JP2000174307A - 太陽電池発電モジュール及びモジュール接続台数診断装置 - Google Patents
太陽電池発電モジュール及びモジュール接続台数診断装置Info
- Publication number
- JP2000174307A JP2000174307A JP10341967A JP34196798A JP2000174307A JP 2000174307 A JP2000174307 A JP 2000174307A JP 10341967 A JP10341967 A JP 10341967A JP 34196798 A JP34196798 A JP 34196798A JP 2000174307 A JP2000174307 A JP 2000174307A
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- solar cell
- module
- output
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Abstract
(57)【要約】
【課題】 法定資格を持たない作業者でも、太陽電池発
電パネルの設置作業が安全に行えるようにする。 【解決手段】 制御回路51によってモジュール内電力
変換回路50が系統連系インバータ8へ自出力を接続さ
れているかどうか診断し、非接続時にはモジュール内電
力変換回路の出力電圧を作業上安全な値以下に抑制し、
接続時には出力電圧を通常動作電圧にする。これによ
り、実際に太陽電池発電モジュールが屋根その他の所定
の位置に固定され、集電バスラインを介して系統連系イ
ンバータに接続されるまでは高電圧が出力端子に印加さ
れることがなくて作業員の安全を保証でき、また集電バ
スラインに接続された後には自動的に通常の高電圧出力
動作を開始することができる。
電パネルの設置作業が安全に行えるようにする。 【解決手段】 制御回路51によってモジュール内電力
変換回路50が系統連系インバータ8へ自出力を接続さ
れているかどうか診断し、非接続時にはモジュール内電
力変換回路の出力電圧を作業上安全な値以下に抑制し、
接続時には出力電圧を通常動作電圧にする。これによ
り、実際に太陽電池発電モジュールが屋根その他の所定
の位置に固定され、集電バスラインを介して系統連系イ
ンバータに接続されるまでは高電圧が出力端子に印加さ
れることがなくて作業員の安全を保証でき、また集電バ
スラインに接続された後には自動的に通常の高電圧出力
動作を開始することができる。
Description
【0001】
【発明の属する技術分野】本発明は、太陽電池発電モジ
ュール及びモジュール接続台数診断装置に関する。
ュール及びモジュール接続台数診断装置に関する。
【0002】
【従来の技術】従来から、太陽電池発電システムに用い
るために、通常の屋根瓦に代えて屋根葺きできるように
した太陽電池発電モジュールが提案されている(実公昭
63−11747号公報)。これによれば、この太陽電
池発電モジュールを用いて屋根葺きすることによって、
本来の屋根と兼用の太陽電池発電システムを得ることが
できる。また、従来、特開平8−46231号公報に記
載されているように、パネル本体内に発電部を組み込ん
だ太陽電池発電モジュールの多数枚を並列接続して電力
を取り出す太陽電池発電システムも知られている。
るために、通常の屋根瓦に代えて屋根葺きできるように
した太陽電池発電モジュールが提案されている(実公昭
63−11747号公報)。これによれば、この太陽電
池発電モジュールを用いて屋根葺きすることによって、
本来の屋根と兼用の太陽電池発電システムを得ることが
できる。また、従来、特開平8−46231号公報に記
載されているように、パネル本体内に発電部を組み込ん
だ太陽電池発電モジュールの多数枚を並列接続して電力
を取り出す太陽電池発電システムも知られている。
【0003】図9はこのような従来の太陽電池発電シス
テムに使用される太陽電池発電モジュールの回路構成を
示している。多数の太陽電池セル101を直列又は並列
に接続し、この出力を電力変換回路としてのDC/DC
コンバータ102あるいはDC/ACコンバータによっ
て所定電圧の直流又は交流にして出力端子103,10
4から取り出す構成である。
テムに使用される太陽電池発電モジュールの回路構成を
示している。多数の太陽電池セル101を直列又は並列
に接続し、この出力を電力変換回路としてのDC/DC
コンバータ102あるいはDC/ACコンバータによっ
て所定電圧の直流又は交流にして出力端子103,10
4から取り出す構成である。
【0004】そしてこのような太陽電池発電モジュール
は、図10に示すようにその他数枚を集電バスライン1
05に並列に接続し、この集電バスライン105で集電
した太陽電池発電力を系統連系インバータ106により
商用電源と同様の50Hz又は60Hz、100V又は
200Vの交流電力にDC/AC変換して配電線系統1
07に出力し、商用電源109と並列に負荷110に給
電する太陽電池発電システムを構成する。
は、図10に示すようにその他数枚を集電バスライン1
05に並列に接続し、この集電バスライン105で集電
した太陽電池発電力を系統連系インバータ106により
商用電源と同様の50Hz又は60Hz、100V又は
200Vの交流電力にDC/AC変換して配電線系統1
07に出力し、商用電源109と並列に負荷110に給
電する太陽電池発電システムを構成する。
【0005】
【発明が解決しようとする課題】しかしながら、このよ
うな従来の太陽電池発電モジュールでは、次のような問
題点があった。すなわち、太陽電池発電モジュールは通
常、屋上に施工するためにまず現場に必要枚数を運び込
んで地面の上に何枚にも重ねておいておき、必要に応じ
て屋根上に必要枚数ずつ運び上げ、さらにそこから1枚
ずつを所定の場所まで持ち運んで位置決め固定し、集電
バスラインに対して接続し、さらにこの集電バスライン
に系統連系インバータを接続する施工法がとられる。
うな従来の太陽電池発電モジュールでは、次のような問
題点があった。すなわち、太陽電池発電モジュールは通
常、屋上に施工するためにまず現場に必要枚数を運び込
んで地面の上に何枚にも重ねておいておき、必要に応じ
て屋根上に必要枚数ずつ運び上げ、さらにそこから1枚
ずつを所定の場所まで持ち運んで位置決め固定し、集電
バスラインに対して接続し、さらにこの集電バスライン
に系統連系インバータを接続する施工法がとられる。
【0006】このような施工作業を行う場合、太陽光に
照らされると太陽電池発電モジュールが働いて発電する
ので、誤ってモジュールの出力端子103,104に作
業者の身体が接触すると感電し、大きなショックを与え
る恐れがあった。
照らされると太陽電池発電モジュールが働いて発電する
ので、誤ってモジュールの出力端子103,104に作
業者の身体が接触すると感電し、大きなショックを与え
る恐れがあった。
【0007】本発明は、このような従来の問題点に鑑み
てなされたもので、実際に太陽電池発電モジュールが屋
根その他の所定の位置に固定され、集電バスラインを介
して系統連系インバータに接続されるまでは高電圧が出
力端子に印加されることがなくて作業員の安全を保証で
き、また系統連系インバータに接続された後には自動的
に通常の高電圧出力動作を開始することができる太陽電
池発電モジュールを提供することを目的とする。
てなされたもので、実際に太陽電池発電モジュールが屋
根その他の所定の位置に固定され、集電バスラインを介
して系統連系インバータに接続されるまでは高電圧が出
力端子に印加されることがなくて作業員の安全を保証で
き、また系統連系インバータに接続された後には自動的
に通常の高電圧出力動作を開始することができる太陽電
池発電モジュールを提供することを目的とする。
【0008】本発明はまた、太陽電池発電モジュールの
設置作業時に集電バスラインに接続された太陽電池発電
モジュールの台数を診断することができるモジュール接
続台数診断装置を提供することを目的とする。
設置作業時に集電バスラインに接続された太陽電池発電
モジュールの台数を診断することができるモジュール接
続台数診断装置を提供することを目的とする。
【0009】
【課題を解決するための手段】請求項1の発明は、パネ
ル本体内に太陽電池セル群と、この太陽電池セル群の直
流電力を所定電圧の電力に変換するモジュール内電力変
換回路とが組み込まれた太陽電池発電モジュールにおい
て、前記モジュール内電力変換回路が系統連系インバー
タへの自出力の接続を診断し、非接続時には前記モジュ
ール内電力変換回路の出力電圧を作業上安全な値以下に
抑制し、接続時には出力電圧を通常動作電圧にする接続
診断手段を備えたものである。
ル本体内に太陽電池セル群と、この太陽電池セル群の直
流電力を所定電圧の電力に変換するモジュール内電力変
換回路とが組み込まれた太陽電池発電モジュールにおい
て、前記モジュール内電力変換回路が系統連系インバー
タへの自出力の接続を診断し、非接続時には前記モジュ
ール内電力変換回路の出力電圧を作業上安全な値以下に
抑制し、接続時には出力電圧を通常動作電圧にする接続
診断手段を備えたものである。
【0010】請求項1の発明の太陽電池発電モジュール
では、接続診断手段によってモジュール内電力変換回路
が系統連系インバータへ自出力を接続されているかどう
か診断し、非接続時にはモジュール内電力変換回路の出
力電圧を作業上安全な値以下に抑制し、接続時には出力
電圧を通常動作電圧にする。
では、接続診断手段によってモジュール内電力変換回路
が系統連系インバータへ自出力を接続されているかどう
か診断し、非接続時にはモジュール内電力変換回路の出
力電圧を作業上安全な値以下に抑制し、接続時には出力
電圧を通常動作電圧にする。
【0011】これにより、実際に太陽電池発電モジュー
ルが屋根その他の所定の位置に固定され、集電バスライ
ンを介して系統連系インバータに接続されるまでは高電
圧が出力端子に印加されることがなくて作業員の安全を
保証でき、また系統連系インバータに接続された後には
自動的に通常の高電圧出力動作を開始することができ
る。
ルが屋根その他の所定の位置に固定され、集電バスライ
ンを介して系統連系インバータに接続されるまでは高電
圧が出力端子に印加されることがなくて作業員の安全を
保証でき、また系統連系インバータに接続された後には
自動的に通常の高電圧出力動作を開始することができ
る。
【0012】請求項2の発明は、請求項1の太陽電池発
電モジュールにおいて、前記接続診断手段が、前記モジ
ュール内電力変換回路を微少時間だけ電力変換動作さ
せ、その間の出力電圧の上昇度合が急激であれば系統連
系インバータに対して非接続であり、その間の出力電圧
の上昇度合が緩やかであれば系統連系インバータに対し
て接続されていると判断するものである。
電モジュールにおいて、前記接続診断手段が、前記モジ
ュール内電力変換回路を微少時間だけ電力変換動作さ
せ、その間の出力電圧の上昇度合が急激であれば系統連
系インバータに対して非接続であり、その間の出力電圧
の上昇度合が緩やかであれば系統連系インバータに対し
て接続されていると判断するものである。
【0013】系統連系インバータに太陽電池発電モジュ
ールが接続されていれば、系統連系インバータが大きな
静電容量を有しているので、モジュール内電力変換回路
を微少時間だけ動作させて出力させてもその静電容量に
よって電流が吸収され、出力電圧が急激に上昇すること
はない。一方、太陽電池発電モジュールが系統連系イン
バータに接続されていなければ、その出力が静電容量に
よって吸収されることがないためにモジュール内電力変
換回路の出力電圧が急激に上昇する。
ールが接続されていれば、系統連系インバータが大きな
静電容量を有しているので、モジュール内電力変換回路
を微少時間だけ動作させて出力させてもその静電容量に
よって電流が吸収され、出力電圧が急激に上昇すること
はない。一方、太陽電池発電モジュールが系統連系イン
バータに接続されていなければ、その出力が静電容量に
よって吸収されることがないためにモジュール内電力変
換回路の出力電圧が急激に上昇する。
【0014】そこで、請求項2の発明の太陽電池発電モ
ジュールでは、接続診断手段によってモジュール内電力
変換回路を微少時間だけ電力変換動作させ、その間の出
力電圧の上昇度合が急激であれば系統連系インバータに
対して非接続であり、その間の出力電圧の上昇度合が緩
やかであれば系統連系インバータに対して接続されてい
ると判断させる。これにより、実際に太陽電池発電モジ
ュールが屋根その他の所定の位置に固定され、集電バス
ラインを介して系統連系インバータに接続されるまでは
高電圧が出力端子に印加されることがなくて作業員の安
全を保証でき、また集電バスラインに接続された後には
自動的に通常の高電圧出力動作を開始することができ
る。
ジュールでは、接続診断手段によってモジュール内電力
変換回路を微少時間だけ電力変換動作させ、その間の出
力電圧の上昇度合が急激であれば系統連系インバータに
対して非接続であり、その間の出力電圧の上昇度合が緩
やかであれば系統連系インバータに対して接続されてい
ると判断させる。これにより、実際に太陽電池発電モジ
ュールが屋根その他の所定の位置に固定され、集電バス
ラインを介して系統連系インバータに接続されるまでは
高電圧が出力端子に印加されることがなくて作業員の安
全を保証でき、また集電バスラインに接続された後には
自動的に通常の高電圧出力動作を開始することができ
る。
【0015】請求項3の発明のモジュール接続台数診断
装置は、集電バスラインに並列に接続されている太陽電
池発電モジュール各々に微少な一定電流を出力させ、当
該集電バスラインに接続した終端抵抗に流れる電流値と
前記太陽電池発電モジュール各々の出力電流との比に基
