JP2000045543A - Dismantling method of four-strut type vent - Google Patents

Dismantling method of four-strut type vent

Info

Publication number
JP2000045543A
JP2000045543A JP10226611A JP22661198A JP2000045543A JP 2000045543 A JP2000045543 A JP 2000045543A JP 10226611 A JP10226611 A JP 10226611A JP 22661198 A JP22661198 A JP 22661198A JP 2000045543 A JP2000045543 A JP 2000045543A
Authority
JP
Japan
Prior art keywords
vent
post
unit vent
rail
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10226611A
Other languages
Japanese (ja)
Inventor
Shinichi Arayoshi
信市 新吉
Hiroyuki Yugawa
浩幸 湯川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAWAJU KOJI KK
Original Assignee
KAWAJU KOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAWAJU KOJI KK filed Critical KAWAJU KOJI KK
Priority to JP10226611A priority Critical patent/JP2000045543A/en
Publication of JP2000045543A publication Critical patent/JP2000045543A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To safely, efficiently and smoothly perform the high place working of the dismantling removal of a unit vent. SOLUTION: A carriage-cum-receiving beam 10 is interposed in the lower part of the four-strut type unit vent 1' of the highest top part, a rail receiving beam 7 is spanned on the upper part of the four-strut type unit vent of a lower order, jacked up with a jack so as to interpose an endless roller 8' between both, the four-strut type unit vent of the highest top part is laterally moved in the orthogonal direction to the longitudinal direction of a bridge up to a prescribed distance by a winch 17 and a wire 16 to form a free space, and hung down by a lifting machine such as a crane in the free space to be dismantled and removed. Next, the four-strut type unit vent 1 of a lower stage is hung down by the lifting machine in order to be dismantled and removed. At this time, a sandle integrally laminated to the four-strut type unit vent 1' of the highest top part is integrally sideward moved to hung down so as to be dismantled and removed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】開示技術は、橋桁やトラス等の大
重量の構造物を支持する4本支柱式のベントの解体撤去
の技術分野に属する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The disclosed technology belongs to the technical field of dismantling and removing a four-post type vent that supports a heavy structure such as a bridge girder or a truss.

【0002】[0002]

【従来の技術】周知の如く橋梁工事や各種鉄骨構造物の
建設現場においては、橋桁やトラス等の大型大重量の構
造物を架設する場合、予め工場で所定に製作されたユニ
ットサイズの橋桁やトラス等の鉄骨構造物を施工現場ま
でトラック輸送等し、出願人が先に案出した組み立て式
の4本支柱式の式ベント等で仮受けし、先行きセット構
造物と後行きセットされる構造物とをジョイント部を介
し継ぎ合わせして一体結合するような接合態様を採る
が、この場合、図6に示す様に組み立てられた各折畳み
式の4本支柱式のユニットベント1,1' に対し、橋桁
やトラス等の図示しない構造物に対する仮受け梁2のレ
ベルを可及的にフラットにし、最頂部の4本支柱式のユ
ニットベント1' の支持パイプ3との間に所定の空間4
を確保するために所定小サイズのボルト孔を穿設したH
型鋼サンドル5等を井桁状等に所定段数積層する等して
介装しているが、該サンドル5の介装は、高所作業によ
るものであり、又各4本支柱式のユニットベント1,1
' の解体撤去に際しては、該サンドル5を作業員の手作
業で単品づつ引き抜いて撤去し、クレーン等の揚重機の
吊りワイヤーが極端に傾斜するのを避ける手法が採られ
ている。
2. Description of the Related Art As is well known, in the construction site of bridge construction and various steel structures, when a large and heavy structure such as a bridge girder or a truss is to be erected, a unit-sized bridge girder manufactured in advance in a factory is required. Truck structures, such as trusses, are transported by truck to the construction site, and are temporarily received by an assembling four-post type vent that was previously devised by the applicant. In this case, a joint mode is adopted in which the objects are joined together through a joint portion to be integrally joined. In this case, each of the folding four-post unit vents 1, 1 'assembled as shown in FIG. On the other hand, the level of the temporary receiving beam 2 for a structure (not shown) such as a bridge girder or a truss is made as flat as possible, and a predetermined space 4 is provided between the temporary supporting beam 2 and the support pipe 3 of the four-post type unit vent 1 'at the top.
H with a predetermined small size bolt hole to secure
The steel sandals 5 and the like are interposed by laminating a predetermined number of steps in a double-girder shape or the like. The interposition of the sandals 5 is performed by working at a high place. 1
At the time of dismantling and removal of ', a method is adopted in which the sandals 5 are manually pulled out and removed one by one by an operator to prevent the suspension wires of a lifting machine such as a crane from being extremely inclined.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、例え
ば、大型構造物としての橋梁等の構築等のに際しては、
ユニット橋桁の継ぎ合わせが高所作業となり、又当該橋
梁等の設置条件により設計構造が異なる等の条件から積
層するサンドル5の段数が異なり、したがって該サンド
ル5の積層施工や解体撤去施工作業等は高所作業のため
に極めて危険を伴うものであり、施工能率が悪いという
欠点があり、施工作業が、極めて困難性を伴うという難
点もあり、又、結果的にコスト高になるという不利点も
あった。
However, for example, when constructing a bridge or the like as a large structure,
The joining of the unit bridge girders is performed at a high place, and the number of layers of the sandals 5 to be stacked is different due to the conditions such as the design structure is different depending on the installation conditions of the bridge and the like. It is extremely dangerous due to work at high places, has the disadvantage of poor construction efficiency, has the disadvantage that construction work is extremely difficult, and has the disadvantage of high cost. there were.

【0004】特に、当該サンドル5の撤去に際しては、
単品ごとの該サンドル5の引き抜き撤去に際しては、極
めて高い熟練を要し、高所作業のうえに、仮受け梁2の
下部に於ける空間4が狭隘なために作業がし難いという
不都合さがあった。
[0004] In particular, when removing the sandal 5,
The removal and removal of the sandals 5 for each item requires extremely high skill, and in addition to working at heights, the inconvenience that the space 4 at the lower part of the temporary receiving beam 2 is narrow is difficult to work. there were.

