JP2000225545A - Production planning organizing device - Google Patents

Production planning organizing device

Info

Publication number
JP2000225545A
JP2000225545A JP3150699A JP3150699A JP2000225545A JP 2000225545 A JP2000225545 A JP 2000225545A JP 3150699 A JP3150699 A JP 3150699A JP 3150699 A JP3150699 A JP 3150699A JP 2000225545 A JP2000225545 A JP 2000225545A
Authority
JP
Japan
Prior art keywords
scenario
production
casting
production plan
rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3150699A
Other languages
Japanese (ja)
Other versions
JP4025449B2 (en
Inventor
Masaya Kubo
真哉 久保
Eiji Takebe
英次 武部
Toshiyuki Kiriishi
俊幸 桐石
Kyoichi Niizawa
恭一 新沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP03150699A priority Critical patent/JP4025449B2/en
Publication of JP2000225545A publication Critical patent/JP2000225545A/en
Application granted granted Critical
Publication of JP4025449B2 publication Critical patent/JP4025449B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Control Of Metal Rolling (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)
  • Continuous Casting (AREA)

Abstract

PROBLEM TO BE SOLVED: To automatically plan a production planning satisfying detail information and a constraint of each process according to a situation at a point of time when the production planning is planned by providing a scenario executing part outputting a command for executing an organization of the production planning in a production planning organization means classified by process based on a scenario. SOLUTION: A production planning organization and management means 20 is constituted of a scenario storing part 201 and a scenario executing part 202. The scenario storing part 202 is a part for storing a scenario to be a planning procedure of a production planning by this production planning organizing device. The scenario executing part 201 is a part for selecting a proper scenario from the scenario storing part 202 based on starting commands from an operator or other systems, giving starting instructions to a detail information management means 21, a continuous casting process production planning organization means 22, a rolling process production planning organization means 23 in accordance with the selected scenario and organizing the production planning.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は生産計画編成装置に
係わり、特に種々の注文仕様を満足するとともに生産工
程の制限をも満足する生産計画を編成することの可能な
生産計画編成装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production planning / organizing apparatus, and more particularly to a production planning / organizing apparatus capable of organizing a production plan that satisfies various order specifications and also satisfies restrictions on production processes.

【0002】[0002]

【従来の技術】近年、生産者が生産する製品に対するユ
ーザの要求は多様化しつつあり、ユーザの要求を満足す
る製品を製造することが要求されるが、一方では生産者
が有する設備の規模、能力等に起因する種々の制限も存
在する。このため、ユーザの要求仕様を満足するととも
に生産者側の制約をも満足する生産計画を立案すること
が必要となるが、このような生産計画編成方法は既に実
用化されている。
2. Description of the Related Art In recent years, the demands of users for products produced by producers are diversifying, and it is required to produce products that satisfy the requirements of users. There are various limitations due to capabilities and the like. For this reason, it is necessary to draft a production plan that satisfies the specifications required by the user and also satisfies the constraints on the producer side. Such a production plan organization method has already been put to practical use.

【0003】例えば製鉄所の製鋼・圧延工程の最終製品
の1つである圧延鋼板Pに対しては、納期D、鋼板巾
H、鋼板厚さt、鋼板長さL、重量W、鋼種Kおよび品
質特性Qがユーザの要求仕様として登録されている。こ
れに対して生産者側の制約としては、例えば以下の制約
がある。 1.圧延工程における圧延機のロールを交換することな
く圧延することのできる圧延鋼板の重量は予め定められ
た範囲内でなければならない。
[0003] For example, for a rolled steel sheet P, which is one of the final products of the steel making and rolling process at an ironworks, a delivery date D, a steel sheet width H, a steel sheet thickness t, a steel sheet length L, a weight W, a steel type K and The quality characteristic Q is registered as a required specification of the user. On the other hand, restrictions on the producer side include, for example, the following restrictions. 1. The weight of the rolled steel sheet that can be rolled in the rolling process without changing the rolls of the rolling mill must be within a predetermined range.

【0004】尚、ロールを交換することなく一度に圧延
する量を1圧延単位と呼ぶ。 2.圧延工程の前工程である鋳造工程においてはタンデ
ィッシュを交換することなく複数の鋼種を連続的に鋳造
できるが、連続的に鋳造できる最大チャージ数には上限
がある。尚、一度に連続的に鋳造できる量を1鋳造単位
と呼ぶ。通常、1鋳造単位は1つ、もしくはそれ以上の
圧延単位に対応する。 3.納期Dを厳守する。 4.圧延機のロールを交換することなく圧延することの
できる圧延鋼板の種類は、ロールの表面特性や形状など
によって限定される。
[0004] The amount of rolling at a time without changing the roll is called one rolling unit. 2. In the casting step, which is a step before the rolling step, a plurality of steel types can be cast continuously without changing the tundish, but there is an upper limit to the maximum number of charges that can be cast continuously. The amount that can be cast continuously at one time is called one casting unit. Usually, one casting unit corresponds to one or more rolling units. 3. Strictly adhere to delivery date D. 4. The type of rolled steel sheet that can be rolled without changing the roll of the rolling mill is limited by the surface characteristics and shape of the roll.

【0005】この限定を圧延タイプと呼ぶ。圧延鋼板ご
とに要求品質に応じて適用可能な圧延タイプが定まる。 5.1圧延単位内の圧延鋼板は、圧延機による圧延処理
の順番に、鋼板幅が順次狭くなるように並べなければな
らない。なお、同一幅の圧延鋼板については、板厚が順
次薄くなるように並べなければならない。 6.連続する並びの圧延鋼板の板厚の差は所定の制限以
内でなければならない。 7.鋳造単位内のスラブの順番は、連続鋳造機による鋳
造処理の順番であるが、スラブの鋳造完了時期は可能な
限り圧延開始時間順に合致するようにする。 8.鋳造単位内では同一幅のスラブを可能な限り集める
ようにする。 9.1台の連続鋳造機で相違する鋼種を鋳造する場合
は、鋼種の切替わり部においては品質は劣化する。
[0005] This limitation is called the rolling type. The applicable rolling type is determined for each rolled steel sheet according to the required quality. 5.1 Rolled steel sheets in a rolling unit must be arranged so that the width of the steel sheets is gradually reduced in the order of the rolling process by the rolling mill. In addition, about the rolled steel plate of the same width, it is necessary to arrange so that a plate thickness may become thin sequentially. 6. The difference between the thicknesses of successively rolled steel sheets must be within predetermined limits. 7. The order of the slabs in the casting unit is the order of the casting process by the continuous casting machine, and the casting completion time of the slab is made to match the rolling start time as much as possible. 8. Within the casting unit, slabs of the same width should be collected as much as possible. 9. When casting different steel types with one continuous casting machine, the quality is deteriorated at the switching portion of the steel types.

【0006】この様な状況において1〜9の制約を全て
満足する生産計画を立案することは極めて困難であるた
め、以下のような一連の流れで具体化する。まず、1鋳
造単位ならびにそれに対応する1または複数の圧延単位
をどのような形にするかを、連鋳工程の前工程にある溶
鉱炉からの出銑量や在庫状況、設備稼働計画などを考慮
し、さらに制約1、2、3を満足するように決める。例
えば、A鋼種6チャージ、B鋼種2チャージの合計8チ
ャージを1鋳造単位とし、この1鋳造単位はある圧延タ
イプの1圧延単位に対応するものとする。
In such a situation, it is extremely difficult to draft a production plan that satisfies all of the restrictions 1 to 9, and therefore, it is embodied in the following series of flows. First, the shape of one casting unit and one or more rolling units corresponding to it should be determined in consideration of the tapping amount from the blast furnace, stock status, equipment operation plan, etc., which are in the preceding process of the continuous casting process. , And further satisfy constraints 1, 2, and 3. For example, a total of 8 charges of 6 charges of type A steel and 2 charges of type B steel are defined as one casting unit, and this one casting unit corresponds to one rolling unit of a certain rolling type.

【0007】次に、この鋳造単位と圧延単位で製造すべ
き注文をA鋼種6チャージ、B鋼種2チャージ分だけ制
約3および4を満足するように選択する。この際、制約
3を制約4に対して優先させる。さらに、各注文に対応
した圧延鋼板を制約5を満足するように並べて圧延工程
生産計画を編成する。このとき、どのように並びかえて
も制約6を満足しない圧延鋼板が存在する場合には、制
約違反鋼板としてタグを付けておく。
Next, an order to be manufactured in the casting unit and the rolling unit is selected so as to satisfy the constraints 3 and 4 by six charges of the A steel type and two charges of the B steel type. At this time, constraint 3 is given priority over constraint 4. Further, a rolling process production plan is formed by arranging the rolled steel sheets corresponding to each order so as to satisfy the constraint 5. At this time, if there is a rolled steel sheet that does not satisfy the constraint 6 no matter how it is rearranged, it is tagged as a steel sheet violating the constraint.

【0008】さらに、編成を終えたスラブを鋳造するた
めに連続鋳造機における鋳造順序を制約7、8を満たす
ように決定する。最後に、決定された順序で鋳造した場
合に制約9が満足されるか、例えば、高品質であるべき
である注文が鋼種の継ぎ目に割り付けられていないかを
検査する。
Further, the casting order in the continuous casting machine is determined so as to satisfy the constraints 7 and 8 in order to cast the slab after knitting. Finally, a check is made as to whether constraint 9 is satisfied when casting in the determined order, for example, if an order that should be of high quality has not been assigned to the steel grade seam.

【0009】制約に違反したままでは鋳造あるいは熱間
圧延工程に対して製造命令を発行できないため、オペレ
ータは対策を検討して制約を満足するように注文の入替
えを行わなければならない。例えば、制約6が満足され
ない場合、即ち、連続する2枚の圧延鋼板が存在する場
合は、厚みの差の大きい2枚の圧延鋼板の中間値の厚み
を有し、かつ、他の制約も満たすような注文を探して、
それを上記2枚の圧延鋼板の間に挿入する。また、制約
9が満足されない場合、即ち、鋼種の切替わり部に高品
質が要求される注文が割り付けられている場合には、高
品質が要求される注文を品質要求の厳しくない注文と交
換する。
[0009] Since production instructions cannot be issued for the casting or hot rolling process while the restrictions are violated, the operator has to consider countermeasures and exchange orders so as to satisfy the restrictions. For example, when the constraint 6 is not satisfied, that is, when there are two continuous rolled steel plates, the rolled steel plate has a median thickness of two rolled steel plates having a large difference in thickness, and also satisfies other constraints. Looking for an order like
It is inserted between the two rolled steel plates. If the constraint 9 is not satisfied, that is, if an order requiring high quality is allocated to the switching part of the steel type, the order requiring high quality is replaced with an order whose quality requirement is not strict. .

【0010】[0010]

【発明が解決しようとする課題】しかしながら、多種多
様の注文の中から適切な注文を検索することによる、あ
るいは制約解消のための作業時間に余裕がなく注文に紐
付かないスラブの製造命令を出さざるを得ないことによ
る生産性の低下は避けることができない。この課題を解
決するために、当初から1〜9の制約をすべて満足する
注文を選択することも考えられるが、選択が収斂しない
場合もある。
However, there is no way to search for an appropriate order from a wide variety of orders, or there is not enough work time for eliminating constraints, and a slab manufacturing instruction that cannot be linked to the order must be issued. It is inevitable that productivity will be lost due to failure to obtain. In order to solve this problem, it is conceivable to select an order that satisfies all of the restrictions 1 to 9 from the beginning, but the selection may not converge.

【0011】また、注文の内容すなわち圧延鋼板の特性
や注文量によっては、上記の手順とは異なる手順で生産
計画を立案する方が効率的な場合もある。そこで、生産
計画編成方法の中に、注文など生産計画立案時の状況に
応じて生産計画立案手順を変更できる仕組みや、オペレ
ータと計算機が協調して生産計画を立案することが可能
な仕組みが必要となる。
Further, depending on the contents of the order, that is, the characteristics of the rolled steel sheet and the order quantity, it may be more efficient to draft a production plan by a procedure different from the above procedure. Therefore, in the production planning method, a mechanism that can change the production planning procedure according to the situation at the time of production planning, such as an order, and a mechanism that allows the operator and the computer to collaborate and draft the production plan are required. Becomes

【0012】本発明は上記課題を鑑みなされたものであ
って、種々の注文仕様に対応することが可能であるとと
もに、複数の各生産工程の制約も同時に満足する全体生
産計画を編成する場合にも生産性の低下を抑制すること
の可能な生産計画編成装置を提供することを目的とす
る。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and is capable of coping with various order specifications and compiling an overall production plan that simultaneously satisfies the constraints of a plurality of production processes. Another object of the present invention is to provide a production planning and organizing apparatus capable of suppressing a decrease in productivity.

【0013】[0013]

【課題を解決するための手段】第1の発明に係る生産計
画編成装置は、注文品目情報とその注文品目の製造方法
からなる明細情報を記憶した明細情報記憶部を含む明細
情報管理手段と、明細情報記憶部に記憶された明細情報
に基づいて予め設定した制約条件を満足する、生産工程
上互いに関連する複数の工程の工程生産計画を編成する
複数の工程別生産計画編成手段と、を具備する生産計画
編成装置において、工程別生産計画編成手段が各工程の
生産計画を編成する生産計画手順であるシナリオを複数
記憶したシナリオ記憶部と、シナリオ記憶部に記憶され
た複数のシナリオから選定されたシナリオに基づいて前
記工程別生産計画編成手段における生産計画の編成を実
行するための指令を出力するシナリオ実行部と、を含む
生産計画編成管理手段をさらに具備する。
According to a first aspect of the present invention, there is provided a production planning / organizing apparatus, comprising: item information management means including an item information storage unit for storing item information including order item information and a method of manufacturing the order item; A plurality of step-by-step production plan forming means for forming a step production plan of a plurality of steps related to each other in a production step, which satisfies a constraint condition set in advance based on the specification information stored in the specification information storage unit. In the production planning and organizing apparatus, a production plan compiling means for each process is selected from a scenario storage unit storing a plurality of scenarios which are production planning procedures for compiling a production plan of each process, and a plurality of scenarios stored in the scenario storage unit. And a scenario execution unit for outputting a command for executing the production plan composition in the production plan composition means for each process based on the scenario. Further comprising a stage.

【0014】本発明にあっては、シナリオに従って工程
生産計画編成手段が実行され、注文および各工程の制約
を満足する生産計画が立案される。第2の発明に係る生
産計画編成装置は、シナリオ記憶部は、生産計画の編成
を実行する工程別生産計画編成手段の特定、工程別生産
計画編成手段による生産計画の編成のの順序、明細情報
の入替えの有無、ならびに編成実行時の前提条件の指定
に関する情報を含むシナリオを少なくとも2つ以上記憶
する。
According to the present invention, the process production plan compiling means is executed according to the scenario, and a production plan that satisfies the order and the constraints of each process is drafted. In the production plan knitting apparatus according to the second invention, the scenario storage unit specifies the production plan knitting means for each process for executing the knitting of the production plan, the order of the knitting of the production plan by the production plan knitting means for each process, and detailed information. At least two or more scenarios including information on the presence / absence of replacement and the specification of the preconditions at the time of executing the composition are stored.

【0015】本発明にあっては、シナリオに従って工程
編成手段が実行されるが、生産工程の制約を満たさない
場合には注文の補填が行なわれ、明細情報および各工程
の制約を満足する生産計画が立案される。第3の発明に
係る生産計画編成装置は、複数の工程別生産計画編成手
段のそれぞれが、シナリオ実行部で明細情報の入替えま
たは追加「有」のシナリオが選定され、かつ、最初に編
成された工程生産計画に含まれる明細情報の中に当該工
程の制約条件を満足しない明細情報が存在する場合は明
細情報を入れ換えまたは追加する明細情報補填処理部を
具備し、明細情報管理手段が、明細情報補填処理部から
明細情報の入替えまたは追加の要求を受けた場合に制約
条件を満足する明細情報を明細情報記憶部に記憶された
明細情報から再選択して明細情報補填処理部に転送する
明細情報選択処理部を具備する。
According to the present invention, the process organizing means is executed according to the scenario. If the constraints of the production process are not satisfied, the order is supplemented, and the production plan satisfying the detailed information and the constraints of each process. Is drafted. In the production plan knitting apparatus according to the third invention, each of the plurality of step-by-step production plan knitting means selects a scenario in which the item information is replaced or added "present" by the scenario execution unit and is knitted first. When the detailed information included in the process production plan includes detailed information that does not satisfy the constraint condition of the process, a detailed information supplementing unit that replaces or adds the detailed information is provided. When receiving a request for replacement or addition of detail information from the compensation processing unit, the detail information that satisfies the constraint condition is reselected from the detail information stored in the detail information storage unit and transferred to the detail information supplement processing unit. A selection processing unit is provided.

【0016】本発明にあっては、シナリオに従って注文
および各工程の制約を満足する生産計画が編成される。
第4の発明に係る生産計画編成装置は、工程別生産計画
編成手段のそれぞれが、工程別生産計画編成手段のそれ
ぞれで編成された生産計画編成を相互に交換する生産計
画編成交換手段を具備する。
In the present invention, a production plan that satisfies the order and the constraints of each process is organized according to the scenario.
According to a fourth aspect of the invention, there is provided a production planning and knitting apparatus, wherein each of the production planning and knitting means for each process includes a production planning and knitting exchanging means for mutually exchanging the production planning and knitting formed by each of the production planning and knitting means for each production. .

【0017】本発明にあっては、工程別生産計画編成手
段のそれぞれで編成された生産計画編成が相互に交換さ
れる。第5の発明に係る生産計画編成装置は、注文品目
情報とその注文品目の製造方法からなる明細情報を記憶
する明細情報記憶部を含む明細情報管理手段と、明細情
報記憶部に記憶された明細情報に基づいて予め設定した
制約条件を満足する鋳造工程生産計画を編成する鋳造工
程生産計画編成手段および圧延工程生産計画を編成する
圧延工程生産計画編成手段を有する鉄鋼生産計画編成装
置において、鋳造工程生産計画編成手段が鋳造工程生産
計画を、圧延工程生産計画編成手段が圧延工程生産計画
を編成する生産計画手順であるシナリオを複数記憶した
シナリオ記憶部と、シナリオ記憶部に記憶された複数の
シナリオから選定されたシナリオに基づいて鋳造工程生
産計画編成手段が鋳造工程生産計画を、圧延工程生産計
画編成手段が圧延工程生産計画を編成を実行するための
指令を出力するシナリオ実行部と、を含む生産計画編成
管理手段をさらに有し、鋳造工程生産計画編成手段およ
び圧延工程生産計画編成手段のそれぞれがシナリオ実行
部で明細情報の入替え「有」のシナリオが選定され、か
つ、最初に編成された工程生産計画に含まれる明細情報
の中に当該工程の制約条件を満足しない明細情報が存在
する場合は明細情報を入れ換える明細情報補填処理部
を、明細情報管理手段が、明細情報補填処理部から明細
情報の入替え要求を受けた場合に制約条件を満足する明
細情報を明細情報記憶部に記憶された明細情報から再選
択して明細情報補填処理部に転送する明細情報選択処理
部を具備する。
In the present invention, the production schedules organized by the process-specific production schedule organizing means are mutually exchanged. According to a fifth aspect of the present invention, there is provided a production plan compiling device, comprising: a specification information management unit including a specification information storage unit for storing specification information including order item information and a manufacturing method of the order item; and a specification stored in the specification information storage unit. In a steel production planning and knitting apparatus having a casting process production plan knitting means for knitting a casting process production plan that satisfies constraints set in advance based on information and a rolling process production plan knitting means for knitting a rolling process production plan, A scenario storage unit storing a plurality of scenarios which are production planning procedures in which the production plan forming means forms a casting process production plan and a rolling process production plan forming means forming the rolling process production plan; and a plurality of scenarios stored in the scenario storage unit. Based on the scenario selected from the above, the casting process production plan composition means prepares the casting process production plan, and the rolling process production plan composition means prepares the rolling process production plan. And a scenario execution unit for outputting a command for executing a plan formation. The production plan formation management unit includes a casting process production plan formation unit and a rolling process production plan formation unit. Replacement of information If a scenario with "Yes" is selected, and if there is detailed information that does not satisfy the constraints of the process in the detailed information included in the initially organized process production plan, the detailed information is replaced. The detail information management unit reselects the detail information that satisfies the constraint condition from the detail information stored in the detail information storage unit when the detail information management unit receives the replacement request for the detail information from the detail information supplement processing unit. And a detailed information selection processing unit for transferring the detailed information to the detailed information compensation processing unit.

【0018】本発明にあっては、シナリオに従って生産
工程の制約を満たさない場合には明細情報を補填して注
文および各工程の制約を満足する鉄鋼生産計画が立案さ
れる。第6の発明に係る生産計画編成装置は、シナリオ
記憶部が、少なくとも、 1.明細情報の選択から生産計画の編成を開始する自動
編成シナリオ 2.予め選択された明細情報に基づいて生産計画を編成
する明細固定編成シナリオ 3.製造ロット内の生産順を固定して生産計画を編成す
る製造順固定編成シナリオ を記憶する。
According to the present invention, if the constraints of the production process are not satisfied in accordance with the scenario, the detailed information is supplemented to make an order and a steel production plan that satisfies the constraints of each process. In the production planning / organizing apparatus according to the sixth invention, the scenario storage unit includes at least: 1. Automatic knitting scenario that starts knitting of a production plan from selection of detailed information 2. Item fixed knitting scenario for knitting a production plan based on item information selected in advance. A production order fixed knitting scenario in which a production plan is organized by fixing the production order in a production lot is stored.

【0019】本発明にあっては、シナリオ記憶部に、少
なくとも3種類のシナリオが記憶される。第7の発明に
係る生産計画編成装置は、シナリオ記憶部が、少なくと
も、圧延工程生産計画編成手段および鋳造工程生産計画
編成手段を圧延工程生産計画編成手段、鋳造工程生産計
画編成手段、圧延工程生産計画編成手段の順序に実行
し、最初の圧延工程生産計画編成手段および鋳造工程生
産計画編成手段の実行時には明細情報補填処理部による
補填を行い最後の圧延工程生産計画編成手段の実行時に
は明細情報補填処理部による補填を行わないシナリオを
記憶する。
According to the present invention, at least three types of scenarios are stored in the scenario storage unit. In the production planning and knitting apparatus according to the seventh invention, the scenario storage unit includes at least rolling process production planning and knitting means, casting process production planning and knitting means, casting process production planning and knitting means, and rolling process production. The execution is performed in the order of the planning means, and when the first rolling process production planning means and the casting process production planning means are executed, compensation is performed by the detail information compensation processing unit, and when the last rolling process production planning means is executed, the detail information is supplemented. A scenario in which compensation by the processing unit is not performed is stored.

【0020】本発明にあっては、明細情報ならびに圧延
工程および鋳造工程の制約を満足する製鉄所における鋳
造および圧延生産計画が全自動で立案される。第8の発
明に係る生産計画編成装置は、シナリオ記憶部が、少な
くとも、圧延工程生産計画編成手段および鋳造工程生産
計画編成手段を鋳造工程生産計画編成手段、圧延工程生
産計画編成手段の順序に実行し、鋳造工程生産計画編成
手段の実行時には明細情報補填処理部による補填を行い
圧延工程生産計画編成手段の実行時には明細情報補填処
理部による補填を行わないシナリオを記憶する。
According to the present invention, a casting and rolling production plan in an ironworks that satisfies the detailed information and the constraints of the rolling process and the casting process is fully automated. In the production plan knitting apparatus according to the eighth invention, the scenario storage unit executes at least the rolling step production plan knitting means and the casting step production plan knitting means in the order of the casting step production plan knitting means and the rolling step production plan knitting means. Then, a scenario is stored in which the detail information compensation processing unit compensates when executing the casting process production planning means, and does not perform compensation when performing the rolling process production planning means.

【0021】本発明にあっては、予め圧延工程生産計画
編成手段に組み込まれた明細情報に基づいて圧延工程お
よび鋳造工程の制約を満足する生産計画が編成される。
第9の発明に係る生産計画編成装置は、シナリオ記憶部
が、少なくとも、圧延工程生産計画編成手段および鋳造
工程生産計画編成手段を鋳造工程編生産計画成手段、圧
延工程生産計画編成手段の順序に実行し、鋳造工程生産
計画編成手段および圧延工程生産計画編成手段の実行時
に明細情報補填処理部による補填を行わないシナリオを
記憶する。
In the present invention, a production plan that satisfies the restrictions of the rolling process and the casting process is formed based on the detailed information incorporated in the rolling process production plan forming means in advance.
In the production planning and knitting apparatus according to the ninth aspect, the scenario storage unit stores at least the rolling process production planning and knitting means and the casting process production planning and knitting means in the order of the casting process knitting production planning and the rolling process production planning knitting means. A scenario is stored in which the execution of the casting process production plan organizing means and the rolling process production plan organizing means is not performed by the detailed information compensation processing section.

【0022】本発明にあっては、予め圧延工程生産計画
編成手段および鋳造工程生産計画編成手段に組み込まれ
た明細情報に基づいて圧延工程および鋳造工程の制約を
満足する生産計画が編成される。第10の発明に係る生
産計画編成装置は、シナリオ記憶部が、少なくとも、鋳
造工程生産計画編成手段だけを鋳造順を変更せずに鋳造
工程の生産計画を編成するシナリオを記憶する。
In the present invention, a production plan that satisfies the restrictions of the rolling process and the casting process is formed based on the detailed information incorporated in the rolling process production plan forming device and the casting process production plan forming device in advance. In the production plan knitting apparatus according to the tenth aspect, the scenario storage unit stores a scenario for knitting a production plan of the casting process without changing at least only the casting process production plan knitting means in the casting order.

【0023】本発明にあっては、鋳造順を変更せずに鋳
造工程の生産計画が編成される。
In the present invention, the production plan of the casting process is organized without changing the casting order.

【0024】[0024]

【発明の実施の形態】図1は、本発明の実施形態である
製鉄所の連続鋳造から熱間圧延までの工程説明図であっ
て、連続鋳造工程(以下単に鋳造工程と称す)11と熱
間圧延工程(以下単に圧延工程と称す)12とからな
る。鋳造工程11は、レードルLからタンディッシュT
を介して溶鋼を受けるモールドMと、モールドMから引
抜いたスラブSをガイドするロールRと、スラブSを所
定長さに切断するシャ−Cとから構成される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is an explanatory view of a process from continuous casting to hot rolling in a steel mill according to an embodiment of the present invention, wherein a continuous casting process (hereinafter simply referred to as a casting process) 11 and a hot casting process are described. And a rolling process (hereinafter simply referred to as a rolling process) 12. Casting process 11 is performed by ladle L to tundish T
And a roll R for guiding a slab S drawn from the mold M, and a shear C for cutting the slab S to a predetermined length.

【0025】また、圧延工程12は、シャーCで所定長
さに切断されたスラブSを粗圧延する粗圧延機Aと、注
文製品厚さの薄鋼板(ストリップ)(以下圧延鋼板と称
す)に仕上げ圧延する仕上圧延機Yと、仕上圧延された
圧延鋼板をコイル状に巻き取る巻取機Bとから構成され
る。鋳造工程11において、1レードル分の溶鋼量を1
チャージと称し、鋳造工程11では数チャージを連続し
て鋳造してスラブSを製造する場合もある。また、溶鋼
が含有する炭素、珪素、マンガン等の成分とその量によ
り溶鋼の種類、即ち、鋼種が決定されるが、鋼種は鋳造
工程11の前工程である転炉(図示せず)等においてチ
ャージ単位で作りこまれる。そして、1鋳造単位には複
数の鋼種が含まれる場合があり、例えば、6チャージ分
のA種鋼と2チャージ分のB種鋼とからなる8チャージ
で1鋳造単位を構成する場合もある。
In the rolling step 12, a rough rolling mill A for roughly rolling a slab S cut to a predetermined length by a shear C and a thin steel sheet (strip) (hereinafter referred to as a rolled steel sheet) having a desired product thickness are formed. It comprises a finish rolling machine Y for finish rolling and a winder B for winding a rolled steel plate that has been finish rolled into a coil. In casting process 11, the amount of molten steel for one ladle is reduced to 1
In some cases, the slab S is manufactured by continuously casting several charges in the casting step 11. The type of molten steel, that is, the type of steel is determined by the components and amounts of carbon, silicon, manganese, and the like contained in the molten steel, and the steel type is determined in a converter (not shown) or the like which is a pre-process of the casting process 11. Created in charge units. In addition, one casting unit may include a plurality of steel types. For example, one casting unit may be constituted by eight charges including Class A steel for six charges and Class B steel for two charges.

【0026】鋳造工程11における生産計画編成(以下
単に鋳造工程生産計画編成と称する。)とは、下記
(1)〜(4)を決定することである。 (1)1鋳造単位に於けるスラブSの鋳造順序。 (2)1鋳造単位内のスラブSの配置順序。 (3)各チャージごとの鋼種および溶鋼量。 (4)鋳造工程11の前工程である転炉工程(図示せ
ず)での吹錬方法。
The production schedule formation in the casting process 11 (hereinafter simply referred to as a casting process production plan formation) is to determine the following (1) to (4). (1) Casting order of the slab S in one casting unit. (2) Arrangement order of the slab S in one casting unit. (3) Steel type and molten steel amount for each charge. (4) A blowing method in a converter step (not shown) which is a step before the casting step 11.

【0027】また、圧延工程12での生産計画編成(以
下単に圧延工程生産計画編成と称する。)とは、下記
(1)および(2)を決定することである。 (1)1圧延単位におけるスラブSの圧延順序。 (2)1圧延単位内の圧延鋼板の配置順序。 なお、1本のスラブSが1本の圧延鋼板に対応する必要
はなく、1本のスラブSが複数の圧延鋼板に対応しても
よい。
The production planning in the rolling process 12 (hereinafter simply referred to as the rolling process production planning) is to determine the following (1) and (2). (1) The rolling order of the slab S in one rolling unit. (2) Arrangement order of rolled steel sheets in one rolling unit. In addition, one slab S does not need to correspond to one rolled steel plate, and one slab S may correspond to a plurality of rolled steel plates.

【0028】通常、1鋳造単位は1つまたは複数の圧延
単位に対応付けられる。この両単位を対応づける理由
は、鋳造後のスラブSの温度が低下しないうちに圧延を
行なうことにより生産効率の向上を図るためである。例
えば、A鋼種6チャージ、B鋼種2チャージの合計8チ
ャージからなる1鋳造単位を鋳造工程11でスラブSと
して鋳造し、特定の圧延タイプの1圧延単位として圧延
工程12で圧延鋼板を製造する場合もある。
Normally, one casting unit is associated with one or more rolling units. The reason for associating the two units is to improve the production efficiency by performing rolling before the temperature of the slab S after casting decreases. For example, a case in which one casting unit composed of a total of eight charges of A steel type 6 charges and B steel type 2 charges is cast as a slab S in the casting step 11 and a rolled steel sheet is manufactured in the rolling step 12 as one rolling unit of a specific rolling type There is also.

【0029】このように鋳造単位と圧延単位の両生産工
程11、12が結びつけられているため、鋳造工程生産
計画編成と圧延工程生産計画編成とを独立させて各々に
とって都合のよい生産計画を立案することはできず、鋳
造工程11と圧延工程12とが一貫性を持つように生産
計画を立案する必要がある。鋳造工程産計画編成と圧延
工程生産計画編成との一貫性を考慮した全体の工程生産
計画編成をVロット編成と称する。
As described above, since the production processes 11 and 12 of the casting unit and the rolling unit are linked, the production plan formation of the casting process and the production plan formation of the rolling process are made independent, and a production plan which is convenient for each is prepared. Therefore, it is necessary to draft a production plan so that the casting process 11 and the rolling process 12 have consistency. The whole process production plan formation considering the consistency between the casting process production plan formation and the rolling process production plan formation is referred to as V lot formation.

【0030】鋳造単位と圧延単位の構成、即ち、鋳造単
位の鋼種ごとのチャージ数と、それに紐付く圧延単位と
その圧延タイプは、溶鉱炉(図示せず)からの出銑量や
在庫状況、設備稼働計画、注文状況などを考慮して事前
に決定される。鋳造工程生産計画編成を実行する際の制
約としては以下に示すC−1〜C−5がある。 C−1:鋳造される鋼種の注文に対応するスラブSを割
り付けなければならない。 C−2:鋳造単位内のスラブの最大幅と最小幅の差は一
定量以下でなければならず、かつ、出来るだけスラブS
間の幅差の変動を少なくしなければならない。
The structure of the casting unit and the rolling unit, that is, the number of charges for each steel type of the casting unit, the rolling unit and its rolling type associated therewith, depend on the amount of tapping from a blast furnace (not shown), inventory status, and equipment. It is determined in advance in consideration of the operation plan, order status, and the like. There are the following C-1 to C-5 as restrictions when executing the casting process production planning. C-1: The slab S corresponding to the order of the steel type to be cast must be allocated. C-2: The difference between the maximum width and the minimum width of the slab in the casting unit must be not more than a certain amount, and the slab S is as small as possible.
The fluctuation of the width difference between them must be reduced.

【0031】例えば、最大幅差制約が600mmである
とすると1000mm幅のスラブと1800mm幅のス
ラブを、1鋳造単位に割り付けることはできない。 C−3:1鋳造単位において異なる鋼種を鋳造する場合
は、鋼種の変更部分(継ぎ目部分)の品質は劣化するの
で、この部分には高品質のスラブSを配置することはで
きない。
For example, if the maximum width difference constraint is 600 mm, a slab having a width of 1000 mm and a slab having a width of 1800 mm cannot be allocated to one casting unit. C-3: When casting different steel types in one casting unit, the quality of the changed portion (seam portion) of the steel type deteriorates, so that a high-quality slab S cannot be arranged in this portion.

【0032】鋼種の切替わり部分とは、先行スラブの後
端部2mから後続スラブの前端部4mの部分をいう。 C−4:1チャージの最大重量(例えば、300〜35
0トン)を越える重量のスラブSを割り付けることはで
きない。例えば、1チャージの最大溶鋼量が350トン
である場合には、1チャージに対して330トンの割り
付けが既に完了している場合には、さらに15トンのス
ラブ1本を割り付けることは可能であるが、15トンの
スラブ2本を割り付けることはできない。10トンのス
ラブを2本割り付けることは可能である。 C−5:1チャージで鋳造する溶鋼量を最大溶鋼量(3
50トン)以下で、かつできるかぎり350トンに近づ
ける。
The portion where the steel type is changed means a portion from the rear end 2 m of the preceding slab to the front end 4 m of the succeeding slab. C-4: Maximum weight of one charge (for example, 300 to 35)
Slabs S with a weight exceeding 0 ton) cannot be allocated. For example, when the maximum amount of molten steel per charge is 350 tons, if the allocation of 330 tons for one charge has already been completed, it is possible to allocate one more 15-ton slab. However, two 15-ton slabs cannot be allocated. It is possible to allocate two 10-ton slabs. C-5: The amount of molten steel cast with one charge is set to the maximum amount of molten steel (3
50 tons) and as close as possible to 350 tons.

【0033】また、圧延工程生産計画編成を実行する際
の制約としては以下のR−1〜R−3がある。 R−1:注文の品質、サイズなどの特性により、スラブ
Sごとに圧延タイプが決められる。 R−2:圧延鋼板は幅の広い順に並べる。幅が同じ場合
には圧延鋼板の厚さの厚い順に並べる。 R−3:圧延鋼板の厚さの変化は急激であってはいけな
い。例えば、後続圧延鋼板の厚さは先行圧延鋼板の厚さ
の70%以上でなければならない。
Further, there are the following R-1 to R-3 as restrictions when executing the rolling process production planning. R-1: The rolling type is determined for each slab S according to characteristics such as quality and size of the order. R-2: Rolled steel sheets are arranged in order of width. If the widths are the same, the rolled steel sheets are arranged in order of increasing thickness. R-3: The change in the thickness of the rolled steel sheet must not be abrupt. For example, the thickness of the succeeding rolled steel sheet must be at least 70% of the thickness of the preceding rolled steel sheet.

【0034】さらに、鋳造工程11と圧延工程12の間
の制約として以下のT−1がある。 T−1:鋳造順序と圧延順序はできる限り入替えないよ
うにする。 図2は本発明に生産計画編成装置の実施例の構成図であ
って、本装置の全動作を統括する生産計画編成管理手段
20、ユーザからの注文情報とその注文品目の製造条件
情報からなる明細情報を記憶するとともに所定の条件に
基づき明細情報を選択する明細情報管理手段21、連続
鋳造機による鋳造順序を編成しチャージごとの成分値や
製鋼方法を決定する鋳造工程生産計画編成手段22、お
よび熱間圧延機によるスラブの圧延順序を編成する圧延
工程生産計画編成手段23とから構成される。
Further, there is the following T-1 as a constraint between the casting step 11 and the rolling step 12. T-1: The casting order and the rolling order are not changed as much as possible. FIG. 2 is a block diagram of an embodiment of the production planning and organizing apparatus according to the present invention, which comprises production planning and organizing management means 20 for supervising all operations of the apparatus, order information from a user, and production condition information of the ordered item. A detailed information management means 21 for storing detailed information and selecting detailed information based on predetermined conditions; a casting process production plan forming means 22 for organizing a casting order by a continuous casting machine and determining a component value and a steel making method for each charge; And a rolling process production planning and knitting means 23 for knitting the slab rolling order by the hot rolling mill.

【0035】以下に各機能毎に構成を詳細に説明する。
生産計画編成管理手段20は、シナリオ記憶部201、
およびシナリオ実行部202から構成される。シナリオ
記憶部202は、本発明に係る生産計画編成装置による
生産計画の立案手順であるシナリオを記憶する部分であ
る。また、シナリオ実行部201は、オペレータあるい
は他のシステムからの起動指令に基づいてシナリオ記憶
部202から適切なシナリオを選択し、選択したシナリ
オに沿って明細情報管理手段21、連続鋳造工程生産計
画編成手段22、圧延工程生産計画編成手段23に起動
指示を出して、生産計画を編成する部分である。
The configuration of each function will be described below in detail.
The production plan organization management means 20 includes a scenario storage unit 201,
And a scenario execution unit 202. The scenario storage unit 202 is a part that stores a scenario, which is a procedure for planning a production plan by the production plan organization device according to the present invention. Further, the scenario executing unit 201 selects an appropriate scenario from the scenario storage unit 202 based on a start command from an operator or another system, and according to the selected scenario, the detailed information management unit 21 and the continuous casting process production plan formation This is a part for issuing a start-up instruction to the means 22 and the rolling process production plan composition means 23 to compose a production plan.

【0036】図3はシナリオの構成図であって、例えば
以下の4種類のシナリオが記憶されているものとする。 ・シナリオ1…全自動Vロット編成 鋳造工程および圧延工程の生産計画編成を全自動で実行
するシナリオであって、以下の順に実行される。 ステップ1…明細情報管理手段21に対して実行指令を
出して、記憶されている明細情報の中から、事前に決め
られた鋳造単位、圧延単位の仕様を満足する明細情報を
選択する。即ち、納期、制約C−1、C−5、R−1を
満たすように、所定量、例えば、A鋼種6チャージ、B
鋼種2チャージに相当する量の特定の圧延タイプ、例え
ば、圧延タイプUの明細情報を選択する。 ステップ2…選択された明細情報に対応する圧延鋼板の
圧延順を決定する圧延工程の生産計画編成を実行する。
FIG. 3 is a diagram showing the configuration of a scenario. For example, it is assumed that the following four types of scenarios are stored. Scenario 1: Fully automatic V lot formation This is a scenario in which the production planning of the casting process and the rolling process is performed fully automatically, and is performed in the following order. Step 1: An execution instruction is issued to the specification information management means 21 to select, from the stored specification information, specification information that satisfies the specifications of a predetermined casting unit and rolling unit. That is, a predetermined amount, for example, A steel grade 6 charge, B, so as to satisfy the delivery date and the constraints C-1, C-5, and R-1.
The detailed information of the specific rolling type, for example, the rolling type U, corresponding to the steel type 2 charge is selected. Step 2: Execute the production planning of the rolling process for determining the rolling order of the rolled steel sheet corresponding to the selected detailed information.

【0037】この際、「明細追加有り」を指定する。こ
れにより、上記の制約R−2、R−3のいずれかに違反
する場合には、圧延単位内の制約違反箇所に新たな圧延
鋼板を装入することで制約を解消した明細情報を明細報
管理手段21の中から再度選択する。 ステップ3…ステップ2により編成された明細情報を基
にスラブSの鋳造順番を決定する鋳造工程生産計画編成
を実行する。
At this time, "specification added" is designated. Accordingly, in the case of violating any of the above restrictions R-2 and R-3, the detailed information in which the restriction has been eliminated by inserting a new rolled steel sheet into the restriction violating portion in the rolling unit is described in the detailed report. It is selected again from the management means 21. Step 3... Perform a casting process production plan formation that determines the casting order of the slab S based on the detailed information organized in Step 2.

【0038】この際、「明細入替え有り」を指定する。
これによって、上記制約C−1〜C−5のいずれかに違
反する場合には、制約を解消可能な新たな明細情報を明
細情報管理手段21の中から再選択し、更に、これによ
り制約C−4に違反したならば不要なスラブSを鋳造単
位から外す。 ステップ4…ステップ3におけるスラブSの入替えによ
り制約R−1〜R−3およびT−1が満足されていない
おそれがあるために、再度圧延工程生産計画編成を実行
する。この際、明情報細管理手段21の中からの再選択
を禁止するために「明細入替え無し」を指定する。 ・シナリオ2…簡易全自動Vロット編成 このシナリオは、シナリオ1と同様に、鋳造工程および
圧延工程の生産計画編成を全自動で実行するシナリオで
あるが、事前に決められた鋳造単位が特定の1鋼種、例
えば、10チャージのE鋼種から構成される場合には、
圧延後の圧延鋼板の要求特性やサイズがほぼ均一である
ことが推測されるので制約のR−2、R−3は容易に満
足されると仮定して、編成処理の効率化の観点から、シ
ナリオ1に比較して簡略化した手順で、Vロット編成を
実行するものである。 ステップ1…生産計画編成管理手段20は、明細情報管
理手段21に対して実行指令を出して、記憶されている
明細情報の中から、事前に決められた鋳造単位、圧延単
位の仕様を満足する明細情報を選択する。
At this time, "replacement of specifications" is designated.
As a result, when any of the above constraints C-1 to C-5 is violated, new detailed information capable of resolving the restriction is re-selected from the detailed information management means 21. If -4 is violated, the unnecessary slab S is removed from the casting unit. Step 4... Since there is a possibility that the constraints R-1 to R-3 and T-1 may not be satisfied due to the replacement of the slab S in Step 3, the rolling process production planning is executed again. At this time, "no specification replacement" is designated in order to prohibit reselection from the bright information detail management means 21. Scenario 2: Simple full-automatic V lot formation This scenario is a scenario in which the production plan formation of the casting process and the rolling process is performed fully automatically, as in scenario 1, but the predetermined casting unit is a specific casting unit. If it is composed of one steel type, for example, E steel type with 10 charges,
Since it is assumed that the required properties and size of the rolled steel sheet after rolling are substantially uniform, it is assumed that the constraints R-2 and R-3 are easily satisfied, and from the viewpoint of efficient knitting processing, The V lot formation is executed in a procedure simplified compared with the scenario 1. Step 1: The production plan organization management means 20 issues an execution command to the specification information management means 21 and satisfies predetermined specifications of the casting unit and the rolling unit from the stored specification information. Select the item information.

【0039】即ち、納期、制約C−1、C−2、C−
5、R−1を満たすように、A鋼種6チャージ、B鋼種
2チャージに相当する量の圧延タイプの明細情報を選択
する。 ステップ2…ステップ1により選択された明細情報を基
にスラブSの鋳造順番を決定する鋳造工程生産計画編成
を実行する。
That is, the delivery date, constraints C-1, C-2, C-
5, the amount of detailed information of the rolling type corresponding to the A steel type 6 charge and the B steel type 2 charge is selected so as to satisfy R-1. Step 2: A casting process production plan formation for determining the casting order of the slab S based on the detailed information selected in Step 1 is executed.

【0040】この際、「明細入替え有り」を指定する。
これによって、制約C−1〜C−5のいずれかに違反す
る場合には、制約を解消可能な新たな明細情報を明細情
報管理手段21の中から再選択し、さらに、これにより
制約C−4に違反したならば不要なスラブを鋳造単位か
ら外す。 ステップ3…ステップ2で編成したスラブSに対して、
R−1〜R−3およびT−1が満足されるように圧延工
程生産計画編成を実行し、圧延順を決める。この際、明
情報細管理手段21からの再選択を禁止するたために
「明細入替え無し」を指定する。 ・シナリオ3…明細入替えをしないVロット編成 このシナリオは、例えば、全自動Vロット編成または手
動により鋳造工程生産計画および圧延工程生産計画を編
成した後に、納期上の観点などからオペレータが手動
で、鋳造単位内または圧延単位内に組み込まれたスラブ
Sまたは圧延鋼板の組外し、もしくは鋳造単位内または
圧延単位へスラブSまたは圧延鋼板の追加を行なった場
合に、即ち、鋳造単位内または圧延単位内に割り付けら
れた明細情報に変更があった場合に、鋳造単位内または
圧延単位内のスラブSまたは圧延鋼板を、制約を満たす
ように並び変えるために使用される。 ステップ1…鋳造単位内の鋳造順序を制約C−1〜C−
4を満足するように決定するため、鋳造工程生産計画編
成を実行する。
At this time, "exchange of specifications" is designated.
As a result, when any of the constraints C-1 to C-5 is violated, new detailed information capable of resolving the restriction is re-selected from the detailed information management unit 21. If it violates 4, remove unnecessary slabs from the casting unit. Step 3 ... For the slab S knitted in step 2,
The rolling process production plan composition is executed so that R-1 to R-3 and T-1 are satisfied, and the rolling order is determined. At this time, "no specification replacement" is designated to prohibit reselection from the bright information management means 21. Scenario 3: V lot formation without replacement of details This scenario is performed by, for example, fully automatic V lot formation or manually forming a casting process production plan and a rolling process production plan, and then manually by an operator from the viewpoint of delivery date. When the slab S or the rolled steel plate incorporated in the casting unit or the rolling unit is removed or the slab S or the rolled steel plate is added to the casting unit or the rolling unit, that is, in the casting unit or the rolling unit. Is used to rearrange the slab S or the rolled steel sheet in the casting unit or the rolling unit so as to satisfy the constraint when there is a change in the detailed information assigned to. Step 1 ... Constraining the casting order within the casting unit C-1 to C-
In order to determine so as to satisfy No. 4, a casting process production plan composition is executed.

【0041】この際、明細情報管理手段21の中からの
再選択を禁止するために「明細入替え無し」を指定す
る。 ステップ2…圧延単位内の圧延順を上記制約R−2、R
−3およびT−1を満足するように変更するため、圧延
工程生産計画編成を実行する。この際、明細情報管理手
段21の中からの再選択を禁止するために「明細入替え
無し」を指定する。 ・シナリオ4…鋳造順を変更しない鋳造編成 このシナリオは、例えば全自動Vロット編成または手動
により鋳造工程生産計画および圧延工程生産計画を編成
した後に、転炉工程、鋳造工程上の観点などからオペレ
ータが手動で鋳造単位内のスラブの配置順を変更したと
きに、チャージに割り付けられたスラブSの品質に基づ
きチャージごとの炭素、珪素、マンガン等の成分値及
び、チャージ重量を再計算し転炉工程などでの製鋼方法
を再決定するために使用される。 ステップ1…スラブSの配置順が変更された結果に対し
て、鋳造工程生産計画編成を実行し、チャージの重量、
含有元素成分値等を再計算し、製鋼方法を決定する。
At this time, "no specification replacement" is designated to prohibit reselection from the specification information management means 21. Step 2: The order of rolling within the rolling unit is determined by the above constraints R-2, R
In order to make changes so as to satisfy -3 and T-1, rolling process production planning is executed. At this time, "no specification replacement" is designated to prohibit reselection from the specification information management means 21. Scenario 4: Casting knitting without changing the casting order This scenario is based on, for example, fully automatic V-lot knitting or manual knitting of a casting process production plan and a rolling process production plan, followed by an operator from the viewpoint of the converter process and the casting process. Manually changes the arrangement order of the slabs in the casting unit, recalculates the component values of carbon, silicon, manganese, etc. for each charge and the charge weight based on the quality of the slab S allocated to the charge, and Used to re-determine the steelmaking method in the process. Step 1: Execute the casting process production plan composition for the result of the change in the arrangement order of the slabs S, and determine the weight of the charge,
Recalculate the values of the contained elements and determine the steelmaking method.

【0042】この際、スラブの鋳造順序の変更を禁止す
るために「明細入替え無し」を指定する。明細情報管理
手段21は、明細情報記憶部211および明細情報選択
処理部212から構成される。明細情報記憶部211
は、客先からの注文Pが例えば次項目で表される明細情
報として記憶されている。
At this time, "no specification replacement" is designated to prohibit the change of the slab casting order. The specification information management unit 21 includes a specification information storage unit 211 and a specification information selection processing unit 212. Statement information storage unit 211
Indicates that the order P from the customer is stored as detailed information represented by, for example, the next item.

【0043】P{H,L,t,W,K,Q,D} ここで、Hは板巾(ミリメートル) Lは板長(ミリメートル) tは板厚(ミリメートル) Wは重量(トン) Kは鋼種 Qは品質特性およびそれに基づく製造方法 Dは納期を表わす。P {H, L, t, W, K, Q, D} where H is the plate width (millimeter) L is the plate length (millimeter) t is the plate thickness (millimeter) W is the weight (ton) K Is the steel type Q is the quality characteristic and the production method based on it D is the delivery date.

【0044】明細情報選択処理部212は、生産計画編
成管理手段20、鋳造工程生産計画編成手段22および
圧延工程生産計画編成手段23から指示された条件を満
足する明細情報を明細情報記憶部211に記憶されてい
る明細情報の中から選択する。例えば、シナリオ1では
生産計画編成管理手段20はステップ1で以下の条件を
設定する。 1.鋳造予定日DL 2.鋼種とその重量。
The detailed information selection processing section 212 stores detailed information satisfying the conditions specified by the production plan composition management means 20, the casting process production plan composition means 22 and the rolling process production plan composition means 23 in the detailed information storage section 211. Select from the stored detailed information. For example, in scenario 1, the production plan organization management means 20 sets the following conditions in step 1. 1. 1. Scheduled casting date D L Steel type and its weight.

【0045】例えば鋳造単位がA種鋼6チャージとB種
鋼2チャージで構成される場合は鋼種値をKA およびK
B に、重量をWA およびWB に設定する(制約C−1お
よびC−5に相当する)。 3.圧延タイプTR を設定する(制約R−1に相当す
る)。次に、明細情報選択処理部212は、記憶されて
いる注文Pの中から、例えば、以下の1〜3の条件を満
足する注文PをWA とWB に相当する注文量だけ選択す
る。 1.納期Dが(鋳造予定日DL +製造工期)より以前か
それに近いもの。 2.鋼種値KがKA またはKB (制約C−1に相当)の
もの。 3.圧延タイプTR は品質特性及びそれに基づく製造方
法Qから求められる可能圧延タイプの集合に含まれる
(制約R−1に相当)のもの。
For example, when the casting unit is composed of Class A steel 6 charge and Class B steel 2 charge, the steel type values are set to K A and K
In B, (corresponding to constraint C-1 and C-5) which W is set to A and W B weight. 3. Setting the rolling type T R (corresponding to the restriction R-1). Next, detailed information selecting unit 212, from the order P stored, for example, to select only those orders amount corresponding orders P satisfying the following three conditions to W A and W B. 1. Delivery date D is before or close to (scheduled casting date D L + production period). 2. Those steels value K is K A or K B (corresponding to the constraint C-1). 3. Rolling type T R those included in the set of possible rolling type obtained from the quality characteristics, and a manufacturing method Q based thereon (corresponding to constraint R-1).

【0046】また、シナリオ1のステップ2において、
制約解消のために新たな明細選択、即ち、圧延鋼板を選
択追加する場合には以下の1〜3の条件を指定する。 1.圧延鋼板の板幅 HP 2.圧延鋼板の最小板厚 tMIN 、および最大板厚 t
MAX 3.選択すべき圧延鋼板の枚数NP 次に、明細情報選択処理部212は、すでに記憶されて
いる注文Pの中から、以下の1および2を満足する注文
PをNP 枚だけ選択する。 1.tMIN < t<tMAX 2.H=HP 圧延工程生産計画編成手段23は圧延編成処理部23
1、明細情報補填処理部232および圧延編成情報記憶
部233から構成される。
In Step 2 of Scenario 1,
In order to select a new specification, that is, to select and add a rolled steel sheet, in order to eliminate restrictions, the following conditions 1 to 3 are specified. 1. Plate width H P 2 of rolled steel. Minimum thickness t MIN of rolled steel sheet and maximum thickness t
MAX 3. Number N P of the rolled steel plate to be selected next, the account information selection processing unit 212, from the order P already stored, selects the order P satisfying the following 1 and 2 only N P sheets. 1. 1. t MIN <t <t MAX H = H P rolling process production planning and knitting means 23
1. It is composed of a specification information supplementation processing section 232 and a rolling knitting information storage section 233.

【0047】圧延編成処理部231は圧延鋼板を圧延単
位内に前記制約R−2、R−3を満足するように並べる
ことにより生産計画を編成し、その結果を圧延編成情報
記憶部233に保存する。例えば、シナリオ1のステッ
プ2では、シナリオ1において明細情報管理手段21の
明細情報選択処理部212によって選択された注文Pに
対応する圧延鋼板を制約R−2を満足するように板幅の
広い順に並び替える。なお、板幅が同じ場合は板厚が厚
い順に並び替える。
The rolling knitting processing section 231 knits the production plan by arranging the rolled steel sheets in the rolling unit so as to satisfy the constraints R-2 and R-3, and stores the result in the rolling knitting information storage section 233. I do. For example, in Step 2 of Scenario 1, the rolled steel sheets corresponding to the order P selected by the detail information selection processing unit 212 of the detail information management means 21 in Scenario 1 are arranged in ascending order of the strip width so as to satisfy the constraint R-2. Rearranges. If the plate widths are the same, the sheets are rearranged in the order of thickness.

【0048】次に並び替えた結果が制約R−3を満足す
るかを検査し、制約R−3を満足していない箇所を見出
す。シナリオで「明細追加有り」が選択されている場合
には、明細情報補填処理部232を起動する。明細情報
補填処理部232は追加装入が必要な圧延鋼板の板幅、
板厚範囲、およびその枚数を指定し、明細情報管理手段
21の明細情報選択処理部212に検索、選択を指示す
る。明細情報選択処理部212は明細情報記憶部211
の中から指定された条件に合致する圧延鋼板を検索、選
択し、明細情報補填処理部232に転送し、明細情報補
填処理部232は制約R−3に違反した箇所に新たに選
択した圧延鋼板を追加挿入して、制約R−3を解消す
る。
Next, it is checked whether the rearranged result satisfies the constraint R-3, and a portion that does not satisfy the constraint R-3 is found. If “detailed addition” is selected in the scenario, the detail information supplement processing unit 232 is activated. The detailed information supplement processing unit 232 is a sheet width of a rolled steel sheet that needs additional charging,
The sheet thickness range and the number of sheets are designated, and a search and selection are instructed to the detail information selection processing section 212 of the detail information management means 21. The statement information selection processing unit 212 is a statement information storage unit 211
, A rolled steel sheet that meets the designated condition is searched and selected, and transferred to the detailed information supplement processing unit 232, where the detailed information supplement processing unit 232 newly selects a rolled steel sheet that violates the constraint R-3. Is added to eliminate the constraint R-3.

【0049】圧延編成情報記憶部233は、圧延編成処
理部231および明細情報補填処理部232、あるいは
手動での編成が終了した圧延単位内の圧延鋼板の情報を
記憶する。鋳造工程生産計画編成手段22は、鋳造編成
処理部221、明細情報補填処理部222および鋳造編
成情報記憶部223から構成される。
The rolling knitting information storage section 233 stores information on the rolled steel sheet in the rolling knitting processing section 231 and the detail information supplementing processing section 232 or in the rolling unit that has been manually knitted. The casting process production plan knitting means 22 includes a casting knitting processing section 221, a detailed information supplementing processing section 222, and a casting knitting information storage section 223.

【0050】鋳造編成処理部221は、連続鋳造機によ
って製造されるスラブの鋳造順序を制約C−1〜C−5
を満たすように決定し、さらにチャージごとの成分値や
チャージ重量を計算し、転炉設備などでの製鋼方法を決
定する。例えば、シナリオ1のステップ3では、ステッ
プ2において圧延工程生産計画編成手段によって編成さ
れたスラブを、制約C−1〜C−5を満足するように並
べて鋳造単位を編成し、鋳造編成情報記憶部223に格
納する。
The casting knitting processing section 221 restricts the casting order of slabs manufactured by the continuous casting machine to C-1 to C-5.
Is determined, and the component value and charge weight for each charge are calculated, and a steelmaking method in a converter facility or the like is determined. For example, in Step 3 of Scenario 1, the slabs knitted by the rolling process production planning knitting means in Step 2 are arranged so as to satisfy the constraints C-1 to C-5 to knit a casting unit, and a casting knitting information storage unit 223.

【0051】この際、制約C−3が満足されるかを検査
し、制約が満足されず、かつ、シナリオにおいて「明細
入替え有り」が指定されている場合は、明細情報補填処
理部222は、制約C−3を満たすような品質特性Qの
特性を持つ新たなスラブを選択するように明細情報管理
手段21の明細情報選択処理部212に指令する。明細
情報選択処理部212は、その条件に適合するスラブを
検索、選択し、明細情報補填処理部222に転送する。
明細情報補填処理部222は、渡された新たなスラブ
を、制約C−3を満たすように鋳造単位内に組み込む。
新たな組み込みにより制約C−4に違反するほど1チャ
ージの重量が増加した場合には、別のスラブを鋳造単位
から組外す。
At this time, it is checked whether or not the constraint C-3 is satisfied. If the constraint is not satisfied and “replacement of specification” is specified in the scenario, the specification information supplement processing unit 222 It instructs the specification information selection processing unit 212 of the specification information management means 21 to select a new slab having the quality characteristic Q satisfying the constraint C-3. The detailed information selection processing unit 212 searches for and selects a slab that satisfies the condition, and transfers the slab to the detailed information supplement processing unit 222.
The specification information supplementing processing unit 222 incorporates the passed new slab into the casting unit so as to satisfy the constraint C-3.
If the new incorporation increases the weight of one charge to violate constraint C-4, another slab is removed from the casting unit.

【0052】鋳造編成情報記憶部223は、鋳造編成処
理部221および明細情報補填処理部222、あるいは
手動によって編成された鋳造単位内のスラブおよびチャ
ージの成分情報、重量、製鋼方法などを記憶する。図4
は、本発明に係る生産計画編成装置のハードウエア構成
図の1例であって、バス40を中心としてCPU41、
メモリ42、ハードディスク43、キーボードとマウス
44、およびディスプレイ45で構成される。
The casting / knitting information storage unit 223 stores component information, weight, steel making method, and the like of the slab and the charge in the casting unit which is knitted by the casting / knitting processing unit 221 and the detailed information supplementing processing unit 222 or manually. FIG.
1 is an example of a hardware configuration diagram of a production planning and organizing apparatus according to the present invention, wherein a CPU 41,
It comprises a memory 42, a hard disk 43, a keyboard and mouse 44, and a display 45.

【0053】ここでシナリオ記憶部201、明細情報記
憶部211、鋳造編成情報記憶部223、圧延編成情報
記憶部233はメモリ42上に存在する。シナリオ実行
部202、明細情報選択処理部212、鋳造編成処理部
221、明細情報補填処理部222、圧延編成処理部2
31、明細情報補填処理部232のプログラム実行コー
ドもメモリ42上に置かれ、CPU41がこれらのプロ
グラム実行コードを読み取り実行する。
Here, the scenario storage unit 201, the detailed information storage unit 211, the casting knitting information storage unit 223, and the rolling knitting information storage unit 233 exist on the memory 42. Scenario execution unit 202, detailed information selection processing unit 212, casting and knitting processing unit 221, detailed information compensation processing unit 222, rolling and knitting processing unit 2
31, the program execution code of the detailed information supplement processing unit 232 is also stored in the memory 42, and the CPU 41 reads and executes the program execution code.

【0054】ハードディスク43には、必要に応じてシ
ナリオ記憶部201、明細情報記憶部211、鋳造編成
情報記憶部223、圧延編成情報記憶部233の情報が
記憶される。さらに、キーボードおよびマウス44は、
オペレータがシナリオ記憶部201に記憶されているシ
ナリオの1つ、例えば、シナリオ1の全自動Vロット編
成を指定して生産計画編成の起動指令を入力したり、あ
るいはまた、編成された後にさらに手動で鋳造単位から
スラブを組外したり、鋳造順序を入れ替えたりする指示
を入力するために使用される。
The hard disk 43 stores information of the scenario storage unit 201, the detailed information storage unit 211, the casting knitting information storage unit 223, and the rolling knitting information storage unit 233 as necessary. In addition, the keyboard and mouse 44
The operator designates one of the scenarios stored in the scenario storage unit 201, for example, the fully automatic V-lot formation of the scenario 1, and inputs a start command of the production plan formation, or further manually operates after the formation. Is used to input an instruction to remove a slab from a casting unit or change the casting order.

【0055】ディスプレイ45は、例えば、シナリオ1
の全自動Vロット編成の結果である鋳造編成情報記憶部
223や圧延編成情報記憶部233の内容を、画面表示
してオペレータなどに伝えるために使用される。なお上
記はいわゆる「スタンドアロン型」のシステムを適用し
た場合について説明したが、ネットワークを介したいわ
ゆる「クライアント−サーバ型」システムによっても本
発明に係る生産計画編成装置を構成することが可能であ
る。
The display 45 is, for example, a scenario 1
The contents of the casting knitting information storage unit 223 and the rolling knitting information storage unit 233, which are the results of the fully automatic V lot knitting, are displayed on a screen and used to inform an operator or the like. Although the above description has been made on the case where a so-called “stand-alone type” system is applied, the so-called “client-server type” system via a network can constitute the production planning and organizing apparatus according to the present invention.

【0056】この場合には、キーボードとマウスなどの
入力装置とディスプレイなどの表示装置をクライアント
とし、生産計画編成管理手段20、明細情報管理手段2
1、鋳造工程生産計画編成手段22、圧延工程生産計画
編成手段23から構成される生産計画編成装置本体はサ
ーバに割り付けることが適当である。以下に各シナリオ
の実行手順を具体的な数値を使用して説明する。
In this case, an input device such as a keyboard and a mouse and a display device such as a display are used as clients, and the production plan organization management means 20 and the detailed information management means 2 are used.
1. The production planning and knitting apparatus main body composed of the casting process production planning and knitting means 22 and the rolling process production planning and knitting means 23 is suitably allocated to a server. The execution procedure of each scenario will be described below using specific numerical values.

【0057】まず、キーボードとマウス44を使用し
て、これからVロット編成を行なう対象を設定するため
以下の情報を入力する。 鋳造単位の構成:鋼種:A(6チャージ分)、B(2チ
ャージ分) 圧延単位の構成:圧延タイプ=Uタイプ そして、シナリオ1を実行する場合は、ディスプレイ4
5に表示されたシナリオのメニューの中からキーボード
とマウス44を使用して、シナリオ1を選択して、シナ
リオ1の実行を開始する。即ち、シナリオ実行部202
が、メモリ42上に存在するシナリオ記憶部201の中
からシナリオ1の内容を読み取り、これに沿ってシナリ
オの実行を開始する。 ステップ1: 1.シナリオ実行部202が明細情報選択処理部212
を起動する。明細情報選択処理部212は、メモリ42
上に存在する明細情報記憶部211に記憶された明細情
報の中から鋳造単位およびそれに対応する圧延単位に基
づき、納期、制約C−1、C−5、R−1を満足するよ
うに明細情報を選択する。 ステップ2: 1.シナリオ実行部202が、ステップ1で選択された
明細情報を引数として圧延編成処理部231を明細追加
有りの指示付きで起動する。そして、圧延編成処理部2
31は、渡された明細情報を制約R−2を満足するよう
に、即ち、板幅の広い順に並べ替え、板幅が同じときは
板厚の厚い順に並べ替える。
First, the following information is input using the keyboard and the mouse 44 in order to set the target for the V lot formation from now on. Configuration of casting unit: steel type: A (for 6 charges), B (for 2 charges) Configuration of rolling unit: rolling type = U type Then, when scenario 1 is executed, display 4
Using the keyboard and mouse 44 from the scenario menu displayed in 5, the scenario 1 is selected, and the execution of the scenario 1 is started. That is, the scenario execution unit 202
Reads the contents of the scenario 1 from the scenario storage unit 201 existing on the memory 42 and starts executing the scenario along with the contents. Step 1: The scenario execution unit 202 executes the detailed information selection processing unit 212
Start The statement information selection processing unit 212 is provided in the memory 42
Based on the casting unit and the corresponding rolling unit from the specification information stored in the specification information storage unit 211 existing above, the specification information is set so as to satisfy the delivery date, constraints C-1, C-5, and R-1. Select Step 2: 1. The scenario execution unit 202 activates the rolling knitting processing unit 231 with an instruction to add a detail, using the detail information selected in step 1 as an argument. And rolling knitting processing section 2
Reference numeral 31 rearranges the passed detailed information so as to satisfy the constraint R-2, that is, in ascending order of the plate width, and, when the plate widths are the same, in ascending order of the plate thickness.

【0058】2.並べ替えが完了した後に、制約R−3
が満足されるか、即ち後行の圧延鋼板の板厚が先行の圧
延鋼板の板厚の70%以上であるかを検査し、満足され
ない箇所を見出す。 3.制約R−3が満足されない箇所が存在するときは、
明細情報補填処理部232を実行して、明細情報選択処
理部212に、制約R−3を満足する圧延鋼板、即ち、
板厚が先行の注文の板厚の70%以上である圧延鋼板を
検索させる。これにより、明細情報選択処理部212
は、メモリ42中に存在する明細情報記憶部211から
制約R−3を満足する明細情報を選択し、明細情報補填
処理部232に転送する。明細情報補填処理部232
は、この圧延鋼板をもとの圧延鋼板の間に挿入する。
2. After the sorting is completed, the constraint R-3
Is satisfied, that is, whether or not the thickness of the succeeding rolled steel sheet is 70% or more of the thickness of the preceding rolled steel sheet, and a portion that is not satisfied is found. 3. When there is a place where the constraint R-3 is not satisfied,
By executing the specification information supplementing processing unit 232, the specification information selection processing unit 212 sends a rolled steel sheet satisfying the constraint R-3, that is,
A rolled steel sheet whose thickness is 70% or more of the thickness of the preceding order is searched. Thereby, the detailed information selection processing unit 212
Selects the detailed information satisfying the constraint R-3 from the detailed information storage unit 211 existing in the memory 42 and transfers it to the detailed information supplement processing unit 232. Statement information compensation processing unit 232
Inserts this rolled steel sheet between the original rolled steel sheets.

【0059】4.以上の処理によって作成された圧延編
成結果をメモリ42上に存在する圧延編成情報記憶部2
33に格納する。 ステップ3: 1.シナリオ実行部202が、ステップ2で編成された
圧延鋼板に対応する明細情報を引数として鋳造編成処理
部231を明細入れ替え有りの指示付きで起動する。鋳
造編成処理部231は、与えられた明細情報をC−1〜
C−5を満足するように鋳造単位内に並べる。その際、
制約C−3を満足するか、即ち、鋼種の切替わり部に高
品質の注文が割り付けられていないかを検査し、満足さ
れていない箇所を見出す。
4. The rolling knitting result created by the above processing is stored in the rolling knitting information storage unit 2 existing in the memory 42.
33. Step 3: 1. The scenario execution unit 202 activates the casting / knitting processing unit 231 with an instruction to replace the specification, using the specification information corresponding to the rolled steel sheet formed in step 2 as an argument. The casting knitting processing section 231 converts the given detailed information into C-1 to C-1.
It arranges in a casting unit so that C-5 may be satisfied. that time,
It is checked whether the constraint C-3 is satisfied, that is, whether or not a high-quality order is assigned to the switching part of the steel type, and a part that is not satisfied is found.

【0060】2.制約C−3が満足されていない箇所が
存在するときは、明細情報補填処理部232を実行し
て、明細情報選択処理部212に制約C−3を満足する
スラブを検索させ、これを鋳造単位に追加する。 3.追加された結果に対し、各チャージの重量が制約C
−4を満足するか、即ち重量が350トンを越えていな
いかを検査する。
2. If there is a portion where the constraint C-3 is not satisfied, the detailed information supplement processing unit 232 is executed to cause the detailed information selection processing unit 212 to search for a slab satisfying the restriction C-3. Add to 3. The weight of each charge is limited by the added result C
-4 is satisfied, that is, the weight does not exceed 350 tons.

【0061】4.制約C−4を満足しない場合は、他の
制約を違反せず、納期に余裕があり、かつ、できる限り
制約C−5を満たすようなスラブを選択し、制約を満足
しないスラブと入れ替る。なお、入れ替えの対象となる
スラブが複数ある場合は、最も納期の遅いスラブを、納
期も同じ場合は、軽量スラブを選択する。
4. When the constraint C-4 is not satisfied, a slab that does not violate other constraints, has a delivery time, and satisfies the constraint C-5 as much as possible is selected, and is replaced with a slab that does not satisfy the constraint. When there are a plurality of slabs to be replaced, the slab with the latest delivery date is selected, and when the slab dates are the same, the lightweight slab is selected.

【0062】5.以上の処理によって作成された鋳造編
成結果をメモリ42上に存在する鋳造編成情報記憶部2
23に記憶する。 ステップ4: 1.シナリオ実行部202が、ステップ3で編成された
スラブに対応する明細情報を引数として圧延編成処理部
231を明細入れ替え無しの指示付きで起動する。
[0062] 5. The casting knitting result stored in the memory 42 is stored in the memory 42 with the casting knitting result created by the above processing.
23. Step 4: 1. The scenario execution unit 202 activates the rolling knitting processing unit 231 with an instruction to replace the details using the detailed information corresponding to the slab knitted in step 3 as an argument.

【0063】圧延編成処理部231は、制約R−1〜R
−3およびT−1を満足するように圧延単位内の圧延鋼
板の圧延順を並び変える。この際、新たな明細情報の追
加や入れ替えは行なわない。 2.以上の処理によって作成された圧延編成結果をメモ
リ42上に存在する圧延編成情報記憶部233に記憶す
る。
The rolling knitting processing section 231 includes the constraints R-1 to R
The rolling order of the rolled steel sheet in the rolling unit is rearranged so as to satisfy -3 and T-1. At this time, no new detailed information is added or replaced. 2. The rolling knitting result created by the above processing is stored in the rolling knitting information storage unit 233 existing in the memory 42.

【0064】3.最終の鋳造編成結果および圧延編成結
果をディスプレイ45に表示する。シナリオ2は、シナ
リオ1と同様に、鋳造工程および圧延工程の生産計画編
成を全自動で実行するシナリオであるが、事前に決めら
れた鋳造単位が特定の鋼種、例えば、E鋼種のみの10
チャージから構成されている場合には圧延鋼板の要求特
性やサイズがほぼ均一であることが推測されるので、制
約R−2、R−3は容易に満足されるため、編成処理の
効率化の観点から、シナリオ1に比較して簡略化された
手順でVロット編成を実行するものである。
3. The final casting and rolling knitting results are displayed on the display 45. Scenario 2 is a scenario in which the production planning of the casting process and the rolling process is performed fully automatically, as in scenario 1. However, the predetermined casting unit is a specific steel type, for example, 10 types of only E type.
Since it is assumed that the required characteristics and size of the rolled steel sheet are substantially uniform when the rolled steel sheet is constituted by the charge, the constraints R-2 and R-3 are easily satisfied, so that the efficiency of the knitting process is improved. From a viewpoint, V lot formation is executed in a procedure simplified as compared with scenario 1.

【0065】シナリオ2で設定されるパラメータは、例
えば、以下であるとする。 鋳造単位の構成:鋼種=E(10チャージ分) 圧延単位の構成:圧延タイプ=Yタイプ このシナリオ2を実行する場合は、ディスプレイ45に
表示されたシナリオのメニューの中からキーボードとマ
ウス44を使用して、シナリオ2を選択して、シナリオ
2の実行を開始する。
The parameters set in scenario 2 are, for example, as follows. Configuration of casting unit: steel type = E (for 10 charges) Configuration of rolling unit: rolling type = Y type When executing this scenario 2, use the keyboard and mouse 44 from the menu of the scenario displayed on the display 45. Then, the scenario 2 is selected, and the execution of the scenario 2 is started.

【0066】即ち、シナリオ実行部202が、メモリ4
2上に存在するシナリオ記憶部201の中から、シナリ
オ2の内容を読み取り、下記の実行を開始する。 ステップ1: 1.シナリオ実行部202が、明細情報選択処理部21
2を起動する。明細情報選択処理部212は、メモリ4
2上に存在する明細情報記憶部211から上記の鋳造単
位とそれに対応する圧延単位の構成に基づき、納期、制
約C−1、C−5、R−1を満足する明細情報を選択す
る。 ステップ2: 1.シナリオ実行部202が、ステップ1で選択された
明細情報を引数として鋳造編成処理部231を明細入れ
替え有りの指示付きで起動する。鋳造編成処理部231
は与えられた明細情報をC−1〜C−5を満足するよう
に鋳造単位内に並べる。その際、制約C−3を満足する
か、即ち、鋼種の切替わり部に高品質の注文が割り付け
らていないかを検査し、制約C−3が満足されていない
箇所を見出す。
That is, the scenario execution unit 202
The contents of the scenario 2 are read from the scenario storage unit 201 existing on the server 2 and the following execution is started. Step 1: The scenario execution unit 202 determines that the detailed information selection processing unit 21
Start 2 The statement information selection processing unit 212 is provided in the memory 4
2. Based on the configuration of the casting unit and the rolling unit corresponding to the casting unit, the detailed information satisfying the delivery date, the constraints C-1, C-5, and R-1 is selected from the detailed information storage unit 211 existing on the second. Step 2: 1. The scenario execution unit 202 activates the casting / knitting processing unit 231 with an instruction to replace the specification, using the specification information selected in step 1 as an argument. Casting knitting processing unit 231
Arranges the given detailed information in the casting unit so as to satisfy C-1 to C-5. At that time, it is checked whether the constraint C-3 is satisfied, that is, whether a high-quality order is allocated to the steel type switching portion, and a portion where the constraint C-3 is not satisfied is found.

【0067】2.制約C−3が満足されていない箇所が
存在するときは、明細情報補填処理部2を実行して、明
細情報選択処理部212に制約C−3を満足するスラブ
を検索させ、これを鋳造単位に追加する。 3.追加された結果に対し、各チャージの重量が制約C
−4を満足するか、即ち、重量が350トンを越えてい
ないかを検査する。
2. If there is a part where the constraint C-3 is not satisfied, the detailed information supplementing unit 2 is executed to make the detailed information selecting unit 212 search for a slab satisfying the restriction C-3. Add to 3. The weight of each charge is limited by the added result C
-4 is satisfied, that is, the weight does not exceed 350 tons.

【0068】4.制約C−4を満足しない場合は、他の
制約を違反せず、納期に余裕があり、かつ、できる限り
制約C−5を満たすようなスラブSを選び、このスラブ
Sを鋳造単位から組外す。組外し可能なスラブが複数あ
る場合は、最も納期の遅いスラブを組外す。納期も同じ
場合は、軽量のスラブを組外す。 5.以上の処理によって作成された鋳造編成結果をメモ
リ42上に存在する鋳造編成情報記憶部223に記憶す
る。 ステップ3: 1.シナリオ実行部202が、ステップ3で編成された
スラブに対応する明細情報を引数として圧延編成処理部
231を明細入れ替え無しの指示付きで起動する。圧延
編成処理部231は、制約R−1〜R−3およびT−1
を満足するように圧延単位内の圧延鋼板の圧延順を並び
変える。この際、明細情報の追加や入れ替えは行なわな
い。
4. If the constraint C-4 is not satisfied, select a slab S that does not violate other constraints, has a delivery time, and satisfies the constraint C-5 as much as possible, and removes the slab S from the casting unit. . If there are a plurality of slabs that can be removed, the slab with the latest delivery date is removed. If the same delivery date, remove the lightweight slab. 5. The result of the casting knitting created by the above processing is stored in the casting knitting information storage unit 223 existing in the memory 42. Step 3: 1. The scenario execution unit 202 activates the rolling knitting processing unit 231 with an instruction to replace the details using the detailed information corresponding to the slab knitted in step 3 as an argument. The rolling knitting processing unit 231 includes the constraints R-1 to R-3 and T-1.
The rolling order of the rolled steel sheet in the rolling unit is rearranged so as to satisfy the following. At this time, addition or replacement of detailed information is not performed.

【0069】2.以上の処理によって作成された圧延編
成結果をメモリ42上に存在する圧延編成情報記憶部2
33に記憶する。 3.最終の鋳造編成結果および圧延編成結果をディスプ
レイ45に表示する。シナリオ3は、鋳造単位や圧延単
位を一旦編成した後に、例えば納期上の観点からオペレ
ータが手動で注文を組み込みあるいは組外して、鋳造単
位や圧延単位に組み込みたい注文を指定した後に、鋳造
および圧延の順序を最適化するものであるので、明細情
報選択は実行されず直ちに圧延編成処理が実行される。
2. The rolling knitting result created by the above processing is stored in the rolling knitting information storage unit 2 existing in the memory 42.
33. 3. The final casting and rolling knitting results are displayed on the display 45. Scenario 3 is a process in which the casting unit and the rolling unit are knitted once, and then the operator manually incorporates or removes the order from the viewpoint of the delivery date, specifies the order to be incorporated into the casting unit or the rolling unit, and then performs casting and rolling. Are optimized, and the rolling knitting process is immediately executed without executing the detailed information selection.

【0070】シナリオ3は、シナリオ1と同様に以下で
あるとする。 鋳造単位の構成:鋼種=A(6チャージ分)、B(2チ
ャージ分) 圧延単位の構成:圧延タイプ=Uタイプ シナリオ3を実行する場合は、ディスプレイ45に表示
されたシナリオのメニューの中からキーボードとマウス
44を使用して、シナリオ3を選択して、シナリオ3の
実行を開始する。即ち、シナリオ実行部202が、メモ
リ42上に存在するシナリオ記憶部201の中から、シ
ナリオ3の内容を読み取り、シナリオの実行を開始す
る。 ステップ1: 1.シナリオ実行部202が、鋳造編成処理部221を
明細入れ替え無しの指示付きで起動する。鋳造編成処理
部221は、メモリ42上に存在する鋳造編成情報記憶
部に格納されているスラブを編成対象として、制約C−
1〜C−4を満足するようにスラブを並び変える。
Scenario 3 is the same as scenario 1 below. Configuration of casting unit: steel type = A (for 6 charges), B (for 2 charges) Configuration of rolling unit: rolling type = U type When executing scenario 3, from the menu of the scenario displayed on display 45, Using the keyboard and mouse 44, select scenario 3 and start execution of scenario 3. That is, the scenario execution unit 202 reads the contents of the scenario 3 from the scenario storage unit 201 existing on the memory 42, and starts executing the scenario. Step 1: The scenario execution unit 202 activates the casting / knitting processing unit 221 with an instruction to replace the statement. The casting knitting processing unit 221 sets a slab stored in the casting knitting information storage unit existing in the memory 42 as a knitting target, and sets a constraint C-
Rearrange the slabs so as to satisfy 1 to C-4.

【0071】C−1の制約に関しては、例えば、鋼種A
のチャージ内に鋼種Bのスラブが配置されていれば、こ
のスラブを鋼種Bのチャージ内に配置するように並び変
える。 2.上記の処理によって作成された鋳造編成結果をメモ
リ42上に存在する鋳造編成情報記憶部223に記憶す
る。 ステップ2: 1.シナリオ実行部202が、圧延編成処理部231を
明細入れ替え無しの指示付きで起動する。圧延編成処理
部231は、メモリ42上に存在する圧延編成情報記憶
部に格納されている圧延鋼板を編成対象として、制約R
−1〜R−3およびT−1を満足するように圧延単位内
の圧延鋼板の圧延順を並び変える。
Regarding the restriction of C-1, for example, steel type A
If the slab of the steel type B is arranged in the charge of the steel type B, the slabs are rearranged so as to be arranged in the charge of the steel type B. 2. The result of the casting knitting created by the above processing is stored in the casting knitting information storage unit 223 existing in the memory 42. Step 2: 1. The scenario execution unit 202 activates the rolling knitting processing unit 231 with an instruction to replace the statement. The rolling knitting processing unit 231 sets the rolled steel sheet stored in the rolling knitting information storage unit existing in the memory 42 as a knitting target and sets a constraint R
The rolling order of the rolled steel sheet in the rolling unit is rearranged so as to satisfy -1 to R-3 and T-1.

【0072】2.上記の処理によって作成された圧延編
成結果をメモリ42上に存在する圧延編成情報記憶部2
33に記憶する。 3.最終の鋳造編成結果および圧延編成結果をディスプ
レイ45に表示する。また、シナリオ4を実行する場合
は、ディスプレイ45に表示されたシナリオのメニュー
の中からキーボードとマウス44を使用して、シナリオ
4を選択して、シナリオ4の実行を開始する。
2. The rolling knitting result created by the above processing is stored in the rolling knitting information storage unit 2 existing in the memory 42.
33. 3. The final casting and rolling knitting results are displayed on the display 45. When executing the scenario 4, the user selects the scenario 4 from the menu of the scenario displayed on the display 45 using the keyboard and the mouse 44, and starts the execution of the scenario 4.

【0073】即ち、シナリオ実行部202が、メモリ4
2上に存在するシナリオ記憶部201の中から、シナリ
オ4の内容を読み取り、これに沿ってシナリオの実行を
開始する。このシナリオ4は、鋳造単位や圧延単位を一
旦編成した後に、例えば製鋼工程上の観点などから、オ
ペレータが手動で鋳造単位内のスラブの配置順を変更し
たときに、チャージに割り付けられたスラブの各々の品
質に基づきチャージごとの炭素、珪素、マンガン等の成
分値やチャージ重量を再計算し、転炉設備などでの製鋼
方法を再決定するためのものであるので、明細情報選択
や圧延編成処理は実行されず、直ちに鋳造編成処理が実
行される。 ステップ1 1.シナリオ実行部202が、鋳造編成処理部221を
鋳造順変更無しの指示付きで起動する。また、鋳造編成
処理部221は、メモリ42上に存在する鋳造編成情報
記憶部に格納されているスラブを編成対象として、スラ
ブの配置順序を変更することなしに、チャージの重量、
含有元素成分値等を再計算し、製鋼方法を決定する。
That is, the scenario execution unit 202
The content of the scenario 4 is read from the scenario storage unit 201 existing on the storage device 2, and the execution of the scenario is started along the read content. In Scenario 4, after the casting unit or the rolling unit is knitted once, when the operator manually changes the arrangement order of the slabs in the casting unit from the viewpoint of, for example, a steelmaking process, the slab allocated to the charge is changed. It is for recalculating the component value of carbon, silicon, manganese, etc. and charge weight for each charge based on each quality, and re-determining the steel making method in converter equipment, etc. The processing is not executed, and the casting knitting processing is immediately executed. Step 1 1. The scenario execution unit 202 activates the casting knitting processing unit 221 with an instruction to change the casting order. Further, the casting knitting processing unit 221 targets the slab stored in the casting knitting information storage unit existing in the memory 42 as a knitting object, without changing the slab arrangement order, without changing the weight of the charge,
Recalculate the values of the contained elements and determine the steelmaking method.

【0074】2.上記の処理によって作成された鋳造編
成結果をメモリ42上に存在する鋳造編成情報記憶部2
23に記憶する。 3.最終の鋳造編成結果および圧延編成結果をディスプ
レイ45に表示する。以上は製鉄所における鋳造・圧延
工程の生産計画立案について説明したが、1つの生産ラ
インを複数の工程に分割できるものであれば、どのよう
な生産ラインに対しても適用することが可能である。
2. The casting / knitting information storage unit 2 existing in the memory 42 stores the casting / knitting result created by the above processing.
23. 3. The final casting and rolling knitting results are displayed on the display 45. In the above, the production planning of the casting and rolling process in the steel mill has been described. However, the present invention can be applied to any production line as long as one production line can be divided into a plurality of processes. .

【0075】[0075]

【発明の効果】第1の発明に係る生産計画装置によれ
ば、生産計画立案時点の状況に応じて明細情報および各
工程の制約を満足する生産計画を自動的に立案すること
が可能となる。第2から4の発明に係る生産計画装置に
よれば、所定の明細情報では個別の生産工程の制約が満
たされない場合に、明細情報の補填を行なうことで制約
を満足する生産計画を自動的に立案することが可能とな
る。
According to the production planning apparatus of the first invention, it becomes possible to automatically prepare a production plan that satisfies the detailed information and the constraints of each process according to the situation at the time of production planning. . According to the production planning device according to the second to fourth aspects of the present invention, when the specific detailed information does not satisfy the restriction of the individual production process, the production plan that satisfies the restriction is automatically made by supplementing the detailed information. It becomes possible to plan.

【0076】第5から10の発明に係る生産計画装置に
よれば、製鉄所の生産状況に応じて客先の注文ならびに
各工程の制約を満足する製鉄工程の生産計画を自動的に
立案することが可能となる。なお、所定の明細情報では
鋳造工程と圧延工程の制約が満たされない場合には明細
情報の補填を行なうことで制約を満足する鋳造工程と圧
延工程の生産計画を自動的に立案することが可能とな
る。
According to the production planning apparatus according to the fifth to tenth aspects of the present invention, it is possible to automatically draft a production plan of an iron making process that satisfies the order of a customer and the constraints of each process according to the production situation of a steel mill. Becomes possible. If the constraints of the casting process and the rolling process are not satisfied with the predetermined detailed information, it is possible to automatically draft a production plan of the casting process and the rolling process that satisfies the constraints by supplementing the detailed information. Become.

【図面の簡単な説明】[Brief description of the drawings]

【図1】連続鋳造から熱間圧延までの工程までの工程説
明図である。
FIG. 1 is an explanatory diagram of a process from a process from continuous casting to a process of hot rolling.

【図2】本発明に係る生産計画編成装置の実施例の構成
図である。
FIG. 2 is a configuration diagram of an embodiment of a production planning and knitting apparatus according to the present invention.

【図3】シナリオの構成図である。FIG. 3 is a configuration diagram of a scenario.

【図4】ハードウェア構成図である。FIG. 4 is a hardware configuration diagram.

【符号の説明】[Explanation of symbols]

20…生産計画編成管理手段 201…シナリオ記憶部 202…シナリオ実行部 21…明細情報管理手段 211…明細情報記憶部 212…明細情報選択処理部 22…鋳造工程生産計画編成手段 221…鋳造編成処理部 222…明細情報補填処理部 223…鋳造編成情報記憶部 23…圧延工程生産計画編成手段 231…圧延編成処理部 232…明細情報補填処理部 233…圧延編成情報記憶部 DESCRIPTION OF SYMBOLS 20 ... Production plan organization management means 201 ... Scenario storage part 202 ... Scenario execution part 21 ... Detailed information management means 211 ... Detailed information storage part 212 ... Detailed information selection processing part 22 ... Casting process production plan knitting part 221 ... Casting processing part 222 ... Detailed information supplement processing unit 223 ... Casting knitting information storage unit 23 ... Rolling process production plan knitting means 231 ... Rolling knitting processing unit 232 ... Detailed information supplementation processing unit 233 ... Rolling knitting information storage unit

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) G06F 17/60 G06F 15/21 R (72)発明者 桐石 俊幸 大分県大分市大字西ノ洲1番地 新日本製 鐵株式会社大分製鐵所内 (72)発明者 新沢 恭一 大分県大分市大字西ノ洲1番地 新日本製 鐵株式会社大分製鐵所内 Fターム(参考) 3C042 RJ02 RL15 4E004 MC30 4E024 GG10 5B049 BB07 CC21 DD01 DD05 EE31 FF03 FF04 FF09 GG04 GG07──────────────────────────────────────────────────続 き Continued on the front page (51) Int.Cl. 7 Identification symbol FI Theme coat ゛ (Reference) G06F 17/60 G06F 15/21 R (72) Inventor Toshiyuki Kiriishi 1 Nishinosu Oaza, Oita City, Oita Prefecture New Japan Inside the Oita Works of Steel Corporation (72) Kyoichi Niizawa, Inventor, Oita City, Oita, Oita, 1st place, Nishinosu F-term (reference) 3C042 RJ02 RL15 4E004 MC30 4E024 GG10 5B049 BB07 CC21 DD01 DD05 EE31 FF03 FF04 FF09 GG04 GG07

