ITMI20100677A1 - ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES - Google Patents

ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES Download PDF

Info

Publication number
ITMI20100677A1
ITMI20100677A1 IT000677A ITMI20100677A ITMI20100677A1 IT MI20100677 A1 ITMI20100677 A1 IT MI20100677A1 IT 000677 A IT000677 A IT 000677A IT MI20100677 A ITMI20100677 A IT MI20100677A IT MI20100677 A1 ITMI20100677 A1 IT MI20100677A1
Authority
IT
Italy
Prior art keywords
anchoring
floating
elements
anchoring elements
anchoring element
Prior art date
Application number
IT000677A
Other languages
Italian (it)
Inventor
Enrico Boni
Cesare Brugnoli
Original Assignee
Auto Nautica Service S R L
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Auto Nautica Service S R L filed Critical Auto Nautica Service S R L
Priority to ITMI2010A000677A priority Critical patent/IT1399506B1/en
Publication of ITMI20100677A1 publication Critical patent/ITMI20100677A1/en
Application granted granted Critical
Publication of IT1399506B1 publication Critical patent/IT1399506B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Sheet Holders (AREA)
  • Artificial Fish Reefs (AREA)

Description

DESCRIZIONE DESCRIPTION

Annessa a domanda di breveto per BREVETTO D’INVENZIONE INDUSTRIALE avente per titolo: Attached to a patent application for an INDUSTRIAL INVENTION PATENT entitled:

“STRUTTURA DI ANCORAGGIO DI OPERE GALLEGGIANTI, IN PARTICOLARE MOLI E/O PONTILI GALLEGGIANTI†⠀ œSTRUCTURE FOR ANCHORING OF FLOATING WORKS, IN PARTICULAR PIERS AND / OR FLOATING BRIDGESâ €

La presente invenzione ha per oggeto una di ancoraggio di opere galleggianti quali moli e/o pontili galleggianti, piataforme, etc... The present invention relates to the anchoring of floating structures such as piers and / or floating piers, platforms, etc ...

In particolare l’oggetto dell’invenzione trova particolare applicazione per ancorare qualsiasi galleggiante. In particular, the object of the invention finds particular application to anchor any float.

L’applicazione del sistema potrà avvenire sia in corrispondenza di laghi naturali o artificiali, sia in corrispondenza di superfici acquatiche marine o oceaniche e fluviali. The application of the system can take place both in correspondence with natural or artificial lakes, and in correspondence with marine or oceanic and fluvial aquatic surfaces.

Come à ̈ noto le superfici acquatiche risentono in generale di escursioni che possono essere anche di notevole entità. As is known, aquatic surfaces are generally affected by excursions which can also be of considerable size.

Infati le maree, ma anche le escursioni di lago tra minimo e massimo di quota (legate ad esempio a periodi di pioggia o siccità) possono raggiungere diversi metri. In fact, the tides, but also the excursions of the lake between minimum and maximum altitude (linked for example to periods of rain or drought) can reach several meters.

In questa situazione à ̈ evidente che opere galleggianti (che possono essere moli 0 pontili o strutture galleggianti) devono potersi adattare a queste variazioni di quota pur rimanendo saldamente ancorati al fondale. In this situation it is evident that floating works (which can be piers or piers or floating structures) must be able to adapt to these changes in altitude while remaining firmly anchored to the seabed.

Tra le diverse tipologie di ancoraggi di moli galleggianti noti, una tra le più diffuse prevede la predisposizione di uno o più pali riempiti in cemento armato emergenti dal fondale nel quale sono stati infissi; tali pali presentano in corrispondenza di una sommità un incemieramento ad un braccio mobile costituito da una struttura metallica in grado di poter oscillare rispetto al pilastro grazie all’ incemieramento attorno ad un asse orizzontale, Among the different types of anchors of known floating piers, one of the most widespread involves the preparation of one or more reinforced concrete filled poles emerging from the seabed in which they have been driven; these poles have at one top a hinging to a movable arm consisting of a metal structure capable of being able to oscillate with respect to the pillar thanks to the hinging around a horizontal axis,

L’altra estremità della struttura metallica si trova vincolata all’opera galleggiante (saldamente attraverso catene) restando pertanto vincolata al fondale pur potendo seguire le variazioni di livello dello specchio d’acqua grazie alla mobilità dell’asta metallica. The other end of the metal structure is bound to the floating work (firmly by means of chains), thus remaining bound to the seabed while being able to follow the variations in the level of the water thanks to the mobility of the metal rod.

1 sistemi sopra descritti, pur assolvendo ai compiti quali sono preposti hanno tuttavia presentato alcuni limiti e/o inconvenienti. The systems described above, while performing their intended tasks, have nevertheless presented some limitations and / or drawbacks.

Innanzitutto la messa in opera di tale tipologia di ancoraggio risulta essere complessa e onerosa. First of all, the implementation of this type of anchoring is complex and burdensome.

E’ infatti necessario realizzare anche strutture in calcestruzzo armato sommerse opportunamente ancorate. In fact, it is also necessary to build submerged reinforced concrete structures that are suitably anchored.

Inoltre gli sforzi e le deformazioni che le variazioni di livello impongono alla struttura sono di notevole entità e generano non di rado cedimenti o rotture, particolarmente del braccio metallico. Furthermore, the stresses and deformations that the variations in level impose on the structure are of considerable magnitude and not infrequently generate yielding or breakages, particularly of the metal arm.

Pertanto in presenza di questa tipologia di ancoraggi à ̈ necessario effettuare un monitoraggio continuativo ed una manutenzione estremamente accurata per evitare pericoli per l’incolumità di persone e/o strutture. Therefore, in the presence of this type of anchorage, it is necessary to carry out continuous monitoring and extremely accurate maintenance to avoid dangers for the safety of people and / or structures.

Va poi notato che la realizzazione e posa in opera di moli galleggianti di tal genere costituisce un enorme onere per pesi e dimensioni. It should also be noted that the construction and installation of floating piers of this kind constitutes an enormous burden due to weights and dimensions.

Infatti oggi queste strutture vengono predisposte a terra e quindi movimentate, ad esempio tramite gru speciali, nell’acqua. In fact today these structures are set up on the ground and then moved, for example by special cranes, in the water.

Si noti che i moli galleggianti attualmente prodotti possono assumere pesi pari a diverse decine di tonnellate con lunghezze di decine e più metri. It should be noted that the floating piers currently produced can assume weights of several tens of tons with lengths of tens and more meters.

La loro movimentazione tramite navi risulta complessa ma più agevole, mentre, viceversa, il trasporto su strada à ̈ estremamente complesso. Their handling by ships is complex but easier, while, vice versa, road transport is extremely complex.

Tuttavia il trasporto su strada risulta oggi inevitabile laddove la struttura galleggiante sia destinata ad un lago. However, road transport is now unavoidable where the floating structure is destined for a lake.

Per ovviare almeno parzialmente agli inconvenienti sopra citati si sono diffuse costruzioni galleggianti costituite da moduli completi della lunghezza di diversi metri e di notevole peso che vengono assemblati a moduli equivalenti in corrispondenza dello specchio d’acqua in maniera tale da facilitare quantomeno le operazioni di trasporto. To obviate at least partially the aforementioned drawbacks, floating constructions have spread consisting of complete modules several meters long and of considerable weight that are assembled to equivalent modules in correspondence with the water mirror in such a way as to facilitate at least the transport operations .

Tuttavia il molo galleggiante necessita di un parziale assemblaggio a terra e quindi di gru speciali atte a porlo in acqua. However, the floating dock requires partial assembly on the ground and therefore special cranes suitable for placing it in the water.

In questa situazione, scopo principale della presente invenzione, à ̈ quello di risolvere uno o più degli inconvenienti sopra evidenziati. In this situation, the main purpose of the present invention is to solve one or more of the drawbacks highlighted above.

Uno degli obiettivi del presente trovato à ̈ quello di mettere a disposizione un sistema di ancoraggio in grado di semplificare le operazioni di posa in opera dello stesso e di manutenzione pur garantendo un ottimale comportamento in presenza anche di importanti variazioni di livello dello specchio d’acqua. One of the objectives of the present invention is to provide an anchoring system capable of simplifying the installation and maintenance operations of the same, while ensuring optimal behavior even in the presence of important variations in the level of the mirror. water.

E’ un ulteriore obiettivo quello di realizzare un sistema di ancoraggio che tenda a riportare sempre in posizione l’opera galleggiante opponendosi al moto ondoso ed alla forza dei venti, altresì operando in maniera elastica: elemento frangiflutto. A further objective is to create an anchoring system that tends to always bring the floating work back into position by opposing the wave motion and the force of the winds, also operating in an elastic manner: a breakwater element.

Un obiettivo ausiliario à ̈ quello di mettere a disposizione una tipologia di ancoraggio che possa essere differenziata zona per zona potendo variare i parametri le forze esercitate sull’opera galleggiante. An auxiliary objective is to provide a type of anchoring that can be differentiated area by area, being able to vary the parameters and the forces exerted on the floating structure.

E’ un obiettivo poi quello di realizzare opere galleggianti di grandi dimensioni limitando i problemi di logistica e movimentazione delle stesse. The aim is to create large floating works, limiting the problems of logistics and handling of the same.

E’ in particolare uno scopo quello di evitare sia onerose movimentazioni del manufatto via terra o via mare, sia le onerose e costose operazioni di trasferimento dell’opera galleggiante dal suolo nell’ambiente acquatico pur garantendo la realizzabilità di strutture di peso e dimensioni sostanzialmente simili o maggiori di quelle attualmente in uso. In particular, an aim is to avoid both costly handling of the product by land or sea, and the onerous and costly operations of transferring the floating work from the ground into the aquatic environment while ensuring the feasibility of structures of weight and dimensions substantially similar to or greater than those currently in use.

E’ infine un obiettivo generale del trovato quello di consentire di eseguire le varie opere con mezzi terrestri, navali e subacquei modesti. Finally, a general objective of the invention is to allow the various works to be carried out with modest land, naval and underwater vehicles.

Questi ed altri scopi che meglio appariranno nel corso della seguente descrizione sono sostanzialmente raggiunti da una struttura di ancoraggio in accordo con le unite rivendicazioni. These and other objects which will become clearer in the course of the following description are substantially achieved by an anchoring structure in accordance with the attached claims.

Ulteriori caratteristiche e vantaggi appariranno maggiormente dalla descrizione dettagliata di una forma realizzativa esemplificativa, e pertanto non limitativa, in accordo con le unite figure in cui: Further characteristics and advantages will become more apparent from the detailed description of an exemplary and therefore non-limiting embodiment, in accordance with the accompanying figures in which:

-la figura 1 mostra una vista schematica di una struttura di ancoraggio secondo una prima forma realizzativa; figure 1 shows a schematic view of an anchoring structure according to a first embodiment;

- la figura 2 mostra la struttura di ancoraggio di figura 1 in due differenti condizioni operative a due diversi livelli o quote della superficie acquatica; Figure 2 shows the anchoring structure of Figure 1 in two different operating conditions at two different levels or heights of the aquatic surface;

- la figura 3 mostra una vista schematica di un’opera galleggiante secondo una forma realizzati va differente dal quella delle figure 1 e 2. - figure 3 shows a schematic view of a floating work according to a different shape from that of figures 1 and 2.

Con riferimento alle figure citate con 1 Ã ̈ stata complessivamente indicata una struttura di ancoraggio in accordo con una forma realizzativa vantaggiosa. With reference to the figures cited with 1, an anchoring structure has been indicated as a whole in accordance with an advantageous embodiment.

Come à ̈ possibile notare nelle figure 1 e 2 l’opera galleggiante può essere di tipo standard costituita da una pluralità di moduli opportunamente vincolati tra loro prima di essere varati in acqua. As can be seen in figures 1 and 2, the floating structure can be of the standard type consisting of a plurality of modules suitably bound together before being launched into the water.

In una forma realizzativa vantaggiosa l’opera galleggiante potrà viceversa essere costituita da una pluralità di moduli 101 ciascuno definente un guscio esterno 102 presentante una cavità interna 103. In an advantageous embodiment, the floating structure can vice versa be constituted by a plurality of modules 101 each defining an external shell 102 having an internal cavity 103.

In particolare il guscio 102 presenta una parete di base 109, destinata ad essere posta inferiormente in condizioni di uso del modulo e pertanto immersa in acqua, con uno spessore maggiore di quello delle pareti laterali 110 che emergono verticalmente dalla base stessa. In particular, the shell 102 has a base wall 109, intended to be placed below in conditions of use of the module and therefore immersed in water, with a thickness greater than that of the side walls 110 which emerge vertically from the base itself.

In particolare il rapporto tra gli spessori à ̈ legato alle dimensioni del modulo ed à ̈ opportunamente selezionabile in modo tale da posizionare il baricentro nel punto desiderato di ciascuno dei moduli. In particular, the ratio between the thicknesses is linked to the dimensions of the module and is suitably selectable in such a way as to position the center of gravity in the desired point of each of the modules.

All’interno della cavità 103 si trovano uno o più corpi di riempimento 104 costituiti da materiale leggero, quale materiale espanso (polistirolo, poliuretano, cemento espanso, eccetera). Inside the cavity 103 there are one or more filling bodies 104 made of light material, such as expanded material (polystyrene, polyurethane, foam concrete, etc.).

In una forma realizzativa alternativa (non rappresentata) il modulo potrebbe essere costituito da un corpo scatolare chiuso contenente al proprio interno anche solo aria. In an alternative embodiment (not shown) the module could be constituted by a closed box-like body containing inside even only air.

Sempre come visibile in figura 3 una pluralità di moduli 101 si trovano posizionati uno affiancato all’altro in maniera tale da definire un settore 105 di un’opera galleggiante (o l’opera galleggiante definitiva in sé). Again as shown in figure 3, a plurality of modules 101 are positioned side by side in such a way as to define a sector 105 of a floating work (or the definitive floating work itself).

Si noti che nella figura schematica 3 à ̈ stato lasciato uno spazio tra un modulo ed il successivo che nella realtà non à ̈ di fatto presente semplicemente per evidenziare la presenza di tale pluralità di elementi. Note that in the schematic figure 3 a space has been left between one module and the next which in reality is not actually present simply to highlight the presence of this plurality of elements.

In corrispondenza di una zona superiore 1 Ola dei moduli emergente dall’acqua si nota la presenza di ima soletta continua 107 che ha uno sviluppo longitudinale sostanzialmente uguale allo sviluppo del settore 105 dell’opera galleggiante e la presenza anche di un prefissato numero di travi 108 continue anch’esse di sviluppo longitudinale sostanzialmente uguale allo sviluppo del settore 105 dell’opera galleggiante. In correspondence with an upper area 1 Ola of the modules emerging from the water, the presence of a continuous slab 107 is noted which has a longitudinal development substantially equal to the development of the sector 105 of the floating structure and the presence also of a predetermined number of continuous beams 108 also of longitudinal development substantially equal to the development of sector 105 of the floating structure.

La figura 3 illustra la presenza di una soletta continua 107 accompagnata da due travi 108 realizzate di pezzo con la soletta. Figure 3 illustrates the presence of a continuous slab 107 accompanied by two beams 108 made integrally with the slab.

Si noti tuttavia che il numero di travi 108 e le dimensioni/spessori sia della soletta, sia delle travi , nonché il posizionamento relativo di queste ultime potrà essere deciso in funzione delle esigenze di progetto. However, note that the number of beams 108 and the dimensions / thicknesses of both the slab and the beams, as well as the relative positioning of the latter, can be decided according to the project requirements.

In particolare la soletta e le travi sono costituite da calcestruzzo armato, con finitura superiore in cemento colorato, resina o legno. In particular, the slab and the beams are made of reinforced concrete, with an upper finish in colored concrete, resin or wood.

Inoltre potranno essere presenti opportuni rivestimenti delle pareti laterali 110 di ciascuno dei moduli costituite ad esempio da legno, pietra o ceramica al fine di conferire un aspetto esteriore all’opera più gradevole. In addition, there may be suitable coatings of the side walls 110 of each of the modules consisting for example of wood, stone or ceramic in order to give a more pleasant external appearance to the work.

Sempre daH’esame della figura 3 si nota poi la presenza di un prefissato numero di staffe di unione 111 che vincolano in corrispondenza di una zona .inferiore 101b di ciascuno dei moduli, ed in particolare esternamente alle pareti laterali 110 ciascuno dei moduli successivi. Again from the examination of Figure 3, it is then noted the presence of a predetermined number of joining brackets 111 which constrain each of the subsequent modules in correspondence with a lower area 101b of each of the modules, and in particular externally to the side walls 110.

Opzionalmente potranno essere presenti una staffa sul lato sinistro ed una staffa sul lato destro dei due moduli consecutivi per unire questi ultimi in maniera stabile. Optionally there may be a bracket on the left side and a bracket on the right side of the two consecutive modules to join the latter in a stable manner.

Si noti peraltro che le staffe 111 potranno essere utilizzate provvisoriamente per unire i moduli durante la fase di costruzione dell’opera (come meglio chiarito in seguito) e quindi essere rimosse o, viceversa, anche permanere a miglior garanzia della strutturalità dell’opera stessa dopo la costruzione. It should also be noted that the brackets 111 can be used temporarily to join the modules during the construction phase of the work (as better clarified below) and therefore be removed or, vice versa, also remain as a better guarantee of the structure of the work. itself after construction.

Ovviamente altri equivalenti sistemi di giunzione di moduli successivi potranno essere adottati. Obviously, other equivalent systems for joining subsequent modules may be adopted.

Premessa la descrizione strutturale dell’opera galleggiante sopra effettuata, il metodo per la realizzazione della stessa, in particolare per la costruzione di settori di molo galleggianti costituiti da una serie di moduli di dimensioni volute, prevede le seguenti fasi: Premised the structural description of the floating work carried out above, the method for its construction, in particular for the construction of floating pier sectors consisting of a series of modules of desired dimensions, involves the following phases:

Si realizza innanzitutto ima prefissata quantità di moduli 101 come precedentemente descritti. First of all, a predetermined quantity of modules 101 is realized as previously described.

Laddove i moduli 101 fossero costituiti da strutture scatolari già contenenti aria o altro materiale leggero non si procede ad alcuna fase di inserimento di corpi di riempimento. Where the modules 101 were made up of box-like structures already containing air or other light material, there is no step to insert the filling bodies.

Qualora viceversa tali moduli fossero del tipo illustrato si procede ad inserire nella cavità 103 il corpo di riempimento 104 (o una pluralità di corpi di riempimento 104 a seconda delle esigenze). If, on the other hand, these modules are of the type illustrated, the filling body 104 (or a plurality of filling bodies 104 according to requirements) is inserted into the cavity 103.

In particolare tali corpi saranno realizzati in materiale leggero, quale materiale espanso (polistirolo, poliuretano, cemento espanso). In particular, these bodies will be made of light material, such as foam material (polystyrene, polyurethane, foam concrete).

Ciascuno dei moduli viene a questo punto varato in acqua e posizionato uno affiancato all’altro al fine di definire almeno un settore 105 dell’opera galleggiante. Each of the modules is then launched into the water and positioned side by side in order to define at least one sector 105 of the floating structure.

I moduli in acqua vengono quindi provvisoriamente uniti, ad esempio mediante le citate staffe di unione 111. The modules in water are then temporarily joined, for example by means of the aforementioned joining brackets 111.

In questa situazione, con i moduli 101 in acqua uniti tra loro a definire il settore 105, si procede al montaggio di un’armatura di ferro da costruzione e quindi viene effettuata una gettata di materiale di rinforzo 106 in corrispondenza di una zona superiore 101a dei moduli emergenti dall’acqua al fine di unire indissolubilmente i moduli 101 tra loro. In this situation, with the modules 101 in water joined together to define the sector 105, a construction iron reinforcement is assembled and then a casting of reinforcing material 106 is made in correspondence with an upper area 101a modules emerging from the water in order to indissolubly join the modules 101 together.

La gettata à ̈ di calcestruzzo, ad esempio in cemento o resina, e particolarmente effettuata in progressione continuativa passando da un modulo 101 al successivo. The casting is made of concrete, for example in cement or resin, and particularly carried out in continuous progression passing from one module 101 to the next.

In altri termini la struttura costituita dai moduli in successione provvisoriamente uniti viene vincolata solidalmente e resa di pezzo mediante la citata gettata di calcestruzzo che viene in generale effettuata in un tempo piuttosto rapido in maniera tale da definire in un’unica operazione una soletta 107 posta superiormente ai moduli ed un prefissato numero di travi 108 (almeno uno ed in generale almeno due) che si estendono longitudinalmente lungo lo sviluppo dei moduli stessi. In other words, the structure made up of the modules in succession provisionally joined is bound together and made of one piece by means of the aforementioned concrete casting which is generally carried out in a rather rapid time in such a way as to define in a single operation a slab 107 placed above the modules and a predetermined number of beams 108 (at least one and in general at least two) which extend longitudinally along the development of the modules themselves.

Si noti che vantaggiosamente sia la soletta 107, sia le travi 108 si estenderanno longitudinalmente sostanzialmente lungo l’intero sviluppo del settore 105 dell’opera galleggiante o lungo l’intero sviluppo dell’opera galleggiante stessa. Tuttavia questo non avviene necessariamente, in quanto in funzione delle esigenze di progetto sarà possibile realizzare solette e/o travi che si estendono su due o più moduli solamente in maniera tale da vincolare tra loro i moduli desiderati e riferiti a larghezze di progetto per ogni singolo caso. It should be noted that advantageously both the slab 107 and the beams 108 will extend longitudinally substantially along the entire development of the sector 105 of the floating structure or along the entire development of the floating structure itself. However this does not necessarily happen, as depending on the project needs it will be possible to create slabs and / or beams that extend over two or more modules only in such a way as to constrain the desired modules to each other and refer to project widths for each individual. case.

A tal proposito combinazioni di geometria, dimensioni, spessori di solette e travi saranno possibili senza uscire dal concetto inventivo del presente metodo. In this regard, combinations of geometry, dimensions, thicknesses of slabs and beams will be possible without departing from the inventive concept of the present method.

Potrà altresì essere prevista la realizzazione della soletta e delle travi in fasi separate unendo le stesse di pezzo o meno sempre a seconda delle esigenze costruttive. The construction of the slab and the beams in separate phases may also be envisaged, joining them in one piece or not, always depending on the construction requirements.

Si noti che la struttura di ancoraggio di seguito descritta potrà essere applicata ad una qualunque delle forme realizzative illustrate o descritte precedentemente. La struttura di ancoraggio 1 prevede innanzitutto la presenza di ima pluralità di primi elementi di ancoraggio 3 presentanti una prima estremità 3a vincolata, direttamente, al fondale marino o lacustre. It should be noted that the anchoring structure described below can be applied to any of the embodiments illustrated or described above. The anchoring structure 1 first of all provides for the presence of a plurality of first anchoring elements 3 having a first end 3a bound directly to the sea or lake bed.

In particolare ciascun elemento di ancoraggio 3 Ã ̈ definito da un corpo allungato 8 atto ad esercitare una reazione sostanzialmente alle sole sollecitazioni di tiro. In altre parole il corpo allungato 8 Ã ̈ definito da un cavo, una catena, una fune o simile elemento cedevole. In particular, each anchoring element 3 is defined by an elongated body 8 capable of exerting a reaction substantially only to the pulling stresses. In other words, the elongated body 8 is defined by a cable, a chain, a rope or similar compliant element.

In particolare la prima estremità 3 a sarà trattenuta in corrispondenza del fondale da idonee zavorre o potrà essere anche trattenuta mediante la realizzazione di opere dedicate rigide vincolate o emergenti dal fondale laddove le esigenze di progetto dovessero richiederlo. In particular, the first extremity 3 a will be held in correspondence with the seabed by suitable ballasts or it can also be held by means of the creation of dedicated rigid works, bound or emerging from the seabed where the project needs require it.

In corrispondenza delle estremità opposta 3b del primo elemento 3 à ̈ presente almeno una boa 9 di dimensioni tali da generare una sufficiente spinta verso l’alto tale da porre in tensione il primo elemento 3 ed a posizionarlo sostanzialmente lungo una direzione di sviluppo verticale. At the opposite ends 3b of the first element 3 there is at least one buoy 9 of such dimensions as to generate a sufficient upward thrust such as to place the first element 3 in tension and to position it substantially along a direction of vertical development.

Ovviamente potranno essere presenti anche due o più boe delle opportune dimensione in funzione del tiro che si vuole impartire al citato corpo allungato 8. Obviously, there may also be two or more buoys of the appropriate size depending on the draft to be imparted to the aforementioned elongated body 8.

Le boe potranno essere riempite di aria, gas o comunque materiali espansi e sono trattenute dal citato primo elemento di ancoraggio 3 sottacqua ad una certa profondità prestabilita. The buoys can be filled with air, gas or in any case expanded materials and are held by the aforementioned first anchoring element 3 underwater at a certain predetermined depth.

In generale le boe si trovano sostanzialmente alla medesima profondità rispetto al pelo libero (L) dell’acqua. In general, the buoys are substantially at the same depth with respect to the free surface (L) of the water.

Ciò significa che, tenendo conto delle irregolarità del fondale, i primi elementi di ancoraggio 3 avranno in generale lunghezze differenti tali da compensare la diversa profondità a cui si trova ancorata la loro prima estremità 3 a. This means that, taking into account the irregularities of the seabed, the first anchoring elements 3 will generally have different lengths such as to compensate for the different depth at which their first extremity 3 a is anchored.

I primi elementi di ancoraggio 3 messi in tensione dalle boe 9 risultano tuttavia mobili, almeno per rotazione, rispetto alla prima estremità 3 a vincolata al fondale. The first anchoring elements 3 put under tension by the buoys 9 are however movable, at least by rotation, with respect to the first extremity 3 a constrained to the seabed.

In generale, considerando che la boa 9 manterrà sostanzialmente sempre in condizione tesa l’elemento allungato 8, la forza delle correnti, il moto ondoso e/o i venti in maniera indiretta agendo sull’acqua e generando correnti, genereranno forze sulle boe dirette anche trasversalmente alla direzione verticale comportando una movimentazione della seconda estremità 3b dei citati elementi di ancoraggio 3 lungo una superficie sferica con centro in corrispondenza della prima estremità 3a ancorata al fondale. In general, considering that the buoy 9 will substantially keep the elongated element 8 in a tense condition, the force of the currents, the wave motion and / or the winds indirectly acting on the water and generating currents, will generate forces on the direct buoys also transversely to the vertical direction involving a movement of the second end 3b of the aforementioned anchoring elements 3 along a spherical surface with a center corresponding to the first end 3a anchored to the seabed.

Si nota poi la presenza di almeno un secondo elemento di ancoraggio 4 il quale à ̈ atto a collegare tra loro la citata pluralità di primi elementi di ancoraggio 3, particolarmente in corrispondenza di rispettive zone di impegno 6. The presence of at least one second anchoring element 4 is also noted, which is able to connect the aforementioned plurality of first anchoring elements 3 to each other, particularly in correspondence with respective engagement areas 6.

Alla luce di quanto precedentemente citato, anche le zone di impegno 6 possono avvicinarsi/allontanarsi alle rispettive prime estremità 3 a sino alla distanza massima DI, D2, D3 coincidente con la lunghezza del corpo allungato 8. In light of the above, also the engagement zones 6 can approach / move away from the respective first ends 3 a up to the maximum distance D1, D2, D3 coinciding with the length of the elongated body 8.

Ovviamente le zone di impegno 6 dei primi elementi di ancoraggio 3 si muoveranno principalmente per rotazione attorno ad un asse sostanzialmente orizzontale e passante per la rispettiva prima estremità 3 a vincolata al fondale. Obviously the engagement areas 6 of the first anchoring elements 3 will move mainly by rotation around a substantially horizontal axis passing through the respective first end 3 a constrained to the seabed.

Tornando ad osservare la figura 1, si nota come il secondo elemento di ancoraggio 4 si sviluppi e colleghi i primi elementi di ancoraggio 3 tra loro lungo una direzione 10 longitudinale ed in generale sostanzialmente perpendicolare alla direzione di sviluppo 11 dei primi elementi di ancoraggio 3. Vantaggiosamente, anche se non necessariamente, il secondo elemento di ancoraggio 4 lega i primi elementi di ancoraggio 3 tra loro in corrispondenza della rispettiva seconda estremità 3b degli stessi in una posizione sostanzialmente prossima a quella dove si trovano vincolate le citate boe 9. Il secondo elemento di ancoraggio 4, pur potendo essere costituito da una barra o altro elemento rigido, à ̈ vantaggiosamente realizzato tramite un corpo allungato 12 atto ad esercitare una reazione sostanzialmente alle sole sollecitazioni di tiro in quanto à ̈ costituito da un cavo, una catena, una fune o simile elemento cedevole esattamente come nel caso dei primi elementi di ancoraggio 3. Returning to observing Figure 1, it can be seen how the second anchoring element 4 develops and connects the first anchoring elements 3 to each other along a longitudinal direction 10 and in general substantially perpendicular to the direction of development 11 of the first anchoring elements 3. Advantageously, although not necessarily, the second anchoring element 4 binds the first anchoring elements 3 to each other at the respective second end 3b of the same in a position substantially close to that where the aforementioned buoys 9 are constrained. anchorage 4, although it can be constituted by a bar or other rigid element, is advantageously made by means of an elongated body 12 capable of exerting a reaction substantially only to the pulling stresses as it is constituted by a cable, a chain, a rope or similar compliant element exactly as in the case of the first anchoring elements 3.

II secondo elemento di ancoraggio 4 sarà disposto sostanzialmente in orizzontale trovandosi alla medesima profondità. The second anchoring element 4 will be arranged substantially horizontally, being at the same depth.

Tornando ad osservare le figure, si nota quindi la presenza di un prefissato numero di elementi di ancoraggio 5 vincolati al citato secondo elemento di ancoraggio 4 e a loro volta collegati all’opera galleggiante 2. Returning to observing the figures, it is therefore possible to note the presence of a predetermined number of anchoring elements 5 constrained to the aforementioned second anchoring element 4 and in turn connected to the floating structure 2.

Anche i terzi elementi di ancoraggio 5 comprendono un corpo allungato 14 atto ad esercitare una reazione sostanzialmente alle sole sollecitazioni di tiro in quanto definito da un cavo, una catena, una fune o simile elemento cedevole atto a resistere alle sollecitazioni di tiro imposte e ad alloggiare in un ambiente acquatico (eventualmente salino) resistendo alle aggressioni ambientali nel tempo, quindi dotato di adeguate protezioni chimiche e metalliche per fenomeni elettrolitici. The third anchoring elements 5 also comprise an elongated body 14 capable of exerting a reaction substantially only to the pulling stresses since it is defined by a cable, a chain, a rope or similar compliant element able to resist the imposed pulling stresses and to house in an aquatic environment (possibly saline) resisting environmental aggressions over time, therefore equipped with adequate chemical and metal protections for electrolytic phenomena.

Il terzo elemento di ancoraggio 5 può essere direttamente o indirettamente vincolato all’opera galleggiante 2 ed in generale presenterà un terminale 13 di vincolo agli appositi golfari o ganci posizionati sull’opera (molo o pontile e struttura) galleggiante. The third anchoring element 5 can be directly or indirectly connected to the floating structure 2 and in general will have a terminal 13 for connection to the appropriate eyebolts or hooks positioned on the floating structure (pier or jetty and structure).

Opzionalmente tale vincolo sarà posto in corrispondenza di una zona inferiore 2b dell’opera galleggiante in maniera tale che tutti i citati elementi di ancoraggio 3, 4, 5 siano sostanzialmente sommersi. Optionally, this constraint will be placed in correspondence with a lower area 2b of the floating structure in such a way that all the aforementioned anchoring elements 3, 4, 5 are substantially submerged.

In particolare il primo ed il secondo elemento di ancoraggio, così come le boe 9 si troveranno tutte al disotto del livello libero dell’acqua, mentre il terzo elemento di ancoraggio 5 presenterà eventualmente una piccola porzione terminale in corrispondenza del golfare dell’opera galleggiante emergente. In particular, the first and second anchoring elements, as well as the buoys 9 will all be below the free level of the water, while the third anchoring element 5 will possibly have a small terminal portion in correspondence with the eyebolt of the emerging floating work.

Si noti poi come l’opera galleggiante 2 presenti una direzione di sviluppo prevalente longitudinale 15 che divide lo specchio d’acqua in due semi-spazi a sinistra e a destra dell’opera. Then note how the floating work 2 has a prevalent longitudinal development direction 15 which divides the water mirror into two semi-spaces to the left and right of the work.

La citata pluralità di primi elementi di ancoraggio 3, il secondo elemento di ancoraggio 4, il prefissato numero di terzi elementi di ancoraggio 5 si troveranno posizionati e vincolati come sopra descritto almeno in corrispondenza di uno dei due semi-spazi restando inteso che l’altro semispazio potrà comprendere un idoneo e corrispondente sistema di vincolo come mostrato in figure 1 e 2 od anche sistemi di vincolo completamente differenti. In particolare nelle figure 1 e 2 il sistema di vincolo rappresentato nell’ulteriore semi-spazio à ̈ stato indicato con i medesimi riferimenti numerici. The aforementioned plurality of first anchoring elements 3, the second anchoring element 4, the predetermined number of third anchoring elements 5 will be positioned and constrained as described above at least in correspondence with one of the two half-spaces, it being understood that the another half-space may include a suitable and corresponding constraint system as shown in Figures 1 and 2 or even completely different constraint systems. In particular in figures 1 and 2 the constraint system represented in the further semi-space has been indicated with the same numerical references.

Resta inteso che la struttura à ̈ esattamente la medesima di quella precedentemente descritta. It is understood that the structure is exactly the same as that previously described.

Si noti peraltro come il terzo elemento di ancoraggio 5 passi sostanzialmente al disotto dell’opera galleggiante partendo da un semi-spazio e vincolandosi all’opera galleggiante stessa e in corrispondenza del semi-spazio opposto; in altri termini il terzo elemento di ancoraggio 5 attraversa trasversalmente l’opera galleggiante fino al punto di vincolo che si trova da parte opposta rispetto a quello in cui si sviluppa il sistema di vincolo stesso. Note, however, how the third anchoring element 5 passes substantially below the floating structure starting from a semi-space and binding itself to the floating structure itself and in correspondence with the opposite semi-space; in other words, the third anchoring element 5 crosses transversally the floating structure up to the constraint point which is on the opposite side with respect to that in which the constraint system itself develops.

Quando sono presenti i citati sistemi di vincolo sia nel semi spazio sinistro, sia nel semi-spazio destro (come in figura 1), i terzi elementi di ancoraggio 5 si incrociano andando ad impegnare l’opera galleggiante 2 in corrispondenza del rispettivo semi spazio opposto. When the aforementioned constraint systems are present both in the left half-space and in the right half-space (as in figure 1), the third anchoring elements 5 cross each other, engaging the floating work 2 in correspondence with the respective semi-space opposite to.

Premesso quanto sopra descritto in termini strutturali, il comportamento della struttura di ancoraggio in presenza di variazioni batimetriche, onde o simili si comporta come rappresentato in figura 2. Given what has been described above in structural terms, the behavior of the anchoring structure in the presence of bathymetric variations, waves or the like behaves as shown in figure 2.

In particolare in figura 2 viene rappresentata una prima situazione ad un livello dello specchio d’acqua più basso ed una seconda situazione o condizione operativa in corrispondenza di un livello batimetrico innalzato. In particular, figure 2 shows a first situation at a lower level of the water mirror and a second situation or operating condition in correspondence with a raised bathymetric level.

Come à ̈ possibile notare, nella prima configurazione, le boe 9 trattengono i primi elementi di ancoraggio 3 sostanzialmente in una posizione verticale ed i terzi elementi di ancoraggio 5 sono sottoposti ad un tiro tale da mantenere una certa distanza tra il terminale di vincolo 13 all’opera galleggiante e la zona di vincolo 16 al secondo elemento di ancoraggio 4. As it is possible to note, in the first configuration, the buoys 9 retain the first anchoring elements 3 substantially in a vertical position and the third anchoring elements 5 are subjected to a pull such as to maintain a certain distance between the tie terminal 13 at the € ™ floating structure and the constraint area 16 to the second anchoring element 4.

Nella configurazione operativa di innalzamento del livello dell’acqua, si nota come si generi una forza con componente orizzontale sulle boe che comporta uno spostamento della seconda estremità 3b lungo un arco con centro in corrispondenza della prima estremità 3 a e raggio pari alla lunghezza del corpo 8. In the operational configuration of raising the water level, it is noted how a force with a horizontal component is generated on the buoys which involves a displacement of the second end 3b along an arc with a center at the first end 3 a and a radius equal to the length of the body 8.

Corrispondentemente la distanza tra il terminale di vincolo 13 e la zona di vincolo 16 può variare andando a compensare e bilanciare elasticamente rinnalzamento dell’opera galleggiante. Correspondingly, the distance between the constraint terminal 13 and the constraint area 16 can vary by compensating and elastically balancing the rising of the floating structure.

E’ evidente come il secondo elemento di vincolo 4 conferisca la stabilità alla struttura di ancoraggio evitando movimenti degli altri elementi di ancoraggio che possano comportare disallineamenti dell’opera galleggiante o comportare il generarsi di forze che possano danneggiare la struttura. It is evident that the second constraint element 4 confers stability to the anchoring structure avoiding movements of the other anchoring elements that could lead to misalignments of the floating structure or to generate forces that could damage the structure.

L’invenzione consegue importanti vantaggi. The invention achieves important advantages.

Viene innanzitutto realizzato un ancoraggio elastico dell’opera galleggiante in quanto le boe, attraverso i terzi elementi di ancoraggio 5, a seguito del movimento rotatorio verso l’opera galleggiante si oppongono al moto ondoso ed alla forza del vento, tendendo a riportarsi sempre in posizione perpendicolare al fondale. First of all, an elastic anchoring of the floating structure is made as the buoys, through the third anchoring elements 5, following the rotational movement towards the floating structure, oppose the wave motion and the force of the wind, tending to always return perpendicular to the bottom.

La struttura di ancoraggio consente escursioni di lago (tra minimo e massimo di quota) o di marea di notevole entità. The anchoring structure allows lake excursions (between minimum and maximum altitude) or tide of considerable size.

E’ permesso un ancoraggio della struttura differenziato zona per zona in quanto à ̈ possibile variare a piacimento il tiro dei terzi elementi 5 di ancoraggio. Differentiated anchoring of the structure is allowed area by area as it is possible to vary the pull of the third anchoring elements 5 as desired.

E’ anche possibile variare la forza di richiamo generata dalle boe aumentandone o diminuendone la spinta verso l’alto. It is also possible to vary the recall force generated by the buoys by increasing or decreasing their upward thrust.

Infine à ̈ consentito di eseguire le varie opere con mezzi navali e subacquei di costo inferiore a quelli oggi utilizzati per opere analoghe. Finally, it is allowed to carry out the various works with naval and underwater vehicles of lower cost than those used today for similar works.

Le opere galleggianti realizzate (moduli) secondo quanto descritto possono essere messe in opera direttamente in acqua riducendo, se non eliminando, tutte le problematiche logistiche legate al trasporto terrestre o marino di manufatti di grosse dimensioni e pesi. The floating works created (modules) as described can be installed directly in the water, reducing, if not eliminating, all the logistical problems related to the land or sea transport of large and heavy products.

Claims (10)

RIVENDICAZIONI 1. Strutura di ancoraggio di opere galleggianti comprendente: - almeno un’opera galleggiante (2); e - una pluralità di primi elementi di ancoraggio (3) presentanti una prima estremità (3a) vincolata, diretamente o indiretamente, al fondale, caraterizzato dal fatto che comprende inoltre: almeno un secondo elemento di ancoraggio (4) atto a collegare tra loro delle pluralità di primi elementi di ancoraggio (3) in corrispondenza di rispetive zone di impegno (6); e - un prefissato numero di terzi elementi di ancoraggio (5) vincolati al secondo elemento di ancoraggio (4) e collegati all’opera galleggiante (2). CLAIMS 1. Anchoring structure for floating structures comprising: - at least one floating work (2); And - a plurality of first anchoring elements (3) having a first end (3a) bound, directly or indirectly, to the seabed, characterized by the fact that it also includes: at least a second anchoring element (4) adapted to connect together plurality of first anchoring elements (3) in correspondence with respective engagement areas (6); And - a predetermined number of third anchoring elements (5) bound to the second anchoring element (4) and connected to the floating structure (2). 2. Strutura secondo la rivendicazione precedente, in cui le zone di impregno (6) dei primi elementi di ancoraggio (3) sono mobili, almeno per rotazione, rispeto alla rispetiva prima estremità (3A), in particolare atorno ad un asse sostanzialmente orizzontale, le zone di impegno (6) potendo eventualmente avvicinarsi alle rispettive prime estremità (3 a) ed allontanarsi dalle stesse sino ad una rispetiva distanza massima e (DI, D2, D3). 2. Structure according to the preceding claim, in which the impregnation areas (6) of the first anchoring elements (3) are movable, at least by rotation, with respect to the respective first end (3A), in particular around a substantially horizontal axis, the engagement zones (6) being able to possibly approach the respective first extremities (3 a) and move away from them up to a respective maximum distance e (DI, D2, D3). 3. Strutura secondo una qualsiasi delle rivendicazioni precedenti in cui ciascun primo elemento di ancoraggio (3) comprende un corpo allungato (8) ato ad esercitare una reazione sostanzialmente alle sollecitazioni di tiro, detto corpo allungato (8) essendo particolarmente un cavo, una catena, una fune o simile, la strutura comprendendo inoltre almeno una boa (9) per ciascun elemento di ancoraggio (3) atta a mantenere il corpo allungato (8) in tensione, dette boe (9) trovandosi in particolare sostanzialmente alla medesima profondità rispetto al pelo libero (L) dell’acqua. 3. Structure according to any one of the preceding claims, in which each first anchoring element (3) comprises an elongated body (8) adapted to exert a substantially reaction to the pulling stresses, said elongated body (8) being particularly a cable, a chain , a rope or the like, the structure further comprising at least one buoy (9) for each anchoring element (3) adapted to keep the elongated body (8) in tension, said buoys (9) being in particular substantially at the same depth with respect to the free surface (L) of the water. 4. Struttura secondo una qualsiasi delle rivendicazioni precedenti, in cui detto secondo elemento di ancoraggio (4) si sviluppa e collega i primi elementi di ancoraggio (3) tra loro secondo una direzione (10) trasversale, sostanzialmente ortogonale, alla direzione di sviluppo (11) dei primi elementi di ancoraggio (3), opzionalmente il secondo elemento di ancoraggio (4) collegando i primi elementi di ancoraggio (3) in corrispondenza di rispettive seconde estremità (3b) opposte alle prime, in maggior dettaglio le boe (9) essendo vincolate in corrispondenza di dette seconde estremità (3b). Structure according to any one of the preceding claims, in which said second anchoring element (4) develops and connects the first anchoring elements (3) to each other according to a transversal direction (10), substantially orthogonal, to the direction of development ( 11) of the first anchoring elements (3), optionally the second anchoring element (4) connecting the first anchoring elements (3) in correspondence with respective second ends (3b) opposite to the first, in greater detail the buoys (9) being constrained at said second ends (3b). 5. Struttura di ancoraggio secondo una qualsiasi delle rivendicazioni precedenti, in cui il secondo elemento di ancoraggio (4) comprende un corpo allungato (12) atto ad esercitare una reazione sostanzialmente alle sole sollecitazioni di tiro, detto corpo allungato (12) essendo particolarmente un cavo, una catena, una fune o simile. 5. Anchoring structure according to any one of the preceding claims, in which the second anchoring element (4) comprises an elongated body (12) adapted to exert a reaction substantially only to the pulling stresses, said elongated body (12) being particularly a cable, chain, rope or similar. 6. Struttura secondo una qualsiasi delle rivendicazioni precedenti, in cui il terzo elemento di ancoraggio (5) comprende un corpo allungato (14) atto ad esercitare una reazione sostanzialmente alle sole sollecitazioni di tiro, detto corpo allungato (14) essendo particolarmente un cavo, una catena, una fune o simile, collegato alle estremità anche eventualmente con l’ausilio di elementi elastici, quali molle. Structure according to any one of the preceding claims, in which the third anchoring element (5) comprises an elongated body (14) adapted to exert a reaction substantially only to the pulling stresses, said elongated body (14) being particularly a hollow, a chain, a rope or similar, connected at the ends also possibly with the aid of elastic elements, such as springs. 7. Struttura secondo una qualsiasi delle rivendicazioni precedenti, in cui il terzo elemento di ancoraggio (5) presenta un terminale (13) di vincolo all’opera galleggiante (2), detto terminale di vincolo (13) essendo posizionato in una zona inferiore (2b) dell’opera galleggiante, in particolare il terzo elemento di ancoraggio (5) essendo prevalentemente immerso nell’acqua ed attraversando l’opera galleggiante (2) nella direzione della sua larghezza. 7. Structure according to any one of the preceding claims, in which the third anchoring element (5) has a terminal (13) for constraint to the floating work (2), said terminal (13) being positioned in a lower area (2b) of the floating structure, in particular the third anchoring element (5) being mainly immersed in the water and crossing the floating structure (2) in the direction of its width. 8. Struttura secondo una qualsiasi delle rivendicazioni precedenti, in cui l’opera galleggiante (2) presenta una direzione di sviluppo prevalente (15) che divide lo specchio d’acqua in due semi-spazi a sinistra e a destra dell’opera, la pluralità di primi elementi di ancoraggio (3), il secondo elemento di ancoraggio (4) ed il prefissato numero di terzi elementi di ancoraggio (5) essendo disposti sostanzialmente sommersi in un semispazio sinistro o destro dell’opera, in particolare la struttura di ancoraggio comprendendo inoltre una ulteriore pluralità di primi elementi di ancoraggio (3) presentanti una prima estremità (3 a) vincolata direttamente o indirettamente al fondale ed almeno un ulteriore secondo elemento di ancoraggio (4) atto a collegare tra loro detta pluralità di ulteriori primi elementi di ancoraggio (3) ed un prefissato numero di ulteriori terzi elementi di ancoraggio (5) vincolati all’ulteriore secondo elemento di ancoraggio (4) e collegati all’opera galleggiante (2) anche eventualmente con l’ausilio di elementi elastici, quali molle, nel dettaglio detta ulteriore pluralità di primi elementi di ancoraggio (3), detto ulteriore secondo elemento di ancoraggio (4) e detto prefissato numero di ulteriori terzi elementi di ancoraggio (5) essendo, disposti nel semi-spazio sinistro o destro opposto. 8. Structure according to any one of the preceding claims, in which the floating work (2) has a prevailing direction of development (15) which divides the water mirror into two semi-spaces to the left and right of the work , the plurality of first anchoring elements (3), the second anchoring element (4) and the predetermined number of third anchoring elements (5) being arranged substantially submerged in a left or right half-space of the work, in particular the anchoring structure further comprising a further plurality of first anchoring elements (3) having a first end (3 a) bound directly or indirectly to the seabed and at least one further second anchoring element (4) able to connect said plurality of further first anchoring elements (3) and a predetermined number of further third anchoring elements (5) bound to the further second anchoring element (4) and connected to the gall work (2) also possibly with the aid of elastic elements, such as springs, in detail said further plurality of first anchoring elements (3), said further second anchoring element (4) and said predetermined number of further third anchoring elements anchor (5) being, arranged in the opposite left or right half-space. 9. Struttura secondo una qualsiasi delle rivendicazioni precedenti, in cui la pluralità di primi elementi di ancoraggio (3) ed il prefissato numero di terzi elementi di ancoraggio (5) sono cedevoli e flessibili definendo una struttura di ancoraggio mobile, in particolare le zone di impegno (6) ruotando rispetto alla prima estremità (3 a) ed una zona di vincolo (16) dei terzi elementi di ancoraggio (5) posta in corrispondenza del dell’opera galleggiante allontanandosi/avvicinandosi al secondo elemento di ancoraggio (4). Structure according to any one of the preceding claims, in which the plurality of first anchoring elements (3) and the predetermined number of third anchoring elements (5) are compliant and flexible, defining a mobile anchoring structure, in particular the areas of engagement (6) by rotating with respect to the first end (3 a) and a constraint area (16) of the third anchoring elements (5) placed in correspondence with the floating structure moving away / approaching the second anchoring element (4). 10. Struttura di ancoraggio di opere galleggianti comprendente: - almeno un’opera galleggiante (2); e - una pluralità di primi elementi di ancoraggio (3) presentanti una prima estremità (3a) vincolata, direttamente o indirettamente, al fondale, ciascun primo elemento di ancoraggio (3) comprendendo un corpo allungato (8) cedevole e flessibile atto ad esercitare una reazione sostanzialmente alle sole sollecitazioni di tiro; almeno una boa (9) per ciascun elemento di ancoraggio (3) atta a mantenere il corpo allungato (8) in tensione; - almeno un secondo elemento di ancoraggio (4) atto a collegare tra loro detta pluralità di primi elementi di ancoraggio (3); e un prefissato numero di terzi elementi di ancoraggio (5) vincolati al secondo elemento di ancoraggio (4) e collegati all’opera galleggiante (2) anche eventualmente con l’ausilio di elementi elastici, quali molle, detti terzi elementi di ancoraggio (5) comprendendo un corpo allungato (14) cedevole e flessibile atto ad esercitare una reazione sostanzialmente alle sole sollecitazioni di tiro, le zone di impegno (6) ruotando rispetto alla prima estremità (3 a) ed una zona di vincolo dei terzi elementi di ancoraggio (5) all’opera galleggiante (2) allontanandosi/ al secondo elemento di ancoraggio (4).10. Anchoring structure for floating structures comprising: - at least one floating work (2); And - a plurality of first anchoring elements (3) having a first end (3a) bound, directly or indirectly, to the seabed, each first anchoring element (3) comprising an elongated body (8) compliant and flexible able to exert a reaction substantially to pull stresses only; at least one buoy (9) for each anchoring element (3) able to keep the elongated body (8) in tension; - at least a second anchoring element (4) adapted to connect said plurality of first anchoring elements (3) to each other; And a predetermined number of third anchoring elements (5) bound to the second anchoring element (4) and connected to the floating structure (2) also possibly with the aid of elastic elements, such as springs, called third anchoring elements ( 5) comprising an elongated body (14) yielding and flexible able to exert a reaction substantially only to the pulling stresses, the engagement zones (6) rotating with respect to the first end (3 a) and a constraint zone of the third anchoring elements (5) to the floating work (2) moving away from / to the second anchoring element (4).
ITMI2010A000677A 2010-04-21 2010-04-21 ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES IT1399506B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ITMI2010A000677A IT1399506B1 (en) 2010-04-21 2010-04-21 ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ITMI2010A000677A IT1399506B1 (en) 2010-04-21 2010-04-21 ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES

Publications (2)

Publication Number Publication Date
ITMI20100677A1 true ITMI20100677A1 (en) 2011-10-22
IT1399506B1 IT1399506B1 (en) 2013-04-19

Family

ID=43223642

Family Applications (1)

Application Number Title Priority Date Filing Date
ITMI2010A000677A IT1399506B1 (en) 2010-04-21 2010-04-21 ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES

Country Status (1)

Country Link
IT (1) IT1399506B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002010589A1 (en) * 2000-07-27 2002-02-07 Christoffer Hannevig Floating structure for mounting a wind turbine offshore
US20030099517A1 (en) * 1998-06-05 2003-05-29 Single Buoy Moorings Inc. Loading arrangement for floating production storage and offloading vessel
FR2859698A1 (en) * 2003-09-15 2005-03-18 Thomas Huldt Floating unit e.g. platform, mooring device for use in offshore oil industry, has set of connection points maintained at equal depth under water surface and connected under water to anchors by mooring lines
WO2005108199A1 (en) * 2004-05-06 2005-11-17 Marine Structure Consultant (Msc) B.V. Anchoring system for a floating construction
EP1666722A1 (en) * 2004-12-02 2006-06-07 Servicios de Ingenieria y Montaje, Alen, S.L. Fixing system for floating wind generators
US20080311804A1 (en) * 2007-06-12 2008-12-18 Christian Bauduin Disconnectable riser-mooring system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030099517A1 (en) * 1998-06-05 2003-05-29 Single Buoy Moorings Inc. Loading arrangement for floating production storage and offloading vessel
WO2002010589A1 (en) * 2000-07-27 2002-02-07 Christoffer Hannevig Floating structure for mounting a wind turbine offshore
FR2859698A1 (en) * 2003-09-15 2005-03-18 Thomas Huldt Floating unit e.g. platform, mooring device for use in offshore oil industry, has set of connection points maintained at equal depth under water surface and connected under water to anchors by mooring lines
WO2005108199A1 (en) * 2004-05-06 2005-11-17 Marine Structure Consultant (Msc) B.V. Anchoring system for a floating construction
EP1666722A1 (en) * 2004-12-02 2006-06-07 Servicios de Ingenieria y Montaje, Alen, S.L. Fixing system for floating wind generators
US20080311804A1 (en) * 2007-06-12 2008-12-18 Christian Bauduin Disconnectable riser-mooring system

Also Published As

Publication number Publication date
IT1399506B1 (en) 2013-04-19

Similar Documents

Publication Publication Date Title
CN101418543B (en) Self-anchored rope-suspension bridge inclined drawing construction method
US4661014A (en) Prefabricated civil engineering module, method for the construction of a structure including said module and resulting structure
CN204110329U (en) Buoyancy aid platform and there is the configuration body of buoyancy aid platform
US9238896B2 (en) Floating structure for supporting a wind turbine
JP2022521716A (en) Manufacturing method of suction anchor and suction anchor
CN107002638A (en) For the floating platform using wind energy
WO2016089220A1 (en) Subsea platform
KR860000259B1 (en) Off-shore mooring structure
ITMI20100678A1 (en) METHOD FOR THE REALIZATION OF A FLOATING WORK AND A FLOATING OPERA AS IT IS REALIZED
ITMI20100677A1 (en) ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES
JP7389893B2 (en) Offshore structures and construction methods
LaNier et al. New technologies proven in precast concrete modular floating pier for US Navy
ITRM980284A1 (en) METHOD AND EQUIPMENT FOR THE CONSTRUCTION OF THE GUARD WALLS OF THE PORTS AND OF ARTIFICIAL REEF BOTH REMOVABLE AFTER
WO1990015223A1 (en) Submerged bridge tunnel
RU2771197C1 (en) Method for manufacturing a gravity-type base (gtb) at a specialized production site
NO142535B (en) FRONT DRAWING FOR GREAT DEPTHS.
Buchlák et al. Experimental verification of functionality of fibre-reinforced concrete submersible piers
RU53308U1 (en) MARINE SUBMERSIBLE PLATFORM
AU713561B2 (en) Anchor
Wijanto et al. Hybrid Floating Structures Case Study: Marisco’s Floating Dry Dock
RU2249647C2 (en) Low drawbridge
Reiso et al. Artificial seabed; a mooring concept for crossing long and deep waterways
Gerwick Jr Construction of Large Concrete Ocean Structures
Lai Critical analysis of the shoots bridge, central span of the second severn crossing
PE Conceptual study for a deep water, long span, submerged floating tunnel (SFT) crossing