づいて当該集電バスラインに接続されている太陽電池発
電モジュールの台数を診断するものである。
装置は、集電バスラインに並列に接続されている太陽電
池発電モジュール各々に微少な一定電流を出力させ、当
該集電バスラインに接続した終端抵抗に流れる電流値と
前記太陽電池発電モジュール各々の出力電流との比に基
づいて当該集電バスラインに接続されている太陽電池発
電モジュールの台数を診断するものである。
【0016】請求項3の発明のモジュール接続台数診断
装置では、多数の太陽電池発電モジュールの新規設置
時、あるいはメンテナンス時には、集電バスラインに並
列に接続されている太陽電池発電モジュール各々に微少
な一定電流を出力させ、当該集電バスラインに接続した
終端抵抗に流れる電流値と太陽電池発電モジュール各々
の出力電流との比に基づいて当該集電バスラインに接続
されている太陽電池発電モジュールの台数を診断するこ
とにより、設置台数を正確に診断する。
装置では、多数の太陽電池発電モジュールの新規設置
時、あるいはメンテナンス時には、集電バスラインに並
列に接続されている太陽電池発電モジュール各々に微少
な一定電流を出力させ、当該集電バスラインに接続した
終端抵抗に流れる電流値と太陽電池発電モジュール各々
の出力電流との比に基づいて当該集電バスラインに接続
されている太陽電池発電モジュールの台数を診断するこ
とにより、設置台数を正確に診断する。
【0017】
【発明の実施の形態】以下、本発明の実施の形態を図に
基づいて詳説する。図1〜図3は本発明の第1の実施の
形態の太陽電池発電モジュール1の構造を示しており、
スレート瓦様式のパネル本体2内の、屋根葺き施工した
状態で太陽光が当たる下半分の働き代2Dに発電部3を
組み込んである。そして、パネル本体2の他のパネル本
体2−1〜2−4と重なり合う4隅それぞれに、他のパ
ネル本体2−1,2−2の上半分の重なり代2Uに上側
から重ねられる下半分の働き代2Dにおいては、その下
面側の左右の2隅それぞれに、発電部3のプラス端子、
マイナス端子が1対ずつ設けられており、逆に他のパネ
ル本体2−3,2−4の下半分の働き代が上側から重ね
られる上半分の重なり代2Uにおいては、その上面側の
左右の2隅それぞれに、発電部3のプラス端子、マイナ
ス端子が1対ずつ設けられている。
基づいて詳説する。図1〜図3は本発明の第1の実施の
形態の太陽電池発電モジュール1の構造を示しており、
スレート瓦様式のパネル本体2内の、屋根葺き施工した
状態で太陽光が当たる下半分の働き代2Dに発電部3を
組み込んである。そして、パネル本体2の他のパネル本
体2−1〜2−4と重なり合う4隅それぞれに、他のパ
ネル本体2−1,2−2の上半分の重なり代2Uに上側
から重ねられる下半分の働き代2Dにおいては、その下
面側の左右の2隅それぞれに、発電部3のプラス端子、
マイナス端子が1対ずつ設けられており、逆に他のパネ
ル本体2−3,2−4の下半分の働き代が上側から重ね
られる上半分の重なり代2Uにおいては、その上面側の
左右の2隅それぞれに、発電部3のプラス端子、マイナ
ス端子が1対ずつ設けられている。
【0018】これらパネル本体2の4隅それぞれに設け
られたプラス端子、マイナス端子の位置は、通常のスレ
ート瓦の屋根葺き施工法である、千鳥格子状の配置にお
いて、上側又は下側にほぼ1/4ずつ重なり合う他のパ
ネル本体2−1〜2−4のその重なり部分に設けられて
いる発電部3のプラス端子、マイナス端子と対向する位
置である。
られたプラス端子、マイナス端子の位置は、通常のスレ
ート瓦の屋根葺き施工法である、千鳥格子状の配置にお
いて、上側又は下側にほぼ1/4ずつ重なり合う他のパ
ネル本体2−1〜2−4のその重なり部分に設けられて
いる発電部3のプラス端子、マイナス端子と対向する位
置である。
【0019】これによって、図2及び図3に示すよう
に、通常のスレート瓦の屋根葺き施工と同じ方法で屋根
葺きしていくと、各パネル1ごとにその前後左右に重な
り合うパネル本体間で、各々に組み込まれている発電部
3のプラス端子、マイナス端子同士が自然に上下から接
触し合い、各パネル本体2に組み込まれている多数の発
電部3が屋根全体で、あるいはいくつかに分割された領
域それぞれの中ですべて並列に接続された状態の太陽電
池発電システムを構成できるようになる。
に、通常のスレート瓦の屋根葺き施工と同じ方法で屋根
葺きしていくと、各パネル1ごとにその前後左右に重な
り合うパネル本体間で、各々に組み込まれている発電部
3のプラス端子、マイナス端子同士が自然に上下から接
触し合い、各パネル本体2に組み込まれている多数の発
電部3が屋根全体で、あるいはいくつかに分割された領
域それぞれの中ですべて並列に接続された状態の太陽電
池発電システムを構成できるようになる。
【0020】図4はこのようにして構成された太陽電池
発電システムにおける太陽電池発電モジュール1間の電
気的な接続関係を示している。いま、図4においてハッ
チングを施した部分Aにおいてプラス極間、マイナス極
間の接続に接触不良が発生した場合では、鎖線B、破線
Cを付したバイパス経路でプラス極間、マイナス極間そ
れぞれが等電位で接続された状態になり、接触不良が発
生した部分の発電部3の発電電力を無駄にすることなく
取り出すことができるのである。
発電システムにおける太陽電池発電モジュール1間の電
気的な接続関係を示している。いま、図4においてハッ
チングを施した部分Aにおいてプラス極間、マイナス極
間の接続に接触不良が発生した場合では、鎖線B、破線
Cを付したバイパス経路でプラス極間、マイナス極間そ
れぞれが等電位で接続された状態になり、接触不良が発
生した部分の発電部3の発電電力を無駄にすることなく
取り出すことができるのである。
【0021】なお、最終的な太陽電池発電システムの発
電力を取り出すための集電バスラインを敷設する必要が
あるが、これは、最初に軒先側の屋根板上に固定してお
き、その上に最初の太陽電池発電モジュール1の1列目
を固定していく施工法、あるいは屋根全体に太陽電池発
電モジュール1を葺き上げた後に、棟側に集電バスを固
定して棟側の1列の太陽電池発電モジュール1それぞれ
のプラス端子、マイナス端子と接続する施工法をとる。
そしてこの集電バスラインが系統連系インバータを介し
て屋内の配電線系統に接続されることになる。
電力を取り出すための集電バスラインを敷設する必要が
あるが、これは、最初に軒先側の屋根板上に固定してお
き、その上に最初の太陽電池発電モジュール1の1列目
を固定していく施工法、あるいは屋根全体に太陽電池発
電モジュール1を葺き上げた後に、棟側に集電バスを固
定して棟側の1列の太陽電池発電モジュール1それぞれ
のプラス端子、マイナス端子と接続する施工法をとる。
そしてこの集電バスラインが系統連系インバータを介し
て屋内の配電線系統に接続されることになる。
【0022】次に、太陽電池発電モジュール1における
発電部3の回路構成について説明する。図5は太陽電池
発電モジュール1に組み込まれた発電部3の回路を示し
ている。発電部3は、太陽電池セル4群を直列又は並列
に接続し、モジュール3を単位としてそのプラス極、マ
イナス極それぞれの出力端にDC/DCコンバータ5を
接続し、所定電圧の直流電圧にして取り出す構成であ
り、このDC/DCコンバータ5のプラス出力、マイナ
ス出力それぞれから引き出したプラス端子、マイナス端
子が上述した太陽電池発電モジュール1における4隅そ
れぞれに1対ずつ配置され、集電バスライン6に接続さ
れるのである。
発電部3の回路構成について説明する。図5は太陽電池
発電モジュール1に組み込まれた発電部3の回路を示し
ている。発電部3は、太陽電池セル4群を直列又は並列
に接続し、モジュール3を単位としてそのプラス極、マ
イナス極それぞれの出力端にDC/DCコンバータ5を
接続し、所定電圧の直流電圧にして取り出す構成であ
り、このDC/DCコンバータ5のプラス出力、マイナ
ス出力それぞれから引き出したプラス端子、マイナス端
子が上述した太陽電池発電モジュール1における4隅そ
れぞれに1対ずつ配置され、集電バスライン6に接続さ
れるのである。
【0023】DC/DCコンバータ5の出力は、図6に
示すように集電バスライン6に他のDC/DCコンバー
タ5とすべて並列に接続され、この集電バスライン6が
系統連系インバータ8に給電するように結線される。
示すように集電バスライン6に他のDC/DCコンバー
タ5とすべて並列に接続され、この集電バスライン6が
系統連系インバータ8に給電するように結線される。
【0024】各発電部3にDC/DCコンバータ5を設
ける理由は、通常、太陽電池モジュールの出力は太陽電
池パネル1枚分に組み込まれたもので20W前後であ
り、多数枚のパネル本体2それぞれに組み込まれた太陽
電池モジュール3を並列接続して直流電力を取り出す場
合、電流容量が大きてジュール損失が大きくなるので、
昇圧型のDC/DCコンバータ5を各太陽電池モジュー
ル3に設けることによって、例えば、3V程度の起電圧
を300V程度まで昇圧し、電流容量は小さくして取り
出すためである。
ける理由は、通常、太陽電池モジュールの出力は太陽電
池パネル1枚分に組み込まれたもので20W前後であ
り、多数枚のパネル本体2それぞれに組み込まれた太陽
電池モジュール3を並列接続して直流電力を取り出す場
合、電流容量が大きてジュール損失が大きくなるので、
昇圧型のDC/DCコンバータ5を各太陽電池モジュー
ル3に設けることによって、例えば、3V程度の起電圧
を300V程度まで昇圧し、電流容量は小さくして取り
出すためである。
【0025】しかし、設置作業中、作業者は建築関係の
技術者である場合がほとんどと予想されるので電気工作
物の工事のための国家資格を取得していることは期待で
きない。そのため、各発電部3のDC/DCコンバータ
5の出力電圧は集電バスライン6に接続し、この集電バ
スライン6に系統連系インバータ8を接続して本格的な
給電動作を開始するまでの期間、作業上安全な電圧とし
て、電気事業法などの電気関係の法規で工事が規制され
る電気工作物に該当しない範囲の電圧、30V以下に設
定しておく必要がある。
技術者である場合がほとんどと予想されるので電気工作
物の工事のための国家資格を取得していることは期待で
きない。そのため、各発電部3のDC/DCコンバータ
5の出力電圧は集電バスライン6に接続し、この集電バ
スライン6に系統連系インバータ8を接続して本格的な
給電動作を開始するまでの期間、作業上安全な電圧とし
て、電気事業法などの電気関係の法規で工事が規制され
る電気工作物に該当しない範囲の電圧、30V以下に設
定しておく必要がある。
【0026】そこでDC/DCコンバータ5は図5に示
すような内部構成を備えているのである。すなわち、パ
ネル本体2内に組み込まれた多数の太陽電池セル4の直
流電力を所定電圧Vout の直流に変換する電力変換主回
路50と、この電力変換主回路50のスイッチング素子
のゲート制御を行う制御回路51とを備え、制御回路5
1は電力変換主回路50への直流入力電力情報52と直
流出力電力情報53により、後述する演算処理によって
自モジュール1の集電バスライン6を介した系統連系イ
ンバータ8に対する接続状態を判断し、接続されている
と判断したときには通常動作のためのゲート信号を生成
し、電力変換主回路50のゲート制御を行う構成であ
る。
すような内部構成を備えているのである。すなわち、パ
ネル本体2内に組み込まれた多数の太陽電池セル4の直
流電力を所定電圧Vout の直流に変換する電力変換主回
路50と、この電力変換主回路50のスイッチング素子
のゲート制御を行う制御回路51とを備え、制御回路5
1は電力変換主回路50への直流入力電力情報52と直
流出力電力情報53により、後述する演算処理によって
自モジュール1の集電バスライン6を介した系統連系イ
ンバータ8に対する接続状態を判断し、接続されている
と判断したときには通常動作のためのゲート信号を生成
し、電力変換主回路50のゲート制御を行う構成であ
る。
【0027】系統連系インバータ8は直流側に緩衝用の
電解コンデンサ9を内蔵し、これによって直流入力電圧
がほぼ一定になるように電力系統に対し電流を流し出す
動作をする。系統連系インバータ8の出力は商用電源と
同様の50Hz又は60Hz、100V又は200Vの
交流電力である。
電解コンデンサ9を内蔵し、これによって直流入力電圧
がほぼ一定になるように電力系統に対し電流を流し出す
動作をする。系統連系インバータ8の出力は商用電源と
同様の50Hz又は60Hz、100V又は200Vの
交流電力である。
【0028】次に、上記の構成の太陽電池発電モジュー
ルの動作を説明する。太陽電池モジュール1に組み込ま
れたDC/DCコンバータ5は、太陽電池セル4群から
取り出せる電力が最大となるように、制御回路51によ
って電力変換主回路50の出力電流Iout を制御する。
このときに、出力電圧Vout を細かく制御することはな
いが、出力電圧Vout が異常に高くなった場合や異常に
低くなった場合には出力を遮断するために動作を停止さ
せる。また出力している電圧Vout が急激に変化した場
合にも、系統連系インバータ8などに異変が起きたもの
として出力を遮断する。
ルの動作を説明する。太陽電池モジュール1に組み込ま
れたDC/DCコンバータ5は、太陽電池セル4群から
取り出せる電力が最大となるように、制御回路51によ
って電力変換主回路50の出力電流Iout を制御する。
このときに、出力電圧Vout を細かく制御することはな
いが、出力電圧Vout が異常に高くなった場合や異常に
低くなった場合には出力を遮断するために動作を停止さ
せる。また出力している電圧Vout が急激に変化した場
合にも、系統連系インバータ8などに異変が起きたもの
として出力を遮断する。
【0029】系統連系インバータ8はDC/ACインバ
