JP2000169059A - Installation method of elevator - Google Patents

Installation method of elevator

Info

Publication number
JP2000169059A
JP2000169059A JP10346843A JP34684398A JP2000169059A JP 2000169059 A JP2000169059 A JP 2000169059A JP 10346843 A JP10346843 A JP 10346843A JP 34684398 A JP34684398 A JP 34684398A JP 2000169059 A JP2000169059 A JP 2000169059A
Authority
JP
Japan
Prior art keywords
hoisting device
hoistway
elevator
hoisting
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10346843A
Other languages
Japanese (ja)
Inventor
Takeshi Sakurada
武 櫻田
Shinichi Iwata
新一 岩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP10346843A priority Critical patent/JP2000169059A/en
Publication of JP2000169059A publication Critical patent/JP2000169059A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide an elevator installation method capable of easily installing hoisting equipment in the neighbourhood of an upper end in an elevator shaft and restraining height of a building in which the hoisting equipment is set. SOLUTION: Hoisting equipment 8 is lifted at a specified rising position of an elevator shaft 1 by a lifter 5 through a top part of the elevator shaft 1 of an elevator by a first process. Thereafter, the hoisting equipment 8 at the specified rising position is pushed up at an installing position above the specified rising position by a push-up device 15 through a fixed part 6 of the elevator shaft 1 below the hoisting equipment 8 at the specified rising position by a second process. Consequently, the maximum rising position of the hoisting equipment 8 to be installed is not restricted by a total value of dimensions in the vertical direction of a hoisting accessory 4, the lifter 5, a slinging work wire 11, etc., and it is possible to easily raise the hoisting equipment 8 up to a required installing position to a top part of the elevator shaft 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、昇降路内の頂部
に巻上装置が設置されるエレベーターの据付工法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator installation method in which a hoisting device is installed at the top of a hoistway.

【0002】[0002]

【従来の技術】図13は、従来のエレベーターの据付工
法を説明する図で、昇降路の縦断面図である。図におい
て、1は乗場2が設けられたエレベーターの昇降路、3
は昇降路1の天井面、4は天井面3に設けられた吊り
具、5は吊り具4に仮設された電動チェーンブロックか
らなる吊上装置である。
2. Description of the Related Art FIG. 13 is a view for explaining a conventional elevator installation method, and is a longitudinal sectional view of a hoistway. In the figure, reference numeral 1 denotes a hoistway of an elevator provided with a landing 2, 3
Reference numeral denotes a ceiling surface of the hoistway 1, reference numeral 4 denotes a hanging device provided on the ceiling surface 3, and reference numeral 5 denotes a lifting device including an electric chain block temporarily provided on the hanging device 4.

【0003】6はレールブラケット7を介して昇降路1
に立設されたレールで、エレベーターのかご(図示しな
い)等の昇降を案内する。8は巻上機9及び巻上機9が
設置された機械台10からなる巻上装置、11は吊上装
置5に掛止されて巻上装置8を吊持した玉掛けワイヤで
ある。
Reference numeral 6 denotes a hoistway 1 via a rail bracket 7.
Guides the elevator car (not shown) up and down. Reference numeral 8 denotes a hoisting device including a hoisting machine 9 and a machine table 10 on which the hoisting machine 9 is installed. Reference numeral 11 denotes a sling wire that is hung on the hoisting device 5 and suspends the hoisting device 8.

【0004】従来のエレベーターの据付工法では、上記
のような構成によって次に述べるように据付作業が行わ
れる。すなわち、図示が省略してあるが昇降路1内に作
業用足場が仮設されてこの足場からの作業によって、レ
ールブラケット7を介して昇降路1内にレール6が立設
される。次いで、吊り具4に吊上装置5が仮設されて、
吊上装置5のフックを昇降路1の下部に下降させる。
[0004] In the conventional elevator installation method, the above-described configuration performs the installation work as described below. That is, although not shown, a working scaffold is temporarily provided in the hoistway 1, and the rail 6 is erected in the hoistway 1 via the rail bracket 7 by work from this scaffold. Next, the lifting device 5 is temporarily installed on the lifting device 4,
The hook of the lifting device 5 is lowered to the lower part of the hoistway 1.

【0005】そして、例えば地上階の乗場2から巻上装
置8を昇降路1内に取り込んで、玉掛けワイヤ11を介
して巻上装置8を吊上装置5のフックに吊持する。次
に、吊上装置5を付勢して巻上装置8を上昇させて、昇
降路1頂部の所定位置に巻上装置8が固定されて据付け
られるようになっている。
Then, the hoisting device 8 is taken into the hoistway 1 from the landing 2 on the ground floor, for example, and the hoisting device 8 is hung on the hook of the hoisting device 5 via the slinging wire 11. Next, the hoisting device 8 is urged to raise the hoisting device 8, and the hoisting device 8 is fixedly installed at a predetermined position on the top of the hoistway 1.

【0006】[0006]

【発明が解決しようとする課題】上記のような従来のエ
レベーターの据付工法において、据付られる巻上装置8
の最上昇位置が、吊り具4、吊上装置5及び玉掛けワイ
ヤ11の上下方向寸法の合計値によって制約される。こ
のため、昇降路1の天井面3から巻上装置8の機械台1
0までの高さ方向寸法が長くなるので、昇降路1の最上
階の乗場2から昇降路1の天井面3までの図13に示す
高さAが高くなる。したがって、最上階の乗場2からの
エレベーターが設置される建物の高さが無用に高くな
り、建物の建築費が嵩み、また周囲地域の日照権を侵す
恐れがあるという問題点があった。
In the conventional elevator installation method as described above, the hoisting device 8 to be installed is installed.
Is restricted by the total value of the vertical dimensions of the lifting tool 4, the lifting device 5, and the slinging wire 11. For this reason, from the ceiling surface 3 of the hoistway 1 to the machine table 1 of the hoisting device 8
Since the height dimension to 0 becomes longer, the height A shown in FIG. 13 from the landing 2 on the top floor of the hoistway 1 to the ceiling surface 3 of the hoistway 1 increases. Therefore, there is a problem that the height of the building in which the elevator from the landing 2 on the top floor is installed is unnecessarily high, the construction cost of the building increases, and there is a possibility that the sunshine right in the surrounding area may be violated.

【0007】この発明は、かかる問題点を解消するため
になされたものであり、巻上装置を昇降路内の上端近く
に容易に据付けできるエレベーターの据付工法を得るこ
とを目的とする。
The present invention has been made in order to solve such a problem, and an object of the present invention is to provide an elevator installation method which can easily install a hoisting device near an upper end in a hoistway.

