JP2000184526A - Tester for circuit-breaker circuit - Google Patents

Tester for circuit-breaker circuit

Info

Publication number
JP2000184526A
JP2000184526A JP10357277A JP35727798A JP2000184526A JP 2000184526 A JP2000184526 A JP 2000184526A JP 10357277 A JP10357277 A JP 10357277A JP 35727798 A JP35727798 A JP 35727798A JP 2000184526 A JP2000184526 A JP 2000184526A
Authority
JP
Japan
Prior art keywords
main circuit
phase
inspection
unit
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10357277A
Other languages
Japanese (ja)
Other versions
JP3077686B2 (en
Inventor
Ryozo Maeda
良三 前田
Noriyuki Mizuno
規幸 水野
Manabu Furuta
学 古田
Akio Komuro
昭夫 小室
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissin Electric Co Ltd
Original Assignee
Nissin Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissin Electric Co Ltd filed Critical Nissin Electric Co Ltd
Priority to JP10357277A priority Critical patent/JP3077686B2/en
Publication of JP2000184526A publication Critical patent/JP2000184526A/en
Application granted granted Critical
Publication of JP3077686B2 publication Critical patent/JP3077686B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Switch Cases, Indication, And Locking (AREA)

Abstract

PROBLEM TO BE SOLVED: To test the order of phases of a main circuit, and operating conditions of the main-circuit contacts and auxiliary contact of a circuit-breaker by a switchgear body independently by connecting an AC test power supplying portion, a phase angle detecting portion, and a control terminal connecting portion in such a way as to be detachable freely, to the main circuit of the switchgear being a test object before fitting a door, and performing a test. SOLUTION: When a test is performed, an AC test power supplying portion 14 and a phase angle detecting portion 17 are connected to main circuit terminals 3R-3T. 8R-8T through connecting cables 24, 25 used exclusively for switching portions 15, 16, so as to be detachable freely. Besides, a control terminal connecting portion 18 is connected to one end 9' and the other end 9" of each auxiliary contact 9 and an on-off control line 10 through a connecting cable 26 for its exclusive use, so as to be detachable freely. A sequencer portion 19 operates according to a set sequence, on the basis of a command of a test processing portion 22, controls the supplying portion 14, switching portions 15, 16, detecting portion 17, and connecting portion 18, and tests the order of phases of the main circuit, and operating conditions of the main circuit contacts 6R-6T and auxiliary contacts 9 of a circuit-breaker 5.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、受変電設備,配電
設備等の電力設備のスイッチギヤを製造等する際に、ス
イッチギヤ本体に設けられた主回路の相順,しゃ断器の
主回路接点及び補助接点の動作状態を、スイッチギヤ完
成前に、スイッチギヤ本体単独(単体)で検査し得るし
ゃ断器回路の検査装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a phase sequence of a main circuit provided in a switchgear main body and a main circuit contact of a circuit breaker when manufacturing a switchgear of power equipment such as a substation equipment and a distribution equipment. Also, the present invention relates to a circuit breaker circuit inspection device capable of inspecting the operating state of an auxiliary contact with a switchgear body alone (single unit) before a switchgear is completed.

【0002】[0002]

【従来の技術】従来、この種の電力設備のスイッチギヤ
はスイッチギヤ本体と扉体とからなり、本体には主回路
のしゃ断器(以下CBという)や各種の計器用変成器等
が設けられ、扉体にはCBの操作機構開閉状態の監視等
を行う制御処理回路等が設けられる。
2. Description of the Related Art Conventionally, a switchgear of this kind of power equipment is composed of a switchgear main body and a door body, and the main body is provided with a circuit breaker (hereinafter referred to as CB) of a main circuit and various instrument transformers. The door is provided with a control processing circuit for monitoring the open / close state of the operating mechanism of the CB and the like.

【0003】そして、スイッチギヤの製造に際しては、
スイッチギヤ本体と扉体とが別個に作製され、本体に扉
体が取付けられ、必要な配線等が行われてスイッチギヤ
が完成する。
[0003] When manufacturing a switchgear,
The switchgear main body and the door body are separately manufactured, the door body is attached to the main body, necessary wiring and the like are performed, and the switchgear is completed.

【0004】このとき、主回路のCBは、3相の主回路
接点の一側が主回路の受電点側(1次側)の各相の主回
路端子に接続され、各相の主回路接点の他側が主回路の
送り出し点側(2次側)の各相の主回路端子に接続され
る。
At this time, the CB of the main circuit is such that one side of the three-phase main circuit contact is connected to the main circuit terminal of each phase on the power receiving point side (primary side) of the main circuit, and the main circuit contact of each phase is connected. The other side is connected to the main circuit terminal of each phase on the sending point side (secondary side) of the main circuit.

【0005】また、CBの各主回路接点に連動して開閉
する1又は複数の補助接点は主回路の各制御端子を介し
て扉体の制御処理回路等に接続される。
[0005] One or more auxiliary contacts that open and close in conjunction with each main circuit contact of the CB are connected to a control processing circuit or the like of a door body through each control terminal of the main circuit.

【0006】ところで、スイッチギヤ本体については、
製造検査の1つであるしゃ断器回路の検査により、主回
路の受電点側の各相の主回路端子からCBを介して送り
出し点側の各相の主回路端子に至る母線の相順(主回路
の相順),CBの各主回路接点及び各補助接点の動作状
態を検査する必要があり、従来は、この検査として、ス
イッチギヤ完成後につぎの〜の項目の測定,検査が
人手で実施される。
By the way, regarding the switchgear body,
Inspection of the circuit breaker circuit, which is one of the manufacturing inspections, shows that the phase sequence of the bus from the main circuit terminal of each phase on the power receiving point side of the main circuit to the main circuit terminal of each phase on the sending point side via CB (main circuit) It is necessary to inspect the operating state of each main circuit contact and each auxiliary contact of the CB, and the operation state of the following items after the completion of the switchgear. Is done.

【0007】CB開閉動作確認 スイッチギヤ完成状態でCBの制御スイッチ(操作スイ
ッチ)を操作し、CB本体の動作表示器の点,消灯から
CBの開閉状態を目視により確認する。 主回路接点の開極時間及び閉極時間の検査 完成したスイッチギヤのCBの1又は複数の適当な補助
接点にタイマ回路等の時計回路を接続し、前記の制御ス
イッチの操作によりCBを開閉し、その間の補助接点の
開閉時間の計測から、各主回路接点の開極時間,閉極時
間を測定して検査する。 主回路相順確認 主回路の受電点側の各相の主回路端子から送り出し点側
の各相の主回路端子までの母線の接続を目視により点検
して確認する。 補助接点動作確認 CBの各補助接点に試験用のランプをそれぞれ接続し、
前記の制御スイッチの操作によりCBを開閉し、各補助
接点の接点信号に基づく各ランプの点滅等から目視によ
り確認する。
CB open / close operation confirmation When the switchgear is completed, the control switch (operation switch) of the CB is operated, and the open / closed state of the CB is visually checked from the on / off state of the operation indicator on the CB body. Inspection of opening and closing times of main circuit contacts A clock circuit such as a timer circuit is connected to one or more appropriate auxiliary contacts of the CB of the completed switchgear, and the CB is opened and closed by operating the control switch. From the measurement of the opening and closing time of the auxiliary contact during that time, the opening time and closing time of each main circuit contact are measured and inspected. Main circuit phase sequence check Visually check and confirm the bus connection from the main circuit terminal of each phase on the power receiving point side of the main circuit to the main circuit terminal of each phase on the sending point side. Auxiliary contact operation check Connect a test lamp to each auxiliary contact of CB,
The CB is opened / closed by operating the above-mentioned control switch, and it is visually confirmed from the blinking of each lamp based on the contact signal of each auxiliary contact.