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】 注文品目情報とその注文品目の製造方法
からなる明細情報を記憶した明細情報記憶部を含む明細
情報管理手段と、 該明細情報記憶部に記憶された明細情報に基づいて予め
設定した制約条件を満足する、生産工程上互いに関連す
る複数の工程の工程生産計画を編成する複数の工程別生
産計画編成手段と、を具備する生産計画編成装置におい
て、 前記工程別生産計画編成手段が各工程の生産計画を編成
する生産計画手順であるシナリオを複数記憶したシナリ
オ記憶部と、該シナリオ記憶部に記憶された複数のシナ
リオから選定されたシナリオに基づいて前記工程別生産
計画編成手段における生産計画の編成を実行するための
指令を出力するシナリオ実行部と、を含む生産計画編成
管理手段をさらに具備することを特徴とする生産計画編
成置。
1. A specification information management means including a specification information storage unit storing order item information and specification information including a manufacturing method of the order item, and preset based on the specification information stored in the specification information storage unit. A plurality of process-specific production plan forming means for forming a plurality of process production plans of a plurality of processes related to each other in the production process, wherein the process-specific production plan forming means comprises: A scenario storage unit that stores a plurality of scenarios that are production planning procedures for forming a production plan for each process; and a process planning unit for each process based on a scenario selected from the plurality of scenarios stored in the scenario storage unit. A production planning system further comprising: a production plan organization management means including: a scenario execution unit that outputs a command for executing production plan organization. Organized location.
【請求項2】 前記シナリオ記憶部は、生産計画の編成
を実行する前記工程別生産計画編成手段の特定、前記工
程別生産計画編成手段による生産計画の編成のの順序、
明細情報の入替えの有無、ならびに編成実行時の前提条
件の指定に関する情報を含むシナリオを少なくとも2つ
以上記憶するものである請求項1に記載の生産計画編成
置。
2. The process according to claim 1, wherein the scenario storage unit specifies the step-by-step production plan organizing means for executing the production plan composition, the order of the production plan composition by the step-by-step production plan composition means,
2. The production planning and knitting apparatus according to claim 1, wherein at least two or more scenarios including information on the presence / absence of replacement of detailed information and designation of preconditions at the time of knitting execution are stored.
【請求項3】 前記複数の工程別生産計画編成手段のそ
れぞれが、 前記シナリオ実行部で明細情報の入替えまたは追加
「有」のシナリオが選定され、かつ、最初に編成された
工程生産計画に含まれる明細情報の中に当該工程の制約
条件を満足しない明細情報が存在する場合は明細情報を
入れ換えまたは追加する明細情報補填処理部を具備し、 前記明細情報管理手段が、 前記明細情報補填処理部から明細情報の入替えまたは追
加の要求を受けた場合に、制約条件を満足する明細情報
を前記明細情報記憶部に記憶された明細情報から再選択
して前記明細情報補填処理部に転送する明細情報選択処
理部を具備する請求項1に記載の生産計画編成置。
3. The plurality of process-specific production plan compiling means, wherein the scenario execution unit selects a scenario with replacement or addition of "existing" of detailed information and is included in a process production plan that has been firstly composed. A detailed information replacement unit that replaces or adds the detailed information when the detailed information that does not satisfy the constraint of the process is included in the detailed information to be processed. When receiving a request for replacement or addition of detailed information from the company, detailed information satisfying the constraint condition is reselected from the detailed information stored in the detailed information storage unit and transferred to the detailed information compensation processing unit 2. The production planning organization according to claim 1, further comprising a selection processing unit.
【請求項4】 前記工程別生産計画編成手段のそれぞれ
が、 前記工程別生産計画編成手段のそれぞれで編成された生
産計画編成を相互に交換する生産計画編成交換手段を具
備する請求項1から3のいずれか1項に記載の生産計画
編成装置。
4. The production plan organization exchange means for mutually exchanging the production plan organization organized by each of the production plan organization means according to each of the step-by-step production plan organization means. The production planning and knitting apparatus according to any one of claims 1 to 7.
【請求項5】 注文品目情報とその注文品目の製造方法
からなる明細情報を記憶する明細情報記憶部を含む明細
情報管理手段と、 該明細情報記憶部に記憶された明細情報に基づいて予め
設定した制約条件を満足する鋳造工程生産計画を編成す
る鋳造工程生産計画編成手段および圧延工程生産計画を
編成する圧延工程生産計画編成手段を有する鉄鋼生産計
画編成装置において、 前記鋳造工程生産計画編成手段が鋳造工程生産計画を、
前記圧延工程生産計画編成手段が圧延工程生産計画を編
成する生産計画手順であるシナリオを複数記憶したシナ
リオ記憶部と、該シナリオ記憶部に記憶された複数のシ
ナリオから選定されたシナリオに基づいて前記鋳造工程
生産計画編成手段が鋳造工程生産計画を、前記圧延工程
生産計画編成手段が圧延工程生産計画を編成を実行する
ための指令を出力するシナリオ実行部と、を含む生産計
画編成管理手段をさらに有し、 前記鋳造工程生産計画編成手段および前記圧延工程生産
計画編成手段のそれぞれが、前記シナリオ実行部で明細
情報の入替え「有」のシナリオが選定され、かつ、最初
に編成された工程生産計画に含まれる明細情報の中に当
該工程の制約条件を満足しない明細情報が存在する場合
は明細情報を入れ換える明細情報補填処理部を、 前記明細情報管理手段が、前記明細情報補填処理部から
明細情報の入替え要求を受けた場合に、制約条件を満足
する明細情報を前記明細情報記憶部に記憶された明細情
報から再選択して前記明細情報補填処理部に転送する明
細情報選択処理部を具備することを特徴とする生産計画
編成置。
5. A specification information managing means including a specification information storage unit for storing order item information and specification information including a manufacturing method of the order item, and preset based on the specification information stored in the specification information storage unit. A casting process production plan knitting means for knitting a casting process production plan that satisfies the set constraints, and a rolling process production plan knitting means for knitting a rolling process production plan. Casting process production plan
A scenario storage unit storing a plurality of scenarios, which are production planning procedures in which the rolling process production plan forming means forms a rolling process production plan, and the scenario based on a scenario selected from the plurality of scenarios stored in the scenario storage unit. A casting process production planning means for outputting a command for executing the casting process production plan; and a rolling process production plan forming means for outputting a command for executing the rolling process production plan. Each of the casting process production plan formation means and the rolling process production plan formation means selects a scenario of “existence” of replacement of detailed information in the scenario execution unit, and the process production plan formed first. If there is detailed information that does not satisfy the constraints of the process in the detailed information included in the process, the detailed information is replaced by the detailed information When the specification information management unit receives a specification information replacement request from the specification information compensation processing unit, reselects specification information satisfying the constraint condition from the specification information stored in the specification information storage unit. And a detailed information selection processing unit for transferring the detailed information to the detailed information compensation processing unit.
【請求項6】 前記シナリオ記憶部が、少なくとも、 1.明細情報の選択から生産計画の編成を開始する自動
編成シナリオ 2.予め選択された明細情報に基づいて生産計画を編成
する明細固定編成シナリオ 3.製造ロット内の生産順を固定して生産計画を編成す
る製造順固定編成シナリオ を記憶する請求項5に記載の生産計画編成装置。
6. The scenario storage unit according to claim 1, wherein: 1. Automatic knitting scenario that starts knitting of a production plan from selection of detailed information 2. Item fixed knitting scenario for knitting a production plan based on item information selected in advance. The production planning and knitting apparatus according to claim 5, wherein a production order fixed knitting scenario for knitting a production plan by fixing a production order in a production lot is stored.
【請求項7】 前記シナリオ記憶部が、少なくとも、 前記圧延工程生産計画編成手段および鋳造工程生産計画
編成手段を前記圧延工程生産計画編成手段、前記鋳造工
程生産計画編成手段、前記圧延工程生産計画編成手段の
順序に実行し、 最初の前記圧延工程生産計画編成手段および前記鋳造工
程生産計画編成手段の実行時には前記明細情報補填処理
部による補填を行い、最後の前記圧延工程生産計画編成
手段の実行時には前記明細情報補填処理部による補填を
行わないシナリオを記憶するものである請求項5に記載
の生産計画編成装置。
7. The rolling stock production planning means, the casting process production planning means, the rolling process production planning means, at least the rolling step production planning means and the casting step production planning means. In the order of the means, when the first rolling process production planning means and the casting process production planning means are executed, compensation is performed by the detailed information compensation processing unit, and when the last rolling process production planning means is executed, 6. The production planning and organizing apparatus according to claim 5, wherein a scenario in which compensation is not performed by the detailed information compensation processing unit is stored.
【請求項8】 前記シナリオ記憶部が、少なくとも、 前記圧延工程生産計画編成手段および鋳造工程生産計画
編成手段を前記鋳造工程生産計画編成手段、前記圧延工
程生産計画編成手段の順序に実行し、 前記鋳造工程生産計画編成手段の実行時には前記明細情
報補填処理部による補填を行い、前記圧延工程生産計画
編成手段の実行時には前記明細情報補填処理部による補
填を行わないシナリオを記憶するものである請求項5に
記載の生産計画編成装置。
8. The scenario storage unit executes at least the rolling step production plan forming means and the casting step production planning means in the order of the casting step production planning means and the rolling step production planning means. A scenario in which compensation is performed by the detailed information supplement processing unit when the casting process production planning unit is executed, and a scenario in which compensation is not performed by the detailed information supplement processing unit when the rolling process production planning unit is executed. 6. The production planning and organizing apparatus according to 5.
【請求項9】 前記シナリオ記憶部が、少なくとも、 前記圧延工程生産計画編成手段および鋳造工程生産計画
編成手段を前記鋳造工程編生産計画成手段、前記圧延工
程生産計画編成手段の順序に実行し、 前記鋳造工程生産計画編成手段および前記圧延工程生産
計画編成手段の実行時に前記明細情報補填処理部による
補填を行わないシナリオを記憶するものである請求項5
に記載の生産計画編成装置。
9. The scenario storage unit executes at least the rolling step production planning means and the casting step production planning means in the order of the casting step knitting production planning means and the rolling step production planning means. 6. A scenario in which compensation is not performed by the detailed information compensation processing unit when the casting process production planning means and the rolling process production planning means are executed.
2. The production planning and organizing apparatus according to 1.
【請求項10】 前記シナリオ記憶部が、少なくとも、 前記鋳造工程生産計画編成手段だけを鋳造順を変更せず
に鋳造工程の生産計画を編成するシナリオを記憶するも
のである請求項5に記載の生産計画編成装置。
10. The scenario storage unit according to claim 5, wherein the scenario storage unit stores at least a scenario for organizing a production plan of a casting process without changing a casting order only in the casting process production plan organizing means. Production planning system.
JP03150699A 1999-02-09 1999-02-09 Production planning organization Expired - Fee Related JP4025449B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03150699A JP4025449B2 (en) 1999-02-09 1999-02-09 Production planning organization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03150699A JP4025449B2 (en) 1999-02-09 1999-02-09 Production planning organization

Publications (2)

Publication Number Publication Date
JP2000225545A true JP2000225545A (en) 2000-08-15
JP4025449B2 JP4025449B2 (en) 2007-12-19

Family

ID=12333117

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03150699A Expired - Fee Related JP4025449B2 (en) 1999-02-09 1999-02-09 Production planning organization

Country Status (1)

Country Link
JP (1) JP4025449B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011065328A1 (en) * 2009-11-27 2011-06-03 株式会社日立製作所 Method and device for proposing manufacturing plans, and computer program for proposing manufacturing plans
JP2012059135A (en) * 2010-09-10 2012-03-22 Jfe Steel Corp Optimum charge forming device and optimum charge forming method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011065328A1 (en) * 2009-11-27 2011-06-03 株式会社日立製作所 Method and device for proposing manufacturing plans, and computer program for proposing manufacturing plans
JP2012059135A (en) * 2010-09-10 2012-03-22 Jfe Steel Corp Optimum charge forming device and optimum charge forming method

Also Published As

Publication number Publication date
JP4025449B2 (en) 2007-12-19

Similar Documents

Publication Publication Date Title
JP5786724B2 (en) Steelmaking process operation schedule creation method, steelmaking process operation schedule creation system, steelmaking process operation method, and steel manufacturing method
JP6642273B2 (en) Plan creation device, plan creation method, and program
JP3320665B2 (en) Method and apparatus for determining rolling order in hot rolling
CN108588323B (en) Steelmaking continuous casting industrial process optimization control method
JP2009262209A (en) System and method for programming manufacturing lot in hot strip mill
JP2000225545A (en) Production planning organizing device
JP4492332B2 (en) Cast knitting apparatus and cast knitting method
JP6930399B2 (en) Planning equipment, planning methods, and programs
JP2006260294A (en) Operation schedule creating system and method of steel manufacturing process, and computer program
JP7156024B2 (en) Plan creation device, plan creation method, and program
JP4007092B2 (en) Production planning system
JP5494194B2 (en) Production target range setting device and production target range setting method
JPH10180597A (en) Product management system in manufacturing processes
JP7077827B2 (en) Manufacturing schedule determination device, manufacturing schedule determination method and program
JP7364892B2 (en) Manufacturing schedule determination device, manufacturing schedule determination method, and program
JP4232386B2 (en) Production plan creation system and production plan creation method
JP4438430B2 (en) Steel production lot knitting system, knitting method and program
JP2964866B2 (en) Casting-rolling operation planning method and apparatus
JP2003323206A (en) Production plan compiling system, production plan compiling method and its program
JP3465625B2 (en) Method for determining width of continuous casting slab
JP3642450B2 (en) Lot organization method in continuous casting
JP7099111B2 (en) Controls, methods and programs for the steel piece manufacturing process
JP7234721B2 (en) PLANNING DEVICE, PLANNING METHOD, AND PROGRAM
JP2002333911A (en) Method for making production plan
JP2023158888A (en) Cast organization apparatus, cast organization method and program

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060327

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060627

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060825

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070306

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070507

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070925

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071005

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101012

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101012

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111012

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111012

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121012

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121012

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131012

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131012

Year of fee payment: 6

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131012

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees