GB2480093A - Recovering fluid from a spilling undersea well - Google Patents
Recovering fluid from a spilling undersea well Download PDFInfo
- Publication number
- GB2480093A GB2480093A GB201007594A GB201007594A GB2480093A GB 2480093 A GB2480093 A GB 2480093A GB 201007594 A GB201007594 A GB 201007594A GB 201007594 A GB201007594 A GB 201007594A GB 2480093 A GB2480093 A GB 2480093A
- Authority
- GB
- United Kingdom
- Prior art keywords
- container
- well
- well fluid
- bucket
- jet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000012530 fluid Substances 0.000 title claims abstract description 45
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 26
- 238000000034 method Methods 0.000 claims abstract description 19
- 230000005484 gravity Effects 0.000 claims abstract description 7
- 238000011084 recovery Methods 0.000 claims description 12
- 230000003019 stabilising effect Effects 0.000 claims description 8
- 230000007306 turnover Effects 0.000 claims description 3
- 230000000737 periodic effect Effects 0.000 claims description 2
- 238000012544 monitoring process Methods 0.000 claims 2
- 239000003921 oil Substances 0.000 description 40
- 238000000605 extraction Methods 0.000 description 9
- 238000010276 construction Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000005553 drilling Methods 0.000 description 3
- 238000007667 floating Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 230000005587 bubbling Effects 0.000 description 1
- 239000010962 carbon steel Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 239000000295 fuel oil Substances 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000013022 venting Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/0122—Collecting oil or the like from a submerged leakage
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
A method of recovering well fluid from a spilling undersea wellhead 16 comprises positioning over the well, using a pair of service vessels (10, fig 1), a container 12 in the form of a submerged inverted bucket having an open bottom and a closed top and initially containing water, allowing well fluid to enter the container through the open bottom to be trapped by the closed top while displacing water from the container and then recovering the container for emptying. When filled with water and submerged, the container 12 has a centre of gravity below its centre of buoyancy.
Description
Recovery of oil from a spilling subsea well This invention relates to the recovery of oil leaking at a high rate from a subsea well.
In recent days following the explosion and loss of the Deepwater Horizon drilling rig, shorelines of the Gulf of Mexico have been threatened by oil rising uncontrollably in large volumes from the wellhead to the surface. For unknown reasons, subsea blowout preventers failed to stem the flow and subsequent efforts to activate them with ROVs also failed.
The wellhead lies in deep water (circa 1500m), beyond diver depth. It is likely that the spill will only be ended by the last-resort measure of drilling a relief well. However in water of that depth, a relief well may take one or two months to complete. Meanwhile it is estimated that 5000 barrels per day (BPD) of oil is flowing into the sea and adding to the growing slick at the surface.
It has been proposed to enclose the wellhead with a specially-fabricated inverted box-like containment structure lying on the seabed surrounding the wellhead. The pointed top of the box is surmounted by a vertical pipe to channel oil to the surface for collection by a recovery vessel stationed directly above the wellhead. Similar containment structures have been used before in the Gulf of Mexico -for example, after Hurricane Katrina to channel oil to the surface where platforms had been damaged -but that was in shallow water.
Even though every wish is made that this operation will be successful, it is not certain that the box containment will work on a fast-flowing spill in deep water. It is possible that the containment structure will act as a separator and that gas phase will easily escape from the oil during its passage through the structure and the pipe, which could lead to unstable vertical flow of the mixture of oil and gas in the pipe. Also, the recovery vessel is vertically above the well, which is not a safe location due to flammable gas bubbling up from the well. Even if the containment structure does work, there has been a long delay in fabricating the structure while oil has continued to escape.
There is a precedent for the recovery of oil leaking from a deep water location, namely the operation in 2004 to recover fuel oil from the wreck of the tanker Prestige, which sank in 2002 off Spain to a depth of nearly 4000m. This was a very different challenge to that now faced in the Gulf of Mexico, mainly because the oil carried by the Prestige was extremely viscous and was largely static. In that case, the oil was not flowing at high speed under pressure in a turbulent jet from an uncontrollably leaking well. Nor was there a problem posed by gas phase entrained with the oil in a flow of well fluid.
