GB2608509B - Asymmetric installation construction method for straddle-type light rail special steel box girder extradosed bridge - Google Patents
Asymmetric installation construction method for straddle-type light rail special steel box girder extradosed bridge Download PDFInfo
- Publication number
- GB2608509B GB2608509B GB2209777.8A GB202209777A GB2608509B GB 2608509 B GB2608509 B GB 2608509B GB 202209777 A GB202209777 A GB 202209777A GB 2608509 B GB2608509 B GB 2608509B
- Authority
- GB
- United Kingdom
- Prior art keywords
- straddle
- construction method
- type light
- box girder
- steel box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/16—Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010447452.XA CN111622116B (en) | 2020-05-25 | 2020-05-25 | Asymmetric installation construction method for steel box short-tower cable-stayed bridge special for straddle type light rail |
PCT/CN2020/121371 WO2021238024A1 (en) | 2020-05-25 | 2020-10-16 | Asymmetric installation construction method for straddle-type light rail special steel box girder extradosed bridge |
Publications (4)
Publication Number | Publication Date |
---|---|
GB202209777D0 GB202209777D0 (en) | 2022-08-17 |
GB2608509A GB2608509A (en) | 2023-01-04 |
GB2608509A8 GB2608509A8 (en) | 2023-01-25 |
GB2608509B true GB2608509B (en) | 2023-06-28 |
Family
ID=72268838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB2209777.8A Active GB2608509B (en) | 2020-05-25 | 2020-10-16 | Asymmetric installation construction method for straddle-type light rail special steel box girder extradosed bridge |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN111622116B (en) |
GB (1) | GB2608509B (en) |
WO (1) | WO2021238024A1 (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622116B (en) * | 2020-05-25 | 2022-02-11 | 中铁上海工程局集团有限公司 | Asymmetric installation construction method for steel box short-tower cable-stayed bridge special for straddle type light rail |
CN114197330B (en) * | 2021-12-21 | 2024-04-16 | 中铁大桥局第七工程有限公司 | Active closure method for large-span steel truss arch |
CN114164767B (en) * | 2021-12-27 | 2024-07-02 | 上海市机械施工集团有限公司 | Method for installing steel box girder bridge |
CN114482015B (en) * | 2021-12-30 | 2023-11-10 | 江苏华滋能源工程有限公司 | Construction method of oversized offshore wind power foundation steel pipe pile |
CN114197331B (en) * | 2021-12-30 | 2024-02-27 | 中铁大桥局集团有限公司 | Guide beam suitable for pushing construction of steel beam and steel box girder erection method |
CN114319135A (en) * | 2022-01-17 | 2022-04-12 | 中交第三公路工程局有限公司工程总承包分公司 | Construction method for steel box girder tied-bar steel arch bridge arch rib closure section |
CN114525734B (en) * | 2022-01-21 | 2024-06-18 | 中铁十一局集团有限公司 | Erection method based on steel-concrete composite beam erection system |
CN114351598B (en) * | 2022-01-26 | 2023-09-22 | 中铁二十二局集团第三工程有限公司 | Hoisting construction method for steel box girder in limited space of complex navigable water area |
CN114703765B (en) * | 2022-03-01 | 2023-12-19 | 中铁广州工程局集团有限公司 | Construction method for closure section of double-tower cable-stayed bridge |
CN114892526B (en) * | 2022-05-12 | 2023-10-20 | 中铁十局集团青岛工程有限公司 | Overhead hoist is used in steel case roof beam construction |
CN114775456B (en) * | 2022-05-24 | 2023-04-25 | 中铁大桥科学研究院有限公司 | Construction method and construction system for asynchronous hoisting of cable-stayed bridge cantilever |
CN115125863A (en) * | 2022-08-03 | 2022-09-30 | 中国十九冶集团有限公司 | Bridge side span construction method |
CN115387245B (en) * | 2022-09-19 | 2024-06-11 | 中铁大桥局集团有限公司 | Method for erecting continuous steel truss girder cantilever |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101424072A (en) * | 2008-11-18 | 2009-05-06 | 中铁一局集团有限公司 | Counter weight control construction method for large span un-symmetric segment stayed-cable bridge |
KR20130124104A (en) * | 2012-05-04 | 2013-11-13 | 지에스건설 주식회사 | Cable-stayed bridge construction method |
CN106702910A (en) * | 2016-12-29 | 2017-05-24 | 中交第三航务工程局有限公司 | Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes |
CN111622116A (en) * | 2020-05-25 | 2020-09-04 | 中铁上海工程局集团有限公司 | Asymmetric installation construction method for steel box short-tower cable-stayed bridge special for straddle type light rail |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104294747B (en) * | 2014-09-23 | 2016-05-18 | 同济大学 | A kind of double tower hybrid beam cable-stayed bridge system and construction method thereof |
JP6434885B2 (en) * | 2015-10-07 | 2018-12-05 | 大日本コンサルタント株式会社 | How to build a cable-stayed bridge |
CN108867383B (en) * | 2018-06-25 | 2019-11-29 | 中铁三局集团有限公司 | A kind of across the steel case trusses cable-stayed bridge rapid constructing method of double tower five |
-
2020
- 2020-05-25 CN CN202010447452.XA patent/CN111622116B/en active Active
- 2020-10-16 GB GB2209777.8A patent/GB2608509B/en active Active
- 2020-10-16 WO PCT/CN2020/121371 patent/WO2021238024A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101424072A (en) * | 2008-11-18 | 2009-05-06 | 中铁一局集团有限公司 | Counter weight control construction method for large span un-symmetric segment stayed-cable bridge |
KR20130124104A (en) * | 2012-05-04 | 2013-11-13 | 지에스건설 주식회사 | Cable-stayed bridge construction method |
CN106702910A (en) * | 2016-12-29 | 2017-05-24 | 中交第三航务工程局有限公司 | Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes |
CN111622116A (en) * | 2020-05-25 | 2020-09-04 | 中铁上海工程局集团有限公司 | Asymmetric installation construction method for steel box short-tower cable-stayed bridge special for straddle type light rail |
Non-Patent Citations (1)
Title |
---|
LI, Chuanxi et al., (Comparison of Subsiduary Side Span Construction Schemes for Extradosed Bridge of Rongjiang River Bridge) , (World Bridges), Vol. 43, No.2, 28 March 2015 , ISSN: 1671-7767, pp. 34-39 * |
Also Published As
Publication number | Publication date |
---|---|
CN111622116B (en) | 2022-02-11 |
GB2608509A (en) | 2023-01-04 |
CN111622116A (en) | 2020-09-04 |
WO2021238024A1 (en) | 2021-12-02 |
GB2608509A8 (en) | 2023-01-25 |
GB202209777D0 (en) | 2022-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2608509B (en) | Asymmetric installation construction method for straddle-type light rail special steel box girder extradosed bridge | |
ATE538460T1 (en) | METHOD FOR CONTROLLING TRAFFIC SIGNALS FOR ASSIGNING SIGNAL PRIORITIES FOR A VEHICLE | |
GB2603424B (en) | Method for erecting segmental steel girder on pier-top short slideway girder | |
ATE439472T1 (en) | SOLID ROADWAY ON A BRIDGE STRUCTURE | |
ZA202200899B (en) | Method for installing viaduct prefabricated cover beam | |
BRPI0819334A2 (en) | Process for hardening annular groove flanges of a steel piston annular groove by means of a laser beam | |
EP4339303A4 (en) | Method for refining molten steel | |
RU2010118262A (en) | METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE | |
KR102213088B9 (en) | Precast concrete girder for used by continuous construction method | |
ZA201004410B (en) | Method for the installation of railway tracks on ballast, without an auxiliary track | |
ZA202110787B (en) | Coating pretreatment method for steel structure bridge | |
GB2603201B (en) | Bogie for a light rail system | |
ZA202109161B (en) | Calculation method for orthotropic steel bridge deck | |
ES1299265Y (en) | SUPPORT FOR THE REPAIR AND MAINTENANCE OF BICYCLES | |
GB2621708B (en) | Railway Infrastructure for a Light Rail System | |
GB2602688B (en) | Railway infrastructure for a light rail system | |
ZA202110786B (en) | Repair and regeneration pretreatment method for corroded area of steel structure bridge | |
ZA202201614B (en) | Fixing support for bridge engineering | |
GB202319961D0 (en) | Method for constructing ultra-high main tower of cable stayed bridge | |
GB202101416D0 (en) | Bogie for a light rail system | |
GB202318071D0 (en) | Installing a slab for a slab track installation | |
PH12017000175A1 (en) | Steel box girder continuous bridge and construction methods thereof | |
MA55569A (en) | SUPPORT STRUCTURE FOR TEMPORARY RAILWAY SUPPORT | |
FR2872829B1 (en) | METHOD OF INSTALLATION OF ENCLOSED RAILWAY, MEANS FOR ITS IMPLEMENTATION AND RAILWAY OBTAINED | |
CA214313S (en) | Temporary bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
789A | Request for publication of translation (sect. 89(a)/1977) |
Ref document number: 2021238024 Country of ref document: WO |