【0005】尚、サンドル5を仮受け梁2と最頂部の4
本支柱式のユニットベント1' の支持パイプ3との間に
サンドル5を介装するに際して後は該サンドル5相互の
ボルト孔等を介しボルト締めを行って安定姿勢を保持す
る等のようにしてはいる。
[0005] Incidentally, the sandals 5 are connected to the temporary receiving beam 2 and the top 4.
When the sandals 5 are interposed between the support pipe 3 of the unit-type vent 1 'and the support pipes 3, the bolts are tightened through bolt holes and the like between the sandals 5 to maintain a stable posture. Yes.

【0006】而して、このようにして該サンドル5の解
体撤去が行われた後で最頂部の4本支柱式のユニットベ
ント1' の撤去が行われても、次いでその下段の4本支
柱式のユニットベント1' の解体撤去を行うには、充分
な空間4が保たれるとは限らず、クレーン等の余裕のあ
るセットが出来ず、したがって、該4本支柱式のユニッ
トベントの解体撤去もし難いという不都合さもあり、加
えてその下段の4本支柱式のユニットベント1の解体撤
去も能率良く行えないという不具合もあった。
Thus, even if the four-post type unit vent 1 'at the top is removed after the disassembly and removal of the sanddle 5, the lower four-post type unit vent 1' is then removed. In order to dismantle and remove the unit vent 1 'of the type, it is not always possible to maintain a sufficient space 4, and it is not possible to set a room such as a crane, so that the unit vent of the four-post type is dismantled. There is also a disadvantage that it is difficult to remove, and in addition, there is a disadvantage that the disassembly and removal of the lower four-post type unit vent 1 cannot be performed efficiently.

【0007】[0007]

【発明の目的】この出願の発明の目的は上述従来技術に
基づく組み立てタイプの4本支柱式のベント等の解体撤
去に際しての最頂部の4本支柱式のユニットベントと橋
桁下部の仮受け受梁との間に介装するサンドル及び、そ
の下部の最頂部4本支柱式のユニットベントの撤去解体
の問題点を解決すべき技術的課題とし、手作業によるサ
ンドルの解体撤去を行わず、最頂部の4本支柱式のユニ
ットベントごと横移動して側方の余裕のある自由空間部
に於けるクレーン等の揚重機を用いてスムーズ吊り降ろ
しを行い、該最頂部の4本支柱式のユニットベントの解
体撤去によって形成される余裕のある空間部を利用して
クレーン等の揚重機をセットし次の下段の4本支柱式の
ユニットベントを順次吊り降ろして、高所作業による4
本支柱式のベントの解体撤去が安全にスムーズに高能率
で行えるようにし、各4本支柱式のユニットベントの転
用等も所望に行えるようにして建設産業に於ける構造物
架設技術利用分野に益する優れた4本支柱式のベントの
解体工法を提供せんとするものである。
It is an object of the present invention to provide a four-post type unit vent at the top and a temporary receiving beam at the lower part of a bridge girder when dismantling and removing a four-post type vent of an assembling type based on the prior art. The technical problem to be solved is to remove and dismantle the sandle interposed between and the lowermost four-post type unit vent at the lower part of the sandle. The four-post unit vent of the four-post type is laterally moved, and smoothly lifted and lowered using a lifting machine such as a crane in a free space with ample room on the side. A crane or other lifting machine is set using the extra space formed by the dismantling and removal of the above, and the next lower four-post type unit vent is sequentially lowered and lowered.
The dismantling and removal of the four-post vent can be performed safely and smoothly with high efficiency, and the diversion of each four-post unit vent can be performed as desired. It is intended to provide an excellent method of dismantling a four-post vent.

【0008】[0008]

【課題を解決するための手段】上部構造物の下部に介装
設置された複段の4本支柱式のユニットベントを頂部の
4本支柱式のユニットベントから順に揚重機を介して撤
去する解体工法であって、最頂部の4本支柱式のユニッ
トベントに予めボルトにより固設した台車兼受梁ごと該
最頂部の4本支柱式のユニットベントをその下部の4本
支柱式のユニットベントに同じくボルトを介し固設した
軌条用受梁に沿って上記構造物と干渉しない位置まで該
構造物の長手方向に対して直角方向に横方移動した後ク
レーン等の揚重機により吊り降ろし撤去し、次いで該構
造物とその下部の4本支柱式のユニットベントとの間に
形成された空間を用いてクレーン等の揚重機により次段
の4本支柱式のユニットベントを順に吊り降ろして撤去
するようにすることを基幹とし、上記最頂部の4本支柱
式のユニットベントと台車兼受梁との移動をウィンチと
ワイヤーにより行うようにし、上記最頂部のユニットベ
ントと台車兼受梁との横移動を上記軌条用受梁の両側に
対するサイドガイドを用いて進行方向から逸脱しないよ
うにして行うようにもし、又、上記台車兼受梁の横移動
に際し該台車兼受梁と軌条用受梁との間にエンドレスロ
ーラーを介装して横移動が行われるようにし、上記エン
ドレスローラーを台車兼受梁と軌条用受梁との間に介装
するに、各固定用のボルトを取外し該台車兼受梁を軌条
用受梁に対し僅かにジャッキアップして行うようにも
し、加えて上記台車兼受梁の横移動を構造物の長手方向
に対し直角方向に行うようにし技術的手段を講じたもの
である。
Means for Solving the Problems A disassembly in which a multi-stage four-post type unit vent installed at a lower portion of an upper structure is sequentially removed from a top four-post type unit vent via a lifting machine. In the construction method, the four-post unit vent at the top of the four-post unit vent is fixed to the four-post unit vent at the bottom, together with the bogie and the receiving beam fixed in advance by bolts to the four-post unit vent at the top. Similarly, after moving laterally in the direction perpendicular to the longitudinal direction of the structure to a position not interfering with the above-mentioned structure along the rail support fixed via bolts, it is lowered and removed by a lifting machine such as a crane, Then, using a space formed between the structure and the four-post unit vent at the lower part, the four-post unit vent of the next stage is lifted down by a crane or other lifting machine in order and removed. To be With the backing as a backbone, the four-post type unit vent at the top and the carriage and receiving beam are moved by a winch and a wire, and the lateral movement between the top unit vent and the truck and receiving beam is moved by the rail. Side guides on both sides of the support beam so as not to deviate from the traveling direction. Also, when the carriage and support beam are laterally moved, an endless space is provided between the carriage and support beam and the rail support beam. In order to perform the lateral movement by interposing rollers, and to interpose the endless roller between the truck / receiver and the rail receiver, each fixing bolt is removed, and the truck / receiver is connected to the rail. A technical measure is taken such that the jack is slightly jacked up with respect to the receiving beam, and in addition, the lateral movement of the carriage and the receiving beam is performed in a direction perpendicular to the longitudinal direction of the structure.

