Prior art keywords
gas
pressure
gas lift
well
jet pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB1210847.8A
Other versions
GB201210847D0 (en
GB2499473B (en
Inventor
Mirza Najam Ali Beg
Mir Mahmood Sarshar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caltec Ltd
Original Assignee
Caltec Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Caltec Ltd filed Critical Caltec Ltd
Publication of GB201210847D0 publication Critical patent/GB201210847D0/en
Priority to PCT/GB2013/050321 priority Critical patent/WO2013124625A2/en
Priority to US14/378,246 priority patent/US20150000926A1/en
Publication of GB2499473A publication Critical patent/GB2499473A/en
Priority to NO20141023A priority patent/NO20141023A1/en
Application granted granted Critical
Publication of GB2499473B publication Critical patent/GB2499473B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift
    • E21B43/123Gas lift valves

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Jet Pumps And Other Pumps (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

An improved gas lift system for use in oil production from a well bore 11 utilising a gas lift injection 10 system having a tube with a plurality of openings or valves at different depths for permitting the ingress of gas to assist upwards fluid flow and further including a boosting unit 16 downstream of the well head 13 for reducing the flowing well head pressure and capable of discharging produced fluid 14 at a pressure required by a downstream production system. The booster unit may be a surface jet pump or eductor.

Description

IMPROVED GAS LIFT SYSTEM FOR OIL PRODUCTION
The use of gas lift, involving the injection of high pressure gas at different depths of an oil well, is well known as an effective way to reduce the hydrostatic head of fluids flowing through the well 5 bore and to increase the velocity of flow in order to prevent liquids building up in the well bore.
In a typical oil production case, particularly when the gas oil ratio (GOR) of the produced fluids is low (typically below 500 Scf/bbl/day) the flow regime of the produced fluids varies within the well bore, dictated mainly by the pressure at each depth. At the lowest points near the production/perforation zone, the flow regime is often single phase turbulent, bubble flow and 10 slug flow. These types of flow regimes arise mainly because of the low velocity of gas at near bottom hole at the prevailing production pressures. These so-called erratic flow regimes cause a significant loss of pressure within the well bore and result in an increase in the flowing bottom hole pressure (FBHP).
A rise in the FBHP will in turn restrict production. At higher levels, nearer the wellhead, the flow 15 regime improves as the produced gas flows at a lower pressure and therefore at a higher apparent velocity and volumetric flow rate. For this reason the flow regime at the well bore sections near the wellhead is more stable and often of dispersed bubble flow type.
A gas lift system increases the velocity of the total gas flowing through the well bore and can change the flow regime within part of the well bore to the more favourable and stable flow 20 regimes such as dispersed bubble flow. This in turn will reduce the FBHP of the well and results in a more stable production rate such that production can increase.
There is an optimum rate at which gas lift is effective, beyond which effectiveness reduces as the high velocity of fluids will increase frictional losses significantly; thus negating the gain from reduction in the hydrostatic head of produced fluids. The pressure of the gas lift gas is dictated 25 by the well depth, injection depth and production pressure at the injection point. Typical gas lift pressure has been 70 to 100 barg, but this is not a limit.
There are, however, the following conditions that can arise in a gas lift system:
There is insufficient amount of lift gas available at the desired pressure to achieve the maximum or optimum level of reduction in the hydrostatic head of fluids and the 30 reduction in the FBHP for achieving maximum production.
The high pressure (HP) gas is not of sufficient pressure to inject it at the lowest parts of the well bore where gas lift is needed and is more effective.
The tubing size restricts the amount of lift gas as excessive frictional losses may be experienced, negating the benefit of lift gas.
35 The above mentioned scenarios restrict production and in some cases could lead to a build up of liquids within the well bore, resulting in erratic production and final seizure of production as the reservoir pressure drops with time.
1
The present invention seeks to address the identified conditions to improve operation of a gas lift system, thereby providing a corresponding improvement in production from an oil well.
In one broad aspect of the invention there is provided an improved gas lift system for use in the production of fluid from a well bore including: an injector for supplying pressurised gas to the well 5 bore; a well head; a tube (also known as "tubing") extending from the well head into the well bore; a plurality of openings or valves at different depths of the tube for permitting the ingress of injected gas to assist fluid flowing upwards through the tube by reducing the hydrostatic pressure; further including a boosting unit downstream of the well head for reducing the flowing well head pressure and capable of discharging produced fluid at a pressure required by a 10 downstream production system.
The improved gas lift system of the invention lowers the flowing wellhead pressure (FWHP) of the well in order to increase production and also to increase the velocity of gas flowing through the well bore. The flowing wellhead pressure (FWHP) of the well is often dictated by the downstream production and process system, however, provision of a dedicated boosting system at surface is a 15 clear advantage because it can reduce the FWHP of the well whilst delivering the produced fluids at the pressure demanded by the downstream production system.
Preferably the boosting unit is a surface jet pump. The use of a surface jet pump (SJP) to reduce the FWHP is a cost effective and simple solution to rectify the problem identified by the first condition above and to improve production from the well. Particularly, by implementing the 20 invention, the flow regime improves within the well bore because the produced fluid flows at a lower pressure and therefore at a higher apparent velocity and volumetric flow rate.
Preferably, the motive HP flow for the SJP could be one of the following: HP gas; HP oil or gas from one or more HP wells; HP liquid phase (oil or water). This HP liquid may be from an available HP source such as injection water or export oil, the pressure of which has been boosted 25 for other reasons.
Typical pressure of the motive high pressure flow of the surface jet pump is twice the flowing wellhead pressure, but the pressure can be several times this value and typically up to 70 barg or higher. The flow rate of the HP flow is also typically equal to or higher than that of the well flow rate to be highly effective in reducing the FWHP by a factor of two or higher.
30 According to the invention, the combined gas lift system (with otherwise limited or not optimum gas lift rate) and the use of a surface jet pump will enhance production in a very cost effective and simple way.
In a second broad aspect of the invention there is provided an improved gas lift system for use in the production of fluids from a well bore including: an injector for supplying pressurised gas to 35 the well bore; a well head; a tube extending from the well head into the well bore; a plurality of openings or gas lift valves at different depths of the tube for permitting the ingress of injected gas to assist fluid flowing upwards through the tube by reducing the hydrostatic pressure; further including a boosting unit upstream of the injector to boost the pressure of the lift gas.
Preferably the boosting unit is a surface jet pump configured to receive low pressure injection gas 40 into a first inlet, the flow rate of gas at the first inlet being increased by a high pressure motive
2
flow capable of being received into a second inlet downstream of a recycle loop from a compressor (e.g. an existing compressor for provision of lift gas or for export of gas by pipeline), wherein the outlet of the surface jet pump is configured to supply gas to the inlet of the gas compression system.
5 This aspect of the invention addresses the problem identified where high pressure gas in the gas lift system is not of sufficient pressure to inject at the lowest parts of the well bore where gas lift is needed and is most effective. The surface jet pump acts as a "pre-boost" pressurisation means before the compressor.
The invention will be further described with reference to the accompanying figures wherein:-10 Figure 1 shows an arrangement of an improved gas lift system according to the invention;
Figure 2 shows in graphical form the additional production achieved as a result of implementing the invention;
Figure 3 illustrates a surface jet pump suitable for use with the present invention; and
Figure 4 illustrates a further improved modification of a gas lift system according to the 15 invention.
Referring to Figure 1, increased oil production in a low GOR well is achieved by implementing a gas lift injection system 10 into a well 11 such that the hydrostatic head of fluids in the extraction tube 12 is reduced. An oil/gas mixture leaves the well head 13 for downstream processing via a pipeline 14.
20 According to known practice, a pressurised upper section 11A of the well 11 is sealed from the pay zone P by a barrier 15 (through which the tube 12 passes) and gas is introduced through the tube 12 wall at different depths via valves or apertures (not pictured in Figure 1). The flow rate of fluid naturally rising through the tube 12 due to underground pressure in the pay zone P is increased by bubbles forming from the injected gas into the tube 12.
25 The gas lift system as described above is generally known; however, in many cases there may be an insufficient amount of lift gas available at the desired pressure to achieve the maximum or optimum level of reduction in the hydrostatic head of fluids and the reduction in the flowing bottom hole pressure for achieving maximum production. To address this problem, according to the invention, a boosting unit, e.g. surface jet pump (SJP), 16 is installed downstream of the well 30 head 13 to improve the flow regime within the well bore, while reducing flowing well head pressure. As illustrated in Figure 1 a valve 17 may, when closed, divert fluid in the pipeline 14 through the surface jet pump 16 or, when open, bypass the pump.
The effect of the SJP in the above described condition is an improvement in the flow regime within the well bore, a reduction in the FBHP of the well and, ultimately, an increase in 35 production. A suitable SJP may be as described in EP0717818; the present Figure 3 is derived from this document. The choice of the SJP system is dependent on the amount of liquids produced with gas and whether HP gas is sufficient as the motive flow or whether because of the rate of liquids produced the motive flow should be HP liquid phase such as that shown in Figure 3.
3
The motive (high pressure) flow 18 entering SJP 16 may be sourced from: HP gas; HP oil or gas from one or more HP wells; HP liquid phase (oil or water). In the latter case the HP liquid may come from an available HP source such as injection water or export oil, the pressure of which has been boosted for other reasons. The advantage of using an SJP 16 to improve the flow regime is 5 that its high pressure fluid for operation need not be a gas, which the gas lift system is necessarily limited to, and can be derived from many possible sources, making efficient use of available resources.
Accordingly, in many cases the combination of a gas lift system at reduced rate or reduced pressure (depending on the availability and pressure of the HP gas) and an SJP system will be 10 more cost effective and beneficial in maximising production from wells (as opposed to finding other ways to increase the injection gas pressure). The SJP also offers the simplest solution compared to alternative surface boosting systems such as multiphase pumps which, if used, require a significant amount of electric power not often available on platforms or well sites.
Figure 2 graphically illustrates the additional (i.e. rise in) production (AP) expected from a system 15 of the invention utilising a surface jet pump and gas lift injection system (SJP+GI), compared to gas lift injection alone (Gl). The respective curves also illustrate the optimum (peak) production, i.e. produced oil flow rate, which drops off with excessive gas injection flow rates as mentioned previously.
Typical pressure of the motive high pressure flow of the surface jet pump is twice the flowing 20 wellhead pressure, but the pressure can be several times this value and typically up to 70 barg or higher. The flow rate of the HP flow is also typically equal to or higher than that of the well flow rate to be highly effective in reducing the FWHP.
A further improvement is shown in Figure 4, wherein an SJP unit 16A is installed within an injection gas circuit 19 to assist in raising the pressure of gas lift gas so that it can be injected 25 effectively at the lowest part of the well to enhance gas lift and improve production. Such an arrangement addresses the identified condition where high pressure (HP) gas is not of sufficient pressure to be injected at the lowest parts of the well bore (where gas lift is most needed and is most effective).
As illustrated, the SJP 16A uses as a motive flow 18 recycled gas from a gas lift compressor unit 20 30 such that the injection gas 21 input into the low pressure side of the SJP is "pre-pressurised" by the motive flow before it is further compressed by the downstream gas lift compressor 20. The illustrated system boosts pressure of lift gas 10 for injection to reach the lowest points within the well 11. It will be noted that, compared to Figure 1, Figure 4 does not show a barrier 15 such that liquid oil from the pay zone rises to a low level 22 in the well 11. As previously mentioned, lift gas 35 passes through the tubing, well casing annulus and the wall of tube 12 via gas lift injection valves 23. The upper valves 23 on tube 12 represent a gas lift at limited pressure, whereas the lower valves (in this case below level 22) represent gas lift at a higher pressure. Bubbles formed in the fluid reduce the hydrostatic head pressure and enable the volumetric flow rate to increase.
The system of Figure 4 can be coupled with an additional SJP as in Figure 1 for further 40 improvements in efficiency.
4

