JP2000017797A JP10190426A JP19042698A JP2000017797A JP 2000017797 A JP2000017797 A JP 2000017797A JP 10190426 A JP10190426 A JP 10190426A JP 19042698 A JP19042698 A JP 19042698A JP 2000017797 A JP2000017797 A JP 2000017797A
Authority
JP
Japan
Prior art keywords
gutter
sleeve
handle
fitting
holding member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10190426A
Other languages
Japanese (ja)
Other versions
JP4086968B2 (en
Inventor
Shigero Sasamoto
茂郎 笹本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP19042698A priority Critical patent/JP4086968B2/en
Publication of JP2000017797A publication Critical patent/JP2000017797A/en
Application granted granted Critical
Publication of JP4086968B2 publication Critical patent/JP4086968B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Clamps And Clips (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily mount/demount a fallen-leaf removing gauze and a drain board by using a gutter bracket. SOLUTION: A bolt 17 with its screw portion 17' directed upward is mounted on either or both of a fixing bracket 1 or/and a supporting bracket 2 constituting a gutter bracket. A holddown member 19 consisting of a sleeve 20 with a handle 22 is threaded to the screw portion 17'.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、樋受け金具とそ
の付属品としての押さえ部材に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gutter receiving fitting and a holding member as an accessory thereof.

【0002】[0002]

【従来の技術】樋受け金具は、建物の軒先に取付けて樋
を支持するために用いられる。このような樋を取付けた
建物の屋根において、建物近辺の樹木の落ち葉等が樋に
落ち込むことを防止するために、樋の上面にメタルラス
等でなる金網を張り、その金網を樋受け金具の部分で針
金を巻き付けて固定したり、或いはクリップを差し込ん
で固定したりすることが行なわれる。
2. Description of the Related Art A gutter receiving fitting is used to support a gutter by being attached to the eaves of a building. On the roof of a building equipped with such a gutter, a wire mesh made of a metal lath or the like is provided on the upper surface of the gutter in order to prevent fallen leaves of trees near the building from falling into the gutter, and the wire mesh is used as a part of a gutter receiving bracket. The wire is wound and fixed, or a clip is inserted and fixed.

【0003】また、上記のこととは別に、樋を取付けた
建物の軒先の出幅が少ないときは、軒先先端の垂直下方
と樋の後端縁との間隔が十分大きくとれないことがあ
る。この場合、軒先から落下する雨水が軒先との間で作
用する表面張力の影響や、建物側に吹き付ける風の影響
などによって、雨水が建物側へカーブすることにより、
樋後端縁から後方に外れて落下することがある。
In addition to the above, when the width of the eaves of a building to which a gutter is attached is small, the space between the vertically lower end of the eaves and the rear edge of the gutter may not be sufficiently large. In this case, the rainwater falling from the eaves is curved toward the building due to the effect of surface tension acting between the eaves and the surface tension, and the effect of wind blowing on the building side.
It may fall off from the trailing edge of the gutter and fall.

【0004】[0004]

【発明が解決しようとする課題】上述の金網について
は、樋の内底面に溜まった細かいゴミや砂ぼこり等の堆
積物を清掃して除去しようとする場合、金網が妨げとな
って清掃ができない問題がある。この場合、清掃に先立
って金網を予め取外しておくことも考えられるが、前述
のように従来は針金やクリップ等でしっかり固定されて
いたので簡単に取外すことができず、また、たとえ取外
したとしても再度固定することは容易なことではなかっ
た。
The above-described wire mesh cannot be cleaned because the wire mesh hinders the cleaning of fine deposits such as fine dust and dust accumulated on the inner bottom surface of the gutter. There is. In this case, it is conceivable to remove the wire mesh in advance before cleaning, but as described above, the wire mesh was conventionally fixed firmly with wires or clips, so it was not easy to remove it, and even if it was removed, It was not easy to fix it again.