【0009】[0009]

【作用】上述構成において、橋梁の受梁や建築物のトラ
ス等の大型の大重量の構造物を架設するに、例えば、組
み立て式の4本支柱式のベント等の各段の4本支柱式の
ユニットベントの最頂部の4本支柱式のユニットベント
と構造物の下部の仮受け受梁との間に小サイズのH型鋼
サンドルを所定段数井桁状に積層状に積み重ね、而し
て、該構造物の下部の仮受け梁と最頂部のユニットベン
トの台座との間の該サンドルの各H型鋼のボルト孔を介
しボルトで締め付け一体化し最頂部の4本支柱式のユニ
ットベントと構造物下部の間に介設した仮受け梁とのレ
ベルを可及的にフラットにし、安定して介装させるよう
にし、そして該4本支柱式のベント等を介し橋桁やトラ
ス等の大型構造物のジョイント部を継ぎ合わせ接合し、
所定の架設工事を行い、而して、その間最頂部の4本支
柱式のユニットベントの台座を台車兼受梁にボルトを介
し固定し、又、該台車兼受梁は当該最頂部4本支柱式の
ユニットベントの下段の4本支柱式のユニットベントの
上部にボルトを介し固定した軌条用受梁に一体的に固設
し、この際ウィンチやジャッキやワイヤーの配設をしな
いようにし而して、当該架設が終了して各4本支柱式の
ユニットベントの解体撤去を行うに際しては、台車兼受
梁と軌条用受梁に対する固定用のボルトを取り外して横
移動自在にし、台車兼受梁を軌条用受梁に対しジャッキ
をセットし該台車兼受梁に設けたエンドレスローラー取
付け用凹部が該エンドレスローラーの寸法に対し僅かに
小さいことを利用し、所定微少量ジャッキアップし、当
該ジャッキアップした微少間隙にエンドレスローラーを
介装し、該台車受梁と軌条用受梁との間にウィンチとワ
イヤーを介装し、構造物の長手方向と直角方向に構造物
に干渉しない位置まで所定量横移動し、この際、該台車
兼受梁の側方には、下部の軌条用受梁の側面に対するロ
ーラータイプのサイドガイドを設けて当該横移動に際し
ての台車兼受梁の軌条用受梁に対する進行方向の逸脱を
防止し、スムーズに横移動が行われるようにし、下段の
4本支柱式のユニットベントの上部側方には、ベント用
張り出し足場を設置し、施工の安全性を保持し、台車兼
受梁とサンドル等を一体的に横移動し、下段の4本支柱
式のユニットベントと上部の構造物の仮受け梁との間に
形成された空間を利用してクレーン等の揚重機を用いサ
ンドルと台車兼受梁を吊り降ろして解体撤去し、又、こ
のようにして最頂部の4本支柱式のユニットベントがサ
ンドルと共に横移動しクレーン等の揚重機により、解体
撤去された後の空間を利用し、順次下段の4本支柱式の
ユニットベントをクレーン等により吊り降ろして解体撤
去するようにして、能率よく、施工期間を短縮し、高所
作業ながら安全裡に全ての4本支柱式のユニットベント
が解体撤去できるようにし、施工期間が短縮され、低コ
ストで解体撤去が行えるようにし、このようにして従来
手作業により、非能率的に行っていた高所作業としての
解体撤去が安全に地上にて行うことができるようにしに
したものである。
In the above construction, in order to construct a large and heavy structure such as a bridge bridge or a building truss, for example, a four-post system of each stage such as an assembled four-post vent is used. The small-sized H-shaped steel sandles are stacked in a predetermined number of rows between the four-post type unit vent at the top of the unit vent and the temporary receiving beam at the lower part of the structure. A four-post type unit vent at the top and a lower part of the structure, which is integrated by bolting the bolts through the bolt holes of each H-shaped steel of the sandal between the temporary receiving beam at the lower part of the structure and the pedestal of the unit vent at the top The level with the temporary receiving beam interposed between them is made as flat as possible, so that they can be stably interposed, and joints of large structures such as bridge girders and trusses are provided via the four-post type vent. Parts are joined and joined,
A predetermined erection work is performed, and the pedestal of the four-post type unit vent at the top is fixed to the trolley / supporting beam via bolts during the erection work, and the trolley / supporting beam is the topmost four post. At the top of the four-post type unit vent at the lower stage of the unit vent, it is integrally fixed to the rail support beam fixed with bolts, and at this time, no winch, jack or wire is arranged. When disassembling and removing each four-post type unit vent after the completion of the erection, the bolts for fixing the truck and the beam and the rail beam are removed so that the truck can be moved laterally, and the truck and the beam are removed. Using the fact that the endless roller mounting recess provided on the carriage / supporting beam is slightly smaller than the size of the endless roller, the jack is set up on the rail receiving beam, and a predetermined minute amount of jacking up is performed. An endless roller is interposed in the small gap, a winch and a wire are interposed between the bogie support and the rail support, and a predetermined amount is set to a position not interfering with the structure in a direction perpendicular to the longitudinal direction of the structure. Lateral movement, at this time, a roller type side guide for the side surface of the lower rail support is provided on the side of the trolley and receiver, and the trolley and receiver for the rail support for the lateral movement is provided. Prevent deviation in the direction of travel, ensure smooth lateral movement, and install overhanging scaffolds on the upper side of the lower four-unit unit vent to maintain construction safety, The trolley / support and the sandals are moved sideways as a unit, and a lifting machine such as a crane is used by utilizing the space formed between the lower four-column unit vent and the temporary support of the upper structure. Hang the sandals and the trolley / supporting beam using The body is removed, and the four-post type unit vent at the top is moved laterally together with the sandals in this way, and the space after being dismantled and removed by a crane or other lifting machine is used to sequentially lower the four pillars. Hanging down the unit vent with a crane etc. and dismantling and removing it, efficiently and shortening the construction period, so that all four-post unit vents can be dismantled and removed safely while working at heights, The construction period is shortened, and dismantling and removal can be performed at low cost. In this way, dismantling and removal as high-altitude work, which was conventionally performed inefficiently, can be safely performed on the ground. It is a thing that I chose.