【0008】[0008]

【課題を解決するための手段】この発明に係るエレベー
ターの据付工法においては、巻上装置をエレベーターの
昇降路頂部を介して吊上装置により昇降路の所定上昇位
置に吊り上げる第一工程と、所定上昇位置に配置された
巻上装置よりも下方の昇降路の固定部を介して、所定上
昇位置の巻上装置を押上装置により所定上昇位置よりも
上方の据付位置に押し上げる第二工程とによる工事が行
われる。
In the elevator installation method according to the present invention, a first step of lifting a hoisting device to a predetermined ascending position of a hoistway by a hoisting device via a hoistway top of the elevator; Construction by the second step of pushing up the hoisting device at the predetermined ascending position to the installation position above the predetermined ascending position by the lifting device via the fixing portion of the hoistway below the hoisting device arranged at the ascending position. Is performed.

【0009】また、この発明に係るエレベーターの据付
工法においては、昇降路に立設されたレールの上端部に
よって固定部が形成される。
Further, in the elevator installation method according to the present invention, the fixed portion is formed by the upper end of the rail erected on the hoistway.

【0010】また、この発明に係るエレベーターの据付
工法においては、昇降路頂部寄りの壁面から水平に突設
された支持腕によって固定部が形成される。
[0010] In the elevator installation method according to the present invention, the fixed portion is formed by a support arm projecting horizontally from a wall near the top of the hoistway.

【0011】また、この発明に係るエレベーターの据付
工法においては、巻上装置の巻上機上面に仮設されてレ
ールからなる固定部に移動可能に係合された転倒防止金
具が設けられる。
In the elevator installation method according to the present invention, a fall prevention fitting temporarily provided on the upper surface of the hoisting machine of the hoisting device and movably engaged with a fixed portion comprising a rail is provided.

【0012】また、この発明に係るエレベーターの据付
工法においては、巻上装置をエレベーターの昇降路頂部
を介して吊上装置により昇降路の所定上昇位置に吊り上
げる第一工程と、昇降路に立設されたレールの上端に設
けられた支持桁、この支持桁から下垂して下端が巻上装
置に挿通されたねじ棒及び巻上装置下面に配置されてね
じ棒の挿通端にねじ込まれたナットによって構成された
引上装置により、所定上昇位置の巻上装置を所定上昇位
置よりも上方の据付位置に引き上げる第二工程とによる
工事が行われる。
Further, in the elevator installation method according to the present invention, a first step of lifting a hoisting device to a predetermined ascending position of a hoistway by a hoisting device via a hoistway top of the elevator, and standing in the hoistway. A support girder provided at the upper end of the rail, the lower end of which is suspended from the support girder, and a lower end of which is inserted into the hoisting device and a nut disposed on the lower surface of the hoisting device and screwed into the insertion end of the screw rod. With the lifting device thus configured, construction is performed by the second step of lifting the hoisting device at the predetermined raising position to the installation position above the predetermined raising position.

【0013】[0013]

【発明の実施の形態】実施の形態1.図1〜図5は、こ
の発明の実施の形態の一例を示す図で、図1は巻上装置
据付の第一状況を示す昇降路の縦断面図、図2は巻上装
置据付の第二状況を示す図1相当図、図3は巻上装置据
付の第三状況を示す図1相当図、図4は巻上装置据付の
第四状況を示す図1相当図、図5は巻上装置据付の終了
状況を示す図1相当図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 1 to 5 are diagrams showing an example of an embodiment of the present invention. FIG. 1 is a vertical sectional view of a hoistway showing a first situation of installation of a hoisting apparatus, and FIG. 1 is a diagram showing the situation, FIG. 3 is a diagram corresponding to FIG. 1 showing a third situation of installation of the hoisting device, FIG. 4 is a diagram corresponding to FIG. 1 showing a fourth situation of installation of the hoisting device, and FIG. FIG. 2 is a diagram corresponding to FIG. 1, showing a state of completion of installation.

【0014】図において、1は乗場2が設けられたエレ
ベーターの昇降路、3は昇降路1の天井面、4は天井面
3に設けられた吊り具、5は吊り具4に仮設された電動
チェーンブロックからなる吊上装置、6はレールブラケ
ット7を介して昇降路1に立設されたレールからなり昇
降路1に構成された固定部で、エレベーターのかご(図
示しない)等の昇降を案内する。8は巻上機9及び巻上
機9が設置された機械台10からなる巻上装置である。
In the drawing, 1 is a hoistway of an elevator provided with a landing 2, 3 is a ceiling surface of the hoistway 1, 4 is a hanger provided on the ceiling surface 3, and 5 is an electric motor temporarily provided on the hanger 4. A lifting device 6 composed of a chain block, 6 is a fixed portion composed of a rail erected on the hoistway 1 via a rail bracket 7 and configured to the hoistway 1, and guides an elevator car (not shown) or the like up and down. I do. Reference numeral 8 denotes a hoisting device including a hoisting machine 9 and a machine base 10 on which the hoisting machine 9 is installed.

【0015】11は吊上装置5に掛止されて巻上装置8
を吊持した玉掛けワイヤ、12は固定部6の上端部に固
定部6の長手に沿って互いに離れて設けられた複数の締
結孔、13は両端部が両側の固定部6にそれぞれ配置さ
れた仮設梁、14は締結具で、締結孔12に挿通された
ボルト及びこのボルトにねじ込まれたナットからなり仮
設梁13を固定部6に着脱可能に締結する。
Reference numeral 11 denotes a hoisting device,
, A plurality of fastening holes provided at the upper end of the fixed portion 6 at a distance from each other along the length of the fixed portion 6, and 13 at both ends of the fixed portion 6 on both sides. The temporary beam 14 is a fastener, and is composed of a bolt inserted into the fastening hole 12 and a nut screwed into the bolt, and fastens the temporary beam 13 to the fixing portion 6 in a detachable manner.

【0016】15は巻上装置8を押し上げる押上装置
で、ジャッキ15aと、ジャッキ15aの上側を機械台
10に、下側を仮設梁13にそれぞれ締結するボルト及
びナットからなる締結具15bとによって構成されてい
る。なお、図1はジャッキ15aが短縮した状態を示
す。
A lifting device 15 for lifting the hoisting device 8 comprises a jack 15a, a fastener 15b comprising a bolt and a nut for fastening the upper side of the jack 15a to the machine base 10 and the lower side to the temporary beam 13, respectively. Have been. FIG. 1 shows a state where the jack 15a is shortened.

