JP2000035326A - Diagnosis device of extension degree of chain - Google Patents
Diagnosis device of extension degree of chainInfo
- Publication number
- JP2000035326A JP2000035326A JP10203379A JP20337998A JP2000035326A JP 2000035326 A JP2000035326 A JP 2000035326A JP 10203379 A JP10203379 A JP 10203379A JP 20337998 A JP20337998 A JP 20337998A JP 2000035326 A JP2000035326 A JP 2000035326A
- Authority
- JP
- Japan
- Prior art keywords
- chain
- elongation
- pulse
- unit
- pulse period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Length Measuring Devices By Optical Means (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
- Escalators And Moving Walkways (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、チェーンの伸長度
を診断するチェーンの伸長度診断装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a chain length diagnosing device for diagnosing chain length.
【0002】[0002]
【従来の技術】一般に搬送装置として知られる乗客コン
ベアでは、乗客や物を乗せる踏み段や、乗客が安心して
乗れるようにハンドレールを設けており、これらは駆動
装置により回転駆動される無端状のチェーンと同期して
無端移動するように構成されている。このチェーンは経
時的に伸び、その伸長度は使用時間や負荷条件によって
異なるため定期的な保守点検作業が必要となる。この伸
長度を検出する従来のチェーンの伸長度検出装置は、特
開平7−137976号公報に記載のように、チェーン
に標識を設け、この標識の通過を検出する検出装置によ
ってチェーンの単位当たりの長さを検出するものが提案
されている。2. Description of the Related Art Passenger conveyors, which are generally known as conveyors, are provided with steps for carrying passengers and goods, and handrails so that passengers can ride with peace of mind. It is configured to move endlessly in synchronization with the chain. This chain elongates over time, and the degree of elongation varies depending on the use time and load conditions, so periodic maintenance and inspection work is required. As described in Japanese Patent Application Laid-Open No. 7-137976, a conventional elongation detecting device for a chain that detects this elongation is provided with a sign on the chain, and a detecting device that detects the passage of the sign per unit of the chain. One that detects the length has been proposed.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、従来の
チェーンの伸長度検出装置は、上述のようにチェーンの
伸びを検出するためにチェーンに標識を設けていたた
め、既存のチェーンの伸長度を検出するためには新たに
標識を設けなければならず多大な労力と時間が必要であ
った。また新品チェーンの場合でも、標識の取付け精度
が検出結果に大きく影響するため、伸長度を判定する上
での信頼性を確保するのが困難であり、しかも、チェー
ンはスプロケットに噛み合う構造上、標識をチェーンの
側面に設けなければならず、これに合わせて標識を検出
するためのセンサもチェーンの側方から近接して配置し
なければならないが、駆動中のチェーンがその駆動方向
と直角方向に振動するため、所定の位置に固定したセン
サで標識を常に検出するのは非常に困難となっていた。However, in the conventional chain elongation detecting device, since a mark is provided on the chain for detecting the elongation of the chain as described above, the elongation of the existing chain is detected. In order to do so, a new sign had to be provided, which required a great deal of labor and time. Also, even in the case of a new chain, it is difficult to ensure the reliability in determining the degree of elongation because the accuracy of sign installation greatly affects the detection result. Must be provided on the side of the chain, and the sensor for detecting the sign must be arranged close to the side of the chain in accordance with this. Due to the vibration, it is very difficult to always detect the sign with a sensor fixed at a predetermined position.
【0004】またチェーンは、回転駆動するスプロケッ
トに噛み合う際、チェーン初期状態でスプロケットのピ
ッチ円直径がチェーンのローラ中心と合致するが、チェ
ーンが伸びるとチェーンのローラ中心がスプロケットの
ピッチ円直径より大きい位置にずれて回転駆動されるこ
とになる。従って、回転駆動するスプロケットの角速度
は経年により変化しなくても、これに噛み合うチェーン
の周速度は経年により変化し、伸びたチェーンの運転速
度は初期状態と比較して速くなっているため、チェーン
が伸びたとしても初期状態でのチェーン一周の通過時間
とほとんど変わらなくなってしまう。このため、チェー
ンに一定間隔で標識を設けて標識の通過を検出しても、
チェーンの単位当たりの長さを検出することは困難であ
り、チェーンの伸長度を正確に検出するのが難しかっ
た。When the chain meshes with a sprocket driven in rotation, the pitch circle diameter of the sprocket matches the center of the roller of the chain in the initial state of the chain. However, when the chain is extended, the center of the roller of the chain is larger than the pitch circle diameter of the sprocket. It will be rotationally driven out of position. Therefore, even if the angular speed of the sprocket driven by rotation does not change over time, the circumferential speed of the chain meshing with it changes over time, and the operating speed of the extended chain is faster than the initial state, so the chain Even if the length increases, it is almost the same as the passing time of one round of the chain in the initial state. For this reason, even if a sign is provided on the chain at regular intervals and the passage of the sign is detected,
It was difficult to detect the length of the chain per unit, and it was difficult to accurately detect the elongation of the chain.
【0005】本発明の目的とするところはねチェーンの
異常伸長を正確に診断することができるようにしたチェ
ーンの伸長度診断装置を提供することにある。It is an object of the present invention to provide a chain elongation diagnostic apparatus capable of accurately diagnosing abnormal elongation of a chain.
【0006】[0006]
【課題を解決するための手段】本発明は上記目的を達成
するために、内リンク部と外リンク部を有するチェーン
の伸長度を診断するチェーンの伸長度診断装置におい
て、上記チェーンの内リンク部と外リンク部の通過をチ
ェーン通過検出器によって検出し、このチェーン通過検
出器のパルス信号から上記チェーンのリンク毎のパルス
周期を測定部で測定し、この測定部で設定値を超えたパ
ルス周期を測定した場合、少なくともそのパルス周期と
そのリンク部を記憶部に記憶し、その後、そのリンク部
のパルス周期を上記測定部で再度測定し、これらの測定
結果から上記チェーンの異常伸長を診断する判定部を設
けたことを特徴とする。SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides an apparatus for diagnosing the degree of elongation of a chain having an inner link part and an outer link part. And the passage of the outer link is detected by a chain passage detector, and the pulse period of each link of the chain is measured by the measuring unit from the pulse signal of the chain passage detector, and the pulse period exceeding the set value by the measuring unit Is measured, at least the pulse cycle and the link section are stored in the storage section, and then the pulse cycle of the link section is measured again by the measurement section, and the abnormal elongation of the chain is diagnosed from the measurement results. A determination unit is provided.
【0007】上述したように本発明のチェーンの伸長度
診断装置は、チェーン通過検出器によってチェーンのパ
ルス周期を測定する測定部を設け、この測定部で設定値
を超えたパルス周期を測定した場合、そのリンク部を記
憶部に記憶し、その後、再度同リンク部のパルス周期を
測定部で測定し、これら測定結果からチェーンの異常伸
長を診断する判定部を設けたため、従来のようにチェー
ンに複数の標識を設けることなく、正確な異常伸長を診
断することができるようになる。As described above, the elongation diagnostic apparatus for a chain according to the present invention is provided with a measuring unit for measuring a pulse period of a chain by a chain passage detector, and when a pulse period exceeding a set value is measured by the measuring unit. Since the link section is stored in the storage section, the pulse period of the link section is measured again by the measuring section, and a determination section for diagnosing abnormal elongation of the chain based on these measurement results is provided. It is possible to accurately diagnose abnormal extension without providing a plurality of markers.
【0008】[0008]
【発明の実施の形態】以下、本発明の実施の形態を図面
によって説明する。図7は、本発明の一実施の形態によ
るチェーンの伸長度診断装置を取り付けたエスカレータ
の要部駆動機構を示す側面図である。機械室に設けられ
たエスカレータ駆動用ドライビングマシン2は、ドライ
ビングチェーン3を介して上部駆動用踏み段チェーンス
プロケット4に連結されている。この上部駆動用踏み段
チェーンスプロケット4と同じシャフト5に軸支された
ハンドレール駆動用スプロケット6は、ハンドレール駆
動用メインチェーン7を介してダブルスプロケット8に
連結されている。このダブルスプロケット8にはハンド
レール駆動用ドライビングチェーン9を介してハンドレ
ール駆動装置10の駆動ローラ11が連結され、この駆
動ローラ11を介して無端状に構成したハンドレール1
を回転移動させている。また、ダブルスプロケット8と
テンションスプロケット14間に位置したハンドレール
駆動用メインチェーン7に対応して、チェーン通過検出
器12を含むチェーンガイド13が配置されている。こ
のチェーンガイド13は、ハンドレール駆動用メインチ
ェーン7に対応した部分に限らず、ハンドレール駆動用
ドライチェーン9やドライビングチェーン3に対応して
取り付けても良いし、設置場所としてはチェーンの噛み
合う二個のスプロケット間であればどこに取り付けても
良い。また、チェーン通過検出器12としては、チェー
ン駆動部分特有の油や塵埃や水に影響されることなく、
鉄鋼部分であるチェーンのローラ部分のみ、つまり金属
の遮へい有無によってのみ信号を出力する磁気センサな
どを用いる。Embodiments of the present invention will be described below with reference to the drawings. FIG. 7 is a side view showing a main drive mechanism of an escalator to which the chain elongation degree diagnostic device according to one embodiment of the present invention is attached. The escalator driving driving machine 2 provided in the machine room is connected to an upper driving step chain sprocket 4 via a driving chain 3. A handrail driving sprocket 6 supported by the same shaft 5 as the upper driving step chain sprocket 4 is connected to a double sprocket 8 via a handrail driving main chain 7. A driving roller 11 of a handrail driving device 10 is connected to the double sprocket 8 via a driving chain 9 for driving a handrail, and the endless handrail 1 is formed via the driving roller 11.
Is rotated. Further, a chain guide 13 including a chain passage detector 12 is arranged corresponding to the handrail driving main chain 7 located between the double sprocket 8 and the tension sprocket 14. The chain guide 13 is not limited to the portion corresponding to the main chain 7 for driving the handrail, and may be attached to the dry chain 9 for driving the handrail or the driving chain 3. It may be installed anywhere between the sprockets. In addition, the chain passage detector 12 is not affected by oil, dust, or water peculiar to the chain driving portion,
A magnetic sensor or the like that outputs a signal only depending on the roller portion of the chain, which is a steel portion, that is, only by the presence or absence of metal shielding is used.
【0009】図1は、上述したチェーン通過検出器12
を用いて構成したチェーンの伸長度診断装置を示すブロ
ック構成図である。複数のチェーン20A,20B,2
0Cの各々の近傍にチェーン通過検出器12A,12
B,12Cが取り付けられており、これら各チェーン通
過検出器12A〜12Cは切換部16を介してMPU2
4に接続されている。この切換部16は、チェーン通過
検出器12Aがチェーン20Aのパルスを検出し終える
と、次にチェーン通過検出器12Bを検出可能な状態と
し、さらにチェーン通過検出器12Cを検出可能な状態
に切り替えることができる。MPU24は、チェーン通
過検出器12A〜12Cが検出したパルス信号からチェ
ーン20A〜20Cのローラ間のパルス幅を測定する測
定部17と、測定部17が測定したチェーン20A〜2
0Cのローラ間のパルス幅を基にチェーンのパルス周期
を比較演算して異常伸長を診断したり、チェーン20A
〜20Cの伸長度を定量的に判定する判定部18と、判
定部18でのチェーン20A〜20Cの伸長度の判定結
果から、例えば、最新の判定結果を比較して変化量を算
出し、これを経過時間で除して単位時間当たりの変化量
を求めてチェーン20A〜20Cの伸びが異常状態に達
するまでの時間を表すチェーン異常時期やチェーン交換
時期を予測する予測部19とで構成されている。FIG. 1 shows the above-described chain passage detector 12.
FIG. 1 is a block diagram showing a chain elongation degree diagnosing device configured by using FIG. A plurality of chains 20A, 20B, 2
Chain passing detectors 12A and 12
B, 12C are attached, and these chain passage detectors 12A to 12C are connected to the MPU 2 via the switching unit 16.
4 is connected. When the chain passage detector 12A finishes detecting the pulse of the chain 20A, the switching unit 16 switches the chain passage detector 12B to a detectable state and further switches the chain passage detector 12C to a detectable state. Can be. The MPU 24 includes a measuring unit 17 that measures a pulse width between rollers of the chains 20A to 20C from a pulse signal detected by the chain passage detectors 12A to 12C, and a chain 20A to 2 that is measured by the measuring unit 17.
Compare the pulse period of the chain based on the pulse width between rollers of 0C to diagnose abnormal elongation,
From the determination unit 18 for quantitatively determining the degree of elongation of the chain 20A to 20C and the determination result of the degree of elongation of the chains 20A to 20C by the determination unit 18, for example, the latest determination result is compared to calculate the amount of change. Is divided by an elapsed time to obtain a change amount per unit time, and a prediction unit 19 for predicting a chain abnormality time or a chain replacement time indicating a time until the elongation of the chains 20A to 20C reaches an abnormal state. I have.
【0010】このMPU24には、記憶部25および通
信部26を介して監視センタ27が接続されており、こ
の記憶部25は、測定部17での測定結果や、判定部1
8でのチェーン伸長度の判定結果や、予測部19でのチ
ェーン異常時期およびチェーン交換時期や、診断実施時
の日時等の情報を記憶し、通信部26は、記憶部25が
記憶した情報を定期的に監視センタ27に送信したり、
チェーン20A〜20Cが予測部19で異常時期に達し
ていると予測したときチェーン交換指示などを監視セン
タ27に送信する。また、判定部18でのチェーン20
A〜20Cの伸長度の判定結果から、例えばチェーン異
常状態に達していると判定されたとき、判定部18は駆
動制御部28に何等かの指令を与えてチェーン駆動を制
御できるよう構成している。A monitoring center 27 is connected to the MPU 24 via a storage unit 25 and a communication unit 26. The storage unit 25 stores the measurement results of the measurement unit 17 and the judgment unit 1
8, the chain abnormal time and the chain replacement time in the prediction unit 19, and information such as the date and time when the diagnosis is performed, and the communication unit 26 stores the information stored in the storage unit 25. It is transmitted to the monitoring center 27 periodically,
When the prediction unit 19 predicts that the chains 20 </ b> A to 20 </ b> C have reached the abnormal time, a chain exchange instruction or the like is transmitted to the monitoring center 27. The chain 20 in the determination unit 18
For example, when it is determined from the determination result of the degree of elongation of A to 20C that the chain has reached the abnormal state, the determination unit 18 is configured to give a command to the drive control unit 28 to control the chain drive. I have.
【0011】ここで、チェーンに伸びが生じる過程を説
明する。チェーンの伸びは、弾性伸び、塑性伸びおよび
摩耗伸びに分類されており、一般にチェーンの伸びと言
われているのは摩耗伸びのことであり、伸びのなかでも
最も大きい比率を占めている。この摩耗伸びについて、
チェーンを中心から外側へ見た場合の断面図である図2
と、図2のB−B線に沿った初期状態を示す断面図であ
る図3と、図2のB−B線に沿った摩耗伸びした状態を
示す断面図である図4を用いて説明する。Here, the process of elongation of the chain will be described. Chain elongation is classified into elastic elongation, plastic elongation and wear elongation, and what is generally referred to as chain elongation is wear elongation, which accounts for the largest proportion of elongation. About this wear elongation,
FIG. 2 is a cross-sectional view when the chain is viewed from the center to the outside.
FIG. 3 is a cross-sectional view showing an initial state along the line BB of FIG. 2, and FIG. 4 is a cross-sectional view showing a state of abrasion extending along the line BB of FIG. I do.
【0012】チェーン20は、交互に対向配置した内側
リンクプレート21Bおよび外側リンクプレート21A
と、両リンクプレート21A、21Bの連結部に配置さ
れてスプロケットに係合することになると共に上述のチ
ェーン通過検出器12A〜12Cによって検出されるロ
ーラ15と、このローラ15に挿入すると共に内側リン
クプレート21Bにはめ込んだブッシュ22と、このブ
ッシュ22内に挿入すると共に外側リンクプレート21
Aにはめ込んだピン23で構成されている。ここで、ロ
ーラ15とブッシュ22の間、またブッシュ22とピン
23の間にはそれぞれ隙間が存在し、ローラ15はブッ
シュ22との間で自由に回転するが、ブッシュ22は内
側リンクプレート21Bに固設され、またピン23は外
側リンクプレート21Aに固設されているため、ピン2
3およびブッシュ22自体が回転することはない。チェ
ーンが屈曲したり、スプロケットに噛み合って軌跡が円
弧を描いたりするのは、ブッシュ22とピン23の間に
存在する隙間によってブッシュ22とピン23が揺動し
生じる現象である。The chain 20 includes an inner link plate 21B and an outer link plate 21A which are alternately arranged.
And a roller 15 which is arranged at the connecting portion of the two link plates 21A and 21B and is engaged with the sprocket, and is detected by the above-mentioned chain passage detectors 12A to 12C. A bush 22 fitted into the plate 21B, and an outer link plate 21 inserted into the bush 22 and
A is composed of a pin 23 fitted in A. Here, a gap exists between the roller 15 and the bush 22 and between the bush 22 and the pin 23, and the roller 15 freely rotates between the bush 22 and the bush 22. Since the pin 23 is fixed to the outer link plate 21A, the pin 2 is fixed.
3 and the bush 22 itself do not rotate. The fact that the chain bends or meshes with the sprocket and the trajectory draws an arc is a phenomenon in which the bush 22 and the pin 23 swing due to the gap existing between the bush 22 and the pin 23.
【0013】チェーン20はこのような構成であるた
め、チェーン20が回転駆動しスプロケットとの噛み合
いにより屈曲を重ねると、当然ピン23とブッシュ22
の間の揺動によりピン23の外面とブッシュ22の内面
の摩耗が進み、隙間が拡大する方向に摩耗伸びが生じる
ことになる。チェーン20が摩耗伸びした状態になる
と、チェーン20の駆動中には常に図4の矢印で示す両
側方向に引っ張られるので、ブッシュ22とピン23間
の隙間が片側に寄り、ローラ15の外径面からそれと隣
り合うローラ15の外径面までの距離が変化する。一
方、ブッシュ22が固設された内側リンクプレート21
Bにおけるローラ間寸法j2,j4は変化せず、摩耗伸
びした状態になってもj2=j2´,j4=j4´とな
る。また、ピン23が固設された外側リンクプレート2
1Aにおけるローラ間寸法j1,j3は磨耗伸びした状
態になるとj1からj1´に、j3からj3´にそれぞ
れ拡がり、チェーン20は全体が伸びる。またローラ1
5の直径は、ローラ15の外面がスプロケットに接触し
て磨耗することで減少するが、その磨耗量はピン23と
プッシュ22の間の隙間ほどではなく微少であるため、
ここではその変化量は無視して考えることができる。こ
の磨耗伸びの現象は、チェーン一周分において同様の傾
向を示し、内側リンクプレート21Bでのローラ間寸法
がj2,j4からj2´,j4´になってもj2=j2
´,j4=j4´の関係がほぼ変化せずに成立し、外側
リンクプレート21Aのローラ間寸法がj1,j3から
j1´,j3´に拡大してj1<j1´またはj3<j
3´の関係が成立する。Since the chain 20 has such a configuration, when the chain 20 is rotated and bent by meshing with the sprocket, the pin 23 and the bush 22
The wear between the outer surface of the pin 23 and the inner surface of the bush 22 progresses due to the rocking during the rotation, and wear elongation occurs in the direction in which the gap increases. When the chain 20 is worn and stretched, the chain 20 is always pulled in both directions as indicated by arrows in FIG. 4 while the chain 20 is being driven. From the roller 15 to the outer diameter surface of the roller 15 adjacent thereto. On the other hand, the inner link plate 21 on which the bush 22 is fixed
The roller-to-roller dimensions j2 and j4 in B do not change, and j2 = j2 'and j4 = j4' even in the state of abrasion and elongation. Further, the outer link plate 2 on which the pin 23 is fixed is provided.
When the dimensions j1 and j3 between the rollers in 1A are in a state of being worn and expanded, they are expanded from j1 to j1 'and from j3 to j3', respectively, and the entire chain 20 is expanded. Roller 1
5, the diameter of the roller 15 decreases as the outer surface of the roller 15 comes into contact with the sprocket and is worn. However, since the amount of wear is small, not as much as the gap between the pin 23 and the push 22,
Here, the amount of change can be ignored. This phenomenon of abrasion elongation shows the same tendency for one round of the chain, and j2 = j2 even when the roller-to-roller dimension on the inner link plate 21B changes from j2, j4 to j2 ', j4'.
, J4 = j4 'holds almost unchanged, and the roller-to-roller dimension of the outer link plate 21A is expanded from j1, j3 to j1', j3 'to j1 <j1' or j3 <j.
The relationship of 3 'is established.
【0014】次に、上述した磨耗伸びの特性を利用した
チェーンの伸長度診断装置の動作原理を、図3に示した
初期状態のチェーンの出力信号の波形図である図5と、
図4に示した磨耗伸びした状態のチェーンの出力信号の
波形図である図6を用いて説明する。図5において、波
形の山部を形成しているパルスの立ち上がりから立ち下
がりまでのパルス幅H1,H2,H3,H4は、図3に
示したローラ15の外径部分h1,h2,h3,h4の
通過時間に対応し、また谷部を形成しているパルスの立
ち下がりから立ち上がりまでのパルス間隔J1,J2,
J3,J4は、図3に示したローラ15の外面から隣り
合うローラ15の外面までの寸法j1,j2,j3,j
4の通過時間に対応している。ローラ15の直径はh1
=h2=h3=h4であるため、それに対応する通過時
間のパルス幅もH1=H2=H3=H4となる。また初
期状態のチェーンは磨耗伸びがないためローラ外面から
隣り合うローラ外面までの寸法j1=j2=j3=j4
であり、それに対応するパルス間隔もJ1=J2=J3
=J4となる。Next, the principle of operation of the chain elongation diagnostic apparatus utilizing the above-described wear elongation characteristics will be described with reference to FIG. 5 which is a waveform diagram of the output signal of the chain in the initial state shown in FIG.
A description will be given with reference to FIG. 6 which is a waveform diagram of the output signal of the chain in the state of abrasion and elongation shown in FIG. In FIG. 5, the pulse widths H1, H2, H3, H4 from the rise to the fall of the pulse forming the peak of the waveform are the outer diameter portions h1, h2, h3, h4 of the roller 15 shown in FIG. And the pulse intervals J1, J2 from the fall to the rise of the pulse forming the valley.
J3, J4 are dimensions j1, j2, j3, j from the outer surface of the roller 15 shown in FIG.
4 corresponds to the transit time. The diameter of the roller 15 is h1
= H2 = h3 = h4, the corresponding pulse width of the transit time is also H1 = H2 = H3 = H4. Further, since the chain in the initial state has no wear and elongation, the dimension j1 = j2 = j3 = j4 from the outer surface of the roller to the outer surface of the adjacent roller.
And the corresponding pulse interval is also J1 = J2 = J3
= J4.
【0015】チェーンが図3の初期状態から図4の磨耗
伸びした状態になるとチェーンの全体長さは長くなる
が、回転駆動するスプロケットに噛み合う際に初期状態
のチェーンではスプロケットのピッチ円直径が噛み合う
チェーンのローラ中心と合致するが、磨耗伸びしたチェ
ーンは噛み合うチェーンのローラ中心がスプロケットの
ピッチ円直径より大きい位置にずれて回転駆動する。こ
のため、回転駆動するスプロケットの角速度は経年によ
り変化しなくても、スプロケットに噛み合うチェーンの
周速度はチェーンの初期状態と伸びた状態では異なり、
磨耗伸びした状態のチェーン運転速度は初期状態のそれ
と比較して速くなる。その結果、チェーンは伸びたとし
ても初期状態と伸びた状態でのチェーン一周の通過時間
はほとんど変わらない。チェーンのローラ15の直径
は、図3の初期状態から図5の磨耗伸びした状態になっ
たとしても変わらないが、上述した理由でチェーンの運
転速度は磨耗伸びすると初期状態と比較して速くなり、
初期状態でのパルス幅H1〜H4は磨耗伸びした状態で
H1´〜H4´となり通過時間が小さくなる。When the chain is worn and stretched from the initial state in FIG. 3 to the wear-out state in FIG. 4, the entire length of the chain becomes longer. However, when the chain meshes with the sprocket driven in rotation, the pitch circle diameter of the sprocket meshes with the chain in the initial state. The chain which is aligned with the roller center of the chain but is worn and stretched is rotated with the roller center of the meshing chain shifted to a position larger than the pitch circle diameter of the sprocket. For this reason, even if the angular speed of the rotating sprocket does not change over time, the peripheral speed of the chain that meshes with the sprocket differs between the initial state and the extended state of the chain,
The running speed of the chain in the state of wear and elongation is higher than that in the initial state. As a result, even if the chain is extended, the transit time of one round of the chain in the initial state and in the extended state hardly changes. The diameter of the roller 15 of the chain does not change even if it is changed from the initial state of FIG. 3 to the state of wear and elongation of FIG. 5, but for the reasons described above, the operating speed of the chain increases with wear and elongation compared to the initial state. ,
The pulse widths H1 to H4 in the initial state become H1 'to H4' in the state of abrasion and elongation, and the transit time becomes shorter.
【0016】ここで、ローラ15の直径の磨耗量は微少
であるためチェーンが磨耗伸びしても変わらないとすれ
ば、図3の外側リンクプレート21Aに支持された隣り
合うローラ15のローラ中心からローラ中心までの寸法
は、図3での寸法K1,K2から、図4での寸法K1
´,K2´となり、また内側リンクプレート21Bに支
持された隣り合うローラ15のローラ中心からローラ中
心までの寸法は、図3での寸法L1,L2から、図4で
の寸法L1´,L2´となる。図3の寸法K1は図5の
出力信号では通過時間F1、寸法K2は通過時間F2、
寸法L1は通過時間G1、寸法L2は通過時間G2とな
り、図4の寸法K1´は図6の出力信号では通過時間F
1´、寸法K2´は通過時間F2´、寸法L1´は通過
時間G1´、寸法L2´は通過時間G2´となる。Here, assuming that the diameter of the roller 15 is small and the amount of wear does not change even if the chain is worn and extended, the distance from the center of the adjacent roller 15 supported by the outer link plate 21A in FIG. The dimension up to the roller center is changed from the dimensions K1 and K2 in FIG. 3 to the dimension K1 in FIG.
, K2 ', and the dimension from the roller center to the roller center of the adjacent roller 15 supported by the inner link plate 21B is changed from the dimensions L1 and L2 in FIG. 3 to the dimensions L1' and L2 'in FIG. Becomes The dimension K1 in FIG. 3 is the transit time F1 in the output signal of FIG. 5, the dimension K2 is the transit time F2,
The dimension L1 is the transit time G1, the dimension L2 is the transit time G2, and the dimension K1 'in FIG. 4 is the transit time F in the output signal of FIG.
1 ', dimension K2' is transit time F2 ', dimension L1' is transit time G1 ', and dimension L2' is transit time G2 '.
【0017】チェーンは初期状態から磨耗した状態にな
ると、チェーンの運転速度は速くなることで、内側リン
クプレート21Bに支持された隣り合うローラ15の外
面から外面までの間隔は変化しなくても、通過時間J2
は通過時間J2´へ、また通過時間J4は通過時間J4
´へと小さくなり、一方、外側リンクプレート21Aに
支持された隣り合うローラ15の外面から外面までの間
隔は拡がるので、通過時間J1は通過時間J1´へ、ま
た通過時間J3は通過時間J3´へと大きくなる。この
ようにチェーン通過検出器12A〜12Cの出力信号で
の初期状態と磨耗伸びした状態の時間通過を比較してみ
ると、初期状態のチェーン一周分の外側リンクプレート
21Aに支持された隣り合うローラ15の中心間寸法の
パルス周期の総和F、また内側リンクプレート21Bに
支持された隣り合うローラ15の中心間寸法のパルス周
期の総和Gは、それぞれ次の数式(1)および数式
(2)で表され、その差M=F−Gはほぼ零に等しい。 F1+F2+F3……=F(1) G1+G2+G3……=G(2) 一方、磨耗伸びした状態におけるチェーン一周分の外側
リンクプレート21Aに支持された隣り合うローラ15
の中心間寸法のパルス周期の総和F´、また内側リンク
プレート21Bに支持された隣り合うローラ15の中心
間寸法のパルス周期の総和G´は、それぞれ次の数式
(3)および数式(4)で表され、その差M´はF´−
G´となる。 F1´+F2´+F3……=F´(3) G1´+G2´+G3……=G´(4) ここで、初期状態での差Mは磨耗伸びした状態で差M´
となり、磨耗伸びが大きくなるに従って差M´も大きく
なるため、初期状態のパルス周期の差Mと、磨耗伸びし
た状態のパルス周期の差M´を比較演算し、差M´と差
Mの差が予め設定した設定値に達しているか否かでチェ
ーンの異常伸長を判定することが可能となる。また、初
期状態でのパルス幅H1〜H4は、磨耗した状態ではチ
ェーン運転速度が速くなってH1´〜H4´に変化する
ので、その差H1”=H1−H1´を比較演算したり、
または初期状態でのパルス幅の総和Hと、磨耗した状態
でのパルス幅の総和H´を数式(5)および数式(6)
で求め、その差H”=H−H´を比較演算して、H”が
予め設定した設定値に達しているか否かでチェーン全体
の伸長度を定量的に判定することも可能となる。 H=H1+H2+H3+H4+……+Hn(5) H´=H´1+H´2+H´3+H´4+……+H´n(6) つまり、チェーン運転速度の変化からチェーン全体の伸
長度を判定することができる。次いで、この伸長度結果
を記憶しチェーン駆動経過時間で除して演算すれば、現
時点でのチェーンの伸長度や、単位時間当たりの伸び量
や、チェーン駆動数時間経過後のチェーン伸長度を定量
的に判定し予測することができるので、異常状態時期を
予測することも可能となる。When the chain becomes worn from the initial state, the running speed of the chain increases, so that the distance between the outer surfaces of the adjacent rollers 15 supported by the inner link plate 21B does not change. Transit time J2
Is the transit time J2 ', and transit time J4 is the transit time J4
', While the distance between the outer surfaces of the adjacent rollers 15 supported by the outer link plate 21A increases, so that the passing time J1 becomes the passing time J1', and the passing time J3 becomes the passing time J3 '. To become larger. A comparison between the initial state of the output signals of the chain passage detectors 12A to 12C and the time passage of the wear-extended state in this way shows that the adjacent rollers supported on the outer link plate 21A for one round of the chain in the initial state. The total sum F of the pulse periods of the center-to-center dimensions of 15 and the total sum G of the pulse periods of the center-to-center dimensions of the adjacent rollers 15 supported by the inner link plate 21B are expressed by the following equations (1) and (2), respectively. Where the difference M = FG is approximately equal to zero. F1 + F2 + F3... = F (1) G1 + G2 + G3... = G (2) On the other hand, the adjacent rollers 15 supported by the outer link plate 21A for one circumference of the chain in a state of wear and elongation.
And the sum of pulse periods G ′ of the center-to-center dimensions of the adjacent rollers 15 supported by the inner link plate 21B are expressed by the following equations (3) and (4), respectively. And the difference M ′ is F′−
G '. F1 ′ + F2 ′ + F3... = F ′ (3) G1 ′ + G2 ′ + G3... = G ′ (4) Here, the difference M in the initial state is the difference M ′ in the state of abrasion and elongation.
Since the difference M ′ increases as the wear elongation increases, the difference M in the pulse period in the initial state and the difference M ′ in the pulse period in the abrasion-expanded state are compared, and the difference between the difference M ′ and the difference M is calculated. Can determine the abnormal elongation of the chain based on whether or not reaches a preset value. Further, the pulse widths H1 to H4 in the initial state change from H1 'to H4' due to the increased chain operation speed in a worn state, so that the difference H1 "= H1-H1 'is calculated,
Alternatively, the total H of the pulse widths in the initial state and the total H ′ of the pulse widths in the worn state are expressed by Expressions (5) and (6).
, The difference H ″ = H−H ′ is compared, and the elongation of the entire chain can be quantitatively determined based on whether or not H ″ has reached a preset value. H = H1 + H2 + H3 + H4 +... + Hn (5) H ′ = H′1 + H′2 + H′3 + H′4 +... + H′n (6) That is, the degree of elongation of the entire chain can be determined from the change in the chain operation speed. Then, by storing this elongation degree result and dividing it by the chain drive elapsed time and calculating, the current elongation degree of the chain, the amount of elongation per unit time, and the elongation degree of the chain after several hours of chain driving are determined. Since it is possible to determine and predict the abnormal state, it is also possible to predict the abnormal state time.
【0018】図8は、上述したチェーンの伸長度診断装
置の診断手順を示すフローチャートである。先ず、ステ
ップS1で伸長度を測定し判定するチェーン20A〜2
0Cのチェーン通過検出器12A〜12Cを選択し、こ
こでは最初に切換部16によりチェーン通過検出器12
Aを選択する。ステップS2で選択したチェーンの1リ
ンク毎のパルスの検出を開始し、チェーンの1リンク毎
のパルス周期、つまり通過時間Tを測定する。次に、ス
テップS3である設定値を超えた特定の通過時間を検出
し、ステップS4でその記憶を行なう。つまり、図9に
示すように横軸にチェーン一周を1リンク毎に順番に配
置し、縦軸に通過時間を表すと、初期状態においては1
リンク毎のパルス周期にTmaxを超えたものは発生し
ない。このTmaxとは、これを超えた場合にそのリン
クが局所的な異常伸びを起こしていると判断する判定値
であり、これ以下では正常な状態を保っていると判断す
る。しかし、局所的な異常伸びを起こしていると、その
部分ではTmaxを超えて検出されるので、その判定を
図8のステップS3で行ない、Tmaxを超えて検出さ
れたリンクの順番と通過時間TsをステップS4で記憶
する。FIG. 8 is a flowchart showing a diagnosis procedure of the above-described chain elongation degree diagnostic apparatus. First, in steps S1, chains 20A to 20A are used to measure and determine the degree of elongation.
0C, and the switching unit 16 first selects the chain passage detectors 12A to 12C.
Select A. The detection of the pulse for each link of the chain selected in step S2 is started, and the pulse period for each link of the chain, that is, the transit time T is measured. Next, a specific transit time exceeding a set value is detected in step S3, and is stored in step S4. That is, as shown in FIG. 9, one round of the chain is arranged on the horizontal axis in order for each link, and the transit time is expressed on the vertical axis.
No pulse cycle exceeding Tmax occurs in each link. This Tmax is a judgment value for judging that the link has caused local abnormal elongation when it exceeds this value, and judges that the link is in a normal state below this value. However, if local abnormal elongation has occurred, it is detected at a portion exceeding Tmax. Therefore, the determination is made in step S3 of FIG. 8, and the order of the links detected beyond Tmax and the transit time Ts Is stored in step S4.
【0019】その後、ステップS5で、測定した1リン
クのパルス周期が偶数番目かどうかを判定し、最初に検
出したパルスは一番目なので、伸び発生状態の診断であ
れば図6の通過時間F1´で示したパルス周期を奇数番
目の通過時間としてステップS6で記録する。次に、二
番目に検出したパルス周期は、伸び発生状態の診断であ
れば図6に示した通過時間G1´の偶数番目の通過時間
としてステップS7で記録する。Thereafter, in step S5, it is determined whether or not the measured pulse period of one link is an even number. Since the pulse detected first is the first, the pass time F1 'in FIG. Is recorded in step S6 as an odd-numbered passage time. Next, if the elongation occurrence state is diagnosed, the second detected pulse cycle is recorded in step S7 as an even-numbered passage time of the passage time G1 'shown in FIG.
【0020】このように1リンク毎のパルス周期である
通過時間を1リンク毎に奇数番目と偶数番目に区別して
記録してゆき、ステップS8で測定中のチェーンの一周
のリンク数に達したかを判定し、チェーン一周の通過時
間の検出や測定の結果を記録を終えたなら、ステップS
9でTmaxを超えた通過時間Tsがあったかどうかを
判断する。該当するものがあった場合、ステップS10
で図9の通過時間Tsが発生したA点のリンクについて
通過時間を再度検出し測定する。ステップS11でその
測定結果をTmaxと比較し、図9のB点のように再度
Tmaxを超えていたら、ステップS12でそのリンク
部は局所的な異常伸びを発生していると判断する。ここ
で、図9のA点のリンク部で局所的な伸びが発生してい
るかどうかを確実に判定するために、A点の検出後に同
リンク部のパルス周期を複数回にわたって測定すること
もできる。In this way, the transit time, which is the pulse period for each link, is recorded separately for each link in odd and even numbers, and in step S8, is the number of links in one round of the chain under measurement measured? Is determined, and the result of detection and measurement of the transit time of one round of the chain has been recorded, and then step S
At 9 it is determined whether or not there is a transit time Ts exceeding Tmax. If there is any, step S10
Then, the transit time is detected and measured again for the link at point A where the transit time Ts of FIG. 9 has occurred. In step S11, the measurement result is compared with Tmax. If the measured value exceeds Tmax again, as shown at point B in FIG. 9, it is determined in step S12 that the link portion has caused local abnormal elongation. Here, in order to reliably determine whether or not local elongation has occurred at the link portion at point A in FIG. 9, the pulse period of the link portion may be measured a plurality of times after the detection of point A. .
【0021】その後、ステップS13でチェーン一周分
の奇数番目のパルス周期の総和と、偶数番目のパルス周
期の総和を算出する。伸び発生状態であれば図6に従っ
て奇数番目のパルス周期の総和F´は数式(3)で表さ
れ、偶数番目のパルス周期の総和G´は数式(4)でそ
れぞれ表される。次にステップS14で、奇数番目のパ
ルス周期の総和F´と偶数番目のパルス周期の総和G´
とを比較する。その結果、奇数番目のパルス周期の総和
F´の方が大きい場合、ステップS16で奇数番目は外
リンク部のパルス周期であり、偶数番目は内リンク部の
パルス周期であると判定する。一方、ステップS14の
判定で偶数番目のパルス周期の総和G´が奇数番目のパ
ルス周期の総和F´を超えている場合、ステップS15
で偶数番目は外リンク部のパルス周期であり、奇数番目
は内リンク部のパルス周期であると判定する。Thereafter, in step S13, the sum of the odd-numbered pulse periods for one round of the chain and the sum of the even-numbered pulse periods are calculated. In the state where the elongation occurs, the sum F 'of the odd-numbered pulse periods is represented by Expression (3) and the sum G' of the even-numbered pulse periods is represented by Expression (4) according to FIG. Next, in step S14, the sum F 'of the odd-numbered pulse periods and the sum G' of the even-numbered pulse periods
Compare with As a result, if the sum F 'of the odd-numbered pulse periods is larger, it is determined in step S16 that the odd-numbered pulse period is the pulse period of the outer link portion and the even-numbered pulse period is the pulse period of the inner link portion. On the other hand, when the sum G 'of the even-numbered pulse periods exceeds the sum F' of the odd-numbered pulse periods in the determination in step S14, step S15
It is determined that the even number is the pulse period of the outer link portion and the odd number is the pulse period of the inner link portion.
【0022】次にステップS17で、外リンク部と内リ
ンク部のパルス周期の総和の差からチェーン全体の伸び
率を計算する。上述したようにチェーンの伸びる過程の
特性により、チェーンは伸びるにつれて速度が速くなり
外リンク部分の距離間隔のみが広がるため、外リンク部
のパルス周期の総和は大きくなり、内リンク部のパルス
周期の総和は小さくなる。従って、外リンク部のパルス
周期の総和から内リンク部のパルス周期の総和を引いた
値は大きくなるので、ステップS17でチェーン全体の
伸び率を計算することができる。Next, in step S17, the elongation ratio of the entire chain is calculated from the difference between the total pulse periods of the outer link portion and the inner link portion. As described above, due to the characteristics of the chain elongation process, the speed increases as the chain elongates and only the distance interval of the outer link portion increases, so that the sum of the pulse periods of the outer link portion increases, and the pulse period of the inner link portion increases. The sum is smaller. Accordingly, the value obtained by subtracting the sum of the pulse periods of the inner link portion from the sum of the pulse periods of the outer link portion becomes larger, and the elongation rate of the entire chain can be calculated in step S17.
【0023】またステップS18で、ステップS17で
算出したチェーン全体の伸び率が使用限度に達している
かどうかを予め定めた設定値と比較して判定する。この
ステップS18で使用限度に達していないと判定したな
ら、ステップS20でチェーンの異常状態時期や適正な
チェーン交換時期を予測部19で予測し、その後、ステ
ップS21で測定結果やチェーン伸長度の判定結果やチ
ェーン異常状態予測時期やチェーン交換適正予測時期や
診断実施時の日時等の情報を記憶部25に記憶する。こ
の記憶部25に記憶した情報は、定期的に通信部26か
ら監視センタ27に送信する。一方、ステップS18で
使用限度に達していると判定したなら、ステップS19
で図1に示した駆動制御部28に何等かの指令を与えて
駆動を停止させるなどして、チェーン交換指示などを通
信部26から監視センタ27に送信する。In step S18, it is determined whether the elongation percentage of the entire chain calculated in step S17 has reached a use limit by comparing it with a predetermined set value. If it is determined in step S18 that the usage limit has not been reached, the prediction unit 19 predicts an abnormal state of the chain and an appropriate chain replacement time in step S20, and then determines the measurement result and the degree of chain elongation in step S21. Information such as a result, a chain abnormal state prediction time, a chain replacement proper prediction time, and a date and time when the diagnosis is performed is stored in the storage unit 25. The information stored in the storage unit 25 is periodically transmitted from the communication unit 26 to the monitoring center 27. On the other hand, if it is determined in step S18 that the usage limit has been reached, step S19
Then, a command for chain exchange or the like is transmitted from the communication unit 26 to the monitoring center 27 by giving any command to the drive control unit 28 shown in FIG.
【0024】このように本実施の形態によるチェーンの
伸長度診断装置によれば、チェーンの近傍にチェーン通
過検出器12A〜12Cを設けてローラ15の鉄鋼部分
を検出し、測定したチェーンのパルス周期から設定値を
超えたものを測定した場合、そのリンク部を記憶し、そ
の後、再度同リンク部のパルス周期を測定し、これら測
定結果からチェーンの異常伸長を診断するようにしたた
め、従来のようにチェーンの複数の標識を設けることな
く、正確な異常伸長を診断することができる。しかも、
保守員を介在することなくチェーンの始動時期から定期
的な計測を行なってチェーン伸びを予測して適切な時期
に点検や調整作業を行なうこともできる。またチェーン
伸びを予測することができるので、異常が生じるのを未
然に防ぐこともでき、搬送装置の信頼性を向上させるこ
とができる。さらに、エスカレータなどの乗客コンベア
では保守点検のための稼動停止時間を削減することがで
きるので、顧客の利用度を高めることができる。As described above, according to the chain elongation diagnostic apparatus of the present embodiment, the chain passage detectors 12A to 12C are provided near the chain to detect the steel portion of the roller 15, and the measured pulse period of the chain When a value exceeding the set value is measured, the link part is stored, and then the pulse period of the link part is measured again, and the abnormal elongation of the chain is diagnosed from these measurement results. An accurate abnormal elongation can be diagnosed without providing a plurality of marks on the chain. Moreover,
It is also possible to carry out inspection and adjustment work at an appropriate time by predicting chain elongation by performing periodic measurement from the start time of the chain without the intervention of maintenance personnel. Further, since the chain elongation can be predicted, it is possible to prevent the occurrence of an abnormality beforehand, and it is possible to improve the reliability of the transfer device. Further, the operation stoppage time for maintenance and inspection of a passenger conveyor such as an escalator can be reduced, so that the usage of customers can be increased.
【0025】尚、上述の実施の形態では、チェーン1周
分のパルス周期からチェーン伸長度を算出するようにし
たが、所定の区分毎にパルス周期からチェーン伸長度を
算出するようにしても良い。また搬送装置としてエスカ
レータを例示したが、動く歩道やオートラインその他の
搬送装置でもチェーンを用いた駆動機構を採用していれ
ば同様に適用することができる。In the above-described embodiment, the chain elongation is calculated from the pulse period for one round of the chain. However, the chain elongation may be calculated from the pulse period for each predetermined section. . Although the escalator is illustrated as a transport device, the present invention can be similarly applied to a moving walkway, an automatic line, and other transport devices if a drive mechanism using a chain is employed.
【0026】[0026]
【発明の効果】以上説明したように本発明のチェーンの
伸長度診断装置は、チェーンの近傍にチェーン通過検出
器を設けてチェーンのパルス周期を測定する測定部を設
け、この測定部で設定値を超えたパルス周期を測定した
場合、そのリンク部を記憶部に記憶し、その後、再度同
リンク部のパルス周期を測定部で測定し、これら測定結
果からチェーンの異常伸長を診断する判定部を設けたた
め、従来のようにチェーンに複数の標識を設けることな
く、正確な異常伸長を診断することができるようにな
る。As described above, the chain elongation diagnostic apparatus of the present invention is provided with a measuring section for measuring a pulse period of a chain by providing a chain passage detector near the chain, and using the measuring section for setting a set value. If a pulse period that exceeds the limit is measured, the link section is stored in the storage section, and then the pulse period of the link section is measured again by the measurement section, and a determination section for diagnosing abnormal elongation of the chain from these measurement results is provided. With this arrangement, it is possible to accurately diagnose abnormal extension without providing a plurality of markers on the chain as in the related art.
【図1】本発明の一実施の形態によるチェーンの伸長度
診断装置を示すブロック図である。FIG. 1 is a block diagram showing a chain elongation degree diagnostic apparatus according to an embodiment of the present invention.
【図2】図1に示したチェーンの伸長度診断装置を適用
するチェーンの断面図である。FIG. 2 is a cross-sectional view of a chain to which the elongation degree diagnostic device for a chain shown in FIG. 1 is applied.
【図3】図2に示したチェーンのB−B線に沿った初期
状態の断面図である。3 is a cross-sectional view of the chain shown in FIG. 2 in an initial state along line BB.
【図4】図2に示したチェーンのB−B線に沿った磨耗
伸びした状態の断面図である。FIG. 4 is a cross-sectional view of the chain shown in FIG.
【図5】図1に示したチェーンの伸長度診断装置を初期
状態のチェーンに用いたときの出力信号の波形図であ
る。FIG. 5 is a waveform diagram of an output signal when the chain elongation degree diagnosing device shown in FIG. 1 is used for a chain in an initial state.
【図6】図1に示したチェーンの伸長度診断装置を磨耗
伸びしたチェーンに用いたときの出力信号の波形図であ
る。6 is a waveform diagram of an output signal when the chain elongation degree diagnosing device shown in FIG. 1 is used for a worn and elongated chain.
【図7】図1に示したチェーンの伸長度診断装置を取り
付けた状態のエスカレータの要部を示す側面図である。FIG. 7 is a side view showing a main part of the escalator in a state where the elongation degree diagnosing device of the chain shown in FIG. 1 is attached.
【図8】図1に示したチェーンの伸長度診断装置による
診断手順を示すフローチャートである。FIG. 8 is a flowchart showing a diagnostic procedure performed by the chain elongation degree diagnostic apparatus shown in FIG. 1;
【図9】図1に示したチェーンの伸長度診断装置による
磨耗伸びしたチェーンのパルス周期の分布特性図であ
る。9 is a distribution characteristic diagram of a pulse period of a chain that has been worn and stretched by the chain length diagnostic apparatus shown in FIG. 1;
12A,12B,12C チェーン通過検出器 17 測定部 18 判定部 19 予測部 20A,20B,20C チェーン 21A 外側リンクプレート 21B 内側リンクプレート 24 MPU 25 記憶部 26 通信部 12A, 12B, 12C Chain passage detector 17 Measurement unit 18 Judgment unit 19 Prediction unit 20A, 20B, 20C Chain 21A Outer link plate 21B Inner link plate 24 MPU 25 Storage unit 26 Communication unit
───────────────────────────────────────────────────── フロントページの続き (72)発明者 松崎 義夫 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 竹井 智也 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 京家 朝紀 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 久保田 弘司 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 栗俣 良之 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 Fターム(参考) 2F065 AA21 CC00 DD03 DD19 FF21 FF32 FF67 QQ28 QQ29 RR08 SS04 TT02 UU05 2F069 AA44 BB40 DD08 DD16 DD19 GG04 GG07 GG31 GG39 GG45 GG52 GG56 GG58 GG77 JJ02 JJ19 JJ25 JJ27 MM04 MM11 MM17 NN09 QQ02 QQ05 3F321 AA02 CA25 EA14 EB07 EC06 HA04 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Yoshio Matsuzaki 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Japan Inside the Hitachi Building System Co., Ltd. (72) Inventor Tomoya Takei 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo, Ltd. Hitachi Building Systems Co., Ltd. (72) Inventor Kyoya Asaki 1-6-6 Kanda Nishikicho, Chiyoda-ku, Tokyo, Ltd. Inside the Hitachi Building Systems Co., Ltd. (72) Inventor Koji Kubota 1-6-6 Kanda Nishikicho, Chiyoda-ku, Tokyo, Ltd. Hitachi Building Systems Co., Ltd. (72) Inventor Yoshiyuki Kurimata 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo F-term (reference) 2F065 AA21 CC00 DD03 DD19 FF21 FF32 FF67 QQ28 QQ29 RR08 SS04 TT02 UU05 2F069 AA44 BB40 DD08 DD16 DD19 GG04 GG07 GG31 GG39 GG45 GG52 GG56 GG58 GG77 JJ02 JJ19 JJ25 JJ27 MM04 MM11 MM17 NN09 QQ02 QQ05 3F321 AA02 CA25 EA14 EB07 EC06 HA04
Claims (3)
ンの伸長度を診断するチェーンの伸長度診断装置におい
て、上記チェーンの内リンク部と外リンク部の通過をチ
ェーン通過検出器によって検出し、このチェーン通過検
出器のパルス信号から上記チェーンのリンク毎のパルス
周期を測定部で測定し、この測定部で設定値を超えたパ
ルス周期を測定した場合、少なくともそのパルス周期と
そのリンク部を記憶部に記憶し、その後、そのリンク部
のパルス周期を上記測定部で再度測定し、これらの測定
結果から上記チェーンの異常伸長を診断する判定部を設
けたことを特徴とするチェーンの伸長度診断装置。1. A chain elongation degree diagnostic device for diagnosing the degree of elongation of a chain having an inner link part and an outer link part, wherein the passage of the inner link part and the outer link part of the chain is detected by a chain passage detector. The pulse period of each link of the chain is measured by the measuring unit from the pulse signal of the chain passage detector. When the measuring unit measures the pulse period exceeding the set value, at least the pulse period and the link unit are stored. And a measuring section for measuring the pulse period of the link section again by the measuring section and diagnosing abnormal elongation of the chain from the measurement results. apparatus.
部による測定結果から上記チェーンの交換適正時期を予
測する予測部を設けたことを特徴とするチェーンの伸長
度診断装置。2. A chain elongation degree diagnostic apparatus according to claim 1, further comprising a prediction unit for predicting a proper replacement time of the chain based on a measurement result by the measurement unit.
部は、上記内リンク部と外リンク部の上記パルス周期の
それぞれの総和との差を、設定値と比較して上記チェー
ンの異常伸長度を診断することを特徴とするチェーンの
伸長度診断装置。3. The abnormal elongation of the chain according to claim 1, wherein the determination unit compares a difference between each of the pulse periods of the inner link unit and the total of the pulse periods of the outer link unit with a set value. A chain elongation degree diagnostic device characterized in that the degree is diagnosed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP20337998A JP3400946B2 (en) | 1998-07-17 | 1998-07-17 | Chain elongation diagnostic device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP20337998A JP3400946B2 (en) | 1998-07-17 | 1998-07-17 | Chain elongation diagnostic device |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000035326A true JP2000035326A (en) | 2000-02-02 |
JP3400946B2 JP3400946B2 (en) | 2003-04-28 |
Family
ID=16473071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP20337998A Expired - Lifetime JP3400946B2 (en) | 1998-07-17 | 1998-07-17 | Chain elongation diagnostic device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3400946B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010139456A (en) * | 2008-12-15 | 2010-06-24 | Chuden Plant Co Ltd | Apparatus for measuring overall length of conveyor belt |
JP2010149970A (en) * | 2008-12-24 | 2010-07-08 | Hitachi Ltd | Diagnostic device of passenger conveyer |
JP2019132668A (en) * | 2018-01-30 | 2019-08-08 | 株式会社椿本チエイン | Elongation determination device, elongation determination method, and computer program |
WO2021084707A1 (en) * | 2019-10-31 | 2021-05-06 | 三菱電機ビルテクノサービス株式会社 | Inspection jig and inspection method for chain of passenger conveyor |
JP7460971B1 (en) | 2023-08-25 | 2024-04-03 | フジテック株式会社 | Man Conveyor |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4860577B2 (en) * | 2007-08-28 | 2012-01-25 | 株式会社日立ビルシステム | Equipment life prediction system for passenger conveyors |
-
1998
- 1998-07-17 JP JP20337998A patent/JP3400946B2/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010139456A (en) * | 2008-12-15 | 2010-06-24 | Chuden Plant Co Ltd | Apparatus for measuring overall length of conveyor belt |
JP2010149970A (en) * | 2008-12-24 | 2010-07-08 | Hitachi Ltd | Diagnostic device of passenger conveyer |
JP2019132668A (en) * | 2018-01-30 | 2019-08-08 | 株式会社椿本チエイン | Elongation determination device, elongation determination method, and computer program |
WO2021084707A1 (en) * | 2019-10-31 | 2021-05-06 | 三菱電機ビルテクノサービス株式会社 | Inspection jig and inspection method for chain of passenger conveyor |
JP6870782B1 (en) * | 2019-10-31 | 2021-05-12 | 三菱電機ビルテクノサービス株式会社 | Passenger conveyor chain inspection jig and inspection method |
CN114072348A (en) * | 2019-10-31 | 2022-02-18 | 三菱电机大楼技术服务株式会社 | Auxiliary tool and method for checking chain of passenger conveyor |
JP7460971B1 (en) | 2023-08-25 | 2024-04-03 | フジテック株式会社 | Man Conveyor |
Also Published As
Publication number | Publication date |
---|---|
JP3400946B2 (en) | 2003-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3570914B2 (en) | Chain elongation diagnostic device | |
JP2019152514A (en) | Diagnosing device | |
JP4453672B2 (en) | Method and apparatus for measuring resistance force of conveyor belt overcoming conveyor roller and evaluation method of power loss of conveyor belt | |
US9995711B2 (en) | Calibration of wear detection system | |
GB2406844A (en) | Chain elongation monitoring apparatus and method | |
JP6790339B2 (en) | Conveyor belt monitoring system | |
JP6604615B2 (en) | Chain elongation detecting device, chain elongation detecting method and passenger conveyor | |
JP3400946B2 (en) | Chain elongation diagnostic device | |
US11174106B2 (en) | System and method for monitoring modular conveyor belts | |
JP3393808B2 (en) | Chain elongation diagnostic device | |
JP5075105B2 (en) | Passenger conveyor diagnostic equipment | |
JP2009084028A (en) | Diagnostic method of chain of passenger conveyor | |
JPH11325829A (en) | Wear elongation amount measuring method of link chain and its measuring equipment | |
JP5963332B1 (en) | Transport device | |
JP2002087750A (en) | Elongation detection device for tread chain of passenger conveyer | |
JP3330540B2 (en) | Chain elongation diagnostic device | |
US20220153555A1 (en) | Diagnostic system | |
RU2775284C2 (en) | System and method for monitoring of modular conveyor belts | |
JP3127340B2 (en) | Endless chain pitch measuring method and pitch measuring device | |
JP4757381B2 (en) | Handrail traveling diagnosis apparatus and method for handrail traveling diagnosis of passenger conveyor | |
JP7293289B2 (en) | Chain elongation detector | |
CN113955615B (en) | Diagnostic device for passenger conveyor and passenger conveyor | |
JPH08327320A (en) | Method and apparatus for measuring extension amount of link chain | |
JPS5860238A (en) | Method and apparatus for testing chain and lubricating oil for the same | |
JP2001097660A (en) | Abnormality diagnostic device for moving handrail of passenger conveyor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090221 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100221 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100221 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110221 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110221 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120221 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120221 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130221 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130221 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140221 Year of fee payment: 11 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
EXPY | Cancellation because of completion of term |