GB1602065A - Method and apparatus for counting pipe joints - Google Patents
Method and apparatus for counting pipe joints Download PDFInfo
- Publication number
- GB1602065A GB1602065A GB19908/78A GB1990878A GB1602065A GB 1602065 A GB1602065 A GB 1602065A GB 19908/78 A GB19908/78 A GB 19908/78A GB 1990878 A GB1990878 A GB 1990878A GB 1602065 A GB1602065 A GB 1602065A
- Authority
- GB
- United Kingdom
- Prior art keywords
- count
- joint
- circuit
- going
- downhole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 title claims description 13
- 210000002445 nipple Anatomy 0.000 claims description 17
- 238000006073 displacement reaction Methods 0.000 claims description 16
- 230000001960 triggered effect Effects 0.000 claims description 8
- 238000012546 transfer Methods 0.000 claims description 3
- 230000004907 flux Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 230000005355 Hall effect Effects 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/20—Combined feeding from rack and connecting, e.g. automatically
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/09—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
- E21B47/092—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes by detecting magnetic anomalies
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Pipeline Systems (AREA)
Description
(54) METHOD AND APPARATUS FOR COUNTING
PIPE JOINTS
(71) We, MONITORING SYSTEMS,
INC., a corporation organised and existing under the laws of the State of Louisiana,
United States of America, of First Federal
Building, Thibodaux, State of Louisiana 70301, United States of America, do hereby declare the invention, for which we pray that a patent may be granted to us, and the method by which it is to be performed, to be particularly described in and by the following statement:- The present invention is concerned with counting pipe joints either going downhole or coming uphole through a drill hole bell nipple.
In the prior art, U.S. Patent 3646808 detects the amount of fluid required to replace the steel of the pipe removed from the drill hole, and automatically replaces same. U.S. Patent 3843923 uses a pair of
Hall effect detectors for pipe joint location, and U.S. Patent 3803797 checks continuity of pipe sections.
According to one aspect of the present invention there is provided apparatus for counting pipe joints either going downhole or coming uphole through a drill hole bell nipple, the apparatus comprising in combination: a) a plurality of sensor means at spaced apart positions along and externally of said bell nipple for sensing the passage of pipe joints going downhole and coming uphole past said sensor means,
b) logical means in circuit with and triggered by signals from said sensor means for logically determining the direction of pipe joint travel to develop plus signal counts for downhole going joints and minus signal counts for uphole coming joints, c) joint counter means in circuit with said logical means,
d) means in circuit with said logical means for adding a count to said joint counter means in response to said plus signal count each time a joint is sensed going downhole,
e) means in circuit with said logical means for subtracting a count from said joint counter means in response to said minus signal count each time a joint is sensed coming uphole, and
f) stand counter means in circuit with said logical means for converting the joint count in said joint counter means to a stand count using said plus and minus signal counts.
The present invention may employ three magnetic pickup units at spaced apart locations to develop signals indicative of pipe joints passing the respective pickup units. The pickup units are spaced apart on the bell nipple and can provide directional information, because if a joint moves downhole, through the bell nipple, it will develop a signal at one pickup unit first, then the second pickup unit and then the third pickup unit. However, if the joint is coming out of the hole the pickups will be tripped in the reverse order.
Pneumatic or electrical logic may be utilized to add or subtract a count at the joint counter depending upon the direction of movement of the pipe. The add and subtract logic circuits may be identical but inverted to provide both the add and subtract signals.
A three position, two way valve or switch may be provided to accommodate a number of joints per stand. The switch may have three inputs for a positive count and three inputs for a negative count and it may be set to indicate the number of joints per stand and influence the count accordingly. If, for example, there are three joints per stand, then the switch will be set to three and after the third joint has passed the joint locator, a
count will be registered on the stand
counter such that the stand counter registers a count every third joint. Also the same logic subtracts a count from the stand
counter when three joints have been removed from the hole.
The system may also provide for a circuit for displaying mud displacement amounts.
This tells how much mud must be pumped into the hole as drill pipe is withdrawn when
removing pipe from the hole.