【0017】上記のような構成によって次に述べるよう
にエレベーターの据付工事が行われる。すなわち、図示
が省略してあるが昇降路1内に作業用足場が仮設されて
この足場からの作業によって、レールブラケット7を介
して昇降路1内にレールからある固定部6が立設され
る。次いで、吊り具4に吊上装置5が仮設されて、吊上
装置5のフックを昇降路1の下部に下降する。そして、
例えば地上階の乗場2で巻上装置8及び押上装置15を
一体化して、昇降路1内に取り込み玉掛けワイヤ11を
介して一体化した巻上装置8及び押上装置15を吊上装
置5のフックに連結する。
With the above configuration, the elevator installation work is performed as described below. That is, although not shown, a work scaffold is temporarily provided in the hoistway 1, and the work from this scaffold causes the fixed portion 6 made of a rail to stand upright in the hoistway 1 via the rail bracket 7. . Next, the lifting device 5 is temporarily installed on the lifting device 4, and the hook of the lifting device 5 is lowered to the lower part of the hoistway 1. And
For example, the hoisting device 8 and the lifting device 15 are integrated in the landing 2 on the ground floor, and the hoisting device 8 and the lifting device 15 integrated into the hoistway 1 via the slinging wire 11 are hooked to the lifting device 5. Connect to

【0018】次に、吊上装置5を付勢して一体化した巻
上装置8及び押上装置15を上昇させて、吊り具4、吊
上装置5及び玉掛けワイヤ11による最上昇位置からな
る昇降路1頂部の第一所定位置に一体化した巻上装置8
及び押上装置15が配置される。次いで、固定部6の締
結孔12に対し締結具14によって仮設梁13が仮設さ
れる。これによって、図1に示す状態となりこの状態で
吊上装置5を緩めて吊上装置5及び玉掛けワイヤ11が
撤去される。
Next, the hoisting device 8 and the push-up device 15 which are integrated by urging the hoisting device 5 are raised to raise and lower the hoisting device 4, the hoisting device 5 and the slinging wire 11 from the highest position. Hoisting device 8 integrated at the first predetermined position on the top of road 1
And a lifting device 15. Next, the temporary beam 13 is temporarily installed in the fastening hole 12 of the fixing portion 6 by the fastener 14. Thus, the lifting device 5 is loosened in this state as shown in FIG. 1 and the lifting device 5 and the slinging wire 11 are removed.

【0019】次いで、図1に示す状態で押上装置15を
伸長して昇降路1頂部の第一所定位置から第二所定位置
に巻上装置8を押し上げる。これによって、図2に示す
ように固定部6の対応した締結孔12に対して、締結具
14によって巻上装置8の機械台10が締結されて仮設
される。
Next, the lifting device 15 is extended in the state shown in FIG. 1 to push up the hoisting device 8 from the first predetermined position on the top of the hoistway 1 to the second predetermined position. As a result, as shown in FIG. 2, the machine base 10 of the hoisting device 8 is fastened to the corresponding fastening holes 12 of the fixing portion 6 by the fasteners 14 and temporarily installed.

【0020】そして、図2に示す状態から仮設梁13の
締結具15bを取り外し、次にジャッキ15aを短縮さ
せることにより仮設梁13を引き上げて図2における仮
設梁13の位置よりも上方の締結孔12の位置に、締結
具14によって仮設梁13が再び仮設されて図3に示す
状態となる。
Then, the fastener 15b of the temporary beam 13 is removed from the state shown in FIG. 2, and then the temporary beam 13 is pulled up by shortening the jack 15a so that the fastening hole above the position of the temporary beam 13 in FIG. At the position 12, the temporary beam 13 is temporarily re-installed by the fastener 14, and the state shown in FIG. 3 is obtained.

【0021】次に、図3に示す状態で押上装置15を伸
長して昇降路1頂部の第二所定位置から据付位置に巻上
装置8を押し上げる。これによって、図4に示すように
固定部6の対応した締結孔12に対して、締結具14に
よって巻上装置8の機械台10が締結されて据付けられ
る。次いで、締結具15bを外して仮設梁13及び押上
装置15が撤去されて、図5に示す状態となり巻上装置
8の据付工事が終了する。
Next, in the state shown in FIG. 3, the lifting device 15 is extended to push up the hoisting device 8 from the second predetermined position on the top of the hoistway 1 to the installation position. Thereby, as shown in FIG. 4, the machine base 10 of the hoisting device 8 is fastened to the corresponding fastening holes 12 of the fixing portion 6 by the fasteners 14 and installed. Next, the fastener 15b is removed, the temporary beam 13 and the lifting device 15 are removed, and the state shown in FIG. 5 is reached, and the installation work of the hoisting device 8 is completed.

【0022】以上説明したように巻上装置8の据付工事
において、まず巻上装置8及び押上装置15を一体化し
た状態で、昇降路1頂部の吊り具4を介して吊上装置5
により昇降路1の所定上昇位置に吊り上げる第一工程が
行われる。そして、所定上昇位置に配置された巻上装置
8よりも下方の昇降路1の固定部6を介して、所定上昇
位置の巻上装置8を押上装置15により所定上昇位置よ
りも上方の据付位置に押し上げる第二工程が行われ、少
なくとも第一工程及び第二工程とによる工事が行われ
る。
As described above, in the installation work of the hoisting device 8, the hoisting device 5 and the push-up device 15 are first integrated, and the hoisting device 5 is connected via the hoist 4 at the top of the hoistway 1.
A first step of lifting the hoistway 1 at a predetermined ascending position is performed. Then, the hoisting device 8 at the predetermined ascending position is moved upward by the push-up device 15 through the fixing portion 6 of the hoistway 1 below the hoisting device 8 disposed at the predetermined ascending position. Is carried out, and construction is performed by at least the first step and the second step.