【0008】[0008]

【発明が解決しようとする課題】従来は、前記したよう
にスイッチギヤ本体のしゃ断器回路の検査が、スイッチ
ギヤの完成後にスイッチギヤ本体に扉体を取付けた状態
で行われ、扉体を取付ける前に、スイッチギヤ本体の製
造ラインでの検査(ライン検査)等により、スイッチギ
ヤ本体の単体で先行して行うことができない問題点があ
る。
Conventionally, as described above, inspection of the circuit breaker circuit of the switchgear body is performed with the door body attached to the switchgear body after the completion of the switchgear, and the door body is attached. Previously, there is a problem that the switchgear body cannot be performed in advance by itself due to inspection (line inspection) on the production line of the switchgear body.

【0009】また、主回路接点の動作状態の検査につい
ては、主回路接点の開極,閉極の時間の測定が補助接点
の動作を介して間接的に行われるため、精度の高い検査
が行えない問題点がある。
In the inspection of the operating state of the main circuit contacts, the opening and closing times of the main circuit contacts are measured indirectly through the operation of the auxiliary contacts. There are no problems.

【0010】さらに、各検査が全て作業員の目視により
行われるため、検査ミスが生じ易く、検査効率の向上を
図ることも困難である。
[0010] Further, since all inspections are carried out visually by an operator, inspection errors are likely to occur, and it is difficult to improve inspection efficiency.

【0011】例えば主回路の相順の検査については、主
回路の母線が複雑な形状,接続の場合やスイッチギヤ本
体が小型で母線の配線密度が高い場合等には、目視点検
が困難であり、相順の見誤り等が生じるおそれがあり、
補助接点の動作状態の検査についても、各補助接点の動
作状態をランプの点滅等から目視確認するため、見誤り
等が生じるおそれがある。
For example, it is difficult to visually check the phase sequence of the main circuit when the bus of the main circuit has a complicated shape and connection, or when the switch gear body is small and the wiring density of the bus is high. , There is a risk of misjudgment of phase order, etc.
Regarding the inspection of the operation state of the auxiliary contacts, the operation state of each auxiliary contact is visually checked from the blinking of a lamp or the like.

【0012】本発明は、スイッチギヤ本体の単体検査に
より、その主回路の相順,CBの主回路接点及び補助接
点の動作状態の検査が自動的に行えるしゃ断器回路の検
査装置を提供することを課題とする。
It is an object of the present invention to provide a circuit breaker circuit inspection apparatus capable of automatically inspecting the phase sequence of its main circuit and the operation states of the main circuit contacts and auxiliary contacts of the CB by unitary inspection of the switchgear body. As an issue.

【0013】[0013]

【課題を解決するための手段】前記の課題を解決するた
めに、本発明のしゃ断器回路の検査装置においては、ス
イッチギヤ本体に設けられた主回路の一方の各相の主回
路端子に着脱自在に接続され,主回路に3相交流の検査
電源を給電する交流検査電源部と、主回路の他方の各相
の主回路端子に着脱自在に接続され,他方の各相の主回
路端子の3相交流の検査電源の受電位相を検出する位相
角検出部と、CBの開閉制御線及び各補助接点が接続さ
れた主回路の各制御端子に着脱自在に接続され,開閉制
御線に開閉制御信号を供給し,各補助接点に直流の制御
電源を給電し,各補助接点を介した直流の検査電源を各
補助接点の接点信号として受電する制御端子接続部と、
検査開始指令の入力により検査シーケンスにしたがって
動作し,交流検査電源部,位相角検出部及び制御端子接
続部を制御し,他方の各相の主回路端子の受電信号,位
相角検出部の各位相検出信号,各補助接点の接点信号を
計測情報として取込むシーケンサ部と、シーケンサ部と
情報をやりとりし,検査時に検査開始指令をシーケンサ
部に通知し,各計測情報を取込んで解析し,他方の各相
の主回端子の受電信号に基づいて各相の主回路接点の動
作状態を検査し,各位相検出信号に基づいて主回路の相
順を検査し,各補助接点の接点信号に基づいて各補助接
点の動作状態を検査する検査処理部とを備える。
In order to solve the above-mentioned problems, in the circuit breaker circuit inspection apparatus according to the present invention, the circuit breaker circuit is attached to and detached from a main circuit terminal of each phase of one of main circuits provided in a switchgear body. An AC test power supply section that is freely connected and supplies three-phase AC test power to the main circuit; and is detachably connected to a main circuit terminal of the other phase of the main circuit and is connected to a main circuit terminal of the other phase. A phase angle detecting unit for detecting a receiving potential phase of a three-phase alternating current inspection power supply, and detachably connected to each control terminal of a main circuit to which an open / close control line of a CB and each auxiliary contact are connected, and open / close control to an open / close control line A control terminal connection unit for supplying a signal, supplying a DC control power supply to each auxiliary contact, and receiving a DC inspection power supply via each auxiliary contact as a contact signal of each auxiliary contact;
It operates in accordance with the inspection sequence by inputting the inspection start command, controls the AC inspection power supply unit, phase angle detection unit, and control terminal connection unit, and receives the power reception signal of the main circuit terminal of each other phase and each phase of the phase angle detection unit. A sequencer unit that takes in the detection signal and the contact signal of each auxiliary contact as measurement information, exchanges information with the sequencer unit, notifies an inspection start command to the sequencer unit at the time of inspection, takes in each measurement information and analyzes it. Check the operation status of the main circuit contacts of each phase based on the power receiving signal of the main terminal of each phase, check the phase sequence of the main circuit based on each phase detection signal, and And an inspection processing unit for inspecting the operation state of each auxiliary contact.

【0014】したがって、扉体を取付ける前の検査対象
のスイッチギヤ本体の主回路に交流検査電源部,位相角
検出部,制御端子接続部を着脱自在に接続し、検査開始
操作を行うと、検査処理部からの検査開始指令の通知に
よりシーケンサ部が設定された検査シーケンスを実行す
る。
Therefore, if the AC inspection power supply unit, the phase angle detection unit, and the control terminal connection unit are detachably connected to the main circuit of the switchgear body to be inspected before the door body is attached, and the inspection start operation is performed, the inspection starts. The sequencer unit executes the set inspection sequence in response to the notification of the inspection start command from the processing unit.

【0015】そして、交流検査電源部から主回路の一方
の各相の主回路端子に3相交流の検査電源が給電され、
CBの開閉に基づき、各相の主回路接点を介した検査電
源が主回路の他方の各相の主回路端子に受電される。
A three-phase AC test power is supplied from the AC test power supply to the main circuit terminal of each phase of the main circuit.
Based on the opening / closing of the CB, the inspection power supply via the main circuit contact of each phase is received by the main circuit terminal of the other phase of the main circuit.

【0016】また、この他方の各相の主回路端子の受電
位相が位相角検出部により検出される。
Further, the receiving phase of the main circuit terminal of each of the other phases is detected by a phase angle detecting section.

【0017】そして、他方の各相の主回路端子の受電信
号に基づき、検査処理部がCBの各相の主回路接点の開
極時間,閉極時間等の動作状態を直接検査する。
Then, based on the power receiving signal of the other main circuit terminal of each phase, the inspection processing section directly inspects the operating state of the main circuit contact of each phase of CB, such as the opening time and closing time.

【0018】また、位相角検出部の各位相検出信号に基
づき、検査処理部が主回路の相順を検査する。
Further, based on each phase detection signal of the phase angle detection section, the inspection processing section inspects the phase sequence of the main circuit.

【0019】さらに、制御端子接続部により、各主回路
接点に連動する各補助接点を介した直流の検査電源がそ
れぞれの接点信号として受電され、この受電された各接
点信号に基づき、検査処理部が各補助接点の動作状態を
検査する。
Further, the control terminal connection unit receives a DC inspection power supply via each auxiliary contact interlocking with each main circuit contact as a respective contact signal, and, based on each received contact signal, an inspection processing unit. Inspects the operating state of each auxiliary contact.

【0020】そのため、スイッチギヤ本体の主回路の相
順,CBの主回路接点及び各補助接点の動作状態が、そ
の単体検査で自動的に行われる。
Therefore, the phase sequence of the main circuit of the switchgear main body, the operation state of the CB main circuit contact and the operation state of each auxiliary contact are automatically performed by the unit inspection.