【0005】そこで、この発明は樋受け金具によって上
記の金網を簡単に取付け、取外しができるようにすると
ともに、その構造を利用して雨水が樋後端縁から外れて
落下する問題も併せて解決することを課題とする。
[0005] In view of the above, the present invention makes it possible to easily attach and detach the above-mentioned wire mesh by means of a gutter receiving fitting, and to solve the problem that rainwater falls off the trailing edge of the gutter by utilizing the structure. The task is to

【0006】[0006]

【課題を解決するための手段】上記の課題を解決するた
めに、この発明は、建物に固定される固定金具に、樋を
支持する支持金具を取付けてなる樋受け金具において、
上記の固定金具と支持金具のいずれか一方、又は両者を
貫通して、ねじ部を上向きにしてボルトを固定し、ねじ
孔を有するスリーブの一端部にハンドルを設けてなる押
さえ部材を、上記ボルトのねじ部に着脱自在に螺合した
構成としたものである。
In order to solve the above-mentioned problems, the present invention relates to a gutter receiving fitting comprising a fixing fitting fixed to a building and a support fitting for supporting the gutter.
The holding member, which penetrates one or both of the fixing bracket and the supporting bracket, fixes the bolt with the screw portion facing upward, and provides a handle provided at one end of a sleeve having a screw hole, with the bolt And is screwed to the screw part of the same in a detachable manner.

【0007】上記の押さえ部材が、上記のスリーブとハ
ンドルとを一体化した一部品からなる構成や、また上記
の押さえ部材が、別部品でなる上記のスリーブとハンド
ルにより構成され、該ハンドルにねじ軸を一体に設け、
そのねじ軸を上記スリーブのねじ孔の一端に螺合した構
成をとることができる。
[0007] The above-mentioned pressing member is constituted by one part in which the above-mentioned sleeve and handle are integrated, and the above-mentioned pressing member is constituted by the above-mentioned sleeve and handle which are separate parts. The shaft is provided integrally,
A configuration in which the screw shaft is screwed to one end of the screw hole of the sleeve can be adopted.

【0008】また、前述の課題を解決するために、建物
に固定される固定金具に、樋を支持する支持金具を取付
け、上記の固定金具と支持金具のいずれか一方、又は両
者を貫通して、ねじ部を上向きにしてボルトを固定して
なる樋受け金具に用いられる押さえ部材において、該押
さえ部材をねじ孔を有するスリーブの一端にハンドルを
設けることにより構成し、該押さえ部材を上記ボルトの
ねじ部に着脱自在に螺合するようにした構成とすること
ができる。
In order to solve the above-mentioned problem, a support fitting for supporting a gutter is attached to a fixing fitting fixed to a building, and one or both of the fixing fitting and the support fitting are penetrated. A holding member used for a gutter receiving bracket having a screw portion facing upward and fixing a bolt, wherein the holding member is provided by providing a handle at one end of a sleeve having a screw hole, and the holding member is formed of the bolt. It is possible to adopt a configuration in which the screw portion is detachably screwed to the screw portion.

【0009】更に、上記のハンドルとスリーブとが一体
化された一部品からなる構成や、上記のハンドルとスリ
ーブとが別部品により構成され、該ハンドルにねじ軸を
一体に設け、そのねじ軸を上記スリーブのねじ孔の一端
に螺合するようにした構成とることができる。
Further, the handle and the sleeve are formed as one integrated component, or the handle and the sleeve are formed as separate components, and a screw shaft is integrally provided on the handle, and the screw shaft is attached to the handle. It is possible to adopt a configuration in which it is screwed into one end of the screw hole of the sleeve.

【0010】[0010]

【発明の実施の形態】以下、この発明の実施形態を添付
図面に基づいて説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0011】図1に示した第1実施形態の樋受け具は、
帯状の金属板により形成された固定金具1と支持金具2
とからなる。固定金具1はその一端部に建物3に取付け
るための取付け部4を有し、その取付け部4の上端を外
向きに屈曲して上段水平部5が設けられ、その上段水平
部5の内端に傾斜屈曲部6を介して、上段水平部5より
低い下段水平部7が形成される。
The gutter receiver of the first embodiment shown in FIG.
Fixing bracket 1 and supporting bracket 2 formed of a band-shaped metal plate
Consists of The fixing bracket 1 has a mounting portion 4 at one end thereof for mounting to the building 3. An upper horizontal portion 5 is provided by bending an upper end of the mounting portion 4 outward, and an inner end of the upper horizontal portion 5 is provided. A lower horizontal portion 7 lower than the upper horizontal portion 5 is formed via the inclined bent portion 6.

