Construction method and construction system for overwater bored piles based on incremental launching movement platform

Info

Publication number
IL260791B
IL260791B IL260791A IL26079118A IL260791B IL 260791 B IL260791 B IL 260791B IL 260791 A IL260791 A IL 260791A IL 26079118 A IL26079118 A IL 26079118A IL 260791 B IL260791 B IL 260791B
Authority
IL
Israel
Prior art keywords
overwater
construction
movement platform
incremental launching
bored piles
Prior art date
Application number
IL260791A
Other languages
Hebrew (he)
Original Assignee
Cccc Second Harbor Eng Co Ltd
Cccc Wuhan Harbour Engineering Design And Res Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Second Harbor Eng Co Ltd, Cccc Wuhan Harbour Engineering Design And Res Co Ltd filed Critical Cccc Second Harbor Eng Co Ltd
Publication of IL260791B publication Critical patent/IL260791B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
IL260791A 2016-09-09 2018-07-26 Construction method and construction system for overwater bored piles based on incremental launching movement platform IL260791B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610812760.1A CN106320332B (en) 2016-09-09 2016-09-09 The construction method and construction system of over-water bored pile are carried out based on pushing tow mobile platform
PCT/CN2017/083957 WO2018045772A1 (en) 2016-09-09 2017-05-11 Construction method and construction system for overwater bored piles based on incremental launching movement platform

Publications (1)

Publication Number Publication Date
IL260791B true IL260791B (en) 2018-12-31

Family

ID=57786989

Family Applications (1)

Application Number Title Priority Date Filing Date
IL260791A IL260791B (en) 2016-09-09 2018-07-26 Construction method and construction system for overwater bored piles based on incremental launching movement platform

Country Status (3)

Country Link
CN (1) CN106320332B (en)
IL (1) IL260791B (en)
WO (1) WO2018045772A1 (en)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320332B (en) * 2016-09-09 2018-08-31 中交第二航务工程局有限公司 The construction method and construction system of over-water bored pile are carried out based on pushing tow mobile platform
CN107653858A (en) * 2017-08-14 2018-02-02 中交第二航务工程局有限公司 The removable piling platform of the stake top of jack up waterborne and its construction method
CN108396744B (en) * 2018-04-27 2024-03-22 中交武汉港湾工程设计研究院有限公司 Movable steel pile casing sinking guide device mounting structure
CN109113057A (en) * 2018-09-06 2019-01-01 中交第二航务工程局有限公司 Pile method under intectate geological conditions based on stake top top pushing platform
CN109208595A (en) * 2018-09-26 2019-01-15 中交第二航务工程局有限公司 A kind of taper pile construction system based on stake top top pushing platform
CN109208533B (en) * 2018-09-26 2023-04-25 中交第二航务工程局有限公司 Wharf integrated construction system and wharf integrated construction method based on pile top pushing platform
CN109457700B (en) * 2018-12-07 2024-02-13 中交第一航务工程局有限公司 Pile top walking type pile foundation construction platform, erecting method thereof and pile foundation construction method
CN113136882A (en) * 2021-04-27 2021-07-20 中交一公局第八工程有限公司 Construction process of double-wall steel suspension box cofferdam of intensive pile group deepwater bearing platform
CN113216840B (en) * 2021-05-18 2023-12-29 浙江交工集团股份有限公司 Impact hole-forming ultra-long bored pile and construction method
CN114000525B (en) * 2021-11-23 2023-08-22 中国二十二冶集团有限公司 Construction method of underwater tie beam
CN114319352B (en) * 2021-12-31 2024-07-23 中国港湾工程有限责任公司 Construction method for pile sinking on water of steel pipe pile
CN114562224B (en) * 2022-01-12 2023-05-23 中交第二航务工程局有限公司 Pile group foundation slurry circulation purifying system and construction method thereof
CN114525787A (en) * 2022-01-20 2022-05-24 浙江欧佩亚海洋工程有限公司 Steel protects a location deviation correcting device based on universal spirit level and hydraulic push rod
CN114808978A (en) * 2022-03-24 2022-07-29 中建国际建设有限公司 Non-landing mobile steel platform with pile guiding function
CN114753357A (en) * 2022-04-08 2022-07-15 中铁七局集团有限公司 Construction method of underwater drilled pile
CN114673144A (en) * 2022-04-28 2022-06-28 中铁十五局集团有限公司 Rapid pile planting construction method for trestle steel pipe pile on bare rock of inclined base surface
CN114808725B (en) * 2022-05-11 2023-07-07 浙江省二建建设集团有限公司 Pier pile foundation construction platform on water
CN114808947A (en) * 2022-05-31 2022-07-29 保利长大工程有限公司 A construction platform for pile foundation trompil
WO2024007203A1 (en) * 2022-07-06 2024-01-11 中交第二航务工程局有限公司 New superstructure for high-piled wharf, and construction apparatus and construction method therefor
CN116024975B (en) * 2022-09-07 2023-09-26 中交第四航务工程局有限公司 Offshore deep mixing pile water-land construction system and construction method
CN115961626A (en) * 2022-12-08 2023-04-14 保利长大工程有限公司 Underwater pile foundation casing anchoring method
CN116837806A (en) * 2023-06-12 2023-10-03 中国铁建港航局集团有限公司 Method for erecting anti-collision pier water platform
CN116856408B (en) * 2023-09-04 2023-11-07 中交第一航务工程局有限公司 Sinking method of steel casing suitable for deepwater bare rock area
CN117306534B (en) * 2023-11-30 2024-03-12 中国海洋大学 Reverse construction method for assembled marine pile foundation building

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2863902Y (en) * 2005-12-29 2007-01-31 中交第二航务工程局有限公司 Guiding device for sinking steel pile casting
EA026518B1 (en) * 2010-10-12 2017-04-28 Бп Корпорейшн Норт Америка Инк. Assembly for connecting a subsea riser
CN201857618U (en) * 2010-11-11 2011-06-08 四川路桥桥梁工程有限责任公司 Floating guide platform and steel casing supported drilling platform deepwater pile foundation
CN203049602U (en) * 2012-11-23 2013-07-10 浙江大学 Offshore platform pile leg capable of realizing convenient pile unplugging and installing platform provided with pile leg
US20140205383A1 (en) * 2013-01-21 2014-07-24 Conocophillips Company Jack-up drilling unit with tension legs
CN103422782A (en) * 2013-09-03 2013-12-04 张家港固耐特围栏系统有限公司 Upper beam guide device
CN103741657B (en) * 2013-12-27 2016-01-20 中铁大桥局集团第一工程有限公司 The construction method of large-sized multifunction waterborne traffic accident
CN104594352B (en) * 2015-01-14 2016-12-07 中铁大桥局集团有限公司 A kind of robust structure and drilling platform construction method based on this robust structure
CN104895056B (en) * 2015-06-02 2016-08-31 正平路桥建设股份有限公司 Protection against erosion large diameter bored pile construction method
CN105002890B (en) * 2015-07-15 2017-03-08 杭州江润科技有限公司 A kind of profundal zone cast-in-situ bored pile is lossless to assemble and disassemble double-deck steel pile casting group structure and construction method
CN106320332B (en) * 2016-09-09 2018-08-31 中交第二航务工程局有限公司 The construction method and construction system of over-water bored pile are carried out based on pushing tow mobile platform
CN206070516U (en) * 2016-09-09 2017-04-05 中交第二航务工程局有限公司 The construction system of over-water bored pile is carried out based on pushing tow mobile platform

Also Published As

Publication number Publication date
CN106320332B (en) 2018-08-31
WO2018045772A1 (en) 2018-03-15
CN106320332A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
IL260791B (en) Construction method and construction system for overwater bored piles based on incremental launching movement platform
IL251958B (en) Systems and methods for improving platform guidance or navigation using uniquely coded signals
EP3602118A4 (en) Global integrity check system and associated method
BR112016022223A2 (en) apparatus, system and method for shot blasting with magnetic communication signal.
EP3198350A4 (en) System and method for mobile platform operation
EP3349040C0 (en) Method for positioning underwater objects and system for the implementation thereof
PL3481999T3 (en) System and method for measuring a track
DK3664245T3 (en) Control system and control method for parallel converter system
EP3287811C0 (en) Method, device and computer-readable storage medium for gnss point positioning
EP3491518A4 (en) System and method for generating api development code for integrating platforms
SG11201809240UA (en) System and method for determining the position of a transport vehicle, and transport vehicle
DK3548383T3 (en) SYSTEM AND PROCEDURE FOR MOORING AN AIRCRAFT, THEREFORE EQUIPPED AIRCRAFT AND THEREFORE EQUIPPED RECEIVING STRUCTURES
ZA201905836B (en) System and method for navigating in a digital environment
BR112017022112A2 (en) piston accumulator bladder apparatus system and method.
DK3727623T3 (en) Toy system and method for detecting toy elements
EP3155369A4 (en) System and method for measuring a displacement of a mobile platform
SG11201609626QA (en) Device and system for representing hits by shots and/or rockets and method for same
GB2565493B (en) Method for time drift measurement, seismic node and seismic node handling system
DK3195076T3 (en) SYSTEM AND PROCEDURE FOR CHOOSING AN OPERATING MODE FOR A MOBILE PLATFORM
EP3507739C0 (en) Track guidance method, track guidance system, and vehicle
SG11201707987WA (en) System and method for securing, moving and placing a pile or heavy elongated object
DK3230159T3 (en) Method and system for the transfer of floating cargo on the high seas
DK3481714T3 (en) Unmanned underwater vehicle and method for controlling a hydraulic system
SG11202100748PA (en) Position detecting system and position detecting method
PL3724064T3 (en) Method and system for neutralising underwater explosive devices

Legal Events

Date Code Title Description
FF Patent granted
KB Patent renewed