【0021】このとき、各相の主回路接点の動作状態が
それらを通る交流検査電源の受電状態から直接検出,測
定されて検査されるため、例えばそれらの開極時間,閉
極時間が補助接点を介して間接的に測定する場合より正
確に測定され、精度の高い検査が行える。
At this time, the operating state of the main circuit contacts of each phase is directly detected, measured, and inspected from the power receiving state of the AC inspection power supply passing therethrough. The measurement can be performed more accurately than when the measurement is indirectly performed through the, and a highly accurate inspection can be performed.

【0022】そして、従来の目視確認(点検)がほとん
ど不要になることから、省力化が図れるとともに検査効
率が向上し、しかも、主回路の母線の形状や接続が複雑
な場合等にも見誤り等なく正確に検査することができ、
その上、回路の特性や交流理論等の専門知識のない者で
も容易に検査することができる。
Since the conventional visual check (inspection) is almost unnecessary, labor saving can be achieved and the inspection efficiency can be improved. In addition, even when the shape and connection of the bus of the main circuit are complicated, it can be mistaken. Can be inspected accurately without any
In addition, even those who do not have specialized knowledge such as circuit characteristics and AC theory can easily perform inspection.

【0023】[0023]

【発明の実施の形態】本発明の実施の1形態につき、図
1及び図2を参照して説明する。図1は全体構成を示
し、扉体が取付けられる前の検査対象(被試験品)のス
イッチギヤ本体1の主回路2は、受電点側(1次側)の
一方の3相の主回路端子3 ,3,3に1次側の母
線4,4,4を介してCB5の主回路接点6
,6の一側が接続され、これらの接点6
,6の他側が2次側の母線7,7,7を介
して送り出し点側(2次側)の他方の3相の主回路端子
,8,8に接続されている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG.
1 and FIG. Figure 1 shows the overall configuration
Of the inspection target (product under test) before the door is attached.
The main circuit 2 of the switch gear body 1 has a power receiving point side (primary side).
One three-phase main circuit terminal 3 R, 3S, 3TMother on the primary side
Line 4R, 4S, 4TThrough the main circuit contact 6 of CB5 R,
6S, 6TAre connected, and these contacts 6R,
6S, 6TThe other side is the secondary side bus 7R, 7S, 7TThrough
And the other three-phase main circuit terminal on the sending point side (secondary side)
8R, 8S, 8TIt is connected to the.

【0024】また、主回路接点6,6,6に連動
するa接点又はb接点からなるCB5の各補助接点9の
一側9′,他側9″及びCB5の開閉制御線10は、主
回路2のプラグ・ソケット構成の各制御端子11に接続
されている。
Further, the main circuit contact 6 R, 6 S, one side 9 of the auxiliary contact 9 of CB5 consisting a contact or b contact interlocked to 6 T ', opening and closing the control line 10 on the other side 9 "and CB5 are Are connected to the control terminals 11 of the plug and socket configuration of the main circuit 2.

【0025】なお、母線4,4,4,7
,7には種々の計器用変成器等が取付けられてい
るが、図1においては、それらを省略している。
The buses 4 R , 4 S , 4 T , 7 R ,
Various instrument transformers and the like are attached to 7 S and 7 T , but they are omitted in FIG. 1.

【0026】つぎに、しゃ断器検査装置は制御盤12と
操作盤13とからなり、本体1は着脱自在に接続される
制御盤12には定電圧電源構成の交流検査電源部14,
1次側端子切換部15,2次側端子切換部16,位相角
検出部17,制御端子接続部18,シーケンサ部19及
びぼ無線送受信部20が設けられ、制御盤12と無線通
信で情報をやりとりする操作盤13には無線送受信部2
1,例えばパソコンからなるコンピュータ構成の検査処
理部22及びプリンタ23が設けられている。
Next, the circuit breaker inspection apparatus comprises a control panel 12 and an operation panel 13. The control panel 12 to which the main body 1 is detachably connected has an AC inspection power supply section 14 having a constant voltage power supply configuration.
A primary terminal switching unit 15, a secondary terminal switching unit 16, a phase angle detection unit 17, a control terminal connection unit 18, a sequencer unit 19, and a wireless transmission / reception unit 20 are provided. The communication panel 13 includes a wireless transmission / reception unit 2
1, an inspection processing unit 22 having a computer configuration composed of, for example, a personal computer and a printer 23 are provided.

【0027】そして、検査時は交流検査電源部14,位
相角検出部17が切換部15,16,専用の接続ケーブ
ル24,25を介して主回路端子3〜3,8〜8
に着脱自在に接続され、制御端子接続部18が専用の
接続ケーブル26を介して各補助接点9の一端9′,他
端9″及び開閉制御線10に着脱自在に接続される。
At the time of inspection, the AC inspection power supply unit 14 and the phase angle detection unit 17 are connected to the main circuit terminals 3 R to 3 T and 8 R to 8 via switching units 15 and 16 and dedicated connection cables 24 and 25.
The control terminal connecting portion 18 is detachably connected to one end 9 ′ and the other end 9 ″ of each auxiliary contact 9 and the open / close control line 10 via a dedicated connection cable 26.

【0028】つぎに、検査処理部22は検査状況を表示
するモニタCRT(図示せず)を有し、作業員(検査
員)がこのモニタCRTの検査開始を促す初期画面にし
たがって、釦操作,マウス操作等で検査処理部22にし
ゃ断器回路の検査開始を指令すると、この指令に基づ
き、検査処理部22は設定された検査プログラムを実行
し、無線送受信部21,20を介してシーケンサ部19
に検査開始指令を通知する。
Next, the inspection processing section 22 has a monitor CRT (not shown) for displaying the inspection status, and the operator (inspector) operates buttons, according to an initial screen for urging the operator to start the inspection of the monitor CRT. When the inspection processing unit 22 is instructed to start the inspection of the circuit breaker circuit by a mouse operation or the like, the inspection processing unit 22 executes the set inspection program based on the instruction, and the sequencer unit 19 via the wireless transmission / reception units 21 and 20.
To the inspection start command.

【0029】この通知に基づき、シーケンサ部19は設
定された検査シーケンスにしたがって動作し、交流検査
電源部14,切換部15,16,位相角検出部17及び
制御端子接続部18を制御し、主回路2の相順,CB5
の主回路接点6〜6及び補助接点9の動作状態の検
査を実施する。
Based on this notification, the sequencer unit 19 operates according to the set inspection sequence, controls the AC inspection power supply unit 14, the switching units 15, 16, the phase angle detection unit 17, and the control terminal connection unit 18, and Circuit 2 phase sequence, CB5
The main circuit contacts 6 R to 6 T and an inspection of the operating status of the auxiliary contact 9.

【0030】すなわち、交流検査電源部14はシーケン
サ部19によりオン,オフされ、例えばAC100Vの
3相交流の検査電源の各相出力を、切換部15を介して
主回路端子3〜3に給電する。
[0030] That is, the AC test power supply unit 14 by the sequencer unit 19 on, is turned off, for example, each phase output of the test power supply 3-phase AC of AC100V, through the switching unit 15 to the main circuit terminal 3 R to 3 T Supply power.

【0031】このとき、シーケンサ部19による切換部
15の制御により、主回路端子3〜3の給電が一斉
に又は個別にオン,オフされる。
[0031] At this time, the control of the switching unit 15 by the sequencer unit 19, simultaneously or individually on the power supply of the main circuit terminal 3 R to 3 T, is off.

【0032】また、主回路端子8〜8の各相の受電
信号が切換部16を介して位相角検出部17に供給さ
れ、この検出部17は供給された各相の受電信号から主
回路端子8〜8の受電位相を検出し、それぞれの位
相検出信号をシーケンサ部19に供給する。
The power reception signals of the respective phases of the main circuit terminals 8 R to 8 T are supplied to the phase angle detection unit 17 via the switching unit 16, and the detection unit 17 converts the received power signals of the respective phases into the main signals. The received potential phases of the circuit terminals 8 R to 8 T are detected, and the respective phase detection signals are supplied to the sequencer unit 19.