【0010】[0010]

【発明が実施しようとする形態】次ぎにこの出願の発明
の実施しようとする形態を1実施例の態様として図1乃
至図5に従って説明すれば以下の通りである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, a preferred embodiment of the present invention will be described with reference to FIGS. 1 to 5 as an embodiment of the present invention.

【0011】尚、第6図と同一態様部分は同一符号を用
いて説明するものとする。
The same parts as those in FIG. 6 will be described using the same reference numerals.

【0012】図示実施例は橋梁の橋桁のジョイント部継
ぎ合わせの仮設施工等に用いる組み立て式の4本支柱式
のベントの解体撤去の態様である。
The illustrated embodiment is an embodiment of disassembly and removal of an assembling four-post vent used for temporary construction of a joint of a bridge girder of a bridge.

【0013】該組み立て式の4本支柱式のユニットベン
ト1,1' は図6に示す在来態様同様に、施工現場に於
いて地上から、順番に所定態様に組み立てられるもので
あり、大型構造物の橋桁の仮受け梁2との間に台座6を
介し、サンドル5をボルト11により組み合わせ固定状
態にされているものであり、サンドル5の組み立て作業
もし易く、解体について地上で行うことができるように
したものである。
The assembled four-post type unit vents 1, 1 'are assembled in a predetermined manner from the ground at the construction site in the same manner as in the conventional embodiment shown in FIG. Sandals 5 are fixed by bolts 11 via pedestals 6 between the temporary receiving beams 2 of the object bridge girder, and the sandals 5 can be easily assembled and dismantled on the ground. It is like that.

【0014】該組み立て式の4本支柱式のベント1,1
' は図6に示す在来態様同様、施工現場に於いて地上か
ら順番に所定態様に組み立てられるものであり、最頂部
の4本支柱式のユニットベント1' と大型構造物の橋桁
の仮受け梁2との間に台座6を介しボルト11を介して
縫い合わせ固定式にされているものであり、該、仮受け
梁2と台座6との間に在来態様のように小サイズのH型
鋼サンドル5がボルト孔を介しボルト締めを介し、所定
段数井桁状に積層状態に介装される態様であって、仮受
け梁2のセット姿勢を設定状態で可及的に水平状態に保
つと共に桁下の作業空間4を確保することが出来るよう
にされている。
The assembled four-post vent 1,1
'Is assembled in a predetermined manner in order from the ground at the construction site in the same manner as the conventional manner shown in FIG. 6, and a four-post unit vent 1' at the top and a temporary support of a bridge girder of a large structure. A small-sized H-shaped steel is provided between the temporary receiving beam 2 and the pedestal 6 in a conventional manner between the temporary receiving beam 2 and the pedestal 6. This is a mode in which the sandals 5 are interposed in a laminated state in a predetermined number of rows of girders through bolt holes through bolt holes, and the setting posture of the temporary receiving beam 2 is kept as horizontal as possible in a set state, and A lower working space 4 can be secured.

【0015】而して、上から2段目の4本支柱式のユニ
ットベント1の上部に最頂部の4本支柱式のユニットベ
ント1' を組付するに際しては下位の4本支柱式のユニ
ットベント1に軌条用受梁7を台座6を介しボルト11
を介し縫い止め固定し、(この段階では、ジャッキ18
やシーブ14,14' ,ワイヤー16,ウィンチ17等
は配設しない。)而して台座6を介しボルト11により
上記軌条用受梁7の上に台車兼受梁10をボルト11を
介し縫い止め固定し、更に、その上部に4本支柱式のユ
ニットベント1' を台座6を介しボルト11により縫い
止め固定する。
When assembling the top four-post unit vent 1 'on the top of the second four-post unit vent 1 from the top, the lower four-post unit vent 1' is assembled. A rail receiving beam 7 is attached to a vent 1 via a pedestal 6 and a bolt 11.
Sewn and fastened through (at this stage, jack 18
And sheaves 14, 14 ', wire 16, winch 17, etc. are not provided. Then, the carriage / receiver beam 10 is sewn and fixed onto the rail support beam 7 by the bolt 11 via the pedestal 6 and the bolt 11, and a four-post unit vent 1 ′ is provided on the upper part thereof. Sewing is fixed by bolts 11 via the base 6.

【0016】解体時には軌条用受梁7と台車兼受梁10
を固定しているボルト11を外しておく。
At the time of dismantling, the rail support 7 and the trolley and support 10 are used.
Remove the bolts 11 fixing the.

【0017】上記軌条用受梁7に対し横移動可能な台車
兼受梁10が両側に、図5
A bogie and receiving beam 10 which can be moved laterally with respect to the rail receiving beam 7 is provided on both sides in FIG.

【イ】,【I】,

【ロ】に示す様に、エンドレスローラー8を解体時に介
装する凹部9が形成され、その端部に所定のジャッキ1
8を解体時に介装可能であるようにセットし、台車兼受
梁10を解体時には該ジャッキ18を介して当該図5の
As shown in (b), a recess 9 is formed to interpose the endless roller 8 during disassembly.
8 is set so that it can be interposed at the time of dismantling, and the bogie / receiving beam 10 is dismantled via the jack 18 of FIG.