【0023】したがって、据付けられる巻上装置8の最
上昇位置が、吊り具4、吊上装置5及び玉掛けワイヤ1
1の上下方向寸法の合計値によって制約されることがな
く、巻上装置8を昇降路1頂部の寄りの所要の据付位置
に容易に上昇させることができる。このため、昇降路1
の天井面3から巻上装置8の機械台10までの高さ方向
寸法を短くすることができ、昇降路1の最上階の乗場2
から昇降路1の天井面3までの図5に示す高さAを低く
することができる。
Therefore, the highest position of the hoisting device 8 to be installed is the lifting device 4, the hoisting device 5, and the slinging wire 1
The hoisting device 8 can be easily raised to a required installation position near the top of the hoistway 1 without being restricted by the total value of the vertical dimensions of the hoistway 1. For this reason, hoistway 1
The height dimension from the ceiling surface 3 to the machine table 10 of the hoisting device 8 can be shortened, and the landing 2 on the top floor of the hoistway 1 can be reduced.
5 from FIG. 5 to the ceiling surface 3 of the hoistway 1 can be reduced.

【0024】これによって、巻上装置8を昇降路1の天
井面3近くに容易に据付けできて、最上階の乗場2から
のエレベーターが設置される建物の高さが無用に高くな
ることがない。したがって、建物の建築費を節減し、ま
た周囲地域における日照権問題を解消することができ
る。
As a result, the hoisting device 8 can be easily installed near the ceiling surface 3 of the hoistway 1, and the height of the building where the elevator from the landing 2 on the top floor is installed does not increase unnecessarily. . Therefore, the construction cost of the building can be reduced, and the sunshine problem in the surrounding area can be solved.

【0025】実施の形態2.図6〜図8は、この発明の
他の実施の形態の一例を示す図で、図6は巻上装置据付
の第一状況を示す昇降路の縦断面図、図7は図6のB−
B線断面拡大図、図8は巻上装置据付の第二状況を示す
図6相当図である。図において、前述の図1〜図5の実
施の形態と同符号は相当部分を示し、16は昇降路1の
壁面から水平に突設された支持腕からなる固定部で、上
下方向に互いに離れた位置に配置されたアンカーボルト
17によって装着され、据付工程の進捗に合わせて逐次
上方のアンカーボルト17位置に配置される。
Embodiment 2 6 to 8 are views showing an example of another embodiment of the present invention. FIG. 6 is a vertical sectional view of a hoistway showing a first situation of installation of a hoisting device, and FIG.
FIG. 8 is a sectional view corresponding to FIG. 6, showing a second state of installation of the hoisting device. In the drawings, the same reference numerals as those in the above-described embodiments of FIGS. 1 to 5 denote corresponding parts, and 16 is a fixing portion including a support arm protruding horizontally from the wall surface of the hoistway 1 and vertically separated from each other. It is attached by the anchor bolt 17 arranged at the position where it is located, and is sequentially arranged at the position of the anchor bolt 17 above in accordance with the progress of the installation process.

【0026】上記のような構成によるエレベーターの据
付工法は、前述の図1〜図5の実施の形態におけるレー
ルからなる固定部6により締結孔12及び締結具14を
介して巻上装置8、仮設梁13を支持する構成を、支持
腕からなる固定部16によって巻上装置8、仮設梁13
を支持する構成に置き換えたものである。
The elevator installation method having the above-described structure is performed by the hoisting device 8 and the temporary installation through the fastening holes 12 and the fasteners 14 by the fixing portions 6 made of rails in the embodiment of FIGS. The structure for supporting the beam 13 is changed to the hoisting device 8 and the temporary beam 13 by the fixing portion 16 including a support arm.
Is replaced by a configuration that supports.

【0027】そして、巻上装置8の据付工事において、
巻上装置8を昇降路1頂部の吊り具4を介して吊上装置
5により昇降路1の所定上昇位置に吊り上げる第一工程
が行われる。次いで、所定上昇位置に配置された巻上装
置8よりも下方の昇降路1の固定部16を介して、所定
上昇位置の巻上装置8を押上装置15により所定上昇位
置よりも上方の据付位置に押し上げる第二工程が行われ
る。
In the installation work of the hoisting device 8,
A first step of hoisting the hoisting device 8 to a predetermined ascending position of the hoistway 1 by the hoisting device 5 via the hoist 4 at the top of the hoistway 1 is performed. Next, the hoisting device 8 at the predetermined ascending position is moved upward by the lifting device 15 through the fixing portion 16 of the hoistway 1 below the hoisting device 8 disposed at the predetermined ascending position. Is carried out.

【0028】そして、押上装置15を伸長して昇降路1
頂部の第一所定位置から第二所定位置に巻上装置8を押
し上げる工程はともかく、少なくとも第一工程及び第二
工程による工事が行われて、据付位置に配置された巻上
装置8が対応した固定部16に据付けられる。したがっ
て、詳細な説明を省略するが図6〜図8の実施の形態に
おいても図1〜図5の実施の形態と同様な作用が得られ
る。
Then, the lifting device 15 is extended to lift the hoistway 1
Aside from the step of pushing up the hoisting device 8 from the first predetermined position on the top to the second predetermined position, at least the first step and the second step are performed, and the hoisting device 8 arranged at the installation position corresponds. It is installed on the fixing part 16. Therefore, although detailed description is omitted, the same operation as the embodiment of FIGS. 1 to 5 can be obtained in the embodiment of FIGS.

【0029】実施の形態3.図9〜図11も、この発明
の他の実施の形態の一例を示す図で、図9は巻上装置据
付の第一状況を示す昇降路の縦断面図、図10は巻上装
置据付の第二状況を示す図9相当図、図11は図10の
C−C線断面拡大図である。図において、前述の図1〜
図5の実施の形態と同符号は相当部分を示し、18は転
倒防止金具で、巻上機9の上面に締結ボルト181によ
って締結されて仮設され、また端部が摺動材182を介
してレールからなる固定部6に移動可能に係合されてい
る。
Embodiment 3 9 to 11 are also views showing an example of another embodiment of the present invention. FIG. 9 is a vertical sectional view of a hoistway showing a first situation of installation of a hoisting apparatus, and FIG. 9 and FIG. 11 showing the second situation, and FIG. 11 is an enlarged cross-sectional view taken along line CC of FIG. In the figures, the aforementioned FIGS.
The same reference numerals as those in the embodiment of FIG. 5 denote corresponding parts, and reference numeral 18 denotes a fall prevention bracket which is temporarily fastened to the upper surface of the hoisting machine 9 by fastening bolts 181, and whose end is connected to a sliding member 182. It is movably engaged with a fixed portion 6 formed of a rail.