【0033】さらに、切換部16は主回路端子8〜8
の各相の受電信号を、シーケンサ部19の制御により
一斉又は個別に位相角検出部17,シーケンサ部19に
供給する。
Further, the switching unit 16 includes main circuit terminals 8 R to 8 R
The power reception signal of each phase of T is supplied to the phase angle detection unit 17 and the sequencer unit 19 simultaneously or individually under the control of the sequencer unit 19.

【0034】つぎに、接続部18はシーケンサ部19の
制御により、開閉制御線10にCB5の開閉制御信号を
供給し、各補助接点9の一側9′に例えばDC100V
の直流の検査電源を個別に給電し、各補助接点9の他側
9″の直流の検査電源をそれぞれの接点信号として受電
し、シーケンサ部19に供給する。
Next, under the control of the sequencer unit 19, the connection unit 18 supplies an open / close control signal of the CB 5 to the open / close control line 10 and, for example, 100 V DC to one side 9 'of each auxiliary contact 9.
, Respectively, and the DC inspection power of the other side 9 ″ of each auxiliary contact 9 is received as a respective contact signal and supplied to the sequencer unit 19.

【0035】また、シーケンサ部19は無線送受信部2
0,21を介して検査処理部22と情報をやりとりし、
切換部16からの主回路端子8〜8の各相の受電信
号,位相角検出部17の各位相検出信号,接続部18の
各補助接点9の接点信号を取込み、A/D変換等を施
し、計測情報として検査処理部22に送信する。
The sequencer section 19 is provided with the radio transmitting / receiving section 2
The information is exchanged with the inspection processing unit 22 via 0 and 21,
A power receiving signal of each phase of the main circuit terminals 8 R to 8 T from the switching unit 16, a phase detection signal of the phase angle detecting unit 17, a contact signal of each auxiliary contact 9 of the connecting unit 18 are taken in, and A / D conversion is performed. And sends it to the inspection processing unit 22 as measurement information.

【0036】そして、検査処理部22はシーケンサ部1
9からの各計測情報を取込んで解析し、主回路接点6
〜6及び各補助接点9の動作状態を検査し、主回路2
の相順を検査し、検査結果をモニタCRTに画面表示す
るとともにプリンタ23で印字する。
Then, the inspection processing unit 22 includes the sequencer unit 1
9 for each main circuit contact 6 R
Examines to 6 T and the operating status of each auxiliary contact 9, the main circuit 2
Are inspected, the inspection result is displayed on a monitor CRT and printed by the printer 23.

【0037】つぎに、図2の検査処理部22の処理のフ
ローチャートを参照して検査処理を具体的に説明する。
まず、検査開始指令に基づき、図2のステップSによ
りモニタCRTにCB5の動作状態の検査開始を表示
し、ステップSにより無線送受信部21,20,シー
ケンサ部19を介して接続部18にCB閉指令を与え、
接続部18から開閉制御線10を用いてCB5に閉成制
御信号を供給する。
Next, the inspection processing will be specifically described with reference to the flowchart of the processing of the inspection processing section 22 in FIG.
First, based on the inspection start command, in step S 1 of FIG. 2 displays the inspection start operating state of CB5 the monitor CRT, the step S 2 wireless transceiver 21 and 20, the connecting portion 18 via the sequencer 19 Give CB close command,
A connection control signal is supplied from the connection unit 18 to the CB 5 using the switching control line 10.

【0038】そして、最初のCB5の閉成,開放はその
本体表示器の点消灯を作業員が目視点検して行われ、C
B5の点検結果が釦操作,マウス操作等で検査処理部2
2に通知される。
The first closing and opening of the CB 5 are performed by an operator visually checking whether the main unit display is turned on or off.
The inspection result of B5 is displayed in the inspection processing unit 2 by button operation, mouse operation, etc.
2 is notified.

【0039】このとき、CB5が不良で開放状態のまま
であれば、その通知に基づき、ステップSを否定(N
O)で通過してステップSに移行し、ブザー音等の警
報音を発生するとともにモニタCRTに不良警報を表示
し、ステップSによりプリンタ23を動作して検査結
果を印字し、検査を終了する。
[0039] At this time, if left in the CB5 is bad open, based on the notification, denying step S 3 (N
Passes by O) proceeds to step S 4, and displays the failure alert monitor CRT with generating an alarm sound such as a buzzer sound, operates the printer 23 prints the test result in step S 5, the test finish.

【0040】一方、CB5の閉成が確認されると、その
通知に基づき、ステップSを肯定(YES)で通過し
てステップSに移行し、検査処理部22は無線送受信
部21,20を介してシーケンサ部19に検査開始を指
令し、シーケンサ部19の制御により、接続部18から
各補助接点9の一側9′に100Vの直流の検査電源を
個別に給電する。
On the other hand, when the closing of CB5 is confirmed, based on the notification, the process proceeds to step S 6 through a positive step S 3 (YES), the inspection processing unit 22 is a radio transceiver 21, 20 A command to start the test is sent to the sequencer unit 19 via the control unit, and under the control of the sequencer unit 19, a 100 V DC test power is individually supplied from the connection unit 18 to one side 9 ′ of each auxiliary contact 9.

【0041】このとき、各補助接点9が正常であれば、
それらのうちのa接点は閉成し、b接点は開放する。
At this time, if each auxiliary contact 9 is normal,
Of these, the a contact is closed and the b contact is open.

【0042】そして、各補助接点9の他側9″の受電信
号が接続部18からシーケンサ部19に各補助接点9の
接点信号として供給され、このシーケンサ部19から検
査処理部22に各補助接点9の接点信号が無線送信さ
れ、検査処理部22は受信した各接点信号から各補助接
点9の正常/異常を判別し、1つでも異常であればステ
ップSからステップSに移行し、ステップS,S
により警報を表示,印字して検査を終了する。
Then, a power receiving signal on the other side 9 ″ of each auxiliary contact 9 is supplied from the connection section 18 to the sequencer section 19 as a contact signal of each auxiliary contact 9, and from the sequencer section 19 to the inspection processing section 22, each auxiliary contact 9 9 contact signal is transmitted wirelessly, the inspection processing unit 22 determines the normality / abnormality of the auxiliary contact 9 from each contact signal received, the process proceeds from step S 7 if abnormality even one in step S 4, Step S 4 , S
The warning is displayed and printed by 5 and the inspection is completed.

【0043】また、各補助接点9が全て正常であれば、
CB5の最初の開放制御を行うため、ステップSから
ステップSに移行し、シーケンサ部19の制御により
接続部18からCB5に開放制御信号を与える。
If all the auxiliary contacts 9 are normal,
In order to perform the initial release control of the CB 5, the process proceeds from step S 7 to step S 8 , and a release control signal is provided from the connection unit 18 to the CB 5 under the control of the sequencer unit 19.

【0044】そして、CB5の開放の有無がその本体表
示器の点消灯等から目視点検され、CB5が閉成状態の
ままであれば、その通知に基づき、ステップSからス
テップSに移行し、ステップS,Sにより警報の
表示,印字を行う。
[0044] Then, whether the opening of the CB5 is visually inspected from the point off etc. of the main body display, if left CB5 is closed state, on the basis of the notification, the process proceeds from step S 9 to step S 4 the display of the alarm in step S 4, S 5, to print.

【0045】一方、CB5が正常に開放すれば、その通
知に基づき、ステップS10に移行し、シーケンサ部1
9の各補助接点9の接点信号の受電の有無に基づき、各
補助接点9の正常/異常を再び判別し、1つでも異常で
あれば、補助接点不良と判別し、ステップS10を否定
で通過してステップSに移行し、全て正常のときの
み、補助接点正常と判別して補助接点9の動作状態の検
査を終了する。
On the other hand, if the opening normally CB5, based on the notification, the process proceeds to step S 10, the sequencer unit 1
9, the normal / abnormal state of each auxiliary contact 9 is determined again based on whether or not power is received from the contact signal of each auxiliary contact 9. If at least one of the auxiliary contacts 9 is abnormal, it is determined that the auxiliary contact 9 is defective, and step S 10 is negative. the process proceeds to step S 4 through only when all normal, it is determined that the normal auxiliary contact ends the inspection of the operating status of the auxiliary contact 9.