ータであり、そのDC入力電圧をAC出力電圧の1.5
倍程度確保しておけば、直流部分に昇圧回路を設ける必
要がなくなるのでDC/ACインバータを安価に構成で
きる。現在、電力会社から供給される商用電源電力の実
効電圧は中心電圧が公称電圧の+2%で、変動幅が公称
電圧の±5%で運用されている。実効電圧の最大値(公
称値×1.07)にルート2を乗じた値(公称値×約
1.51)が交流電力のピーク電圧であるが、DC/A
C変換する際のスイッチング素子の電圧降下を考慮する
と、さらに数%の余裕が必要になる。
ータであり、そのDC入力電圧をAC出力電圧の1.5
倍程度確保しておけば、直流部分に昇圧回路を設ける必
要がなくなるのでDC/ACインバータを安価に構成で
きる。現在、電力会社から供給される商用電源電力の実
効電圧は中心電圧が公称電圧の+2%で、変動幅が公称
電圧の±5%で運用されている。実効電圧の最大値(公
称値×1.07)にルート2を乗じた値(公称値×約
1.51)が交流電力のピーク電圧であるが、DC/A
C変換する際のスイッチング素子の電圧降下を考慮する
と、さらに数%の余裕が必要になる。
【0030】これらのことから、系統連系インバータ8
としてのDC/ACインバータが無駄なDC/DC変換
部を省略した効率の良いDC/AC変換を実現するため
には、入力される直流入力電圧の最低値が交流出力の公
称電圧の概ね1.52倍を確保する必要がある。
としてのDC/ACインバータが無駄なDC/DC変換
部を省略した効率の良いDC/AC変換を実現するため
には、入力される直流入力電圧の最低値が交流出力の公
称電圧の概ね1.52倍を確保する必要がある。
【0031】そこで、DC/DC変換部を備えない効率
の良いDC/AC変換を実現するためには、入力される
直流電圧、すなわち太陽電池発電モジュール1から出力
される電圧値が上記した条件を満たすように調整された
ものである必要がある。したがって、各太陽電池発電モ
ジュール1に組み込まれたDC/DCコンバータ5の出
力電圧の最低電圧は、これらと組み合わされるDC/A
Cインバータの公称出力電圧の概ね1.52倍以上の電
圧を出力することになる。公称電圧を200Vとすれ
ば、概ね304V以上ということになり、この電圧を太
陽電池モジュール1のDC/DCコンバータ5の出力電
圧として無条件に出力させるのは、設置・改修などの工
事中に作業者が感電する事故が起こることが予想され
る。
の良いDC/AC変換を実現するためには、入力される
直流電圧、すなわち太陽電池発電モジュール1から出力
される電圧値が上記した条件を満たすように調整された
ものである必要がある。したがって、各太陽電池発電モ
ジュール1に組み込まれたDC/DCコンバータ5の出
力電圧の最低電圧は、これらと組み合わされるDC/A
Cインバータの公称出力電圧の概ね1.52倍以上の電
圧を出力することになる。公称電圧を200Vとすれ
ば、概ね304V以上ということになり、この電圧を太
陽電池モジュール1のDC/DCコンバータ5の出力電
圧として無条件に出力させるのは、設置・改修などの工
事中に作業者が感電する事故が起こることが予想され
る。
【0032】そこで、制御回路51は系統連系インバー
タ8に対する接続状態の自己診断機能により、設置工事
などの非通常時には30V以内に抑え、正しく設置され
たことが確認された場合に30V以上の高い電圧を出力
することにより、運用時の高効率化と工事作業中の安全
性を共に実現する。
タ8に対する接続状態の自己診断機能により、設置工事
などの非通常時には30V以内に抑え、正しく設置され
たことが確認された場合に30V以上の高い電圧を出力
することにより、運用時の高効率化と工事作業中の安全
性を共に実現する。
【0033】通常、太陽電池モジュール1の設置工事
は、十分な光強度がある昼間に行われる。太陽電池モジ
ュールの太陽電池セル4群に光が当たると電力が発生
し、これに組み込まれているDC/DCコンバータ5の
制御回路51に電力が供給できるようになる。
は、十分な光強度がある昼間に行われる。太陽電池モジ
ュールの太陽電池セル4群に光が当たると電力が発生
し、これに組み込まれているDC/DCコンバータ5の
制御回路51に電力が供給できるようになる。
【0034】制御回路51は太陽電池セル4群の発生電
圧を入力電力情報52として監視し、十分な光強度があ
って電力変換を開始してもよいと判断した場合には、D
C/DCコンバータ5の制御回路51が出力電圧Vout
が読みとれるだけの微小時間τだけ電力変換主回路50
を動作させることを所定周期ρで行う。
圧を入力電力情報52として監視し、十分な光強度があ
って電力変換を開始してもよいと判断した場合には、D
C/DCコンバータ5の制御回路51が出力電圧Vout
が読みとれるだけの微小時間τだけ電力変換主回路50
を動作させることを所定周期ρで行う。
【0035】すなわち、図7に示したように、制御回路
51は一定時間ρごとに微少時間τだけ電力変換主回路
50を動作させ、出力電圧Vout の上昇率を監視する。
51は一定時間ρごとに微少時間τだけ電力変換主回路
50を動作させ、出力電圧Vout の上昇率を監視する。
【0036】そして (1)直線Aに示すように、τ時間以内に出力電圧Vou
t が急上昇してV1電圧(=30V、これはさらに低い
値でも良い)に到達するような上昇率であれば集電バス
ライン6及び負荷としての系統連系インバータ8が接続
されていないと判断し、(2)直線Bに示すように、上
昇率が鈍り、τ時間中に出力電圧Vout が30Vに達せ
ず、V2程度であれば負荷である系統連系インバータ8
に接続されていると判断し、(3)出力電圧が上昇しな
ければ、ショート、逆接続など、何らかの異常があると
判断する。
t が急上昇してV1電圧(=30V、これはさらに低い
値でも良い)に到達するような上昇率であれば集電バス
ライン6及び負荷としての系統連系インバータ8が接続
されていないと判断し、(2)直線Bに示すように、上
昇率が鈍り、τ時間中に出力電圧Vout が30Vに達せ
ず、V2程度であれば負荷である系統連系インバータ8
に接続されていると判断し、(3)出力電圧が上昇しな
ければ、ショート、逆接続など、何らかの異常があると
判断する。
【0037】なおここで、上記の判断を正確に行えるよ
うにするためには、次のシステム設計が好ましい。系統
連系インバータ8は入力回路の静電容量Ciに比べて、
太陽電池発電モジュール1のDC/DCコンバータ5の
出力回路の合計静電容量ΣCcが十分に小さい場合、集
電バスライン6にすべての太陽電池発電モジュール1の
DC/DCコンバータ5を接続してから系統連系インバ
ータ8を接続したときでも、最後のDC/DCコンバー
タ5が集電バスライン6に接続されたのか、系統連系イ
ンバータ8が接続されたのかを容易に判別することがで
きる。そこで、静電容量の比が、 Ci:ΣCc=α:1 (α>2) を満たすように容量を配分したシステム設計をすること
により、系統連系インバータ8の接続が正確に判断でき
るようになる。
うにするためには、次のシステム設計が好ましい。系統
連系インバータ8は入力回路の静電容量Ciに比べて、
太陽電池発電モジュール1のDC/DCコンバータ5の
出力回路の合計静電容量ΣCcが十分に小さい場合、集
電バスライン6にすべての太陽電池発電モジュール1の
DC/DCコンバータ5を接続してから系統連系インバ
ータ8を接続したときでも、最後のDC/DCコンバー
タ5が集電バスライン6に接続されたのか、系統連系イ
ンバータ8が接続されたのかを容易に判別することがで
きる。そこで、静電容量の比が、 Ci:ΣCc=α:1 (α>2) を満たすように容量を配分したシステム設計をすること
により、系統連系インバータ8の接続が正確に判断でき
るようになる。
【0038】次に、本発明の第2の実施の形態について
説明する。図8は本発明の第2の実施の形態のモジュー
ル接続台数診断装置の構成を示している。
説明する。図8は本発明の第2の実施の形態のモジュー
ル接続台数診断装置の構成を示している。
【0039】多数の太陽電池発電モジュール1の設置工
事やメンテナンス作業を行うときには、集電バスライン
6を系統連系インバータ8から切り離し、診断装置10
を接続しておく。診断装置10は高低2種類の抵抗11
A,11Bを内蔵し、抵抗切替スイッチ12によって集
電バスライン6に対する終端抵抗を高低切替できるよう
にしてある。
事やメンテナンス作業を行うときには、集電バスライン
6を系統連系インバータ8から切り離し、診断装置10
を接続しておく。診断装置10は高低2種類の抵抗11
A,11Bを内蔵し、抵抗切替スイッチ12によって集
電バスライン6に対する終端抵抗を高低切替できるよう
にしてある。
【0040】診断装置10は制御用の電源を内蔵する
か、配電線系統からの電源を利用して動作する。そして
初期状態では、スイッチ12Aを投入することによって
高い抵抗値(ここでは、例えば、1kΩとしている)で
集電バスライン6を終端し、診断開始スイッチ(図示せ
ず)が押されて動作を開始すると、抵抗切替スイッチ1
2を切り替えて低い抵抗値(ここでは、5Ωとしてい
る)の抵抗11Bで終端させ、集電バスライン6から診
断装置10に流入する電流値を監視する。
か、配電線系統からの電源を利用して動作する。そして
初期状態では、スイッチ12Aを投入することによって
高い抵抗値(ここでは、例えば、1kΩとしている)で
集電バスライン6を終端し、診断開始スイッチ(図示せ
ず)が押されて動作を開始すると、抵抗切替スイッチ1
2を切り替えて低い抵抗値(ここでは、5Ωとしてい
る)の抵抗11Bで終端させ、集電バスライン6から診
断装置10に流入する電流値を監視する。
【0041】太陽電池発電モジュール1のDC/DCコ
ンバータ5では、起動したときに制御回路51が電力変
換主回路50の出力電圧Vout を読み取り、第1の電圧
しきい値(ここでは、5Vに設定)以下の電圧で一定時
間(ここでは、10μsに設定)だけ電力を出力した後
に再び出力電圧Vout を読み取り、その結果が同じく第
1の電圧しきい値以下であればショート状態、すなわ
ち、診断装置10が接続されていると判断し、その後は
一定電流(ここでは、1mAに設定)を流し続けるよう
に電力変換主回路50を制御する機能が組み込まれてい
る。
ンバータ5では、起動したときに制御回路51が電力変
換主回路50の出力電圧Vout を読み取り、第1の電圧
しきい値(ここでは、5Vに設定)以下の電圧で一定時
間(ここでは、10μsに設定)だけ電力を出力した後
に再び出力電圧Vout を読み取り、その結果が同じく第
1の電圧しきい値以下であればショート状態、すなわ
ち、診断装置10が接続されていると判断し、その後は
一定電流(ここでは、1mAに設定)を流し続けるよう
に電力変換主回路50を制御する機能が組み込まれてい
る。
【0042】診断装置10は、抵抗11Bに発生する電
圧を読み取り、読み取った電圧値を電圧基準5mVで割
ることによって、現在接続されているDC/DCコンバ
ータ5の台数を算定する。ここでは読取値が5mVであ
ったとすると、これを電圧基準5mVで割ることによっ
て、1台のDC/DCコンバータ5が集電バスライン6
に接続されていると診断する。
圧を読み取り、読み取った電圧値を電圧基準5mVで割
ることによって、現在接続されているDC/DCコンバ
ータ5の台数を算定する。ここでは読取値が5mVであ
ったとすると、これを電圧基準5mVで割ることによっ
て、1台のDC/DCコンバータ5が集電バスライン6
に接続されていると診断する。
【0043】なお、上記の例では、太陽電池発電システ
ムに接続する太陽電池発電モジュール1が1000台で
あり、1000台の太陽電池発電モジュール1の直列接
続によって集電バスライン6の線間電圧が第1の電圧し
きい値と等しくなるように、この第1の電圧しきい値を
5Vに設定している。なお、接続する太陽電池発電モジ
ュール1の台数が1000台と異なる場合にはその台数
に応じて第1の電圧しきい値も変更することになる。
ムに接続する太陽電池発電モジュール1が1000台で
あり、1000台の太陽電池発電モジュール1の直列接
続によって集電バスライン6の線間電圧が第1の電圧し
きい値と等しくなるように、この第1の電圧しきい値を
5Vに設定している。なお、接続する太陽電池発電モジ
ュール1の台数が1000台と異なる場合にはその台数
に応じて第1の電圧しきい値も変更することになる。
【0044】工事が終了したなら、DC/DCコンバー
タ5の接続台数を診断装置10で確認し、問題がなけれ
ば終了スイッチ(図示せず)を押して作業を終了する。
この場合、終了スイッチが押されると切替スイッチ12
は集電バスライン6に対して高抵抗12Aに切り替えて
終端させることになる。
タ5の接続台数を診断装置10で確認し、問題がなけれ
ば終了スイッチ(図示せず)を押して作業を終了する。
この場合、終了スイッチが押されると切替スイッチ12
は集電バスライン6に対して高抵抗12Aに切り替えて
終端させることになる。
【0045】DC/DCコンバータ5の制御回路51に
はまた、定電流出力中に出力電圧Vout も監視し、急激
に上昇した場合には診断モードが解除されたものと判断
し、一定時間(例えば、5分)出力を停止する機能が組
み込まれている。
はまた、定電流出力中に出力電圧Vout も監視し、急激
に上昇した場合には診断モードが解除されたものと判断
し、一定時間(例えば、5分)出力を停止する機能が組
み込まれている。
【0046】診断装置10は、集電バスライン6の電圧
が安全な電圧(例えば、30V以下)まで低下したな
ら、表示あるいはブザーによって診断装置を集電バスラ
イン6から取り外しても良いことを作業者に伝え、診断
作業を終了する。
が安全な電圧(例えば、30V以下)まで低下したな
ら、表示あるいはブザーによって診断装置を集電バスラ