【0030】上記のような構成によるエレベーターの据
付工法において、巻上装置8を昇降路1頂部の吊り具4
を介して吊上装置5により昇降路1の所定上昇位置に吊
り上げる第一工程が行われる。次いで、所定上昇位置に
配置された巻上装置8よりも下方の昇降路1の固定部6
を介して、所定上昇位置の巻上装置8を押上装置15に
より所定上昇位置よりも上方の据付位置に押し上げる第
二工程が行われる。
In the elevator installation method having the above-described configuration, the hoisting device 8 is connected to the hoist 4 on the top of the hoistway 1.
A first step of lifting the hoistway 1 to a predetermined ascending position on the hoistway 1 by the lifting device 5 is performed. Next, the fixing portion 6 of the hoistway 1 below the hoisting device 8 disposed at the predetermined ascending position.
, A second step of pushing the hoisting device 8 at the predetermined ascending position to the installation position above the predetermined ascending position by the lifting device 15 is performed.

【0031】そして、押上装置15を伸長して昇降路1
頂部の第一所定位置から第二所定位置に巻上装置8を押
し上げる工程はともかく、少なくとも第一工程及び第二
工程による工事が行われて、据付位置に配置された巻上
装置8が対応した固定部6に据付けられる。したがっ
て、詳細な説明を省略するが図9〜図11の実施の形態
においても図1〜図5の実施の形態と同様な作用が得ら
れる。
Then, the lifting device 15 is extended to extend the hoistway 1
Aside from the step of pushing up the hoisting device 8 from the first predetermined position on the top to the second predetermined position, at least the first step and the second step are performed, and the hoisting device 8 arranged at the installation position corresponds. It is installed on the fixing part 6. Therefore, although detailed description is omitted, the same operation as the embodiment of FIGS. 1 to 5 can be obtained in the embodiment of FIGS. 9 to 11.

【0032】また、図9〜図11の実施の形態におい
て、巻上装置8の上端側が転倒防止金具18によってレ
ールからなる固定部6に移動可能に係合される。このた
め、機械台10に対して重心位置が高い巻上装置8の上
部寄りが、固定部6に案内されて移動する。これによ
り、巻上装置8を安定した状態で上昇移動させることが
でき、巻上装置8の据付作業を容易化することができ
る。
In the embodiments shown in FIGS. 9 to 11, the upper end of the hoisting device 8 is movably engaged with the fixing portion 6 made of a rail by a fall prevention metal fitting 18. For this reason, the upper part of the hoisting device 8 having a high center of gravity relative to the machine base 10 is guided by the fixing part 6 and moves. Thereby, the hoisting device 8 can be moved up in a stable state, and the installation work of the hoisting device 8 can be facilitated.

【0033】実施の形態4.図12も、この発明の他の
実施の形態の一例を示す図で、巻上装置据付の第一状況
を示す昇降路の縦断面図である。図において、前述の図
1〜図5の実施の形態と同符号は相当部分を示し、19
は引上装置で、両端が両側のレールからなる固定部6の
上端に固定された支持桁20、支持桁20に上面から挿
通されて下端が巻上装置8の機械台10にすきまばめさ
れて支持桁20の両端寄りにそれぞれ配置されたねじ棒
21及び機械台10下面に配置されてねじ棒21の挿通
端にねじ込まれたナット22によって構成されている。
Embodiment 4 FIG. FIG. 12 is also a view showing an example of another embodiment of the present invention, and is a longitudinal sectional view of a hoistway showing a first situation of installation of a hoisting device. In the figure, the same reference numerals as those in the embodiment of FIGS.
Is a lifting device, a support girder 20 having both ends fixed to the upper end of a fixing portion 6 composed of rails on both sides. The support girder 20 is inserted through the support girder 20 from above and the lower end is loosely fitted to the machine base 10 of the hoisting device 8. A screw bar 21 is disposed near each end of the support girder 20, and a nut 22 is disposed on the lower surface of the machine base 10 and screwed into the insertion end of the screw bar 21.

【0034】上記のような構成によるエレベーターの据
付工法において、巻上装置8を昇降路1頂部の吊り具4
を介して吊上装置5により昇降路1の所定上昇位置に吊
り上げる第一工程が行われる。次いで、昇降路1の上端
の固定部6に引上装置19が仮設されて、所定上昇位置
の巻上装置8を引上装置19のナット22を回して所定
上昇位置よりも上方の据付位置に引き上げる第二工程が
行われる。
In the elevator installation method having the above-described configuration, the hoisting device 8 is connected to the hoist 4 on the top of the hoistway 1.
A first step of lifting the hoistway 1 to a predetermined ascending position on the hoistway 1 by the lifting device 5 is performed. Next, a hoisting device 19 is temporarily installed on the fixed portion 6 at the upper end of the hoistway 1, and the hoisting device 8 at the predetermined ascent position is turned to the installation position above the predetermined ascent position by turning the nut 22 of the hoisting device 19. A second step of lifting is performed.

【0035】そして、第一工程及び第二工程による工事
が行われて、据付位置に配置された巻上装置8が対応し
た固定部6に据付けられる。したがって、詳細な説明を
省略するが図12の実施の形態においても図1〜図5の
実施の形態と同様な作用が得られる。なお、引上装置1
9は巻上装置8を据付位置に固定した後に撤去される。
Then, the work in the first step and the second step is performed, and the hoisting device 8 arranged at the installation position is installed on the corresponding fixing portion 6. Therefore, although detailed description is omitted, the same operation as the embodiment of FIGS. 1 to 5 can be obtained in the embodiment of FIG. The lifting device 1
9 is removed after fixing the hoisting device 8 in the installation position.

【0036】[0036]

【発明の効果】この発明は以上説明したように、巻上装
置をエレベーターの昇降路頂部を介して吊上装置により
昇降路の所定上昇位置に吊り上げる第一工程と、所定上
昇位置に配置された巻上装置よりも下方の昇降路の固定
部を介して、所定上昇位置の巻上装置を押上装置により
所定上昇位置よりも上方の据付位置に押し上げる第二工
程とによる工事を行うものである。
As described above, according to the present invention, the first step of lifting the hoisting device to the predetermined ascending position of the hoistway by the hoisting device through the hoistway top of the elevator, and the hoisting device are disposed at the predetermined ascending position. The second step of raising the hoisting device at a predetermined ascending position to an installation position above the predetermined ascending position by a lifting device via a fixing portion of a hoistway below the hoisting device is performed.