【0046】つぎに、主回路2の相順及び主回路接点6
〜6の動作状態の検査に移り、ステップS11によ
りその旨をモニタCRTに画面表示してステップS12
に移行する。
Next, the phase sequence of the main circuit 2 and the main circuit contacts 6
Proceeds to check the operating state of S to 6 T, step S 12 to the screen display to that effect on the monitor CRT in step S 11
Move to

【0047】そして、シーケンサ部19の制御により交
流検査電源部14をオンし、この電源部14から切換部
15を介して主回路端子3〜3に3相交流の検査電
源を給電する。
Then, the AC inspection power supply unit 14 is turned on under the control of the sequencer unit 19, and a three-phase AC inspection power supply is supplied from the power supply unit 14 to the main circuit terminals 3 R to 3 T via the switching unit 15.

【0048】また、ステップS13の閉指令に基づき、
接続部18から開閉制御線10に閉成制御信号を供給し
てCB5を閉成する。
[0048] Further, based on the closing command of the step S 13,
A closing control signal is supplied from the connection section 18 to the opening / closing control line 10 to close the CB 5.

【0049】そして、補助接点9の接点信号の有無から
CB5の閉成を検出すると、ステップS14からステッ
プS15に移行し、主回路接点6〜6の投入動作状
態の確認中をモニタCRTに表示する。
[0049] Then, the monitor detects the closing of CB5 from the presence or absence of the contact signal of the auxiliary contact 9, the process proceeds from step S 14 to step S 15, through the confirmation of the closing operation state of the main circuit contacts 6 R to 6 T Display on CRT.

【0050】ところで、主回路端子8〜8の受電信
号の計測情報に基づき、検査処理部22はステップS
13の閉指令の発生から実際に主回路接点8〜8
閉成するまでの時間(閉極時間(投入時間))を個別に
直接計測する。
By the way, based on the measurement information of the power reception signals of the main circuit terminals 8 R to 8 T , the inspection processing unit 22 performs the processing in step S
Indeed the main circuit contacts 8 R to 8 T from the occurrence of close instruction 13 the time until closing (closing time (on time)) for measuring the individual directly.

【0051】そして、計測した時間がいずれも100m
secの基準時間以内で正常であれば、ステップS16
からステップS17に移行して主回路2の相順確認の実
行をモニタCRTに表示する。
The measured time is 100 m in each case.
If the normal within the reference time of sec, step S 16
From the process proceeds to step S 17 to display the running of the phase sequence confirmation of the main circuit 2 to the monitor CRT.

【0052】さらに、位相角検出部17の各位相検出信
号の計測情報に基づき、主回路端子8〜8の受電位
相と,例えば主回路端子3〜3に給電される検査電
源位相との一致,不一致から、主回路端子3〜3
R,S,Tの相順に対して、主回路端子8〜8
R,S,Tの相順であるか否かを判別して主回路2の相
順を検査する。
[0052] Further, on the basis of the measurement information of the phase detection signal of the phase angle detector 17, receiving the main circuit terminal 8 R to 8 T phase and, for example, the main circuit terminal 3 R to 3 T to powered by inspection supply phase match with, the mismatch, the main circuit terminal 3 of R to 3 T R, S, with respect to the phase order of T, the main circuit terminal 8 R to 8 T also R, S, whether the phase sequence of the T Then, the phase sequence of the main circuit 2 is checked.

【0053】そして、主回路端子8〜8もR,S,
Tの相順で正常であれば、ステップS18からステップ
19に移行してCB5の開指令を発生し、適当な補助
接点9の接点信号の有無からCB5の開放を検出する
と、ステップS20を肯定で通過してステップS21
移行し、モニタCRTに主回路接点確認中を表示する。
The main circuit terminals 8 R to 8 T are also R, S,
If normal in phase sequence T, then the steps S 18 an open command for transition to CB5 occurs to step S 19, detects the opening of CB5 from the presence or absence of a suitable contact signal of the auxiliary contact 9, step S 20 the passes in a positive and proceeds to step S 21, and displays the main circuit contact being confirmed on the monitor CRT.

【0054】このとき、主回路端子8〜8の受電信
号の計測情報に基づき、検査処理部22はステップS
19の開指令の発生から主回路端子8〜8が実際に
開放(しゃ断)されるまでの時間を個別に計測し、主回
路接点6〜6の開極時間(しゃ断時間)も直接計測
する。
At this time, on the basis of the measurement information of the power reception signals of the main circuit terminals 8 R to 8 T , the inspection processing unit 22 performs step S
19 main circuit terminal 8 R to 8 T from the occurrence of open command is actually opened (cut-off) is the time until the measured discrete, main circuit contacts 6 R to 6 T opening time (cut-off time) Measure directly.

【0055】そして、計測した時間がいずれも100m
secの基準時間以内で正常であれば、開極時間の計測
を終了し、ステップS22からステップS23に移行し
てモニタCRTに検査終了の相順確認中を表示する。
The measured time is 100 m in each case.
If successful within the reference time of sec, and ends the measurement of the contact opening time period, and displays the in phase order confirmation completion of the inspection to monitor CRT shifts from step S 22 to step S 23.

【0056】そして、主回路端子8〜8のいずれも
が受電しなくなり、位相角検出部17の全ての位相検出
信号が消失すると、CB5の開放を確認して検査を終了
する。
When all the main circuit terminals 8 R to 8 T stop receiving power and all the phase detection signals of the phase angle detector 17 disappear, the CB 5 is opened and the inspection is terminated.

【0057】すなわち、ステップS24からステップS
25に移行して接続部18の直流の検査電源をオフした
後、ステップS26に移行して交流検査電源部14もオ
フし、その後、ステップSに移行して検査結果を印刷
し、検査を終了する。
[0057] In other words, step S from step S 24
After turning off the test power of DC migration to connection 18 to 25, migrated AC test power supply unit 14 is also turned off in step S 26, then the test result is printed the process proceeds to step S 5, the inspection To end.

【0058】ところで、ステップS14,S16,S
18,S20,S22,S24において、正常でなけれ
ば、それぞれのステップを否定で通過してステップS
に移行し、異常を警報等して検査を終了する。
Incidentally, steps S 14 , S 16 , S
18 , S 20 , S 22 , and S 24 , if they are not normal, the respective steps are negatively passed and the step S 4
Then, the abnormality is warned and the inspection is terminated.

【0059】また、検査が終了すると、スイッチギヤ本
体1と制御盤12の各部とのケーブル接続が切離され
る。
When the inspection is completed, the cable connection between the switchgear body 1 and each part of the control panel 12 is disconnected.

【0060】したがって、スイッチギヤ本体1を検査装
置にケーブル接続して検査開始を指令することにより、
スイッチギヤ本体1単体で主回路2の相順,主回路接点
〜6,各補助接点9の動作状態を自動的に検査す
ることができる。
Therefore, by connecting the switchgear main body 1 to the inspection apparatus by a cable and instructing the start of the inspection,
Switchgear body 1 itself in the main circuit 2 phase sequence, the main circuit contact 6 R to 6 T, the operating status of each auxiliary contact 9 can be automatically inspected.

【0061】この場合、作業員の目視による確認,判別
がほとんどなくなり、従来の見誤り等による検査ミスが
激減し、検査精度が向上する。
In this case, there is almost no visual confirmation and discrimination by the operator, and the number of inspection errors due to mistakes in the prior art is drastically reduced, and the inspection accuracy is improved.

【0062】また、検査結果等がプリンタ26でプリン
トアウトされるため、測定,良否判定の専門的知識は不
要であり、検査記録を手書きする必要もなく、大幅な省
力化が図られて検査効率が向上する。
In addition, since the inspection results and the like are printed out by the printer 26, there is no need for specialized knowledge of measurement and pass / fail judgment, and there is no need to hand-write the inspection records. Is improved.

【0063】ところで、前記実施の形態にあっては、シ
ーケンサ部19と検査処理部22との情報のやりとりを
無線で行うようにしたため、検査装置の配線が著しく簡
素化するとともに、配置の自由度の向上等を図ることが
できる利点がある。
In the above embodiment, the exchange of information between the sequencer section 19 and the inspection processing section 22 is performed wirelessly, so that the wiring of the inspection apparatus is significantly simplified and the degree of freedom of arrangement is increased. There is an advantage that it is possible to improve and the like.