イン6から取り外しても良いことを作業者に伝え、診断
作業を終了する。
【0047】
【発明の効果】以上のように請求項1の発明の太陽電池
発電モジュールによれば、実際に太陽電池発電モジュー
ルが屋根その他の所定の位置に固定され、集電バスライ
ンを介して系統連系インバータに接続されるまでは高電
圧が出力端子に印加されることがなくて作業員の安全を
保証し、また系統連系インバータに接続された後には自
動的に通常の高電圧出力動作を開始することができる。
発電モジュールによれば、実際に太陽電池発電モジュー
ルが屋根その他の所定の位置に固定され、集電バスライ
ンを介して系統連系インバータに接続されるまでは高電
圧が出力端子に印加されることがなくて作業員の安全を
保証し、また系統連系インバータに接続された後には自
動的に通常の高電圧出力動作を開始することができる。
【0048】請求項2の発明の太陽電池発電モジュール
によれば、接続診断手段によってモジュール内電力変換
回路を微少時間だけ電力変換動作させ、その間の出力電
圧の上昇度合が急激であれば系統連系インバータに対し
て非接続であり、その間の出力電圧の上昇度合が緩やか
であれば系統連系インバータに対して接続されていると
判断させるので、太陽電池発電モジュールの系統連系イ
ンバータに対する接続、非接続を正確に決定することが
できる。
によれば、接続診断手段によってモジュール内電力変換
回路を微少時間だけ電力変換動作させ、その間の出力電
圧の上昇度合が急激であれば系統連系インバータに対し
て非接続であり、その間の出力電圧の上昇度合が緩やか
であれば系統連系インバータに対して接続されていると
判断させるので、太陽電池発電モジュールの系統連系イ
ンバータに対する接続、非接続を正確に決定することが
できる。
【0049】請求項3の発明のモジュール接続台数診断
装置によれば、集電バスラインに並列に接続されている
太陽電池発電モジュール各々に微少な一定電流を出力さ
せ、当該集電バスラインに接続した終端抵抗に流れる電
流値と太陽電池発電モジュール各々の出力電流との比に
基づいて当該集電バスラインに接続されている太陽電池
発電モジュールの台数を診断するので、設置台数を正確
に診断することができる。
装置によれば、集電バスラインに並列に接続されている
太陽電池発電モジュール各々に微少な一定電流を出力さ
せ、当該集電バスラインに接続した終端抵抗に流れる電
流値と太陽電池発電モジュール各々の出力電流との比に
基づいて当該集電バスラインに接続されている太陽電池
発電モジュールの台数を診断するので、設置台数を正確
に診断することができる。
【図1】本発明の第1の実施の形態の太陽電池発電モジ
ュールの平面図。
ュールの平面図。
【図2】上記の実施の形態の太陽電池発電モジュールを
用いた太陽電池発電システムの分解平面図。
用いた太陽電池発電システムの分解平面図。
【図3】上記の実施の形態の太陽電池発電モジュールを
用いた太陽電池発電システムの分解斜視図。
用いた太陽電池発電システムの分解斜視図。
【図4】上記の実施の形態の太陽電池発電システムの回
路図。
路図。
【図5】上記の実施の形態の太陽電池発電モジュールに
おける発電部の回路図。
おける発電部の回路図。
【図6】上記の実施の形態の太陽電池発電モジュールを
用いた太陽電池発電システムの回路図。
用いた太陽電池発電システムの回路図。
【図7】上記の実施の形態の太陽電池発電モジュールに
よる接続診断の動作説明図。
よる接続診断の動作説明図。
【図8】本発明の第2の実施の形態のモジュール接続台
数診断装置の回路ブロック図。
数診断装置の回路ブロック図。
【図9】従来例の太陽電池発電モジュールの回路図。
【図10】従来例の太陽電池発電モジュールを用いた太
陽電池発電システムの回路図。
陽電池発電システムの回路図。
1 太陽電池発電モジュール 2 パネル本体 3 発電部 4 太陽電池セル 5 DC/DCコンバータ 6 集電バスライン 8 系統連系インバータ 9 電解コンデンサ 10 診断装置 11A,11B 抵抗 12 切替スイッチ 50 電力変換主回路 51 制御回路
フロントページの続き (72)発明者 松井 伸郎 東京都港区芝浦一丁目1番1号 株式会社 東芝本社事務所内 (72)発明者 高橋 幸伸 東京都港区芝浦一丁目1番1号 株式会社 東芝本社事務所内 (72)発明者 土屋 恒和 東京都港区芝浦一丁目1番1号 株式会社 東芝本社事務所内 (72)発明者 藤井 栄一郎 静岡県富士市蓼原336 株式会社東芝富士 工場内 (72)発明者 佐田 豊 神奈川県川崎市幸区小向東芝町1 株式会 社東芝研究開発センター内 (72)発明者 安保 達明 東京都府中市東芝町1番地 株式会社東芝 府中工場内 Fターム(参考) 5F051 BA03 EA01 EA17 JA08 KA03 KA04 KA10 5G003 AA06 FA04 GB03 GB06
Claims (3)
- 【請求項1】 パネル本体内に太陽電池セル群と、この
太陽電池セル群の直流電力を所定電圧の電力に変換する
モジュール内電力変換回路とが組み込まれた太陽電池発
電モジュールにおいて、 前記モジュール内電力変換回路が系統連系インバータへ
の自出力の接続を診断し、非接続時には前記モジュール
内電力変換回路の出力電圧を作業上安全な値以下に抑制
し、接続時には出力電圧を通常動作電圧にする接続診断
手段を備えたことを特徴とする太陽電池発電モジュー
ル。 - 【請求項2】 前記接続診断手段は、前記モジュール内
電力変換回路を微少時間だけ電力変換動作させ、その間
の出力電圧の上昇度合が急激であれば系統連系インバー
タに対して非接続であり、その間の出力電圧の上昇度合
が緩やかであれば系統連系インバータに対して接続され
ていると判断することを特徴とする請求項1に記載の太
陽電池発電モジュール。 - 【請求項3】 集電バスラインに並列に接続されている
太陽電池発電モジュール各々に微少な一定電流を出力さ
せ、当該集電バスラインに接続した終端抵抗に流れる電
流値と前記太陽電池発電モジュール各々の出力電流との
比に基づいて当該集電バスラインに接続されている太陽
電池発電モジュールの台数を診断するモジュール接続台
数診断装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10341967A JP2000174307A (ja) | 1998-12-01 | 1998-12-01 | 太陽電池発電モジュール及びモジュール接続台数診断装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10341967A JP2000174307A (ja) | 1998-12-01 | 1998-12-01 | 太陽電池発電モジュール及びモジュール接続台数診断装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2000174307A true JP2000174307A (ja) | 2000-06-23 |
Family
ID=18350158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10341967A Pending JP2000174307A (ja) | 1998-12-01 | 1998-12-01 | 太陽電池発電モジュール及びモジュール接続台数診断装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2000174307A (ja) |
Cited By (66)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002359385A (ja) * | 2001-05-31 | 2002-12-13 | Canon Inc | 太陽電池アレイ及び太陽光発電システム |
CN101933209A (zh) * | 2007-12-05 | 2010-12-29 | 太阳能安吉有限公司 | 分布式电力装置中的安全机构、醒来和关闭方法 |
JP2011501436A (ja) * | 2007-10-15 | 2011-01-06 | エーエムピーティー, エルエルシー | 高効率で遠隔制御可能な太陽エネルギーシステム |
JP2011129574A (ja) * | 2009-12-15 | 2011-06-30 | National Institute Of Advanced Industrial Science & Technology | 太陽電池モジュール |
US8461811B2 (en) | 2007-10-23 | 2013-06-11 | Ampt, Llc | Power capacitor alternative switch circuitry system for enhanced capacitor life |
JP2014509176A (ja) * | 2011-02-02 | 2014-04-10 | エスエムエー ソーラー テクノロジー アーゲー | 光起電力システムのための保護デバイス |
US8710699B2 (en) | 2009-12-01 | 2014-04-29 | Solaredge Technologies Ltd. | Dual use photovoltaic system |
US8766696B2 (en) | 2010-01-27 | 2014-07-01 | Solaredge Technologies Ltd. | Fast voltage level shifter circuit |
US8773092B2 (en) | 2007-08-06 | 2014-07-08 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US8816535B2 (en) | 2007-10-10 | 2014-08-26 | Solaredge Technologies, Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US8947194B2 (en) | 2009-05-26 | 2015-02-03 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US8963369B2 (en) | 2007-12-04 | 2015-02-24 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US8988838B2 (en) | 2012-01-30 | 2015-03-24 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US9041339B2 (en) | 2006-12-06 | 2015-05-26 | Solaredge Technologies Ltd. | Battery power delivery module |
US9088178B2 (en) | 2006-12-06 | 2015-07-21 | Solaredge Technologies Ltd | Distributed power harvesting systems using DC power sources |
JP2015173519A (ja) * | 2014-03-11 | 2015-10-01 | オムロン株式会社 | 評価装置、評価方法及び、太陽光発電システム |
US9235228B2 (en) | 2012-03-05 | 2016-01-12 | Solaredge Technologies Ltd. | Direct current link circuit |
US9318974B2 (en) | 2014-03-26 | 2016-04-19 | Solaredge Technologies Ltd. | Multi-level inverter with flying capacitor topology |
US9362743B2 (en) | 2008-05-05 | 2016-06-07 | Solaredge Technologies Ltd. | Direct current power combiner |
US9368964B2 (en) | 2006-12-06 | 2016-06-14 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US9397497B2 (en) | 2013-03-15 | 2016-07-19 | Ampt, Llc | High efficiency interleaved solar power supply system |
US9407161B2 (en) | 2007-12-05 | 2016-08-02 | Solaredge Technologies Ltd. | Parallel connected inverters |
US9438035B2 (en) | 2003-05-28 | 2016-09-06 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US9442504B2 (en) | 2009-04-17 | 2016-09-13 | Ampt, Llc | Methods and apparatus for adaptive operation of solar power systems |
US9466737B2 (en) | 2009-10-19 | 2016-10-11 | Ampt, Llc | Solar panel string converter topology |
