JP2000008379A - Cut soil reinforcing method - Google Patents

Cut soil reinforcing method

Info

Publication number
JP2000008379A
JP2000008379A JP10179344A JP17934498A JP2000008379A JP 2000008379 A JP2000008379 A JP 2000008379A JP 10179344 A JP10179344 A JP 10179344A JP 17934498 A JP17934498 A JP 17934498A JP 2000008379 A JP2000008379 A JP 2000008379A
Authority
JP
Japan
Prior art keywords
filler
drill rod
hole
cut
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP10179344A
Other languages
Japanese (ja)
Inventor
Kazu Miyata
和 宮田
Hirotaka Kawasaki
廣貴 川崎
Kazuo Miyazawa
和夫 宮沢
Hisaya Sugawara
尚也 菅原
Hiroshi Kagitani
博司 鍵谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Sanshin Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Sanshin Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp, Sanshin Corp filed Critical Shimizu Construction Co Ltd
Priority to JP10179344A priority Critical patent/JP2000008379A/en
Publication of JP2000008379A publication Critical patent/JP2000008379A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent collapse of a hole wall and useless diffusion of filler into cracks in a cut soil reinforcing method. SOLUTION: Reinforcement members 1 such as reinforcement bars and lock bolts are placed into a natural ground 2 to reinforce the natural ground 2. In this case, a drill rod 6a is moved forward to form a bored hole 7 while injecting filler 9 from a tip of the drill rod 6a, the drill rod 6a is retracted to be pulled out of the bored hole 7 while injecting the filler 9 from the tip of the drill rod 6a, and then the reinforcement member 1 is inserted into the bored hole 7 where the filler 9 is filled. As the filler 9, cement milk or cement mortar is used, favorably.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地山へ鉄筋やロッ
クボルト等の補強材を打設して地山を補強する切土補強
土工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cut soil reinforcing method for reinforcing a ground by driving a reinforcing material such as a reinforcing bar or a rock bolt into the ground.

【0002】[0002]

【従来の技術】地山の中規模崩壊対策の抑止工や、切土
勾配の急勾配化対策として、あるいは構造物掘削の際の
仮設法面等に対して、切土補強土工法が広く採用されて
いる。切土補強土工法は、図2に示すように、鉄筋やロ
ックボルト等の比較的短い補強材1を地山2の法面に多
数本挿入することで地山2を補強し、法面全体の安定性
を高めるものである。図2において破線で示す符号3は
原状法面、4は切土補強土工法によらない通常の場合の
法面であり、切土補強土工法によればより急勾配ののり
面を形成することが可能であることがわかる。
2. Description of the Related Art The cut-reinforcement earth method is widely used as a measure to prevent medium-scale collapse of soil in the ground, to prevent a steep cut slope, or for temporary slopes when excavating structures. Have been. As shown in FIG. 2, the cut-cut reinforcement earth method reinforces the ground 2 by inserting a number of relatively short reinforcing members 1 such as reinforcing steel bars and rock bolts into the slope of the ground 2. To increase the stability of the In FIG. 2, reference numeral 3 indicated by a broken line is an original slope, and 4 is a normal slope not using the cut-reinforcement earth method. According to the cut-reinforcement earth method, a steeper slope is formed. It can be seen that is possible.