【0012】また、支持金具2は、上記の下段水平部7
の下面に添えられる水平の中間部8の外端部(建物3か
ら遠い方の端部)に外側樋耳係止部9が設けられ、また
中間部8の内端部に傾斜屈曲部10を介して、前記の上
段水平部5の下面に添う水平部11が設けられる。さら
に、その水平部11の内端を下方に屈曲し下端を内側に
折り返して内側樋耳係止部12が設けられる。
The supporting bracket 2 is provided with the lower horizontal portion 7.
An outer gutter ear locking portion 9 is provided at an outer end (an end farther from the building 3) of a horizontal intermediate portion 8 attached to the lower surface of the vehicle, and an inclined bent portion 10 is provided at an inner end of the intermediate portion 8. A horizontal portion 11 is provided along the lower surface of the upper horizontal portion 5 through the intermediary. Further, the inner end of the horizontal portion 11 is bent downward and the lower end is turned inward to provide an inner gutter ear engaging portion 12.

【0013】前記の固定金具1の上段水平部5に長孔1
3が該固定金具1の長さ方向に設けられ、また支持金具
2の中間部8にも同様の長孔14が設けられる。さら
に、中間部8の内端部下面において板ばねにより構成さ
れた押さえばね15が取付けられ、その押さえばね15
の先端は前記の内側樋耳係止部12の先端に所要の間隙
をおいて対向する。
An elongated hole 1 is formed in the upper horizontal portion 5 of the fixture 1.
3 is provided in the length direction of the fixture 1, and a similar long hole 14 is provided in the intermediate portion 8 of the support 2. Further, a presser spring 15 constituted by a leaf spring is attached to the lower surface of the inner end of the intermediate portion 8, and the presser spring 15
Is opposed to the tip of the inner gutter ear engaging portion 12 with a required gap.

【0014】上記の固定金具1の上段水平部5と下段水
平部7の下面に、それぞれ支持金具2の水平部11と中
間部8を添わせ、上記の上段水平部5と水平部11と
は、固定金具1の長孔13に通したリベット16により
相対的なスライドが可能なように結合される。また、下
段水平部7と中間部8とは、支持金具2の長孔14に下
方から挿通したボルト17のねじ部17’に蝶ナット1
8を螺合して固定する。上記のボルト17のねじ部1
7’は比較的長く上方に突出す。
The horizontal part 11 and the intermediate part 8 of the support metal fitting 2 are attached to the lower surface of the upper horizontal part 5 and the lower horizontal part 7 of the fixing bracket 1, respectively. The rivets 16 are passed through the long holes 13 of the fixture 1 so as to be relatively slidable. Further, the lower horizontal portion 7 and the intermediate portion 8 are connected to the screw portion 17 ′ of the bolt 17 inserted from below into the elongated hole 14 of the support fitting 2, and the wing nut 1 is inserted.
8 is screwed and fixed. Screw part 1 of bolt 17 described above
7 'protrudes upward relatively long.

【0015】上記のねじ部17’の上端部に押さえ部材
19が螺合される。押さえ部材19は、スリーブ20の
上端につば部21を介して蝶形のハンドル22を一体に
設けたものである。スリーブ20にはその下端に開放し
たねじ孔21’が形成される。
A holding member 19 is screwed to the upper end of the screw portion 17 '. The pressing member 19 has a butterfly-shaped handle 22 integrally provided at the upper end of a sleeve 20 via a collar 21. The sleeve 20 has an open screw hole 21 ′ at its lower end.

【0016】第1実施形態の樋受け金具は以上の如きも
のであり、樋23を取付ける際は、予め押さえ部材19
をボルト17のねじ部17’から外しておき、固定金具
1の取付け部4を釘24により建物3に固定する。次
に、支持金具2を適宜スライドさせて軒先に合わせて出
調整を行ない、蝶ナット18を締結し所定位置に固定す
る。
The gutter receiving fitting of the first embodiment is as described above. When the gutter 23 is mounted, the holding member 19
Is removed from the screw portion 17 ′ of the bolt 17, and the mounting portion 4 of the fixing bracket 1 is fixed to the building 3 with the nail 24. Next, the support fitting 2 is appropriately slid to adjust the protrusion in accordance with the eaves, and the wing nut 18 is fastened and fixed at a predetermined position.

【0017】次に、樋23の外側樋耳25を外側樋耳係
止部9に係止し、続いて内側樋耳26で押さえばね15
を上方に押し上げつつ内側樋耳係止部12に係止させ
る。押さえばね15はそのばね力で元の状態に戻り、内
側樋耳26の外れを防止する。
Next, the outer gutter ear 25 of the gutter 23 is locked to the outer gutter ear locking portion 9, and then the holding spring 15 is held by the inner gutter ear 26.
While being pushed upward, is locked to the inner gutter ear locking portion 12. The presser spring 15 returns to its original state by its spring force, and prevents the inner gutter ear 26 from coming off.

【0018】上記のようにして樋23の取付けが完了す
ると、樋23上に金網27を展張する。金網27は樋2
3の開口幅とほぼ等しい幅を有するラス網が用いられ
る。その金網27を外側樋耳25と、固定金具1の上段
水平部5の上に載せて展張し、展張後押さえ部材19を
金網27の上方からその網目を通して差し込み、そのね
じ孔21’をボルト17のねじ部17’に螺合する。そ
うすると、金網27の網目が押さえ部材19のつば部2
1によって押さえられるため、金網27が樋受け金具に
対して取付けられる。
When the installation of the gutter 23 is completed as described above, the wire net 27 is spread on the gutter 23. Wire mesh 27 is gutter 2
A lath net having a width substantially equal to the opening width of No. 3 is used. The wire mesh 27 is placed on the outer gutter ears 25 and the upper horizontal portion 5 of the fixing fitting 1 and extended, and after the extension, the holding member 19 is inserted through the mesh from above the wire mesh 27, and the screw hole 21 ′ is inserted into the bolt 17. To the threaded portion 17 ′. Then, the mesh of the wire mesh 27 is fitted to the flange 2 of the holding member 19.
1, the wire mesh 27 is attached to the gutter receiving fitting.

【0019】上記のつば部21を省略して、ハンドル2
2で金網27を押さえるようにしてもよい。
By omitting the above-mentioned collar portion 21, the handle 2
2, the wire net 27 may be pressed.

【0020】軒先28から落下する雨水は、金網27の
網目を通して樋内に落下するが、樹木の落ち葉は金網2
7に遮られ樋23内に侵入することがない。樋23の内
部を清掃するときは、押さえ部材19を取外すことによ
り金網27を全部又は部分的に取外して清掃を行い、清
掃終了後は再びその金網27を展張し、押さえ部材19
をボルト17のねじ部17’に螺合して元の状態に戻
す。
The rainwater falling from the eaves 28 falls into the gutter through the mesh of the wire mesh 27, but the fallen leaves of the trees are
7 does not enter the gutter 23. When cleaning the inside of the gutter 23, the wire mesh 27 is completely or partially removed by removing the holding member 19 to perform cleaning, and after the cleaning is completed, the wire mesh 27 is expanded again and the holding member 19 is removed.
Is screwed into the screw portion 17 ′ of the bolt 17 to return to the original state.

【0021】図2(a)(b)に示した第2実施形態
は、押さえ部材19の構造において前述のものと相違す
る。即ち、この場合はスリーブ20’とハンドル22’
とが別部品であり、この他に座金29が用いられる。上
記のスリーブ20’はねじ孔21’が貫通して設けら
れ、またハンドル22’はその下端にねじ軸30が一体
に設けられたものである。その他の構成は第1実施形態
と同じである。
The second embodiment shown in FIGS. 2A and 2B differs from the above-described embodiment in the structure of the holding member 19. That is, in this case, the sleeve 20 'and the handle 22'
Are separate components, and a washer 29 is also used. The sleeve 20 'has a screw hole 21' penetrating therethrough, and the handle 22 'has a screw shaft 30 integrally provided at the lower end thereof. Other configurations are the same as those of the first embodiment.

【0022】上記の第2実施形態の場合は、金網27を
展張したのち、その網目を通してスリーブ20’をボル
ト17のねじ部17’に螺合し、座金29をねじ軸30
に挿通してこれを上記のスリーブ20’の上端に螺合す
る。これにより、金網27は座金29により押さえられ
る。座金29を省略してハンドル22’で押さえるよう
にしてもよい。
In the case of the second embodiment, after the wire mesh 27 is expanded, the sleeve 20 'is screwed through the mesh into the screw portion 17' of the bolt 17, and the washer 29 is screwed on the screw shaft 30.
And screwed into the upper end of the sleeve 20 '. Thus, the wire net 27 is pressed by the washer 29. The washer 29 may be omitted and the handle 22 'may be used to hold the washer.