US9537445B2 (en) | 2008-12-04 | 2017-01-03 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US9548619B2 (en) | 2013-03-14 | 2017-01-17 | Solaredge Technologies Ltd. | Method and apparatus for storing and depleting energy |
US9644993B2 (en) | 2006-12-06 | 2017-05-09 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US9680304B2 (en) | 2006-12-06 | 2017-06-13 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US9812984B2 (en) | 2012-01-30 | 2017-11-07 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US9819178B2 (en) | 2013-03-15 | 2017-11-14 | Solaredge Technologies Ltd. | Bypass mechanism |
US9831824B2 (en) | 2007-12-05 | 2017-11-28 | SolareEdge Technologies Ltd. | Current sensing on a MOSFET |
US9853565B2 (en) | 2012-01-30 | 2017-12-26 | Solaredge Technologies Ltd. | Maximized power in a photovoltaic distributed power system |
US9853538B2 (en) | 2007-12-04 | 2017-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9866098B2 (en) | 2011-01-12 | 2018-01-09 | Solaredge Technologies Ltd. | Serially connected inverters |
US9870016B2 (en) | 2012-05-25 | 2018-01-16 | Solaredge Technologies Ltd. | Circuit for interconnected direct current power sources |
US9876430B2 (en) | 2008-03-24 | 2018-01-23 | Solaredge Technologies Ltd. | Zero voltage switching |
US9935458B2 (en) | 2010-12-09 | 2018-04-03 | Solaredge Technologies Ltd. | Disconnection of a string carrying direct current power |
US9948233B2 (en) | 2006-12-06 | 2018-04-17 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9960731B2 (en) | 2006-12-06 | 2018-05-01 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US10061957B2 (en) | 2016-03-03 | 2018-08-28 | Solaredge Technologies Ltd. | Methods for mapping power generation installations |
US10115841B2 (en) | 2012-06-04 | 2018-10-30 | Solaredge Technologies Ltd. | Integrated photovoltaic panel circuitry |
US10230310B2 (en) | 2016-04-05 | 2019-03-12 | Solaredge Technologies Ltd | Safety switch for photovoltaic systems |
US10396662B2 (en) | 2011-09-12 | 2019-08-27 | Solaredge Technologies Ltd | Direct current link circuit |
JP2019193550A (ja) * | 2018-04-28 | 2019-10-31 | ベイジン・ハナジー・ソーラー・パワー・インベストメント・カンパニー・リミテッド | ソーラーモジュールジャンクションボックス、ソーラーシステム及びソーラーモジュールの制御方法 |
US10599113B2 (en) | 2016-03-03 | 2020-03-24 | Solaredge Technologies Ltd. | Apparatus and method for determining an order of power devices in power generation systems |
US10673229B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10673222B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10931228B2 (en) | 2010-11-09 | 2021-02-23 | Solaredge Technologies Ftd. | Arc detection and prevention in a power generation system |
US10931119B2 (en) | 2012-01-11 | 2021-02-23 | Solaredge Technologies Ltd. | Photovoltaic module |
US11018623B2 (en) | 2016-04-05 | 2021-05-25 | Solaredge Technologies Ltd. | Safety switch for photovoltaic systems |
US11081608B2 (en) | 2016-03-03 | 2021-08-03 | Solaredge Technologies Ltd. | Apparatus and method for determining an order of power devices in power generation systems |
US11177663B2 (en) | 2016-04-05 | 2021-11-16 | Solaredge Technologies Ltd. | Chain of power devices |
US11201494B2 (en) | 2009-10-02 | 2021-12-14 | Tigo Energy, Inc. | Systems and methods to provide enhanced diode bypass paths |
US11264947B2 (en) | 2007-12-05 | 2022-03-01 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US11296650B2 (en) | 2006-12-06 | 2022-04-05 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US11309832B2 (en) | 2006-12-06 | 2022-04-19 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11545912B2 (en) | 2013-03-14 | 2023-01-03 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US11569659B2 (en) | 2006-12-06 | 2023-01-31 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11687112B2 (en) | 2006-12-06 | 2023-06-27 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11728768B2 (en) | 2006-12-06 | 2023-08-15 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US11735910B2 (en) | 2006-12-06 | 2023-08-22 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11855231B2 (en) | 2006-12-06 | 2023-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11881814B2 (en) | 2005-12-05 | 2024-01-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US11888387B2 (en) | 2006-12-06 | 2024-01-30 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11967653B2 (en) | 2023-09-05 | 2024-04-23 | Ampt, Llc | Phased solar power supply system |
-
1998
- 1998-12-01 JP JP10341967A patent/JP2000174307A/ja active Pending
Cited By (177)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002359385A (ja) * | 2001-05-31 | 2002-12-13 | Canon Inc | 太陽電池アレイ及び太陽光発電システム |
US11658508B2 (en) | 2003-05-28 | 2023-05-23 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US11817699B2 (en) | 2003-05-28 | 2023-11-14 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US10135241B2 (en) | 2003-05-28 | 2018-11-20 | Solaredge Technologies, Ltd. | Power converter for a solar panel |
US10910834B2 (en) | 2003-05-28 | 2021-02-02 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US11075518B2 (en) | 2003-05-28 | 2021-07-27 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US11476663B2 (en) | 2003-05-28 | 2022-10-18 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US11824398B2 (en) | 2003-05-28 | 2023-11-21 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US9438035B2 (en) | 2003-05-28 | 2016-09-06 | Solaredge Technologies Ltd. | Power converter for a solar panel |
US11881814B2 (en) | 2005-12-05 | 2024-01-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US9644993B2 (en) | 2006-12-06 | 2017-05-09 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US9966766B2 (en) | 2006-12-06 | 2018-05-08 | Solaredge Technologies Ltd. | Battery power delivery module |
US10637393B2 (en) | 2006-12-06 | 2020-04-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11735910B2 (en) | 2006-12-06 | 2023-08-22 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US9041339B2 (en) | 2006-12-06 | 2015-05-26 | Solaredge Technologies Ltd. | Battery power delivery module |
US9088178B2 (en) | 2006-12-06 | 2015-07-21 | Solaredge Technologies Ltd | Distributed power harvesting systems using DC power sources |