【イ】に示す様に、該凹部9がエンドレスローラー8の
寸法に対し小さいため僅かな間隙dを形成するようにジ
ャッキアップし、更に台車兼受梁10の端部側面には、
当該図5の
As shown in (a), since the recess 9 is smaller than the size of the endless roller 8, the jack 9 is jacked up so as to form a slight gap d.
In FIG.

【ロ】に示す様に軌条用受梁7のフランジ部に当接して
転動し、該台車兼受梁10が軌条用受梁7に沿って横移
動する時に進行方向から逸脱しないようにサイドガイド
のローラ19が外側に配設されて該台車兼受梁10が軌
条用受梁7の進行方向に沿ってスムーズに横移動するこ
とが出来るようにされている。
[2] As shown in (b), it rolls in contact with the flange portion of the rail support 7 so that the bogie / support 10 does not deviate from the traveling direction when it moves laterally along the rail support 7. A guide roller 19 is provided on the outside so that the carriage / receiver beam 10 can move laterally smoothly along the traveling direction of the rail receiver beam 7.

【0018】そして、軌条用受梁7の端部には補助受梁
7' が縦方向に渡設され、その中央部には、プーリタイ
プのシーブ14が設けられ、ウィンチ17に挿通されて
いるエンドレスワイヤー16の端部のフックを係止して
おり、該エンドレスワイヤー16の中途部は台車兼受梁
10に渡設された縦方向の受梁10' のブラケット15
に中途のフックを係止すると共に他端部は図11に示す
様に、軌条用受梁10の他端部に渡設された縦方向の受
梁10''に設けた後方のシーブ14' に係止されてお
り、したがって、図3,4に示す様にウィンチ17のハ
ンドル17' を操作することにより、エンドレスワイヤ
ー16をシーブ14,14' 間に周回させ、軌条用受梁
7に台車兼受梁10をサイドガイド19,19を介し、
進行方向から逸脱することなく、スムーズに、進退動さ
れて所定距離横移動することが出来るようにされてい
る。
An auxiliary support beam 7 'is provided at the end of the rail support beam 7 in the vertical direction, and a pulley type sheave 14 is provided at the center of the auxiliary support beam 7'. A hook at an end of the endless wire 16 is locked, and a middle part of the endless wire 16 is a bracket 15 of a vertical receiving beam 10 ′ provided to the carriage / receiving beam 10.
11, and the other end is provided at the rear sheave 14 'provided on a vertical receiving beam 10''provided at the other end of the rail receiving beam 10 as shown in FIG. Therefore, by operating the handle 17 'of the winch 17 as shown in FIGS. 3 and 4, the endless wire 16 is turned between the sheaves 14 and 14', and the carriage 7 Through the side guides 19, 19,
It is possible to smoothly move forward and backward and move laterally for a predetermined distance without deviating from the traveling direction.

【0019】勿論、前述した如く該台車兼受梁10上に
は、最頂部の4本支柱式のユニットベント1' が台座6
及びボルト11を介し予め一体的に固設されているため
に、該最頂部の4本支柱式のユニットベント1' は一体
的に軌条用受梁7に沿って橋梁1の長手方向に対し直角
方向に所定距離横移動することが出来るものである。
Of course, as described above, the four-post type unit vent 1 'at the top is provided on the pedestal 6 on the trolley and receiving beam 10.
And the bolts 11 are integrally fixed in advance, so that the four-post type unit vent 1 ′ at the top is integrally formed along the rail support 7 at right angles to the longitudinal direction of the bridge 1. It can move laterally in the direction by a predetermined distance.

【0020】而して、当該態様において、最頂部の4本
支柱式のユニットベント1' の仮受梁2の上にサンドル
5,5がボルト11を介し一体的に井桁状に積層されて
いて該サンドル5は在来態様の如くを手作業により摺動
を介し解体撤去することなく、頂部4本支柱式のベント
1' と共に一体的に横移動されるものである。
Thus, in this embodiment, the sandals 5 and 5 are integrally laminated on the temporary receiving beam 2 of the four-post type unit vent 1 'at the top via the bolt 11 in a cross-girder shape. The sandle 5 is integrally laterally moved together with the four-post type vent 1 'without being dismantled and removed manually by sliding as in the conventional mode.

【0021】又、この際、橋桁を仮受けする仮受け梁2
もボルト11を介しサンドル5と共に最頂部4本支柱式
のユニットベント1' に一体的に固設されたまま側方に
横移動できることは、勿論のことである。
At this time, a temporary receiving beam 2 for temporarily receiving the bridge girder is provided.
It is needless to say that the unit can be laterally moved while being integrally fixed to the unit vent 1 'of the topmost four-post type together with the sanddle 5 via the bolt 11.

【0022】尚、この場合、図2,図4に示す様に、軌
条用受梁7の台車兼受梁10の移動位置に対しブラケッ
トを介しベント用張り出し足場12及び作業足場12'
を配設しておくようにしておくものである。
In this case, as shown in FIGS. 2 and 4, the projecting scaffold 12 for venting and the working scaffold 12 'are moved via the brackets to the moving position of the bogie / receiving beam 10 of the rail receiving beam 7 via the bracket.
Is to be arranged.

【0023】そして、最頂部4本支柱式のユニットベン
ト1' の横移動に際しては、該台車兼受梁10と軌条用
受梁7とを一体連結していたボルト11を取り外し上述
した如くジャッキ18をセットしウィンチ17,シーブ
14をセットし、該ジャッキ18により、台車兼受梁1
0を該台車兼受梁10に設けたエンドレスローラー8の
取付け用凹部9が該エンドレスローラー8の寸法に対し
て小さいため僅かに小さい高さdだけジャッキアップ
し、当該ジャッキアップにより、エンドレスローラー8
を台車兼受梁10の凹部9に挿入セットし、該台車兼受
梁10上の4本支柱式のユニットベント1' の軌条用受
梁7の横移動がスムーズに安定した状態で行われるよう
にする。
When the four-post top unit vent 1 'is moved laterally, the bolt 11 that integrally connects the truck / receiver beam 10 and the rail beam receiver 7 is removed, and the jack 18 is moved as described above. And the winch 17 and the sheave 14 are set.
0 is slightly smaller in height than the dimension of the endless roller 8 because the mounting recess 9 of the endless roller 8 provided on the carriage and receiving beam 10 is jacked up by a slightly smaller height d.
Is inserted into the recess 9 of the trolley and support beam 10 so that the lateral movement of the rail support beam 7 of the four-post type unit vent 1 ′ on the trolley and support beam 10 can be performed smoothly and stably. To

【0024】尚、この際ジャッキ18による当該dの小
さい高さだけジャッキアップするだけでよいために、台
車兼受梁10の傾斜は、ほとんど実際上は無視すること
ができる。
In this case, since the jack 18 only needs to be jacked up by the small height of d, the inclination of the bogie / supporting beam 10 can be practically ignored.

【0025】而して、上述の如く台車兼受梁10を介し
最頂部の4本支柱式のユニットベント1' 及びH型鋼サ
ンドル5を一体的に所定量の構造物の長さ方向に対して
直角方向に所定距離横移動して橋桁等の構造物とは干渉
しない位置まで移動した後は形成される自由空間4に於
いて、クレーン等の揚重機を介し該最頂部4本支柱式の
ユニットベント1' 及び又サンドル5及び仮受け梁2を
吊り降ろして所定に解体撤去すれば良い。
Thus, as described above, the four-post type unit vent 1 'and the H-shaped steel sandle 5 on the top are integrally integrated with the predetermined amount of the structure in the longitudinal direction via the trolley and receiving beam 10. After moving to a position not interfering with a structure such as a bridge girder by laterally moving a predetermined distance in a right angle direction, in a free space 4 to be formed, the topmost four-post type unit is provided via a lifting machine such as a crane. The vent 1 ', the sandals 5, and the temporary receiving beams 2 may be suspended and dismantled and removed in a predetermined manner.

【0026】このようにすることにより、初期組付セッ
トされた最頂部の4本支柱式のユニットベント1' がセ
ットされた空間4が広くなるために、該空間4にクレー
ン等の揚重機を所定にセットし、下部の軌条用受梁7や
次段の4本支柱式のユニットベント1を順に地上に吊り
下げ、所定に解体撤去することが出来る。
By doing so, the space 4 in which the four-post type unit vent 1 'at the top, which is initially assembled and set, is widened, and a hoist such as a crane is installed in the space 4. It can be set in a predetermined manner, the lower rail support beam 7 and the next-stage four-post unit vent 1 can be suspended from the ground in order, and can be dismantled and removed in a predetermined manner.

【0027】尚、側方横移動後の最頂部4本支柱式のユ
ニットベント1' のクレーンに対する玉がけ等の諸作業
はベント用張り出し足場12或いは作業用足場12' を
介し、高所作業にもかかわらず、安全に作業行うことが
出来る。
Various operations such as balling on the crane of the four-post top unit vent 1 'after the lateral lateral movement are performed via the vent overhanging scaffolding 12 or the working scaffolding 12'. Nevertheless, they can work safely.

【0028】又、ウィンチ17のハンドル17' の操作
やシーブ14に対するフックの係止作業等の作業も同様
にベント用張り出し足場12や作業用足場12' により
安全に行うことが出来る。
Also, operations such as the operation of the handle 17 'of the winch 17 and the hooking operation of the hook to the sheave 14 can be performed safely by the vent overhanging scaffold 12 and the working scaffold 12'.

【0029】尚、台車兼受梁10の側方横移動の所定距
離端部に於いては軌条用受梁7の端部に渡設されている
受梁7' が該台車兼受梁10に対するストッパとして機
能する。
At the end of the lateral movement of the carriage / receiver beam 10 at a predetermined distance, a support 7 'provided at the end of the rail support beam 7 is provided with respect to the carriage / receiver beam 10. Functions as a stopper.

【0030】尚、この出願の発明の実施態様は上述実施
例に限るものでないことは勿論であり、又、設計変更的
には、軌条用受梁7の端部に渡設したストッパとしての
受梁7' 端部にゴム等の緩衝材を設ける等は適宜に採用
し得るものである。
It should be noted that the embodiment of the invention of this application is not limited to the above-described embodiment, and that the design of the invention is not limited to the above-described embodiment. Providing a cushioning material such as rubber at the end of the beam 7 'can be appropriately adopted.

【0031】そして、適用対象は橋梁の橋桁のトラス等
の大型鉄鋼構造物等の施工にも適用し得ることは勿論の
ことである。
Of course, the present invention can be applied to the construction of a large steel structure such as a truss of a bridge girder of a bridge.

【0032】[0032]

【発明の効果】以上、この出願の発明によれば、基本的
には橋梁の橋桁や鉄骨構造物等のブロック状の大型構造
物の仮受け材として架設に用いるベントの最頂部4の本
支柱式のユニットベントの解体撤去施工が該最頂部の4
本支柱式のユニットベント上に於けるサンドルの積層状
態の解体撤去施工も含めて、最頂部の4本支柱式のユニ
ットベントと該最頂部の4本支柱式のベントとの間の狭
隘な空間に於いてクレーン等の揚重機のワイヤーが当該
狭隘さの故に桁本体に接触したりして作業の困難性が無
く、最頂部の4本支柱式のユニットベントごと台車兼受
梁を介しその下部の軌条用受梁に沿って当該構造物の長
手方向に対し直角方向に所定量の横移動をさせて自由空
間を形成し、当該自由空間に於いてクレーン等の揚重機
により順に地上に吊り下げ解体撤去が出来るために、高
所作業が安全でスムーズで高能率で施工期間も短縮して
行われるという優れた効果が奏される。
As described above, according to the invention of this application, basically, the main support at the topmost portion 4 of the vent used for erection as a temporary receiving material for a large block-shaped structure such as a bridge girder of a bridge or a steel structure. The dismantling and removal of the unit vent is performed at the top 4
Narrow space between the top four-post unit vent and the top four-post vent, including the demolition and removal of sandals on the single-post unit vent There is no difficulty in the work because the wires of the lifting machine such as a crane touch the girder main body due to the narrowness, and the lower part of the four-post type unit vent at the top through the bogie / supporting beam. A free space is formed by a predetermined amount of lateral movement along the rail support beam in the direction perpendicular to the longitudinal direction of the structure, and it is suspended on the ground by a crane or other lifting machine in the free space. Since the dismantling is possible, there is an excellent effect that work at a high place is performed safely, smoothly, efficiently and with a shortened construction period.