【0064】そして、制御盤12,操作盤13の構成等
は前記実施の形態のものに限られるものでなく、例え
ば、切換部15,16のいずれか一方又は両方を省いて
形成してもよく、また、シーケンサ部19と検査処理部
22とを有線接続して情報のやりとりを有線で行うよう
にしてもよいのは勿論である。
The configuration and the like of the control panel 12 and the operation panel 13 are not limited to those of the above-described embodiment. For example, one or both of the switching sections 15 and 16 may be omitted. Alternatively, the sequencer section 19 and the inspection processing section 22 may be connected by wire to exchange information by wire.

【0065】[0065]

【発明の効果】本発明は、以下に記載する効果を奏す
る。扉体を取付ける前の検査対象のスイッチギヤ本体1
の主回路2に交流検査電源部14,位相角検出部17,
制御端子接続部18を着脱自在に接続し、検査開始操作
を行うと、検査処理部22からの検査開始指令の通知に
よりシーケンサ部19が設定された検査シーケンスを実
行し、主回路2の相順,しゃ断器(CB)5の各相の主
回路接点6〜6及び各補助接点9の動作状態をスイ
ッチギヤ本体1の単体検査で行うことができる。
The present invention has the following effects. Switchgear body 1 to be inspected before installing the door
AC power supply section 14, phase angle detection section 17,
When the control terminal connection unit 18 is detachably connected and an inspection start operation is performed, the sequencer unit 19 executes the set inspection sequence according to the notification of the inspection start command from the inspection processing unit 22, and the phase sequence of the main circuit 2 The operation state of the main circuit contacts 6 R to 6 T and the auxiliary contacts 9 of each phase of the circuit breaker (CB) 5 can be performed by a single inspection of the switchgear body 1.

【0066】このとき、各相の主回路接点6〜6
動作状態がそれらを通る検査電源の受電状態から直接検
出されて検査されるため、とくにそれらの開極時間,閉
極時間の測定精度が補助接点を介して間接的に測定する
場合より正確であり、精度の高い検査を行うことができ
る。
At this time, the operating states of the main circuit contacts 6 R to 6 T of each phase are directly detected and inspected from the power receiving state of the inspection power supply passing therethrough. The measurement accuracy is more accurate than in the case where the measurement is performed indirectly through the auxiliary contact, and a highly accurate inspection can be performed.

【0067】そして、自動検査であることから、省力化
が図れるとともに検査効率が向上し、しかも、主回路2
の母線の形状や接続が複雑な場合等にも見誤り等なく正
確に検査することができ、その上、回路の特性や交流理
論等の専門知識のない者でも容易に検査することができ
る。
Since the automatic inspection is performed, labor saving can be achieved and the inspection efficiency can be improved.
Even when the shape and connection of the bus are complicated, accurate inspection can be performed without mistakes and the like. In addition, even those who do not have specialized knowledge such as circuit characteristics and AC theory can easily perform inspection.

【0068】したがって、扉体を取付けてスイッチギヤ
を完成する前に、その本体の製造ライン等において、ス
イッチギヤ本体1単独で容易に主回路のしゃ断器回路の
種々の先行検査を行うことができる。
Therefore, before the door body is attached to complete the switchgear, various preliminary inspections of the circuit breaker circuit of the main circuit can be easily performed by the switchgear body 1 alone on the manufacturing line of the body or the like. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の1形態のブロック結線図であ
る。
FIG. 1 is a block connection diagram of an embodiment of the present invention.

【図2】図1の動作説明用のフローチャートである。FIG. 2 is a flowchart for explaining the operation of FIG. 1;

【符号の説明】[Explanation of symbols]

1 スイッチギヤ本体 2 主回路 3〜3,8〜8主回路端子 5 しゃ断器 6〜6主回路接点1 switchgear body second main circuit 3 R ~3 T, 8 R ~8 T main circuit terminal 5 breaker 6 R to 6 T main circuit contacts

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成12年2月8日(2000.2.8)[Submission Date] February 8, 2000 (200.2.8)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Correction target item name] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【特許請求の範囲】[Claims]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0002[Correction target item name] 0002

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0002】[0002]

【従来の技術】従来、この種の電力設備のスイッチギヤ
はスイッチギヤ本体と扉体とからなり、本体には主回路
のしゃ断器(以下CBという)や各種の計器用変成器等
が設けられ、扉体にはCBの操作機構開閉状態の監視
等を行う制御処理回路等が設けられる。
2. Description of the Related Art Conventionally, a switchgear of this kind of power equipment is composed of a switchgear main body and a door body, and the main body is provided with a circuit breaker (hereinafter referred to as CB) of a main circuit and various instrument transformers. The door is provided with a CB operating mechanism , a control processing circuit for monitoring the open / closed state, and the like.

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0012[Correction target item name] 0012

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0012】本発明は、スイッチギヤ本体の単体検査に
より、その主回路の相順,CBの主回路接点及び補助接
点の動作状態の検査が自動的に行えるしゃ断器回路の検
査装置を提供することを課題とする。また、その際、装
置の配線の簡素化及び配置の自由度の向上等も図られる
ようにする。
It is an object of the present invention to provide a circuit breaker circuit inspection apparatus capable of automatically inspecting the phase sequence of its main circuit and the operation states of the main circuit contacts and auxiliary contacts of the CB by unitary inspection of the switchgear body. As an issue. At that time,
Simplification of placement wiring and improvement of arrangement flexibility
To do.

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0013[Correction target item name] 0013

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0013】[0013]

【課題を解決するための手段】前記の課題を解決するた
めに、請求項1のしゃ断器回路の検査装置は、主回路の
一方の各相の主回路端子と他方の各相の主回路端子との
間にしゃ断器の各相の主回路接点を設け、主回路の各制
御端子にしゃ断器の開閉制御線及び補助接点を接続した
スイッチギヤ本体に、しゃ断器の操作機構及び制御回路
等が設けられた扉体を取付ける前に、スイッチギヤ本体
を単体検査するしゃ断器回路の検査装置であって、一方
の各相の主回路端子に着脱自在に接続され,主回路に3
相交流の検査電源を給電する交流検査電源部と、方の
各相の主回路端子に着脱自在に接続され,他方の各相の
主回路端子の3相交流の検査電源の受電位相を検出する
位相角検出部と、制御端子に着脱自在に接続され,開
閉制御線に開閉制御信号を供給し,各補助接点に直流の
検査電源を給電し,補助接点を介した直流の検査電源
助接点の接点信号として受電する制御端子接続部と、
検査開始指令の入力により設定された検査シーケンス
実行し,交流検査電源部,位相角検出部及び制御端子接
続部を制御し,他方の各相の主回路端子の受電信号,位
相角検出部の各位相検出信号,補助接点の接点信号を計
測情報として取込むシーケンサ部と、シーケンサ部と情
報をやりとりし,検査時に検査開始指令をシーケンサ部
に通知し,各計測情報を取込んで解析し,他方の各相の
主回端子の受電信号に基づいて各相の主回路接点の動作
状態を自動検査し,各位相検出信号に基づいて主回路の
相順を自動検査し,補助接点の接点信号に基づいて補
接点の動作状態を自動検査する検査処理部とを備える。
In order to solve the above-mentioned problems, an inspection apparatus for a circuit breaker circuit according to claim 1 is provided .
Between the main circuit terminal of each phase and the main circuit terminal of the other phase.
Main circuit contacts for each phase of the circuit breaker are provided between
The breaker switching control line and auxiliary contacts are connected to the control terminal
Switchgear body, circuit breaker operating mechanism and control circuit
Before installing the door body equipped with a switchgear body, etc.
A circuit breaker circuit inspection device for inspecting a single circuit of a circuit breaker.
An AC test power supply unit for supplying a test power phase AC, is detachably connected to the main circuit terminals of each phase of the other hand, detects the test power receiving phase of the other phases of the 3-phase AC main circuit terminals Phase angle detector, which is detachably connected to each control terminal, supplies an open / close control signal to the open / close control line, and supplies a DC
And feeding the test power, a test power of a direct current through the auxiliary contact
A control terminal connecting portion for receiving a contact signal of the auxiliary contacts,
The test sequence is set by the input of the inspection start command
Run, AC test power supply unit, and controls the phase angle detector, and a control terminal connecting portion, the other of each phase of the power receiving signal of the main circuit terminals, the phase detection signal of the phase angle detection unit, a contact signal auxiliary contacts Exchanges information with the sequencer unit that takes in measurement information and the sequencer unit, notifies an inspection start command to the sequencer unit at the time of inspection, fetches and analyzes each measurement information, and receives the power reception signal of the main terminal of each other phase. automatically check the operation status of each phase of the main circuit contacts on the basis of the phase order of the main circuit based on the phase detection signal to automatic inspection, the operation state of the auxiliary contacts based on the contact signal auxiliary contacts An inspection processing unit for performing automatic inspection.