【0003】上記のような切土補強土工法の施工手順
は、補強対象の地山2全体を覆うような法面工5(ある
いは法枠工)を実施した後、地山2に沿って作業足場を
設けてそこに削岩機を設置し、あるいは図3に示すよう
に地盤面上から重機により削岩機6を支持してのり面に
対向せしめ、その削岩機6により図4(a)〜(c)に
示す手順で補強材1を打設することが通常である。すな
わち、まず図4(a)に示すように削岩機6のドリルロ
ッド6aにより地山2に対して削孔7を形成し、ドリル
ロッド6aを削孔7から引き抜いた後、(b)に示すよ
うに削孔7内に注入ホース8を挿入してセメントミルク
やセメントモルタル等の充填材9を孔口まで充填し、注
入ホース8を引き抜いた後、(c)に示すように削孔7
内に補強材1を挿入し、しかる後に、図2(b)に示す
ように孔口にベアリングプレート10およびナット11
を取り付けて締め付けることにより補強材1を法面工5
(あるいは法枠工)に対して定着することが一般的であ
る。
[0003] The construction procedure of the above-described cut-reinforcement earth method includes a slope work 5 (or a slope work) that covers the entire ground 2 to be reinforced, and then works along the ground 2. A scaffold is provided and a rock drill is installed there, or, as shown in FIG. 3, the rock drill 6 is supported by a heavy machine from above the ground surface so as to be opposed to the slope, and the rock drill 6 shown in FIG. It is usual that the reinforcing material 1 is cast in the procedure shown in (1) to (c). That is, first, as shown in FIG. 4A, a drill hole 7 is formed in the ground 2 by a drill rod 6a of the rock drill 6 and the drill rod 6a is pulled out from the drill hole 7, and then as shown in FIG. As shown in the figure, an injection hose 8 is inserted into the hole 7 to fill the hole 9 with a filler 9 such as cement milk or cement mortar, and the injection hose 8 is pulled out. Then, as shown in FIG.
After that, the reinforcing member 1 is inserted into the hole, and thereafter, the bearing plate 10 and the nut 11 are inserted into the holes as shown in FIG.
Attach and tighten the reinforcing material 1 to make the slope 5
It is common to settle for (or a legal framework).

【0004】[0004]

【発明が解決しようとする課題】上記のように、切土補
強土工法は地山2の地表面付近に削孔7を形成して補強
材1を打設する工法であるため、補強対象の地山2は風
化が進んで亀裂が多く発生しているものであったり、強
度が小さい岩および表層すべりの堆積物である崩積土で
あることが多い。したがって、削岩機6により形成した
削孔7の孔壁が自立し得ずに崩壊してしまったり、削孔
7内に充填した充填材9が亀裂内に無駄に散逸してしま
うことがあり、有効な改善策が必要とされていた。
As mentioned above, the cut-reinforcement earth method is a method in which a hole 7 is formed near the ground surface of the ground 2 and the reinforcing material 1 is cast, so that the reinforcing object The ground 2 is often weathered and has many cracks, and is often a rock with low strength and collapsible soil that is a deposit of surface slip. Therefore, the hole wall of the drilling hole 7 formed by the rock drill 6 may not be able to stand on its own, and may collapse or the filler 9 filled in the drilling hole 7 may be dissipated in a crack. , Effective remedies were needed.

【0005】[0005]

【課題を解決するための手段】上記事情に鑑み、本発明
は、ドリルロッドの先端より充填材を注入しつつ該ドリ
ルロッドを前進させて削孔を形成した後、前記ドリルロ
ッドの先端から充填材を注入しつつ該ドリルロッドを後
退させて削孔内から引き抜き、しかる後に、充填材が充
填されている削孔内に補強材を挿入するようにしたもの
である。充填材としてはセメントミルクまたはセメント
モルタルを用いることが好適である。
SUMMARY OF THE INVENTION In view of the above circumstances, the present invention provides a method of forming a hole by advancing a drill rod while injecting a filler material from the tip of the drill rod and forming a hole from the tip of the drill rod. The drill rod is retracted while the material is being injected, and the drill rod is withdrawn from the drilled hole. Thereafter, the reinforcing material is inserted into the drilled hole filled with the filler. It is preferable to use cement milk or cement mortar as the filler.

【0006】[0006]

【発明の実施の形態】以下、本発明の切土補強土工法の
実施形態を図1(a)〜(c)を参照して説明する。本
実施形態の切土補強土工法では、図1(a)に示すよう
に削孔7を形成するに際して削岩機6のドリルロッド6
aの先端より充填材9としてのセメントミルクまたはセ
メントモルタルを注入しながらドリルロッド6aを前進
せしめて削孔7を形成する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a cut-reinforcement earth method according to the present invention will be described below with reference to FIGS. 1 (a) to 1 (c). In the cut-reinforcement earth method of the present embodiment, the drill rod 6 of the rock drill 6 is used to form the hole 7 as shown in FIG.
The drill rod 6a is advanced while pouring cement milk or cement mortar as the filler 9 from the tip end of the hole a to form the hole 7.