Instead, once the vessel sank, oil leaked slowly from the wreck and there was time to plug many of the leaks using ROVs while designing and implementing a bespoke solution over a period of more than a year.
The solution that was eventually adopted for the Prestige involved tapping ROy-operable extraction valves through the hull into the oil tanks of the vessel. Water was injected into the tanks as oil was allowed to escape through an extraction valve into one of a series of shuttle tanks positioned above the extraction valve. For this purpose, the bottom of each shuttle tank was provided with an ROV-operable door allowing oil oozing from the extraction valve to float up from the extraction valve into the shuttle tank. During the extraction process, the flow of oil was controlled by ROV operation of the extraction valve, with failsafe systems to avoid overfilling. Once a shuttle tank was full, the extraction valve and the door were closed and the tank was recovered to near the surface for unloading the oil. Meanwhile a further empty shuttle tank was positioned above the extraction valve for filling in the same manner.
The shuttle tanks were fabricated specially for the Prestige project. Each shuttle tank comprised a hollow aluminium body with a diameter of approximately 5.3m and an overall length of approximately 23m, suitable to carry up to 350 m3 of oil. Buoyancy units installed externally to the shuttle tank maintained buoyancy throughout and allowed controlled transportation through the water column using dedicated shuttle handling equipment and ballast chains. A top interface comprised a mechanical interface to a riser termination unit for unloading the oil to a FPSO.
Shuttle tanks such as those used in the recovery operation on the Prestige would not be suitable to capture oil flowing at a high rate from a subsea wellhead. The fast-moving jet of well fluid would threaten the stability of the shuttle tank when it is lowered and as it passes over the well jet. There would be further challenges in controlling the position of the shuttle tank during filling, controlling filling of the shuttle tank, releasing the expanding gas phase during recovery of the shuttle tank through the water column and thereafter recovering the oil from the shuttle tank to a tanker.
In acute emergency circumstances such as are now faced in the Gulf of Mexico, there is an urgent need for a temporary solution that is effective to prevent substantial uncontrolled leakage of oil into the sea until a more permanent solution can be effected. It is essential that the temporary solution can be implemented quickly using readily-available resources and assets, for example by using apparatus that can be fabricated easily if needs be and that can be handled by existing service vessels.
It is against this background that the present invention has been devised. In accordance with the invention, it is proposed to use an inverted bucket (i.e. a hollow closed-topped, open-bottomed catching structure) to be positioned over the well to catch the well fluid rising from it. Advantageously, the inverted bucket is similar in size and construction to a subsea suction pile. The inverted bucket is held in place by service vessels (typically tugs, ROV support vessels or similar service vessels) preferably operating in pairs opposed about the bucket and the wellhead.
The bucket may be sized for the expected daily (or half a day) production of the well to suit continuous recovery to the surface in a shuttle process. Several such buckets should be used to ensure continuous recovery in a noria' arrangement in which buckets are brought into position one after the other over the well by respective sets of two support vessels.
The invention thus resides in a method of recovering well fluid from a spilling undersea well, the method comprising: positioning a container over the well, the container having an open bottom and a closed top and initially containing water; allowing well fluid to enter the container through the open bottom to be trapped by the closed top while displacing water from the container; and recovering well fluid from the container.
The method of the invention suitably comprises raising the container to a depth compatible with the volume of the container and the Gas-Oil Ratio (GOR) before recovering well fluid from the container. From this location, a conventional (not deepwater and therefore readily available) flexible hose can be used to recover the fluid.
The container is preferably positioned over a jet of well fluid emanating upwardly from the well and more preferably is positioned such that the jet enters the open bottom of the container. Elegantly, the container may be aligned with the jet by impingement of the jet against the container.
Gas in the well fluid may be allowed to expand within the container as the container is raised toward the surface. In an emergency to avoid escape of oil, the gas may be vented from the container to control the volume of gas in the container as the container is raised toward the surface. However venting of gas is not desirable in normal situations as the gas will rise to the surface and may threaten the safety of vessels located where it rises.
The container is suitably suspended between a plurality of surface vessels that move the container with respect to the well. Advantageously, the surface vessels may be widely spaced in this arrangement to avoid the unsafe area of the surface directly above the well.
The method preferably comprises successively positioning a plurality of containers over the well, each successive container taking over from the preceding container when the preceding container is removed from the well for emptying the recovered well fluid.
The inventive concept extends to a system for recovering well fluid from a spilling undersea well, the system comprising: a container positionable over the well, the container having a chamber with an open bottom to admit well fluid into the chamber and a closed top to trap well fluid in the chamber; and a container support operable to move the container from the well for periodic recovery of well fluid from the container; wherein when filled with water and submerged, the container has a centre of gravity substantially below its centre of buoyancy. This is important for stability as the container could encounter a high-speed jet of well fluid emanating from the well.
The chamber is preferably defined by an upright elongate hollow cylinder like a suction pile in size, shape, material and method of construction, having added buoyancy at an upper end and added weight at a lower end.
Where the container has attachment points for chains, wires or the like of the container support, the attachment points are preferably below the centre of buoyancy and above the centre of gravity to keep the closed top of the container uppermost.
Buoyancy means such as floats may be positioned at or near to an upper end of the container. Buoyancy may be directly attached to the container or held by chains or wires. Conversely the container may be weighted at or near to a lower end. For example, the container may have an annular stabilising ring at its lower end. That stabilising ring may be supported by spars extending downwardly from the chamber of the container and is preferably of substantially greater diameter than the chamber of the container.
To maximise the potential for catching well fluid and to make the container self-aligning with respect to a jet of well fluid, the container preferably comprises a flared skirt around its open bottom.
The container support system suitably comprises chains, wires or the like suspending the container between a plurality of surface vessels that together determine the depth and position of the container in the water. The container may be equi-spaced between the support vessels.
To maximise efficiency, the system of the invention preferably comprises a plurality of containers that are positionable in turn over the well.
In order that the invention may be more readily understood, reference will now be made, by way of example, to the accompanying drawings in which: Figures 1(a) and 1(b) are, respectively, schematic plan and side views showing the deployment of apparatus in accordance with the invention; Figure 2 is a sectional side view of a bucket in accordance with the invention, forming part of the apparatus shown in Figure 1; Figures 3(a), 3(b), 3(c) and 3(d) show, respectively, a turbulent jet of well fluid emanating from a subsea wellhead; the bucket of Figure 2 positioned over the jet to catch the well fluid and hence to fill the bucket with oil and gas phase; and the effect of decreasing depth upon the gas phase volume within the filled bucket; and Figure 4 is a schematic side view showing oil and gas being emptied from the bucket at a shuttle tanker or an FPSO.
Figures 1(a) and 1(b) show a team of two service vessels 10 holding a submerged inverted bucket 12 centrally between them, suspended in the water column by opposed chains or wires 14 of equal length. The service vessels 10 are located about 2000m (6560 feet) apart in this example and so are advantageously positioned safely away from the unsafe area on the surface that is directly above the well. They move the bucket 12 over a spilling wellhead 16 by travelling across the surface 18 in unison and in parallel. By paying out or pulling in the chains or wires 14 in unison using winches on each vessel 10, they control the depth of the bucket 12 beneath the surface 18. Atypical distance of lOm above the well could be expected.
Figure 1(a) shows a second team of two service vessels 10 on stand-by, waiting to take its turn over the wellhead 16 with a further bucket 12 when the first bucket 12 is full and is recovered for emptying. Depending on the flow rate expected and the capacity of the buckets 12, the number of teams of service vessels 10 and the frequency of their visits to the wellhead 16 may be adjusted.
If it is assumed that the deployment and removal of the bucket 12 will be a daily or twice daily operation, the typical minimum size of the bucket 12 is the daily or half the daily volume of hydrocarbon released at the wellhead 16. For example, based on a daily release of 5000 BPD, the required volume is 800 m3. That volume can be achieved with a cylinder of circular cross-section 8m (26') in diameter and 1 6m (52') long. For a twice-daily operation the required volume would be for example 6.1 m (20') in diameter and 14m (45') long. These dimensions are typical of suction anchors used for anchoring drilling rigs or floating production facilities. If fabrication is necessary, this speeds production of the buckets 12; it also makes the buckets 12 easy for existing service vessels to handle.
Referring now to Figure 2 of the drawings, the design and construction of the bucket 12 are also similar to the design and construction of suction anchors. The bucket 12 comprises a hollow cylinder 20 of circular cross-section made of rolled, plated carbon steel and is fabricated by welding. The cylinder 20 has a flat, closed top 22. A frusto-conical skirt 24 flares from the open bottom of the cylinder 20 to capture a wider area of well fluid and lead it into the cylinder 20 in use. The angled skirt 24 of the bucket 12 reacts with lateral force against an impinging jet of well fluid in use and so helps to align the open bottom of the bucket 12 with the jet.
The flat top 22 of the bucket 12 is reinforced with steel beams 26. The top 22 is penetrated centrally by a pipe 28 equipped with a valve 30, typically an ROV-operable 8" (20cm) ball valve 30, and a connector 32. Foam blocks 34 atop the bucket 12 around the pipe 28 provide buoyancy to the bucket 12, their position raising the centre of buoyancy and so helping to keep the bucket 12 upright when it is deployed in the water. Alternatively the buoyancy can be connected by chain or wire. Optionally there is provided a link with a load cell to measure the vertical load as this load varies during the filling of the bucket 12 by well fluid.
The skirt 24 of the bucket 12 is surrounded by spars 36 radiating downwardly and outwardly from the bottom edge of the cylinder 20. The spars 36 help to support and stiffen the skirt 24. The spars 36 also extend beyond the skirt 24 to support an annular ring 38 that helps to stabilise the bucket 12 in use to minimise movement of the bucket 12 when over-passing the jet of well fluid at the wellhead 16. The weight and enlarged diameter of the stabilising ring 38 near the bottom of the bucket 12 advantageously lowers its centre of gravity and increases its inertial resistance to lateral movement.
The stabilising ring 38 provides a restoring moment additional to that which may be provided by impingement of the jet with the angled skirt 24 of the bucket 12.
The base of the cylinder 20 above the skirt 24 is surrounded by a circular reinforcement 40 that also provides mounting points 42 for the chains or wires 14 that suspend the bucket in use. Such a reinforcement is not required for a regular suction pile which is held from the top. For optimum stability, the centre of buoyancy of the bucket 12 is above the mounting points 42, and above the centre of gravity of the bucket 12, even when the bucket is full of water. The centre of buoyancy will rise further as buoyant oil and gas displaces water downwardly from within the bucket 12.
The bucket 12 may be equipped with pressure transducers and load cells. The purpose is to monitor the amount of well fluid being received and possibly adjust the rate at which buckets 12 are brought to the wellhead 16 for filling.
Figure 3(a) shows well fluid comprising oil and gas flowing upwardly from a wellhead 16 on the seabed 44 in a fully turbulent jet 46. The jet 46 is initially confined within a narrow angle a, typically about 100. Once the jet 46 loses momentum, the well fluid rises buoyantly thereafter through the water column as a more dispersed plume with a wider angle. The chance of catching the well fluid is enhanced by lowering the bucket 12 close enough (typically lOm) to the wellhead 16 to receive the jet 46 through the open bottom of the bucket 12 as shown schematically in Figure 3(b), rather than keeping the bucket 12 above the jet 46 and hence waiting until the well fluid has dispersed into a plume.
The desirability of the bucket 12 encountering the jet 46 with its turbulent dynamic forces emphasises the importance of the stability of the bucket 12 in use. Here, the low position of the stabilising ring 38 is advantageous as this concentrates weight below the point at which the jet 46 impinges on the skirt 24 and the inside of the cylinder 20.
As the well fluid is collected from the well into the bucket 12, it separates into oil 48 and a gas phase 50. The gas phase 50 rises from the oil 48 within the bucket 12 and is trapped by the oil 48 in the closed top portion of the bucket 12. At 1500m water depth, the pressure is 150 bar (2000 psi) and the gas phase 50 occupies a correspondingly small volume as shown in Figure 3(c). The volume of the gas phase 50 increases with decreasing depth and pressure as the bucket 12 is recovered toward the surface, as shown in Figure 3(d). Here, the depth is 500m, pressure has reduced to 50 bar and the volume of the gas phase 50 has trebled over that at 1 500m in accordance with Boyle's Law, assuming constant temperature. More elaborate Pressure Volume Temperature (PVT) calculation can of course be used to confirm this order of magnitude estimate, which is valid for black oils. This expansion displaces the oil 48 toward the open bottom of the bucket 12.
The downward displacement of oil 48 will not be a problem if the bucket 12 is deep enough to prevent the oil 48 from escaping from the bucket 12 through the open bottom. However, if it were necessary under unexpected conditions to control the expanding volume of the gas phase 50 to prevent the escape of oil 48, it is possible to vent the gas phase 50 by opening and closing the valve 30 (either automatically, under remote control or using an ROV) periodically during the recovery procedure.
Referring finally to Figure 4, the bucket 12 is brought to the vicinity of a floating storage unit 52 such as a shuttle tanker, equipped with a separator 54 and a flare 56. For a flow rate of 5000 BPD, a standard 2000 psi test separator 54 should be suitable. The bucket 12 is connected to the floating storage unit 52 via a conventional flexible hose 58 connected to the valve 30 and connector 32 on the top of the bucket 12, whereupon oil 48 and gas phase 50 are released from the bucket 12 as water rises through the open bottom. The gas phase 50 is flared off and oil 48 is held in tanks in the storage unit 52 for subsequent unloading. Jetting or pumping could alternatively be used Variations are possible without departing from the inventive concept. For example, the closed top of the bucket could alternatively comprise a dished head, but the time needed to fabricate that feature may not be compatible with the urgent delivery schedule required in an emergency situation.
Also, provision may be made for anchoring the bucket temporarily to the wellhead or to the seabed to keep the bucket in position above the jet during the collection of well fluid. It would also be possible to manoeuvre the bucket using ROVs to position the bucket above the jet and to resist drift while the bucket remains on station, collecting the well fluid.
Claims (24)
- Claims 1. A method of recovering well fluid from a spilling undersea well, the method comprising: positioning a container over the well, the container having an open bottom and a closed top and initially containing water; allowing well fluid to enter the container through the open bottom to be trapped by the closed top while displacing water from the container; and recovering well fluid from the container.
- 2. The method of Claim 1, comprising raising the container to at or near the surface before recovering well fluid from the container.
- 3. The method of Claim 1 or Claim 2, wherein the container is positioned over a jet of well fluid emanating upwardly from the well.
- 4. The method of Claim 3, wherein the container is positioned such that the jet enters the open bottom of the container.
- 5. The method of Claim 3 or Claim 4, comprising aligning the container with the jet by impingement of the jet against the container.
- 6. The method of any preceding Claim, wherein gas in the well fluid is allowed to expand within the container as the container is raised toward the surface.
- 7. The method of Claim 6, wherein the gas is vented from the container to control the volume of gas in the container as the container is raised toward the surface.
- 8. The method of any preceding claim, wherein the container is suspended between a plurality of surface vessels that move the container with respect to the well.
- 9. The method of any preceding claim and comprising successively positioning a plurality of containers over the well, each successive container taking over from the preceding container when the preceding container is removed from the well.
- 10. The method of any preceding claim, comprising monitoring filling of the container by the use of one or more load cells.
- 11. A system for recovering well fluid from a spilling undersea well, the system comprising: a container positionable over the well, the container having a chamber with an open bottom to admit well fluid into the chamber and a closed top to trap well fluid in the chamber; and a container support operable to move the container from the well for periodic recovery of well fluid from the container; wherein when filled with water and submerged, the container has a centre of gravity substantially below its centre of buoyancy.
- 12. The system of Claim 11, wherein the container has attachment points for chains, wires or the like of the container support, the attachment points being below the centre of buoyancy.
- 13. The system of Claim 12, wherein the attachment points are above the centre of gravity.
- 14. The system of any of Claims 11 to 13, comprising buoyancy means at or near to an upper end of the container.
- 15. The system of any of Claims 11 to 14, wherein the container is weighted at or near to a lower end.
- 16. The system of Claim 15, wherein the container has an annular stabilising ring at its lower end.
- 17. The system of Claim 16, wherein the stabilising ring is supported by spars extending downwardly from the chamber of the container.
- 18. The system of Claim 16 or Claim 17, wherein the stabilising ring is of substantially greater diameter than the chamber of the container.
- 19. The system of any of Claims 11 to 18, wherein the container comprises a flared skirt around its open bottom.
- 20. The system of any of Claims 11 to 19, wherein the chamber is defined by an upright elongate hollow cylinder having added buoyancy at an upper end and added weight at a lower end.
- 21. The system of any of Claims 11 to 20, further comprising one or more load cells for monitoring filling of the container.
- 22. The system of any of Claims 11 to 21, wherein the container support system comprises chains, wires or the like suspending the container between a plurality of surface vessels that together determine the depth and position of the container in the water.
- 23. The system of Claim 22, wherein the container is equi-spaced between the support vessels.
- 24. The system of any of Claims 11 to 23, and comprising a plurality of containers positionable in turn over the well.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB201007594A GB2480093A (en) | 2010-05-06 | 2010-05-06 | Recovering fluid from a spilling undersea well |
GB201008805A GB2480112A (en) | 2010-05-06 | 2010-05-26 | Recovery of oil for a spilling subsea well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB201007594A GB2480093A (en) | 2010-05-06 | 2010-05-06 | Recovering fluid from a spilling undersea well |
Publications (2)
Publication Number | Publication Date |
---|---|
GB201007594D0 GB201007594D0 (en) | 2010-06-23 |
GB2480093A true GB2480093A (en) | 2011-11-09 |
Family
ID=42314934
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB201007594A Withdrawn GB2480093A (en) | 2010-05-06 | 2010-05-06 | Recovering fluid from a spilling undersea well |
GB201008805A Withdrawn GB2480112A (en) | 2010-05-06 | 2010-05-26 | Recovery of oil for a spilling subsea well |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB201008805A Withdrawn GB2480112A (en) | 2010-05-06 | 2010-05-26 | Recovery of oil for a spilling subsea well |
Country Status (1)
Country | Link |
---|---|
GB (2) | GB2480093A (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014037569A2 (en) | 2012-09-07 | 2014-03-13 | Total Sa | A containment system and a method for using such containment system |
US9388670B2 (en) | 2012-09-07 | 2016-07-12 | Total Sa | Containment system and a method for using said containment system |
US9416632B2 (en) | 2012-09-07 | 2016-08-16 | Total Sa | Containment system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2804935A1 (en) * | 2000-02-11 | 2001-08-17 | Bouygues Offshore | Recovery of pollutants which float on water from a sunken or damaged vessel on the seabed |
WO2004040957A2 (en) * | 2002-12-23 | 2004-05-21 | Lazes Richard J | Subsea oil collector |
EP1449762A1 (en) * | 2003-02-21 | 2004-08-25 | Saipem SA | Method and installation of effluent recovery at sea by using a shuttle reservoir |
EP1459976A1 (en) * | 2003-03-21 | 2004-09-22 | Coperion Buss AG | Method and apparatus for recovering polluting fluids |
EP1607322A1 (en) * | 2003-03-04 | 2005-12-21 | Mariano Bendito Saura | Hydrostatic system for extracting hydrocarbons and oils from the tanks of a sunken ship |
US20060225810A1 (en) * | 2003-03-26 | 2006-10-12 | Michel Baylot | Buoyancy device and method for stabilizing and controlling lowering or raising of a structure between the surface and the sea floor |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3667605A (en) * | 1970-05-04 | 1972-06-06 | Robert O Zielinski | Submerged oil leak control |
WO1981000875A1 (en) * | 1979-09-19 | 1981-04-02 | J Dupont | Device for collecting oil escaping accidentally from a underwater oil sheet |
NO153938C (en) * | 1979-11-02 | 1986-06-18 | Ostlund As | PROCEDURE FOR THE COLLECTION AND SEPARATION OF OIL, WATER AND GAS FROM AN OIL WELL AND AN EQUAL COLUMN FOR EXECUTION OF THE PROCEDURE. |
GB2063776B (en) * | 1979-11-08 | 1984-04-18 | Duke J A | Apparatus and method for collecting subsea oil leakage and the like |
US4358218A (en) * | 1979-12-17 | 1982-11-09 | Texaco Inc. | Apparatus for confining the effluent of an offshore uncontrolled well |
-
2010
- 2010-05-06 GB GB201007594A patent/GB2480093A/en not_active Withdrawn
- 2010-05-26 GB GB201008805A patent/GB2480112A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2804935A1 (en) * | 2000-02-11 | 2001-08-17 | Bouygues Offshore | Recovery of pollutants which float on water from a sunken or damaged vessel on the seabed |
WO2004040957A2 (en) * | 2002-12-23 | 2004-05-21 | Lazes Richard J | Subsea oil collector |
EP1449762A1 (en) * | 2003-02-21 | 2004-08-25 | Saipem SA | Method and installation of effluent recovery at sea by using a shuttle reservoir |
EP1607322A1 (en) * | 2003-03-04 | 2005-12-21 | Mariano Bendito Saura | Hydrostatic system for extracting hydrocarbons and oils from the tanks of a sunken ship |
EP1459976A1 (en) * | 2003-03-21 | 2004-09-22 | Coperion Buss AG | Method and apparatus for recovering polluting fluids |
US20060225810A1 (en) * | 2003-03-26 | 2006-10-12 | Michel Baylot | Buoyancy device and method for stabilizing and controlling lowering or raising of a structure between the surface and the sea floor |
Also Published As
Publication number | Publication date |
---|---|
GB2480112A (en) | 2011-11-09 |
GB201007594D0 (en) | 2010-06-23 |
GB201008805D0 (en) | 2010-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4324505A (en) | Subsea blowout containment method and apparatus | |
US10753058B2 (en) | Containment unit and method of using same | |
US8776706B2 (en) | Buoyancy device and a method for stabilizing and controlling the lowering or raising of a structure between the surface and the bed of the sea | |
RU2719516C1 (en) | Bottom-based platform and method of creating drilling terminal for drilling in shallow-water shelf | |
EP2750967B1 (en) | Device for collecting and temporarily storing fluids from an underwater source | |
US9878761B2 (en) | Large subsea package deployment methods and devices | |
NO153938B (en) | PROCEDURE FOR THE COLLECTION AND SEPARATION OF OIL, WATER AND GAS FROM AN OIL WELL AND AN EQUAL COLUMN FOR EXECUTION OF THE PROCEDURE. | |
CN103270239A (en) | Offshore tower for drilling and/or production | |
US8784011B2 (en) | Marine-equipment installation method and apparatus | |
CN103270221A (en) | Offshore tower for drilling and/or production | |
JPS5922879B2 (en) | Liquid/gas separation equipment | |
GB2480093A (en) | Recovering fluid from a spilling undersea well | |
US3396544A (en) | Storage tank fixed on the ocean bottom and method of installation | |
US3421579A (en) | Underwater completion | |
US8911176B2 (en) | Subsea crude oil and/or gas containment and recovery system and method | |
WO2017171646A1 (en) | Offshore storage facility | |
CA2809627A1 (en) | Textile oil containment sleeve | |
NO342222B1 (en) | Device for preventing contamination during drilling for and production of offshore oil / gas from an installation on the sea surface. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WAP | Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1) |