【手続補正5】[Procedure amendment 5]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0022[Correction target item name] 0022

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0022】そして、従来の目視確認(点検)がほとん
ど不要になることから、省力化が図れるとともに検査効
率が向上し、しかも、主回路の母線の形状や接続が複雑
な場合等にも見誤り等なく正確に検査することができ、
その上、回路の特性や交流理論等の専門知識のない者で
も容易に検査することができる。そして、検査装置の配
線の簡素化及び配置の自由度の向上を図る場合は、スイ
ッチギヤ本体に着脱自在に接続される制御盤に、交流検
査電源部,位相角検出部,制御端子接続部及びシーケン
サ部と、このシーケンサ部に接続された制御盤側の無線
送受信部とを設け、制御盤と別個の操作盤に、検査処理
部と、この検査処理部に接続された操作盤側の無線送受
信部とを設け、シーケンサ部と検査処理部との情報のや
りとりを、前記両無線送受信部を介して無線で行えばよ
い。
Since the conventional visual check (inspection) is almost unnecessary, labor saving can be achieved and the inspection efficiency can be improved. In addition, even when the shape and connection of the bus of the main circuit are complicated, it can be mistaken. Can be inspected accurately without any
In addition, even those who do not have specialized knowledge such as circuit characteristics and AC theory can easily perform inspection. And the arrangement of inspection equipment
Use switches to simplify lines and increase the degree of freedom in arrangement.
The control panel, which is detachably connected to the
Power supply section, phase angle detection section, control terminal connection section and sequence
And the radio on the control panel side connected to this sequencer.
A transmission / reception unit is provided, and inspection processing is performed on a separate operation panel from the control panel
Unit, and wireless transmission and reception on the operation panel side connected to this inspection processing unit.
A communication unit is provided, and information between the sequencer unit and the inspection processing unit is provided.
Retrieval may be performed wirelessly via the two wireless transmission / reception units.
No.

【手続補正6】[Procedure amendment 6]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0026[Correction target item name] 0026

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0026】つぎに、しゃ断器検査装置は制御盤12と
操作盤13とからなり、本体1着脱自在に接続される
制御盤12には定電圧電源構成の交流検査電源部14,
1次側端子切換部15,2次側端子切換部16,位相角
検出部17,制御端子接続部18,シーケンサ部19及
制御盤側の無線送受信部20が設けられ、制御盤12
と無線通信で情報をやりとりする操作盤13には操作盤
側の無線送受信部21,例えばパソコンからなるコンピ
ュータ構成の検査処理部22及びプリンタ23が設けら
れている。
Next, the circuit breaker inspection apparatus comprises a control panel 12 and an operation panel 13, and the control panel 12 which is detachably connected to the main body 1 has an AC inspection power supply section 14 having a constant voltage power supply configuration.
A primary terminal switching unit 15, a secondary terminal switching unit 16, a phase angle detection unit 17, a control terminal connection unit 18, a sequencer unit 19, and a wireless transmission / reception unit 20 on the control panel side are provided.
The operation panel 13 for exchanging information by wireless communication with the operation panel
A wireless transmission / reception unit 21, for example, an inspection processing unit 22 having a computer configuration including a personal computer, and a printer 23 are provided.

【手続補正7】[Procedure amendment 7]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0065[Correction target item name] 0065

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0065】[0065]

【発明の効果】本発明は、以下に記載する効果を奏す
る。扉体を取付ける前の検査対象のスイッチギヤ本体1
の主回路2に交流検査電源部14,位相角検出部17,
制御端子接続部18を着脱自在に接続し、検査開始操作
を行うと、検査処理部22からの検査開始指令の通知に
よりシーケンサ部19が設定された検査シーケンスを実
行し、主回路2の相順,しゃ断器(CB)5の各相の主
回路接点6R〜6T及び補助接点9の動作状態をスイッ
チギヤ本体1単体で自動検査することができる。
The present invention has the following effects. Switchgear body 1 to be inspected before installing the door
AC power supply section 14, phase angle detection section 17,
When the control terminal connection unit 18 is detachably connected and an inspection start operation is performed, the sequencer unit 19 executes the set inspection sequence according to the notification of the inspection start command from the inspection processing unit 22, and the phase sequence of the main circuit 2 , can be automatically inspected breaker (CB) 5 each phase of the operation state of the main circuit contacts 6R~6T及beauty auxiliary contacts 9 of a switch gear body 1 single body.

【手続補正8】[Procedure amendment 8]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0068[Correction target item name]

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0068】したがって、扉体を取付けてスイッチギヤ
を完成する前に、その本体の製造ライン等において、ス
イッチギヤ本体1単独で容易に主回路のしゃ断器回路の
種々の先行検査を行うことができる。また、スイッチギ
ヤ本体1に着脱自在に接続される制御盤12に、交流検
査電源部14,位相角検出部17,制御端子接続部18
及びシーケンサ部19と、このシーケンサ部19に接続
された制御盤側の無線送受信部20とを設け、制御盤1
2と別個の操作盤13に、検査処理部22と、この検査
処理部22に接続された操作盤側の無線送受信部21と
を設け、シーケンサ部19と検査処理部22との情報の
やりとりを、無線送受信部20,21を介して無線で行
う場合は、検査装置の配線が著しく簡素化するととも
に、配置の自由度の向上等を図ることができる。
Therefore, before the door body is attached to complete the switchgear, various preliminary inspections of the circuit breaker circuit of the main circuit can be easily performed by the switchgear body 1 alone on the manufacturing line of the body or the like. . Also, switchgear
The control panel 12 detachably connected to the
Power supply unit 14, phase angle detection unit 17, control terminal connection unit 18
And connected to the sequencer unit 19
And a wireless transmission / reception unit 20 on the control panel side provided.
The inspection processing unit 22 and the inspection
A wireless transmission / reception unit 21 on the operation panel connected to the processing unit 22;
And the information of the sequencer unit 19 and the inspection processing unit 22 is
The communication is performed wirelessly via the wireless transmitting / receiving units 20 and 21.
In this case, the wiring of the inspection equipment will be significantly simplified.
In addition, the degree of freedom of arrangement can be improved.

【手続補正9】[Procedure amendment 9]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】図面の簡単な説明[Correction target item name] Brief description of drawings

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の1形態のブロック結線図であ
る。
FIG. 1 is a block connection diagram of an embodiment of the present invention.