【0033】又、台車兼受梁も該台車兼受梁をごと最頂
部の4本支柱式のユニットベントを横移動することが出
来るために移動後は吊り降ろし等が自由空間において行
われるために、安全性が高く、高能率で高精度で信頼性
の高い施工が行えるという優れた効果が奏される。
In addition, since the truck and the beam can be moved laterally through the four-post unit vent at the top of the truck and the beam, the suspension and the like are performed in free space after the movement. An excellent effect is achieved in that the construction can be performed with high safety, high efficiency, high accuracy and high reliability.

【0034】又、台車兼受梁を軌条用受梁に沿って横移
動させるには、台車兼受梁と軌条用受梁に介装したウィ
ンチとワイヤーにより行うことが出来るために、スムー
ズ、且つ、正確に解体撤去が行われるという優れた効果
が奏される。
[0034] In addition, the lateral movement of the bogie / receiver along the rail support can be performed by a winch and a wire interposed between the bogie / receiver and the rail support. This has an excellent effect that dismantling and removal are performed accurately.

【0035】又、台車兼受梁には、軌条用受梁に対する
ローラタイプのサイドガイドを用いて移動させるため
に、進行方向における台車兼受梁の逸脱が無く、正確に
横移動が行われるという優れた効果が奏される。
In addition, since the carriage and the beam are moved using the roller type side guide with respect to the rail beam, there is no deviation of the carriage and the beam in the traveling direction, and the lateral movement is accurately performed. Excellent effects are achieved.

【0036】又、台車兼受梁の軌条用受梁に沿って横移
動に対しジャッキにより該台車兼受梁を軌条用受梁に対
し僅かにジャッキアップさせてエンドレスローラー等を
両者の間に介装することにより、スムーズな移動が出
来、しかも、僅かなジャッキアップであるために、台車
兼受梁の傾斜等が生ぜず、作業が安全で高能率に行える
という優れた効果が奏される。
In addition, the carriage and receiver are slightly jacked up with respect to the rail support by a jack against lateral movement along the rail support of the carriage and receiver, and an endless roller or the like is interposed between them. By mounting the vehicle, smooth movement can be performed, and since the jack is slightly jacked up, the inclination of the bogie and the receiving beam does not occur, and an excellent effect that work can be performed safely and efficiently can be achieved.

【0037】又、最頂部の4本支柱式のユニットベント
と上部の受梁との間にサンドルが介装されていても、該
サンドルと最頂部ユニットベントをボルトにより一体固
設状態にしたまま横移動ができるために、該サンドルの
在来態様の高所、且つ、狭隘な部位に作業員による個別
的なばらし作業を介する等の作業が行われずに済み、ク
レーン等の揚重機を介し地上に降ろした状態で撤去が行
えるために、安全性が高く作業能率も良いという効果も
ある。
Further, even if a sanddle is interposed between the top four-post type unit vent and the upper receiving beam, the sanddle and the topmost unit vent are fixed integrally by bolts. Since the sandal can be moved laterally, it is not necessary to perform an operation such as an individual unloading operation by a worker in a high place and a narrow portion in the conventional manner of the sanddle, and the ground can be lifted through a lifting machine such as a crane. Since it can be removed in a state where it is lowered, there is an effect that safety is high and work efficiency is good.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この出願の発明の左半分の平面図である。FIG. 1 is a plan view of the left half of the invention of this application.

【図2】同右半分の平面図である。FIG. 2 is a plan view of the right half.

【図3】同左断面概略側面図である。FIG. 3 is a schematic side view of the left section.

【図4】同右半分の概略側面図である。FIG. 4 is a schematic side view of the right half.

【図5】FIG. 5

【イ】は台車兼受梁のジャッキアップの概略部分断面側
面図であり、
[A] is a schematic partial cross-sectional side view of the jack-up of the trolley and receiving beam,

【ロ】は同断面図である。[B] is a sectional view of the same.

【図6】従来技術に基づくユニットベントと上部受梁と
その間に介装するサンドルの取り合い側面図である。
FIG. 6 is a side view in which a unit vent, an upper receiving beam and a sandle interposed therebetween are arranged according to the prior art.

【符号の説明】[Explanation of symbols]

1,1' 4本支柱式のユニットベント 7 軌条用受梁 10 台車兼受梁 4 空間 17 ウィンチ 16 エンドレスワイヤー 19 ローラータイプのサイドガイド 8 エンドレスローラ 18 ジャッキ d ジャッキアップ間隙 5 サンドル 1, 1 '4 column type unit vent 7 Rail support 10 Carriage and support 4 Space 17 Winch 16 Endless wire 19 Roller type side guide 8 Endless roller 18 Jack d Jack-up gap 5 Sandle

───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 2D059 AA05 GG41 2E177 AA03 BA06 CA01 CB01 CB04 CC12  ──────────────────────────────────────────────────続 き Continued on the front page F term (reference) 2D059 AA05 GG41 2E177 AA03 BA06 CA01 CB01 CB04 CC12

