HK1232269A1 - 預製框架結構及其串連預製建築方法 - Google Patents

預製框架結構及其串連預製建築方法

Info

Publication number
HK1232269A1
HK1232269A1 HK17106010.4A HK17106010A HK1232269A1 HK 1232269 A1 HK1232269 A1 HK 1232269A1 HK 17106010 A HK17106010 A HK 17106010A HK 1232269 A1 HK1232269 A1 HK 1232269A1
Authority
HK
Hong Kong
Prior art keywords
same
construction method
prefabricated frame
prefabricated
frame
Prior art date
Application number
HK17106010.4A
Other languages
English (en)
Inventor
黃天祥
黃慧敏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Publication of HK1232269A1 publication Critical patent/HK1232269A1/zh

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
HK17106010.4A 2016-12-20 2017-06-16 預製框架結構及其串連預製建築方法 HK1232269A1 (zh)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611180617.1A CN106638947A (zh) 2016-12-20 2016-12-20 预制框架结构及其串连预制建筑方法

Publications (1)

Publication Number Publication Date
HK1232269A1 true HK1232269A1 (zh) 2018-01-05

Family

ID=58833838

Family Applications (1)

Application Number Title Priority Date Filing Date
HK17106010.4A HK1232269A1 (zh) 2016-12-20 2017-06-16 預製框架結構及其串連預製建築方法

Country Status (3)

Country Link
CN (1) CN106638947A (zh)
HK (1) HK1232269A1 (zh)
SG (1) SG10201704988QA (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313506B (zh) 2017-08-14 2022-12-23 有利华建筑预制件(深圳)有限公司 设有边梁的建筑框架结构及其施工方法
CN107503368B (zh) * 2017-08-28 2023-07-21 广东水电二局股份有限公司 预制组装式钢混结构光伏发电设备平台
CN108360675A (zh) * 2017-12-29 2018-08-03 湖南标迪夫节能科技有限公司 框架结构预制钢筋砼主梁
CN109403458A (zh) * 2018-12-18 2019-03-01 有利华建材(惠州)有限公司 新型的预制框架结构
CN110130487B (zh) * 2019-05-24 2024-01-16 广东中建新型建筑构件有限公司 一种预制主次梁连接节点及连接方法
CN113565205B (zh) * 2021-08-24 2023-07-25 中建四局华南建设有限公司 一种层间梁一次浇筑成型方法
CN114215348B (zh) * 2021-12-21 2023-01-06 浙江恒鸿建设有限公司 屋面现浇钢梁混凝土栅顶及施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101660327B (zh) * 2008-08-29 2011-07-20 万科企业股份有限公司 预制混凝土次梁与主梁的连接结构、施工方法及建筑
JP2014051798A (ja) * 2012-09-06 2014-03-20 Splice Sleeve Japan Ltd 鉄筋の継手工法
CN203174770U (zh) * 2013-04-19 2013-09-04 深圳海龙建筑制品有限公司 预制柱与施工现场基座连接结构及建筑物
CN204112548U (zh) * 2014-04-27 2015-01-21 绍兴精工绿筑集成建筑系统工业有限公司 一种集成式楼面模块
CN105256891B (zh) * 2015-09-17 2018-02-06 东南大学 高强底筋预制混凝土框架结构

Also Published As

Publication number Publication date
CN106638947A (zh) 2017-05-10
SG10201704988QA (en) 2018-07-30

Similar Documents

Publication Publication Date Title
SG10201902337QA (en) Prefabricated frame
GB202106231D0 (en) Area construction method
HK1232269A1 (zh) 預製框架結構及其串連預製建築方法
PT3327214T (pt) Estrutura de esqueleto e respetivo método de construção
GB201900330D0 (en) Assembly and method
NO20161803A1 (en) Modular structures and method for construction thereof
HK1225771A1 (zh) 模塊化遮蔽物及其展開方法
GB2547116B (en) Building structure and method
ZA201900942B (en) Caisson block construction method and caisson block structure
PL3064676T3 (pl) Stelaż namiotu i odpowiadający mu namiot
ZA201802601B (en) Composite closure with support brace and method for making the same
SG11201706586SA (en) Column-pile connecting method and connecting structure
HK1207524A2 (zh) 種 及其製作方法
GB2592994B (en) A structure and method of construction of the structure
LT3150790T (lt) Staliaus dirbinių montavimo būdas ir staliaus dirbinių montavimo detalių rinkinys
RS61269B1 (sr) Lančanik, kao i postupak i uređaj za njegovu proizvodnju
KR101881968B1 (ko) 그라우팅 시공 장치 및 이를 이용한 그라우팅 공법
ZA201900993B (en) Side frame center core construction and method
SG11201907113SA (en) Fastening structure and fastening method
SG11201907112RA (en) Fastening structure and fastening method
IL253936A0 (en) Structure and method for saturated burial
GB201701916D0 (en) Double glazing unit and method
GB201609625D0 (en) Modular construction system and method
GB201505749D0 (en) Construction method and structures built using such
PT3332962T (pt) Elemento de construção compósito