US11728768B2 (en) | 2006-12-06 | 2023-08-15 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US11687112B2 (en) | 2006-12-06 | 2023-06-27 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11682918B2 (en) | 2006-12-06 | 2023-06-20 | Solaredge Technologies Ltd. | Battery power delivery module |
US11658482B2 (en) | 2006-12-06 | 2023-05-23 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10673253B2 (en) | 2006-12-06 | 2020-06-02 | Solaredge Technologies Ltd. | Battery power delivery module |
US11598652B2 (en) | 2006-12-06 | 2023-03-07 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US11594880B2 (en) | 2006-12-06 | 2023-02-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9368964B2 (en) | 2006-12-06 | 2016-06-14 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11594882B2 (en) | 2006-12-06 | 2023-02-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11594881B2 (en) | 2006-12-06 | 2023-02-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10447150B2 (en) | 2006-12-06 | 2019-10-15 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10230245B2 (en) | 2006-12-06 | 2019-03-12 | Solaredge Technologies Ltd | Battery power delivery module |
US11961922B2 (en) | 2006-12-06 | 2024-04-16 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11579235B2 (en) | 2006-12-06 | 2023-02-14 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11575261B2 (en) | 2006-12-06 | 2023-02-07 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9543889B2 (en) | 2006-12-06 | 2017-01-10 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11575260B2 (en) | 2006-12-06 | 2023-02-07 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11569659B2 (en) | 2006-12-06 | 2023-01-31 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9590526B2 (en) | 2006-12-06 | 2017-03-07 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11569660B2 (en) | 2006-12-06 | 2023-01-31 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11962243B2 (en) | 2006-12-06 | 2024-04-16 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US10097007B2 (en) | 2006-12-06 | 2018-10-09 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US11002774B2 (en) | 2006-12-06 | 2021-05-11 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US9680304B2 (en) | 2006-12-06 | 2017-06-13 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US11476799B2 (en) | 2006-12-06 | 2022-10-18 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11855231B2 (en) | 2006-12-06 | 2023-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11309832B2 (en) | 2006-12-06 | 2022-04-19 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11296650B2 (en) | 2006-12-06 | 2022-04-05 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US9853490B2 (en) | 2006-12-06 | 2017-12-26 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11031861B2 (en) | 2006-12-06 | 2021-06-08 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US11043820B2 (en) | 2006-12-06 | 2021-06-22 | Solaredge Technologies Ltd. | Battery power delivery module |
US11063440B2 (en) | 2006-12-06 | 2021-07-13 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US11183922B2 (en) | 2006-12-06 | 2021-11-23 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11888387B2 (en) | 2006-12-06 | 2024-01-30 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11073543B2 (en) | 2006-12-06 | 2021-07-27 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US9960731B2 (en) | 2006-12-06 | 2018-05-01 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US9960667B2 (en) | 2006-12-06 | 2018-05-01 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US9948233B2 (en) | 2006-12-06 | 2018-04-17 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9673711B2 (en) | 2007-08-06 | 2017-06-06 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US10516336B2 (en) | 2007-08-06 | 2019-12-24 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US11594968B2 (en) | 2007-08-06 | 2023-02-28 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US10116217B2 (en) | 2007-08-06 | 2018-10-30 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US8773092B2 (en) | 2007-08-06 | 2014-07-08 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US8816535B2 (en) | 2007-10-10 | 2014-08-26 | Solaredge Technologies, Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US11070063B2 (en) | 2007-10-15 | 2021-07-20 | Ampt, Llc | Method for alternating conversion solar power |
US9673630B2 (en) | 2007-10-15 | 2017-06-06 | Ampt, Llc | Protected conversion solar power system |
US11289917B1 (en) | 2007-10-15 | 2022-03-29 | Ampt, Llc | Optimized photovoltaic conversion system |
US10886746B1 (en) | 2007-10-15 | 2021-01-05 | Ampt, Llc | Alternating conversion solar power system |
US11228182B2 (en) | 2007-10-15 | 2022-01-18 | Ampt, Llc | Converter disabling photovoltaic electrical energy power system |
US9438037B2 (en) | 2007-10-15 | 2016-09-06 | Ampt, Llc | Systems for optimized solar power inversion |
JP2011501436A (ja) * | 2007-10-15 | 2011-01-06 | エーエムピーティー, エルエルシー | 高効率で遠隔制御可能な太陽エネルギーシステム |
US10326283B2 (en) | 2007-10-15 | 2019-06-18 | Ampt, Llc | Converter intuitive photovoltaic electrical energy power system |
US10608437B2 (en) | 2007-10-15 | 2020-03-31 | Ampt, Llc | Feedback based photovoltaic conversion systems |
US11070062B2 (en) | 2007-10-15 | 2021-07-20 | Ampt, Llc | Photovoltaic conversion systems |
US8461811B2 (en) | 2007-10-23 | 2013-06-11 | Ampt, Llc | Power capacitor alternative switch circuitry system for enhanced capacitor life |
US9853538B2 (en) | 2007-12-04 | 2017-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US8963369B2 (en) | 2007-12-04 | 2015-02-24 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10693415B2 (en) | 2007-12-05 | 2020-06-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US9831824B2 (en) | 2007-12-05 | 2017-11-28 | SolareEdge Technologies Ltd. | Current sensing on a MOSFET |
CN101933209A (zh) * | 2007-12-05 | 2010-12-29 | 太阳能安吉有限公司 | 分布式电力装置中的安全机构、醒来和关闭方法 |
US11264947B2 (en) | 2007-12-05 | 2022-03-01 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
JP2011507465A (ja) * | 2007-12-05 | 2011-03-03 | ソラレッジ テクノロジーズ リミテッド | 分散型電力据付における安全機構、ウェークアップ方法およびシャットダウン方法 |