【0023】図3から図5に示した第3実施形態は、大
サイズの樋受け金具に関するものであり、この場合の固
定金具1の取付け部4は、その中央部分に外方にコの字
形に屈曲して突き出した挟持受け部31を有し、その挟
持受け部31を取付け板33に設けた角孔32に挿通し
ている。上記の挟持受け部31を角孔32から前方に突
出せしめ、その取付け板33をスポット溶接により取付
け部4に固着している。また固定金具1の下段水平部7
の先端に耳押さえ部34が設けられる。
The third embodiment shown in FIGS. 3 to 5 relates to a large-sized gutter receiving fitting. In this case, the mounting portion 4 of the fixing fitting 1 has a U-shaped outside at the center thereof. The holding portion 31 is bent and protruded, and the holding portion 31 is inserted through a square hole 32 provided in the mounting plate 33. The holding portion 31 is projected forward from the square hole 32, and the mounting plate 33 is fixed to the mounting portion 4 by spot welding. The lower horizontal portion 7 of the fixing bracket 1
An ear holding portion 34 is provided at the tip of the.

【0024】支持金具2は、中間部8が樋23の内幅に
等しい長さを有し、内端を下向きに屈曲して前記の挟持
受け部31に対向した挟持押さえ部35が形成され、ま
た外端を上向きに屈曲して外側樋耳係止部9が形成され
る。この外側樋耳係止部9の上に前記の耳押さえ部34
が臨む。また、中間部8に長手方向の長孔14が形成さ
れる。
In the support 2, the intermediate portion 8 has a length equal to the inner width of the gutter 23, and the inner end is bent downward to form a clamping holding portion 35 facing the clamping receiving portion 31. The outer end is bent upward to form the outer gutter ear locking portion 9. The ear-holding portion 34 is placed on the outer gutter ear-holding portion 9.
Faces. Further, a long hole 14 in the longitudinal direction is formed in the intermediate portion 8.

【0025】上記の支持金具2の中間部8を、固定金具
1の下段水平部7の下面に添わせ、上方からコの字形の
結合金具36を下向きにはめている。更に、下方から長
孔14に挿通したボルト17を固定金具1と結合金具3
6に貫通させ、そのねじ部17’を上方に突出せしめ、
その突出部分に蝶ナット18を螺合している。ねじ部1
7’は蝶ナット18の上方から若干突出する程度の長さ
を有する。
The intermediate portion 8 of the support fitting 2 is attached to the lower surface of the lower horizontal portion 7 of the fixing fitting 1, and the U-shaped connecting fitting 36 is fitted downward from above. Further, the bolt 17 inserted into the elongated hole 14 from below is fixed to the fixing fitting 1 and the coupling fitting 3.
6, and the screw portion 17 'is projected upward,
A wing nut 18 is screwed into the protruding portion. Screw part 1
7 'has a length that slightly protrudes from above the wing nut 18.

【0026】上記のねじ部17’に螺合される押さえ部
材19は、スリーブ20’、座金29、ねじ軸30を有
するハンドル22’からなり、前記の第2実施形態と同
様に別部品であり(図4参照)、それらの構造も同一で
ある。
The holding member 19 screwed to the screw portion 17 'is composed of a sleeve 20', a washer 29, and a handle 22 'having a screw shaft 30, and is a separate component as in the second embodiment. (See FIG. 4), their structures are also the same.

【0027】なお、図3において、37は水切り板、3
8は建物、39は屋根である。
In FIG. 3, reference numeral 37 denotes a drain plate, 3
8 is a building and 39 is a roof.

【0028】第3実施形態の樋受け金具は以上の如きも
のであり、樋23を取付ける際は、支持金具2を外方に
スライドして(図3の一点鎖線参照)、その支持金具2
の外側樋耳系係止部9に外側樋耳25を係止すると共
に、内側樋耳26を挟持押さえ部35より高く持ち上げ
た状態で建物38側にスライドさせ、内側樋耳26を挟
持押さえ部35と挟持受け部31との間で挟持させる。
また、耳押さえ部34により外側樋耳25の浮き上がり
を防止する。
The gutter receiving fitting of the third embodiment is as described above. When the gutter 23 is mounted, the support fitting 2 is slid outward (see the dashed line in FIG. 3) and the support fitting 2 is mounted.
The outer gutter ear 25 is locked to the outer gutter ear system locking portion 9, and the inner gutter ear 26 is slid toward the building 38 in a state where the inner gutter ear 26 is lifted higher than the holding and holding portion 35, and the inner gutter ear 26 is held and held. It is clamped between 35 and the clamp receiving portion 31.
In addition, the ear holding portions 34 prevent the outer gutter ears 25 from rising.

【0029】この第3実施形態の場合も、前述の各実施
形態と同様に金網を展張してこれを押さえる使用方法も
あるが、ここでは水切り板37の取付けに使用する場合
について説明する。
In the case of the third embodiment, there is also a method of extending the wire net and holding it down, as in the above-described embodiments. However, here, the case where the wire net is used to attach the drain plate 37 will be described.

【0030】水切り板37は、屋根39の軒下からその
勾配に沿って樋23の上方まで下降傾斜して延び出し、
樋23の上部で屈曲され中間水平部40が形成される、
その中間水平部40に取付け孔41が設けられる。
The draining board 37 extends downward from the eaves of the roof 39 downwardly along the slope to above the gutter 23,
Bent at the top of the gutter 23 to form an intermediate horizontal portion 40,
A mounting hole 41 is provided in the intermediate horizontal portion 40.

【0031】上記の水切り板37を取付ける際は、予め
スリーブ20’をボルト17のねじ部17’の上端に螺
合しておき、中間水平部40の取付け孔41をそのスリ
ーブ20’上に合致させ、次にハンドル22’のねじ軸
30を、その取付け孔41に通すと共にスリーブ20’
のねじ孔21’に螺合して締付ける。これにより、水切
り板37が樋受け金具に固定される。
When attaching the draining plate 37, the sleeve 20 'is screwed in advance to the upper end of the screw portion 17' of the bolt 17, and the mounting hole 41 of the intermediate horizontal portion 40 is fitted on the sleeve 20 '. Then, the screw shaft 30 of the handle 22 ′ is passed through the mounting hole 41 and the sleeve 20 ′.
Screwed into the screw hole 21 '. Thereby, the drainer 37 is fixed to the gutter receiving fitting.

【0032】上記の水切り板37は、建物38の軒先2
8から落下する雨水をその下端まで案内し、雨水が樋2
3の後端縁から外方に外れて落下することを防止する。
The draining board 37 is used for the eaves 2 of the building 38.
8 guides the rainwater that falls from the bottom to its lower end.
3 is prevented from falling off the rear end edge outward.

【0033】[0033]

【発明の効果】以上のように、この発明によると、樋受
け金具のボルトのねじ部に押さえ部材を着脱自在に取付
けることにより、落ち葉除けのための金網や水切り板を
簡単に取付け或いは取外すことができる便利さがある。
As described above, according to the present invention, the holding member is detachably attached to the threaded portion of the bolt of the gutter receiving fitting, so that the wire net or the drain plate for removing fallen leaves can be easily attached or detached. There is convenience that can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)第1実施形態の使用時における断面図 (b)同上の押さえ部材の斜視図FIG. 1A is a cross-sectional view when the first embodiment is used. FIG.

【図2】(a)第2実施形態の使用状態における一部断
面図 (b)同上の押さえ部材の分解斜視図
FIG. 2A is a partial cross-sectional view of the second embodiment in use, and FIG. 2B is an exploded perspective view of the same pressing member.

【図3】第3実施形態の使用状態における断面図FIG. 3 is a sectional view of the third embodiment in use.

【図4】同上の分解斜視図FIG. 4 is an exploded perspective view of the above.

【図5】同上の一部断面図FIG. 5 is a partial sectional view of the above.

【符号の説明】[Explanation of symbols]

1 固定金具 2 支持金具 3 建物 4 取付け部 4 上段水平部 6 傾斜屈曲部 7 下段水平部 8 中間部 9 外側樋係止部 10 傾斜屈曲部 11 水平部 12 内側樋耳係止部 13 長孔 14 長孔 15 押さえばね 16 リベット 17 ボルト 18 蝶ナット 19 押さえばね 20、20’ スリーブ 21 つば部 21’ ねじ孔 22、22’ ハンドル 23 樋 24 釘 25 外側樋耳 26 内側樋耳 27 金網 28 軒先 29 座金 30 ねじ軸 31 挟持受け部 32 角孔 33 取付け板 34 耳押さえ部 35 挟持押さえ部 36 結合金具 37 水切り板 38 建物 39 屋根 40 中間水平部 41 取付け孔 DESCRIPTION OF SYMBOLS 1 Fixed metal fitting 2 Support metal fitting 3 Building 4 Mounting part 4 Upper horizontal part 6 Inclined bending part 7 Lower horizontal part 8 Intermediate part 9 Outer gutter locking part 10 Inclined bending part 11 Horizontal part 12 Inner gutter ear locking part 13 Slot 14 Elongated hole 15 Pressing spring 16 Rivet 17 Bolt 18 Wing nut 19 Pressing spring 20, 20 'Sleeve 21 Collar 21' Screw hole 22, 22 'Handle 23 Gutter 24 Nail 25 Outer gutter ear 26 Inner gutter ear 27 Wire mesh 28 eaves 29 Washer REFERENCE SIGNS LIST 30 screw shaft 31 holding portion 32 square hole 33 mounting plate 34 ear holding portion 35 holding holding portion 36 coupling fitting 37 draining plate 38 building 39 roof 40 intermediate horizontal portion 41 mounting hole

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 建物に固定される固定金具に、樋を支持
する支持金具を取付けてなる樋受け金具において、上記
の固定金具と支持金具のいずれか一方、又は両者を貫通
して、ねじ部を上向きにしてボルトを固定し、ねじ孔を
有するスリーブの一端部にハンドルを設けてなる押さえ
部材を、上記ボルトのねじ部に着脱自在に螺合したこと
を特徴とする樋受け金具。
1. A gutter receiving fitting in which a supporting fitting for supporting a gutter is attached to a fixing fitting fixed to a building, wherein one or both of the fixing fitting and the supporting fitting are penetrated to form a screw portion. A gutter receiving fitting characterized in that a holding member having a handle provided at one end of a sleeve having a screw hole is detachably screwed to a screw part of the bolt, with the bolt fixed with the head facing upward.
【請求項2】 上記の押さえ部材が、上記のスリーブと
ハンドルとを一体化した一部品からなることを特徴とす
る請求項1に記載の樋受け金具。
2. The gutter receiving metal fitting according to claim 1, wherein said holding member is formed as a single component in which said sleeve and handle are integrated.
【請求項3】 上記の押さえ部材が、別部品でなる上記
のスリーブとハンドルにより構成され、該ハンドルにね
じ軸を一体に設け、そのねじ軸を上記スリーブのねじ孔
の一端に螺合したことを特徴とする請求項1に記載の樋
受け金具。
3. The pressing member is constituted by the sleeve and the handle, which are separate parts, and a screw shaft is provided integrally with the handle, and the screw shaft is screwed into one end of a screw hole of the sleeve. The gutter receiving fitting according to claim 1, wherein:
【請求項4】 建物に固定される固定金具に、樋を支持
する支持金具を取付け、上記の固定金具と支持金具のい
ずれか一方、又は両者を貫通して、ねじ部を上向きにし
てボルトを固定してなる樋受け金具に用いられる押さえ
部材において、該押さえ部材をねじ孔を有するスリーブ
の一端にハンドルを設けることにより構成し、該押さえ
部材を上記ボルトのねじ部に着脱自在に螺合するように
したことを特徴とする樋受け金具の押さえ部材。
4. A fixing bracket for supporting a gutter is attached to a fixing bracket fixed to a building, and one or both of the fixing bracket and the supporting bracket is penetrated, and the bolt is turned up with the screw portion facing upward. In a holding member used for a fixed gutter receiving fitting, the holding member is constituted by providing a handle at one end of a sleeve having a screw hole, and the holding member is detachably screwed to a screw portion of the bolt. A holding member for a gutter receiving fitting, wherein:
【請求項5】 上記のハンドルとスリーブとが一体化さ
れた一部品からなることを特徴とする請求項4に記載の
樋受け金具の押さえ部材。
5. The holding member for a gutter receiving fitting according to claim 4, wherein the handle and the sleeve are formed as a single unit.
【請求項6】 上記のハンドルとスリーブとが別部品に
より構成され、該ハンドルにねじ軸を一体に設け、その
ねじ軸を上記スリーブのねじ孔の一端に螺合するように
したことを特徴とする請求項4に記載の樋受け金具の押
さえ部材。
6. The handle and the sleeve are formed as separate components, a screw shaft is provided integrally with the handle, and the screw shaft is screwed into one end of a screw hole of the sleeve. The holding member for the gutter receiving fitting according to claim 4.
JP19042698A 1998-07-06 1998-07-06 樋 Bracket and its holding member Expired - Fee Related JP4086968B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19042698A JP4086968B2 (en) 1998-07-06 1998-07-06 樋 Bracket and its holding member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19042698A JP4086968B2 (en) 1998-07-06 1998-07-06 樋 Bracket and its holding member