【図2】図1の動作説明用のフローチャートである。FIG. 2 is a flowchart for explaining the operation of FIG. 1;

【符号の説明】 1 スイッチギヤ本体 2 主回路 3R〜3T,8R〜8T 主回路端子 5 しゃ断器 6R〜6T 主回路接点12 制御盤 13 操作盤 14 交流検査電源部 17 位相角検出部 18 制御端子接続部 19 シーケンサ部 20,21 無線送受信部 22 検査処理部 [Description of Signs] 1 Switchgear body 2 Main circuit 3R to 3T, 8R to 8T Main circuit terminal 5 Breaker 6R to 6T Main circuit contact 12 Control panel 13 Operation panel 14 AC inspection power supply unit 17 Phase angle detection unit 18 Control terminal Connection unit 19 Sequencer unit 20, 21 Wireless transmission / reception unit 22 Inspection processing unit

───────────────────────────────────────────────────── フロントページの続き (72)発明者 古田 学 京都市右京区梅津高畝町47番地 日新電機 株式会社内 (72)発明者 小室 昭夫 京都市右京区梅津高畝町47番地 日新電機 株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor: Manabu Furuta 47, Umezu Takaune-cho, Ukyo-ku, Kyoto-shi Nissin Electric Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 主回路の一方の各相の主回端子と他方の
各相の主回路端子との間にしゃ断器の各相の主回路接点
を設けたスイッチギヤ本体に操作機構及び制御回路等が
設けられた扉体を取付ける前に、前記スイッチギヤ本体
の単体検査により、前記主回路の相順,前記しゃ断器の
前記各相の主回路接点及び各補助接点の動作状態を検査
するしゃ断器回路の検査装置において、 前記一方の各相の主回路端子に着脱自在に接続され,前
記主回路に3相交流の検査電源を給電する交流検査電源
部と、 前記他方の各相の主回路端子に着脱自在に接続され,前
記他方の各相の主回路端子の前記3相交流の検査電源の
受電位相を検出する位相角検出部と、 前記しゃ断器の開閉制御線及び前記各補助接点が接続さ
れた前記主回路の各制御端子に着脱自在に接続され,前
記開閉制御線に開閉制御信号を供給し,前記各補助接点
に直流の制御電源を給電し,前記各補助接点を介した前
記直流の検査電源を前記各補助接点の接点信号として受
電する制御端子接続部と、 検査開始指令の入力により検査シーケンスにしたがって
動作し,前記交流検査電源部,前記位相角検出部及び前
記制御端子接続部を制御し,前記他方の各相の主回路端
子の受電信号,前記位相角検出部の各位相検出信号,前
記各補助接点の接点信号を計測情報として取込むシーケ
ンサ部と、 前記シーケンサ部と情報をやりとりし,検査時に前記検
査開始指令を前記シーケンサ部に通知し,前記各計測情
報を取込んで解析し,前記他方の各相の主回端子の受電
信号に基づいて前記各相の主回路接点の動作状態を検査
し,前記各位相検出信号に基づいて前記主回路の相順を
検査し,前記各補助接点の接点信号に基づいて前記各補
助接点の動作状態を検査する検査処理部とを備えたこと
を特徴とするしゃ断器回路の検査装置。
An operation mechanism and a control circuit are provided on a switchgear body having main circuit contacts of each phase of a circuit breaker provided between a main circuit terminal of one phase of each main circuit and a main circuit terminal of the other phase of the main circuit. Before installing the door body provided with the switchgear, the shutoff for inspecting the phase sequence of the main circuit and the operation states of the main circuit contacts and the auxiliary contacts of the respective phases of the circuit breaker by unit inspection of the switchgear body. An AC test power supply unit detachably connected to the main circuit terminal of each of the one phases and supplying a three-phase AC test power to the main circuit; and a main circuit of the other phase. A phase angle detection unit detachably connected to a terminal and detecting a receiving potential phase of the three-phase alternating current test power supply of the main circuit terminal of each of the other phases; an open / close control line of the circuit breaker and each of the auxiliary contacts; Removably connected to each control terminal of the connected main circuit. Then, a switching control signal is supplied to the switching control line, a DC control power is supplied to each auxiliary contact, and the DC inspection power supply via each auxiliary contact is received as a contact signal of each auxiliary contact. A control terminal connection unit that operates according to a test sequence by inputting a test start command, controls the AC test power supply unit, the phase angle detection unit, and the control terminal connection unit, and controls main circuit terminals of the other phases. A sequencer unit for receiving the power reception signal, each phase detection signal of the phase angle detection unit, and a contact signal of each auxiliary contact as measurement information, exchanging information with the sequencer unit, and transmitting the inspection start command at the time of inspection to the sequencer. The main circuit contact of each phase is inspected based on the power receiving signal of the main terminal of the other phase, and the phase detection signal is notified. And a test processing unit for testing a phase sequence of the main circuit based on a contact signal of each auxiliary contact and inspecting an operation state of each auxiliary contact based on a contact signal of each auxiliary contact. apparatus.
JP10357277A 1998-12-16 1998-12-16 Circuit breaker circuit inspection device Expired - Fee Related JP3077686B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10357277A JP3077686B2 (en) 1998-12-16 1998-12-16 Circuit breaker circuit inspection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10357277A JP3077686B2 (en) 1998-12-16 1998-12-16 Circuit breaker circuit inspection device

Publications (2)

Publication Number Publication Date
JP2000184526A true JP2000184526A (en) 2000-06-30
JP3077686B2 JP3077686B2 (en) 2000-08-14

Family

ID=18453300

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10357277A Expired - Fee Related JP3077686B2 (en) 1998-12-16 1998-12-16 Circuit breaker circuit inspection device

Country Status (1)

Country Link
JP (1) JP3077686B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002150896A (en) * 2000-08-08 2002-05-24 Schneider Electric Ind Sa Electric equipment, supporting body of electric switch equipment and monitor equipment, and electric equipment including these
JP4558088B1 (en) * 2009-09-24 2010-10-06 中国電力株式会社 Circuit breaker monitoring device
CN115060944A (en) * 2022-06-09 2022-09-16 国网山东省电力公司金乡县供电公司 Three-phase four-wire electric energy meter charge control system and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014088739A (en) * 2012-10-31 2014-05-15 Nankai Plywood Co Ltd Shelf and set for execution of shelf

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002150896A (en) * 2000-08-08 2002-05-24 Schneider Electric Ind Sa Electric equipment, supporting body of electric switch equipment and monitor equipment, and electric equipment including these
JP4558088B1 (en) * 2009-09-24 2010-10-06 中国電力株式会社 Circuit breaker monitoring device
JP2011070838A (en) * 2009-09-24 2011-04-07 Chugoku Electric Power Co Inc:The Circuit breaker monitoring device
CN115060944A (en) * 2022-06-09 2022-09-16 国网山东省电力公司金乡县供电公司 Three-phase four-wire electric energy meter charge control system and method

Also Published As

Publication number Publication date
JP3077686B2 (en) 2000-08-14

Similar Documents

Publication Publication Date Title
CN107771288A (en) Method and test device for measurement translator wiring
CN108847078A (en) A kind of dress table connects electric training system
CN209417960U (en) It corrects errors with wiring and connects electric actual training device with the dress table of fabrication evaluation
CN208985418U (en) Dress table connects electric Simulated training device
JP3077686B2 (en) Circuit breaker circuit inspection device
JP4035897B2 (en) Transformer circuit inspection equipment
CN110609190A (en) Relay protection device outlet checking instrument and method thereof
JP2007171069A (en) Insulation withstand voltage tester
JP2000338157A (en) Method and device for measuring operation time of protective relay
CN106066445A (en) Voltage transformer open delta circuit breaking monitoring device and application process
CN113671324B (en) Automatic testing device and method for testing performance of medium-low voltage distribution board
CN113433412A (en) Measurement and control five-prevention function detection device and system
CN101082649B (en) Method for testing three phases power supply of flying vehicle and tool set
JPH0798601A (en) Fault-tolerant programmable controller
CN112485663A (en) Online detection device and detection method for aircraft circuit breaker
KR0154351B1 (en) Automatic diagnosing apparatus of a railcar
CN111208465A (en) Self-checking circuit for fault arc detection device and fault arc self-checking method
JPH07140214A (en) Circuit breaker testing device and connecting cable for use in same
CN117878822B (en) Relay protection conversion device, circuit detection method and teaching method
CN116873220B (en) Multi-agent technology-based aircraft telex bench test system and method
JP4553563B2 (en) Voltage / current measuring apparatus and voltage / current measuring method for switchboard
CN217931863U (en) Motor train unit air conditioner test system
CN217505713U (en) Online tester device for airplane lubricating oil cooling system
JPH10270511A (en) Wafer probe test method and wafer or dice
CN220305436U (en) Insulation monitoring device of off-line system

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees