GB2505505A - Ground source energy system for an outdoor traffic-bearing surface - Google Patents

Ground source energy system for an outdoor traffic-bearing surface Download PDF

Info

Publication number
GB2505505A
GB2505505A GB1215695.6A GB201215695A GB2505505A GB 2505505 A GB2505505 A GB 2505505A GB 201215695 A GB201215695 A GB 201215695A GB 2505505 A GB2505505 A GB 2505505A
Authority
GB
United Kingdom
Prior art keywords
piping
bearing surface
traffic
heat transfer
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB1215695.6A
Other versions
GB201215695D0 (en
Inventor
Iain James Howley
Andrew David Howley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LOOPMASTER EUROP Ltd
Original Assignee
LOOPMASTER EUROP Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LOOPMASTER EUROP Ltd filed Critical LOOPMASTER EUROP Ltd
Priority to GB1215695.6A priority Critical patent/GB2505505A/en
Publication of GB201215695D0 publication Critical patent/GB201215695D0/en
Priority to PCT/GB2013/052291 priority patent/WO2014033475A1/en
Publication of GB2505505A publication Critical patent/GB2505505A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • E01C11/26Permanently installed heating or blowing devices ; Mounting thereof
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H5/00Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
    • E01H5/10Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice by application of heat for melting snow or ice, whether cleared or not, combined or not with clearing or removing mud or water, e.g. burners for melting in situ, heated clearing instruments; Cleaning snow by blowing or suction only
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • F24T10/10Geothermal collectors with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

A method for providing a ground source energy system for reducing the build-up of ice on an outdoor traffic-bearing surface 100, such as an airport stand, involves forming at least one borehole adjacent the traffic-bearing surface, installing flow and return ground piping 106 into the borehole(s), and filling the ground piping with a first heat transfer fluid. The method further comprises forming at least one slot in the outdoor traffic-bearing surface, installing flow and return surface piping (110, fig.1) in the slot(s) with the surface piping embedded in the traffic-bearing surface, sealing the surface piping in place, and filling the surface piping with a second heat transfer fluid. An interchange, such as a manifold, is provided between the first and second heat transfer fluids, and a pumping mechanism is included to circulate the heat transfer fluids in the piping. The method is designed to enable quick and efficient installation of heating elements in the traffic-bearing surface, thus minimising the time that the surface is out of service. The system may be used in other areas of an airport such as service roads, taxi-ways and runways and may be used with other outdoor traffic-bearing surfaces such as car-parks and plazas.

Description

"A ground source energy system for an outdoor traffic-bearing surface" [0001] This invention relates to a method for providing a ground source energy system for reducing the build-up of ice on an outdoor traffic-bearing surface, the steps of the method comprising forming at least one borehole adjacent the traffic-bearing surface; installing flow and return ground piping into the at least one borehole, filling the ground piping with a first heat transfer fluid; installing flow and return surface piping in the traffic-bearing surface; filling the surface piping with a second heat transfer fluid; providing an interchange between the first heat transfer fluid and the second heat transfer fluid; and a pumping mechanism to circulate the heat transfer fluids in the piping.
[0002] In regions of the world where snow and ice are a characteristic of the climate conditions, there is always potential for disruption and danger to any type ot vehicular or foot.
[0003] Where wintery conditions are realized, the conditions can and do adversely affect airports. The difficulties with de-icing and snow clearance of aeroplane stands, service roads, taxi-ways and runways at a busy airport cannot be underestimated.
[0004] Traditionally, airports that suffer from snow and ice precipitation deal with the problem in a reactive manner with snow clearing machinery and chemical de-icing solutions. There are, however, a number of disadvantages associated with this situation.
[0005] Firstly, the unpredictability of weather patterns gives rise to hugely complex snow and ice emergency plans as large quantities of equipment, such as de-icing chemicals and snow ploughs, and large numbers of personnel must be organised. Additionally, there are clear difficulties with de-icing and snow clearance of an aeroplane stand when an aeroplane occupies that stand.
[0006] Furthermore, in particularly extreme conditions, for example an abnormally heavy snow fall, lower than average temperatures or prolonged periods of snow and ice, airport maintenance staff struggle to cope. This can lead to disruption severe enough to impact the normal airport operations. This in turn leads to considerable inconvenience for travellers; lost revenue for the airport operators and airlines; and exposes the airport operators to media criticism.
[0007] On the other hand, preventive solutions, such as burying heating elements of some sort under the surface, can be difficult to implement, particularly as a retro-fit solution in existing airports. Such solutions involve carrying out significant works on the areas in question, digging up large areas, installing the heating elements, and then replacing the surface. Such installation work amounts to a significant disruption of airport operations as it causes the area in question to be out of commission for a long time. A busy airport, 01 indeed car park or the like, cannot tolerate sections of hard-standing being out of commission while work is carried out. Furthermore, the expense associated with taking up a surface and relaying it over heating elements is prohibitive, especially if the surface area concerned is not necessarily in need of replacement at that time.
[0008] It is therefore an object of the present invention to overcome at least some of the above-mentioned problems.
BRIEF SUMMARY OF THE DISCLOSURE
[0009] According to the invention there is provided a method providing a ground source energy system for reducing the build-up of ice on an outdoor traffic-bearing surface, the steps of the method comprising: forming at least one borehole adjacent the traffic-bearing surface; installing flow and return ground piping into the at least one borehole, filling the ground piping with a first heat transfer fluid; forming at least one slot in the outdoor traffic-bearing surface; installing flow and return surface piping in the at least one slot such that the surface piping is embedded in the traffic-bearing surface; sealing the surface piping in place; filling the surface piping with a second heat transfer fluid; providing an interchange between the first heat transfer fluid and the second heat transfer fluid; and a pumping mechanism to circulate the heat transfer fluids in the piping.
[0010] In this way! a ground source energy system can be installed quickly and conveniently for the traffic-bearing surface, for example an airport stand. By embedding the surface pipework in the surface, rather than burying it underneath, the installation of the surface pipework can be carried out very quickly. Milling slots into the surface, rather than taking up the whole surface, is convenient and expedient. Typically, the work involved can be carried out at night, in the existing downtime of the airport. The significant work involved in forming the boreholes for the ground pipework can be carried out away from the working area the traffic-bearing surface or at an adjacent non-traffic bearing surface..
The invention has the further advantage of limited waste generation. The milling of slots for embedded pipework generates only a small amount of waste, compared to that generated by completely removing and replacing the surface in question so as to bury suitable piping beneath it. Furthermore, the reduction of ice build-up on working outdoor surfaces provides clear safety improvements, ensuring that the surfaces in question are safe for foot and vehicle (including aeroplane) traffic. Additionally, the use a ground source energy system in this way reduces or eliminates the use of chemical de-icers for the surface in question, which saves the cost of these products and is also more environmentally friendly. Finally, a ground source energy pump of this nature is a renewable energy source, only requiring external power for the pumps to circulate the heat transfer fluids. Again this is more cost effective and more environmentally friendly than current solutions. The present invention allows the airport or the like to function at a normal or near normal operational basis with only limited disruption.
[0011] In one embodiment of the invention there is provided a method in which the first heat transfer fluid and the second heat transfer fluid are the same and the step of providing an interchange comprises providing a manifold for putting the surface piping and the ground piping in fluid communication. In this way, there is direct fluid communication between the ground piping and the surface piping by way of the manifold. This is a simple and efficient manner of providing heat transfer between the ground and the traffic-bearing surface.
[0012] In another embodiment of the invention there is provided a method in which the step of providing the manifold comprises installing the manifold in a chamber beneath the traffic-bearing surface. In this way, the manifold will not form an obstacle on the traffic bearing surface. The chamber may alternatively be located adjacent the traffic-bearing surface.
[0013] In a further embodiment of the invention there is provided a method in which the first heat transfer fluid and the second heat transfer fluid are the same and the step of providing an interchange comprises providing a heat pump.
[0014] In an embodiment of the invention there is provided a method in which the first heat transfer fluid and the second heat transfer fluid are the same and the step of providing an interchange comprises pioviding a heat exchanger for transmitting heat between the first heat transfer fluid and the second hear transfer fluid. In this way, there is no direct fluid communication between the heat transfer fluids.
[0015] In one embodiment of the invention there is provided a method in which the step of forming at least one slot in the outdoor traffic-bearing surface comprises forming a perimeter slot surrounding the traffic-bearing surface. In this way, the area of the traffic-bearing surface to be the subject of the method of invention can be defined by the perimeter slot, separating the working area of the surface, that require protection from ice build-up, from surface areas that do not require ice-reduction treatment.
[0016] In an embodiment of the invention there is provided a method comprising the step of forming at least one branch slot in the traffic-bearing surface, the branch slot projecting from the perimeter slot. In this way, the branch slots may be used to provide surface piping to areas enclosed by the perimeter slot, increasing the surface area protected by the ground source energy system.
[0017] In a further embodiment of the invention there is provided a method in which the step of forming the at least one branch slot comprises forming at least one slot that is a different width to the perimeter slot. In this way, surface piping of different widths may be used, allowing low pressure flow to be implemented therein, reducing the specifications for the pumping mechanism.
[0018] In another embodiment of the invention there is provided a method comprising forming a plurality of spaced-apart branch slots. In this way, the surface area protected by the surface piping is further increased.
[0019] In one embodiment of the invention there is provided a method comprising the step of forming a plurality of parallel spaced-apart branch slots. Keeping the branch slots substantially parallel to each other allows the regular and even coverage of the traffic-bearing surface.
[0020] In a further embodiment of the invention there is provided a method comprising the step of forming adjacent branch slots spaced apart by a distance of 500mm. This provides for an efficient spacing of surface piping.
[0021] In a further embodiment of the invention there is provided a method comprising the step of arranging the surface piping substantially horizontally in the at least one slot. In this way, the surface piping corresponds with the traffic bearing surface.
[0022] In another embodiment of the invention there is provided a method in which the step of sealing the surface piping in place comprises sealing the piping in place with a fill material comprising synthetic resin. This is a particularly effective way of securing the surface pipework in place and also strengthening the surface of the slots. Alternatively, the surface piping may be sealed in place using fill material comprising a cementitious material, or a combination of synthetic resin and cementitious fill material.
[0023] In a further embodiment of the invention there is provided a method in which the step of sealing the surface piping in place comprises sealing the surface piping in place with a dark coloured fill material. In this way, the synthetic resin will absorb more energy from the sun, thus heating the second heat transfer fluid more effectively, and allowing for improved energy transfer and increased energy storage. Preferably, the synthetic resin is black for maximum energy absorption. Alternatively, the resin may be adapted to be similar in colour to the existing surface.
[0024] In an alternative embodiment of the invention there is provided a method in which the step of forming at least one borehole comprises forming a borehole to a depth of greater than 55 metres below ground level. This is a particularly effective depth for storage of heat energy in the ground.
[0025] In one embodiment of the invention there is provided a method in which the step of forming at least one borehole comprises forming a substantially vertical borehole. This is a particularly convenient way to reach the required depth.
[0026] In another embodiment of the invention there is provided a method in which the step of forming at least one borehole comprises forming a borehole between 100 mm and 650 mm in diameter. This provides for a wide range of borehole diameters for placing one or more flow and return sets of ground piping. Preferably, the borehole may be 450 mm in diameter.
[0027] In an alternative embodiment of the invention there is provided a method in which the first heat transfer fluid and the second heat transfer fluid are the same and in which the step of providing an interchange comprises providing a direct fluid communication between the vertical piping and the surface piping. In this way, there is a direct transfer of heat from the ground to the surface or vice versa.
[0028] In a further embodiment of the invention there is provided a method in which the step of forming at least one slot in the outdoor traffic-bearing surface comprises using a planing machine with a milling attachment. A milling attachment on a planing machine is an effective and convenient way of forming the slots in the outdoor traffic-bearing surface.
Preferably, the milling attachment comprises a drum having at least one cutting tool thereon. A method as claimed in claim 19 in which the milling attachment comprises a drum having at least one cutting tool thereon. The width of the at least one cutting tool is adjustable. In a preferred embodiment the drum comprises a plurality of cutting tools, where the spacing between the plurality of cutting tools may be adjustable. In this way, the milling attachment may be used to form more than one slot at a time; may be used to form slots of different thicknesses; and may be used to form slots at variable spacings. The cutting tool may be adapted to forms slots of variable depth.
[0029] According to a further embodiment of the invention, there is provided an outdoor traffic-bearing surface comprising a ground source energy system, the ground source energy system comprising ground piping located in at least one borehole, the ground piping containing a first heat transfer fluid; surface piping embedded in at least one slot formed in the traffic-bearing surface and sealed therein, the surface piping being sealed in place and containing a second heat transfer fluid; an interchange that facilitates heat transfer between the first heat transfer fluid and the second heat transfer fluid; and a pumping mechanism for circulating the heat transfer fluids in the piping. In this way, the outdoor traffic-bearing surface is provided with a ground source energy system with minimal disturbance to the surface. The use of slots and embedded surface piping allow for the heating of the traffic-bearing surface without having to bury the surface-interacting parts, involving significant disturbance of the surface.
[0030] In a further embodiment of the invention there is provided an outdoor traffic-bearing surface in which the at least one borehole is substantially vertical.
[0031] In an alternative embodiment of the invention there is provided an outdoor traffic-bearing surface in which the at least one borehole is approximately 450 mm in diameter.
[0032] In one embodiment of the invention there is provided an outdoor traffic-bearing surface in which the at least one borehole has a depth greater than 55 metres below ground level.
[0033] In another embodiment of the invention there is provided an outdoor traffic-bearing surface in which the at least one borehole has a depth greater than 55 metres below ground level.
[0034] In a further embodiment of the invention there is provided an outdoor traffic-bearing surface further comprising a perimeter slot surrounding the at least one slot, the perimeter slot further comprising surface piping.
[0035] In an alternative embodiment of the invention there is provided an outdoor traffic-bearing surface in which the surface piping is sealed in place with a synthetic or cementitious resin.
[0036] In a further embodiment of the invention there is provided an outdoor traffic-bearing surface in which the synthetic resin in dark in colour.
[0037] In an alternative embodiment of the invention there is provided an outdoor traffic-bearing surface in which the slot comprises adjoining slot sections of different dimensions.
[0038] In one embodiment of the invention there is provided an outdoor traffic-bearing surface in which the surface piping is arranged substantially horizontally.
[0039] In another embodiment of the invention there is provided an outdoor traffic-bearing surface in which the first heat transfer fluid and the second heat transfer fluid are the same and the interchange comprises a direct fluid communication between the ground piping and the surface piping.
[0040] In a further embodiment of the invention there is provided an outdoor traffic-bearing surface in which the interchange comprises a heat exchanger.
[0041] In an alternative embodiment of the invention there is provided an outdoor traffic-bearing surface in which the interchange is located within a chamber beneath the surface.
BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Embodiments of the invention are further described hereinafter with reference to the accompanying drawings, in which: Fig. 1 is a diagrammatic representation of an airport stand modified according to the invention; Fig. 2 is diagrammatic representation of an airport stand including the soil strata thereunder; Fig. 3 is a cross-section view of a slot according to the invention comprising a portion of surface piping; Fig. 4 is a flow chart for the design and installation of a ground source energy system according to the invention; and Figs. 5(a), (b), and (c) are a plan, isometric and close-up isometric views respectively of an embodiment of milling attachment for use in the method of the invention.
DETAILED DESCRIPTION
[0043] Referring to Figs. 1 and 2 in which there is shown an outdoor traffic-bearing surface 100 in the form of an airport stand, having a terminal building 102 adjoining it, and an aeroplane 104 in place thereon. A ground source energy system has been implemented in the airport stand. The ground source energy system comprises a set of flow and return ground piping 106, extending vertically into the ground 108 in one or more boreholes (not shown) located at the edge of the airport stand. The ground piping 106 contains heat transfer fluid (not shown). The ground source energy system further comprises a set of flow and return surface piping 110 embedded in a set of slots (not shown) milled into the outdoor traffic-bearing surface 100. The surface piping 110 also contain heat transfer fluid (not shown). The surface piping 110 is sealed in place using a fill material (not shown). The ground source energy system further comprises an interchange (not shown), in this case a manifold that facilitates fluid transfer between the ground piping and the surface piping; and a pumping mechanism (not shown) for circulating the heat transfer fluid in the piping 106. 110. The manifold (not shown) is located in an underground chamber 112.
[0044] The heat transfer fluid will typically comprise an ethylene glycol based fluid, which is non-toxic. The pumping mechanism will comprise standard low head pressure circulation pumps.
[0045] The aiipoit stand is suiiounded by a perimetei slot that runs around the edge of the stand, a set of branch slots branch off the perimeter slot and extend across the airport stand. The branch slots are parallel to each other and are spaced approximately 500mm apa it.
[0046] The ground pipes are fitted in boreholes drilled in a non-traffic or low-traffic area.
The boreholes may be drilled in the outdoor traffic-beanng surface or in a suitable adjacent location. The boreholes are approximately 450mm diameter and drilled to a depth of 60m.
Each borehole is equipped with a number of flow and return ground pipes, for example three flow and return pipes per borehole. The design and implementation of the boreholes and ground pipes may vary as required for a particular installation according to the invention. Once the ground pipes are in place in the boreholes, the boreholes may be filled with a suitable grout to maximize heat transfer. Dnlling boreholes is a more obtrusive operation than milling slots in a surface, therefore it is preferable to carry out the borehole work away from busy or high-traffic areas.
[0047] Referring now to Fig. 3, there is shown a cross-section view of a portion of surface pipe 110 in its slot 200 formed in the outdoor traffic-bearing surface 100. The surface pipe 110 has been surrounded by a fill material 202 in the slot. The piping may be sealed in place with a fill material comprising synthetic resin, cementitious fill material or a combination of synthetic resin and cementitious fill. The fill material will be chosen to provide the required strength and may be stronger than the original material of the traffic-bearing surface.
[0048] Referring now to Fig. 4, there is shown a flow chart of the method for design and installation of the ground source energy system according to the invention. In step 300, the outdoor traffic bearing surface to be protected from ice and snow is surveyed so as to identify the dimensions thereof and further to identify any fixed structures or other obstacles in the area that need to be accommodated. For example, a typical airport stand is measures 80 metres by 80 metres, giving a stand area of 6,400 m2. If this whole stand area is to be protected from snow and ice build-up, then that whole area must be equipped with embedded surface piping. For maximum efficiency, the surface piping should be spaced apart no more than 500 mm. These dimensions indicate that approximately 12,800m of pipe will be required for that stand, based on the following calculation 80m x 80m x 2 pipe runs per meter.
[0049] Next in step 302, the ground source energy system of the invention is designed, including specifying the quantity, diameter, depth, spacing and location of the boreholes for the ground pipes and the number of flow and return ground pipes will be titted in each borehole. Similarly, the quantity, width, depth, spacing and path of the slots of the surface pipes are calculated, as well as the diameter of the surface piping to be fitted at different sections of the slot. In order to effectively distribute and collect heat via the surface piping, the design must take into consideration the flow path and pressure loss calculations associated with circulating the second heat transfer fluid through the surface piping. To achieve optimum performance -that is a turbulent flow with Reynolds number of circa 2500 -sizing of the surface piping is important. The surface piping will be configured to reflect several circuits and will reduce in diameter (according to the pressure calculations as the piping progresses across the target area) to 75mm and then to 63mm, 50mm, 40mm and 32mm. The differing pipe sizes will determine the slot dimension for each section of the installation.
[0050] Next, in step 304 work begins on the installation of the ground source energy system with the milling of a perimeter slot around the full perimeter of the traffic-bearing surface to be protected. Typically, the perimeter slot will be 100mm wide by 100mm deep.
At this time, the perimeter slot is used to accommodate a pair of primary feed and return pipes to connect the outdoor traffic-bearing surface in question to the manifold. Such primary feed and return pipes will typically have a diameter of 90 mm, so slots of 100 mm by 100 mm are used for these pipes.
[0051] Next in step 306, the branch slots for the remaining surface piping are formed. As discussed in relation to step 302, the slots will be of different dimensions to allow for optimum operation. The slots of are formed using a standard planing machine, as is known in the art for use in road works. The planning machine is fitted with a milling attachment adapted to generate slots of the desired width and depth. Typically, the milling attachment is equipped to form a plurality of spaced apart parallel slots simultaneously. In a preferred arrangement, the milling attachment is four metres wide, allowing for the milling of eight slots simultaneously, with a centreline to centreline distance of 500 mm.
[0052] Next, in step 308, the surface piping is installed in the slots. Again, as discussed in relation to the design process in step 302, the surface piping will have different diameters as it travels along the slot in the traffic-bearing surface. The piping may manufactured from polyethylene PE100+ or cross-linked polyethylene (PEX) and may be joined together using a fusion weld technique. The surface piping may be held in place once installed by a temporary fix, such as pins or weights. The heat transfer fluid and suitable circulation pumps to circulate that heat transfer fluid in the surface piping, the ground piping and to and from the manifold and also installed.
[0053] In step 310, a fill material is backfilled into the slots so as to fill the remaining space around the surface piping. The fill material may be black or otherwise dark coloured so as to increase energy absorption from the sun. Preferably, the fill material is reasonably quick-setting with good heat transfer properties. The resin will form a level finish with the surrounding surface. Once the resin has set, any temporary measures used to hold the piping in place may be removed.
[0054] In step 312, the surface piping is connected to the manifold via the pair of primary feed and return pipes. The manifold is preferably located in an underground chamber.
Preferably, the underground chamber is located away from the airport stand or the like to minimise disturbance from its construction, and is 1500mm by 1500mm by 1500 mm, with a suitable access lid.
[0055] In steps 314, 316 and 318, which may take place prior to, after, or at the same time as steps 304 to 312, the method of installation of the ground piping is outlined. First in step 314, the boreholes are drilled to the dimensions specified at the design stage in step 312. Next in step 316, the ground piping is installed in the boreholes. The boreholes may then be filled with a heat-conducting grout to aid heat transfer between the ground pipes and the ground. Finally, in step 318, the ground piping is connected to the manifold, either directly or via a suitable set of feed and return pipes. The ground piping is filled with the heat transfer fluid, and suitable circulation pumps are fitted to circulate the heat transfer fluid in the ground piping, to the manifold and in the surface piping.
[0056] During the summer months, the surface piping embedded in the tarmac or the like of the outdoor traffic-bearing surface act as solar collectors. The heat transfer fluid contained within the surface piping embedded into the airport hard-standing area will warm up as the piping gets hot and a the pumping mechanism directs the warmed fluid to the ground piping in the boreholes. The majority of the heat is retained within the strata of the ground until the winter season demands that it is returned to the surface piping so as to prevent ice from building-up on the traffic-bearing surface and causing disruption to the airport operation.
[0057] Referring now to Figs.(a). (b) and (c), there is shown an embodiment of a milling attachment for a planing machine. The milling attachment may be used to form the slots in the traffic-bearing surface according to the method of the invention. The milling attachment, indicated generally by the reference numeral 500, comprises a wide circular drum 502 with a plurality of spaced apart ring-like cutting blades 504 projecting therefrom.
The cutting blades 504 may a number of cutting or grinding teeth or other suitable means for cutting typical hard-standing surfaces. The location of the cutting blades 504 on the drum 502 may be varied so as to make slots at different spacings. Similarly, the thickness of the cutting blades may be varied so that the width of the slots can be varied. The drum may be fitted with more or fewer cutting blades as required to form the desired slot pattern.
[0058] Throughout the specification, the person skilled in the art will understand that, while the invention is suitable for use in areas of an airport, including but not limited to airport stands and taxi-ways, the invention is not limited to use in airports but may also be used in other facilities having areas of hard-standing where a build-up of snow and/or ice would be undesirable, for example, car parks, outdoor plazas and the like. Similarly, the details of the invention will vary according the size, location, purpose, and other factors of the outdoor traffic-bearing surface to be fitted the ground source energy system. The system described herein in relation to the accompanying figures is an example only and should not be considered as limiting the invention.
[0059] Furthermore, the person skilled in the art will understand references to ice, snow or the like to encompass ice, snow, hail, frost and other such cold-weather substances whose build up on the a traffic bearing surface would render human or vehicle movement on the surface dangerous.
[0060] It will be understood that while the borehole for use in the invention is preferably vertical, it is not necessarily so, and may reach the required depth by travelling at an angle through the ground, or by a combination of vertical and angled portions.
[0061] Throughout the description and claims of this specification, the words "comprise" and "contain" and variations of them mean "including but not limited to", and they are not intended to (and do not) exclude other components, integers or steps. Throughout the description and claims of this specification, the singular encompasses the plural unless the context otherwise requires. In particular, where the indefinite article is used, the specification is to be understood as contemplating plurality as well as singularity, unless the context requires otherwise.
[0062] The present application relates to a method tor installing a ground source energy system for preventing build-up of ice on an outdoor traffic-bearing surface, and an outdoor traffic-bearing surface equipped with such a ground sour heat pump. The method of the invention allows for installation of the heating elements in the traffic bearing surface in a quick and efficient manner, thus minimising the time that the traffic-bearing surface is out of service. The invention is described in relation to an airport stand but may also be used in other areas of an airport such as service roads, taxi-way and runways; and may be used with other outdoor traffic bearing surfaces such as car-parks, plazas and the like.
[0063] Features, integers, characteristics, compounds, chemical moieties or groups described in conjunction with a particular aspect, embodiment or example of the invention are to be understood to be applicable to any other aspect, embodiment or example described herein unless incompatible therewith. All of the features disclosed in this specification (including any accompanying claims, abstract and drawings), and/or all of the steps of any method or process so disclosed, may be combined in any combination, except combinations where at least some of such features and/or steps are mutually exclusive. The invention is not restricted to the details of any foregoing embodiments.
The invention extends to any novel one, or any novel combination, of the features disclosed in this specification (including any accompanying claims, abstract and drawings), or to any novel one, or any novel combination, of the steps of any method or process so disclosed.
[0064] The reader's attention is directed to all papers and documents which are filed concurrently with or previous to this specification in connection with this application and which are open to public inspection with this specification, and the contents of all such papers and documents are incorporated herein by reference.

Claims (42)

  1. CLAIMS1. A method for providing a ground source energy system for reducing the build-up of ice on an outdoor traffic-bearing surface, the steps of the method comprising: forming at least one borehole adjacent the traffic-bearing surface; installing flow and return ground piping into the at least one borehole, filling the ground piping with a first heat transfer fluid; forming at least one slot in the outdoor traffic-bearing surface; installing flow and return surface piping in the at least one slot such that the surface piping is embedded in the traffic-bearing surface; sealing the surface piping in place; filling the surface piping with a second heat transfer fluid; providing an interchange between the first heat transfer fluid and the second heat transfer fluid; and a pumping mechanism to circulate the heat transfer fluids in the piping.
  2. 2. A method as claimed in claim 1 in which the first heat transfer fluid and the second heat transfer fluid are the same and the step of providing an interchange comprises providing a manifold for putting the surface piping and the ground piping in fluid communication.
  3. 3. A method as claimed in claim 2 in which the step of providing the manifold comprises installing the manifold in a chamber beneath the traffic-bearing surface.
  4. 4. A method as claimed in claim 1 in which the first heat transfer fluid and the second heat transfer fluid are the same and the step of providing an interchange comprises providing a heat pump.
  5. 5. A method as claimed in claim 1 in which the first heat transfer fluid and the second heat transfer fluid are the same and the step of providing an interchange comprises providing a heat exchanger for transmitting heat between the first heat transfer fluid and the second hear transfer fluid.
  6. 6. A method as claimed in any preceding claim in which the step of forming at least one slot in the outdoor traffic-bearing surface comprises forming a perimeter slot surrounding the traffic-bearing surface.
  7. 7. A method as claimed in claim 6 complising forming at least one branch slot in the traffic-bearing surface, the branch slot projecting from the perimeter slot.
  8. 8. A method as claimed in claim 7 in which the step of forming the at least one branch slot comprises forming at least one slot that is a different width to the perimeter slot.
  9. 9. A method as claimed in claim 8 comprising forming a plurality of spaced-apart branch slots.
  10. 10. A method as claimed in claim 9 comprising the step of forming a plurality of parallel spaced-apart branch slots.
  11. 11. A method as claimed in claim 10 in which comprising the step of forming adjacent bianch slots spaced apait by a distance of 500mm.
  12. 12. A method as claimed in any preceding claim comprising the step of arranging the surface piping substantially horizontally in the at least one slot.
  13. 13. A method as claimed in any preceding claim in which the step of sealing the surface piping in place comprises sealing the piping in place with a fill material comprising a synthetic resin.
  14. 14. A method as claimed in any preceding claim in which the step of sealing the surface piping in place comprises sealing the piping in place with a fill material comprising a cementitious material.
  15. 15. A method as claimed in claim 13 or 14 in which the step of sealing the surface piping in place comprises sealing the surface piping in place with a daik coloured fill material.
  16. 16. A method as claimed in any preceding claim in which the step of forming at least one borehole comprises forming a borehole to a depth of greater than 55 metres below ground level.
  17. 17. A method as claimed in any preceding claim in which the step of forming at least one borehole comprises forming a substantially vertical borehole.
  18. 18. A method as claimed in any preceding claim in which the step of forming at least one borehole comprises forming a boiehole between 100mm and 650mm in diametei.
  19. 19. A method as claimed in any preceding claim in which the step of forming at least one slot in the outdoor traffic-bearing surface comprising using a planing machine with a milling attachment.
  20. 20. A method as claimed in claim 19 in which the milling attachment comprises a drum having at least one cutting tool thereon.
  21. 21. A method as claimed in claim 19 in which the width of the at least one cutting tool isadjustable.
  22. 22. A method as claimed in claim 20 or 21 in which the drum comprises a plurality of cutting tools.
  23. 23. A method as claimed in claim 22 in which the spacing between the plurality of cutting tools is adjustable.
  24. 24. An outdoor traffic-bearing surface comprising a ground source energy system, the ground source energy systeni comprising ground piping located in at least one borehole, the ground piping containing a first heat tiansfer fluid; surface piping embedded in at least one slot formed in the tiaffic-bearing surface and sealed therein, the surface piping being sealed in place and containing a second heat transfer fluid; an interchange between the first heat transfer fluid and the second heat transfer fluid; and a pumping mechanism for circulating the heat transfer fluids in the piping.
  25. 25. An outdoor traffic-bearing surface as claimed in claim 24 in which the interchange comprises a manifold for putting the surface piping and the ground piping in fluid communication.
  26. 26. An outdoor traffic-bearing surface as claimed in claim 25 in which the manifold is located within a chambei beneath the tiaffic-beaiing surface.
  27. 27. An outdooi tiaffic-bearing surface as claimed in claim 24 in which the interchange comprises a heat pump.
  28. 28. An outdooi tiaffic-bearing surface as claimed in claim 24 in which the interchange comprises a heat exchanger for transmitting heat between the first heat transfer fluid and the second heat transfer fluid.
  29. 29. An outdoor traffic-bearing surface as claimed in any of claims 24 to 28 in which the at least one slot comprises a perimeter slot bordering the outdoor traffic-bearing surface.
  30. 30. An outdoor traffic-bearing surface as claimed in claim 29 further comprising at least one bianch slot in the traffic-beating surface, the branch slot projecting from the perimetel slot.
  31. 31. An outdooi tiaffic-bearing surface as claimed claims 29 or 30 in which the at least one branch slot is a different width to the perimeter slot.
  32. 32. An outdoor traffic-bearing surface as claimed in claims 30 to 31 comprising a plurality of spaced-apart branch slots in the traffic-bearing surface.
  33. 33. An outdoor traffic-bearing surface as claimed in claim 32 in which the spaced-apart branch slots are mutually parallel.
  34. 34. An outdoor traffic-bearing surface as claimed in claim 33 in which the branch slots are spaced-apart by 500 mm.
  35. 35. An outdoor traffic-bearing surface as claimed in any of claims 24 to 35 in which the surface piping is arranged substantially horizontally.
  36. 36. An outdoor traffic-bearing surface as claimed in any of claims 24 to 35 in which the surface piping is sealed in place with a fill material comprising a synthetic resin.
  37. 37. An outdoor traffic-bearing surface as claimed in any of claims 24 to 36 in which the surface piping is sealed in place with a fill material comprising a cementitious material.
  38. 38. An outdoor traffic-bearing surface as claimed in claim 36 or 37 in which the fill material dark in colour.
  39. 39. An outdoor traffic-bearing surface as claimed in any of claims 24 to 38 in which the at least one borehole is substantially vertical.
  40. 40. An outdoor traffic-bearing surface as claimed in claim 24 or 39 in which the at least one borehole is between 100mm and 650 mm in diameter.
  41. 41. An outdoor traffic-bearing surface as claimed in any of claims 24 to 40 in which the at least one borehole has a depth greater than 55 metres below ground level
  42. 42. An outdoor traffic-bearing surface as claimed in any of claims 24 to 41 in which the at least one slot in the outdoor traffic-bearing surface is a milled slot.
GB1215695.6A 2012-09-03 2012-09-03 Ground source energy system for an outdoor traffic-bearing surface Withdrawn GB2505505A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB1215695.6A GB2505505A (en) 2012-09-03 2012-09-03 Ground source energy system for an outdoor traffic-bearing surface
PCT/GB2013/052291 WO2014033475A1 (en) 2012-09-03 2013-09-02 A ground source energy system for an outdoor traffic-bearing surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1215695.6A GB2505505A (en) 2012-09-03 2012-09-03 Ground source energy system for an outdoor traffic-bearing surface

Publications (2)

Publication Number Publication Date
GB201215695D0 GB201215695D0 (en) 2012-10-17
GB2505505A true GB2505505A (en) 2014-03-05

Family

ID=47075182

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1215695.6A Withdrawn GB2505505A (en) 2012-09-03 2012-09-03 Ground source energy system for an outdoor traffic-bearing surface

Country Status (2)

Country Link
GB (1) GB2505505A (en)
WO (1) WO2014033475A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863036A (en) * 2015-05-30 2015-08-26 北京中企卓创科技发展有限公司 Intelligent monitoring heating system for snow melting and deicing of airport pavement
CN111798144B (en) * 2020-07-08 2023-12-05 大连海事大学 Body-based energy pile bridge surface deicing system evaluation method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3217155A1 (en) * 1982-05-07 1983-07-14 Daimler-Benz Ag, 7000 Stuttgart Carriageway heating system supplied with terrestrial heat
CH664178A5 (en) * 1984-06-19 1988-02-15 Shf Ag Road ice prevention equipment - has pipes laid in surface forming grating connected to probe in subsoil
JPH07190503A (en) * 1993-12-27 1995-07-28 Fumio Hiraga Method and apparatus for collecting terrestrial heat
JPH10280310A (en) * 1997-04-02 1998-10-20 Nippon Steel Corp Snow-thawing device by use of underground heat-accumulation system
JP2003014335A (en) * 2001-06-27 2003-01-15 Kubota Corp Snow melting equipment
JP2003301434A (en) * 2002-04-12 2003-10-24 Misawa Kankyo Gijutsu Kk Thawing device utilizing terrestrial heat
JP2003307353A (en) * 2002-04-15 2003-10-31 Misawa Kankyo Gijutsu Kk Antifreeze circulation-type device for utilizing underground heat
JP2004052385A (en) * 2002-07-22 2004-02-19 Misawa Kankyo Gijutsu Kk Hybrid geotheremal snow melter
KR100969985B1 (en) * 2010-02-09 2010-07-15 주식회사 지지케이 Device of freezing of the road surface using earth heat

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3217155A1 (en) * 1982-05-07 1983-07-14 Daimler-Benz Ag, 7000 Stuttgart Carriageway heating system supplied with terrestrial heat
CH664178A5 (en) * 1984-06-19 1988-02-15 Shf Ag Road ice prevention equipment - has pipes laid in surface forming grating connected to probe in subsoil
JPH07190503A (en) * 1993-12-27 1995-07-28 Fumio Hiraga Method and apparatus for collecting terrestrial heat
JPH10280310A (en) * 1997-04-02 1998-10-20 Nippon Steel Corp Snow-thawing device by use of underground heat-accumulation system
JP2003014335A (en) * 2001-06-27 2003-01-15 Kubota Corp Snow melting equipment
JP2003301434A (en) * 2002-04-12 2003-10-24 Misawa Kankyo Gijutsu Kk Thawing device utilizing terrestrial heat
JP2003307353A (en) * 2002-04-15 2003-10-31 Misawa Kankyo Gijutsu Kk Antifreeze circulation-type device for utilizing underground heat
JP2004052385A (en) * 2002-07-22 2004-02-19 Misawa Kankyo Gijutsu Kk Hybrid geotheremal snow melter
KR100969985B1 (en) * 2010-02-09 2010-07-15 주식회사 지지케이 Device of freezing of the road surface using earth heat

Also Published As

Publication number Publication date
GB201215695D0 (en) 2012-10-17
WO2014033475A1 (en) 2014-03-06

Similar Documents

Publication Publication Date Title
US4693300A (en) Method and apparatus for sprinklerless snow control
JP6109248B2 (en) Solar heat storage snow melting system and control method thereof.
CN208201566U (en) Active ground source-air-source snow melt deicing device
CN208201567U (en) Passive geothermal snow melt deicing device
CA2945638C (en) A system for inductive power transfer, a pavement slab assembly and a method of operating a system for inductive power transfer
CN101553662A (en) A wind energy converter, a method and use hereof
PT1490552E (en) Safety improvements for airport runways and taxiways
CN104594156B (en) Utilize the deicing or snow melting system of underground heat in tunnel
CN106012829A (en) Heating system for bridge pavement and construction method
GB2505505A (en) Ground source energy system for an outdoor traffic-bearing surface
CN103061230A (en) Construction method of technology utilizing ground source heat pump to cool and melt frozen road surfaces and drain boards for construction
WO2014143687A1 (en) Premeable paving system
JP2008304141A (en) Heat storage snow melting system using solar heat
CN107360751B (en) Sand-fixing greening method
CN201933383U (en) Low-temperature heat pipe road surface snow melting device
CN112127457B (en) Method for collecting and processing urban road ice and snow by integrated snow storage and melting space system
CN203654122U (en) Automatic land surface temperature regulating system
EP3454439A1 (en) Method for laying power cables
CN206656514U (en) A kind of ground buried pipe of ground source heat pump system using foundation ditch region
CN205399544U (en) Sponge formula road rain flood resource accumulation utilizes system
CN208235256U (en) A kind of honest formula bridge floor inorganic medium heat pipe snow-melting system of bridge
Tanaka et al. Snow melting using heat pipes
CN206554935U (en) It is a kind of three circle overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel
CN209836728U (en) Highway bridge road surface snow melt deicing equipment based on deep buried pipe energy stake
Mast et al. mast

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)