Publications (2)

Publication Number Publication Date
JP2000017797A true JP2000017797A (en) 2000-01-18
JP4086968B2 JP4086968B2 (en) 2008-05-14

Family

ID=16257940

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19042698A Expired - Fee Related JP4086968B2 (en) 1998-07-06 1998-07-06 樋 Bracket and its holding member

Country Status (1)

Country Link
JP (1) JP4086968B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038669A (en) * 2000-07-26 2002-02-06 Toyo Chem Co Ltd Eaves gutter suspender and eaves gutter fixing method
JP2002242389A (en) * 2001-02-20 2002-08-28 Otis:Kk Rain gutter support
JP2002294948A (en) * 2001-04-03 2002-10-09 Otis:Kk Rain gutter support
JP2012225076A (en) * 2011-04-21 2012-11-15 Panasonic Corp Fitting tool of eaves gutter

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038669A (en) * 2000-07-26 2002-02-06 Toyo Chem Co Ltd Eaves gutter suspender and eaves gutter fixing method
JP4583560B2 (en) * 2000-07-26 2010-11-17 電気化学工業株式会社 Eaves anchor hanging tool and eave anchor fixing method
JP2002242389A (en) * 2001-02-20 2002-08-28 Otis:Kk Rain gutter support
JP2002294948A (en) * 2001-04-03 2002-10-09 Otis:Kk Rain gutter support
JP4729190B2 (en) * 2001-04-03 2011-07-20 株式会社オーティス Gutter support
JP2012225076A (en) * 2011-04-21 2012-11-15 Panasonic Corp Fitting tool of eaves gutter

Also Published As

Publication number Publication date
JP4086968B2 (en) 2008-05-14

Similar Documents

Publication Publication Date Title
US5288094A (en) Bracket for supplying an electrical connector
US20070204521A1 (en) Gutter guard and decor support arrangement
JP2000017797A (en) Gutter bracket and its holddown member
JP4431596B2 (en) Reinforcement plate for hanging metal parts such as folded roof
JP2004232239A (en) Installation structure for eaves gutter and fallen leaf visor
JP3495120B2 (en) Antenna branch line fixture
JP3756644B2 (en) Eaves mounting structure
JP2001098718A (en) Gutter suspending tool for folded roof
JP2004225465A (en) Eaves gutter cover
JPH11100955A (en) Gutter receiving device
JP2979695B2 (en) Eave gutter support device
JP3146866B2 (en) Eave gutter support structure
JP3753848B2 (en) Eaves panel mounting structure
JP2511991Y2 (en) Antenna branch support structure
KR19980043980U (en) Clip fastening structure for fixing the trim
JPH088178Y2 (en) Eaves gutter holder
JPH0651346U (en) Eaves gutter support device
JPH07269048A (en) Gutter fitting
JPH0230575Y2 (en)
JP3110636B2 (en) Makeup gutter hanging equipment
JP2515584Y2 (en) Eaves gutter hanging bracket mounting device
JP2000096786A (en) Gutter cover mounting clip
JP2554148Y2 (en) Eave gutter cover retention structure
JP2001115616A (en) Fascia board mounting bracket
JP2536968Y2 (en) Eave gutter support

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050706

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080122

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080220

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110228

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees