IE83908B1 - A method for underwater transportation and installation or removal of objects at sea - Google Patents

A method for underwater transportation and installation or removal of objects at sea Download PDF

Info

Publication number
IE83908B1
IE83908B1 IE2003/0156A IE20030156A IE83908B1 IE 83908 B1 IE83908 B1 IE 83908B1 IE 2003/0156 A IE2003/0156 A IE 2003/0156A IE 20030156 A IE20030156 A IE 20030156A IE 83908 B1 IE83908 B1 IE 83908B1
Authority
IE
Ireland
Prior art keywords
buoyancy unit
towing
vessel
installation
towed
Prior art date
Application number
IE2003/0156A
Other versions
IE20030156A1 (en
Inventor
Tangen Gunner
Hvam Lars
Original Assignee
Aker Marine Contractors As
Filing date
Publication date
Priority claimed from NO20021119A external-priority patent/NO316168B1/en
Application filed by Aker Marine Contractors As filed Critical Aker Marine Contractors As
Publication of IE20030156A1 publication Critical patent/IE20030156A1/en
Publication of IE83908B1 publication Critical patent/IE83908B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/56Towing or pushing equipment
    • B63B21/66Equipment specially adapted for towing underwater objects or vessels, e.g. fairings for tow-cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/08Arrangement of ship-based loading or unloading equipment for cargo or passengers of winches
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/36Arrangement of ship-based loading or unloading equipment for floating cargo
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B77/00Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C7/00Salvaging of disabled, stranded, or sunken vessels; Salvaging of vessel parts or furnishings, e.g. of safes; Salvaging of other underwater objects
    • B63C7/02Salvaging of disabled, stranded, or sunken vessels; Salvaging of vessel parts or furnishings, e.g. of safes; Salvaging of other underwater objects in which the lifting is done by hauling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0052Removal or dismantling of offshore structures from their offshore location
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling

Description

PATENTS ACT, 1992 2003/0156 A METHOD FOR UNDERWATER TRANSPORTATION AND INSTALLATION OR REMOVAL OF OBJECTS AT SEA AKER MARINE CONTRACTORS AS A method for underwater transportation and installation or removal of objects at sea Field of the Invention Oil and gas field developments are experiencing a push to- wards underwater production with more of the infrastructure placed on the seabed. There is thus an increasing need for transportation of objects with subsequent installation of the objects at the field. Also, with an increasing number of oil and gas fields being decommissioned, there is a growing need for removal of objects with subsequent trans- port to shore. Some of the objects that are to be installed or removed from the offshore sites are relatively_comp1i— cated with large dimensions and weights. One is often de- pendent on costly vessels and equipment, and the availabil- ity of such vessels may also be poor. Based on these as- pects there is a need to develop new and alternative meth- ods for transport and installation/removal of objects, as conventional methods become unfit, inadequate or very ex- pensive.
The more conventional methods are normally based on trans- porting the objects to the destination on deck of the in~ stallation vessel or a transportation barge, with subse- quent offshore lift from deck and lowering of object through the splash zone/sea surface using a crane. Such op- erations set high demands to crane capacity and deck space, and can be very weather sensitive operations depending on type of object to be installed and the motion characteris- tics of the installation vessel(s). They further require costly construction vessels and potentially tying them up for long periods of time depending on weather.
Thus, the present invention, in a first aspect, relates to a method for transport and installation of objects at sea, particularly relating to transport and installation of ob- jects that are part of the infrastructure in oil and gas fields offshore, where the object is put in the sea at a suitable location near the shore or in sheltered waters, then towed to the installation site while being suspended in at least one floating buoyancy unit, and subsequently lowered to its final destination.
A method of this type is known from GE 1191146. In this _ method two slightly different types of buoys are used for suspending a pipeline while it is being towed from the shore to its place of installation. At the installation site, the pipeline is lowered to the sea bottom by flooding the buoys, some of them deliberately and others automati- cally through the implosion of bursting disks so as to fill their buoyancy chambers at a predetermined depth. The low- ering of the pipeline is started from one end, and if the water is deep, a substantial part of the pipeline will be suspended in the still floating part before the first end reaches the bottom, thus subjecting part of the pipeline to very substantial bending loads and possibly also causing the lowering process to become out of control. GB 1191146 is silent on the possible recovery of the buoys after the pipeline has reached the bottom. In any case, such recovery -work would be quite complicated, particularly at greater depths.
US 4690586 discloses a method for installing the jacket of an offshore platform structure, wherein the jacket is towed on a barge to the installation site. At the site the barge is submerged by means of tension legs and ballasting so that the jacket may be pulled off the barge while in float- ing condition. This method is only possible for objects that have sufficient buoyancy to be self—floating and can therefore not satisfy the first aspect of the present in; vention as mentioned above. Besides, the installation of temporary tension legs for the barge adds considerably to the complexity and cost of this method, which also seems limited to shallow waters and good weather conditions.
According to a second aspect, the present invention also relates to a method for removal and transport of objects at sea. In this respect, Us 2001/0053311 discloses the use of a sea going crane vessel for raising a jacket structure or the like to a horizontal position so that it may be sus- pended at either end of a barge, The suspension points on the barge are releasable rocker beams in order to facili- tate quick release of the jacket once it has been towed to a place where it can be dumped at deep water. This method is limited to water depths where jackets may be used and where the object may be raised one end at a time. The di- mensions of the barge must correspond approximately to the length of the object. The barge will have a substantial wa- ter line cross-section and therefore respond to wave mo- tion, and with the object suspended in releasable rocker beams it will not be possible to lower the object in a con- trolled manner after its release.
Thus, the purpose of the present invention is to provide a method as defined in the preamble of claims 1 and 2, re- spectively, which is safe and simple and may be performed’ with the use of readily available equipment even when the weather conditions are not favourable.
Summary of the invention The transport and installation method may be summarised as follows: The object is transported from the fabrication yard to a suitable location inshore or a location in sheltered waters or a location near shore with the appropriate weather to perform the transfer operations. An inshore crane vessel will then pick up the object from the transportation barge or transportation vessel and lower the object through the splashzone/sea surface with subsequent hook-up and weight transfer to the buoyancy unit and towing arrangement, ac- cording to the invention. The object will then be towed to the destination by a towing vessel while immersed and sus- pended from the buoyancy unit. On arrival at the destina- tion the towing winch wire from the shortened to take the weight of the enable release of the buoyancy unit. towing vessel will be suspended object and The buoyancy unit will be released from the object when it no longer carries any weight, and subsequently stored on deck of or alongside of the towing/installation vessel, or other vessel, with post- installation transport back to shore either on deck or towed in a horizontal position, respectively. The object will then be lowered to the seabed or to a specified target depth between the surface and the seabed for installation with the heave compensated towing winch wire from the tow- ing vessel or other vessel with heave compensated lifting arrangement.
This is obtained by a method as recited in claim 1.
The invention also relates to removal operations as defined in claim 2.
When applying the invention one achieves a number of advantages compared to conventional methods. In particular, one avoids the problems and weather restrictions associated with an offshore lift from deck and subsequent lowering through the splashzone/sea surface. Avoiding using crane vessels and improving the weather criteria for the installation will also result in a major reduction in cost for the operation, and the invention is in principle independent of dimensions and weight of the object to be transported and installed. Further, the transport to destination is safer and less weather sensitive since the object is suspended from a slender buoyancy unit and is independent of the installation vessel during transport.
The buoyancy unit has a small and constant waterplane area and acts as a heave compensator, thereby reducing the dynamic loads in the object and the suspension arrangement between the object and buoyancy unit. The method can be based on using the same vessel for both the tow and the in- stallation or recovery, and a minimum of equipment is needed. This means that any vessel that satisfies the basic capacity requirements may be used, which increases vessel availability, opens for using low cost vessels and reduces vessel mobilisation time.
Brief description of the drawings The present invention shall be described in more detail in the following with reference to the attached schematic drawings which illustrate a preferred embodiment, wherein: Fig.1 is a side View showing how a typical inshore crane vessel lifts the object from deck of a vessel or a trans- portation barge and lowers it into the sea for connection to the towing vessel.
Fig.2 is a plan View showing the connection of the buoyancy unit and the towing wire to the suspension arrangement while the object is hanging below the stern of the towing vessel and the buoyancy unit lying on deck of the towing vessel.
Figs 3A—F are side views illustrating the launch of the buoyancy unit with subsequent weight transfer from towing winch to buoyancy unit.
Fig.4 is a side View illustrating the invention during the transport phase, with an object suspended from a slender buoyancy unit and connected via a towing arrangement to a towing vessel.
Figs.5A-F are side views illustrating the end of tow situa- tion where the object weight is transferred from the buoy- ancy unit to the towing winch, with subsequent disconnec- tion and recovery of the buoyancy unit.
Fig.6 is a side View showing the lowering of the object to- wards seabed or target depth for installation.
Detailed description of the preferred embodiment Fig.1 shows the start of the operation according to the in- vention. The object 4 is being lifted through the surface 1 into the sea in sheltered waters after having been lifted off the deck of a vessel or transportation barge by a crane vessel 12. The object will be connected to the lower part of the suspension arrangement 7 and hung off in shark jaws at the stern of the towing vessel 2. The lifting wire from the crane vessel is then disconnected from the object.
Fig.2 shows the object 4 hanging just beneath the stern of the towing vessel 2, hung off in the shark jaws 14. The buoyancy unit 5 is lying on deck of the vessel and is con- nected to the tri—plate 8. The towing winch wire 10, run- ning from the towing winch 3 via a heave compensator 13 on deck, is also connected to the tri—plate.
Figs.3A—F show the launch of the buoyancy unit 5 from the towing vessel 2 and the subsequent object 4 weight transfer from the towing winch 3 to the buoyancy unit. In Figs. 3A-C the towing winch wire 10 is paid out and the buoyancy unit is thereby pulled off the deck by means of the object 4 weight. This launch operation is performed with the vessel 2 in forward motion. In Fig. 3D and E the towing wire con- tinues to be paid out and the buoyancy unit starts to take some of the object weight and is thereby raised towards a vertical position. In Fig. 3F the buoyancy unit 5 has taken the full weight of the object 4.
Fig.4 shows the towing situation of the present invention wherein the towing vessel 2 is an anchor handling tug with an onboard heave compensated winch. Further, the object 4 is shown suspended from the cylindrical buoyancy unit 5, which are connected to each other by a suspension arrange- ment 6, 7, 8. The winch wire from the anchor handling tug, or other heave compensated winch, is used as towing wire . The towing wire is connected to a buoy 11, which re- lieves the buoyancy unit of the weight of the towing wire.
If required, the directional stability of the towed object 4 may be controlled by a guideline, denoted 9.
The buoyancy unit 5 has a long, slender, cylinder shape with a small and mainly constant waterplane area and a ta- pered lower end. The unit will preferably be a steel struc- ture that may be divided into several watertight compart- ments, a principle that will ensure continued buoyancy in case of leakage or damage to one or more of the compart- ments. In the lower tapered end of the buoyancy unit there may be a padeye arrangement for connection of the suspen- sion arrangement 6-8 between the suspended object 4 and the buoyancy unit 5. The buoyancy unit may also be fitted with a ballast system which, as required, can be utilised to ad- just the vertical position of the buoyancy unit 5 in the water, and also enable connection or disconnection of a liftline between the buoyancy unit and the object.
The main purpose of the buoyancy unit 5 is to keep the towed object 4 afloat and in the capacity of its shape act as a heave compensator and thereby minimise the dynamic loads in the towed object 4 and the suspension arrangement 6, 7, 8 between the object and the buoyancy unit 5. The heave compensation achieved by this principle is not lim- ited by e.g. a defined cylinder stroke length, as large waves will wash over the buoyancy unit. Thus, the resulting changes in dynamic loads will be small in the towed object 4 and the suspension arrangement 6-8 between object and buoyancy unit.
The suspension arrangement 6, 7, 8 between the slender buoyancy unit 5 and the object may consist of two parts 6,7 connected together by a link 8, preferably a tri—plate. The purpose of dividing the arrangement in such a manner is to be able to pull the tri—plate 8 onto deck for connection and disconnection of the towing wire 10 to the suspension arrangement, while the object 4 is still hanging below sur- face 1.
The actual towing force is acting in the link 8 between the upper 6 and lower 7 part of the suspension arrangement, in such a way that neither the towed object 4 nor the buoyancy unit 5 is directly connected to the towing wire 10.
Figs.5A—F show the end of the tow when the destination is reached, with weight transfer from buoyancy unit 5 to the towing winch 3 and subsequent recovery of the buoyancy unit. In Figs. 5A—D the towing winch wire 10 is hauled in to take the weight of the object 4. The buoyancy unit will gradually take less of the object load until it is floating horizontally on the surface without carrying any load. In Fig. 5E the buoyancy unit is disconnected from the object 4 and a recovery winch (not shown) is attached to it for re- covery of the buoyancy unit onto deck of the towing vessel 2. In Fig. 5F the buoyancy unit is lying on deck of the towing vessel while the object is hanging in the winch wire ready for deployment towards seabed.
Fig.6 shows the object 4 being lowered towards seabed for final installation. A clump weight and orientation wires (not shown) are typically used as installation aids for po- sitioning of the object at the seabed.
The vessel 2 used for towing the object 4 will according to the invention preferably also be used for installation of the object upon arrival at the destination, as the object 4 then is lowered to the seabed using the towing winch wire . However, the method according to the invention is not limited to using the same vessel for transport and instal- lation, and the method according to the invention could thus include using more than one vessel. The vessel per- forming the installation or recovery offshore may be any type of ves- sel, self—propelled or not, with a heave compensated lift- ing arrangement.
The method is intended for use with only one slender buoy- ancy unit 5 for transport and installation of relatively compact objects where the structural design is such that it can be lifted or carried in a single point using a lift bridle or similar. Moreover, the method may be used with two or more equivalent slender buoyancy units when the ob— ject has a structural design that requires two or more points for lifting/carrying to ensure the integrity of the structure during the transport and installation, e.g. large pipe spoolpieces. according to the Invention, for transport and installation of In relation to spool piece installation, the method accord- ing to the invention is considered not only applicable for installation of single spoolpieces, but is also applicable for transport and installation of several spoolpieces si- multaneously. This is made possible by having a number of in a basket or spoolpieces stacked, or in other way placed, transportation frame that will be suspended from the buoy- ancy unit as per the method according to the invention. The transportation frame may then be lowered to the seabed and wet parked on arrival at the destination, and the spool- pieces may then be picked up from the basket one by one and installed.
In addition to transport and subsequent installation of ob— jects, the method according to the invention is also suit- able for removal of objects and transportation of these to shore. This is beneficial when a field is to be decommis» sioned or when objects are to be removed for other reasons, e.g. repair or replacement. Some objects are also unfit for recovery to the surface and lifting onto deck of a con- struction vessel or a transportation barge due to cost or technical limitations like large object dimensions and/or weight. The step by step method for removal and subsequent transport to shore of an object will in principle be the reverse of the step by step method already outlined for in- stallation of an object. It is envisioned that removal of structures using the method also may include e.g. removal of jackets, as these may be laid down on the seabed for subsequent recovery and transport to shore using the method according to the invention. The removal method is defined in claim 2.
The method may also be used to install objects that in op- eration are to be located mid-water, i.e. in a position be» low the sea surface, between the seabed and the critical wave zone. Such an object is e.g. an Artificial Buoyant Seabed (ABS), The method ac- cording to the invention is in this respect not limited to also referred to as Atlantis. installing or recovering objects on the seabed, but also involves installing or recovering objects from mid-water positions.
Another possible utilisation of the method is to have at least one winch mounted on the buoyancy unit itself, to be used for controlled lowering of the object towards seabed or target depth between seabed and sea surface. Due to its shape, the buoyancy unit acts as a heave compensator and lift arrangement and object during the lowering and final land- thereby minimises the dynamic loads in the winch wire, ing, and makes the lowering and landing operations inde- pendent of installation vessel motions. Alternatively, the same advantages may be gained by having a sheave arrange- ment or similar mounted on the buoyancy unit itself, with at least one sheave or similar. At least one winch from at least one vessel may then be routed over the sheave ar- rangement and further connected to the object for lowering and final landing of the object. These utilisations of the method may also be used for recovery operations.
If the tow will encounter more shallow depths underway where the submerged object 4 could possibly hit the sea bottom, it is envisioned that when passing such waters, the object 4 is raised somewhat by bringing the buoyancy unit into a horizontal position. This could be done in various ways, e.g. by connecting a wire between the triplate 8 and the top of the buoyancy unit and then shortening this wire until it has the same length as the upper suspension wire 6.
The invention is not limited to the exemplifying embodiment described herein, but may be varied and modified by the skilled person within the scope of the appended claims.

Claims (10)

1. A method for transport_and installation of objects at sea, particularly relating to transport and installation of subsea objects that are part of the infrastructure in oil and gas fields offshore, where the object (4) is put in the sea at a suitable location near the shore or in sheltered, waters, then towed to the installation site while being suspended via a suspension arrangement (6-8) of a predeter- mined length in at least one floating buoyancy unit (5), and subsequently lowered to its final destination, ' c h a r a c t_e r i z e d i n t h a t least one slender upright buoyancy unit (5), which also is used as a heave compensator during the towing and thereby reduces the dynamic loads in the towed object (4) and the use is made of at suspension arrangement (6-8) between the towed object (4) and the buoyancy unit (5), and that upon arrival at the in- stallation site, the suspension of the object (4) is trans- ferred from said at least one buoyancy unit (5) to a heave compensated winch (3) on a surface vessel (2) while the buoyancy unit (5) is disconnected, said winch being used to lower the object (4) to its destination on the sea bottom or a predetermined location above the sea bottom.
2. A method for removal and transport of objects (4) at sea, particularly relating to removal and transport of ob- jects that are part of the infrastructure in oil and gas fields offshore, where the object (4) is recovered from the seabed or a position between the seabed and sea surface (1), with subsequent tow to a predetermined place; wherein the object (4) is raised to a predetermined distance below the surface (1) by means of a winch (3) on a surface vessel (2), whereupon the suspension of the object (4) is trans- ferred via a suspension arrangement (6-8) of a predeter- mined length to at least one floating buoyancy unit (5) be- fore the tow is started, c h a r a c t e r i z e d heave compensated winch (3) during the raising, and further i n t h a t use is made of a that use is made of a slender upright buoyancy unit (5); which is also used as a heave compensator during the towing and thereby reduces the dynamic loads in the towed object (4) and the suspension arrangement (6-8) between the towed _object (4) and the buoyancy unit (5).
3. A method according to claim 1 or 2, c h a r a c t e r i z e d i_n t h a t the freeboard of the or each-buoyancy unit (5) is set so small that large waves will wash over the buoyancy unit (5), whereby the re- sulting changes in dynamic loads will be small in the towed’ object (4) and the suspension arrangement (6, 7, 8) between object and buoyancy unit (5).
4. A method according to any one of the preceding claims, c h a r a c t e r i z e d i n t h a t at the or each buoyancy unit (5) has a constant diameter along the longi- tudinal axis, has a tapered lower end, and is divided into several watertight compartments to ensure continued buoy- ancy in case of leakage or damage to one or more compart- ments, .and in the lower tapered end has a padeye arrange- ment for connection of the suspension arrangement (6, 7, 8) between the suspended object (4) and the buoyancy unit (5).
5. A method according to any one of the preceding claims, c h a r a c t e r i z e d i n t h a t the or each buoy- ancy unit (5) is fitted with a system for ballasting, fort the purpose of adjusting the vertical position of the buoy- ancy unit in the water and thus enable connection or dis- connection of a liftline between the buoyancy unit (5) and an object (4) on the seabed or an object (4) in a position mid—water, or for the purpose of selecting the draft and freeboard of the buoyancy unit (5) in the upright position to adjust the motion behaviour.
6. A method according to any one of the preceding claims, c h a r a c t e r i z e d i n t h a t a towing arrange- ment is used comprising a towing line (10) which connects “c h a r a c t e r i z e d 13 the buoyancy unit (5) and object (4) with a towing vessel (2).
7. A method according to claim 6, c h a r a c t e r i z e d i n t h a t rangement further comprises a guideline (9) between the vessel (2) and object (4) to control the directional sta- the towing ar- bility of the towed object.
8. - A method according to claim 6 or 7, i n t h a t the towing line (10) in the towing arrangement is the same winch wire of the towing vessel winch system (3) which is utilised for lowering or raising the object (4) during installation or removal, respectively.
9. A method according to any one of the preceding claims. i n t h a t the suspension ar- to the buoy- c h a r a c t e r i z e d rangement (6-8) that connects the object (4) ancy unit (5) comprises a lower part (7) and an upper part (6) connected together with a link (8), preferably a tri- plate, to enable connection and disconnection of a towing line (10) to the suspension arrangement (6-8) on the deck of a towing vessel (2).
10. A method according to any one of the preceding claims, i n t h a t the vessel (2) used for lowering or raising the object (4) is also used c-h a r a c t e r i z e d for towing the object. F. R. KELLY & CO., AGENTS FOR THE APPLICANTS
IE2003/0156A 2003-03-05 A method for underwater transportation and installation or removal of objects at sea IE83908B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NONORWAY06/03/2002NO20021119
NO20021119A NO316168B1 (en) 2002-03-06 2002-03-06 Procedure for transporting and installing objects at sea

Publications (2)

Publication Number Publication Date
IE20030156A1 IE20030156A1 (en) 2003-09-17
IE83908B1 true IE83908B1 (en) 2005-05-18

Family

ID=

Similar Documents

Publication Publication Date Title
US7011473B2 (en) Method for underwater transportation and installation or removal of objects at sea
AU2009306155B2 (en) Method and apparatus for subsea installations
CN100402371C (en) Riser installation vessel and method of using the same
EP1150881B1 (en) Working ship
EP2243695B1 (en) Mating of buoyant hull structure with truss structure
US5054963A (en) Tether system for an offshore based work platform
WO2000027692A1 (en) Device for positioning of vessels
US20080089745A1 (en) Method And Device For Connecting A Riser To A Target Structure
EP0945338A1 (en) SPAR construction method
GB2344574A (en) Floating heavy lift vessel with stabilizing suction anchors
US6408781B1 (en) Mooring system and method for deep and ultra deep water
EP0908382A2 (en) Methods of assembling floating offshore structures
US6685519B1 (en) System for transferring fluids and methods for installing, modifying and operating system
EP3094905B1 (en) Transportation and installation of subsea rigid tie-in connections
IE83908B1 (en) A method for underwater transportation and installation or removal of objects at sea
EP0137625B1 (en) Transport of prefabricated offshore structures
GB2222190A (en) Installing large, heavy structures on the sea bottom
WO2023244156A1 (en) Floating wind turbine installation arrangement and method
CN115892359A (en) Concrete tunnel immersed tube pipe section transportation method
MXPA06013864A (en) Method for deploying floating platform