【0037】これによって、据付けられる巻上装置の最
上昇位置が、吊り具、吊上装置、玉掛けワイヤ等の上下
方向寸法の合計値によって制約されることがなく、巻上
装置を昇降路頂部の寄りの所要の据付位置に容易に上昇
させることができる。このため、昇降路の天井面から巻
上装置の機械台までの高さ方向寸法を短くすることがで
き、昇降路の最上階の乗場から昇降路の天井面までの高
さを低くすることができる。したがって、巻上装置を昇
降路の天井面近くに容易に据付けできて、最上階の乗場
からのエレベーターが設置される建物の高さが無用に高
くなることがない。このため、建物の建築費を節減し、
また周囲地域における日照権問題を解消する効果があ
る。
Thus, the highest position of the hoisting device to be installed is not restricted by the total value of the vertical dimensions of the hoisting device, hoisting device, slinging wire, etc., and the hoisting device is moved to the top of the hoistway. It can be easily raised to the required required installation position. For this reason, the height dimension from the hoistway ceiling surface to the machine stand of the hoisting device can be shortened, and the height from the top floor of the hoistway to the hoistway ceiling surface can be reduced. it can. Therefore, the hoisting device can be easily installed near the ceiling surface of the hoistway, and the height of the building where the elevator from the landing on the top floor is installed does not increase unnecessarily. This saves on building costs,
It also has the effect of eliminating the sunshine problem in the surrounding area.

【0038】また、この発明は以上説明したように、昇
降路に立設されたレールの上端部によって固定部を形成
したものである。
Further, as described above, in the present invention, the fixed portion is formed by the upper end portion of the rail erected on the hoistway.

【0039】これによって、据付けられる巻上装置の最
上昇位置が、吊り具、吊上装置、玉掛けワイヤ等の上下
方向寸法の合計値によって制約されることがなく、巻上
装置を昇降路頂部の寄りの所要の据付位置に容易に上昇
させることができる。このため、昇降路の天井面から巻
上装置の機械台までの高さ方向寸法を短くすることがで
き、昇降路の最上階の乗場から昇降路の天井面までの高
さを低くすることができる。したがって、昇降路に立設
されたレールの上端部からなる固定部を介して、巻上装
置を昇降路の天井面近くに容易に据付けでき、最上階の
乗場からのエレベーターが設置される建物の高さが無用
に高くなることがない。このため、建物の建築費を節減
し、また周囲地域における日照権問題を解消する効果が
ある。
Thus, the highest position of the hoist to be installed is not restricted by the total value of the vertical dimensions of the hoisting device, hoisting device, slinging wire, etc., and the hoisting device is moved to the top of the hoistway. It can be easily raised to the required required installation position. For this reason, the height dimension from the hoistway ceiling surface to the machine stand of the hoisting device can be shortened, and the height from the top floor of the hoistway to the hoistway ceiling surface can be reduced. it can. Therefore, the hoisting device can be easily installed near the ceiling surface of the hoistway through the fixed part consisting of the upper end of the rail installed on the hoistway, and the building in which the elevator from the landing on the top floor is installed The height does not increase unnecessarily. This has the effect of reducing the construction costs of the building and eliminating the sunshine problem in the surrounding area.

【0040】また、この発明は以上説明したように、昇
降路頂部寄りの壁面から水平に突設された支持腕によっ
て固定部を形成したものである。
Further, as described above, in the present invention, the fixed portion is formed by the support arm projecting horizontally from the wall near the top of the hoistway.

【0041】これによって、据付けられる巻上装置の最
上昇位置が、吊り具、吊上装置、玉掛けワイヤ等の上下
方向寸法の合計値によって制約されることがなく、巻上
装置を昇降路頂部の寄りの所要の据付位置に容易に上昇
させることができる。このため、昇降路の天井面から巻
上装置の機械台までの高さ方向寸法を短くすることがで
き、昇降路の最上階の乗場から昇降路の天井面までの高
さを低くすることができる。したがって、昇降路頂部寄
りの壁面から水平に突設された支持腕からなる固定部を
介して、巻上装置を昇降路の天井面近くに容易に据付け
でき、最上階の乗場からのエレベーターが設置される建
物の高さが無用に高くなることがない。このため、建物
の建築費を節減し、また周囲地域における日照権問題を
解消する効果がある。
Thus, the highest position of the hoist to be installed is not restricted by the total value of the vertical dimensions of the hoisting device, hoisting device, slinging wire, etc., and the hoisting device is mounted on the top of the hoistway. It can be easily raised to the required required installation position. For this reason, the height dimension from the hoistway ceiling surface to the machine stand of the hoisting device can be shortened, and the height from the top floor of the hoistway to the hoistway ceiling surface can be reduced. it can. Therefore, the hoisting device can be easily installed near the ceiling surface of the hoistway through the fixed part consisting of the support arm protruding horizontally from the wall near the top of the hoistway, and the elevator from the landing on the top floor is installed. The height of the building will not be unnecessarily high. This has the effect of reducing the construction costs of the building and eliminating the sunshine problem in the surrounding area.

【0042】また、この発明は以上説明したように、巻
上装置の巻上機上面に仮設されレールからなる固定部に
移動可能に係合された転倒防止金具を設けたものであ
る。
Further, as described above, the present invention is provided with a fall-prevention metal fitting which is tentatively provided on the upper surface of the hoisting machine of the hoisting device and movably engaged with a fixed portion comprising a rail.

【0043】これによって、据付けられる巻上装置の最
上昇位置が、吊り具、吊上装置、玉掛けワイヤ等の上下
方向寸法の合計値によって制約されることがなく、巻上
装置を昇降路頂部の寄りの所要の据付位置に容易に上昇
させることができる。このため、昇降路の天井面から巻
上装置の機械台までの高さ方向寸法を短くすることがで
き、昇降路の最上階の乗場から昇降路の天井面までの高
さを低くすることができる。したがって、巻上装置を昇
降路の天井面近くに容易に据付けできて、最上階の乗場
からのエレベーターが設置される建物の高さが無用に高
くなることがない。このため、建物の建築費を節減し、
また周囲地域における日照権問題を解消する効果があ
る。また、巻上装置に転倒防止金具が設けられて、レー
ルからなる固定部に移動可能に係合されるので、巻上装
置を安定した状態で上昇移動させることができ、据付作
業を容易化する効果がある。
Thus, the highest position of the hoist to be installed is not restricted by the total value of the vertical dimensions of the hoisting device, the hoisting device, the slinging wire, etc. It can be easily raised to the required required installation position. For this reason, the height dimension from the hoistway ceiling surface to the machine stand of the hoisting device can be shortened, and the height from the top floor of the hoistway to the hoistway ceiling surface can be reduced. it can. Therefore, the hoisting device can be easily installed near the ceiling surface of the hoistway, and the height of the building where the elevator from the landing on the top floor is installed does not increase unnecessarily. This saves on building costs,
It also has the effect of eliminating the sunshine problem in the surrounding area. In addition, since the hoisting device is provided with a fall prevention fitting and is movably engaged with the fixed portion formed by the rail, the hoisting device can be moved up in a stable state, and the installation work is simplified. effective.