Claims (1)

  1. An improved gas lift system for use in the production of fluid from a well bore including: an injector for supplying pressurised gas to the well bore;
    a well head;
    a tube extending from the well head into the well bore;
    a plurality of openings or valves at different depths of the tube for permitting the ingress of injected gas to assist fluid flowing upwards through the tube by reducing the hydrostatic pressure;
    further including a boosting unit downstream of the well head for reducing the flowing well head pressure and capable of discharging produced fluid at a pressure required by a downstream production system.
    The gas lift system of claim 1 wherein the boosting unit is a surface jet pump.
    The gas lift system of claim 2 wherein the surface jet pump utilises a motive flow sourced from one or more of the following: high pressure gas; high pressure oil and/or gas from one or more high pressure wells; high pressure liquid phase (oil or water) already boosted for other reasons.
    The gas lift system of any preceding claim, including a further boosting unit installed upstream of the injector to boost the pressure of the lift gas.
    An improved gas lift system for use in the production of fluid from a well bore including: an injector for supplying pressurised gas to the well bore;
    a well head;
    a tube extending from the well head into the well bore;
    a plurality of openings or valves at different depths of the tube for permitting the ingress of injected gas to assist fluid flowing upwards through the tube by reducing the hydrostatic pressure;
    further including a boosting unit upstream of the injector to boost the pressure of the lift gas.
    The gas lift system of claim 5 wherein the boosting unit is a surface jet pump.
    The gas lift system of claim 6 wherein the surface jet pump is configured to receive low pressure injection gas into a first inlet, the flow rate of gas at the first inlet being increased by a high pressure motive flow capable of being received into a second inlet downstream of a recycle loop from a gas lift compressor, wherein an outlet of the surface jet pump is configured to supply gas to the gas lift compressor.
    A method of fluid extraction from a well bore utilising a gas lift system that includes:
    an injector for supplying pressurised gas to the well bore;
    a well head;
    a tube extending from the well head into the well bore;
    a plurality of openings or valves at different depths of the tube for permitting the ingress of injected gas to assist fluids flowing upwards through the tube by reducing the hydrostatic pressure;
    the method further including the provision of a surface jet pump downstream of the well head for reducing the flowing well head pressure and capable of discharging produced fluid at a pressure required by a downstream production system;
    wherein the surface jet pump utilises a motive flow sourced from one or more of the following: high pressure gas; high pressure oil and/or gas from one or more high pressure wells; high pressure liquid phase (oil or water) already boosted for other reasons.
    A gas lift system or method of fluid extraction substantially as herein described with reference to the accompanying drawings.
GB1210847.8A 2012-02-20 2012-06-19 Improved gas lift system for oil production Active GB2499473B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/GB2013/050321 WO2013124625A2 (en) 2012-02-20 2013-02-13 Improved gas lift system for oil production
US14/378,246 US20150000926A1 (en) 2012-02-20 2013-02-13 Gas lift system for oil production
NO20141023A NO20141023A1 (en) 2012-02-20 2014-08-21 Improved gas lift system for oil production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GBGB1202904.7A GB201202904D0 (en) 2012-02-20 2012-02-20 Extra production gain with SJP system and gaslift

Publications (3)

Publication Number Publication Date
GB201210847D0 GB201210847D0 (en) 2012-08-01
GB2499473A true GB2499473A (en) 2013-08-21
GB2499473B GB2499473B (en) 2016-03-23

Family

ID=45939897

Family Applications (2)

Application Number Title Priority Date Filing Date
GBGB1202904.7A Ceased GB201202904D0 (en) 2012-02-20 2012-02-20 Extra production gain with SJP system and gaslift
GB1210847.8A Active GB2499473B (en) 2012-02-20 2012-06-19 Improved gas lift system for oil production

Family Applications Before (1)

Application Number Title Priority Date Filing Date
GBGB1202904.7A Ceased GB201202904D0 (en) 2012-02-20 2012-02-20 Extra production gain with SJP system and gaslift

Country Status (4)

Country Link
US (1) US20150000926A1 (en)
GB (2) GB201202904D0 (en)
NO (1) NO20141023A1 (en)
WO (1) WO2013124625A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2527681A (en) * 2014-11-14 2015-12-30 Caltec Ltd A method of using a surface jet pump to mitigate severe slugging in pipes and risers

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9494166B1 (en) * 2015-12-22 2016-11-15 Syphon Energy, LLC Jet-gas lift system and method for pumping well fluids
WO2017112508A1 (en) * 2015-12-22 2017-06-29 Shell Oil Company Enhanced riser-based gas-lift apparatus
GB2541504B (en) * 2016-06-17 2017-09-20 Starstream Ltd Flow control system and method
US10837463B2 (en) 2017-05-24 2020-11-17 Baker Hughes Oilfield Operations, Llc Systems and methods for gas pulse jet pump
US11060385B2 (en) * 2019-02-12 2021-07-13 Baker Hughes Oilfield Operations Llc Artificial lift system for a resource exploration and recovery system
US11193483B1 (en) 2019-09-30 2021-12-07 Estis Compression, LLC Gas lift compressor system and method for supplying compressed gas to multiple wells

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0717818B1 (en) * 1993-09-06 1998-05-27 B.H.R. Group Limited System for pumping liquids using a jet pump
WO2011025590A1 (en) * 2009-08-31 2011-03-03 Exxonmobil Upstream Research Company Dense slurry production methods and systems

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2621071B1 (en) * 1987-09-29 1996-01-12 Inst Francais Du Petrole METHOD AND SYSTEM FOR PRODUCING AN EFFLUENT CONTAINED IN AN UNDERWATER GEOLOGICAL FORMATION
GB0112103D0 (en) * 2001-05-17 2001-07-11 Alpha Thames Ltd Fluid transportation system
WO2003003865A1 (en) * 2001-07-03 2003-01-16 Promoción De Calzado, S.A. (Prodecasa) Improved shoe
WO2003033865A1 (en) * 2001-10-11 2003-04-24 Weatherford/Lamb, Inc. Combination well kick off and gas lift booster unit
GB2399864A (en) * 2003-03-22 2004-09-29 Ellastar Ltd A system and process for pumping multiphase fluids
GB0410961D0 (en) * 2004-05-17 2004-06-16 Caltec Ltd A separation system for handling and boosting the production of heavy oil
US7308952B2 (en) * 2004-06-04 2007-12-18 Strazhgorodskiy Semen Iosiphov Underbalanced drilling method and apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0717818B1 (en) * 1993-09-06 1998-05-27 B.H.R. Group Limited System for pumping liquids using a jet pump
WO2011025590A1 (en) * 2009-08-31 2011-03-03 Exxonmobil Upstream Research Company Dense slurry production methods and systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
European Artificial Lift Forum 2010, Aberdeen, 17/02/2010 to 18/02/2010. S. Sarshar & N Beg. The applications of jet pump systems to boost production. Recent applications and exerience. *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2527681A (en) * 2014-11-14 2015-12-30 Caltec Ltd A method of using a surface jet pump to mitigate severe slugging in pipes and risers
GB2529491A (en) * 2014-11-14 2016-02-24 Caltec Ltd A method of using a surface jet pump to mitigate severe slugging in pipes and risers
GB2527681B (en) * 2014-11-14 2016-06-08 Caltec Ltd A method of using a surface jet pump to mitigate severe slugging in pipes and risers
GB2529491B (en) * 2014-11-14 2020-09-16 Caltec Production Solutions Ltd A method of using a surface jet pump to mitigate severe slugging in pipes and risers

Also Published As

Publication number Publication date
US20150000926A1 (en) 2015-01-01
NO20141023A1 (en) 2014-11-20
GB201202904D0 (en) 2012-04-04
WO2013124625A3 (en) 2014-04-10
GB201210847D0 (en) 2012-08-01
WO2013124625A2 (en) 2013-08-29
GB2499473B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
US20150000926A1 (en) Gas lift system for oil production
US11613972B2 (en) System and method for low pressure gas lift artificial lift
US7152681B2 (en) Method and arrangement for treatment of fluid
US6543537B1 (en) Method and apparatus for producing an oil reservoir
US7594543B2 (en) Method and apparatus for production in oil wells
US10066465B2 (en) Chemical injection with subsea production flow boost pump
CA2961469C (en) Sea floor boost pump and gas lift system and method for producing a subsea well
US8534364B2 (en) Assembly and method for production of gas or gas and condensate/oil
GB2529491A (en) A method of using a surface jet pump to mitigate severe slugging in pipes and risers
RU2680028C1 (en) Compressor unit
US20180340551A1 (en) Systems and methods for gas pulse jet pump
RU2550613C2 (en) Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation
US20140030117A1 (en) Multi-stage hydraulic jet pump
WO1992008037A1 (en) Downhole jet pump system using gas as driving fluid
RU165135U1 (en) SUBMERSIBLE PUMP INSTALLATION
RU2674042C1 (en) Pumping-ejector unit for operating wells
GB2261030A (en) Recovery of liquids from underground reservoirs
RU2728065C2 (en) Artificial lift method
AU2009238321A1 (en) An Improved Pump System
GB2549365A (en) Improved lift system for use in the production of fluid from a well bore
RU2553110C2 (en) Method of production of single-formation borehole fluid and pumping and ejecting unit for its implementation
RU2447264C2 (en) Method for production of borehole fluid under complicated conditions and device for its realisation
RU2515646C1 (en) Method to operate well furnished with electric-centrifugal pump
RU173534U1 (en) SECTION AND CENTRIFUGAL GAS SEPARATOR
Olson Adding Multiphase Pumps To Gathering Systems Optimizes Artificial Lift