A five position valve or switch may be used to set a binary number into the tenths and hundredths stages of adders, which display, (via seven bar encoders) the numbers indicating the mud displacement.
It may be a five stage adder capable of counting and displaying 999.99 but other capacity adders may be used.
In an example, the triggering inputs to the adder sections are the negative counts from the stand counter, and accordingly, the five position valve or switch may be set manually to insert a binary number into the tenths and hundredths stages which represents the displacement per stand of a particulars size and weight drill pipe. This number is inserted automatically each time a negative count is received. This information could be utilized on a per joint basis, if desired.
Thus, the binary number set into the adders which represents the displacement per stand, will be added to the total each time a stand is removed from the hole. The calculation displacement number is displayed on the face of the instrument panel, as being representative of the total volume of mud which should have been pumped into the hole at any given time.
This number can be compared to the actual mud pumped, or can be used to actuate an automatic fill-up system.
According to another aspect of the invention, there is provided the method of counting pipe joints either going downhole or coming uphole through a drill hole bell nipple, the method comprising in combination: a) sensing at spaced apart positions along and externally of said bell nipple the passage of pipe joints going downhole and coming uphole::
b) logically determining the direction of pipe joint travel by means in circuit with and triggered by signals representative of the sensed passage of pipe joints to develop plus signal counts for downhole going joints and minus signal counts for uphole coming joints;
c) adding a count to a joint count in response to said plus signal count each time a joint is sensed going downhole,
d) subtracting a count from said joint count in response to said minus signal count each time a joint is sensed coming uphole, and
e) converting the joint count to a stand count using said plus and minut signal counts.
The invention will be better understood
from a reading of the following detailed
description of an example thereof, when
taken in the light of the accompanying
drawings wherein: Figure 1 is a block or schematic
representation of the entire system;
Figure 2 shows the components for each pickup unit:
Figure 3 depicts the flux diagram for a pickup unit in the absence of a joint:
Figure 4 shows the flux distribution pattern in the presence of a joint
Figure 5 shows the three pickup units setting the add-subtract logic circuitry for the joint counter, and the three position, two way valve or switch for converting joints to stands for the stand counter::
Figures 6 and 7 show three of five stages of the adders with the five position valve or switch for inputting the binary number representing displacement per stand or joint and, also shows the numeric readout display panel for the displacement number calculated.
The following description of an example of the invention also appears in the specification of our copending application
No. 8009139, Serial No. 1602066, which is divided from the present application.
The three pickup units labeled PU1, PU2 and PU3 are shown in Figure 1 against bell nipple 101 through which pipe 102 having a joint 103 is passing.
Each pickup unit is comprised of the components shown in Figure 2, being a bar magnet 104, coil 105 and similar bar magnet
106, with the coil interposed between the magnets. It should be noted that the magnetic poles of bar magnets 104 and 106 oppose each other, i.e., South to South. This is similar to designs used in casing collar locators for downhole tools.
Since the poles of the magnets oppose each other, the flux patterns from the two magnets intersect the coil in a perpendicular manner as shown in Figure 3. The presence of a drill pipe 102 will not upset the symmetrical pattern of the flux, therefore the output from the coil 105 will be zero volts.
As a joint 103 approaches the locator pickup unit, the increased mass of the joint attracts the flux from the upper magnet (as seen in Figure 4), causing the flux pattern of both magnets to move upward. The movement of the flux perpendicular to the
centerline of the coil 105 causes a voltage to be generated inside the coil 105. This
voltage is the signal which indicates the
presence of a pipe joint.
As a joint moves downhole, through the bell nipple 101, it will trip pickup #1, then
pickup #2, then pickup #3, in that order. If
the joint is coming out of the hole, the
pickups will be tripped in the reverse order
In Figure 1 a block diagram is shown of the overall system wherein the three pickup units actuate respectively solenoid valves 107, 108 and 109. The electrical signals generated in the pickup coils 105 are transferred to solenoid valves 107, 108 and 109, serving to open these valves in sequence.
The system will be explained as employing pneumatic components, but their equivalents in electrical circuits can be substituted to make an all electric control system.