【0044】また、この発明は以上説明したように、巻
上装置をエレベーターの昇降路頂部を介して吊上装置に
より昇降路の所定上昇位置に吊り上げる第一工程と、昇
降路に立設されたレールの上端に設けられた支持桁、こ
の支持桁から下垂して下端が巻上装置に挿通されたねじ
棒及び巻上装置下面に配置されてねじ棒の挿通端にねじ
込まれたナットによって構成された引上装置により、所
定上昇位置の巻上装置を所定上昇位置よりも上方の据付
位置に引き上げる第二工程とによる工事を行うものであ
る。
As described above, according to the present invention, the first step of lifting the hoisting device to a predetermined elevation position of the hoistway by the hoisting device via the hoistway top of the elevator, and the erecting device is provided on the hoistway. It is composed of a support girder provided at the upper end of the rail, a screw rod which is suspended from the support girder and whose lower end is inserted into the hoisting device, and a nut which is disposed on the lower surface of the hoisting device and is screwed into the insertion end of the screw rod. The lifting device raises the hoisting device at the predetermined raising position to an installation position above the predetermined raising position, thereby performing construction by a second step.

【0045】これによって、据付けられる巻上装置の最
上昇位置が、吊り具、吊上装置、玉掛けワイヤ等の上下
方向寸法の合計値によって制約されることがなく、巻上
装置を昇降路頂部の寄りの所要の据付位置に容易に上昇
させることができる。このため、昇降路の天井面から巻
上装置の機械台までの高さ方向寸法を短くすることがで
き、昇降路の最上階の乗場から昇降路の天井面までの高
さを低くすることができる。したがって、昇降路に立設
されたレール上端の引上装置により、巻上装置を昇降路
の天井面近くに容易に据付けできて、最上階の乗場から
のエレベーターが設置される建物の高さが無用に高くな
ることがない。このため、建物の建築費を節減し、また
周囲地域における日照権問題を解消する効果がある。
Thus, the highest position of the hoist to be installed is not restricted by the total value of the vertical dimensions of the hoisting device, hoisting device, slinging wire, etc. It can be easily raised to the required required installation position. For this reason, the height dimension from the hoistway ceiling surface to the machine stand of the hoisting device can be shortened, and the height from the top floor of the hoistway to the hoistway ceiling surface can be reduced. it can. Therefore, the hoisting device at the upper end of the rail installed on the hoistway can easily install the hoisting device near the ceiling surface of the hoistway, and the height of the building where the elevator from the landing on the top floor is installed can be reduced. It doesn't get unnecessarily high. This has the effect of reducing the construction costs of the building and eliminating the sunshine problem in the surrounding area.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1を示す図で、巻上装
置据付の第一状況を示す昇降路の縦断面図。
FIG. 1 is a view showing a first embodiment of the present invention, and is a longitudinal sectional view of a hoistway showing a first state of installation of a hoisting device.

【図2】 巻上装置据付の第二状況を示す図1相当図。FIG. 2 is a diagram corresponding to FIG. 1, showing a second situation of installation of the hoisting device.

【図3】 巻上装置据付の第三状況を示す図1相当図。FIG. 3 is a diagram corresponding to FIG. 1 showing a third situation of installation of the hoisting device.

【図4】 巻上装置据付の第四状況を示す図1相当図。FIG. 4 is a diagram corresponding to FIG. 1, showing a fourth situation of installation of the hoisting device.

【図5】 巻上装置据付の終了状況を示す図1相当図。FIG. 5 is a view corresponding to FIG. 1, showing a state of completion of installation of the hoisting device.

【図6】 この発明の実施の形態2を示す図で、巻上装
置据付の第一状況を示す昇降路の縦断面図。
FIG. 6 is a view showing the second embodiment of the present invention, and is a longitudinal sectional view of a hoistway showing a first state of installation of a hoisting device.

【図7】 図6のB−B線断面拡大図。FIG. 7 is an enlarged cross-sectional view taken along line BB of FIG. 6;

【図8】 巻上装置据付の第二状況を示す図6相当図。FIG. 8 is a view corresponding to FIG. 6, showing a second situation of installation of the hoisting device.

【図9】 この発明の実施の形態3を示す図で、巻上装
置据付の第一状況を示す昇降路の縦断面図。
FIG. 9 is a view showing the third embodiment of the present invention, and is a longitudinal sectional view of a hoistway showing a first state of installation of a hoisting device.

【図10】 巻上装置据付の第二状況を示す図9相当
図。
FIG. 10 is a diagram corresponding to FIG. 9, showing a second situation of installation of the hoisting device;

【図11】 図10のC−C線断面拡大図。FIG. 11 is an enlarged cross-sectional view taken along line CC of FIG. 10;

【図12】 この発明の実施の形態4を示す図で、巻上
装置据付の第一状況を示す昇降路の縦断面図。
FIG. 12 is a view showing the fourth embodiment of the present invention, and is a longitudinal sectional view of a hoistway showing a first situation of installation of a hoisting device.

【図13】 従来のエレベーターの据付工法を説明する
図で、昇降路の縦断面図。
FIG. 13 is a view for explaining a conventional elevator installation method, and is a longitudinal sectional view of a hoistway.

【符号の説明】[Explanation of symbols]

1 昇降路、5 吊上装置、6 固定部、8 巻上装
置、15 押上装置、16固定部、18 転倒防止金
具、19 引上装置、20 支持桁、21 ねじ棒、2
2 ナット。
DESCRIPTION OF SYMBOLS 1 hoistway, 5 lifting device, 6 fixing part, 8 hoisting device, 15 lifting device, 16 fixing part, 18 fall prevention metal fitting, 19 pulling device, 20 support girder, 21 screw rod,
2 nuts.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 巻上装置をエレベーターの昇降路頂部を
介して吊上装置により上記昇降路の所定上昇位置に吊り
上げる第一工程と、上記所定上昇位置に配置された上記
巻上装置よりも下方の上記昇降路の固定部を介して、上
記所定上昇位置の上記巻上装置を押上装置により上記所
定上昇位置よりも上方の据付位置に押し上げる第二工程
とからなるエレベーターの据付工法。
A first step of lifting the hoisting device to a predetermined elevation position of the hoistway by a hoisting device via a hoistway top of an elevator; and a step below the hoisting device arranged at the predetermined elevation position. And a second step of pushing up the hoisting device at the predetermined ascending position to an installation position above the predetermined ascending position by a lifting device via the fixed portion of the hoistway.
【請求項2】 固定部を、昇降路に立設されたレールの
上端部によって形成したことを特徴とする請求項1記載
のエレベーターの据付工法。
2. The elevator installation method according to claim 1, wherein the fixed portion is formed by an upper end portion of a rail erected on the hoistway.
【請求項3】 固定部を、昇降路頂部寄りの壁面から水
平に突設された支持腕により形成したことを特徴とする
請求項1記載のエレベーターの据付工法。
3. The elevator installation method according to claim 1, wherein the fixing portion is formed by a support arm protruding horizontally from a wall near the top of the hoistway.
【請求項4】 巻上装置の巻上機上面に仮設されてレー
ルからなる固定部に移動可能に係合された転倒防止金具
を備えたことを特徴とする請求項1〜請求項3のいずれ
か一つに記載のエレベーターの据付工法。
4. A fall prevention fitting temporarily provided on an upper surface of a hoist of a hoist of a hoisting device and movably engaged with a fixed portion comprising a rail. Elevator installation method according to one of the above.
【請求項5】 巻上装置をエレベーターの昇降路頂部を
介して吊上装置により上記昇降路の所定上昇位置に吊り
上げる第一工程と、上記昇降路に立設されたレールの上
端に設けられた支持桁、この支持桁から下垂して下端が
上記巻上装置に挿通されたねじ棒及び上記巻上装置下面
に配置されて上記ねじ棒の挿通端にねじ込まれたナット
によって構成された引上装置により、上記所定上昇位置
の上記巻上装置を上記所定上昇位置よりも上方の据付位
置に引き上げる第二工程とからなるエレベーターの据付
工法。
5. A first step of lifting a hoisting device to a predetermined elevation position of the hoistway by a hoisting device via a hoistway top of an elevator, and provided at an upper end of a rail erected on the hoistway. A lifting device including a support girder, a screw rod that is suspended from the support girder and has a lower end inserted into the hoisting device, and a nut disposed on the lower surface of the hoisting device and screwed into the insertion end of the screw bar. And lifting the hoisting device at the predetermined ascending position to an installation position above the predetermined ascending position.
JP10346843A 1998-12-07 1998-12-07 Installation method of elevator Pending JP2000169059A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10346843A JP2000169059A (en) 1998-12-07 1998-12-07 Installation method of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10346843A JP2000169059A (en) 1998-12-07 1998-12-07 Installation method of elevator

Publications (1)

Publication Number Publication Date
JP2000169059A true JP2000169059A (en) 2000-06-20

Family

ID=18386189

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10346843A Pending JP2000169059A (en) 1998-12-07 1998-12-07 Installation method of elevator

Country Status (1)

Country Link
JP (1) JP2000169059A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002079067A1 (en) * 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Method for installing hoist
WO2002079068A1 (en) * 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Mechanism for fixing hoist and elevator
JP2006027749A (en) * 2004-07-12 2006-02-02 Toshiba Elevator Co Ltd Installation equipment for hoisting machine
JP2010189081A (en) * 2009-02-16 2010-09-02 Toshiba Elevator Co Ltd Hoisting machine installing device
DE102012104993A1 (en) * 2012-06-11 2013-12-12 Thyssenkrupp Elevator Ag Method and assembly system for mounting elevator components
CN114212651A (en) * 2021-12-17 2022-03-22 中国建筑第八工程局有限公司 Rear-mounted structure of elevator hook in completed project
WO2023175880A1 (en) * 2022-03-18 2023-09-21 株式会社日立ビルシステム Guide device for installation of hoisting machine, and hoisting machine installation method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002079067A1 (en) * 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Method for installing hoist
WO2002079068A1 (en) * 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Mechanism for fixing hoist and elevator
JP4828084B2 (en) * 2001-03-29 2011-11-30 三菱電機株式会社 How to install the hoist
JP2006027749A (en) * 2004-07-12 2006-02-02 Toshiba Elevator Co Ltd Installation equipment for hoisting machine
JP4597595B2 (en) * 2004-07-12 2010-12-15 東芝エレベータ株式会社 Hoisting machine installation equipment
JP2010189081A (en) * 2009-02-16 2010-09-02 Toshiba Elevator Co Ltd Hoisting machine installing device
DE102012104993A1 (en) * 2012-06-11 2013-12-12 Thyssenkrupp Elevator Ag Method and assembly system for mounting elevator components
CN114212651A (en) * 2021-12-17 2022-03-22 中国建筑第八工程局有限公司 Rear-mounted structure of elevator hook in completed project
WO2023175880A1 (en) * 2022-03-18 2023-09-21 株式会社日立ビルシステム Guide device for installation of hoisting machine, and hoisting machine installation method

Similar Documents

Publication Publication Date Title
JPH07100582B2 (en) Elevator work platform and elevator installation method
WO2010056202A1 (en) Mobile cantilever platforms and methods of installation thereof
JP2000169059A (en) Installation method of elevator
WO2020142001A1 (en) A moveable platform
JP3193609B2 (en) Elevator installation method
JP3348018B2 (en) Elevator installation method
JP2001335255A (en) Elevator installation construction method, and elevator installation unit
JP2878936B2 (en) Elevator installation method
JP2674392B2 (en) Hydraulic elevator installation method
JP4841171B2 (en) Rise-up elevator installation method
JPH0734069Y2 (en) Lifting device for car or counterweight in elevator
JP2008214062A (en) Lifting device and structural material mounting method
JPH061562A (en) Guide rail erection method for hydraulic elevator
JP4312590B2 (en) Lower assembly method for elevator upper equipment
JP2507636B2 (en) Mechanical platform support device for temporary elevator
JP3301948B2 (en) Elevator installation method
JP2000335847A (en) Elevator installation device
JP2002060158A (en) Installation method for elevator
JPH0741746Y2 (en) Elevator installation device
JP2877593B2 (en) Elevator installation method
JP3519009B2 (en) Elevator installation method
JPH11209027A (en) Installation method for elevator
JP2005298207A (en) Emergency stop device for elevator
JPH05262475A (en) Installation method of elevator
JP4454744B2 (en) Temporary elevator device