US11894806B2 (en) | 2007-12-05 | 2024-02-06 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US9407161B2 (en) | 2007-12-05 | 2016-08-02 | Solaredge Technologies Ltd. | Parallel connected inverters |
US11183969B2 (en) | 2007-12-05 | 2021-11-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US11693080B2 (en) | 2007-12-05 | 2023-07-04 | Solaredge Technologies Ltd. | Parallel connected inverters |
CN105244905A (zh) * | 2007-12-05 | 2016-01-13 | 太阳能安吉有限公司 | 分布式电力装置中的安全机构、醒来和关闭方法 |
US10644589B2 (en) | 2007-12-05 | 2020-05-05 | Solaredge Technologies Ltd. | Parallel connected inverters |
US11183923B2 (en) | 2007-12-05 | 2021-11-23 | Solaredge Technologies Ltd. | Parallel connected inverters |
US9979280B2 (en) | 2007-12-05 | 2018-05-22 | Solaredge Technologies Ltd. | Parallel connected inverters |
US9876430B2 (en) | 2008-03-24 | 2018-01-23 | Solaredge Technologies Ltd. | Zero voltage switching |
US9362743B2 (en) | 2008-05-05 | 2016-06-07 | Solaredge Technologies Ltd. | Direct current power combiner |
US10468878B2 (en) | 2008-05-05 | 2019-11-05 | Solaredge Technologies Ltd. | Direct current power combiner |
US11424616B2 (en) | 2008-05-05 | 2022-08-23 | Solaredge Technologies Ltd. | Direct current power combiner |
US9537445B2 (en) | 2008-12-04 | 2017-01-03 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US10461687B2 (en) | 2008-12-04 | 2019-10-29 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US10938219B2 (en) | 2009-04-17 | 2021-03-02 | Ampt, Llc | Dynamic methods and apparatus for adaptive operation of solar power systems |
US10326282B2 (en) | 2009-04-17 | 2019-06-18 | Ampt, Llc | Safety methods and apparatus for adaptive operation of solar power systems |
US9442504B2 (en) | 2009-04-17 | 2016-09-13 | Ampt, Llc | Methods and apparatus for adaptive operation of solar power systems |
US10969412B2 (en) | 2009-05-26 | 2021-04-06 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US11867729B2 (en) | 2009-05-26 | 2024-01-09 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US8947194B2 (en) | 2009-05-26 | 2015-02-03 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US9869701B2 (en) | 2009-05-26 | 2018-01-16 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US11201494B2 (en) | 2009-10-02 | 2021-12-14 | Tigo Energy, Inc. | Systems and methods to provide enhanced diode bypass paths |
US11411126B2 (en) | 2009-10-19 | 2022-08-09 | Ampt, Llc | DC power conversion circuit |
US10032939B2 (en) | 2009-10-19 | 2018-07-24 | Ampt, Llc | DC power conversion circuit |
US10714637B2 (en) | 2009-10-19 | 2020-07-14 | Ampt, Llc | DC power conversion circuit |
US9466737B2 (en) | 2009-10-19 | 2016-10-11 | Ampt, Llc | Solar panel string converter topology |
US9276410B2 (en) | 2009-12-01 | 2016-03-01 | Solaredge Technologies Ltd. | Dual use photovoltaic system |
US11056889B2 (en) | 2009-12-01 | 2021-07-06 | Solaredge Technologies Ltd. | Dual use photovoltaic system |
US11735951B2 (en) | 2009-12-01 | 2023-08-22 | Solaredge Technologies Ltd. | Dual use photovoltaic system |
US10270255B2 (en) | 2009-12-01 | 2019-04-23 | Solaredge Technologies Ltd | Dual use photovoltaic system |
US8710699B2 (en) | 2009-12-01 | 2014-04-29 | Solaredge Technologies Ltd. | Dual use photovoltaic system |
JP2011129574A (ja) * | 2009-12-15 | 2011-06-30 | National Institute Of Advanced Industrial Science & Technology | 太陽電池モジュール |
US9564882B2 (en) | 2010-01-27 | 2017-02-07 | Solaredge Technologies Ltd. | Fast voltage level shifter circuit |
US9231570B2 (en) | 2010-01-27 | 2016-01-05 | Solaredge Technologies Ltd. | Fast voltage level shifter circuit |
US8766696B2 (en) | 2010-01-27 | 2014-07-01 | Solaredge Technologies Ltd. | Fast voltage level shifter circuit |
US9917587B2 (en) | 2010-01-27 | 2018-03-13 | Solaredge Technologies Ltd. | Fast voltage level shifter circuit |
US10673229B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US11349432B2 (en) | 2010-11-09 | 2022-05-31 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US11070051B2 (en) | 2010-11-09 | 2021-07-20 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US11489330B2 (en) | 2010-11-09 | 2022-11-01 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10931228B2 (en) | 2010-11-09 | 2021-02-23 | Solaredge Technologies Ftd. | Arc detection and prevention in a power generation system |
US10673222B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US11271394B2 (en) | 2010-12-09 | 2022-03-08 | Solaredge Technologies Ltd. | Disconnection of a string carrying direct current power |
US9935458B2 (en) | 2010-12-09 | 2018-04-03 | Solaredge Technologies Ltd. | Disconnection of a string carrying direct current power |
US11205946B2 (en) | 2011-01-12 | 2021-12-21 | Solaredge Technologies Ltd. | Serially connected inverters |
US10666125B2 (en) | 2011-01-12 | 2020-05-26 | Solaredge Technologies Ltd. | Serially connected inverters |
US9866098B2 (en) | 2011-01-12 | 2018-01-09 | Solaredge Technologies Ltd. | Serially connected inverters |
JP2014509176A (ja) * | 2011-02-02 | 2014-04-10 | エスエムエー ソーラー テクノロジー アーゲー | 光起電力システムのための保護デバイス |
US10396662B2 (en) | 2011-09-12 | 2019-08-27 | Solaredge Technologies Ltd | Direct current link circuit |
US10931119B2 (en) | 2012-01-11 | 2021-02-23 | Solaredge Technologies Ltd. | Photovoltaic module |
US10381977B2 (en) | 2012-01-30 | 2019-08-13 | Solaredge Technologies Ltd | Photovoltaic panel circuitry |
US9853565B2 (en) | 2012-01-30 | 2017-12-26 | Solaredge Technologies Ltd. | Maximized power in a photovoltaic distributed power system |
US10608553B2 (en) | 2012-01-30 | 2020-03-31 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US11929620B2 (en) | 2012-01-30 | 2024-03-12 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US8988838B2 (en) | 2012-01-30 | 2015-03-24 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US9923516B2 (en) | 2012-01-30 | 2018-03-20 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US11620885B2 (en) | 2012-01-30 | 2023-04-04 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US9812984B2 (en) | 2012-01-30 | 2017-11-07 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US11183968B2 (en) | 2012-01-30 | 2021-11-23 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US10992238B2 (en) | 2012-01-30 | 2021-04-27 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US9639106B2 (en) | 2012-03-05 | 2017-05-02 | Solaredge Technologies Ltd. | Direct current link circuit |