The signals from solenoid valves 107, 108 and 109 are processed in add-subtract logic counters (block 110) which includes reset button 111. Block 110 includes both the joint counter and stand counter of Figure 5.
The input triggering signals to the adder circuits are the negative counts to the stand counter, which appear on lead 112 and trip the appropriate stages 113--117 of the adder circuitry for display of the displacement number on readout panel 118.
Five position valve or switch 27 puts in the correct binary number into adder stages 116 and 117 in accordance with the displacement per stand for five different pipe sizes. This binary number is added for each negative stand trigger count, such that readout panel 118 indicates the actual mud displacement at any given time.
The logic diagram shown in Figure 5 indicates the pickups actuating the three solenoid operated air valves, and the rest of the logic is pneumatic. The basic logic would be the same if the system were entirely electric, however.
As a joint moves downhole, it trips pickup #1 first. This causes an output from valve #1. Look first at the upper circuit which is the add portion. Valve #1 triggers flip-flop 1 and its signal also goes through OR gate 4 to insure that flip-flop 3 is turned off. The output of flip-flop 1 goes to AND gate 2.
When valve #2 fires, its output goes to
AND gate 2 and turns on flip-flop 3, which sends a signal to AND gate 5.
When valve #3 fires, its output turns off flip-flop I and also goes to AND gate 5. The output from AND gate 5 is a pulse which is used to add one joint on the joint counter
II. The output from gate 5 also goes through OR gate 4 to turn flip-flop 3 off.
Now looking at the lower position of the counter diagram as the joint goes downhole, this portion is the subtract circuit.
Valve #I fires first, turning off flip-flop 10, and also sending a signal to AND gate 6.
Since there is no signal from flip-flop 8, there is no output from gate 6. When valve #2 fires, it sends a signal to AND gate 9, but since there is no output from flip-flop 10, gate 9 has no output, thus flip-flop 8 still has no output. When valve #3 fires, it turns on flip-flop 10, and its output also goes through
OR gate 7 to keep flip-flop 8 turned off. Thus, there is never a signal out of ANL) gate 6.
The output from gate 6 is the signal to subtract a joint from the joint counter.
Therefore, as a joint moves downhole, there is a pulse out of the add circuit, and no pulse out of the subtract circuit. Since the add and subtract circuits are identical, but inverted, when ajoint comes out of the hole, the subtract circuit sends a pulse to joint counter 11.
The joint counter is a count up and down counter, thus it will keep accurate count of the joints in the hole at all times.
The add and subtract pulses are also fed into a binary counter consisting of two binary counter modules 22 and 26.
These modules are connected by means of AND gates 23 and 25, and OR gate 24.
This allows the binary counter to count both up and down. The outputs of the two modules connect to AND gates 18, 19 and 20. The outputs of these gates represent the counts 1, 2 and 3 respectively.
The counter will be set at zero by pressing the reset push button 17. Thus, the counter will always start at zero.
If the drill pipe is going into the hole, there will be an add pulse into the binary counter each time a joint passes the joint locator. The first pulse will cause an output from AND gate 18. The third pulse will cause an output from AND gate 20.
The outputs from these gates go to the ports. of a 3 position, two way valve or switch 12. The switch has three inputs for a positive count, and three inputs for a negative count.
This switch is set to indicate the number of joints per stand. Assume there are three joints per stand, then the switch will be set as shown in the diagram.
After the third joint has passed the joint locator, there will be an output from AND gate 20. This output will go through switch 12, since it is set on three joints per stand, pass through AND gate 14, and register a count on the stand counter 15. The signal will also go through OR gate 16 and reset the binary counters to zero. Thus, the stand counter will register a count every third joint.
The same logic subtracts a count from the stand counter when three joints have been removed from the hole.
The last part of the system consists of the circuit of Figures 6 and 7 for displaying how much mud must be pumped into the hole as drill pipe is withdrawn when stripping the hole.
A five position valve or switch 27 is used to set a binary number into the adder system. Each position will represent the displacement per stand or per joint of a particular size and weight drill pipe.
