SG10201704988QA - Prefabricated frame and construction method using the same - Google Patents

Prefabricated frame and construction method using the same

Info

Publication number
SG10201704988QA
SG10201704988QA SG10201704988QA SG10201704988QA SG10201704988QA SG 10201704988Q A SG10201704988Q A SG 10201704988QA SG 10201704988Q A SG10201704988Q A SG 10201704988QA SG 10201704988Q A SG10201704988Q A SG 10201704988QA SG 10201704988Q A SG10201704988Q A SG 10201704988QA
Authority
SG
Singapore
Prior art keywords
prefabricated
construction method
prefabricated frame
main beam
same
Prior art date
Application number
SG10201704988QA
Inventor
Tin Cheung Wong
Wai Man Wong Rosana
Original Assignee
Yau Lee Wah Construction Mat Huizhou Company Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yau Lee Wah Construction Mat Huizhou Company Limited filed Critical Yau Lee Wah Construction Mat Huizhou Company Limited
Publication of SG10201704988QA publication Critical patent/SG10201704988QA/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PREFABRICATED FRAME AND CONSTRUCTION METHOD USING THE SAME 5 The present invention relates to a prefabricated frame and a construction method using the same. The prefabricated frame includes comprising a column (1), a main beam (2) connected to the column (1), a secondary beam (3) connected to the main beam (2), and a floor (5). The main beam (2) and the secondary beam (3) both are 10 prefabricated members, and are provided with, on respective top portions thereof, exposed reinforcing bars, and reinforcing bars at cast-in-situ parts. The floor (5) is a laminated plate, with a prefabricated slab (51) arranged at a lower portion thereof. The prefabricated slab (51), the main beam (2), and the secondary beam (3) are connected together by means of cast-in-situ concrete on the respective top portions thereof. The 15 prefabricated frame and the construction method of the present invention can effectively reduce the amount of on-site construction work, the number of on-site nailing of plates, and pollution and waste, and remarkably save human resources, thereby effectively improving construction efficiency and shortening construction durations. 20 (Fig. 1)
SG10201704988QA 2016-12-20 2017-06-16 Prefabricated frame and construction method using the same SG10201704988QA (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611180617.1A CN106638947A (en) 2016-12-20 2016-12-20 Prefabricated frame structure and cascaded prefabrication construction method thereof

Publications (1)

Publication Number Publication Date
SG10201704988QA true SG10201704988QA (en) 2018-07-30

Family

ID=58833838

Family Applications (1)

Application Number Title Priority Date Filing Date
SG10201704988QA SG10201704988QA (en) 2016-12-20 2017-06-16 Prefabricated frame and construction method using the same

Country Status (3)

Country Link
CN (1) CN106638947A (en)
HK (1) HK1232269A1 (en)
SG (1) SG10201704988QA (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130487A (en) * 2019-05-24 2019-08-16 广东中建新型建筑构件有限公司 A kind of prefabricated primary and secondary beam connecting node and connection method
CN113565205A (en) * 2021-08-24 2021-10-29 中建四局华南建设有限公司 One-time pouring forming method for interlayer beam

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313506B (en) 2017-08-14 2022-12-23 有利华建筑预制件(深圳)有限公司 Building frame structure with boundary beam and construction method thereof
CN107503368B (en) * 2017-08-28 2023-07-21 广东水电二局股份有限公司 Photovoltaic power generation equipment platform with prefabricated assembled steel-concrete structure
CN108360675A (en) * 2017-12-29 2018-08-03 湖南标迪夫节能科技有限公司 Frame structure prefabricated reinforced concrete girder
CN109403458A (en) * 2018-12-18 2019-03-01 有利华建材(惠州)有限公司 Novel pre-fabricated one
CN114215348B (en) * 2021-12-21 2023-01-06 浙江恒鸿建设有限公司 Roof cast-in-place steel beam concrete grid top and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101660327B (en) * 2008-08-29 2011-07-20 万科企业股份有限公司 Connecting structure of precast concrete secondary beam and main beam, construction method and building
JP2014051798A (en) * 2012-09-06 2014-03-20 Splice Sleeve Japan Ltd Joint construction method of reinforcing-bar
CN203174770U (en) * 2013-04-19 2013-09-04 深圳海龙建筑制品有限公司 Connection structure of prefabricated column and construction site base and building
CN204112548U (en) * 2014-04-27 2015-01-21 绍兴精工绿筑集成建筑系统工业有限公司 A kind of integrated form flooring module
CN105256891B (en) * 2015-09-17 2018-02-06 东南大学 High-strength bottom muscle Precast Concrete Frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130487A (en) * 2019-05-24 2019-08-16 广东中建新型建筑构件有限公司 A kind of prefabricated primary and secondary beam connecting node and connection method
CN113565205A (en) * 2021-08-24 2021-10-29 中建四局华南建设有限公司 One-time pouring forming method for interlayer beam

Also Published As

Publication number Publication date
CN106638947A (en) 2017-05-10
HK1232269A1 (en) 2018-01-05

Similar Documents

Publication Publication Date Title
SG10201704988QA (en) Prefabricated frame and construction method using the same
PH12018501752A1 (en) Method for constructing multi-story buildings using stacked structural steel wall trusses
SG10201710094VA (en) Building frame structure having edge beam, and construction method thereof
KR101274479B1 (en) Permanent concrete form for the prefabricated reinforced concrete column
RU155973U1 (en) COMPOSITION STEEL CONCRETE BEAM
RS52330B (en) Prefabricated building structure built of prefabricated ribbed sandwich type ferro cement elements effused in moulds
MX2011012554A (en) Half precast floor plank, and slab construction method using same.
CN105569243A (en) Self-supporting pre-stress combination beam lightweight aggregate concrete composite slab
RU152451U1 (en) STEEL CONCRETE BEAM
ATE509166T1 (en) DEVICE FOR FIRMLY JOINING PREFABRICATED BEAMS AND PREFABRICATED PILLARS
CN103696437A (en) Construction method for cutting latticed column
CN204081090U (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post
CN206769153U (en) Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure
EA201492144A1 (en) ASSEMBLY-MONOLITHIC REINFORCED CONCRETE FRAMEWORK OF THE ARCOS-2014 MULTILEVEL BUILDING
CN102071804A (en) Building method of floor plate
RU2393307C2 (en) Wood-gypsum-concrete panel
RU2590251C1 (en) Platform assembly-monolithic joint
EA200700928A1 (en) PRECAST CONCRETE COLUMN
CN205955018U (en) But device of effective control breast cover to reinforcement effect
Purandare et al. Ferrocast Structural Elements For Mass Housing For Low Income Group In India
JP6816941B2 (en) Foundation structure of seismic isolated building
CN221073395U (en) Operation steel platform convenient for local area construction
RU107208U1 (en) PLATE BUILDING CONSTRUCTION
CN208184042U (en) A kind of civilian villa steel concrete composite floor
RU155615U1 (en) REINFORCED CONCRETE PLATE