US9235228B2 (en) | 2012-03-05 | 2016-01-12 | Solaredge Technologies Ltd. | Direct current link circuit |
US10007288B2 (en) | 2012-03-05 | 2018-06-26 | Solaredge Technologies Ltd. | Direct current link circuit |
US11740647B2 (en) | 2012-05-25 | 2023-08-29 | Solaredge Technologies Ltd. | Circuit for interconnected direct current power sources |
US9870016B2 (en) | 2012-05-25 | 2018-01-16 | Solaredge Technologies Ltd. | Circuit for interconnected direct current power sources |
US10705551B2 (en) | 2012-05-25 | 2020-07-07 | Solaredge Technologies Ltd. | Circuit for interconnected direct current power sources |
US11334104B2 (en) | 2012-05-25 | 2022-05-17 | Solaredge Technologies Ltd. | Circuit for interconnected direct current power sources |
US11177768B2 (en) | 2012-06-04 | 2021-11-16 | Solaredge Technologies Ltd. | Integrated photovoltaic panel circuitry |
US10115841B2 (en) | 2012-06-04 | 2018-10-30 | Solaredge Technologies Ltd. | Integrated photovoltaic panel circuitry |
US11742777B2 (en) | 2013-03-14 | 2023-08-29 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US9548619B2 (en) | 2013-03-14 | 2017-01-17 | Solaredge Technologies Ltd. | Method and apparatus for storing and depleting energy |
US11545912B2 (en) | 2013-03-14 | 2023-01-03 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US10778025B2 (en) | 2013-03-14 | 2020-09-15 | Solaredge Technologies Ltd. | Method and apparatus for storing and depleting energy |
US10651647B2 (en) | 2013-03-15 | 2020-05-12 | Solaredge Technologies Ltd. | Bypass mechanism |
US11121556B2 (en) | 2013-03-15 | 2021-09-14 | Ampt, Llc | Magnetically coupled solar power supply system for battery based loads |
US9819178B2 (en) | 2013-03-15 | 2017-11-14 | Solaredge Technologies Ltd. | Bypass mechanism |
US10116140B2 (en) | 2013-03-15 | 2018-10-30 | Ampt, Llc | Magnetically coupled solar power supply system |
US11424617B2 (en) | 2013-03-15 | 2022-08-23 | Solaredge Technologies Ltd. | Bypass mechanism |
US9397497B2 (en) | 2013-03-15 | 2016-07-19 | Ampt, Llc | High efficiency interleaved solar power supply system |
JP2015173519A (ja) * | 2014-03-11 | 2015-10-01 | オムロン株式会社 | 評価装置、評価方法及び、太陽光発電システム |
US9318974B2 (en) | 2014-03-26 | 2016-04-19 | Solaredge Technologies Ltd. | Multi-level inverter with flying capacitor topology |
US10886831B2 (en) | 2014-03-26 | 2021-01-05 | Solaredge Technologies Ltd. | Multi-level inverter |
US11296590B2 (en) | 2014-03-26 | 2022-04-05 | Solaredge Technologies Ltd. | Multi-level inverter |
US10886832B2 (en) | 2014-03-26 | 2021-01-05 | Solaredge Technologies Ltd. | Multi-level inverter |
US11855552B2 (en) | 2014-03-26 | 2023-12-26 | Solaredge Technologies Ltd. | Multi-level inverter |
US11632058B2 (en) | 2014-03-26 | 2023-04-18 | Solaredge Technologies Ltd. | Multi-level inverter |
US11538951B2 (en) | 2016-03-03 | 2022-12-27 | Solaredge Technologies Ltd. | Apparatus and method for determining an order of power devices in power generation systems |
US11824131B2 (en) | 2016-03-03 | 2023-11-21 | Solaredge Technologies Ltd. | Apparatus and method for determining an order of power devices in power generation systems |
US11081608B2 (en) | 2016-03-03 | 2021-08-03 | Solaredge Technologies Ltd. | Apparatus and method for determining an order of power devices in power generation systems |
US10599113B2 (en) | 2016-03-03 | 2020-03-24 | Solaredge Technologies Ltd. | Apparatus and method for determining an order of power devices in power generation systems |
US10540530B2 (en) | 2016-03-03 | 2020-01-21 | Solaredge Technologies Ltd. | Methods for mapping power generation installations |
US10061957B2 (en) | 2016-03-03 | 2018-08-28 | Solaredge Technologies Ltd. | Methods for mapping power generation installations |
US11201476B2 (en) | 2016-04-05 | 2021-12-14 | Solaredge Technologies Ltd. | Photovoltaic power device and wiring |
US10230310B2 (en) | 2016-04-05 | 2019-03-12 | Solaredge Technologies Ltd | Safety switch for photovoltaic systems |
US11870250B2 (en) | 2016-04-05 | 2024-01-09 | Solaredge Technologies Ltd. | Chain of power devices |
US11177663B2 (en) | 2016-04-05 | 2021-11-16 | Solaredge Technologies Ltd. | Chain of power devices |
US11018623B2 (en) | 2016-04-05 | 2021-05-25 | Solaredge Technologies Ltd. | Safety switch for photovoltaic systems |
JP2019193550A (ja) * | 2018-04-28 | 2019-10-31 | ベイジン・ハナジー・ソーラー・パワー・インベストメント・カンパニー・リミテッド | ソーラーモジュールジャンクションボックス、ソーラーシステム及びソーラーモジュールの制御方法 |
US11967653B2 (en) | 2023-09-05 | 2024-04-23 | Ampt, Llc | Phased solar power supply system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2000174307A (ja) | 太陽電池発電モジュール及びモジュール接続台数診断装置 | |
US9608451B2 (en) | Electric power supplying apparatus, electric power supplying method, inverter, and electric vehicle | |
EP2224571B1 (en) | Power supply system | |
CN103269117B (zh) | 多能源汇流协调控制系统的控制方法 | |
EP2675035A1 (en) | Photovoltaic power system with generation modules and method of controlling output power thereof | |
JPH1031525A (ja) | 太陽光発電システム | |
CN103094631A (zh) | 蓄电系统 | |
CN103384958A (zh) | 功率转换装置 | |
WO2014012270A1 (zh) | 太阳能系统以及通信装置 | |
CN108054998A (zh) | 一种优化器、光伏发电系统及光伏发电控制方法 | |
JP2003289626A (ja) | 太陽光発電システム用パワーコンディショナ | |
KR100860337B1 (ko) | 태양광을 이용한 발전시스템 | |
KR101055616B1 (ko) | 바이패스 유닛을 구비하는 태양 전지판 | |
JPH0951638A (ja) | 分散形電源装置 | |
CN217935569U (zh) | 一种光伏发电现场多功能检测系统 | |
CN110729807A (zh) | 一种直流电源浮充控制方法及直流电源系统 | |
JP2003116224A (ja) | 太陽光発電システム及びその電力変換装置、並びに該システムの制御方法 | |
JP2000174317A (ja) | 太陽電池発電システム | |
JPH07302130A (ja) | 電力制御装置 | |
CN207603232U (zh) | 一种能量变换存储装置 | |
JPH0946912A (ja) | 分散形電源装置 | |
JP2000166124A (ja) | 補助電源装置 | |
JP2000174318A (ja) | 太陽電池組込パネル及びそれを用いた太陽電池発電システム | |
JPH09238427A (ja) | 電源装置及びこの電源装置を用いた太陽光発電装置 | |
CN212909049U (zh) | 一种适用于静音发电的双向变流装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20040113 |