By use of the OR gates 28, 29 and 30, the proper binary number will be set into the adders. When the stand counter is pulsed, it will actuate the transfer flip-flops. This will transfer the number from the adders to the flip-flops.
The outputs from the flip-flops go to a seven bar encoder, which encodes the number and displays the number on the numeric readouts.
The outputs from the flip-flops are also fed back into the adders, to be added to the original binary number set into the adders by the switch 27.
Thus, the original number set into the adders, which represents the displacement per stand, will be added to the total each time a stand is removed from the hole. This number will be displayed numerically on the face of the panel, and will represent the total volume of mud which should have been pumped into the hole at any given time.
This number can be compared to the actual mud pumped, or can be used to actuate an automatic fill up system.
By adding additional binary adders to the circuit, and having them triggered by the positive stand count rather than the negative count, the system can be made to calculate and display the volume of mud which should be displaced from the hole when the drill pipe is going into the hole.
If binary subtracters were added to the original system, and pulsed by the positive stand count, the system would accurately display the total mud required for the hole at all times, whether going in or coming out of the hole.
WHAT WE CLAIM IS:
1. Apparatus for counting pipe joints either going downhole or coming uphole through a drill hole bell nipple, the apparatus comprising in combination: a) a plurality of sensor means at spaced apart positions along and externally of said bell nipple for sensing the passage of pipe joints going downhole and coming uphole past said sensor means,
b) logical means in circuit with and triggered by signals from said sensor means for logically determining the direction of pipe joint travel to develop plus signal counts for downhole going joints and minus signal counts for uphole coming joints,
c) joint counter means in circuit with said logical means,
d) means in circuit with said logical means for adding a count to said joint counter means in response to said plus signal count each time a joint is sensed going downhole,
e) means in circuit with said logical means for subtracting a count from said joint counter means in response to said minus signal count each time a joint is sensed coming uphole, and
f) stand counter means in circuit with said logical means for converting the joint count in said joint counter means to a stand count using said plus and minus signal counts.
2. The apparatus of claim I wherein the logical means comprises:- a) means including solenoid valves respectively actuating said valves upon the sensing of a passing joint to develop pulses;
b) means including an adding circuit consisting of flips-flops, AND, and OR components to produce the downhole signal: and
c) means including a subtracting circuit which is the same as the adding circuit except inverted to produce the uphole signals.
3. The method of counting pipe joints either going downhole or coming uphole through a drill hole bell nipple, the method comprising in combination: a) sensing at spaced apart positions along and externally of said bell nipple the passage of pipe joints going downhole and coming uphole;
b) logically determining the direction of pipe joint travel by means in circuit with and triggered by signals representative of the sensed passage of pipe joints to develop plus signal counts for downhole going joints and minus signal counts for uphole coming joints;
c) adding a count to a joint count in response to said plus signal count each time a joint is sensed going downhole: :
d) subtracting a count from said joint count in response to said minus signal count each time a joint is sensed coming uphole, and
e) converting the joint count to a stand count using said plus and minus signal counts.
4. Apparatus for counting pipe joints
substantially as hereinbefore described with
reference to and as illustrated in the
accompanying drawings.
5. A method of counting pipe joints substantially as hereinbefore described with reference to and as illustrated in the accompanying drawings.
6. A method of calculating mud
displacement substantially as hereinbefore
**WARNING** end of DESC field may overlap start of CLMS **.
Claims (7)
1. Apparatus for counting pipe joints either going downhole or coming uphole through a drill hole bell nipple, the apparatus comprising in combination: a) a plurality of sensor means at spaced apart positions along and externally of said bell nipple for sensing the passage of pipe joints going downhole and coming uphole past said sensor means,
b) logical means in circuit with and triggered by signals from said sensor means for logically determining the direction of pipe joint travel to develop plus signal counts for downhole going joints and minus signal counts for uphole coming joints,
c) joint counter means in circuit with said logical means,
d) means in circuit with said logical means for adding a count to said joint counter means in response to said plus signal count each time a joint is sensed going downhole,
e) means in circuit with said logical means for subtracting a count from said joint counter means in response to said minus signal count each time a joint is sensed coming uphole, and
f) stand counter means in circuit with said logical means for converting the joint count in said joint counter means to a stand count using said plus and minus signal counts.
2. The apparatus of claim I wherein the logical means comprises:- a) means including solenoid valves respectively actuating said valves upon the sensing of a passing joint to develop pulses;
b) means including an adding circuit consisting of flips-flops, AND, and OR components to produce the downhole signal: and
c) means including a subtracting circuit which is the same as the adding circuit except inverted to produce the uphole signals.
3. The method of counting pipe joints either going downhole or coming uphole through a drill hole bell nipple, the method comprising in combination: a) sensing at spaced apart positions along and externally of said bell nipple the passage of pipe joints going downhole and coming uphole;
b) logically determining the direction of pipe joint travel by means in circuit with and triggered by signals representative of the sensed passage of pipe joints to develop plus signal counts for downhole going joints and minus signal counts for uphole coming joints;
c) adding a count to a joint count in response to said plus signal count each time a joint is sensed going downhole: :
d) subtracting a count from said joint count in response to said minus signal count each time a joint is sensed coming uphole, and
e) converting the joint count to a stand count using said plus and minus signal counts.
4. Apparatus for counting pipe joints
substantially as hereinbefore described with
reference to and as illustrated in the
accompanying drawings.
5. A method of counting pipe joints substantially as hereinbefore described with reference to and as illustrated in the accompanying drawings.
6. A method of calculating mud
displacement substantially as hereinbefore
described with reference to and as illustrated in the accompanying drawings.
7. Apparatus for calculating mud displacement substantially as hereinbefore described with reference to and as illustrated in the accompanying drawings.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB9139/80A GB1602066A (en) | 1978-05-16 | 1978-05-16 | Method and apparatus for calculating the quantity of mud required to replace the pipe displacement volume when removing a pipe having joints from a drill hole bell nipple |
GB19908/78A GB1602065A (en) | 1978-05-16 | 1978-05-16 | Method and apparatus for counting pipe joints |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB19908/78A GB1602065A (en) | 1978-05-16 | 1978-05-16 | Method and apparatus for counting pipe joints |
Publications (1)
Publication Number | Publication Date |
---|---|
GB1602065A true GB1602065A (en) | 1981-11-04 |
Family
ID=10137145
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB19908/78A Expired GB1602065A (en) | 1978-05-16 | 1978-05-16 | Method and apparatus for counting pipe joints |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB1602065A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2126348A (en) * | 1982-07-08 | 1984-03-21 | Duerrwaechter E Dr Doduco | Magnetic sensor |
FR2562147A1 (en) * | 1984-03-30 | 1985-10-04 | Nl Industries Inc | METHOD OF OPTIMIZING THE MANEUVER SPEED OF A DRILL ROD TRAIN |
EP0412535A1 (en) * | 1989-08-09 | 1991-02-13 | Michael L. Smith | Tubing collar position sensing apparatus, and associated methods, for use with a snubbing unit |
GB2306657A (en) * | 1995-10-18 | 1997-05-07 | Tuijl Bert Van | Wellhead tool detector |
GB2315866A (en) * | 1996-08-01 | 1998-02-11 | Radiodetection Ltd | Position detection |
GB2383418A (en) * | 2001-12-20 | 2003-06-25 | Antech Ltd | Non-invasive detector for wells |
GB2390906A (en) * | 2002-04-16 | 2004-01-21 | Thomas Energy Services Inc | Identification of ferrous changes in piping deployed in a wellbore |
WO2004065754A1 (en) * | 2003-01-21 | 2004-08-05 | Key Energy Services, Inc. | Inventory counter for oil and gas wells |
-
1978
- 1978-05-16 GB GB19908/78A patent/GB1602065A/en not_active Expired
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2126348A (en) * | 1982-07-08 | 1984-03-21 | Duerrwaechter E Dr Doduco | Magnetic sensor |
FR2562147A1 (en) * | 1984-03-30 | 1985-10-04 | Nl Industries Inc | METHOD OF OPTIMIZING THE MANEUVER SPEED OF A DRILL ROD TRAIN |
EP0412535A1 (en) * | 1989-08-09 | 1991-02-13 | Michael L. Smith | Tubing collar position sensing apparatus, and associated methods, for use with a snubbing unit |
GB2306657B (en) * | 1995-10-18 | 1999-10-27 | Tuijl Bert Van | A detector |
GB2306657A (en) * | 1995-10-18 | 1997-05-07 | Tuijl Bert Van | Wellhead tool detector |
GB2315866B (en) * | 1996-08-01 | 2001-01-10 | Radiodetection Ltd | Position detection |
GB2315866A (en) * | 1996-08-01 | 1998-02-11 | Radiodetection Ltd | Position detection |
GB2383418A (en) * | 2001-12-20 | 2003-06-25 | Antech Ltd | Non-invasive detector for wells |
US6762601B2 (en) | 2001-12-20 | 2004-07-13 | Antech Limited | Non-invasive detectors for wells |
GB2383418B (en) * | 2001-12-20 | 2005-09-14 | Antech Ltd | Non-invasive detectors for wells |
GB2390906A (en) * | 2002-04-16 | 2004-01-21 | Thomas Energy Services Inc | Identification of ferrous changes in piping deployed in a wellbore |
US6720764B2 (en) | 2002-04-16 | 2004-04-13 | Thomas Energy Services Inc. | Magnetic sensor system useful for detecting tool joints in a downhold tubing string |
GB2390906B (en) * | 2002-04-16 | 2006-03-08 | Thomas Energy Services Inc | Magnetic sensor system useful for detecting tool joints in a downhole tubing string |
WO2004065754A1 (en) * | 2003-01-21 | 2004-08-05 | Key Energy Services, Inc. | Inventory counter for oil and gas wells |
US7221155B2 (en) | 2003-01-21 | 2007-05-22 | Key Energy Services, Inc. | Inventory counter for oil and gas wells |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4110688A (en) | Method and apparatus for pipe joint locator, counter and displacement calculator | |
CN100468059C (en) | Position detector | |
US4654590A (en) | Method and apparatus for detecting the position of a movable object utilizing the magnetostrictive effect to generate ultrasonic waves | |
GB1602065A (en) | Method and apparatus for counting pipe joints | |
FR2410719A1 (en) | MAGNETIC LOCK | |
GB1582748A (en) | Code identification apparatus | |
Silva et al. | Implications of the possibility that sin 2 β is small | |
GB1602066A (en) | Method and apparatus for calculating the quantity of mud required to replace the pipe displacement volume when removing a pipe having joints from a drill hole bell nipple | |
CA1121460A (en) | Method and apparatus for pipe joint locator, counter and displacement calculator | |
GB2340245A (en) | Control and/ or tracking of a pipeline crawler | |
US3780579A (en) | Digital integrating flowmeter | |
US4130791A (en) | Automatic pipe depth locator | |
US3733472A (en) | Apparatus for the automatic detection of counting errors in a displacement measuring system by encoding and counting | |
US4965040A (en) | Maximum/minimum asymmetric rod detection | |
DE19920393A1 (en) | Arrangement for determining a volume of a gas stream | |
JP2016008960A (en) | Nondestructive inspection method and nondestructive inspection device | |
US3007109A (en) | Apparatus for detecting casing joints | |
JP3021221B2 (en) | Moving object detection method and apparatus | |
JPS5550181A (en) | Device for inspecting arrangement of reinforcing iron bars in building | |
SU1037298A1 (en) | Device for reading graphic data | |
JP2705806B2 (en) | Train presence / absence determination device using wheel counter | |
SU792083A1 (en) | Apparatus for determining weigh netto of moving object | |
SU1259202A2 (en) | Electric prospecting using phase method | |
SU984531A1 (en) | Apparatus for detecting welded seams | |
DE4215184C2 (en) | Methods and devices for the detection of residual currents |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PS | Patent sealed [section 19, patents act 1949] | ||
PCNP | Patent ceased through non-payment of renewal fee |