【0007】上記のようにして所定深度の削孔7を形成
した後、ドリルロッド6aを引き抜くに際しては、
(b)に示すように同様にドリルロッド6aの先端から
充填材9としてのセメントミルクまたはセメントモルタ
ルを注入しながらドリルロッド6aを引き抜く。
After the drill hole 7 having a predetermined depth is formed as described above, when the drill rod 6a is pulled out,
Similarly, as shown in (b), the drill rod 6a is pulled out while injecting cement milk or cement mortar as the filler 9 from the tip of the drill rod 6a.

【0008】ドリルロッド6aを削孔7内から引き抜く
と、削孔7内には孔口まで既に充填材9が充填されてい
るので、(c)に示すようにその削孔7内に鉄筋あるい
はロックボルト等の補強材1を挿入する。
When the drill rod 6a is pulled out from the drilled hole 7, the filler 9 has already been filled up to the hole opening in the drilled hole 7, and as shown in FIG. Insert a reinforcing material 1 such as a lock bolt.

【0009】最後に、従来と同様にして補強材1の基端
部にベアリングプレート10およびナット11を取り付
けて締め付け、補強材1を法面工5(あるいは法枠工)
に対して定着する(図2参照)。
Finally, a bearing plate 10 and a nut 11 are attached to the base end of the reinforcing member 1 and tightened in the same manner as in the prior art, and the reinforcing member 1 is sloped 5 (or framed).
(See FIG. 2).

【0010】以上の手順によれば、充填材9を注入しな
がら削孔7を形成するので、削孔7内全体に自ずとかつ
確実に充填材9が充填されて孔壁の崩落を防止できるも
のとなり、かつ、充填材9が自ずと亀裂内に浸入してい
って土粒子間の粘着性が増し、孔壁の自立安定性を十分
に高めることができる。また、充填材9が無駄に散逸す
ることもないのでその注入量を節約でき、補強材1に対
するかぶり厚も確保することが可能である。特に、充填
材9として上記実施形態のようにセメントミルクまたは
セメントモルタルを用いる場合には、それらの比重が土
や岩とほぼ同程度であること、および亀裂に対してセメ
ントミルクあるいはセメントモルタルとくり粉(スライ
ム)とが注入されることになって無駄がなく、それら以
外の充填材たとえば孔壁安定用の薬液等を用いる場合に
比較してより効果的である。
According to the above-described procedure, since the drilling holes 7 are formed while the filler 9 is being injected, the filler 9 is naturally and reliably filled in the entire drilling hole 7 so that the hole wall can be prevented from collapsing. In addition, the filler 9 naturally penetrates into the cracks, and the adhesiveness between the soil particles increases, and the self-standing stability of the hole wall can be sufficiently increased. Further, since the filler 9 is not dissipated wastefully, the injection amount can be saved, and the cover thickness for the reinforcing member 1 can be ensured. In particular, when cement milk or cement mortar is used as the filler 9 as in the above-described embodiment, the specific gravity of the cement milk or cement mortar is almost the same as that of soil or rock, and cracks and cement milk or cement mortar are used. Since the powder (slime) is injected, there is no waste, and it is more effective as compared with the case where other fillers such as a chemical for stabilizing pore walls are used.

【0011】また、従来においては削孔7を形成した後
に注入ホース8を挿入して充填材9の充填を行っていた
が、上記方法では削孔工程と充填材充填工程とが同時に
行われることになり、従来における注入ホース8による
充填材注入工程を省略できるので、作業時間の短縮を図
ることができ工期短縮に寄与し得る。
In the prior art, the filling material 9 is filled by inserting the injection hose 8 after the formation of the hole 7. However, in the above method, the hole making step and the filler filling step are performed simultaneously. In this case, the conventional filling material injection step using the injection hose 8 can be omitted, so that the working time can be shortened and the construction period can be shortened.

【0012】なお、上記方法は、ドリルロッド6aの基
端からスイベルジョイントを介して充填材9を供給で
き、ドリルロッド6aの先端から充填材9を注入できる
形式のものであれば、汎用の削岩機をそのままあるいは
若干の変更を行う程度で採用可能であり、特に複雑な装
置は必要としない。
In the above method, if the filler 9 can be supplied from the base end of the drill rod 6a via a swivel joint and the filler 9 can be injected from the distal end of the drill rod 6a, a general-purpose cutting tool can be used. The rock drill can be adopted as it is or with a slight change, and no particularly complicated device is required.

【0013】[0013]

【発明の効果】以上で説明したように、本発明は、ドリ
ルロッドの先端より充填材を注入しつつ削孔を形成した
後、充填材を注入しながらドリルロッドを後退させて削
孔内から引き抜き、しかる後に充填材が充填されている
削孔内に補強材を挿入するので、削孔に際してその内部
に確実に充填材を充填し得て孔壁の崩落を自ずと防止で
きることはもとより、充填材が亀裂内に浸入していくの
で土粒子間の粘着性が増して孔壁の自立安定性を十分に
高めることができ、充填材が無駄に散逸することもない
ので充填材の注入量を節約でき、補強材に対するかぶり
厚も確保することが可能である。また、本発明によれ
ば、削孔工程と充填材充填工程とが同時に行われるので
作業時間の短縮を図ることができるし、特に複雑な装置
も必要としない。特に、充填材としてセメントミルクま
たはセメントモルタルを用いれば、その比重が土や岩と
ほぼ同程度であり、かつ亀裂に対してセメントミルクや
セメントモルタルとくり粉とが注入されることになって
無駄がなく、したがってそれら以外の充填材たとえば孔
壁安定用の薬液等を用いる場合に比較してより効果的で
ある。
As described above, according to the present invention, a drilling hole is formed while injecting a filler from the tip of a drill rod, and then the drill rod is retracted while injecting a filler to remove the drilling hole from within the drilling hole. Since the reinforcing material is inserted into the drilled hole filled with the filler after that, the filler can be reliably filled into the hole when drilling, and the collapse of the hole wall can be prevented by itself, as well as the filler. Penetrates into the cracks, increasing the cohesion between the soil particles and sufficiently increasing the self-sustaining stability of the pore wall. It is possible to secure the cover thickness for the reinforcing material. Further, according to the present invention, since the drilling step and the filler filling step are performed at the same time, the working time can be reduced, and no particularly complicated apparatus is required. In particular, if cement milk or cement mortar is used as the filler, the specific gravity is almost the same as that of soil or rock, and the cement milk, cement mortar, and cutting powder are injected into the cracks, resulting in waste. Therefore, it is more effective as compared with the case where a filler other than these, for example, a chemical solution for stabilizing pore walls is used.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の実施形態である切土補強土工法の作
業手順を示す図である。
FIG. 1 is a diagram showing an operation procedure of a cut-reinforcement soil method according to an embodiment of the present invention.

【図2】 切土補強土工法の適用例を示す図である。FIG. 2 is a diagram showing an application example of a cut-cut reinforced earth method.

【図3】 従来の切土補強土工法の実施状況を示す図で
ある。
FIG. 3 is a view showing the state of implementation of a conventional cut reinforcing earth method.

【図4】 従来の切土補強土工法の作業手順を示す図で
ある。
FIG. 4 is a diagram showing a work procedure of a conventional cut reinforcing earth method.

【符号の説明】[Explanation of symbols]

1 補強材 2 地山 6a ドリルロッド 7 削孔 9 充填材 DESCRIPTION OF SYMBOLS 1 Reinforcement material 2 Ground 6a Drill rod 7 Drilling hole 9 Filler

───────────────────────────────────────────────────── フロントページの続き (72)発明者 川崎 廣貴 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 宮沢 和夫 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 菅原 尚也 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 鍵谷 博司 東京都文京区後楽一丁目2番7号 三信建 設工業株式会社内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Hiroki Kawasaki 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Kazuo Miyazawa 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Naoya Sugawara 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation Co., Ltd. (72) Inventor Hiroshi Kagiya 1-27 Koraku, Bunkyo-ku, Tokyo In company

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地山へ鉄筋やロックボルト等の補強材を
打設して地山を補強する切土補強土工法であって、ドリ
ルロッドの先端より充填材を注入しつつ該ドリルロッド
を前進させて削孔を形成した後、前記ドリルロッドの先
端から充填材を注入しつつ該ドリルロッドを後退させて
削孔内から引き抜き、しかる後に、充填材が充填されて
いる削孔内に補強材を挿入することを特徴とする切土補
強土工法。
1. A cut-cut reinforcing earth method for reinforcing a ground by placing a reinforcing material such as a reinforcing bar or a rock bolt into the ground, and filling the drill rod while injecting a filler from the tip of the drill rod. After forming a drill hole by moving forward, the drill rod is retracted while injecting filler material from the tip of the drill rod and pulled out from the drill hole, and then reinforced in the drill hole filled with filler material. A cut-cut reinforced earth method characterized by inserting wood.
【請求項2】 前記充填材としてセメントミルクまたは
セメントモルタルを用いることを特徴とする請求項1記
載の切土補強土工法。
2. The method according to claim 1, wherein cement filler or cement mortar is used as the filler.
JP10179344A 1998-06-25 1998-06-25 Cut soil reinforcing method Withdrawn JP2000008379A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10179344A JP2000008379A (en) 1998-06-25 1998-06-25 Cut soil reinforcing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10179344A JP2000008379A (en) 1998-06-25 1998-06-25 Cut soil reinforcing method

Publications (1)

Publication Number Publication Date
JP2000008379A true JP2000008379A (en) 2000-01-11

Family

ID=16064209

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10179344A Withdrawn JP2000008379A (en) 1998-06-25 1998-06-25 Cut soil reinforcing method

Country Status (1)

Country Link
JP (1) JP2000008379A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100774715B1 (en) * 2006-11-20 2007-11-08 현대자동차주식회사 A multi phase push button switch for a vehicle's seat warmer
RU2684674C1 (en) * 2016-12-03 2019-04-11 Конинклейке Филипс Н.В. Vacuum cleaner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100774715B1 (en) * 2006-11-20 2007-11-08 현대자동차주식회사 A multi phase push button switch for a vehicle's seat warmer
RU2684674C1 (en) * 2016-12-03 2019-04-11 Конинклейке Филипс Н.В. Vacuum cleaner

Similar Documents

Publication Publication Date Title
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
JP5045971B2 (en) Ready-made piles and tip fittings
JP2003184078A (en) Cast-in-place concrete pile and its construction method
JP2008297864A (en) Construction method of cast-in-place pile
EP0556642A1 (en) Reinforcing block for excavation work and method of construction thereof
JP2000008379A (en) Cut soil reinforcing method
JP3169840B2 (en) Grout pipe mounting device and grout material injection method using it
JP3596687B2 (en) Seismic retrofitting method for existing foundation
JP4293674B2 (en) Natural mountain reinforced earth method
JPH07113229A (en) Cast-in-place concrete pile method
KR19980020441A (en) Pile foundation construction method and device
KR100446586B1 (en) Soil-Nail able to Withdraw Itself by Blasting
JP4623577B2 (en) How to build cast-in-place piles
JPS60119816A (en) Formation of continuous pile
JP2000297430A (en) Cast-in-place concrete pile by pulling out steel pipe form
JP2645322B2 (en) Construction method of soil cement composite pile
JP2617267B2 (en) Rock anchoring method for steel pipe piles
KR20030069922A (en) Method for grouting and drilling nail and anchor
JPH05113095A (en) Structure of starting-arrival shaft in shield method
JP4664706B2 (en) Construction method of vending machines etc. on asphalt surface using anchor bolts and anchor bolts used in this method
JPH073782A (en) Method for constructing cast-in-place hollow concrete pile, and cast-in-place concrete pile
KR200245407Y1 (en) Soil-Nail able to Withdraw Itself by Blasting
JPS60208515A (en) Piling work
JP2564465B2 (en) Ready-made pile burying method
JPS6245370B2 (en)

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20050906