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】上部構造物の下部に介装設置された複段の
4本支柱式のユニットベントを上段の4本支柱式のユニ
ットベントから順に揚重機を介して吊り降ろし撤去する
解体工法において、最頂部の4本支柱式のベントを予め
固設した台車兼受梁ごと該最頂部の4本支柱式のベント
の下部の4本支柱式のユニットベントの上部に固定して
横設した軌条用受梁に沿って上記構造物と干渉しない位
置まで横移動した後、揚重機により吊り降ろし撤去し、
次いで該構造物と該下部の4本支柱式のユニットベント
との間に形成された空間を用いて揚重機により次段の下
位の4本支柱式のユニットベントを順に吊り降ろして撤
去するようにすることを特徴とする4本支柱式の式ベン
トの解体工法。
1. A disassembly method in which a multi-stage four-post type unit vent interposed and installed at a lower portion of an upper structure is suspended and removed from a four-post type unit vent in an upper stage through a lifting machine in order. A rail fixed horizontally to the upper part of the four-post type unit vent below the four-post type vent, together with the bogie / supporting beam having the four-post type vent at the top fixed in advance. After traversing along the receiving beam to a position where it does not interfere with the above structure, it is suspended by a hoist and removed.
Then, using a space formed between the structure and the lower four-post unit vent, the lower four-post unit vent of the next lower stage is sequentially lifted down by a crane and removed. A method of dismantling a four-post type vent that is characterized in that:
【請求項2】上記最頂部の4本支柱式のユニットベント
と台車兼受梁との横移動をウィンチとワイヤーにより行
うようにすることを特徴とする請求項1記載の4本支柱
式の式ベントの解体工法。
2. The four-post system according to claim 1, wherein the lateral movement of the top-end four-post unit vent and the carriage and receiving beam is performed by a winch and a wire. Dismantling method of vent.
【請求項3】上記最頂部の4本支柱式のユニットベント
と台車兼受梁が横移動する際に上記軌条用受梁の両側に
対する対するローラタイプのサイドガイドによって進行
方向からの逸脱を防止するようにすることを特徴とする
請求項1記載のユニット式ベントの解体工法。
3. A roller-type side guide for both sides of the rail support beam to prevent deviation from the traveling direction when the four-unit unit vent at the top and the carriage and support beam move laterally. The method for dismantling a unit vent according to claim 1, wherein
【請求項4】上記台車兼受梁の横移動に際し該台車兼受
梁と軌条用受梁との間にエンドレスローラーを介装して
行うようにすることを特徴とする請求項1記載の4本支
柱式のベントの解体工法。
4. The trolley according to claim 1, wherein an endless roller is interposed between the trolley and the beam and the rail support during the lateral movement of the trolley and the beam. Dismantling method of this pillar type vent.
【請求項5】上記エンドレスローラーを台車兼受梁と軌
条用受梁との間に介装するに、該台車兼受梁を軌条用受
梁に対し僅かにジャッキアップして行うようにすること
を特徴とする請求項4記載の4本支柱式のユニット式ベ
ントの解体工法。
5. The method according to claim 5, wherein the endless roller is interposed between the trolley and the rail and the rail and the rail are slightly jacked up with respect to the rail and the rail. The method for dismantling a four-post type unit vent according to claim 4, characterized in that:
JP10226611A 1998-07-28 1998-07-28 Dismantling method of four-strut type vent Pending JP2000045543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10226611A JP2000045543A (en) 1998-07-28 1998-07-28 Dismantling method of four-strut type vent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10226611A JP2000045543A (en) 1998-07-28 1998-07-28 Dismantling method of four-strut type vent

Publications (1)

Publication Number Publication Date
JP2000045543A true JP2000045543A (en) 2000-02-15

Family

ID=16847921

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10226611A Pending JP2000045543A (en) 1998-07-28 1998-07-28 Dismantling method of four-strut type vent

Country Status (1)

Country Link
JP (1) JP2000045543A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131519A (en) * 2014-08-11 2014-11-05 浙江兴土桥梁专用装备制造有限公司 Bridge demolishing construction method and device thereof
CN111877165A (en) * 2020-07-08 2020-11-03 广西路建工程集团有限公司 Bailey beam translation device in limited space and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131519A (en) * 2014-08-11 2014-11-05 浙江兴土桥梁专用装备制造有限公司 Bridge demolishing construction method and device thereof
CN104131519B (en) * 2014-08-11 2016-09-07 浙江兴土桥梁专用装备制造有限公司 A kind of bridging toughening equipment construction method
CN111877165A (en) * 2020-07-08 2020-11-03 广西路建工程集团有限公司 Bailey beam translation device in limited space and construction method thereof
CN111877165B (en) * 2020-07-08 2022-01-28 广西路建工程集团有限公司 Bailey beam translation device in limited space and construction method thereof

Similar Documents

Publication Publication Date Title
JP6167025B2 (en) Stair lifting device and method for lifting heavy objects
JP2000045543A (en) Dismantling method of four-strut type vent
JP2709091B2 (en) Manufacturing and stocking method of unit floor
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
JP2563762B2 (en) Bridge girder uplifting method, uplifting machine and vent member
JPH08333898A (en) Trestle for vertically and horizontally conveying building blocks
JP3220397B2 (en) Elevating scaffold
CN109056741B (en) Method for dismantling lower steel support in multi-layer steel support
CN219114032U (en) Go up people's wallboard storage rack
JP2934567B2 (en) Work gondola for multi-story parking lot construction
JP7415657B2 (en) Roof construction system and roof construction method
CN215331380U (en) Rail type suspension platform
JP7435025B2 (en) Mechanical gantry and roof construction method
CN106382001A (en) Parapet wall mold supporting frame capable of being moved and revolved
JP7380322B2 (en) Roof construction system and roof construction method
CN219431321U (en) Adjustable operation platform for elevator well construction
CN217268854U (en) Bailey truss beam formwork support system
CN211421802U (en) High-rise building construction machinery
JPH066597U (en) Mobile suspension scaffolding equipment
JP3234442B2 (en) Building and scrap type building method
JP2005231870A (en) Escalator installation method and crane device for installation
JP3192543B2 (en) Building demolition method
JP2002356813A (en) Movable scaffolding device and construction method thereof
JP2000145127A (en) Transferable scaffold
CN114232987A (en) Electric formwork climbing frame and lifting method thereof