A (en) * 2006-11-30 2008-06-19 Jfe Metal Products & Engineering Inc Segment
JP2014224421A (en) * 2013-05-17 2014-12-04 日本電信電話株式会社 Structure and method for reinforcing shield tunnel
JP2014227688A (en) * 2013-05-21 2014-12-08 日本ヒューム株式会社 Joint part structure of pile

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007016446A (en) * 2005-07-06 2007-01-25 Shintoku Kogyo Kk Connection structure of concrete pile
JP4612488B2 (en) * 2005-07-06 2011-01-12 シントク工業株式会社 Concrete pile connection structure
JP2008138406A (en) * 2006-11-30 2008-06-19 Jfe Metal Products & Engineering Inc Segment
JP4722820B2 (en) * 2006-11-30 2011-07-13 Jfe建材株式会社 segment
JP2014224421A (en) * 2013-05-17 2014-12-04 日本電信電話株式会社 Structure and method for reinforcing shield tunnel
JP2014227688A (en) * 2013-05-21 2014-12-08 日本ヒューム株式会社 Joint part structure of pile

Similar Documents

Publication Publication Date Title
TWI491800B (en) Wind power installation and wind power installation pylon segment
KR20050000710A (en) A connection device to connect concrete piles
JP5213249B2 (en) Pile head structure of precast concrete pile and pile head formation method
JP2000291372A (en) Concrete block for inner excavation type shaft construction method
JP3649717B2 (en) Joints and structures for joining steel pipe pile heads to concrete foundations
JP4931509B2 (en) Flexible waterproof joint and its construction method
CN101356318A (en) Precast concrete segment having connecting structure using steel duct, and connecting structure thereof
JP4461914B2 (en) Temporary deadline structure and temporary deadline method
KR101447722B1 (en) Composite rahmen bridge and construction method thereof
JP2634381B2 (en) Split type box culvert and method of assembling the same
JP2002294727A (en) Manhole structure, manhole structure cut-off flexible joint and construction method of manhole structure
JP4029303B2 (en) Concrete block for medium pit type shaft construction method
JP4129660B2 (en) Concrete block for medium pit type shaft construction method
CN111119354A (en) Novel universal construction joint waterproof manufacturing method
KR101807825B1 (en) Reinforced coupler
KR200448265Y1 (en) Joining device for corrugated steel plate
KR102087834B1 (en) The hybrid precast concrete pile with all-in-one steel pipe and the manufacturing method thereof
JP5433555B2 (en) Connection structure of concrete member connector and concrete member
KR100507291B1 (en) Reinforced Method of Head in a Steel Pipe Pile
JP4520273B2 (en) Molding method of box culvert with sealing material
CN219080346U (en) Foundation pit supporting structure
JPH0355610Y2 (en)
JP3677405B2 (en) Flexible joint for connecting tunnel hollow connectors
JPH10331179A (en) Concrete block coupling method and metal piece for coupling
JP5442336B2 (en) Joint structure of reinforced concrete beam and steel beam